OJT'S DAILY REPORT

Student Name Course Site (Company & Address) Department : : : : Baliwag, Rose Karen F. Electrical Engineering Siemens Power Operation Stores Department

DATE
26-May-11 27-May-11 30-May-11 31-May-11 1-Jun-11 2-Jun-11 3-Jun-11 4-Jun-11 5-Jun-11 6-Jun-11 7-Jun-11 8-Jun-11 9-Jun-11 10-Jun-11 13-Jun-11 14-Jun-11 15-Jun-11 16-Jun-11 17-Jun-11 18-Jun-11 19-Jun-11 21-Jun-11 28-Jun-11 24-Jun-11 30-Jun-11

TIME
8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00

8:00 - 5:00 8:00 - 5:00 8:00 - 5:00 8:00 - 5:00 8:00 - 5:00 8:00 - 5:00 8:00 - 5:00 8:00 - 5:00 8:00 - 5:00 8:00 - 5:00 8:00 - 5:00

Frank Franklin Manager

OJT'S DAILY REPORT


Baliwag, Rose Karen F. Electrical Engineering Siemens Power Operation Stores Department

: : ss) : :

DAILY ACTIVITY
Locating the spare parts base on its designation either slo or sr. Encoding the missing and excess quantity of the spare parts on the stocks. Tagging of the stickers for the spare parts Reporting of the excess and missing quantity on the stocks. Checking and inspecting of the files received and the maintenance program. Editing the maintenance program. Encoding of the new spare parts on the maintenance program. Inventory and tagging of spare parts as a Siemens AG (SAG). Relocation of the spare parts in BFS Production. Searching of files for the missing spare parts. SI#29871(Generator: Contact Volt) Sorting of files by month of the maintenance program of the year 2011. Sorting of the issue list. Inventory of personal Protective equipment list of issues. Sorting of issue list. Encoding of the personal protective equipment list of issues. Sorting of issue list. Checking of the location of the spare parts. Summarizing the overtime application form. Encoding a tally sheet for overtime. Sorting of issue list. Sorting of the purchase order by SIEMENS. Created list of toners and ink on stock. Attending seminars. Sorting of issue list. Preparing a storage report for a new spare parts for the maintenance program for the month of May 2011. Sorting of issue list. Preparing a storage report for a new spare parts for the maintenance program for the month of May 2011. Checking of the sizes of the T-shirt for the personal protective equipment. Checking of the sizes of the T-shirt for the personal protective equipment. Sorting of the issue list. Checking of the quantity for the temporary loan list. Inventory of the spare parts rack "DC". Tour around the plant. Inspecting the circuit breaker in the switch yard.

Eva Maria Lat Supervisor