You are on page 1of 3

(760) 832-5131 * DALE WALDEN@YAHOO.

COM
DALE WALDEN
OBJECTIVE
To further advance the 28 years I have in the construction industry. To be a lea
der and grow with a company that can use my vast experience and qualifications a
s well as learn new skills to benefit both myself and the company. To not just p
aint the big picture, but make it happen! I'm not just looking for a job, but fo
r a future as well.
SUMMARY OF QUALIFICATIONS
Strong background in civil and public works construction
I am an above average equipment operator/foreman/superintendent
I have done all trades from cradle to grave
Underground utilities (sewer, water, sd, dry utility)
Water treatment and sewer treatment facilities
Grading, demo, and paving (mass grade, streets, pads, and parking lots)
Concrete: both structural and decorative (foundations, poured in place walls, e
ct.)
Buildings: pre engineered metal buildings, masonry, wood frame
In 1995 I received a California (A) general engineering contractors license
CERTIFICATION
I am CPR and first aid certified, I 've been trained in the reasonable suspicio
n supervisor training on the recognition of drug and alcohol abuse in compliance
with 49 CFR part 362.603. I'm also certified as a railroad worker, safety train
ed, California OSHA 8 hour, confined space, competent person trained, and have c
onducted under ground safety classes for AT&T field employees.
WORK EXPERIENCE
CORA CONSTRUCTORS
(760) 674-1536
02/06/06 thru 09/01/09
SUPERINTENDENT - PAID AS A CONSULTANT/EQUIPMENT OPERATOR (please review list fo
r jobs completed with this company) (CIVIL AND PUBLIC WORKS) Dollar amount of j
obs range from 400,000 - 3.8 million additional information will be furnished up
on request.
PITTS BROS. CONSTRUCTION
(909) 453-5290
10/01/03 thru 02/04/06
SUPERINTENDENT/EQUIPMENT OPERATOR - (COMERCIAL AND INDUSTRIAL UTILITIES)
KANA PIPELINE
(714) 986-1400
SUPERINTENDENT FOR 6 CREWS WITH 15 JOBS IN PROGRESS (UNDERGROUND UTILITIES)
J.W. CONTRACTION CORP.
Jim Pleasant
(909) 278-7840
EQUIPMENT OPERATOR
(SEWER AND WATER TREATMENT PLANTS)

Equipment I can operate efficiently.


Finish Blade----CAT 140G,12G,14G,J/D 672,722 Finish pads, Streets, Parking lots,
blue top, Laser experienced, Work with scrapers and trucks.
824 R/T Dozer---- Support the fill mix and process and compact
Scrapers---- 613, 623, 637, 657, 651
Dozers----Cat D4H, D6, D8L, D9L, and J/D 450,650,750
R/T Loaders----966, 988A, 988B Load trucks and Re Rail Trains
Tract Loaders----977, 943 Demo work and Load trucks
Tract Hoes----Cat 235, 245, 330L and J/D 670, 690 Load trucks, Demo, Hammer and
Dig Trench for under ground utility's
Back Hoes----Cat 416, 426, 436, J/D 310, 410, 710 and CASE 580E,590 Dig footing
s and trench for under ground utility's
Hydro Hammer----Compaction
Trenchers----Cleveland wheel, Ditch Witch chain, Case chain and Earth saw
Cable Plow----All types. Place cable, interduct and fiber optics
Hydro Crane's----Grove 45 Ton / 75 ton, Pore concrete with buckit, move misc. su
pplies and equip. around job
Rock Truck
Low bed----5ax, 7ax move misc. equip. from job to job
Water trucks and pulls----2,000 , 4,000 Gal. trucks 6,000 , 8,000 Gal. pulls
Trucks----End dumps high/low side, bottom dumps, flat bed and lots of specialize
d over sized loads.
Projects Completed as Superintendent and multitasking as an Equipment Operator.
Zone 1 Reservoir
28999 S. Lower Valley Rd Tehachapi, Ca 93561 / (661)821-4428
Owner - Bear Valley Community Service District /
Project Manager -
Start - January 2006 / Complete - May 2006 / Total Construction time - 120 worki
ng days
Type of work - Reservoir site work, Excavation, paving, piping and electrical.
Ridgecrest Reservoirs Tank A, B and C
500 W. Ridgecrest Blvd. Ridgecrest, Ca 93555 / (949) 2407902
Owner - Indian Wells Valley Water District /
Project Manager - Pacific Tank - Bob Wakeham
Start - May 2006 / Complete - April 2007 / Total Construction time - 200 working
days
Type of work - Ring wall, paving, grading, fence, curb and gutter, electrical an
d piping.
J258 - Construction of (1) 5.0 MG welded Steel Reservoir, Adelanto / Victor Vall
ey
Owner - City of Adelanto
Project Manager - Bob Wakeham / (949) 240-7902
Start - March 2007 / Complete - May 2008 / Total Construction time - 250 working
days
Type of work - Construction of 5 MG steel Reservoirs, grading, Reservoir foundat
ions, fence, trenching, Excavation work, electrical and paving.
J263 - LCID ASR Improvement and P-1 Pump Station Expansion / Pasadena, Ca
Owner - Foothill Municipal Water District
Project Manager - Taum Mcginnis / (760) 602-3818
Start - Sept. 2007 / Complete - May 2008 / Total Construction time / 180 working
days
Type of work - Installation of pumping equipment for the expansion of the P-1 Pu
mp Station. Construction of the injection water pipeline and injection water pum
p station for Las Canada Irrigation District, Aquifer Storage Recovery Improveme
nts. Piping, valves, electrical, Instrumental work, fabrication and installation
of sound enclosures. Start up and testing of two 350 HP vertical turbine pumps.
J259 - Reservoir Improvements Project / various locations (7 job sites 16 tanks)
Victorville, Ca
Owner - Victorville Water District /
Project Managers - Peterson, Brustad, Jeffery Pivetti, Skytel / (916) 608-3818
Start - June 2007 / Complete - June 2008 / Total Construction time - 520 working
days
Type of work - Seismic repairs and modifications to various existing water tanks
.
J 265 - 6 MGS Julian Pump Station / Julian, Ca
Owner - Ramona Municipal Water District
Project Manager - Melvin Tsang / (760) 788-2218
Start - Oct. 2007 / Complete - Oct. 2008 / Total Construction time - 365 working
days
Type of work - Demolition, grading, earthwork, retaining wall, pump station buil
ding, pumps, install from 12" to 30" steel pipe and valves, electrical and instr
umental, surge tank, paving and modifications to existing tank.
Ground Water Pump Station / City of Industry
Owner - Walnut Valley Water District
Project Manager - Sherry Shaw / (909) 595-1268
Start - April 2007 / Complete - Sept. 2007 / Total Construction time - 180 work
ing days
Type of work - Schedule III construction of Pump Station, trenching, backfill, e
lectrical work and concrete paving.
J273 - Misc. Booster Pump Station Upgrades / various locations in city of Pomona
PO Box 660 Pomona, Ca 91769
Owner - City of Pomona Public Works Department
Project Manager - Carl Paraza / (909) 620-9651
Start - September 2007 / Complete - 90%
Type of work - Booster Pump Station Upgrades for Booster Pumps 14A, 14B, 15A, 15
B and 3G, mobilization, demolition, furnish and install 60 HP booster pump, pipi
ng, electrical and concrete work.
J277 - Pomona Water Reclamation Plant Emergency Generator / City of Pomona
Owner - Sanitation District of Los Angeles County
Project Manager - Paul Perkins / (562) 699-7411
Start - Pending notice of award August 28, 2008 / Completed -
Type of work - Construction of new electrical switch gear building, install dist
rict furnished 2.5k switch gear emergency generator.

You might also like