Professional Documents
Culture Documents
300
C=
20
fctd = 0.21*((fck)^0.67)/1.5=
Allowable punching resistance of
concrete, Vup(KPa)
fcd=0.85*fck/1.5
9.07
0.90
= 0.5fctd(1+50*rho)
260.87
672.90
336.45
200
= 0.25fctd(1+50*rho)
3.00
18.00
0.30
Footing Group
F1
229.00
1.50
2.25
Depth, D (m)
0.25
1.50
= D - 0.05
0.20
=1.3*Af*d*gs
18.28
= 1.3*Af*(fd-D)*gs
144.79
= Ps+Wc+Ws
392.07
= PT/A
174.25
=Ps*(1-((a+d)/L)^2)
203.56
= Vp/(4(a+d)*d)
508.89
= Ps/Af(L/2-d-a/2)
40.71
203.56
18.32
0.051
1 -(1 - 2*N)^0.5
0.052
As
B*fcd*b*d/fyd
360.48
0.5/fyk*b*d
333.33
12.00
113.14
Asig*1000/As
313.87
Asig*1000/Asmin
339.43
Asmin
Asing (3.14*d^2/4)
Spacing for As
Spacing for Asmin
Final
174.25
300
C=
25
fctd = 0.21*((fck)^0.67)/1.5=
Allowable punching resistance of
concrete, Vup(KPa)
Allowable bearing pressure, s
(KPa)
Allowable wide beam shear
resistance of concrete, vud
(KN/m2)
1.04
= 0.5fctd(1+50*rho)
200
= 0.25fctd(1+50*rho)
1.50
18.00
0.30
Footing Group
F2
390.00
1.60
2.56
Depth, D (m)
0.30
= D - 0.05
=1.3*Af*d*gs
= 1.3*Af*(fd-D)*gs
= Ps+Wc+Ws
= PT/A
=Ps*(1-((a+d)/L)^2)
= Ps/Af(L/2-d-a/2)
2
Wide beam Shear stress Vuw(KN/m=
) Vw/(b*d)
= (Ps/Af)*((La)/2)^2*0.5
=
(Md*10E+6/fcd*b*d^2
)
1 -(1 - 2*N)^0.5
As
B*fcd*b*d/fyd
Asmin
Asing (3.14*d^2/4)
Spacing for As
Spacing for Asmin
Final
0.5/fyk*b*d
14.00
Asig*1000/As
Asig*1000/Asmin
use 714 c/c 300
260.87
fcd=0.85*fck/1.5
11.33
781.41
390.71
0.25
24.96
71.88
486.84
190.17
343.92
625.30
60.94
1.60
190.17
243.75
32.18
0.045
0.047
505.22
416.67
154.00
304.82
369.60
300
C=
25
fctd = 0.21*((fck)^0.67)/1.5=
Allowable punching resistance of
concrete, Vup(KPa)
Allowable bearing pressure, s
(KPa)
Allowable wide beam shear
resistance of concrete, vud
(KN/m2)
Foundation depth, fd (m)
Unit weight of soil, gs (KN/m3)
Column width, a (m)
Footing Group
Super-structural load, Ps (KN)
260.87
fcd=0.85*fck/1.5
11.33
1.04
= 0.5fctd(1+50*rho)
781.41
390.71
200
= 0.25fctd(1+50*rho)
1.50
18.00
0.30
F3
310.00
1.40
1.96
Depth, D (m)
0.25
1.40
= D - 0.05
0.20
=1.3*Af*d*gs
15.93
= 1.3*Af*(fd-D)*gs
57.33
= Ps+Wc+Ws
383.26
= PT/A
195.54
=Ps*(1-((a+d)/L)^2)
270.46
676.15
55.36
276.79
23.92
0.053
= Ps/Af(L/2-d-a/2)
2
Wide beam Shear stress Vuw(KN/m=
) Vw/(b*d)
= (Ps/Af)*((La)/2)^2*0.5
=
(Md*10E+6/fcd*b*d^2
)
1 -(1 - 2*N)^0.5
0.054
As
Asmin
Asing (3.14*d^2/4)
Spacing for As
Spacing for Asmin
Final
B*fcd*b*d/fyd
471.29
0.5/fyk*b*d
333.33
14.00
154.00
Asig*1000/As
326.76
Asig*1000/Asmin
462.00
use 614 c/c 300
ETHOD
195.54
300
C=
25
fctd = 0.21*((fck)^0.67)/1.5=
Allowable punching resistance of
concrete, Vup(KPa)
Allowable bearing pressure, s
(KPa)
Allowable wide beam shear
resistance of concrete, vud
(KN/m2)
Foundation depth, fd (m)
Unit weight of soil, gs (KN/m3)
Column width, a (m)
Footing Group
1.04
= 0.5fctd(1+50*rho)
200
= 0.25fctd(1+50*rho)
1.50
18.00
0.30
F4
210.00
1.20
1.44
Depth, D (m)
0.20
= D - 0.05
=1.3*Af*d*gs
= 1.3*Af*(fd-D)*gs
= Ps+Wc+Ws
= PT/A
=Ps*(1-((a+d)/L)^2)
= Ps/Af(L/2-d-a/2)
2
Wide beam Shear stress Vuw(KN/m=
) Vw/(b*d)
= (Ps/Af)*((La)/2)^2*0.5
=
(Md*10E+6/fcd*b*d^
2)
1 -(1 - 2*N)^0.5
As
B*fcd*b*d/fyd
Asmin
Asing (3.14*d^2/4)
Spacing for As
Spacing for Asmin
Final
0.5/fyk*b*d
14.00
Asig*1000/As
Asig*1000/Asmin
260.87
fcd=0.85*fck/1.5
11.33
781.41
390.71
0.15
9.36
43.80
1.20
263.16
182.75
180.47
668.40
43.75
291.67
14.77
0.058
0.060
388.95
250.00
154.00
395.94
616.00
182.75