Professional Documents
Culture Documents
. .
tal
11
he dc,' en of a storm drainage '~,sre n by the ational ~ hod · ,'>01 'e ,"epea,'" ,""us' oftbe ec uati 0 " e
a
I.
cor: eee'T = __ , __
I' -I_~ (
2)
MUM BA I (S.
TD
D. CHAWATHE ET AL)
R.B
A~
r:n Pericd
{Y'sars
.. 5 2
"j}
AH M E DABAD
·_1
(S. D. CHAWATHE)
·_1
'0.3203
3 TO 3.75 YRS
·_1
------------------------
PUNE
1 TO 1 .7.5 YRS i 2 TO 2.75 YRS i3 TO 3.75 YRS 5425
(S.D.CHAWAT·HE)
FREQ 1;1; :0.4837
-------------------
= --------------
,IN M M/HR
( OUR + 33.44)1;1; 1.4019 107840 FREQ 1;1; .564 0 - --- -- --- --- -- --- --- -- --- --- ---R + 69.08) 1r1r 2.0029
- -(-OU
OUR IN MIN.
(-D-U-R--~-7g~96--)-:~-2~O-695--1761900
FREQ 1;1; .6709 0
------
FREQ IN MONTHS
4 TO 5 YRS
I
-(-DUR-:-1-15.58)-~:-;~55-
K 0 L KA T A
T
= 1 TO
3 MONTHS
1=
= 1 TO 2 YRS
1=
9 5 3 T 1;1;0.1 57
( t + 45 ) 1;1;1.34
= 5 TO
20 YRS
1=
290T1;1;0.119
( t + 45 ) 1;1;1.05
= 1 MONTH
TO 20 YRS
1
81 0 T 1;1;0 .126
T.)
10** 6
1=
--------------------( t + 188.85 ) ** 6.848 '0·.'0004174(t -99.28} ** 2 0.0001' 177( t -181.9) ** 2 0.0003165(~ - 129. t8) ** ~ 0.0004692( t - 119.94)**' 2 0.0002755 ( t - 1,4,9) ** 2
ALSO
· 1= · 1= · 1= · 1= · 1=
AL)
I'
'"f
BANGALORE
(P. KHAGESHAN)
iii
the
a
1_•
a OR
•
-----------t+b
= ---------------
Where i is the intensity of rainfall mm/hr, t is the duration of storm in minutes, And a, b, and n are constants.
CPHEEO MANUAL
Type of Area Residential Peripheral Central (high value) Commercial Twice in a year Once in a year Once in 2 years Frequency
ASCEMANUALNo
Type of Area Residential Commercial ·(High value)
37
Frequency
Once in 2 to 15 years
Once in 10 to 15 Years
To design the drai nag e system for 1 in 1 year storm a considerab Ie increase in capacity is required and this results in drains of substantially larger dimensions and a large increase in the 'number . .' 'of drains to be replaced or augme nted There is 37 % increase in expenditure for catchment 129. This' clearly indicates that designing for the increased' level of :service is no where justified.
AS DISCUSSED THE COST OF DESI'GNING FOR ,STORMS OF GREATER INTENSI,TY THAN A 2 IN 1 YEAR EVENT IS NOT JUSTIFIED. IT IS .THEREFORE P'ROPOSED, TO CONSTRUCT WORKS TO, A .. . . DASIGN CAPACITY TO ONLY COPE UP WITH A 2 IN 1 YEAR EVENT.
, "
BRIMSTOWAD
'BRIMSTOWAD JUSTIFIES TWICE IN A·YEAR FREQUENCY· FOR STORMS IN DESIGN. 26/7 EXPERIENCE HAS TAUGHT . US TO, REVIEW THIS ASPECT . . AND ADOPT FREQUE·NCIES SUCH AS SAY ONCE IN TEN . . YEARS FOR DESIGN.
• SMALL CATCHMENTS:
50mm/hr~
2 IN ONE YEAR
This Report, providing proposal's to M',aster Plan and Preliminary Engineering, does not cover the detailed investiqation and proposals for local drainage systems. The proposals contained in subsequent 'sections are the result of ana lysis of the major network' and give in 0 utli ne the requ ireme nts fo alleviate the major causes of flooding. As with any analysis on' this scale, not all branches were considered.
RECOM MENDATIONS
• DESIGN / PROPOSA.LS SHOULD BE PREPARED FOR INTENSITIES OF STO'RMS FOR ,A FREQUENCY OF 'OCCURRENCE OF 'SAY ONCE IN TEN YEARS. • DESIGN/PR:OPOSALS SHO'ULD BE ADDED FOR LOCAL STORM WATER 'DRAINAGE SYSTEMS (SMALL/MEDIUM/LARGE ROADS ~SMAL'L NALLAS WITH CONCENTRA,TION TIME 10 MIN. TO '60 MIN.) • USE RAINFALL INTEN'SITY- DURAT'IONFREQURENCY RELATIONSHIPS DEVLOPED BY CHAWAT,HE ,ET AL FOR DESIGNING LOCAL STORM WATER DRAINAGE S'YST,EM
, ,
2[0"
~]
"
'
120
3 4 Sma Nallas 45 95
THANK
YOU