YOKOGAWA

DCS Introduction
CS 3000 – Integrated Control System Overview
Advanced , Flexible Operator Functions
Powerful Control Station Features
Flexibility in Engineering
Integrated Solutions – Extended Applications
Unique Advantages leading to Lower TCO
DCS Background
a l Computer
A ctu Compatible Nest Type DCS
System Cost C Controller (TDC-2000)
DD Controller
(SPEC-200) 1975
62H
a log
An
Base:
p e cted * Computer Compatible System
Ex
DDC * Process I/O with PID back up

No. of Loops *Position DDC as a Future System DCS


*Justify DDC cost by Automation (CENTUM)
Early1960s Promotion 1975

Base:
* Enhancement of DDC from cost, failure problem, engineering
point of view
First Generation DCS
1975: CENTUM was developed based on DDC Experience
< CENTUM is the first Distributed Control System in the world.>
– High Confidence on Reliability /Dependability
• First Token Pass Highway in the world.
* Token Pass Data High Way
-- No Electronic Parts at System Common.
-- Redundant Highway alternately used for Complete Error Detection
-- Became the Base of IEC Standard ”PROWAY”.
then IEEE 802.4, MAP, and FieldBus.
• Duplex Control Station
* CPU redundancy
-- Memory Update is a Key and Most Difficult
-- Block by Block and Table by Table Memory Copy was applied.
* Internal Bus Redundancy
-- Redundant Internal bus between CPU and I/Os with Alternate Use
-- Power Supply for I/Os are also Redundant.
– Easy Engineering for Automation and Advanced Control
– User Friendly CAD (Fill-in Type) based Engineering
History of Yokogawa DCS
1965 1970 1975 1980 1985 1990 1995 2000

Supervisory Computer System


YEWCOM, HP9000

Computer Systems for Control


CCS YODIC100 YODIC1000

Production Line Control System


Concentrated Control System YEWMAC ASTMAC
YODIC500 YODIC600

CS1000
DCS CENTUM CENTUM-V CENTUM-XLCENTUM CS/CS3000

YEWPACK μXL
YS 80 YS 100
Analog Control
ECS EBS I SERIES
Progress of Yokogawa DCS
system
’75 ~’ 78 ’79 ~’ 82 ’82 ~’ 88 ’84 ~’ ’88 ~’ ’92 ~’ ’98 ~’
INTEGRATED SYSTEMOPEN SYSTEM
EXCELLENT SYSTEM
1. UNIX OS 1. WINDOWS-NT OS
1. Function Assignment 2. Advanced Control 2. Client / Server
3. Open Net Work
2. Separation of Engneering 3. Migration
USER ORIENTED 4. High Reliability
3. High Peroformance 4. High Reliability
OPERATION 4. Touch Operation 5. Utilisation of Users’ Assets
1. 5. Window 6. Easy Engineering
NEW MODEL Enhanced 6. Integration (Super Window)
Functions of OPS7. Expanded Control Capacity CENTUM
1. 2.
High Speed CS3000
Voice Output C ENTU M
Comunication 3.
Japanese CS
THE FIRST DCS 1. Bus
Unified Operator
SYSTEM IN THE 2. Language CENT UM- XL HIS
WORLD Stations Adoption of 4.
Support ICS
2. Redundant HDD
1. Distribution of Control Sequence-
CE NTU M- V
Control Stations 3. CMOS Memory oriented Control
2. FIF 4. One-Touch Station Computer 10Mbps   V net
EOPS ENGS
CTM - 2
Operation XLAIS Station
(Function Key BCV
COPS Development) COPSV FCS

COPS2
7DF
EFCS
COPS
1Mbps
CFSS
7DF 7VP HF-BUS
CFFS
CFCS2
256Kbps
HF/F Converter
CFCS Station
F-BUS
7FS

Control Loops 32 32 40 40 80
40 200 200 4096 Blocks
Sequence 20 20
Tables
Technology waves on Control Systems

Windows 2000
Internet
NT
IT
and
Microsoft

UNIX

Micro processor

1st CENTUM V XL CS CS 3000 CS 3000 R3 time

June 1975 ’82 ’88 ’93 ’98 ‘01


Enterprise Technology & Solution

Business (Top Management) Domain


◆ Corporate Information systems
◆ Enterprise Resource Planning (ERP)
◆ Supply Chain Management (SCM)
Business
Domain
Manufacturing Exec. System Domain
◆ Plant Information & Management System
(PIMS)
MES Domain ◆ Maintenance Management (MM)
Control Domain
Advanced Application
◆Advanced Process Control (APC)
Control Domain ◆ Advance Operation Assistance (AOA)
Plant Control Room/Factory Floor
DCS/PLC/PC/ESD/F&G
Field Domain
Field Domain Fieldbus and conventional
Field Instrumentation.
DCS Introduction
CS 3000 – Integrated Control System Overview
Advanced , Flexible Operator Functions
Powerful Control Station Features
Flexibility in Engineering
Integrated Solutions – Extended Applications
Unique Advantages leading to Lower TCO
Integrated Plant Control System (IPCS)
Hi-Tech Solutions Available in
CS1000/3000

◆Foundation Fieldbus

◆Profibus

◆ExaOPC - OPC Interface OLE for Process


Control
OPC Compliance
Exaopc:
PIMS / Maint.Mgt. Domain wide
M “OPEN”Interface
OPC Client
E
S
OPC Interface
APC/AOA Process Data
OPC Client
Eng. Data
C
O
N HIS
HIS/
T OPC Server
ENG
R
O V-net
ABC-H
L
FCS HF-Bus
CENTUM-XL
Positioning of CS 3000 R3
Business Systems
Well-balanced ERP/SCM Featuring
cutting-edge
open architecture PIMS “open”
and reliability technologies

New migration path APC


supplies open
HMI
architecture with CENTUM AOA
existing systems.
CS 3000 R3
MM
Migration FCS
Rich interface by
new I/O.
Existing Systems
CENTUM-XL FOUNDATION™
CENTUM V Fieldbus
Field Network
Typical System Configuration
Business Domain Remote DCS
Ethernet Domain
Closed-type HIS LCD-type HIS
HIS/ENG
APC AOA
PIMS MM
ACG

Vnet
Incl. Fieldbus
APCS
Engg. BCV
Mulcom FCS
With I/O Migration
bus converter

I/O in the Remote Field CS/CS 1000/3000


(ExaCoast) CENTUM-XL/V/ µXL
RS-232/485/Ethernet

Prosafe-ESD H1 Fieldbus

Field Devices

PLC / Remote I/O / Subsystems


System Scalable

Min. Configuration Expanded. System


Single Domain Configuration
Configuration

Controller

Whole Complex
One Process
Unit
Max. No. of Tags : 100,000 per HIS
Max. No. of Stations : 64 Expanded System
Max. No. of Domains : 16
Max. No. of Stations : 256
Security
User User
•Function block operation
Group Permission and monitoring
Check operation Check operation
Check user •Windows operation and
and monitoring and monitoring
name monitoring
scope authority
User in •Receipt of messages

Operation
History

Tag Basis
Operation Mark
Important
Tag PV
(Major Alarm) Key Access CONTROL 0007
PVPVPVPVPVPVPVPVPV
SVSVSVSVSVSVSVSVSV
Ordinary Tag FIC001

(Medium Alarm) Windows user


Auxiliary security
Tag1
(Minor Alarm)
Auxiliary
Tag2
(Logging Alarm)
DCS Introduction
CS 3000 – Integrated Control System Overview
Advanced , Flexible Operator Functions
Powerful Control Station Features
Flexibility in Engineering
Integrated Solutions – Extended Applications
Unique Advantages leading to Lower TCO
Monitoring & Operation
Human Interface Station
Management
Information Maintenance
Easy integration with higher
Extensive self diagnostics
level systems
Maintenance & report
Historical database packages functions
etc... On-line maintenance
Remote maintenance
etc....

Off line engineering 100.000 tagnames


On line engineering 2,500 Display Panels
Powerful engineering & Enhanced trending
testing tools Intelligent alarm functions
One global database Reliable security functions
etc.... Windowing operation
etc....
Engineering Process
Information
(HIS)
Web based Plant Monitoring
HIS graphic/trend General-purpose PC
windows are
converted into HTML
files and Java Applets
Web
Server

Graphic windows,
Ethernet Plant LAN/WAN trend windows,
Dial-up
Internet and ITV windows
HIS
General-purpose PC
Connection

V net

FCS Plant monitoring on a business


trip, at home, at maintenance
office, etc. using Web Browser
Browser
❚ Yokogawa FIELDEYE ITV system
❙ The Web camera server enables ITV images to be displayed
via a Web browser at an incredible low cost.

FIELDEYE System
HIS Internet Web camera
Explorer (free) server
ITV image ITV camera
signal
Ethernet or dial-up connection

ITV camera control signal


Multiple Monitor
❚ Efficient monitoring/control of Advanced Process
Control/Operation by a single operator with dual monitor

Single Monitor
Dual Monitors
Windows overlap each Much easier
other. Hard to see!
to see!
Operation and Monitoring
Standard Operation and Operation and Monitoring Support
Monitoring Windows Functions
Graphic,Tuning, Trends, Alarms, Process & Historical message reports, Security
Operator guidance ITV camera & CENTUM desktop customization

Control Status Display Trend Functions


Window Real time, Historical trends Long term data
archive, External recorder, Expert trend
Control drawing, Sequence table viewer &Tuning trend
Logic chart window SEBOL & SFC
windows System Maintenance Functions
Common Operation and System status, System alarm, HIS setting,
Time setting dialog & Help dialog
Monitoring Functions
Window call-up, Window” or “Full
screen”, System message, Window
Lets have a
sizing, Window hierarchy, Navigator
window…
look at some
samples
Operation and Monitoring
Windows
Navigator Window Control Group Window Tuning Window

Overview Window Trend Window Sequence Table Window


DCS Introduction
CS 3000 – Integrated Control System Overview
Advanced , Flexible Operator Functions
Powerful Control Station Features
Flexibility in Engineering
Integrated Solutions – Extended Applications
Unique Advantages leading to Lower TCO
Control
Field Control Station
Processor Redundancy
RISC processor Redundant CPU, Power Supply
Fixed scan times and Communication Interface
INPUT
4000 free configurable function blocks
Powerful math. capacity BUFFER BUFFER Unique Pair & Spare
etc...
CPU CPU CPU CPU Design
COMP COMP
BUFFER BUFFER

OUTPUT

Easy integration Large control block library


subsystems e.g. PLC, SER.. Advanced control functions
Data exchange between FCS Calculation functions
Support Fieldbus C-language
etc... Graphic Flowchart (SFC)
etc...
Integration Analog &
Digital Control
Input Output
Analog single card I/O Unit Analog Multiplexer Unit (16 channels)
 Current/Voltage In ◆ Voltage Input
 mV, Thermocouple, RTD ◆ mV Input
Input ◆ Thermocouple Input
 Pulse Input RTD Input

 Current/Voltage Out 2-wire transmitter input

◆ 4-20 mA Output

RIO bus (max. 20 km)


I/OUnit I/OUnit
16 channels 32 channels
Node Interface Unit
Max. 8 units per FCS
Input/Output
Modules
I/OUnit Input / Output Units I/OUnit
128 channels Max. 5 units per NIU 2 ports

Digital I/O unit connector type Communication unit


◆ RS-232C
◆ 16 -pt. Input (isolated)
◆ RS-422
◆ 16 -pt Output (isolated)
◆ RS-485
◆ 32 -pt. Input
◆ Fieldbus
◆ 32 -pt. Output
◆ Profibus
◆ Ethernet
Field Control Station and FIO
feature
..
FIO Features
Vnet
Direct Node ❚ Small-sized
To Field Device (Compact)
❚ Two kinds of
Serial, FF-H1 connection
Ethernet ❙ Direct Node
・ 4-20mA
・ ❙ Remote Node
FCS
・ (Subsystem)
❚ Dual redundant
・ PLC
I/O Module are
Remote Node possible (for all
New Remote I/O Bus (Ethernet) type)
❚ Field Network
❙ RS:2 ports
FF-H1 ❙ FF-H1 : 4
segments
❙ Profibus-DP
To Field Devices
4-20mA (Conventional) Fieldbus
  KFCS (Remote I/O
type)
<CCR> <Site> Generic cabinets
KFCS
Local node
CP333 Remote node
SB301
ESB bus
128 Mbps
FIO TB

FIO TB
FIO TB
FIO TB
FIO TB
FIO TB

FIO TB

Front Rear ER bus Front Rear


( 10 ERbus : Enhanced Remote
Mbps ) BUS
FIO Node overview
Remote I/O Interface
(10Base2)
Up to 8 I/O modules
Power supply

5 units (222.3mm)
写真挿入

19 inches
Node / FIO Features
Environment ALF111 Advantage (FF-H1)
❚ Zone2 Compliant No. of Segments
❙ 4 Segments / ALF111
❚ Temperature -20 -- 70 DEGC
No. of Points
❚ corrosion gas resistant G3
❙ 48 Points / Segment
No. of total Points
Node ❙ 3072 Points / FIO
❚ Direct Node : Max 10
LFCS
Nodes/FCS 48 Points x 4
❚ Remote Node : Segments
- Max 9 Nodes/FCS x 16 ALF111
- Max 4 Nodes/RIO
- Max 4 RIO/FCS
❚ Field Communication
- 2 ports : RS
- 4 segments : FF-H1
Low cost of construction with FIO

FIO can be installed closely near


field devices to reduce wiring cost

Open architecture FIO is compact:


Saves Space
Ethernet
based ER Bus
RS232/422/485
Cost-effective choice is available:

Single/Dual
Isolated/Non isolated/Channel isolation
Hi-Density modules
Built in interpose relays avoids relay cabinets
Rich Flexibility: Field connections
Field wiring method according to the application & budget
Pressure Clamp Terminal block (Direct wiring for field
devices)

Yokogawa Terminal Board, Cable & I/O adapter


(Wiring of field devices via Terminal Boards/marshaling)

I/O module
Terminal Board & MIL Connector Cable
(Popular for low cost installations-Wiring of field devices via
Terminal Board/Marshaling)
Remote I/O installation

Explosive sites

Corrosive sites
FCU

ooo

Separated sites
CCR (Central Control Room)
FF Solution: Four-segments & Redundant

High density of segments provides Cost Effective FF solutions


Redundancy of modules adds high reliability for FF solutions

Port
4 Segments
FF-H1 ALF111 ALF111

1
SB40 SB40
1 1
IOM IOM IOM IOM IOM IOM or or PSU PSU
2 EB50 EB50
1 1
Local Node or Remote Node
3

4
Redundant Configuration Available

Field Devices
Redundancy
❚ Synchronous hot standby with fully redundant
hardware and duplex functionality in design

Unique Pair &


Spare Design
DCS Introduction
CS 3000 – Integrated Control System Overview
Advanced , Flexible Operator Functions
Powerful Control Station Features
Flexibility in Engineering
Integrated Solutions – Extended Applications
Unique Advantages leading to Lower TCO
En gi neer in g
Off line Engineering without Target Hardware
by using Hardware Simulation Technology On line Engineering
Off line Testing CAE
and Hardware Computer Aided
Simulation Engineering
HIS ENG
Builder software

V net
Electronic
Concurrent Media
Engineering Input FCS

Order Start-up

❚Engineering can start direct after ordering


❚Engineering up to Configuration Testing can be done
Off Line
Concurrent Engineering
Engineering done by multiple PCs
DOWNLOAD the project

Engineering PC
Master Database
HIS

Engineering PC
FCS

backup

Engineering PC
Virtual Test Function
Virtual Testing Off line Testing
HIS
HIS HIS
HIS Function FCS
Function Simulator

Virtual
Wiring FCS Exatif Communication Interface
Simulator

Plant Simulator

Plant Model

- Off Line Virtual Testing using only one PC


- Connection with Plant Simulator using the FCS Simulator
DCS Introduction
CS 3000 – Integrated Control System Overview
Advanced , Flexible Operator Functions
Powerful Control Station Features
Flexibility in Engineering
Integrated Solutions – Extended Applications
Unique Advantages leading to Lower TCO
AOA: Advanced Operation Assistance

Yokogawa’s unique AOA Solutions for the Benefits of Customers

Exa plo g: Event Analysis Package


-Detailed Analysis of Process and Operation events
-Helps in decision making for further Automation/Monitoring/Operation

Exa pil ot: Operation Efficiency Improvement Packag


-Automation of St-Up, S/D, Transition & Emergency Procedures
-Reduction in Operating Time during Manual Operation
-Higher Productivity
-Maximization of Safe Operation
-Availability of “EXPERT” knowledge for uniform operation every time
Partners in
Advanced Process Control

Shell Global Solutions


The Alliance
The Alliance

Shell Yokogawa
customers customers Market
a c e b Segmentation

f
d
ROW
EX: EXA-SMOC with CS3000
Optional
Remote
Operation/
Monitoring
Ethernet Card
WIN Exasmoc
NT OPC Client
Exaopc
OS Server
VF701 Card

Etherne
t
HIS/E SMOC-PC Optional
Ethernet
Operation HIS NG (Builder)
Standard Exasmoc
/ Displays Station
Monitorin
APC Download
g/
Displays
Control

V Net / VL
Net

SFCS

Process Data
LFCS
Exasmoc Data
YOKOGAWA
Exa tas Ter minal Sys tem
Architec ture
TAS-MS poll to Host System
and searches for the following TAS-MS Client
Delivery data:
TAS-MS Management
- BOLServer
No.
- Delivery Number
- Host System Interface
- Order Management- Order Number
- Traffic Management- Truck Number
- Product
- Ship Loading/Unloading and Quantity
Management
- Data Gathering
- Management Data Handling
- Reporting
- Master Data Management

TAS-CS Control Station


TAS-CS Human Machine Interface

Loading Control, Pump Management, Bay Change,


Additive Control, Spot Loading, Loading Monitoring
Ex ata s Main F unc tio ns :
Inte gra tion

Host System
(e.g., SAP )

Exatas Terminal
Automation System
Refinery Refinery
Onsite Systems Ethernet Offsite System

TAS-MS
Human Machine
Interface
(HIS)

Control Station
(FCS)

If the terminal is If the terminal is


a part of refinery. a part of refinery.
Tank Safety MOV Electronic Card Various
Gauging System System Preset Reader Subsystems
TIM3000 : Tank Inventory Management
Functionality
Real-time module
 Tank data collection
 Tank data calculation
 Tank status management
 Monitoring of job control conditions
 Monitoring of tank behavior

Interface Module
 Collection of tank snapshots into Database
 Receipt of tank property

Features Benefits
 Modularity of functions  Safe tank operation
 Adoption of Oracle RDBMS  Provision of tank data
 Easy interface to other systems for operation accounting & scheduling
 Easy development of reports  Precise grasp of tank inventory
 Easy development of user interface
 Connectable to various TGS
 Reliable TGS
PIMS: Plant Information & Management System

DATA
MASS BALANCING PERFORMANCE PRODUCTION ENVIRONMENTAL
RECONCILIATION
MONITORING ACCOUNTING MONITORING
ECONOMIC CHARACTERISTICS MATERIALS
PROCESS PLANT
PLANT FEED
UNIT INTERMEDIATE ERP
TANK PLANT MODEL FINISHED PRODUCT CMMS
FACILITY CHEMICALS EDMS
STREAM UTILITIES
TECHNICAL CHARACTERISTICS

isa PIMS OPERATIONS ACTIVITY


LIMS MANAGEMENT

DATA MANAGER

HISTORICAL REAL TIME REFERENCE


DATABASE DATABASE DATABASE

OPC CLIENT

quantum
OPC SERVER

PCS
YOKOGAWA
DCS Introduction
CS 3000 – Integrated Control System Overview
Advanced , Flexible Operator Functions
Powerful Control Station Features
Flexibility in Engineering
Integrated Solutions – Extended Applications
Unique Advantages leading to Lower TCO
Quick & High-quality configuration

❚ The time for newly plant construction or


reconstruction should be minimum.
❙ The longer time links the larger financial disadvantage.
❚ R3 provides the following configuration environment.
❙ Total Project management.
❙ Advance Debugging.
❘ You need not wait the hardware delivery or field wiring
construction.
❙ Reuse of configuration data
❘ This is available between several stations or between several
plants.
❙ Unified configuration operation with LOOK&FEEL.
❙ Several engineers can work at the same time.
❙ On-line maintenance.
❙ Pinpoint help viewer.
Concurrent engineering

❚ Several engineers can work at the same time.

Only one database

Back
Total Project management.

All graphics,
❚ The application of all all control logic
stations in a system is are in a database
included in one
database.

ooo FCS No.1 ooo FCS No.2


HIS No.1 HIS No.2
Back
Benefit of Project management.

❚ The application of all stations in a system is


included in one database.
❙ At least 1 PC is required to generate whole over a system.
❘ You need not create same or similar graphics/sequences in
front of each engineering PC.
❙ One PC (one configuration software) can handle several
projects.
❙ You can reuse the application database of a plant to
another plant by a project, by a station, by a graphic, by a
control logic.
❘ This shortens the configuration time.
❘ This makes the configuration quality excellent
because the copy source has been working well in an actual
plant.
❙ Optimum management of application data is available. Back
Advance Debugging.

❚ The delivery time of controller and construction time


of field wiring is much longer than the delivery time
of PC.
❙ If you can advance your configuration work only with PC,
you can shorten your total configuration time.
❙ If you can advance your debugging work without actually
connecting the controllers and field devices,
you can shorten your total configuration time.
❚ Yokogawa provides the excellent debug functions.
Virtual Test
You can debug R3 configuration only with a PC.
Target Test
You can debug R3 configuration without field wiring.
Back
Advance Debugging Theory.

❚ Virtual test (only with PC)


❙ Check simple entry Normal operation is HIS
mistakes. available.

❙ Try new control logic.


❙ Check graphic work Memory in PC
❙ Operator training.
FCS
FCS
Simulator
❚ Target test ( without For HIS, this
wiring) ooo
ooo
ooo
pretends FCS
Virtual input is
FCS memory
❙ Check actual FCS CPU Virtual input is
created from the
performance created from the
output from FCS Field
Field devices
devices
output from FCS
❙ Check the actual simulator. Auto
Auto
For FCS
For FCS, this
wiring simulator, this
relationship among each wiring pretends the
pretends the
Only station.
minimum check is needed actual plant.
actual plant.

at start up !
Start up Virtual
!Target
(Actual plant)
test
Actual plant
Reuse of configuration data.

Tag 1
Export CSV file to use in MS-EXCEL.
Tag 2 Import CSVthe
Reuse file project
to reuse.
Tag 3 Reuse the graphic •Configuration tool is not needed
Reuse
in another project onlythe
forcontrol logicwork
simple entry
Reuse the graphic in another station Reuse the control logic
in own station Reuse(Graphic
the control in another project
logicavailable)
is also
in own station

ooo ooo ooo

Plant A Plant B
(project A) (project B) Back
Unified configuration with LOOK&FEEL.

Project Detail configuration


(Each plant) • Graphical configuration
for each
• FB in FCS and FF devices
are handled in a same tool.

Each folder for each FCS

Drag&Drop enables
Copy& paste Each folder for each HIS

FB : Function Block
Example : Control logic
I/O specification

❚ Installation environment
❙ ISA G3 for corrosive environment
❙ Wide temperature range -20°C to 70°C
❙ Conformed to EMC, C-tick.
❙ Non-incendive for Explosion proof
❘ Class I, Div.2, Group A,B,C,D, T4
❚ Redundancy
❙ Available for all types (analog, digital, Fieldbus, Modbus)
❚ Replacement ability for the existing XL, V systems.
❙ Full compatible size, connection, and function.
Flexible Field Wiring.

❚ According to your plant,


any I/O modules can be
connected with
direct connection or
terminal board
connection.
❚ Even in case of fieldbus,
Dedicated
you can choose eithercable Field wiring
type.
Terminal board

Field wiring
❚ Change the front
blocks,
Flexible Field Wiring.

For dual

For single

Dedicated
cable

Terminal board
On-line maintenance.

❚ In your plant operation, sometimes you would like to


modify or to add/remove your control logic or
graphics.
❙ It is quite difficult (nearly impossible) to stop your controller
frequently.
❙ You usually configured several control loops.
While modifying one of loops, you do not want to effect the
control of any other loops.
❚ R3 provides the “On-line maintenance” function to
meet your above requirement.
❙ You need not stop your controller when you modify small
parts of control logic, graphics, etc.
❙ Any other parts of control logic are effected by this
modification, so the influence for your plant control is Back
On-line maintenance.

No effect Control logicNo effect


No effect

(1) R3 Controller is controlling


the plant with its control logic. No effect
(2) You modify one of control loops.
(or sequence logic etc.)
Only this loop is stopped. No effect
Others are going on working.
(3) Modified item loop is retrieved on-
line to actual control without any
effect to other loops.
(4) In this term, CPU of controller
never stops. Controller CPU
ooo

Controlling No effect
is Non-stop !
Life Cycle Benefits
Efficient Engineering Function of CS 3000 Local Engineering Force

Short Engineering Period

Reasonable Engineering Pricing Reduce


Customer’s Total
Maintenance Service
Cost of Ownership
Hardware maintenance
System upgrade
in Life Cycle
Remote Maintenance
Additional Service
ETS capability
Software support
System Integration Service Sub system support
Network Engineering Service Tuning & Control Solutions
APC/AOA/PRM/PIMS
R3 Summary & Benefits
HIS
(1)
Cost Effective LCD Displays,
Win 2000: More Open to IT, Dual Monitor, Web monitoring,
Low cost ITV Interfacing
FIO
Very Cost Effective, High Density & Compact I/O
Simple and low Engineering & Construction cost,
Application and Budget based Flexibility in Selection,
Cost cutting in field wiring on top of Fieldbus
More immune towards Corrosion & Temperature
Redundant modules even for Fieldbus
Migration Friendly
R3: Fieldbus & PRM
Hi density Module, Integrated Engineering, Maintenance Management
R3 Summary & Benefits (2)
APCS - Station
A Cost Effective station for Advanced Regulatory Control and Exacoast,
Reduce load on FCSs,
Compliments and Supplements Exasmoc and Exarqe based APC

AOA (Exaplog & Exapilot) & APC (Exasmoc & Exarqe)


Seamlessly Integrated (Almost embedded like) in System

R3: Fully Loaded with IT Power


PIMS, MES and Enterprise Integration
R3 Summary & Benefits (3)
R3: Better than Hybrid Systems
R3 is a Cost Effective Complete DCS solution against

V & XL Migration
A special FCS (RFCS2) is available for V & XL migration,
Field Wiring is not affected,
Phase wise and/or Customer’s budget wise plan can be offered.
Benefits of FIO, Win2000 HIS, FCS, APC & Fieldbus for Migrated system,
Additional Benefits on MES & Enterprise Integration

Migration of Other Vendor DCS


These Issues can be handled project by project.
New Customer is benefited by R3 features.