Professional Documents
Culture Documents
Presupuesto
MAESTRANZA
Subpresupuesto
MAESTRANZA
Cliente
Lugar
Costo al
Und.
13/03/2008
Item
Descripcin
01
OBRAS PRELIMINARES
Parcial S/.
01.01
m2
546.00
0.41
223.86
01.02
Caseta de guardiana
m2
2.30
103.86
238.88
02
TRABAJOS PRELIMINARES
02.01
03
MOVIMIENTO DE TIERRAS
03.01
03.02
462.74
305.76
m2
546.00
0.56
305.76
2,127.19
m3
7.10
12.43
88.25
m3
9.30
4.67
m3
9.30
12.78
43.43
03.03
118.85
03.04
m2
546.00
2.64
1,441.44
03.05
m3
41.02
10.61
435.22
04
04.01
SOLADOS
04.01.01
04.02
CIMIENTOS CORRIDOS
04.02.01
1,359.06
220.15
m3
1.20
183.46
220.15
600.48
m3
3.60
166.80
600.48
04.03
SOBRECIMIENTOS
538.43
04.03.01
04.03.02
m2
12.00
19.66
235.92
m3
1.80
168.06
302.51
05
2,960.25
05.01
ZAPATAS
05.01.01
m3
1.10
266.51
293.16
05.01.02
kg
3.10
3.31
10.26
05.02
COLUMNAS
05.02.01
m3
2.00
305.57
611.14
05.02.02
m2
20.70
23.87
494.11
05.02.03
kg
111.40
3.31
368.73
05.03
VIGAS
05.03.01
m3
2.00
287.71
575.42
05.03.02
m2
10.00
23.87
238.70
05.03.03
kg
111.40
3.31
368.73
06
ESTRUCTURAS DE MADERA
06.01
pza
16.00
271.59
4,345.44
06.02
98.00
4.05
396.90
07
COBERTURA
303.42
1,473.98
1,182.85
4,742.34
2,325.60
PRESUPUESTO
Presupuesto
MAESTRANZA
Subpresupuesto
MAESTRANZA
Cliente
Lugar
Costo al
Item
Descripcin
Und.
07.01
m2
08
08.01
38.76
13/03/2008
Parcial S/.
2,325.60
5,458.36
m2
92.00
59.33
5,458.36
09
4,865.18
09.01
m2
184.00
12.13
2,231.92
09.02
m2
104.00
11.27
1,172.08
09.03
m2
52.00
11.27
586.04
09.04
m2
16.80
20.12
m2
10.00
20.12
52.00
6.46
338.02
09.05
201.20
09.06
335.92
10
CIELORRASO
1,033.76
10.01
11
PISOS Y PAVIMENTOS
2,502.76
11.01
FALSO PISO
1,257.88
11.01.01
52.00
m2
19.88
52.00
1,033.76
24.19
1,257.88
11.02
CONTRAPISO
1,244.88
11.02.01
Contrapiso de 48 mm
12
CARPINTERIA DE MADERA
791.02
12.01
PUERTAS
621.28
12.01.01
12.02
VENTANA
12.02.01
13
CARPINTERIA METALICA
5,800.12
13.01
DIVISIONES METALICAS
5,800.12
13.01.01
142.86
5,800.12
14
CERRAJERIA
14.01
BISAGRAS
14.01.01
14.02
CERRADURAS
14.02.01
m2
m2
52.00
4.00
23.94
155.32
1,244.88
621.28
169.74
m2
2.00
84.87
m2
169.74
40.60
340.00
61.10
pza
10.00
6.11
61.10
278.90
5.00
55.78
278.90
15
89.54
PRESUPUESTO
Presupuesto
MAESTRANZA
Subpresupuesto
MAESTRANZA
Cliente
Lugar
Costo al
13/03/2008
Item
Descripcin
Und.
15.01
p2
22.00
4.07
Parcial S/.
16
PINTURA
16.01
m2
52.00
4.83
251.16
16.02
m2
104.00
3.94
409.76
16.03
m2
52.00
5.22
271.44
16.04
m2
16.80
3.94
66.19
16.05
m2
10.00
4.83
48.30
16.06
17.10
5.03
86.01
16.07
m2
6.00
4.84
89.54
1,161.90
29.04
17
351.04
17.01
INODOROS
282.66
17.01.01
17.02
LAVATORIOS
17.02.01
18
INSTALACION SANITARIA
883.88
18.01
SISTEMA DE DESAGUE
727.27
18.01.01
Salida de desage
pto
18.01.02
18.01.03
pza
2.00
141.33
282.66
68.38
pza
1.00
68.38
68.38
5.00
22.38
111.90
10.00
6.39
63.90
12.00
7.72
92.64
18.01.04
10.00
21.46
214.60
18.01.05
pza
2.00
10.88
21.76
18.01.06
pza
1.00
9.29
9.29
18.01.07
pza
2.00
10.17
20.34
18.01.08
pza
5.00
10.17
50.85
18.01.09
pza
2.00
8.07
16.14
18.01.10
pza
2.00
10.38
20.76
18.01.11
pza
2.00
8.88
17.76
18.01.12
pza
2.00
8.07
16.14
18.01.13
pza
1.00
12.35
12.35
18.01.14
pza
1.00
58.84
58.84
18.02
18.02.01
pto
18.02.02
18.02.03
18.02.04
156.61
2.00
6.70
13.40
15.00
4.43
66.45
und
2.00
5.47
10.94
und
2.00
5.65
11.30
18.02.05
und
1.00
26.24
26.24
18.02.06
pza
1.00
28.28
28.28
19
INSTALACIONES ELECTRICAS
2,003.37
PRESUPUESTO
Presupuesto
MAESTRANZA
Subpresupuesto
MAESTRANZA
Cliente
Lugar
Costo al
Item
Descripcin
19.01
SALIDA DE INSTALACIONES
19.01.01
pto
6.00
28.70
172.20
19.01.02
pto
4.00
17.91
71.64
19.01.03
pto
10.00
41.72
417.20
19.02
19.02.01
pza
1.00
332.43
332.43
19.02.02
Caja de paso
pza
2.00
9.96
19.92
19.03
ARTEFACTOS
19.03.01
79.93
799.30
19.04
19.04.01
Und.
13/03/2008
Parcial S/.
661.04
352.35
799.30
jgo
10.00
190.68
1.00
190.68
190.68
39,563.87