Arlington, TX 76011 Home phone 817-276-9461 cell phone 214-908-8650 email: nn1033cb2@westpost.net Summary: 30 years experience, 20,000 CATIA hours version 4 Aircraft Wing, Fuselage, Mechanical Systems, Wiring Installation, ECS Design & I nstl Helicopter, & Tilt Rotor Aircraft Design & Liaison Engineering Helicopter Rotating Controls, Rotor Blade, Airframe, Powerplant, & Fuel Systems Flight Test & Mechanical Lab Testing, Requirements Definition, Design & Build up Test Operation, Configuration Management, Test Documentation, & Project Manageme nt Aircraft Wing, Fuselage, Primary & Secondary Structure Design Mechanical System Design & Installation, Crew Station Design Aircraft Interiors, ECS Layout, Design & Installation, Fire Detection & Protecti on Instl Cargo liners, fire extinguisher tubing, hydraulic tubing design & installation Scheduling, Estimating, Manpower Forecasting, Technical Writing MIL-STD-1388 LSA, Maintenance Task Analysis & Task Writing SLIC2B Education: Texas A&M University Bachelor of Science - 1979 Experience: 7/01 to 6/10: Bell Helicopter Fort Worth, Texas V-22 Wing Structure Design & Systems Provisions & Liaison Liaison Engineering for Hydraulics, Equipment, Armament, Crew Station 609 Baggage Compartment Design including fire protection 6/01 to 7/01: Sikorsky Helicopters Trumbull, CT Comanche Composite Primary Airframe Design with Fibersim 1/01 to 4/01: NORDAM Tulsa, OK Aircraft Interior Design & Installation 4/00 to 1/01: Boeing Commercial Aircraft Everett, WA Cargo Fire Detection & Protection Installation, Halon Bottles, Smoke Detectors, Valves 1/99 to 3/00: Boeing Aircraft Mod Center Shreveport, LA Design Lead CH-47 Structural & Systems Mod Design Systems Installations & Wiring Installation 7/98 to 12/98: Bell Helicopter Fort Worth, Texas 609 Civil Tiltrotor Airframe Design Liaison Engineering (multiple disciplines & programs) 5/98 to 7/98: Lockheed Martin Skunk Works Palmdale, CA JSF Prototype ECS Installation Design 5/96 to 4/98: Lockheed Martin Tactical Aircraft Systems Fort Worth, Texas Flight Test Equipment Installation Design F-22 Primary Structure Design with Systems & Wiring Provisions JSF J/IST Integrated Systems Test F-16 mod program ECS design 1 2 Nicholas Leo Norman 422 Royal Colonnade Arlington, TX 76011 Home phone 817-276-9461 cell phone 214-908-8650 email: nn1033cb2@westpost.net 3/93 to 6/96: Bell Helicopter Fort Worth, Texas Rotor Design Group, Proprotor Blade, Bearingless Main Rotor Hub Tiltrotor Composite Wing Design Helicopter Airframe & Powerplant Installation Design MIL-STD-1388 Supportability & Maintenance Task Analysis (SLIC2B) 10/90 to 2/93: Boeing Commercial Aircraft Company Renton, Washington Project Management 777 Fly by Wire Flight Controls Test Rig (Iron Bird) Flight Deck & Flight Controls Design Engineering Coordination Schedule & Coordinate First Article Manufacturing & Procurement for Tests 9/89 to 8/90: Lockheed Aerospace Systems Company Burbank, CA P-7A Environmental Control System Design & Installation Central Systems Design Focal & Systems to Structures Focal for all Systems in th e Flight Deck Design Zone including Avionics Bay, Flight Deck, & Cabin Cooling S ystem Design 7/87 to 9/89: McDonnell Douglas Helicopter Company Mesa, Arizona Apache Fly by Wire Iron Bird Design C-17 Landing Gear Pod Composite Structure Design APU Installation Design 10/86 to 7/87: Boeing Military Airplane Company Wichita, Kansas A-6 Composite Re-Wing Design, Wing Systems Installations including Wing Fold int erfaces with Flap Drive, Speed Brakes, Flight Control Cables, Bellcranks, Pulley s, Push/Pull Rods, Fuel, Hydraulics, & Electrical Installations 9/85 to 9/86: Bell Helicopter Textron Fort Worth, Texas Rotor Design Group, V-22 Spinner Assembly Design 9/84 to 9/85: LTV Aerospace Dallas, Texas Composite & Titanium Primary Airframe Design, Titanium & Aluminum Forging Design Composite Integrally Stiffened Wing Skin Analysis & Design 6/84 to 9/84: International Business Machines Austin, Texas Injection Molded Plastic & Sheet Metal Computer Chassis Design Prototype Machined Plastic Part Design for Automated Assembly & Process Verifica tion 1/84 to 6/84: Lockheed Missiles & Space Austin, Texas System Design & Installation in Aquilla Remote Piloted Vehicle Carbon Fiber Airframe & Fiberglass ECS Ducting Electrical Equipment, Systems, & Wiring Installation Design 1/80 to 1/84: General Dynamics Fort Worth, Texas Flight Test Engineering, Design, Test Aircraft Configuration Management Crew Station System Design & Installation