REGION 9 I. LIST OF ADs/ALs WITH COMPLETED SURVEY as of APRIL 30, 2011 Region LOCATION CADC No.

/ Process Claimant Tribe/Clan

IX

Bobeyawas,Lamitan,Basilan

Yakan

IX

Lintangan, Sibuco, Zamboanga City

CADC 119

Subanon

IX

Anongan, Sibuco, Zamboanga City New App Kolibugan 3 AD Total II. LIST OF ADs/ALs AREAS WITH ON GOING SURVEYS & READY FOR SURVEY as of APRIL 30, 2011 Region AD Location CADC No./ Tribe/Claiman Process ts

IX

Lapuyan, Zamboanga del Sur

AO1

Subanen

IX

Midsalip, Zam del Sur

New App

Subanen

2 ADs
IX XI 1 2 Sumisip, Basilan Kiblawan,Davao Del Sur CADC 103 Yakan B'laan

2 Ads
as of APRIL 30, 2011 Region AD Location CADC No./ Process

TOTAL

III. LIST OF ADs/ALs AREAS UNDERGOING SOCIAL PREPARATION/

Tribe/Clan

IX

Titay, Zamboanga Sibugay 1 ADs; Dimataling, Zamboanga del Sur Kabasalan, Zamboanga Sibugay Siayan,Zamboanga Del Norte 4 AD Areas;

CADC 104 Kalibugan (SUB-TOTAL ) New App New App SUB-TOTAL TOTAL Subanen Subanen Subanen

IX IX IX

2 3 4

12 AD Areas;

SUMMARY Nos. CADT AREA

NO. OF APPROVED CADTs AND CALTs NO. OF REGISTERED CADTs AND CALTs

11 4

143,109.6122 35,514.7815 107,594.8322 319,056.0000

NO. OF ON-PROCESS FOR REGISTRATION 7 NO. OF 0N-PROCESS FOR APPROVAL 12

(AREA (in Hectares) ) Project Cost

Counterparts NCIP Agency/ies

19,437.00

893,200.00

893,200.00

20,000.00 19437

893,200.00 893200

893,200.00 893200

RVEY AREA (Hectares) Project Cost Counterparts NCIP Agency/ies

85,514.00

1,070,270.25

1,070,270.25

23,000.00 147,951.0000 2,000.00 55,000.00 57,000.00

776,876.00 3,633,546.25 499,548.00 1,456,600.00 1,956,148.00

590,526.00 3,447,196.25 499,548.00 1,456,600.00 1,956,148.00

186,350.00 186,350.00

Area (has)

Project Cost

Counterparts NCIP Agency/ies

4,868.00 4,868.00 15,000.00 24,800.00 45,000.00 89,800.00 319,056.00

562,996.00 562,996.00 1,799,681.00 1,227,923.00 1,698,435.00

562,996.00 562,996.00 671,440.00 741,815.00 998,435.00

0.00 0.00 1,128,241.00 486,108.00 700,000.00 2,314,349.00 2,500,699.00

5,232,776.00 2,918,427.00 12,278,666.25 9,777,967.25

CADT (Right Holders )

41,760 14,772 26,988

Partner Agencies

Remarks/Status Survey Returns Being Prepared: Preparation of SR. Extension of WO issued on 9/17/10 as per request of RO on 9/14/10.WO issued 3/16/10 to Engr. Jocutan Survey Returns Being Prepared: Preparation of SR. WO issued to conduct Perimeter Survey Survey Returns Being Prepared: Preparation of SR. WO no. 01-05-2010 issued to Engrs. Jocutan and Dulagan on 1/21/10 to conduct Perimeter Survey

Partner Agencies

(IPEX-ANTHRO ) -

Survey on going: With SPAR Status /Remarks on 8/3/10 endorsed by RO on 8/26/10.WO issued to Engr. Obial. Memo sent on 9/18/09 for the submission of the revised WFP (summary/breakdown) & physical matrix Survey on going: Establishment of Project Ready for survey: With SPAR Controls ongoing dated 10/20/10. Endorsed by RD on 10/28/10. WO issued to Engr. Padrique on 11/19/10. Ready 2010) Memo sent on (PDAD for survey: For issuancefor submission of 11/8/10 of work order resolutions.Social preparation stage

Partner Agencies

Status /Remarks

survey suspended: due to oppositions;

(PBS, MAGI )

Social Preparation Stage

(PLGU-ZS thru PIPOZSI ) Social Preparation Stage (KASAPI )

REGION 10 I. LIST OF ADs/ALs WITH COMPLETED SURVEY as of APRIL 30, 2011 Region LOCATION CADC No./ Process Claimant Tribe/Clan

Kimambong, Sumpong, Malaybalay City, Bukidnon (CALT) Basak and Lantud, Talakag, Bukidnon

New App.

Salagia Clan

New App

Higa-onon Heirs of Apo Bartolome Ayoc (BukidnonHigaonon)

Guinawahan, Bontongan, Impasug-ong, Bukidnon (CALT) New App

Buayan, San Jose, Quezon, Bukidnon

New App

Manobo

Brgy. San Miguel, Municipality of Maramag, Province of Bukidnon New App 3 ADs; 2 ALs

Manobo Total

Brgys. Hindangon & Bal-ason, Gingoog City, Prov. Of Misamis Oriental an New App Higa-onon

Rogongon, Panoruganan,Kalilangan & Mainit Iligan City, Lanao del Norte. (Ads-1002-0017-Gni)

New App

Higa-onon /Kalambugan

2 Ads

Total

II. LIST OF ADs/ALs AREAS WITH ON GOING SURVEYS & READY FOR SURVEY as of APRIL 30, 2011 Region AD Location CADC No./ Tribe/Claiman Process ts Subanen

X X X X

1 1 2 3

Namut, Tudela, Misamis Occidental 089 CADC

Brgy. Mahayay and Upper Malubog, Mun. Of Manticao and Brgys. Limun New App Higa-onon (DULANGAN) Lubilan, Naawan, Misamis Oriental App New Central Mindanao University (CMU), Musuan, Maramag, Bukidnon New Applic. Palabukan (Tagiptip),Libona, Bukidnon & Brgy. Cugman (Malasag), and Agusan, Cag de Oro City AO1 Higa-onon Higa-onon

Higa-onon

4 Ads
III. LIST OF ADs/ALs AREAS UNDERGOING SOCIAL PREPARATION/ as of APRIL 30, 2011 Region X X X 1 2 3 4 X X X X 5 6 7 8 X 17 AD Areas; 3 AL Areas AD Location CADC No./ Process

TOTAL

Tribe/Clan

Balungkot, Dansolihon, Cagayan de Oro, Misamis Oriental. New App Higa-onon Kimambong, Sumpong, New App Malaybalay City (CALT) Datu Luminton Portion of Sagay, Catarman, CADC 172 Kamigin Mambajao, Camiguin Portions of Cabanglasan, San New App Fernando, Impasug-ong and Malaybalay, Bukidnon Higaonon Maecate, Lukalok, Baungon, Bukidnon AO1 Higa-onon Guilang-guilang,MonoloFortich (Bukidnon) Lantad,Balatukan,1st District,Misamis Or. Higaonon Dukdukaan,Kalanawan,Impalu hod,BaliguhanEurika,Gingoog City,misamis Oriental. Higaonon 7 AD Areas; 1 AL Areas SUB-TOTAL TOTAL

SUMMAR
Nos. NO. OF APPROVED CADTs AND CALTs 15 CADT AREA
247,705.7120

NO. OF REGISTERED CADTs AND CALTs

149,539.9338 98,165.7782 263,526.7000

NO. OF ON-PROCESS FOR REGISTRATION11 NO. OF ON-PROCESS FOR APPROVAL 17

(AREA (in Hectares) )

Project Cost

Counterparts NCIP Agency/ies

Partner Agencies

990.73

363,727.00

137,120.00

226,607.00

Claimant

20,000.00

Community

3,000.00

Claimant

2,000.00

376,950.00

376,950.00

Claimant

1,500.00 27,490.7300

383,355.00 1124032 137120

383,355.00 986912

Community

20,083.1755

1,036,259.00

1,011,259.00

269,115.00

IPEX-ANTHRO

60,000.00 80,083.1755

1,656,259.00 2692518

1,011,259.00 2022518

645,000.00 914115

ECOWEB,LGU,C OMM

EY AREA (Hectares) 4,539.00 28,000.00 1,022.00 6,700.00 Project Cost Counterparts NCIP Agency/ies 617,000.00 317,072.50 412,264.00 127,095.00 978,050.00 LGU,NGA,EWEB I Partner Agencies

617,000.00 1,295,122.50 412,264.00 127,095.00

11,193.54 46,915.54

543,637.00 140,887.00 2,378,118.50 997,318.50

402,750.00 1,380,800.00

Community

Area (has) 14,000.00 32.50 1,007.00

Project Cost 824,760.00 219,900.00 516,012.00

NCIP 824,760.00 75,000.00 516,012.00

Counterparts Agency/ies

Partner Agencies Claimant

144,900.00

10,000.00 20,379.00 3,103.00 50,000.00

794,325.00 657,877.00 524,466.00 1,642,045.00

794,325.00 146,327.00 524,466.00 1,642,045.00 511,550.00 Community

10,000.00 108,521.50 263,010.95

601,270.00 601,270.00 5,780,655.00 5,124,205.00 ### 8,281,161.50

656,450.00 3,938,277.00

SUMMARY
(Right Holders ) 55,210 Nos. 5 AREA 1,924.9314 Right Holders 2,106

CADT

27,540 27,670 5 3 1,924.9314 4023.2300 2,106

Remarks/Status For deliberation (for third reading): The Commission En Banc recommended for legal opinion to LAO on 1/27/10; undergone first and second reading For deliberation (for third reading): undergone 1st and 2nd reading on 9/9-10/09; For deliberation (for third reading): undergone 1st and 2nd reading on 9/910/09;however, no approved WFP, no SPAR, no SR For deliberation (for third reading): undergone 1st and 2nd reading on 01/20/10; For deliberation (for third reading): undergone 1st and 2nd reading on 01/20/10;

For 1st and 2nd reading: TD endorsed for publication on 5-1209; with LRA comments re: segregation of titled properties For 1st and 2nd reading: undergone 1st reading on 9/9-10/09; survey returns submitted to ADO for verification on 10/19/09; map forwarded to RO/PO for validation on 10/29/09

Status /Remarks On going survey: Social Preparation Stage Ready for survey: For issuance of work order Ready for survey: For issuance of work order Ready for survey: for survey; work order issued Ready for survey: WO issued on 3/9/09 to Engr. Obial;

Status /Remarks Social Preparation Stage Social Preparation Stage for social preparation stage

for social preparation stage for social preparation stage for social preparation stage for social preparation stage

for social preparation stage

REGION 11 I. LIST OF ADs/ALs WITH COMPLETED SURVEY as of APRIL 30 , 2011 Region LOCATION CADC No./ Process Claimant Tribe/Clan

XI

Samal Island, Davao del Norte Brgy. Paquibato, portion of Calinan, Marilog, Buhangin, all in Davao City, and portion of Sto. Tomas, Davao Del Norte

New App CADC 016 & 093

Sama

XI

Ata ICCs

2 Ads
XI 1 Macambol & Cabuaya, Mati, Davao OrientalNew

Total
Mandaya

XI

Molmol,Jose Abad Santos,Davao Del Sur

B'laan-Manobo

2 AD

Total

II. LIST OF ADs/ALs AREAS WITH ON GOING SURVEYS & READY FOR SURVEY as of APRIL 30, 2011 Region AD Location CADC No./ Process Tribe/Claima nts

XI XI XI

1 2 3

Kiblawan,Davao Del Sur Sta. Cruz, Davao del Sur (CALT) Guihing, Hagonoy, Davao del Sur (CALT) New App New App

B'laan Bolado-Balderas Clan Bodoy Clan

XI

Brgy. Manuel Guianga, Tugbok Dist., Brgys. Sirib & Tamayong, Calinan Dist., Brgys. Cadalian, Carmen and Tawantawan, Baguio Dist., Davao City

New App

Bagobo-Klata

2 Ads & 2 Als

TOTAL

III. LIST OF ADs/ALs AREAS UNDERGOING SOCIAL PREPARATION/ as of APRIL 30, 2011 Region IX 1 AD Location Titay, Zamboanga Sibugay CADC No./ Process CADC 104 Tribe/Clan Kalibugan

1 ADs;
XI XI 1 2

Daliaon Plantation,Tungkalan,Eden,Bayabas, Tagunano,Toni District,Davao Del Norte Banaybayan,Davao Oriental Cabidanan,Del Monte,ElSalvador,Limbaan,Mambing, Patrocinio,Sta.Fe,New Corella,Davao Del Norte

(SUB-TOTAL )
Bagobo-Tagabanwa Mandaya-Mansaka

XI

Mangngauanga

3 AD Areas; 11 AD Areas; 2 Als

SUB-TOTAL TOTAL

SUMMARY
Nos. NO. OF APPROVED CADTs AND CALTs NO. OF REGISTERED CADTs AND CALTs NO. OF ON-PROCESS FOR REGISTRATION NO. OF ON-PROCESS FOR APPROVAL 14 11
637,861.6637

CADT AREA
637,861.6637

14

219,627.8600

(AREA(in Hectares) )

Date Filed

Project Cost

Counterparts NCIP Agency/ies

Partner Agencies

2,000.00

764,000.00

87,664.6680 89,664.6680 18,000.00

9/27/2001 1,418,965.00 2182965 1,001,122.00 1,001,122.00

1,418,965.00 1418965

10,000.00 28000

577,664.00 1578786 1001122

577,664.00 577664

ADFI

EY AREA (Hectares) Date Filed Project Cost Counterparts NCIP Agency/ies Partner Agencies

55,000.00

1,456,600.00 1,456,600.00

o-Balderas Clan Claimant

7,095.19 62,095.19

871,800.00 ###

723,600.00 ###

148,200.00 148,200.00

Community

Area (has) 4,868.00 4,868.00 10,000.00 20,000.00

Date Filed

Project Cost 562,996.00 562,996.00 774,270.00 942,450.00

Counterparts 562,996.00 562,996.00 0.00 0.00

Partner Agencies

5,000.00 35,000.00 219,627.86

694,837.50 ### ### 0.00 ### 0.00 ###

MMARY
CADT (Right Holders ) 131,516 (Nos. ) 1 (CALT ) AREA 701.1459 Right Holders 1

131,516

1 2

701.1459

Remarks/Status For 1st and 2nd reading: With LRA comments on 9/14/10.Sent request to LRA copy of plan on 9/21/10.TD endorsed for publication. For projection to LRA,DENR & DAR on 7/8/10. Work order issued to Engrs. Dulagan and Dinamling to conduct Perimeter Survey revoking WO no. 1102-09 issued to Engrs. Sagario, Padrique and Ventura For 1st and 2nd reading: Sent memo to RD/PO for publication on 12/15/10.Transmitted to LRA for projection on 12/1/10.

Survey returns being prepared: Preparation of SR. WO issued on 5/15/09 to Engr. Padrique; Survey returns being prepared: With SPAR on 4/7/10, endorsed by RO on 8/24/10.WO issued to Engr. Ventura on 9/6/10.for social preparation stage

Status /Remarks Ready for survey: With SPAR dated 10/20/10. Endorsed by RD on 10/28/10. WO issued to Engr. Padrique on 11/19/10.(PDAD 2010) Memo sent on 11/8/10 for submission of resolutions.Social preparation stage Ready for survey: SWO issued on 8/3/09 to Engr. Padrique Ready for survey: Work order issued on 7/29/09 to Engr. Padrique Ready for survey: SR returned back to COP for rectification & completion of lacking requirements on 2/11/11.Memo sent re- documents for supplimental budget request on 7/6/10.WO issued on 8/14/09 to Engr. Padrique;

Status /Remarks survey suspended: due to oppositions;

for social preparation stage for social preparation stage

for social preparation stage

REGION 12 I. LIST OF ADs/ALs WITH COMPLETED SURVEY as of APRIL 30, 2011 Region LOCATION CADC No./ Process Claimant Tribe/Clan

XII

Tampat, Tinoto, Maasim, Sarangani (CALT) New Applic. Ismael Clan

XII

Pres. Roxas, Cotabato & Sanipon, Bukidnon (ADs-1201-0015-Gni) Sitios Tubak, Datal Lawa, Lambadak and Malunes of Brgy. Upper Sepaka, Surallah and Sitios Datal Bonglangon, Tawan Dagat, Segowit and Tuburan of Ned, Lake Sebu, all in South Cotabato

CADC 008,052,13 Manobo1 Kulamanen

XII

New Applic. T'boli-Ubo

XII

Brgy. Kimadzil (portion), Manili(portion), Aroman, Kibudtun Gan (portion), Upper Kilala(portion) & Sitio Takuran, Mun. of Carmen, North Cotabato. (Ads-1201-0017Gni) New

Aromanon-Manobo

XII

S'nalang, Tinoto, Maasim, Sarangani

New App

Masana Tom/ Martin Modia Cla Datu A. Lukes Talila Clan

XII

Tukananes, Cotabato City (CALT)

New App

XII

Limulan,Kalamansig,S. Kudarat

Manobo-Dulangan

4 ADs/2 ALs

Total

XII

Polomolok, South Cotabato

New App.

B'laan

1 Ad
XII 1 Datal Lamblong,Brgy. Faxima,Gen. Santos City, South Cotabato (CALT) New App Brgy. Mabuhay and Conel, General Santos, South Cotabato(CALT) New App

Total
Nei Galao Clan (Salarda)

XII

B'laan (Bagon Clan)

2 ALs

Total

II. LIST OF ADs/ALs AREAS WITH ON GOING SURVEYS & READY FOR SURVEY as of APRIL 30, 2011 Region XII XII XII XII XII XII XII XII XII 1 2 3 4 5 6 7 8 9 AD Location CADC No./ Tribe/Claimants Process B'laan (Taluna Clan) B'laan (Dawang, Dani & Gulada Clan) Tinuray

Sinawal, General Santos City (CALT) New App Brgy. Kablon, Tupi, South Cotabato (CALT) New App Salumping, Esperanza, Sultan Kudarat New App

Brgys. Magsaysay,Pisan, Bato, Arakan, Pinamaton, Tamped I, Tamped II, Tagura New App Arumanon-Manobo So. Datal Dufet, Kamanga, Maasim, Sarangani (CALT) New App So. Datal Dufet, Kamanga, Maasim, Sarangani (CALT) New App Kematu, T'boli, South Cotabato Brgy. Chua, Bagumbayan, Sultan Kudarat Sitio Libas, Kamanga, Maasim, Sarangani Renibon,Pigcawayan,North Cotabato New App CADC 139 New App

Mangelen Clan Represented by

Bonyang Clan represented by B Maguan Clan Maguindanaons Joquin Modia Clan

XII

10

Aromanen-Menuvo

XII

11

Alabel,Sarangani

Tagakaulo-B'laan

XII

12

Tinoto, Maasim, Sarangani

New App

Abdul Bali Clan

5 Ads & 7 Als

TOTAL

III. LIST OF ADs/ALs AREAS UNDERGOING SOCIAL PREPARATION/ as of APRIL 30, 2011 Region AD Location CADC No./ Process Tribe/Clan

XII

So. Lower Balnabo, Brgy. Bawing, Sos. Ulo Cabo, Ulo Supo, Brgy Tambler & So. Lower Aspang, Brgy. San Jose, Gen. Santos City (CALT) New App. Barangay Maligo, Polomolok, South Cotabato (CALT) New App Cebuano, Tupi, South Cotabato (CALT) Sitio Banwalan, Kalsangi, Polomolok, South Cotabato (CALT) Sitio Yama, Uhay & Blacol, Ned, Lake Sebu, South Cot

Aguira-Sulanting and Calatao Clans B'laan (Pandatuula Clan) B'laan (Dasan Clan) Imba Clan T'boli Tao-Mohin

XII XII XII XII

2 1 2 3

2 AL

(SUB-TOTAL )
New App New App New App TOTAL

1 AD Areas; 2 AL Areas
11 AD Areas; 16 AL Areas

SUB-TOTAL

SUMMARY
Nos. NO. OF APPROVED CADTs AND CALTs NO. OF REGISTERED CADTs AND CALTs NO. OF ON-PROCESS FOR REGISTRATION NO. OF ON-PROCESS FOR APPROVAL 14 2 12 11 CADT AREA
377,783.8433

77,777.7811 300,006.0622 138,359.6700

(AREA (in Hectares) )

Date Filed

Project Cost

Counterparts NCIP Agency/ies

375.00

334,740.00

334,740.00

18,356.8178

966,856.00

584,090.00

382,766.00

5,379.5931

###

883,785.00

228,690.00

655,095.00

485.00

198,031.00

297,175.00

om/ Martin Modia Clan

2,000.00 26,221.4109

477,782.00 2526454

401,532.00 1511487 1037861

2,507.00 2507 973.53 ###

303,723.00 303723

303,723.00 303723

2,543.00 3,516.53

373,690.80 373,690.80

210,945.00 210,945.00

162,745.00 162,745.00

VEY AREA (Hectares) 855.00 2,372.00 21,228.00 14,000.00 210.00 70.00 Date Filed Project Cost 306,967.50 778,574.00 667,700.00 846,000.00 Counterparts NCIP Agency/ies 52,500.00 244,335.00 667,700.00 580,000.00 266,000.00 254,467.50 534,239.00

3,271.00

557,844.00

75,964.00

207,844.00

1,512.26

606711

51,000.00

1,381,370.00

380.00 94,518.26

426,090.00 5,145,166.50 1,620,499.00

426,090.00 1,262,550.50

Area (has)

Date Filed

Project Cost

Counterparts NCIP Agency/ies

318,300.0000

284,235.0000

34,065.0000

300.00 300.00 498.00 103.00 19,000.00 19,601.00 147,039.20

309,277.50 627,577.50 290,200.00 268,800.00 936,547.00 1,495,547.00 10,806,898.80

109,620.00 393,855.00 106,800.00

199,657.50 233,722.50 183,400.00 268,800.00

936,547.00 1,043,347.00 5,083,856.00

452,200.00 3,483,819.00

SUMMARY
CADT (Right Holders ) 148,826 52,706 96,120 (Nos. ) 21 6 15 16 (CALT ) AREA 11,301.1223 3914.81 7,386.3135 8679.5300 Right Holders 3,335 1,796 1,539

For deliberaton for third reading: TD endorsed to RO/PO for publication; with LRA certification; Transmitted to DENR & DAR for (Claimant ) projection For 1st and 2nd reading: With LRA ceritfication on 9/14/10.Transmitted to RO/PO for projection to DENR & DAR on 8/5/10.Transmitted to LRA for projection on 1/21/10TD endorsed to RO/PO for publication on (IPEX-ANTHRO ) 10/16/09. For 1st and 2nd reading: Transmitted to RO/PO for projection to DENR & DAR on 8/4/10.Transmitted to RD/PO for publication on 07/31/09.Requested data from DENR-R12; memo sent to RO/PO R12 Re: result of LRA projection; Transmitted to LRA for projection on TRICOM 9/18/09; SR submitted to ADO on 6/16/09 For 1st and 2nd reading: TD published on 09/13/10.Request for projection to DENR & DAR submitted by RO on 9/7/10.Transmitted to RO/PO for projection to DENR & DAR on 8/4/10.Transmitted to LRA for projection.Endorsed to RO/PO for publication on 6/24/10.Survey returns submitted for verification on 6/15/10.WO issued on 4/20/09 to SCC-IPDS, comm Engr. Matias; For 1st and 2nd reading: Transmitted to LRA for re-projection on 11/18/10.With LRA comments on 10/4/10.WO issued to Engrs. Matias and Rangaban on 2/2/10 For 1st and second reading: SR returned back to COP for rectification on 11/18/10. WO issued on 9/18/09 to Engr. Matias; For 1st and 2nd reading: Transmitted to LRA for projection on2/17/11.Endorsed to RO/PO for publication on 2/8/11.For finalization of SR9/7/10.SPAR submitted 2/16/10; WO issued to Engr. Matias;4/5/10

Partner Agencies

Remarks/Status

----------

Survey Returns Being Prepared: WO issued on 11/19/10 , for the clarification/relocation survey on the identified untitled lots within or adjoining. Result of ADO projection was forwarded back to RO & PO for validation and continuation of the remaining activities described by the commission on 8/6/09.

Claimant

Pending: undergone 1st reading; for further validation of proofs by ADO Pending (with complete survey/undergone 1st reading): subject to the decision of expanded Task Force

claimant

Partner Agencies claimant claimant ---------IPEX-Anthro

Status /Remarks Ready for survey: for issuance of work order. Ready for survey: WO issued on 3/17/09 to Engr. Bayangdan for relocation survey; Ready for survey: Work Order issued for continuation of survey activities. Ready for survey: Work order issued Ready for survey: Work order issued to Engr. Bayangdan on 12/23/09 Ready for survey: WO issued to Engr. Bayangdan on 1/28/10; Ready for survey: Special WO issued to Engr. Matias to conduct Perimeter Survey

Claimant

Ready for survey: SPAR submitted 2/16/10; WO issued to Engr. Matias;4/5/10 Ready for survey: WO issued to Engr. Bayangdan on 2/22/10 to conduct Perimeter Survey Ready for survey: For perimeter survey9/7/10.SPAR submitted on 8/12/10.WO issued to Engr. Matias on 8/20/10.social preparation stage Ready for survey: With SPAR dated 8/15/10. Endorsed by RD on 10/8/10. WO issued to Engr. Matias on 11/19 10.For submission of SPAR 9/7/10

Claimant

Ready for survey: SPAR submitted 6/30/09,endorsed by RD on 12/8/09;

Partner Agencies

Status /Remarks Survey suspended: Memo sent to R12 on 7/09/09 follow up status; survey activities suspended; WO issued on 6/13/08 to Engr. Matias; request for survey on 5/5/08 Survey suspended: Social Preparation completed; Did not pursue perimeter survey because the claim is within titled property Social Preparation stage Social Preparation stage social preparation stage

(Claimant )

claimant claimant claimant

REGION 13 I. LIST OF ADs/ALs WITH COMPLETED SURVEY as of APRIL 30, 2011 Region LOCATION CADC No./ Process Claimant Tribe/Clan

XIII

Trento, Agusan del Sur

New App

Manobo

1 ad

Total

II. LIST OF ADs/ALs AREAS WITH ON GOING SURVEYS & READY FOR SURVEY as of APRIL 30, 2011 Region AD Location San Francisco, Malimono & Sison, Surigao del Norte CADC No./ Tribe/Claima Process nts

XIII

New App

Mamanwa

1 Ads & 0 Als

TOTAL

III. LIST OF ADs/ALs AREAS UNDERGOING SOCIAL PREPARATION/ as of APRIL 30, 2011 Region AD Location Esperanza, Agusan del Sur Brgy. Lydia Lapaz, Agusan del Sur CADC No./ Process CADC 154 Tribe/Clan Higa-onon & Banwa-on

XIII

XIII XIII XIII

2 3 4

CADC 176

Manobo

Esperansa,Agusan Del Sur Direct App. Higa-onon & Banwa-on Ambago,Butuan City,Agusan Del Sur Carascal,Cantilan,Mad rid,Carmen,Lanuza,Su rigo Sur TOTAL Asaytona clan ManoboMamanwa

XIII

4 AD Areas; 1 AL Areas SUB-TOTAL


6 AD Areas; 1 AL Areas

SUMMAR CADT Nos. AREA

NO. OF APPROVED CADTs AND20 CALTs NO. OF REGISTERED CADTs AND CALTs 3

472,086.5138

47,253.3125

NO. OF ON-PROCESS FOR REGISTRATION 17 N0. OF ON-PROCESS FOR APPROVAL 6

424,833.20 253,550.0000

(AREA (in Hectares) )

(Date Filed )

Project Cost

Counterparts NCIP

30,000.00

1,329,573.00 1,329,573.0000

167,513.00 167,513.00

30,000.0000 DY FOR SURVEY AREA (Hectares) Date Filed

Project Cost

Counterparts NCIP

25,000.00 25,000.00

1,242,969.00 1,242,969.00

1,242,969.00 1,242,969.00

ON/ Area (has) Date Filed Project Cost Counterparts NCIP

74,827.00

1,539.00 22,000.00 1,648.00 1,188,000.00 984,275.00 224,500.00

100,184.00 200,198.00 255,198.00

2690764.00 4,863,039.00 2,572,586.00

75,000.00 299,500.00 1,709,982.00

SUMMARY CADT (Right Holders ) (Nos. ) Nos. (CALT ) AREA

73,187 4,861

68,326 1 1,648.0000

Counterparts Agency/ies

Partner Agencies

Remarks/Status

1,162,060.00 1,162,060.00

Undergoing verification of survey returns: Survey plan returned back to COP for rectification and completion of lacking requirements on 3/3/11.Extended WO on 9/8/10.Work Order issued to MLGU & Cong. Engrs. Cierona Cutan, Joel Fel Sanco and Jhonuan Lex Plaza Gaputan

Counterparts Agency/ies

Partner Agencies

Status /Remarks

Ready for survey: work order issued; survey to commence -

Counterparts Agency/ies

Partner Agencies DAR- IFAD

Status /Remarks Social preparation stage: For the conduct of Boundary Conflict Resolution Social preparation stage: Not yet engaged by DARIFAD projects; NCIP still establishes linkage with head claimant; Area is controlled by armed group Social preparation stage: PDAP 2010; WFP back to RO/PO

DAR- IFAD

759,775.00

Claimant

Social preparation stage: WFP for signature,6/21/10.social preparation stage

(Claimant ) 759,775.00 1,921,835.00

social preparation stage

Right Holders

y to commence

P back to RO/PO