You are on page 1of 33

Official Gazette n special of 24 May 2011

Ibirimo/Summary/Sommaire

Page/Urup.

A. Iteka rya Minisitiri wIntebe/Prime Ministers Order/Arrt du Premier Ministre

N41/03 ryo kuwa 20/05/2011 Iteka rya Minisitiri wIntebe rishyiraho imbonerahamwe nincamake yimyanya yimirimo mu Kigo cyIgihugu gishinzwe guteza imbere Ingufu, Amazi nIsukura (EWSA).3 N41/03 of 20/05/2011 Prime Ministers Order determing structure and summary of job positions for Rwanda Energy, Water and Sanitation Authority (EWSA) ..3 N41/03 du 20/05/2011 Arrt du Premier Ministre dterminant lorganigramme et la synthse des emplois de lOffice Rwandais pour le Dveloppement de lEnergie, de lEau et de lAssainissement (EWSA) .3 B. Iteka rya Minisitiri/Ministerial Order/Arrt Ministriel N10/2011 ryo kuwa 20/5/2011 Iteka rya Minisitiri rigena ibiciro byerekeye imirimo yiyandika ryibikorwa byubucuruzi byamasosiyete.........................................................................................................................23 N10/2011 of 20/5/2011 Ministerial Order determining fees for registration of companies business activities ...23 N10/2011 du 20/5/2011 Arrt Ministriel determinant les frais denregistrement des activits commerciales des socits23

Official Gazette n special of 24 May 2011

C. Ibindi /Miscellaneous / Divers

RWANDA REVENUE AUTHORITY : Announcement : Public Notice on required documents for customs declarations...30

CITYOF KIGALI (COK) - RWANDA DEVELOPMENT BOARD (R.D.B): Public Notice ..31

Official Gazette n special of 24 May 2011

ITEKA RYA MINISITIRI WINTEBE N41/03 RYO KUWA 20/05/2011 RISHYIRAHO IMBONERAHAMWE NINCAMAKE YIMYANYA YIMIRIMO MU KIGO CYIGIHUGU GISHINZWE GUTEZA IMBERE INGUFU, AMAZI NISUKURA (EWSA)

PRIME MINISTERS ORDER N41/03 OF 20/05/2011 DETERMING STRUCTURE AND SUMMARY OF JOB POSITIONS FOR RWANDA ENERGY, WATER AND SANITATION AUTHORITY (EWSA)

ARRETE DU PREMIER MINISTRE N41/03 DU 20/05/2011 DETERMINANT LORGANIGRAMME ET LA SYNTHESE DES EMPLOIS DE LOFFICE RWANDAIS POUR LE DEVELOPEMENT DE LENERGIE, DE LEAU ET DE LASSAINISSEMENT (EWSA)

ISHAKIRO Ingingo ya mbere: Icyo iri teka rigamije

TABLE OF CONTENTS Article one: Purpose of this Order

TABLE DE MATIERES Article premier: Objet du prsent arrt

Ingingo ya 2: Imbonerahamwe nincamake Article 2: Organizational structure and Article 2: Organigramme et synthse des byimyanya yimirimo yinzego zimirimo summary of jobs emplois Ingingo ya 3: Abashinzwe iri teka Ingingo ya 4: Ivanwaho zinyuranyije niri teka Ingingo ya gukurikizwa 5: Igihe iteka Article 3: Authorities responsible for the Article 3: Autorits charges implementation of this Order lexcution du prsent arrt ryingingo Article 4: Repealing provision Article 4: Disposition abrogatoire de

ritangira Article 5: Commencement

Article 5: Entre en vigueur

Official Gazette n special of 24 May 2011

ITEKA RYA MINISITIRI WINTEBE N41/03 RYO KUWA 20/05/2011 RISHYIRAHO IMBONERAHAMWE NINCAMAKE YIMYANYA YIMIRIMO MU KIGO CYIGIHUGU GISHINZWE GUTEZA IMBERE INGUFU, AMAZI NISUKURA (EWSA)

PRIME MINISTERS ORDER N41/03 OF 20/05/2011 DETERMING STRUCTURE AND SUMMARY OF JOB POSITIONS FOR RWANDA ENERGY, WATER AND SANITATION AUTHORITY (EWSA)

ARRETE DU PREMIER MINISTRE N41/03 DU 20/05/2011 DETERMINANT LORGANIGRAMME ET LA SYNTHESE DES EMPLOIS DE LOFFICE RWANDAIS POUR LE DEVELOPEMENT DE LENERGIE, DE LEAU ET DE LASSAINISSEMENT (EWSA)

Minisitiri wIntebe; Ashingiye ku Itegeko Nshinga rya Repubulika yu Rwanda ryo kuwa 04 kamena 2003, nkuko ryavuguruwe kugeza ubu, cyane mu ngingo zaryo iya 118, iya 119, iya 120, iya 121 niya 201; Ashingiye ku Itegeko n 43/2010 ryo kuwa 07/12/2010 rishyiraho Ikigo cyIgihugu gishinzwe guteza imbere Ingufu, Amazi nIsukura (EWSA) rikanagena inshingano, imiterere nimikorere byacyo;

The Prime Minister; Pursuant to the Constitution of the Republic of Rwanda of 04 June 2003, as amended to date, especially in Articles 118, 119, 120, 121 and 201;

Le Premier Ministre ; Vu la Constitution de la Rpublique du Rwanda du 04 juin 2003, telle que rvise ce jour, spcialement en ses articles 118, 119, 120, 121 et 201;

Pursuant to Law n 43/2010 of 07/12/2010 establishing Rwanda Energy, Water and Wanitation Authority (EWSA) and determining its responsibilities, organisation and functioning;

Vu la Loi n 43/2010 du 07/12/2010 portant cration de lOffice Rwandais pour le dveloppement de lEnergie, de lEau et de lAssainissement (EWSA) et dterminant ses attributions, son organisation et son fonctionnement ;

Ashingiye ku Itegeko n 22/2002 ryo kuwa Pursuant Law n 22/2002 of 09/07/2002 on Vu la Loi n 22/2002 du 09/07/2002 portant 09/07/2002 rishyiraho Sitati rusange igenga General Statutes for Rwanda Public Service; Statut Gnral de la Fonction Publique; spcialement en ses articles premier, 2 et 17; Abakozi ba Leta nInzego zImirimo ya Leta especially in Articles One, 2 and 17; cyane cyane mu ngingo zaryo iya mbere, iya 2 niya 17; Bisabwe na Minisitiri wAbakozi ba Leta On proposal by the Minister Public Service Sur proposition du Ministre de la Fonction 4

Official Gazette n special of 24 May 2011

nUmurimo;

and Labour;

Publique et du Travail;

Inama yAbaminisitiri yateranye kuwa After consideration and approval by the Aprs examen et adoption par le Conseil des 16/03/2011 imaze kubisuzuma no kubyemeza. Cabinet in session of 16/03/2011. Ministres en sa sance du 16/03/2011.

ATEGETSE:

HEREBY ORDERS:

ARRETE:

Ingingo ya mbere: Icy iri teka rigamije Iri teka rigena imbonerahamwe yimyanya yimirimo nincamake yimyanya yimirimo mu Kigo cyIgihugu gishinzwe guteza imbere Ingufu, Amazi nIsukura (EWSA)

Article One: Purpose of this Order This Order determines the organizational structure and the summary of job positions for Rwanda Energy, Water and Sanitation Authority (EWSA).

Article premier: Objet du prsent arrt Le prsent arrt dtermine lorganigramme et la synthse des emplois de lOffice rwandais pour le dveloppement de lEnergie, de lEau et de lAssainissement (EWSA).

Ingingo ya 2: Imbonerahamwe nincamake Article 2: Organizational structure and Article 2 : Organigramme et synthse des yinzego zimirimo summary of jobs emplois Imbonerahamwe yimyanya yimirimo mu Kigo cyIgihugu gishinzwe guteza imbere Ingufu, Amazi nIsukura (EWSA) nincamake yimyanya yimirimo biboneka ku migereka wa I nuwa II yiri teka. Ingingo ya 3: Abashinzwe kubahiriza iri teka Rwanda Energy, Water and Sanitation Authority (EWSA) organizational chart and the summary of job positions are respectively in annexes I and II of this Order. LOrganigramme de lOffice Rwandais pour le Dveloppement de lEnergie, de lEau et de lAssainissement (EWSA) et la synthse des emplois sont respectivement en annexes I et II du prsent arrt. de

Article 3: Authorities responsible for the Article 3 : Autorits charges implementation of this Order lexcution du prsent arrt

Minisitiri wAbakozi ba Leta nUmurimo, The Minister of Public Service and Labour, the Le Ministre de la Fonction Publique et du Minisitiri wIbikorwa Remezo na Minisitiri Minister of Infrastructure, and the Minister of Travail, le Ministre des Infrastructures et le 5

Official Gazette n special of 24 May 2011

wImari nIgenamigambi bashinzwe kubahiriza Finance and Economic Planning are Ministre des Finances et de la Planification iri teka. responsible for the implementation of this Economique sont chargs de lexcution du Order. prsent arrt. Ingingo ya 4: Ivanwaho zinyuranye niri teka Ingingo zamateka abanziriza zinyuranyije na ryo zivanweho. ryingingo Article 4: Repealing provision iri Article 4 : Disposition abrogatoire

kandi All prior provisions contrary to this Order are Toutes les dispositions antrieures contraires hereby repealed. au prsent arrt sont abroges. Article 5 : Entre en vigueur

Ingingo ya 5: Igihe iri teka ritangira Article 5: Commencement gukurikizwa

Iri teka ritangira gukurikizwa ku munsi This Order shall come into force on the date of Le prsent arrt entre en vigueur le jour de ritangarijweho mu Igazeti ya Leta ya its publication in the Official Gazette of the sa publication au Journal Officiel de la Repubulika yu Rwanda. Republic of Rwanda. Rpublique du Rwanda.

Kigali, kuwa 20/05/2011

Kigali, on 20/05/2011

Kigali le 20/05/2011

(s) (s) MAKUZA Bernard Minisitiri wIntebe (s) MUREKEZI Anastase Minisitiri wAbakozi ba Leta nUmurimo MAKUZA Bernard Prime Minister

(s) MAKUZA Bernard Premier Ministre

(s) MUREKEZI Anastase Minister of Public Service and Labour 6

(s) MUREKEZI Anastase Ministre de la Fonction Publique et du

Official Gazette n special of 24 May 2011

Travail Bibonywe kandi bishyizweho Ikirango cya Repubulika: Seen and sealed with the Seal of the Republic: Vu et scell du Sceau de la Rpublique :

(s) KARUGARAMA Tharcisse Minisitiri wUbutabera/Intumwa Nkuru ya Leta

(s) KARUGARAMA Tharcisse Minister of Justice/Attorney General

(s) KARUGARAMA Tharcisse Ministre de la Justice/Garde des Sceaux

Official Gazette n special of 24 May 2011 UMUGEREKA WA I KU ITEKA RYA MINISITIRI WINTEBE N 41/03 RYO KUWA 20/05/2011 RISHYIRAHO IMBONERAHAMWE NINCAMAKE YIMYANYA YIMIRIMO MU KIGO CY'IGIHUGU GISHINZWE GUTEZA IMBERE INGUFU, AMAZI NISUKURA (EWSA) ANNEXE I TO PRIME MINISTERS ORDER N 41/03 OF 20/05/2011 DETERMINING ORGANISATIONAL STRUCTURE AND SUMMARY OF JOB POSITIONS FOR RWANDA ENERGY, WATER AND SANITATION AUTHORITY (EWSA) ANNEXE I DE LARRETE DU PREMIER MINISTRE N 41/03 DU 20/05/2011 DETERMINANT LORGANIGRAMME ET LA SYNTHESE DES EMPLOIS DE LOFFICE RWANDAIS POUR LE DEVELOPEMENT DE LENERGIE, DE LEAU ET DE LASSAINISSEMENT (EWSA)

ANNEXE I:

ENERGY, WATER AND SANITATION AUTHORITY - ORGANIZATIONAL CHART 2011

Official Gazette n special of 24 May 2011

BoD of EWSA

Director General

Strategic Advisor Administrative Assistant

Central Secretariat Internal Audit & Mgt control

Deputy DG -Energy Department

Deputy DG - Water and Sanitation Department

Deputy DG Corporate Serv

Spec ial Unit for Elec tric ity Ac c ess Roll Out

Adm Assistant

Adm Assistant

Financ e Water and Sanitation Development Division

and Bu Unit

Electricity Utility Division

Energy Development Division

Water and Sewerage Utility Division

HR and Administr Unit

Elec tric ity Operations & Maintenanc e Unit

Studies, Researc h & Development Unit

Water Commerc ial & Distribution Unit

Studies, Researc h and Developement Unit

Proc urement U

Elec tric ity Commerc ial & Distribution Unit

Projec ts & Programs Management Unit

Water Supply Operations Unit

Projec ts and Programs Management Unit

Legal and T ransa Affairs Unit

Sewerage Operations Unit


Re ne w able Ene rgy:hydro,solar,ge o the rmal,biomass, w ind Unit

ICT Unit Water Supply Unit

Water Utility Support Unit

Corporate Plan Unit

Elec tric ity Network Planning, Monitoring and Evaluation Unit

Rational Use of Ene rgy and Substitute s Unit Ele ctricity Infrastructure De ve lopme nt Unit

Solid Waster

Unit

Costomer Protec Safeguards U

Sanitation Unit

Elec tric ity Utility Support Unit

Petroleum & Methane Gas Unit

Official Gazette n special of 24 May 2011

Bibonywe kugira ngo bishyirwe ku migereka yIteka rya Minisitiri wIntebe n 41/03 ryo kuwa 20/05/2011 rishyiraho imbonerahamwe nincamake yimyanya yimirimo mu Kigo cyIgihugu gishinzwe guteza imbere Ingufu, Amazi nIsukura (EWSA)

Seen to be annexed to the Prime Ministers Order n 41/03 of 20/05/2011 determining the organizational structure and summary of job positions for Rwanda Energy, Water and Sanitation Authority (EWSA)

Vu pour tre annex lArrt du Premier Ministre n 41/03 du 20/05/2011 dterminant lorganigramme et la synthse des emplois dans lOffice Rwandais pour le dveloppement de lnergie, de leau et de lassainissement (EWSA)

Kigali, kuwa 20/05/2011


(s)

Kigali, on 20/05/2011
(s)

Kigali, le 20/05/2011
(s)

MAKUZA Bernard Minisitiri wIntebe

MAKUZA Bernard Prime Minister

MAKUZA Bernard Premier Ministre

(s)

(s)

(s)

MUREKEZI Anastase Minisitiri wAbakozi ba Leta nUmurimo

MUREKEZI Anastase Minister of Public Service and Labour

MUREKEZI Anastase Ministre de la Fonction Publique et du Travail

10

Official Gazette n special of 24 May 2011

Bibonywe kandi bishyizweho Ikirango cya Repubulika

Seen and sealed with the Seal of the Republic:

Vu et scell du Sceau de la Rpublique :

(s) (s) (s)

KARUGARAMA Tharcisse Minisitiri wUbutabera/Intumwa Nkuru ya Leta

KARUGARAMA Tharcisse Minister of Justice/Attorney General

KARUGARAMA Tharcisse Ministre de la Justice/ Garde des Sceaux

11

Official Gazette n special of 24 May 2011 UMUGEREKA WA II KU ITEKA RYA MINISITIRI WINTEBE N 41/03 RYO KUWA 20/05/2011 RISHYIRAHO IMBONERAHAMWE NINCAMAKE YIMYANYA YIMIRIMO MU KIGO CY'IGIHUGU GISHINZWE GUTEZA IMBERE INGUFU, AMAZI NISUKURA (EWSA) ANNEXE II TO PRIME MINISTERS ORDER N 41/03 OF 20/05/2011 DETERMINING ORGANISATIONAL STRUCTURE AND SUMMARY OF JOB POSITIONS FOR RWANDA ENERGY, WATER AND SANITATION AUTHORITY (EWSA) ANNEXE II DE LARRETE DU PREMIER MINISTRE N 41/03 DU 20/05/2011 DETERMINANT LORGANIGRAMME ET LA SYNTHESE DES EMPLOIS DE LOFFICE RWANDAIS POUR LE DEVELOPEMENT DE LENERGIE, DE LEAU ET DE LASSAINISSEMENT (EWSA)

12

Official Gazette n special of 24 May 2011

ANNEX II: SUMMARY OF JOBS AND JOB PROFILES FOR RWANDA ENERGY, WATER & SANITATION AUTHORITY (EWASA)

Administrative Unit Office of Managing Director

Job Title Managing Director Central Secretariat Central Secretariat Internal Audit Internal Audit Customer Protection Administrative Assistant Strategic Advisor S/Total Deputy Managing Director Administrative Assistant S/Total

Title of Job position linked to the job Managing Director of EWSA Head of Central Secretariat Secretary in Central Secretariat Director Internal auditor Internal auditor Officers Customer Protection Officer Administrative Assistant to DG Strategic Advisor to DG Deputy Managing Director Administrative Assistant

Proposed Job 1 1 3 1 19 9 1 2 37 1 1 2

Office of Deputy MD Corporate Services

Finance and Budget Unit

Director

Director of Finance and Budget Unit

Finance officers Chief Account Accounts

Finance officers Chief Accountant Accounts

4 1 6

13

Official Gazette n special of 24 May 2011 Budget officers Secretary S/Total Director Human resource development officers Administration Administration officers Procurement Officers Public Relations Logistics Fleet Asset Mgt Fuel management Documentation and Archives Officers Legal and Transactions Affairs Unit S/Total Director Financial transaction advisors Environmental Safeguards Advisors Director Strategic Planning S/Total Director ICT Officer S/Total Budget officers Secretary of Unit Director of Human Resources and Administration Human resource development officers Administration Officer Administration officers Procurement Officers Public Relations Logistics officers Drivers Asset Mgt Officer Fuel Management Documentation and Archives Officers 4 1 21 1 6 1 4 10 5 20 150 5 5 5 212 6 4 4 1 7 8 1 19 20

Human Resources and administrative Unit

Director of Legal & Transactions Unit Financial and Legal transaction advisors Environmental and social experts Director of Strategic planning Unit Strategic Planning Officer Director of ICT Unit ICT Officers (network, maintenance)

Strategic Planning Unit

ICT UNIT

14

Official Gazette n special of 24 May 2011 Office of Deputy MD Energy Departement Deputy DG Administrative Assistant S/Total Head of Division Administrative Assistant S/Total Director Generation section Deputy DG of Energy Department Administrative Assistant Head of Electricity Utility Division Administrative Assistant Director of Operations and Maintenance unit Chief of Power plants Electricity operations officers Mechanical operations officers chief of power plants Electricity operations officers Mechanical operations officers Public Generation officers IPPs officers Head of National control Center Substations operations SCADA operations Head of Transmission lines and substations maintenance Substations maintenance officers Transmission Line maintenance officers Networks, Protection and Stability officers 1 1 2 1 1 2 1 12 80 20 2 50 25 2 2 194 1 180 18 1 28 18 5

Electricity Utility Division

Operations & Maintenance Unit

Thermal and gaz plants

Power generation Head Quarters S/Total Head of National control Center Substations operations SCADA operations Head of Transmission lines and substations maintenance Substations maintenance officers Transmission Line maintenance officers Networks, Protection and Stability officers

Transmission

15

Official Gazette n special of 24 May 2011 Network Planning, Monitoring and Evaluation Unit Manager of NPME Administrative Assistant Strategic and specific Studies Electricity project implementation Equipment acquisition planning Standards+techn. Specifications Network mapping+database S/Total Director Commercial Customer service Marketing Customer Management Revenue Accounting Billing Debt Management Regional Coordination Distribution Distribution line maintenance Distribution line extension Distribution Cabins and Switch Gears Secretary S/T Director of EARP Planning Network Planning, Monitoring and Evaluation Unit Manager of NPME Administrative Assistant Strategic and specific Studies Electricity project implementation Equipment acquisition planning officers Standards+techn. Specifications officers Network mapping+database officers Director of Commercial & Distribution Unit Chief Of Commercial Customer service officers Marketing officers Customer Management officers Revenue Accounting officers Billing officers Debt Management officers Regional Coordination officers Chief of Distribution Distribution maintenance Distribution line extensions Distribution Cabins and Switch Gears Secretary of Unit Director of EARP Chief Planner 16 1 1 2 2 3 3 4 283 1 1 3 4 3 4 4 3 3 1 10 10 6 1 54 1 1

Commercial and Distribution Unit

Special Unit - Electricity Access Rollout Program

16

Official Gazette n special of 24 May 2011 Planning officer Contract Management specialist Contract Management Officer Senior Financial Officer Financial Officer Administration & Logistics Officers Secretary of Unit Director of Electricity Utility Support Administrativre Assistant Utility Finance officers Utility Procurement specialists Logistics and Stock Management officers Director General Energy Development Division Administrative Assistant Director of Research & Development Strategic and specific Studies officers Energy information System Management officers Monitoring and Evaluation officers Research and Development Officers( technical, social, economics) Carbon markets specialist Director of Project and Programs Management Unit 5 1 3 1 3 14 1 30 1 1 17 3 17 39 1 1 2 1 2 2 2 3 1 11 1

Contract Management Finance Administration & Logistics Secretary S/Total Director Administrativre Assistant Utility Finance (17 branches) Utility Procurement Logistics and Stock Management S/Total Director General Administrative Assistant S/Total Director Strategic and specific Studies Energy information System Management Monitoring and Evaluation Research and Development Carbon markets S/Total Director

Electricity Utility Support Unit

Energy Development Division

Studies, Research and Development unit

Project and Programs Management Unit

17

Official Gazette n special of 24 May 2011 Administrative Assistant S/Total Renewable Energies Unit Director Hydropower development Director of Renewable Energies Chief Hydro power Engineer Senior Hydro mechanical engineer, Senior electrical engineer, senior civil engineer, senior hydro business specialist Hydro Surveyor, geologist,hydrologist Head of Geothermal + exploration, development, application Geothermal exploration( geologist, geochemist, geophysist, hydrologist, civil engineer) Geothermal application( steam specialist, power production) Wind and Solar specialists ( Wind specialist, solar pv, solar thermal specialists) Head of Biomass Domestic biogas specialist, institutional biogas specialist, peat to heat specialist, improved stoves specialists (2), carbonisation of charcoal specialist Director Rational use of energy and sub.energy Industry and Transport Tertiasy Sector and Residential Substitute Energy Director of Electricity Infrastructure electricity generation specialist 1 2 1 1 4

3 1 5 2 3 1 6

Geothermal

Wind and Solar

Biomass

Rational use of energy and subsitute Energy

S/Total Director Industry and Transport Tertiasy Sector and Residential Substitute Energy S/Total Director Generation

23 1 2 2 1 6 1 2

Electricity Infrastructure Unit

18

Official Gazette n special of 24 May 2011 Transmission Distribution S/Total Director Petroleum Methane Exploration and Development Peat to Power develoment Lake Kivu Monitoring electricity transport specialist Electricity distribution specialist Director of Petroleum and Methane Gaz Petroleum exploration experts ( upstream and down stream) Methane Exploration and Development Peat to power development Head of Lake Kivu Monitoring Lake Kivu Monitoring Officer (Inspector, biologist, chemist, physist, database) Deputy DG of Water and Sanitation Department 2 2 7 1 4 4

Petroleum and Methane Gaz Unit

1 5 14 1

Office of Deputy Water and Sanitation Department

S/Total Deputy DG

Administrative Assistant Water and Sewerage Utility Division S/Total Director

Administrative Assistant Director of Water and Sewerage Utility Division

1 2 1

Administrative Assistant S/Total Commercial and Distribution Unit Director Secretary Marketing and Customer Service officers Revenue Accounting officers

Administrative Assistant Director of Commercial and Distribution Secretary of Unit Marketing and Customer Service officers Revenue Accounting officers

1 2 1 1 7 10

19

Official Gazette n special of 24 May 2011 Private Operations officers Regional Coordination officers S/Total Water Supply Operations Unit Director Water treatment plants ( heads and operations officers) Water supply network management Water Supply Quality Management District Operations Support S/Total Water Utility Support Unit Director Special Utility Finance Utility Procurement Logistics, Stock and management S/Total Sewerage Operations Director Sewarage treatment plant Sewarage Network Water and Sanitation Development Division S/Total Director General Administrative Assistant S/Total Director of Sewarage operations Sewarage treatment plant Sewarage network DG of Water and Sanitation Development Division Administrative Assistant Water Supply Operations Unit Water treatment plants ( heads and operations officers) Water supply network management Water Supply Quality Management District Operations Support Director of Water Utility Support Special Utility Finance Utility Procurement Logistics, Stock and management Private Operations officers Regional Coordination officers 3 2 26 1 491 162 8 5 667 1 6 5 2 14 1 2 2 5 1 1 2

20

Official Gazette n special of 24 May 2011 Studies, Research and Development unit Director Research and Development Water and Sanitation Information Management Monitoring and evaluation Studies and designs S/Total Director Administrative Assistant Water supply Solid waste officers District support officers Sanitation officers S/Total GRAND TOTAL Director of Studies, Research and Development Unit Research and Development Water and Sanitation Information Management Monitoring and evaluation Studies and designs Director of Projects and Programs Management unit Administrative Assistant Water supply Officzr Solid waste officers District support officers Sanitation officers 1 5 3 6 6 21 1 1 5 2 5 3 17 1725

Projects and Programs Management unit

21

Official Gazette n special of 24 May 2011

Bibonywe kugira ngo bishyirwe ku migereka yIteka rya Minisitiri wIntebe n 41/03 ryo kuwa 20/05/2011 rishyiraho imbonerahamwe nincamake yimyanya yimirimo mu Kigo cyIgihugu gishinzwe guteza imbere Ingufu, Amazi nIsukura (EWSA)

Seen to be annexed to the Prime Ministers Order n 41/03 of 20/05/2011 determining the organizational structure and summary of job positions for Rwanda Energy, Water and Sanitation Authority (EWSA)

Vu pour tre annex lArrt du Premier Ministre n 41/03 du 20/05/2011 dterminant lorganigramme et la synthse des emplois dans lOffice Rwandais pour le dveloppement de lnergie, de leau et de lassainissement (EWSA)

Kigali, kuwa 20/05/2011


(s)

Kigali, on 20/05/2011
(s)

Kigali, le 20/05/2011
(s)

MAKUZA Bernard Minisitiri wIntebe

MAKUZA Bernard Prime Minister

MAKUZA Bernard Premier Ministre

(s)

(s)

(s)

MUREKEZI Anastase Minisitiri wAbakozi ba Leta nUmurimo

MUREKEZI Anastase Minister of Public Service and Labour

MUREKEZI Anastase Ministre de la Fonction Publique et du Travail

22

Official Gazette n special of 24 May 2011

Bibonywe kandi bishyizweho Ikirango cya Repubulika

Seen and Sealed with the Seal of the Republic:

Vu et scell du Sceau de la Rpublique :

(s) (s) (s)

KARUGARAMA Tharcisse Minisitiri wUbutabera/Intumwa Nkuru ya Leta

KARUGARAMA Tharcisse Minister of Justice/Attorney General

KARUGARAMA Tharcisse Ministre de la Justice/ Garde des Sceaux

23

Official Gazette n special of 24 May 2011

ITEKA RYA MINISITIRI N10/2011 RYO KUWA 20/5/2011 RIGENA IBICIRO BYEREKEYE IMIRIMO YIYANDIKA RYIBIKORWA BYUBUCURUZI BYAMASOSIYETE

MINISTERIAL ORDER N10/2011 OF 20/5/2011 DETERMINING FEES FOR REGISTRATION OF COMPANIES BUSINESS ACTIVITIES

ARRETE MINISTERIEL N10/2011 DU 20/5/2011 DETERMINANT LES FRAIS DENREGISTREMENT DES ACTIVITES COMMERCIALES DES SOCIETES

ISHAKIRO

TABLE OF CONTENTS

TABLE DES MATIERES

Ingingo ya mbere: Icyo iri teka rigamije Ingingo ya nibiciro 2: Imirimo

Article One: Purpose of this Order

Article premier: Objet du prsent arrt

yishyurwa Article 2: Activities to be paid for and Article 2: Activits requrant paiement fees et frais payer Article 3: Demande denregistrement par internet

Ingingo ya 3: Kwiyandikisha Article 3: Online application hakoreshejwe umurongo wa interinete

Ingingo ya 4: Ivanwaho ryingingo Article 4: Repealing of inconsistent Article 4: Disposition abrogatoire zinyuranyije niri teka provisions Ingingo ya 5: Igihe iteka ritangira Article 5: Commencement gukurikizwa Article 5: Entre en vigueur

24

Official Gazette n special of 24 May 2011

ITEKA RYA MINISITIRI N10/2011 RYO KUWA 20/5/2011 RIGENA IBICIRO BYEREKEYE IMIRIMO YIYANDIKA RYIBIKORWA BYUBUCURUZI BYAMASOSIYETE Minisitiri wUbucuruzi nInganda;

MINISTERIAL ORDER N10/2011 OF 20/5/2011 DETERMINING FEES FOR REGISTRATION OF COMPANIES BUSINESS ACTIVITIES

ARRETE MINISTERIEL N10/2011 DU 20/5/2011 DETERMINANT LES FRAIS DENREGISTREMENT DES ACTIVITES COMMERCIALES DES SOCIETES

The Minister of Trade and Industry;

Le Ministre du Commerce et de lIndustrie ;

Ashingiye ku Itegeko Nshinga rya Repubulika y'u Rwanda ryo ku wa 04 Kamena 2003, nkuko ryavuguruwe kugeza ubu, cyane cyane mu ngingo zaryo iya 120, iya 121 niya 201; Ashingiye ku Itegeko n 07/2009 ryo ku wa 27/04/2009 ryerekeye amasosiyeti yubucuruzi nkuko ryahinduwe kandi ryujujwe kugeza ubu, cyane cyane mu ngingo yaryo ya 374; Asubiye ku Iteka rya Minisitiri n 03/09/MINICOM ryo ku wa 08/05/2009 rigena ibiciro byerekeye imirimo yiyandika ryibikorwa byubucuruzi byamasosiyete;

Vu la Constitution de la Rpublique du Rwanda Pursuant to the Constitution of the Republic du 04 juin 2003, telle que rvise ce jour, of Rwanda of 04 June 2003, as amended to spcialement en ses articles 120, 121 et 201; date, especially in Articles 120, 121 and 201; Pursuant to Law no 07/2009 of 27/04/ 2009 relating to companies as modified and complemented to date, especially in Article 374; Having reviewed the Ministerial Order no 03/09/MINICOM of 08/05/2009 determining fees for registration of companies business activities;

Vu la Loi n 07/2009 du 27/04/2009 relative aux socits commerciales tel que modifie et complte ce jour, spcialement en son article 374 ; Revu lArrt Ministriel no 03/09/MINICOM du 08/05/2009 dterminant les frais denregistrement des activits commerciales des socits;

Inama yAbaminisitiri yateranye ku wa After consideration and approval by the Aprs examen et adoption par le Conseil des 11/05/2011 imaze kubisuzuma no Cabinet in its session of 11/05/ 2011; Ministres en sa sance du 11/05/2011 ; kubyemeza;

25

Official Gazette n special of 24 May 2011

ATEGETSE: Ingingo ya mbere: Icyo iri teka rigamije Iri teka rigena ibiciro byimirimo yiyandika ryamasosiyete nibikorwa byubucuruzi byayo ikorerwa mu biro byUmwanditsi Mukuru.

HEREBY ORDERS: Article One: Purpose of this Order

ARRETE: Article premier: Objet du prsent arrt

This Order determines fees for registration of companies and their business activities applicable by the Office of the Registrar General.

Le prsent arrt dtermine les frais denregistrement des socits commerciales et de leurs activits commerciales appliqus par lOffice du Registraire Gnral.

Ingingo ya nibiciro

2:

Imirimo

yishyurwa Article 2 : Activities to be paid for and Article 2: Activits requrant paiement et fees frais payer

Ibiciro bisabwa ku mirimo yo kwandika Fees for registration of companies and their Les frais denregistrement des socits amasosiyete nibikorwa byubucuruzi business activities are provided for in the commerciales et de leurs activits commerciales byayo biri ku mugereka wiri teka. annex to this Order. sont en annexe du prsent arrt. Ibiciro byimirimo yiyandika ryamasosiyeti yubucuruzi byishyurirwa ku biro byUmwanditsi Mukuru, ku byabamuhagarariye, ku mabanki nibigo byimari byemewe hakurikijwe uburyo bwo kwishyura bukoreshwa mu Rwanda. Fees for companies registration services shall be paid at the office of the Registrar General, delegated offices, banks and other recognized financial institutions in accordance with payment systems used in Rwanda. Les frais des services denregistrement des socits commerciales sont pays au bureau du Registraire Gnral, ses bureaux dcentraliss et aux banques et institutions financires agres selon les moyens de paiement admis au Rwanda. Article 3 : Demande denregistrement par internet

Ingingo ya 3: Kwiyandikisha Article 3: Online application hakoreshejwe umurongo wa interinete

Kwiyandikisha hakoreshejwe umurongo Online application shall be free of charge. La demande denregistrement par voie wa interineti ni ubuntu. Ibiciro bivugwa The fees for services as provided for in dinternet est gratuite. Les frais des services tels

26

Official Gazette n special of 24 May 2011

mu ngingo ya 2 yiri teka ntibikurikizwa Article 2 of this Order shall not be que prvus larticle 2 du prsent arrt ne sont iyo imirimo isabwe hakoreshejwe applicable in case of online application. pas applicables en cas de demande par voie d umurongo wa interinete. internet. Uburyo bwo kwiyandikisha hakoreshejwe Modalities for online application shall be Les modalits denregistrement par internet umurongo wa interinete buteganywa determined by the guidelines of the seront dtermines par les directives du namabwiriza yUmwanditsi Mukuru. Registrar General. Registraire General. Ingingo ya 4: Ivanwaho ryingingo Article 4: zinyuranyije niri teka provisions Iteka rya Minisitiri n 03/09/MINICOM ryo kuwa 08/05/2009 rigena ibiciro byerekeye imirimo yiyandika ryibikorwa byubucuruzi byamasosiyete, kimwe nizindi ngingo zose zamateka abanziriza iri kandi zinyuranyije naryo bivanyweho. Repealing of inconsistent Article 4 : Disposition abrogatoire LArrte Ministriel No 03/09/MINICOM du 08/05/2009 dterminant les frais denregistrement des activits commerciales des socits, ainsi que toutes les dispositions antrieures contraires au prsent arrt sont abroges.

The Ministerial Order No 03/09/MINICOM of 08/05/2009 determining fees for registration of companies business activities, and all prior provisions contrary to this Order are hereby repealed.

Ingingo ya 5: Igihe iteka ritangira Article 5 : Commencement gukurikizwa

Article 5 : Entre en vigueur

Iri Teka ritangira gukurikizwa ku munsi This Order shall come into force on the date Le prsent arrt entre en vigueur le jour de sa ritangarijwe mu Igazeti ya Leta ya of its publication in the Official Gazette of publication au Journal Officiel de la Rpublique Repubulika yu Rwanda. the Republic of Rwanda. du Rwanda.

Kigali, ku wa 20/5/2011

Kigali, on 20/5/2011

Kigali, le 20/5/2011

27

Official Gazette n special of 24 May 2011

(s) KANIMBA Franois Minisitiri wUbucuruzi nInganda

(s) KANIMBA Franois Minister of Trade and Industry

(s) KANIMBA Franois Ministre du Commerce et de lIndustrie

Bibonywe kandi bishyizweho Ikirango cya Repubulika:

Seen and sealed with the Seal of the Republic:

Vu et scell du Sceau de la Rpublique:

(s) KARUGARAMA Tharcisse Minisitiri wUbutabera/Intumwa Nkuru ya Leta

(s) KARUGARAMA Tharcisse Minister of Justice/Attorney General

(s) KARUGARAMA Tharcisse Ministre de la Justice/Garde des Sceaux

28

Official Gazette n special of 24 May 2011

UMUGEREKA KU ITEKA RYA MINISITIRI N 10/2011 RYO KUWA 20/5/2011 RIGENA IBICIRO BYEREKEYE IMIRIMO YIYANDIKA RYIBIKORWA BYUBUCURUZI BYAMASOSIYETE IBIKORWA Kwiyandikisha mu gitabo cyubucuruzi ku masosiyete Kubitsa no guhindura izina ryisosiyete Gushaka amakuru mu gitabo cyubucuruzi

ANNEX TO THE MINISTERIAL ORDER N 10/2011 OF 20/5/2011 DETERMINING FEES FOR REGISTRATION OF COMPANIES BUSINESS ACTIVITIES

ANNEXE A LARRETE MINISTERIEL N 10/2011 DU 20/5/2011 DETERMINANT LES FRAIS DENREGISTREMENT DES ACTIVITES COMMERCIALES DES SOCIETES

ACTIVITIES Company registration

ACTIVITES Enregistrement des socits commerciales Rservation ou Changement de Nom de la socit Consultation du registre de commerce Classement dactes juridiques des socits Changement dactivits commerciales Changement dactionnaires ou dactions Demande de radiation dune socit Tout autre service non indiqu

IGICIRO/FEE/FRAIS

10,000Frw

Reservation or Change of company name Searching in the register

3,000Frw

5,000Frw

Kubika inyandiko zamasosiyeti Filing Deeds of companies Guhindura ibikorwa byubucuruzi Guhindura abanyamigabane cyangwa imigabane Guhagarika isosiyete yubucuruzi Izindi serivisi zitavuzwe Change of business activities

2,000Frw 5,000Frw

Change of shareholders or shares Closing a company

5,000Frw

5,000Frw

Any other service not provided for

5,000Frw

29

Official Gazette n special of 24 May 2011

Bibonywe ngo bishyirwe ku mugereka wIteka rya Minisitiri n 10/2011 ryo kuwa 20/5/2011 rigena ibiciro byerekeye imirimo yiyandika ryibikorwa byubucuruzi byamasosiyete Kigali, ku wa 20/5/2011

Seen to be annexed to Ministerial Order n10/2011 of 20/5/2011 determining fees for registration of companies business activities

Vu pour tre annex lArrt Ministriel n 10/2011 du 20/5/2011 dterminant les frais denregistrement des activits commerciales des socits Kigali, le 20/5/2011

Kigali, on 20/5/2011

(s) KANIMBA Franois Minisitiri wUbucuruzi nInganda

(s) KANIMBA Franois Minister of Trade and Industry

(s) KANIMBA Franois Ministre du Commerce et de lIndustrie

Bibonywe kandi bishyizweho ikirango cya Repubulika: (s) KARUGARAMA Tharcisse Minisitiri wUbutabera/Intumwa Nkuru ya Leta

Seen and sealed with the Seal of the Republic: (s) KARUGARAMA Tharcisse Minister of Justice/Attorney General

Vu et scell du Sceau de la Rpublique:

(s) KARUGARAMA Tharcisse Ministre de la Justice/Garde des Sceaux

30

Official Gazette n special of 24 May 2011

RWANDA REVENUE AUTHORITY

ANNOUNCEMENT PUBLIC NOTICE ON REQUIRED DOCUMENTS FOR CUSTOMS DECLARATIONS In a bid to enhance trade facilitation and simplifying doing businesses in Rwanda, Rwanda Revenue Authority-Customs Services Department has revised required import documents as follows:
A) The mandatory documents

1. Commercial Invoice 2. Packing List 3. Bill of Lading/Airway Bill.

B) Optional documents

1. The certificate of origin- Importers will only submit it to enable them benefit from preferential tariff treatment 2. Technical/health certificate- It may be required only for clearance of some specific commodities This notice takes effect with immediate effect. Done at Kigali, May 13th, 2011.

(s) Richard TUSABE Deputy Commissioner General and Commissioner for Customs Services Department

31

Official Gazette n special of 24 May 2011

CITYOF KIGALI (COK) - RWANDA DEVELOPMENT BOARD (R.D.B): PUBLIC NOTICE CITY OF KIGALI IN CONJUCTION WITH THE RWANDA DEVELOPMENT BOARD (RDB) IS PLEASED TO INFORM THE GENERAL PUBLIC THAT THE ONE STOP CENTRE FOR CONSTRUCTION PERMITS LOCATED AT NYARUGENGE DISTRICT HAS FURTHER STREAMLINED THE CONSTRUCTION PERMITING PROCESS BY CONSOLIDATING ALL PROCESSES RELATED TO CONSTRUCTION AT THE CENTRE. IN ORDER TO REDUCE THE APPROVAL TIME, THE CENTRE NOW PROCESSES ALL LAND DOCUMENTS (SUCH AS LEASE CONTRACT, CONSTRUCTION PERMIT, OCCUPANCY PERMIT AND UTILITIES CONNECTION APPLICATIONS (ELECTRICITY,WATER, FIXED TELEPHONE) FOR ALL COMMERCIAL, MULTI-FAMILY RESIDENTIAL AND INSTITUTIONAL PROJECTS. THIS CONSOLIDATED APPLICATION PROCESS, DOES NOT APPLY TO SINGLE FAMILY RESIDENTIAL CONSTRUCTION PROJECTS AND LAND TRANSFERS THAT WILL CONTINUE TO BE PROCESSED AT DISTRICT LAND OFFICES AS USUAL. THE CITY OF KIGALIS ONE STO CENTRE WILL RECEIVE THE CONSOLIDATED APPLICATION AND DIRECTLY LINK WITH ENERGY, WATER AND SANITATION AUTHORITY (EWSA) AND LANDLINE TELEPHONE PROVIDER TO FACILIATE THIS PROCESS AND IT WILL DO THE SAME WITH RDB/IT FOR ICT CONNECTIVITY. CUSTOMERS DO NOT HAVE TO GO TO EWASA, TELEPHONE LANDLINE PROVIDER AND RDB-IT IF THEY HAVE SUBMITTED A CONSOLIDATED APPLICATION TO THE CENTRE.
32

Official Gazette n special of 24 May 2011

THE CENTRE ENFORCES LEGALLY BINDING TIME LIMITS SET BY THE PRIME MINISTERS ORDER ON CONSTRUCTION PERMITS (CLIENT CHARTER). WE PLEDGE TO CONTINUE BETTER SERVICE DELIVERY. DONE IN KIGALI, ON 11TH MAY 2011

(s) NDAYISABA FIDLE MAYOR KIGALI CITY

(s) JOHN GARA CHIEF EXECUTIVE OFFICER RWANDA DEVELOPMENT BOARD

33