Professional Documents
Culture Documents
S u c c e s s S t o r y
to changes.
SS_Bayer_2007_engl_RZ2_A4.FH11 Mon Apr 23 10:14:35 2007 Seite 3
Complete integration of the strategic plan for The planning processes can be improved
sales and operational planning plus, in particular, continuously, additional implementations require
enablement of forecast-based, market-oriented less effort and achieves higher ROI.
production. Implementation in steps helps users understand
Replacement of the previous insular solution the solution before the system schedules
and simultaneous improvement of the new IT independently in the background (black box
solution to gain detailed information in fewer syndrome).
operational steps. Users themselves learn to demand and accept
automatic processes.
Bayer MaterialScience engaged J&M Management
Consulting to implement SAP APOPP/DS. The The implementation now enables planners to
challenge was to integrate sales planning, order promptly react to requirements from sales and to
processing, and production in terms of both directly schedule production adjustments from one
processes and IT. The first step consciously source. Special alerts immediately inform those
abstained from a completely automated solution responsible for planning of changes in production
so that the application would remain manageable requirements. These include deviations, changes
and to foster its acceptance. A comprehensive and unplanned events that always occur in practice.
planning board enabled schedulers to follow all The production planning board clearly indicates
the information relevant to real-time scheduling the need for action in real time and immediately
and to intervene in planning when necessary. displays the changes relevant to production that
are triggered by the alerts. It thus supports
Coupled Sales & modifications to the production plan.
Order Processing
Deviations Analyse
The following steps proved essential to the success- Changes Initiate
Unplanned Events Alert
ful implementation of SAP APOPP/DS at Bayer New Conditions Situation
Planning
MaterialScience:
Contact
Lars Eickmann, Partner
J&M Management Consulting
Kaiserringforum
Willy-Brandt-Platz 5
D-68161 Mannheim
Tel +49 621 124769 0
Fax +49 621 124769 20
E-Mail l.eickmann@jnm.com
www.jnm.com