Professional Documents
Culture Documents
Title Block
(fill out completely - each sheet)
Item Comments
4. North Arrow
8. Designers/Draftsman/Reviewers Initials
11. Revision Block (fill out for each change after City
Engineer signs)
Vicinity Map
(single line drawing, minimum detail)
Item Comments
1. North Arrow
5. Street Names
Item Comments
1. North Arrow
2. Scale
7. R/W Width
9. Size and Type of Existing Underground and (do not dimension location)
Overhead Utilities
Item Comments
7. Manhole Numbers
8. Pipe Size
Item Comments
1. Scale
2. Detail Title