e2o Project History

INTERNATIONAL NATIONAL
Project Location Description Date Project Location Description Date
Bohai Bay Houston / Supply electrical, Jan 06 - Present Woodside Pluto NW Shelf, Multi-disciplinary Aug 09 - Present
China instrument, mechanical Riser Platform WA offshore commissioning
work pack development,
completions,
commissioning and
TCN’s
CSPC China Testing and Dec 05 Energy Karratha, Commissioning, Mar 09 - Nov 09
Petrochemical Commissioning Developments WA planning, CFT’s and
Plant Karratha LNG Calibration
Plant
Conoco Phillips Singapore Technical assistance for Mar 05 Santos Coal Fairview, Commissioning, EEHA Sep 08 - Feb 09
Safe Concordia installation and testing of Seam Roma, Inspection and
telecommunications Compressor QLD Verification Dossier,
system Stations Compilation and
rectification of Punch List
Murphy Sarawah Malaysia Provide completions Jun 04 - Oct 04 Conoca Phillips Darwin, Calibration and Apr 08
Oil Company management package LNG Plant NT certification of test
West Patricia Shutdown equipment
Production B
MODEC Santos Singapore QA/QC Inspection May 04 - Jan 05 Santos Cooper South Pre-commissioning and Jan 07- Jun 07
Multineer/Exeter services Oil West QLD Commissioning support
Project
Conoco Phillips - Singapore E/I and mechanical Jan 02 - Apr 03 DBNGP Stage 5 WA Construction, Jun 05 - Jan 07
Bayu Undan / Offshore completions, onshore & Facilities installation, civil,
and offshore Upgrade maintenance, E/I
KBR Halliburton Singapore Provision of E/I, Nov 02 - Aug 03 Caltex Refinery Kurnell, Plant upgrade projects, Jan 05 - Aug 06
Barracuda FPSO mechanical and telecoms Kurnell Capital NSW various E/I and EEHA
commissioning personnel Upgrade Projects
Global Santa Fe Singapore E/I pre-commissioning, Aug 04 - May 05 Ace Project Moomba, Site control system Jun 02 - Sep 04
Development commissioning, handover Santos SA upgrade
Driller documentation
BP Yacheng 13 China Provide completions Jan 03 - Aug 03 HV Reticulation Moomba, Upgrade site HV system Dec 02 - Mar 04
RDPP1 management package Project, Santos SA
SBM Falcon Singapore E/I and mechanical Oct 01 - Mar 02 LRP Remediation Moomba, Rebuild LRP after Jan 04 - Sep 04
FPSO commissioning Project SA fire/explosion
BP Lan Tay South E/I commissioning, Jan 02 - Aug 02 Magellan Palm Install E/I systems for May 02 - Jun 02
Korea handover documentation Petroleum Liquid Valley, NT new KO drum
KO Drum
Installation
Haven FPSO Dubai, Supply of E/I and Mar 03 - Sep 03 Callide Power Biloela, Instrument maintenance Sep 02
Refurbishment UAE mechanical Station Shutdown QLD and calibrations
commissioning team
Clough/Origin Indonesia E/I construction, BHPB Olympic Roxby Smelter Instrumentation Aug 98 - Sep 01
Energy Bass Gas installation and EEHA Oct 03 - Feb 04 Dam Expansion Downs, and commissioning
Yolla A Platform testing SA
Projects listed have been completed by either e2o, Eco Connection or historically by senior management personnel on previous engagements