You are on page 1of 55

PRE-QUALIFICATION

DOCUMENT

Kingdom Hospital, Riyadh NCCI Head Office Bldg., Riyadh


Scope: Electro-
Electro-Mechanical Scope: Electro-
Electro-Mechanical

Saud Al-
Al-Babtain Cardiac Center, Dammam Residential & Commercial Bldg., Madinah
Scope: Turn Key Scope: Electro-
Electro-Mechanical

Al-Ta’afuf Company for Electrical Works (STS)


Table of Contents
Page

Introduction to STS ........ .............................................. 2

Organization Chart ........................................................ 7

Team Member’s Resume ............................................ 16

STS Staff .............................................................. 21

STS Overview ............................................................... 23

Projects History ............................................................... 28

STS Projects Photos ………......................................… 50

Typical Project Planning ............................................... 90

STS Field Equipment .................................................... 97


Commercial Registration Certificates,
Classification Certificate,
Commercial Registration Certificate,
Jeddah Chamber of Commerce .....................................103

Table of Contents 1
Introduction to STS

Introduction to STS 2
The Company
Al-Ta’afuf Company for Electrical Works (STS) has acquired its multi-disciplinary
experience through the highly technical skills and dedication of its staff. Within a
relatively short period of ten years, STS has grown to become one of the leading
Electro-Mechanical contracting companies in Saudi Arabia, with Ambitions to
expand the company’s horizon by also operating in other areas in the Middle
East.

The entire management, employees and resources of Al Ta’afuf Company for


Electrical Works has operated earlier under another company named Saudi
Trading & Services International Co. Ltd.

Realizing the potential for growth in the construction industry and as a strategy in
expanding the contracting business, two new owners having wide experience in
engineering and contracting have agreed with the owners of Saudi Trading to
transfer the entire management, employees, resources and offices of Saudi
Trading to a newly established company registered under the name of Al Ta’afuf
Company for Electrical Works. The Logo of STS was also transferred to
Al Ta’afuf and officially registered at the Ministry of Trade & Industry.

This smooth transfer has made the continuation of the construction business
possible, thus allowing the new company to add the past achievements to its
pre-qualification.

To expand its services, STS has associated itself with reputable international
firms by becoming a licensee of their products in the field of:

• Water and sewerage treatment using the advance technology of ZENON


Environmental of Canada.
• Medical Gas System of Medimaster of England.
• Hospital Bed-Head Units of Medimaster of Turkey.

STS has proudly achieved successful completion of major landmark projects in


various cities in Saudi Arabia. Although specialized in the Electro-Mechanical
field, STS has accepted to execute projects on turnkey basis including civil,
structural and architectural works.

Introduction to STS 3
STS also adapted itself to the needs of its clients, by providing value-engineering
and re-design services that proved to accomplish substantial cost saving without
compromising performance and quality.

This pre-qualification document gives an overview of the organization structure


of STS and its management team and brief description and values of the projects
executed by STS in the fields of:

1. Hospitals.
2. Prestigious Residential High Rise Towers.
3. Hotels and Recreational Centers.
4. Office Buildings.
5. Infrastructure and Power Plants for Housing Development Projects.
6. Commercial Centers.
7. Water Treatment Plants.

Hoping that this document will give you a good understanding of STS goals and
achievements.

Introduction to STS 4
• Business of STS
• Electro - Mechanical Contracting
• Turnkey General Contractor
• Project Management

• Management
• A management team having 20 years experience.
• A commitment to achieving recognized quality standards.
• Good experience in the Saudi Market and the Middle
East.

• People
• STS Team consists of highly qualified experienced and
committed professionals.

• Technology
• Information Technology Systems including computer
integrated construction software which enhances
efficiency and on time performance
• On Line Quality Management System

• Engineering
• Capability to perform value engineering.
• Sound engineering input supported by experienced
engineers.

Introduction to STS 5
Introduction to STS 6
Organization Charts

Organization Charts 7
STS Organization Chart

Managing Director
RAHIF IBRAHIM

Executive Secretary
Quality Management
Representative

Human Finance
Contracts Riyadh Area Technical Construction
Resources Manager
Manager Manager Manager Manager
Manager

Organization Charts 8
Organization Chart
Western Region Projects

Construction
Manager

Admin. Assistant

5 Star Sana’a Western Region


Hotel, Yemen Projects

150 Bed General 100 Bed


Hospital, Haqel Hospital, Arar

Organization Charts 9
Organization Chart
Riyadh Area Projects

Riyadh Area
Manager
Chawki Ibrahim

Admin. Assist.

Kingdom G-100 Bed


Dawadmi Granada Hospitals
Center
Project Project Project
Projects

Organization Charts 10
STS Typical Project Organization Chart
Project’s Management

Support Services Support Services


STS – HEAD OFFICE Project Manager STS – RIYADH OFFICE
JEDDAH JEDDAH

Admin. Assistant

Accountant

Local Purchaser/
Driver

Sr. Project Sr. Project Sr. Mech. Sr. Electrical


Planning
Engineer Engineer Storekeeper Design Design
Engineer
Mechanical Electrical Engineer Engineer

Mechanical Electrical
Engineer Engineer
QC / QS CAD CAD
Engineer Operators Operators
Mech. Site Elect. Site
Supervisors Supervisors

Foreman Foreman

Construction Team Engineering & Shop


Drawings Team
Operation Construction
Manager Manager

Safety
Engineer

Organization Charts 11
Organization Chart
Technical Department

Technical
Manager
Maged Gamil

Admin. Assistant
Hameed Hussain

Engineering Tendering Procurement


Department Department Department

Admin. Sr. Mechanical Sr. Electrical Sr. Mechanical


Assistant Engineer Engineer Engineer
Malik Sohail Khan Victor Batutay Rashid Qureshi Bairam Khan

Sr. Mechanical
Mechanical Qty. Electrical Mechanical
Engineer Engineer
Surveyor Engineer
Waqar Azim Syed Wahiduddin Syed Khurshid Hitham Bisharat
Khan

Procurement
Sr. Electrical Electrical Engr /
Admin.
Qty. Surveyor
Engineer Coordinator
Ahmed Kamel
Renato Gaa Bilal Hussein

Main Store
Storekeeper
Ziad El-Dahdah

Organization Charts 12
Organization Chart
Finance Department

Financial
Controller
Efren Rodriguez

Admin. Assistant
Mohamed Nazir

I.T. Chief Payroll Accnt.


Department Accountant & H.R. Supvr.
(TBA) Thomas Stephen Samer Namour

Accountant
Audie Agpalo

Accountant
Malik Ajmal

Accountant
Mina Gamil Anis

Organization Charts 13
Organization Chart
Human Resources Department

H.R. Manager
Jaber Al-Otaibi

Admin. Assistants

Govt. Relation Driver Logistic Asst. Acct. Clerk


Salem Bin Ahmad Hussein Midhat Mohd.
Yamin Al-Biladi Bamehriz Essa

Storekeeper
Driver Receptionist /
Govt. Relation Helper
Mohamed Tel. Operator
Mishal Hamdan Mushabab
Al-Nefai Ceferino Algara
Al-Harthi

Receptionist / Storekeeper
Govt. Relation
Driver Tel. Operator Helper
Saeed Bin
Abdul Jaweed Masaad Bin Ali Abdul Rahim
Hamid
Hussein Salim

Office Clerk
Badr Hemaid
Al-Biladi

Office Tea Boy


Modh. Mustafa

Organization Charts 14
Support for Projects
Support is provided by Head office teams operating
through a linked IT system enabling timely
communication of relevant data to the job site.

Project Logistics
Financing Services
80

60
80
40
60
20
40
0
1 st Q t r 2 nd Q t r 20

0
1s t Q tr 2 n d Q tr

80

60

40

20

0
1 st Q t r 2 nd Q t r

80

60

40

20

0
1s t Q tr 2 n d Q tr

Information
Technology Engineering
Services Project Services

80

60

40

20

0
1 st Q t r 2 nd Q t r

80

60

40

20

0
1st Q tr 2 n d Q tr

Financial 80

60

40

20

0
1 s t Q tr 2n d Q tr

Procurement
Services Services

Quality Assurance
Services

Typical Project Planning 15


Team Member’s Resumes

Team Member’s Resume’s 16


NAME: RAHIF IBRAHIM

POSITION: Managing Director

QUALIFICATIONS: Bachelor of Science in Electrical Engineering from


American University of Beirut

PROFESSIONAL
AFFILIATIONS:

SUMMARY OF Over 20 years of experience in the field of electro-


EXPERIENCE: mechanical construction in the gulf and Saudi Arabia.

PROJECT EXPERIENCE:

Technical Manager SAUDI BINLADEN GROUP (SAUDI ARABIA)

Project Manager SAUDI BINLADEN GROUP (SAUDI ARABIA)

Project Manager WILKINSON ENGINEERING (U.A.E.)

Team Member’s Resume’s 17


NAME: IBRAHIM W. MAZHAR

POSITION: Customer Services & Contracts Manager

QUALIFICATIONS: B. Sc. Mathematics, University of Jordan, Amman, Jordan


1976
B. Sc. Civil Engineering, (With Distinction) University of
Arizona, Tucson, Arison, USA 1982

PROFESSIONAL Member of Jordanian Association of Engineers


AFFILIATIONS:

SUMMARY OF 21 Years
EXPERIENCE:

PROJECT EXPERIENCE:

Assistant Operations Manager DAR-AL-HANDASAH CONSULTANTS, JEDDAH, K.S.A.


• Diversion of Utilities Obstructing Makkah Holy Mosque
Extension and Souq Al-Saghir Underpass (53-Contracts),
Makkah
• Wadi Ibrahim Sewage Relocation Trunk Main and Tunnel
(2 Contracts), Makkah
• Manakha Hotel Madina
• Extension of the Madina Grand Mosque (Partly)
• Madina Car Park Around Grand Mosque (Partly)
Business Promotion Engineer DAR-AL-HANDASAH CONSULTANTS, JEDDAH, K.S.A.
• Feasibility Study for Abdul Latif Jamil Residential
Complex in Makkah
• Proposal for Residential Corniche Towers for SEDCO,
Jeddah
• Proposal for Business Center in Madinah Road for SBG,
Jeddah
• Proposal for s Hotel at downtown Jeddah for SBG
• Coordination with IDB headquarter in Jeddah in relation
to Africa and Asia Projects

Project Manager (Client’s JORDAN VALLEY AUTHORITY, AMMAN, JORDAN


Representative) • Middle Jordan Valley Irrigation Project
Assistant Project Manager JORDAN VALLEY AUTHORITY, AMMAN, JORDAN
(Client’s Representative) • Mujib and Southern Ghors Irrigation Project, Stage 1
Assistant/Acting Resident DAR AL-HANDASAH CONSULTANT (SHAIR &
Engineer PARTNERS), MAKKAH, K.S.A.
• Diversion of utilities obstructing Makkah Holy Mosque
Extension and Souq Al-Saghir Underpass

Team Member’s Resume’s 18


NAME: MAGED GAMIL ANIS

POSITION: Technical Manager

QUALIFICATIONS: Bachelor of Science in Electrical and Communication


Engineering Faculty of Engineering, University of
Alexandria, Egypt in 1990.

SUMMARY OF 11 Years
EXPERIENCE:

PROJECT EXPERIENCE:

Technical Manger Saudi Trading & Services Int’l. Co. Ltd.


(1999 till date) Jeddah, Saudi Arabia

Tender Team Leader Saudi Trading & Services Int’l. Co. Ltd.
1998 - 1999 Jeddah, Saudi Arabia

Electrical Engineer Saudi Trading & Services Int’l. Co. Ltd.


1995 - 1998 Jeddah, Saudi Arabia

Electrical & Communication Al-Henaki Trading & Contracting Co.


Site Engineer Jeddah, Saudi Arabia

Team Member’s Resume’s 19


NAME: EFREN T. RODRIGUEZ

POSITION: Financial Controller

QUALIFICATIONS: Certified Public Accountant


Bachelor of Science in Business Administration Major
in Accounting - graduated cum laude from the
University of the East, Manila, Philippines.

PROFESSIONAL President - Philippines Institute of Certified Public


AFFILIATIONS: Accountants - 1997 (member since 1984)

EXPERIENCE: 16 Years Experience:


4 Years experience in Audit & 12 Years in Finance

Financial Controller Saudi Trading & Services Int’l. Co. Ltd.


( 1992 to Present ) Jeddah, Saudi Arabia

Accounting Supervisor Saudi Tourist & Travel Bureau Ltd.


( 1988 to 1992 ) Jeddah, Saudi Arabia

Accounting Manager Airspeed International Company Ltd.


( 1987 ) Manila, Philippines

Senior Auditor SyCip, Gorres, Veloyo & Company, CPA’s


( 1983 to 1986 ) Makati, Philippines

Team Member’s Resume’s 20


STS Staff

STS Staff 21
Head Office Staff
Senior Manager = 3
Managers = 3
Engineers = 5
Planning Engineer = 1
Quality Assurance / Quality Control = 1
Quantity Surveyor = 2
Finance = 5
Human Resources/Logistics = 4
Information Technology = 1
Administrative Assistant = 3
Storekeeper (Main Store) = 1
Storekeeper Helper = 2
Clerks = 1
Drivers = 1
Total = 33

Projects Staff Direct Hire


Project Manager = 7
Senior Electrical Engineer = 2
Senior Mechanical Engineer = 2
Planning / Cost Engineer = 1
Design Civil Engineer = 1
Civil Engineer = 3
Electrical Engineer = 8
Junior Electrical Engineer = 1
Mechanical Engineer = 12
Junior Mechanical Engineer = 3
Safety Engineer = 1
Chief Surveyor = 1
Quantity Surveyor = 3
Electrical Supervisor = 5
Mechanical Supervisor = 4
Plumbing Supervisor = 1
General Foreman = 3
Electrical Foreman = 13
Civil Works Foreman = 1
Surveyor = 1
HVAC Foreman = 1
Plumbing Foreman = 6
Site CAD Operators = 14
Duct Foreman = 1
Pipefitting Foreman = 2
Administrative Assistant = 8
Business Support Officers = 1
Government Relations Officer = 4
Electrician (Leadman) = 5
Pipefitter (Leadman) = 2
Clerks = 2
Storekeeper = 5
Timekeeper = 4
Welder = 13
Ductman = 1
Pipefitter = 35
Electrician = 71
Plumber = 42
Insulator = 15
Painter = 1
Purchaser = 2
Camp Boss = 1
Office Boy = 8
Electrician Helper = 68
Ductman Helper = 2
Pipefitter Helper = 18
Plumber Helper = 53
Welder Helper = 2
Surveyor Helper = 2
Storekeeper Helper = 1
Driver = 9
Building Watchman = 6
Laborer = 2
Total = 480 513

STS-EMS Staff 22
STS Overview

STS Overview 23
Client Oriented Approach

We exceed our clients expectations by:

• Providing a quality product

• Delivered on time

• At the best price

We accomplish this through our core


value competencies which are:

• Client Communication

• Integrated Planning and scheduling

• Engineering Know-how

• Procurement & relationship building in

the supplier chain

• Quality Management System

STS Overview 24
Total Quality Management Initiatives

• ISO 9002 certification passed December 3, 1995

• Online Quality Management System

• Monthly Operational Audits

• HR Development Programs

• Customer Interviews

Cost of Quality Problems

1000x
1000x Installation

The cost of a defect, increases


dramatically as it moves along
Cost to 100x
Resolve
$ the production line
100x Procurement

10x
10x Design

x Design x Specifications Hand Over

Beginning of Project End of Project

Time

STS Overview 25
STS - A UNIQUE APPROACH TO QUALITY MANAGEMENT

STS has, in the space of a single year, achieved ISO 9002


certification. This was only possible through total commitment
to a simple and clearly understood policy.

“TO DELIVER PRODUCTS & SERVICES TO ALL CUSTOMERS,


WHICH FULLY SATISFY OR EXCEED THEIR NEEDS AND ARE
PERCEIVED AS EXCELLENT VALUE”

STS controls all Commercial and Engineering operational aspects of the


construction processes through a computerized on - line Quality
Management System.

Every facet of front end engineering, estimating, procurement, planning,


scheduling, and project preparation is subject to the standardized and
systematic control of the Quality Management System.

Project execution is subject to the same systematic approach. Since


every project is unique, the Quality Management System requires that
each project has its own specific Quality Plans in both narrative and
matrix forms. These unique Quality Plans supported by client- approved
Inspection and Test Plans identify all the Witness & Hold Points of the
construction processes and record the participation responsibilities for
every test and inspection.

The STS Total Quality Management approach to project execution has


made STS the market leader in construction quality management.

It is said that, “Imitation is the most sincere form of flattery”, perhaps this
is why other organizations copy STS Quality Documentation and use it as
their own.

STS Overview 26
STATEMENT OF COMPANY SAFETY POLICY

It is management responsibility to safeguard the


health & safety of all STS employees and other
personnel within STS work areas.

The following points are considered to be


fundamental:

• The safety of the employee is of paramount


importance.

• Safety will take precedence over all other


considerations during site operations.

• Saudi Arabian Standards Organization safety


requirements shall be complied with.

• All Managers, Supervisors and Employees will


be involved in the implementation of safety
procedures.

The Management will ensure that there is


adequate staff, funds and material to meet these
requirements.

STS Overview 27
PROJECT HISTORY

Project History 28
Trading Projects

Projects Value Completion


S.R.
Madinah Mosque E & M Equipment 25 M 1991

SCECO East EHV Substations & Relay Panels 10 M 1991

RSAF- Aircraft Arrestors 17 M 1991

VIP Hospital 13.8 kv Standby Power/LV Panel


& Distribution System 23 M 1992

KKNG Hospital Standby Power Plant 3M 1993

AFHC Cardiac Center BMS & Fire Detection Systems 10 M 1994

Abrug Al- Raghama, Jeddah 12 M 1992

SCECO 132KV S/S, Riyadh 27 M 1994

Shoaiba Phase
- 2 (BECHTEL) 1.4 M 1995

Project History 29
Contracting Projects

Project History 30
Hospital Projects
Project Location Gen. Cont. Owner Value Completion
S.R.

SAAD Hospital Engineering Al Khobar STS SAAD 2M Nov 1995

Dr. Soliman Fakeeh Hospital Jeddah STS Dr. Fakeeh 44 M March 1999

Kingdom Hospital Riyadh El-Seif Kingdom Holding Co. 53 M March 2000

Saud Al Babtain Dammam STS Abdul Latif S. 39.9 M March 2000


Cardiac Hospital AlBabtain & Bros. Co.

King Khalid National Hospital Jeddah STS National Guard 10 M April 2000
King Abdul Aziz Oncology Center
Remodeling Wards 10/11/12

Sultan Bin Abdulaziz City Riyadh Al Mabani Sultan Bin Abdulaziz 9.7 M Aug. 2001
for Humanitarian Services City for Humanitarian
Child Development Center Services.
and Mosque

Three 100 Bed Hospitals Rahfa THINET Ministry of Health 109.5 M Nov. 2002
Khafji & International
Domat Al-Jundal

Prince Abdul Aziz Bin Ar’ar Areel Ministry of Health 31 M Nov. 2003
Musa’ad 100 Bed Hospital Construction

150 Bed General Hospital Haqel ASTRA Co. Ministry of Health 17.8 M Sep. 2003

200 Bed Hospital Dawadmi Al-Mobty Ministry of Health 38.9 M Mar. 2004

Project History 31
Residential High Rise Towers

Project Location Gen. Cont. Owner Value Completion


S.R.
Al Shubaikah-1 Bldg. Makkah ICCC Dallah 7.8 M May 1995

GOSI Bldg. HVAC Madina Al Redwan GOSI 17.8 M May 1996

Residential Bldg. (155-156) Madina Al Maram Dallah 31 M June 1996

Residential Bldg. (165-166) Madina ICCC Dallah 43 M March 1997

Taiba Res. & Comm. Center Madina SAUDICO Taiba Invst. 44.5 M Jan. 1999

Al Nawras Jeddah Al-Sahat Fakeeh Group 1M Dec. 2000

Project Management Cairo,


Sun Rise Res & Comm Bldg Egypt STS

Project History 32
Office Buildings
Project Location Gen. Cont. Owner Value Completion
S.R.

Tamlik Tower Jeddah ICCC Tamlik Ltd. 6.4 M March 1997

National Guard H.Q. Complex Jeddah STS National Guard 105 M Jan. 1999

NCCI Head Office Building Riyadh SAUDICO CREIC NCCI 65.5 M March 1999

Sculpture Lighting Works at Riyadh STS Kingdom 4.6 M Sept. 2001


Kingdom Centre Project Holding Co.

Kingdom Centre Riyadh STS Kingdom 7.5 M Sep. 2002


Audio Visual System Holding Co.

Project History 33
Infrastructure for Housing Development
& Power Plants

Project Location Gen. Cont. Owner Value Completion


S.R.

Khalidiah Project Jeddah SBG/SBD Prince Sultan 18 M Jan. 1995

SADAF Phase III Housing Jubail A.A. Turki Sabic 6M Jan 1996

Sabic Residential Complex Jubail Binladin Sabic 15 M July 1996

Durrat Al-Arus Package “B” Jeddah Samaco Dallah 60 M Sept. 1996


(All Infrastructure &
Underground Utilities)

Durrat Al-Arus - 2 Design Jeddah STS Dallah 1.3 M Jan. 1997

Durrat Al-Arus - 2 Jeddah STS Dallah 17.3 M Nov. 1997


Utility Link and
Golf Area Lighting

Parts Distribution Center Jeddah STS Abdul 25.2 M Jan. 2004


(E&M & Finishing Works) Latif Jameel

Project History 34
Commercial Centers
Project Location Gen. Cont. Owner Value Completion
S.R.

Al Ta’meer Center-1 Riyadh El-Seif ArRiyadh Co. 45.5 M Dec. 1999

Al Maddah
Commercial Center Jeddah STA Mr. Abdullah 4.1 M July 2001
Al-Maddah

Granada Center Riyadh SAUDICO GOSI 68.5 M March 2005

Project History 35
Hotels
Project Location Gen. Cont. Owner Value Completion
S.R.

Durrat Al-Arus Jeddah Al Angari Dallah 7.6 M July 1996


Durrah Beach Hotel

Durrat Al-Arus Jeddah Dallah 14.5 M Sept. 1996


(Villas, Marina Apartment, Al Maram
Equestrian Club, Studios Al Angari
& Civic Center) STS

M213 Hotel Makkah STS Abdul


Latif Jameel 16 M Feb. 1999

5 Star Sana’a Hotel Sana’a STS Shk. Abdul 61.6 M August 2003
Yemen Rahman Banafea

Project History 36
Schools
Project Location Gen. Cont. Owner Value Completion
S.R.

9 Schools for the Ministry of


Ministry of Education Jeddah STS Education 41 M Feb. 2005

41 Schools for the South Areas Ministry of


Ministry of Education of Saudi Arabia STS Education 366 M Dec. 2006

Project History 37
Water Treatment Plants
Project Location Gen. Cont. Owner Value Completion
S.R.

Durrat Al-Arus Package # 1 Jeddah STS Dallah 44 M Sept. 1996


(Utilities: Power, Water, Sewage)

Durrat Al-Arus Jeddah STS Dallah 19.3 M Jan. 1998


Desalination Plant

Project History 38
KHALIDIYAH
Location: Jeddah Scope of Work
Gen. Contractor: Saudi Binladin - • Supply, install, commission and test 4
Special Bldg. Div. units of stand-by Genset (Caterpillar
Owner: Prince Sultan Genset 13.8, 1.5 MW each, 13.8 KV, 60
Value: 18 M HZ, 3 phase); and 10 substations with
Start Date: 01 December 1993 RMU’s, COM’s; Fiber Optic Cable Control
Completion Date: 22 January 1995

AL SHUBAIKAH-1 BUILDING
Location: Makkah Scope of Work
Gen. Contractor: ICCC • Supply & installation of all electro-
Owner: Dallah mechanical works: plumbing, sanitary
Value: 7.8 M drainage, heaters, ventilation system, air
Start Date: 10 May 1994 conditioning, electrical distribution boards,
Completion Date: May 1995 antenna system, closed circuit TV, electric
switches, outlets/lighting points, fire
fighting system, elevators and pumps.

SADAF HOUSING PHASE III


Scope of Work
Location Jubail • Site underground utilities for a 74-Villa
Gen. Contractor A.A. Turki housing complex, including all civil works
Owner SADAF and electro-mechanical utilities.
Value 6M • 12-300 kva transformers
Start Date 10 November 1994 • LV Cable 2,130m
Completion Date 30 September 1995 • MV - 15kv 1,655m
• Potable water 2,810m
• Sewer Network 1,880m
• As well as street lighting, telephone and
CATV distribution.
• Storm Drain

Project History 39
DURRAT AL-ARUS (PACKAGE 1)
Location Jeddah Scope of Work
Gen. Contractor STS • Supply and install Power Generation Plant
Owner Dallah with 3 X 3612 Caterpillar Gensets, 1 X
Value 44 M 3616 Caterpillar Genset; MV switchgear
Start Date 11 September 1994 and generator control
Completion Date 16 September 1996 • 2 X 700 m3 Fuel Oil Storage Tanks;
• Tertiary Waste Water Treatment Plant 500
m3 /day capacity with 2 X 17m diameter
chlorine contact tanks, 12m diameter
sewage lift station and sludge dewatering.
Concrete irrigation tanks with pump
station. All underground utilities for the
facility.

GOSI INVESTMENT BUILDING

Location Madinah Scope of Work


Gen. Contractor Al Redwan Co. 18-floors residential building includes:
Owner GOSI • 2 underground basements, ground,
Value 18 M mezzanine and 14 typical floors
Start Date 10 July 1994 • HVAC for all 14-stories with scope of
Completion Date 1 January 1996 works including the Building Management
System controlling the operation of the
HVAC and systems supplied by others.

RESIDENTIAL & COMMERCIAL BUILDING (155/156)


Location Madinah Scope of Work
Gen. Contractor Saudi Maram 18-floors hotel and apartment building
Owner Dallah includes:
Value 31 M • 2 basements, 1 ground and 1 mezzanine
Start Date 13 August 1994 floor for commercial outlets and 14 typical
Completion Date June 1996 floors.
• All mechanical, plumbing, HVAC (central
chilled water system), electrical &
elevators, 2 X 240 kw gensets, fire alarm,
telephone/PABX and CCTV system.

Project History 40
SABIC RESIDENTIAL COMPLEX
Location Jubail Scope of Work
Gen. Contractor Binladin - Special Infrastructure & site development, includes:
Bldg. Division • Installation of sewer mains network 5120 m
Owner SABIC • Installation of potable water mains 3190 m
Value 15 M • Storm drain network 1800 m
Start Date 4 June 1994 • Telecommunication networks telephone &
Completion Date July 1996 CATV distribution
• Primary & LV distribution; 66-300 kva
transformers, 20,345 m of MV cable & 5870
m of LV cable
• Street lighting

DURRAT AL-ARUS (DURRAH BEACH HOTEL)


Location Jeddah Scope of Work
Gen. Contractor Saudi Maram • Supply and installation of all electro-
Owner Dallah mechanical works for 14 bungalows and
Value 7.6 M 140-room multi-storey hotel building.
Start Date 19 November 1994
Completion Date July 1996

NATIONAL GUARD HEAD QUARTER COMPLEX


Scope of Work
Location Jeddah
Gen. Contractor STS Structural, Architectural and Electro-
Owner National Guard mechanical works for phase one buildings.
Value 99 M
Start Date October 1996
Completion Date Jan. 1999

Project History 41
DURRAT AL-ARUS -PACKAGE B (INFRASTRUCTURE)

Location: Jeddah Scope of Work


Gen. Contractor: Samaco/Binladin Included all infra-structure and site
Owner: Dallah development for a 2.1 million m2 beach
Value: 60 M development resort including 12 km of
Start Date: 21 May 1994 underground pipe laying for:
Completion Date: September 1996 •Potable Water System
•Irrigation System
•Storm Water Network
•Drainage Sewer Network
•Lift Stations
•47 compact substations 500 to 1,000 kv
•28,500 M-13.8 KV Ring Main Unit &
MV cable networks
•49,000 M-LV (600/1,000 V) cables
•125 no.- LV Panel Boards & LV Switchgear
•600 no. - light poles
•Telecommunication system with PABX
CATV System Network
RESIDENTIAL & COMMERCIAL BUILDING (165/166)
Location: Madinah Scope of Work
Gen. Contractor: ICCC 18-floor residential and commercial building
Owner: Dallah includes:
Value: 43 M • 2 underground basements, 1 ground,
Start Date: 28 May 1994 1 mezzanine floor and 1 first floor for
Completion Date: 15 November 1996 commercial outlets, 10 typical floors, 2
executive floors and 1 VIP floor.
• All mechanical, plumbing, HVAC,
electrical & elevators, 1 X 1,000 KVA
prime rated gensets, fire alarm, 1,000
lines telephone/ PABX and CCTV system.

TAMLIK TOWER
Scope of Work
Location Jeddah • All electrical works and equipment,
Gen. Contractor ICCC including transformers, generators,
Owner Tamlik Ltd. switchgears, and other related equipment.
Value 6.4 M Installation of lighting / power systems,
Start Date 15 July 1995 communication and CCTV system.
Completion Date March 1997

Project History 42
DR. SOLIMAN FAKEEH HOSPITAL
Scope of Work
Location Jeddah Structural work - all civil works for additional
Gen. Contractor STS pediatric wing, Medical Fitness Center and
Owner Dr. Fakeeh staff residences, including:
Value 44 M •Dewatering 2 steel bridges and 2 concrete
Start Date 1 July 1995 tunnels
Completion Date March 1999 •Electro-mechanical works: electrical,
plumbing, HVAC, medical gas system,
complete fire fighting system, A/C filters with
30% over capacity for chillers.

TAIBA RESIDENTIAL & COMMERCIAL CENTER (WESTERN TOWER)


Scope of Work
Location Madinah 14 Floors Over 5 Basements:
Gen. Contractor SAUDICO Electrical and mechanical works on the project
Owner Taiba including the design review, delivery, erection,
Value 44.5 M installation, testing & commissioning,
Start Date March 1996 maintenance of electrical distribution system,
Completion Date Jan. 1999 plumbing & sanitary installations, HVAC, BMS,
F.A. System, Elevators, Lighting system,
Television System, PABX and CCTV System.

NCCI HEAD OFFICE BUILDING


Scope of Work
Location Riyadh Supply install, testing & commissioning of all
Gen. Contractor SAUDICO the electrical, mechanical and HVAC systems
Owner NCCI servicing the building covers the following:
Value 65.5 M Mechanical:
Start Date July 1996 Fire Protection System, Chillers, AHU’s,
Completion Date March 1999 Ductworks, Insulation, Air Thermal Units,
Thermal Heat Transfer Units, FCU’s and
Thermal Energy Storage System (TES), etc...
Electrical:
Power Distribution Boards, Panel Boards,
Interior & Exterior Lighting System, Flood
lights & Emergency Lighting System,
Emergency Power Generators, Earthing and
Lightning Protection System, F.A. System,
Security System, etc..

Project History 43
AL TA’MEER CENTER-1
Scope of Work
Location Riyadh To execute the Electrical Works.
Gen. Contractor El-Seif Supply, erection, installation, testing &
Owner ArRiyadh Devpt. commissioning, and warranty maintenance of
Value 45.5 M the following:
Start Date August 1996
Completion Date Dec. 1999 Electrical Distribution Systems incl.
Transformers, Standby Generator Sets, F.A.
System, Lighting Systems, Telephone Cabling,
CCTV Security incl. P.A. System and Building
Management System.

KINGDOM HOSPITAL
Scope of Work
Location: Riyadh STS is subcontracted to execute the
Contractor: El-Seif electrical, mechanical, and medical gas
Owner: Kingdom Holding Co. works on the project in accordance with the
Value: 53 M specifications and standards as mentioned in
Start Date: October 1997 the main contract.
Completion Date: March 2000 STS has adapted to the needs of the Client
by executing in three phases Value-
Engineering & re-design of the systems
providing substantial cost saving without
compromising performance & quality.
These works include the design review,
delivery, erection, installation, testing &
commissioning and maintenance of the
following:

• Telephone & Data System with structural cabling


networks of fiber optic back bone.
• MV/LV Power Distribution System Network
• Generator Sets
• Plumbing & Sanitary Installations
• HVAC
• Fire Alarm, Fire Fighting & Fire Suppression System
• Lighting Systems (Including Emergency)
• Public Address & CATV System
• Grounding & Lightning System
• Medium Voltage Distribution
• Medical Gas System
• Storage Tanks & Storm Water Network
• Nurse Call System
• LPG & Fuel System
• Steam Networks

Project History 44
MAKKAH M-213 HOTEL PROJECT
Location: Makkah Scope of Work
Contractor: STS The Hotel building consist of 17-floors
Owner: Abdul Latif Jameel typical over 3 basements, 1 ground floor
Value: 16 M and a mezzanine includes the design
Start Date: 16 Sept. 1997 review, delivery, erection installation, testing
Completion Date: February 1999 & commissioning and maintenance of the
following:

• Low Voltage Electrical Distribution System


• Generator Set
• Plumbing & Sanitary Installations
• HVAC
• Fire Alarm & Fire Fighting Systems
• Lighting Systems (Including Emergency)
• Telephone Systems
• Public Address, CATV System & Nurse Call
• Grounding & Lightning System

SAUD AL BABTAIN CARDIAC CENTER


Location: Dammam Scope of Work
Contractor: STS STS is contracted to execute the complete
Owner: Saud Al Babtain civil, architectural, electrical & mechanical,
Value: 40 M works including supply of fixed medical
Start Date: 15 June 1998 equipment like, bed head units, operating
Completion Date: March 2000 lights & surgical column. These works includes
the design review, delivery, erection,
installations, testing & commissioning &
maintenance of the following:

• Structural / Architectural Works


• Interior and Exterior Finishing
• Low Voltage Electrical Distribution System
• Generator Set
• Plumbing & Sanitary Installations
• HVAC
• Fire Alarm, Fire Fighting & Fire Suppression Sys.
• Lighting Systems (Including Emergency)
• Telephone & Data Systems
• Public Address, CATV & Nurse Call System
• Grounding & Lightning System

Project History 45
KING KHALID NATIONAL GUARD HOSPITAL
Scope of Work
Location Jeddah
Gen. Contractor STS Structural, Architectural and Electro-
Owner National Guard Mechanical works for Oncology Center
Value 10 M Remodeling Wards 10/11/12.
Start Date October 1999
Completion Date April 2000

THREE 100 BED HOSPITALS


Location: Rahfa, Khafji & Domat Al Jundal Scope of Work
Gen. Contractor: THINET International
Owner: Ministry of Health The scope of this project consist of the
Value: 108 M Electro-Mechanical works such as
Start Date: February 2000 Plumbing, HVAC, Electrical MV / LV
Completion Date: August 2002 Networking System and Medical Gases
Systems for the building facilities, as
follows:

• Main Hospital & Ancillary Building


• Housing Buildings
• Mosque
• Guardhouses

And for the external site facilities and


utilities networks, including water treatment,
sewage treatment plants & storm water
network.

SULTAN BIN ABDULAZIZ CITY FOR HUMANITARIAN SERVICES


BID PACKAGE 9 – CHILD DEVELOPMENT CENTER & MOSQUE
Scope of Work
Location: Riyadh
Gen. Contractor: Al Mabani The scope of this project consist of the
Owner: Sultan Bin Abdulaziz Electro-Mechanical works such as
Value: 9.7 M Plumbing, HVAC, Electrical services and
Start Date: June 2000 Low Current Systems, Building
Completion Date: August 2001 Management System & Fuel Storage Tanks

Project History 46
AL-MADDAH COMMERCIAL CENTER
Scope of Work
Location: Jeddah
Gen. Contractor: STA Co. The scope of this project consist of the
Owner: Mr. Abdullah Al Maddah Electro-Mechanical works such as
Value: 4.1 M Plumbing, HVAC, Electrical services and
Start Date: July 2000 Low Current Systems.
Completion Date: July 2001

SCULPTURE LIGHTING, AUDIO VISUAL (A/V) &


FIRE FIGHTING SYSTEM AT
KINGDOM CENTRE PROJECT
Location: Riyadh Scope of Work
Gen. Contractor: STS
Owner: Kingdom Holding Co. The Contractor shall design, engineer,
Value: 13.4 M source, supply, fabricate, install, test and
Start Date: November 2000 commission the works to the complete
Completion Date: September 2001 satisfaction of the Employer. The works
consist of the following:

• Design, fabrication of lighting panels &


installation of the panels at the sculpture
area from level 200 till 300 meters with
control thru BMS including structural
catwalk for maintenance purpose.
• Design, installation & Testing &
Commissioning A/V System for Kingdom
Tower with 4 Season Hotel.
• Design, installation Testing &
Commissioning of 100 & 300 HP pumps for
the fire fighting system & handing-over to
the satisfaction of the Employer.

Project History 47
5 Star Hotel, Sana’a - Yemen

Location: Sana’a, Yemen Scope of Work


Gen. Contractor: STS
Owner: Shk. Abdul Rahman Banafea The scope comprise electrical and
Value: 61.6 M mechanical works as follows:
Start Date: May 2001 • HVAC
Completion Date: August 2003 • Plumbing
• Fire Protection
• Fire Alarm
• Steam Works
• Power Distribution (MV & LV)
• Lighting
• Building Management System
• Security Systems
• Generators
• Data & Telephone Network
• Kitchen Equipment
• Swimming Pools

Prince Abdul Aziz Bin Scope of Work


Musa’ad 100 Bed Hospital
The scope of the subcontract for this project
Location: Ar’ar, Saudi Arabia consist of the Electrical and Mechanical
Gen. Contractor: Areel Construction Works such as, Plumbing, HVAC, Electrical,
Owner: Ministry of Health Medical Gas Systems, Steam and
Value: 31 M Equipment’s for the following buildings:
Start Date: June 2002 • Main Hospital & Ancillary Buildings
Completion Date: November 2003 • Housing Buildings
• External Works

Project History 48
150 Bed General Hospital Scope of Work

Location: Haql, Saudi Arabia The scope of the subcontract for this project
Gen. Contractor: ASTRA Co. consist of the Electrical and Mechanical
Owner: Ministry of Health Works such as, Plumbing, HVAC, Electrical,
Value: 17.8 M Medical Gas Systems, etc & system’s
Start Date: September 2001 equipment’s for the following:
Completion Date: January 2004 • Main Hospital & Ancillary Buildings
• External Works

Granada Center

Location: Riyadh, Saudi Arabia Scope of Work


Gen. Contractor: SAUDICO The scope of the subcontract for this
Owner: GOSI project consist of the Electro-Mechanical
Value: 68.5 M works such as Plumbing, HVAC, Electrical
Start Date: December 2002 & External Works.
Completion Date: March 2005

Project History 49
STS Projects Photos

STS Projects Photos 50


Prospective View
Granada Center, Riyadh

STS Projects Photos 51


Prospective View
Granada Center, Riyadh

STS Projects Photos 52


Prospective View
Granada Center, Riyadh

STS Projects Photos 53


Prospective View
Granada Center, Riyadh

STS Projects Photos 54

You might also like