You are on page 1of 19

Scope of Activities Scope I - BTS and Minilink (1+0 ) outdoor and indoor Scope 2 - BTS Implementation Scope 3 Minilink

k HOP(1+0) Scope 4 Minilink(1+1)

Unit of Measurement 5950 4760 1440 2040 1440 2464

Per Site Per Site Per Hop Per Hop Per Site (with cabinet Scope 5 - Expansion for RBS 2202 (2,2,2 to 4,4,4) expansion) Scope 6 - Expansion (4,4,4 to 6,6,6) Per Site Per site (Not applicable for ASP who have separate site Scope 7 - Preventive site Maintenance of Bharti- maintenance All Circles contract) Per Site (Including Scope 8 Macro-cell change out (replacing 2202 Transportation with 2206) charges) Per Site (With Antenna Mounts) Scope 9 -GSM Antenna Height Reduction (With Per Site (Without Antenna Mounts or without Antenna Mount ) Antenna Mounts) Scope 10 - Antenna changeover Per Site Scope11-1800 SITE (Co-located with 900) MBC Per Site Per Site (Upto 3 Scope 12 -TRU ADDITION TRU's) Per Site (Excluding Transportation Scope 13 Micro cell Installation (2302 or 2308) charges) Per Site (Excluding Scope 14 Microcell Installation (2*2308 or Transportation 2*2302) charges) Per Site (Excluding Scope 15 Microcell Installation (2*2308 or Transportation 2*2302) with Minilink charges) Per Site (Excluding Scope 16 Microcell Installation (2308 or micro Transportation BTS) with Minilink charges) Scope 17 - Microwave hop Installation (1.8 meter & 1.2 meter), one antenna each at both ends, 1+0 0r 1+1) on backbone site. Per Hop Scope 18 - Microwave hop Installation (1.8 meter & 1.2 meter), two antenna each at both ends, (1+1) on backbone site. Per Hop Scope 19 - Replacement of BTS 2202 with BTS 2206 - INDOOR Per Site Scope 20 - Expansion of BTS 2206 with BTS 2202 collocated Per Site Scope 21 - Alignment of Existing Hop Per Hop

960

4760 1200 600 400 2816 200

2112

3168

3872

2816 2816 3910 2112 2464 720

Scope 22 - Installation of ODU,IF CABLE,MMU, Wave guide Splitters and Base Plates (for 1+1 hops) Scope 23 Replacement of RBS 2202 with RBS 2206 along with 2 to 3 sector addition - 2 days

Per Site Per Site Per Feeder Cable 2 to 3 Feeder Cables 4 to 6 Feeder Cables Per Pole Per ODU Per Hop Per Hop Per Site

480 2816 320 800 1232 360 200 1000 2288 200 1440 640 1440 2816 2464 880 1440 4420 3740 7820 7140 2816 3520 3520 4080 2112 1440 2112 1440 4760

Scope 24 - Replacement of Feeder Cable with connectorization and Earthing Scope 25 - Installation/Deinstallation of MW/GSM Pole Scope 26 - Changing of ODU Scope 27 - Upgradation of MW from 1+0 to 1+1 Config. Scope 28 - Changing of Antenna from 0.3/0.6 mtr. To 1.2 mtr Scope 29 - Polarization Changes

Per Site (Repeator Installation) Per Site(Repeator Scope 30 Repeater installation & de-installation De-Installation) Scope 31 Swaping of 2302 with 2308/2309 Per Site Scope 32 High Capacity MW installation with ECI MUX or AXX or TRAFFIC NODE Per Hop Scope 33 Dismantle of BTS includingML Per Site Scope 34 Dismantle of ML hop (0.6m) Per Hop Scope 35 Dismantle of ML hop (1.2m) Per Hop Scope 36 Installation of outdoor BTS & ML site Per Site (RBS 2106/2104/2954) Scope 37 - Installation of outdoor BTS only (RBS 2106/2104/2954) Per Site Scope 38 Installation of BTS (2 RBS cabinets)& ML hop Per Site Scope 39 Installation of BTS (2 RBS cabinets) Per Site Scope 40 INSTALLATION OF RBS 2111 With SMPS & Battery Bank Per Site Scope 41 INSTALLATION OF RBS 2111 with Mini Link, With SMPS & Battery Bank Per Site Scope 42 INSTALLATION OF RBS 2111(Two Per Site cabinets) With SMPS & Battery Bank Scope 43 INSTALLATION OF RBS 2* 2111 with Per Site Mini Link Scope 44 :- EXPANSION of RBS 2111 (2,2,2 to 4,4,4) Per Site Scope 45 INSTALLATION OF AXX 9100 or 9200 Per Site Scope 46 INSTALLATION OF AXX 9300) Per Site Scope 47 SWAP OUT OF MACRO BTS WITH Per Site 2308/2309(Micro) Scope 48 INSTALLATION OF BTS (With Per Site Antenna Mounts)

Per Site (for Single Cabinet expansion) Per Site (for Scope 49 EXPANSION FROM 2+2+2 TO 6+6+6 Double Cabinet (Single cabinet & double cabinet) expansion) Scope 50 Implementation of Node B(Only) (WCDMA) Per Site Scope 51 Implementation of Node B with Mini Link (WCDMA) Per Site Scope 52 Installation, Commissioning, Integration and AT of OMS 16XX Nodes (includes test equipment for AT ) Per Site Scope 53 Installation of OMS 16XX Nodes Per Site Scope 54 Commissioning, Integration and AT of OMS 16XX Nodes (includes test equipment for AT ) Per Site Scope 55 Installation, Commissioning, Integration and AT of OMS 12XX Nodes (includes test equipment for AT) Per Site Scope 56 Installation of 12xx nodes Per Site Scope 57 Commissioning, Integration and AT of OMS 12XX Nodes (includes test equipment for AT) Per Site Scope 58 Installation, Commissioning, Integration and AT of MHL3000 (single row or dual row) Nodes(includes test equipment for AT) Per Site Scope 59 Commission, Integration & AT for MHL 3000 (single row or dual row) ; (includes test equipment for AT ) Per Site Scope 60 Installation of MHL3000 Nodes (single row or dual row ) Per Site Scope 61 Installation, Commissioning, Integration and AT of MD202 Nodes(includes test equipment for AT) Per Site Scope 62 Installation of MD202 Nodes Per Site Scope 63 Commissioning, Integration and AT of MD202 Nodes (includes test equipment for AT) Per Site Per Site (For Optical & Scope 64 Installation, Commissioning, Electrical testing) Integration and AT of XMP1 Nodes or MHL compact node (For Optical or Electrical testing) ; Per Site (For (includes test equipment for AT) Electrical testing) Scope 65 Installation of XMP1 Nodes or MHL compact node Per Site Per Site (For Optical & Scope 66 Commissioning, Integration & AT of Electrical testing) XMP1 or MHL compact node (For Optical or Per Site (For Electrical testing);(includes test equipment for AT ) Electrical testing) Scope 67 Installation, Commissioning, Integration and AT of OMS 8XX Nodes (includes test equipment for AT) Per Site Scope 68 Commissioning, Integration and AT of OMS 8XX Nodes(includes test equipment for AT ) Per Site

2464 2816 4760 5950 14110 3910 10200 11900 3168 8840 14110 10200 3910 11900 3168 8840 9350 5100 2640 6800 2640 2816 1440

Scope 69 Installation of 8xx nodes Scope 70 - 2 to 3 sector expansion Scope 71 - TMA or Filter Installation

Per Site Per Site Per Site Per cable inlet ( 7/8 ) Scope 72 - Cut-out for cable inlets (Roxtec) 7/8 or Per cable inlet (11-1/4 or 1-5/8 1/4or1-5/8) Scope 73 Supply of Manpower Supervisor Per Month Supervisor Per Day Technician/Installation Engineer Per Month Technician/Installation Engineer Per Day Testing Engineer Per Day Rigger Per Month Rigger Per Day Rigger Daily Allowance (Only applicable If asked to work outside of base city for Night Accomodation other living expenses other than Metro cities defined Per Day Rigger Daily Allowance (Only applicable If asked to work outside of base city for Night Accomodation other living expenses for Delhi and NCR region, Chennai, Kolkatta, Bangalore, Pune, Hyderabad & Mumbai Per Day Scope 74 - Implementation of BTS & ML site (GSM/WCDMA)-3 Days-Without battery bank & smps installation Per Site Scope 75 - Implementation of BTS (GSM/WCDMA) 2 Days-Without battery bank & SMPS installation. Per Site Scope 76 - REPLACEMENT OF BTS 2202 WITH BTS 2206 INDOOR- (1 Day)(Without battery bank and SMPS.) Per Site Scope 77 - EXPANSION OF BTS 2206 WITH BTS 2202 COLLOCATED - (1.5 Day) Without battery bank and SMPS Per Site Scope 78 - Replacement of BTS 2202 with BTS 2206 - indoor and third sector addition 2 Days(Without battery bank and SMPS) Per Site Scope79 - HIGH CAPACITY MW INSTALLATION WITH ECI MUX OR AXX OR TRAFFIC NODE (2 Days)-Without battery bank and SMPS Per Hop Scope 80 - DISMANTLING OF BTS &ML (1 Day)-Without battery bank and power plant Per Site Scope 81 - Dismantle of ML hop (0.6m) (0.5 Day)-Without battery bank and power plant Per Hop Scope 82 - Dismantle of ML hop (1.2m) (0.5 Day)- Without battery bank and power plant Per Hop Scope 83 - INSTALLATION OF BTS (2 RBS CABINETS)& ML HOP - (4 Days) Without battery bank and SMPS Per Site Scope 84 - INSTALLATION OF BTS (2 RBS CABINETS) (3 Days) Without battery bank and SMPS Per Site

1440 1000 600 200 300 0 8800 360 7200 280 440 4800 180

200

280 5100 3910 1620 1800 1980 1980 1980 480 1000 6970 6290

Scope 85 - INSTALLATION OF RBS 2111 (1.5 Days)-Without battery bank and UPS Scope 86 - INSTALLATION OF RBS 2111 with Mini Link (2 Days) -Without battery bank and UPS

Per Site Per Site

2288 3060 2992 3696 600 1400 1000 3910 3910 5100

Scope 87 - INSTALLATION OF RBS 2111(Two cabinets) (2 Days)Without battery bank and UPS Per Site Scope 88 - INSTALLATION OF RBS 2* 2111 with Mini Link (3 Days) Without battery bank and UPS Per Site Scope 89 - INSTALLATION OF AXX 9100/9200 Per Site (1 Day) Without battery bank and power plant Scope 90 - INSTALLATION OF AXX 9300 (1.5 Per Site Day) Without battery bank and SMPS Scope 91- SWAP OUT OF MACRO BTS WITH 2308/2309 (Micro) (1 Day) Without Battery Bank and SMPS Per Site Scope 92 - INSTALLATION OF BTS (With Antenna Mounts) - (2 Days) Without battery bank and SMPS Per Site Scope 93 - Implementation of Node B (Only) (WCDMA) (2 Days) Without battery bank and SMPS Per Site Scope 94 - Implementation of Node B with Mini Link (WCDMA) (3 Days) Without battery bank and SMPS Per Site Scope 95 - INSTALLATION OF OUTDOOR BTS 2954/ 2974 Enclosure(having one cabinet with maximum capacity of 4+4+4) with ML(1+0) (2.5 Days) Per Site Scope 96 - INSTALLATION OF OUTDOOR BTS 2954/2974 enclosure only(having single RBS cabinet with a maximum capacity of 4+4+4) (1.5 Day) Per Site Scope 97- INSTALLATION OF 2954/2974 Enclosure (having 2 BTS CABINETS) with ML HOP(1+0) - (4 Days) Per Site Scope 98 - INSTALLATION OF 2954/2974 Enclosure (having 2 BTS CABINETS) only (3 days) Per Site Scope 99 - Swapping of Nokia/Motorola outdoor with Ericsson 2974/2954 enclosure (having one cabinet with maximum capacity of 4+4+4 Per Site Scope 100 - Expansion in 2974 BTS enclosure from one cabinet with 4,4,4 configuration to 6,6,6/8,8,8 configuration Per Site Scope101 - Replacement of 2202 cabinet with 444 config & Expansion upto 888 with (900+1800) RBS 2206/2964-3 days A) REPLACEMENT OF BTS 2202 WITH BTS 2206/2964 INDOOR- (1 Day) Per Site B) 1800 SITE (CO-located WITH 900), Multi Band Per Site CELL (MBC)(2 Days) Scope102 - INSTALLATION OF OUTDOOR BTS 2954/2974 Enclosure(having one cabinet with maximum capacity of 4+4+4) with ML(1+1) Per Site

4420

3740 7820 7140 3740 3740 0 2160 2816 5168

Scope 103 - INSTALLATION OF OUTDOOR 2954/2974 Enclosure (having 2 BTS CABINETS) with ML HOP(1+1) Scope 104 - Implementation of BTS & ML(1+1) site (GSM/WCDMA)-3 Days Scope 105 - INSTALLATION OF BTS (2 RBS CABINETS)& ML HOP(1+1) Scope 106 - Swapping of Nokia BTS cabinet with 444 config & Expansion upto 666/888 with (900+1800) RBS 2206/2964-3 days A) REPLACEMENT OF Nokia BTS with BTS 2206/2964 INDOOR- (1 Day) B) 1800SITE(CO-located WITH 900),Multi Band CELL(MBC) (2 Days) Scope 107 - Swapping of Nortel/Nokia BTS cabinet with 444 config & Expansion upto 666/888 with (900) RBS 2206/2964 A) REPLACEMENT OF Nortel/Nokia BTS with BTS 2206/2964 INDOOR- (1 Day) B) BTS Expansion (4,4,4 to 6,6,6/888) - (1.5 Days) Scope 108 - Swapping of Nortel/Nokia BTS cabinet having config of 444 to 444 with RBS 2206/2964 Scope 109 - Swapping of Nortel/Nokia BTS (with Mini-Link De-installation cabinet having config of 444 to 444 with RBS 2206/2964 Scope 110 - Scope of work of a BTS Tester (Not to be Used) A) I&C done by other ASP B) I&C done by self Scope 111 - Replacement of 2202 cabinet with 444 config & Expansion upto 888 with RBS 2206/2964-(900 or 1800) A) REPLACEMENT OF BTS 2202 WITH BTS 2206/2964 INDOOR- (1 Day) B) Expansion from 444 to 666/888 Scope 112 - PDH Hop upgrade from 4*2 TO 16*2 & 1+0 to 1+1 configuration Scope 113 - PDH TO SDH HOP UPGRADE with 1+0 configuration Scope 114 - Swapping of Nokia/Motorola outdoor with Ericsson 2974/2954 enclosure (having two cabinets with maximum capacity of 8+8+8) Scope 115 - Swapping of Motorola micro cabinet with 2111 BTS Scope 116 - Swapping of Motorola micro cabinet with 2111 BTS(double cabinet ) Scope 117 - Swapping of Motorola/Nokia BTS cabinet with one/two RBS 2964 having maximum configuration of 888 Scope 118 - Swapping of Motorola BTS cabinet with RBS 2964( Three/four cabinets)

Per Site Per Site Per Site

8568 6698 8568 0

Per Site Per Site

2112 2816 0

Per Site Per Site Per Site Per Site

2112 2816 2816 3168 0 1000 800 0

Per Site Per Site

Per Site Per Site Per Hop Per Hop

2112 2464 1200 1000

Per Site Per Site Per Site Per Site Per Site

4420 2816 3520 3590.4 4216

Scope 119 - Swapping of Nortel/Nokia BTS (with Mini-Link Dismantling &new Minilink hop installation cabinet having config of 444 to 444 with RBS 2206/2964 Per Site Scope 120- Nokia/Nortel swap 444 with RBS 2974 with Minilink dismanteling, Battery bank & SMPS swap and new Ericsson MW hop installation Per Site Scope 121 - Nokia/Nortel Swap 444 to 444 with RBS 2206/2964 + expansion upto 888 in 900+1800 (MBC) config with Minilink de-installation and new Ericsson Minilink HOP Installation Per Site Scope 126 -Implementation of BTS (GSM/WCDMA) 2 Days-Without battery bank, SMPS & GSM Antennas installation Per Site Scope 127 -De-installation of BTS 2111 (1 to 2) MU and RRU's without Battery, SMPS & MW 1 Day Unit Rate 3500/- Per Site Per Site Scope 128 -Microwave hop Installation (1.2 meter), one antenna each at both ends, 1+0 0r 1+1) on access site. Per Hop Scope 129 -Microwave hop Installation (1.8 meter), one antenna each at both ends, 1+0 0r 1+1) on access site. Per Hop Scope 134 -BTS Integration & Acceptance Testing (H/O) to Custoemr/Ericsson (Site Installed by Self) Per Site Scope 135 -Integration & Acceptance Testing (H/O) to Custoemr/Ericsson (Site Installed by other ASP) Per Site Scope 136 -Acceptance Testing (H/O in case of Prvate Operators) (Site Installation and Integration done by other ASP) Per Site Scope 137 -MW Integration & Acceptance Testing (H/O) to Custoemr/Ericsson (Site Installed by Self) Per Site

3696

4250

5270 3696

1400 2464 2816 1600 1920 1200 1000

Sl.No
1

1.1

Core Equipment Installation Scenario Server Rack (MSC,MGW,BSC,NGN,UMS,MSG,S S1,HLRe,OMC) Installation With cabling, Routing, Connectivity & Terminations Switch Rack

Description

unit

Target price 2010 3400

Division Item

unit

per Rack

1.2 1.3 1.4 1.5 2 2.1

(MSC,MGW,BSC,NGN,UMS,MSG,S per Rack S1,HLRe) Installation With Cabling, Routing, Alarm Box, Connectivity & Terminations Cable Tray Installation at Core per Meter Room DDF RACK Installation per Rack ODF Rack Installation BTS Installation Scenario BTS Site Survey, providing Site Survey detail report along with as built drawings / Engineering Site Survey BTS Indoor Installation, Commissioning, Integration & ATP Sign-Off per Rack

3400 16 800 800 0

per Site

800

2.2

per Site

2.3

BTS Indoor +Outdoor Installation, Commissioning, Integration & per Site ATP Sign-Off MBTS/BBU Site Indoor Installation and RFS/RRU Tower Top Mounted (Optical cable per Site &Power Cable Routing, No Feeder cable) BTS Outdoor Installation (Hoisting of 3 Antennas, per Site Connectivity & Routing of Feeder Cables)(without cable tray) BTS Outdoor Installation (Hoisting of 1 Omni-Antenna, per Sector Connectivity & Routing of Feeder Cables) Installation of Antenna Pole or RRU or MW Pole VSWR&DFT Measurement at site with data recording (provided soft copy of data) ,Testing Meter Provide by Vendor Power Calibration Only, Power Meter Provide by Vendor per Sector

BTS indoor Installation (only Indoor installation and Cabling work, no commissioning and no AT work)

Site

5600

2.4

4000

2.5

2000

2.6

720

2.7

360

2.8

per Site

800

2.9

per Site

800

2.10 2.11 2.12 2.13 2.14

RRU to BBU Optical Cable Power loss Measurement Grounding Testing BTS Expansion BTS Swapping GSM Antenna change over.

per Site per Site per Site per Site Per Sector

640 400 2800 4800 720

2.15 2.16 2.17

Realignment of Existing hop MW ODU replacement MW Hop up gradation from 1+0 to 1+1 Replacement of Feeder cable with connectorization, weather proofing and earthing. MW Scenario Microwave Installation, Commissioning, Integration &AT(Diameter<=0.6m) Microwave Installation, Commissioning &AT(Diameter<=1.2m) Microwave Installation, Commissioning &AT(Diameter<=2.1m) Power Equipment Scenario BTS Power Plant(SMPS) Installation, Commissioning & ATP Sign-off Core Room Power Plant(SMPS) Installation, Commissioning &ATP Sign-off(Capacity of power plant) ZTE - Battery Bank Installation, Commissioning (240 AH) with ATP BTS - Battery Bank Installation, Commissioning (240 ~ 500AH) With ATP BTS - Battery Bank Installation, Commissioning (600 AH) With ATP BTS - Battery Bank Installation, Commissioning (800 AH) With ATP BTS - Battery Bank Installation, Commissioning (1000 AH ~ 1500AH) With ATP Bank Core Room -Battery Installation, Commissioning (1600 AH ~ 3000AH) With Core Room -Battery Bank ATP(Core Room ) Installation, Commissioning (3000 AH Plus) With ATP(Core Room ) UPS and Battery(Internal) Installation& Commissioning &AT With Accessories &Terminals (Capacity <= 10KVA ) UPS and Battery(Internal) Installation& Commissioning &AT With Accessories &Terminals (Capacity <= 20KVA ) UPS and Battery(Internal) Installation& Commissioning &AT With Accessories &Terminals (Capacity <= 30KVA )

Per Sector Per Rack Per Hop

1120 600 1200

2.18 3 3.1 3.2

Per Meter

20

per Hop per Hop

2800 3600

3.3 4 4.1

per Hop

4800

Microwave Installation ( Diameter Microwave <=.6m) Microwave Installation Commissioning ( Diameter & Integration <=1.2m) Microwave ( Diameter Installation <=1.2m) ( Diameter <=2.1m)

Hop Hop Hop Hop

per Set

720

4.2

per Set

1000

4.3

per Set

720

4.4

per Set

1120

4.5

per Set

1520

4.6

per Set

1520

4.7 4.8 4.9

per Set per Set per Set

1920 2320 3120

4.1

per Set

1120

4.11

per Set

1520

4.12

per Set

1520

5 5.1

5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 5.11 5.12 5.13 5.14 5.15 5.16 5.17 5.18

ZTE De-installation Scenario MSC /MGW/BSC/NGN/UMS/MSG/SS1/ Server Rack De-installation(All per Rack AC Server Rack) With ZTE MSC Accessories & Terminals(With out /MGW/BSC/NGN/UMS/MSG/SS1/ material) Switch Rack De-installation(All per Rack DC Switch Rack) With Accessories & Terminals DDF RACK De-installation per Rack ODF Rack De-installation De-installation of BTS(Indoor only) With Accessories De-installation of BTS(outdoor (Exclusive of Feeder Cable & only) With Antenna's) Accessories ( Feeder De-installation of Hoisting MW & Cable & Antenna's) De-installation of Existing 1 Antenna Poles Hoisting other Accessories Existing MW & De-installation of (Inclusive of Feeder Cable & Antenna) other Accessories Existing MW & De-installation of (Inclusive of (Antenna Diameter<=0.6m) Feeder Cable & Antenna) other Accessories Existing MW & De-installation of (Inclusive of (Antenna Diameter<=1.2m) Feeder Cable & Antenna) other Accessories (Exclusive of (Antenna Diameter<=2.1m) Feeder Cable & of Existingonly De-installation Antenna) SMPS IDU' Battery Bank De- Installation & other Accessories (240AH)Bank De- Installation Battery with cable & Accessories (240 ~500AH) with cable & per Rack per Site per Site per Sector per Site per Site per Site per Site per Set per Set per Set per Set per Set per Set per Set

1120

1120 360 360 1120 1520 360 1120 1520 1920 360 360 400 720 720 1320 1720 2320

Battery Bank Accessories De-Installation (600 Battery Bank De- Installation AH Plus)with cable & Accessories (800AH)Bank De- Installation Battery with cable & Accessories (1000 ~ 1500AH) with cable & Accessories De-Installation Battery Bank (1600~ 3000AH ) with cable & Accessories Battery Bank De-Installation (3000AH Plus)with cable & Accessories

5.19 6 6.1

per Set

2320

6.2

Transportation Scenario Supply of Wooden Boxes & Packing Materials - - (BTS-12mm Plywood Box, Wrapping up with per Site Bubble Sheet, Rapper sheet & Thermo coal Packing inside Box.) Packing of BTS including Loading per Site & Unloading(at Site& Warehouse) Transportation from Site to WH up to 100Km (Based One way distance) Transportation from Site to WH up to 200Km (Based One way distance) Transportation from Site to WH above 200Km (Based One way distance) per Site

1920

720

6.3

720

6.4 6.5

per Site per KM

1520 6

7.1

480

7.2

320

Feeder Installation(RF Additional Cable Installation, connectoriztion, weatherproofing , labelling, earthing & routing of feeder Antenna cable , Excluding Installation(Excl Antenna) uding feeder)

Sector

Sector

7.3 7.4

400 600

On Site Charge(Extra No Each Visit of times) Feeder DeBoard Installation(Dein expansion(Card Site srtallation of RF Exchange) Cable, connectors, weatherproofing , labelling, earthing, provide packing Antenna Delist and Installation(Excl packaging, uding feeder) Excluding Microwave Antenna) Microwave Installation Commissioning ( Diameter & Integration >2.1m) Microwave AT ( Diameter ( Diameter >2.1m) Upgradation of >2.1m) IDU Upgradation of ODU DeTMA Sector

7.5

340

7.6 7.7 7.8 7.9 7.10 7.11 7.12 7.13 7.14

220 0 3300 1980 1320 1120 1300 200 600 400 0

Sector Hop Hop Hop Hop Hop Nos. Nos. Nos.

7.15

1960

7.16

1400

7.17

2200

7.18

2320

7.19

2200

7.20

1400

7.21

1600

Installation Duplexer Supply of Installation Wooden Boxes & TMA Installation Packing Transportation Materials (BTS12mm Plywood Supply of Box, Wrapping & Wooden Boxes up with Bubble Packing Sheet, Rapper Materials sheet & Thermo ( Accessoriescoal Packing 12mm Plywood inside Box.) Box, Wrapping Supply of up with Bubble packing Material Sheet, Rapper for Rack / Bay/ sheet & Thermo OLA without coal Packing Cards (Wrapping Supply of inside Box.) with Stretch packing Material Wrapping Film for Rack / Bay/ 23 micron, 2 ply OLA without Corrugate sheet Supply of& 20 Cards (Wooden / 140 GSM packing Material Ply BS ) Boxfor Electronic Pelletize Base 3" Cards (Wrapping x 3 " wooden with4" x 1" leg, Stretch Wrapping Film Wooden plunks 23 micron, 2 ply for Frame, and Corrugate sheet 18 mm Ply at all Supply ) GSM & 120/ 140 6 side. of packing Material 17/ 20 BS, 20 / for Electronic 25 mm Cards (Wooden Thermacole at / Ply Box- 4" x all six side of 3/4" Wooden Cartons & 5 Ply Supply for Frame plunks . Cartonsof packing Material and 12mm Ply at for Electronic all 6 side.) Cards ( 10 -12 cards are being packed in one carton box & carton box to be packed in Wooden / Ply)

Site

Site

Site

Site

Site

Site

Site

7.22

2400

7.23

2320

7.24

320

7.25

200

7.26

720

7.27

720

Supply of packing Material for Rack / Bay/ OLA with Cards (Wrapping with Stretch Wrapping Film Supply of 23 micron packing Material ( Double), 3 ply for Rack / Bay/ Corrugate sheet OLA with Cards 140 GSM & 20 Wooden / Ply BS, 25 -30 mm Box- Pelletize Thermacole Base 3" x 3 " sheet at all six wooden leg, 4" x side.) Packing of 1" Wooden BTS/MSC plunks for /MGW/BSC/NGN/ Frame, and 18 UMS/MSG/SS1/ mm Ply at all 6 Server Rack (at side. Site& Warehouse) Packing of BTS/MSC /MGW/BSC/NGN/ UMS/MSG/SS1/ Server Rack's Accessories (at Site& Warehouse) Loading & Unloading of BTS/MSC /MGW/BSC/NGN/ UMS/MSG/SS1/ Server Rack (at Site & warehouse) Loading & Unloading of BTS/MSC /MGW/BSC/NGN/ UMS/MSG/SS1/ Server Rack 's Accessories (at Site & warehouse) for Other Items Labour charges RFI for Unloading and shifting BTS/BSC/MSC/M GW/Server Rack, RF & Antenna, SMPS, BB and other items from Labour charges siteUnloading for to up to 3 Floor and shifting

Site

Site

Site

Site

Site

Site

7.28

400

Floor

7.29

960

7.30

1200 0

7.31 7.32

1800 0 2400

BTS/BSC/MSC/M GW/Server Rack, RF & Antenna, LabourBB and SMPS, charges for Unloading other items from and shifting 8 site to up to BTS/BSC/MSC/M Floor GW/Server Rack, RF & Antenna, SMPS, BB and other items from Special AT site to above 8 System AT for Floor Operator Govt. BSC/MSC HI & SC PDF Installation

Floor

Floor

Site Site

ZTE Target Price(INR)

3600.0

8 0

2800 3600 0 4800 0

You might also like