General Overview
General overview
Main design difference
. . . . Combined pressure generation and injection rate shape control One complete electro-mechanical hydraulic pump system per cylinder Common rail vs. fuel is brought to high pressure at every cylinder station Single injection nozzle operation vs. no single injection nozzle
RT-flex engine
General overview
Advantages
Increased margin against water carry over Simple welded construction Easy assembly Gallery arrangement for easy cooler dismantling Cooler arrangement for easy and efficient cleaning
Stop Running
7
Suction valve
High pressure pipe Fuel pump Fuel oil inlet 8 bar Membrane accumulator
10
11
Distribution block
Fuel pump Housing
Accumulator with pipe(1000 bar) Servo oil pump Gear wheel (200bar)
Camshaft assy
Supply Unit
12
Suction valve Fuel pump plunger Hydraulic piston ELFI Proportional valve
High pressure pipe Slide Fuel valve Fuel pump Fuel oil inlet 8 bar Membrane accumulator
13
Rail valve
Common rail
14
INDEX
1. Engine reference for ME vs. RTF 2. Design comparison 1) General Overview 2) Hydraulic Cylinder Unit for ME 3) Common Rail System for RT-flex 4) Hydraulic Power Supply Unit 3. Service experience
15
-. Reason
1) Distance sleeve loosening 2) Plug / connector wear
-. Countermeasure
1) Distance sleeve : Gluing method change from thread fitting to welding 2) Plug / connector : Material change from Aluminium to steel
16
-. Reason
1) Quality check 2) Switching time 3) Magnetic properties
-. Countermeasure
1) Quality check : Function and quality check strengthened since May. 2005 2) Switching time : Introduction of small clearance (RV2 as latest design) 3) Magnetic properties : Additional specification for magnetic properties
17
-. Reason
1) Material and hardening process
-. Countermeasure
1) Material and hardening process : S45C + Induction hardening has been changed to SKD61 + Nitriding
18
Flex components Main issue 4. Rail unit Control oil pipe broken
-. Reason
1) Vibration and/or misalignment
-. Countermeasure
1) Material was changed to flexible hose
19
Flex components Main issue 5. Protective tube crack of Fuel oil HP pipe
-. Reason
1) Vibration and metal contact between pipe and pipe clamp
-. Countermeasure
1) Material of pipe clamp was changed to SPCE(DC04) with hardness
20
-. Reason
1) Incorrect charging of Nitrogen 2) Incorrect type of screw and improper tightening
-. Countermeasure
1) Reducing the charging pressure (From 104Bar to 95Bar at 20 Deg) 2) Replace all screw with 8.8 screw and tightening procedure.
21
-. Reason
1) Poor quality of minimess valve
-. Countermeasure
1) Replaced all minimess valve with improved one
22
Steel shim
-. Reason
1) Abnormal movement of spring 2) Poor workmanship for assembly
-. Countermeasure
1) Installed steel shims 2) Replace O-ring
23
ME components Main issue 4. Double-wall piping; oil leak from sealing ring
-. Reason
1) Unsuccessful choice of sealing rings
-. Countermeasure
1) New type of sealing rings introduced on engine size 80 bore and up
24
-. Reason
1) Sensor damaged due to hydraulic pressure
-. Countermeasure
1) New sensor design with reinforced sensor head introduced
25
26