NETWORK
VILLAGE
COMMENCEMENT
BUSINESS PLAN

A joint venture between

CREATING SUSTAINABLE MIXED-USE COMMUNITY DEVELOPMENTS


FOREWORD BY JOHN WALKER
IN 1997 THE COALFIELDS TASK FORCE WAS SET UP BY THE DEPUTY
PRIME MINISTER JOHN PRESCOTT MP TO DEVELOP A PROGRAMME
OF ACTION TO ASSIST COALFIELD COMMUNITIES.
Many towns and villages were suffering from falling Network Space will consult with local communities
populations and lack of jobs, high levels of crime and and work closely with key stakeholders and local
problems with long-term illness. authorities to prepare detailed masterplans for the
Network Village proposals.
As part of the National Coalfields Programme, which
reached its eleventh year in March 2008, English Thriving business centres will act as a catalyst to enable
Partnerships in 1999 established Network Space Ltd, local businesses to grow, attract inward investment
a joint venture company with Langtree Group plc, to and generate better job opportunities. The benefits of
address the shortage of good quality small business well-designed, good quality mixed-use development
premises in the coalfield areas. The joint venture create more cohesive communities and better places
company has far exceeded expectations and its initial to live, reducing crime and anti-social behaviour.
target of 500,000 sq ft, and has now delivered over
700,000 sq ft of employment floor space. The latest We need to ensure that we continue to achieve
initiative, Network Village, is set to deliver a further sustained regeneration of coalfield communities
300,000 sq ft of business space that will take us and mixed-use redevelopment. The provision of
past the one million square feet milestone. This will attractive business premises is key to the delivery of
be achieved within a 7 year timeframe through the long-term benefits and the creation of economically
development of 6 sustainable mixed use schemes and socially sustainable communities. English
where the additional funding required for the Partnerships has an on-going commitment to the
delivery of the business space will be funded by coalfield communities and we see Network Villages
residential development. as an important initiative to the plans for the new
Homes and Communities Agency.
Successful, sustainable and cohesive communities
require not only good housing, but also an attractive
environment and a thriving economy. Network Village
will deliver mixed-use development where the provision
of high quality business premises will be at the forefront
and carefully integrated into the existing community
alongside exemplar, energy-efficient housing and John Walker
attractive parks and open space. Chief Executive, English Partnerships
EXECUTIVE SUMMARY
NETWORK VILLAGE - WHO AND WHAT IS NETWORK SPACE? THE CORE BUSINESS MODEL The business space will be maintained and managed
by Network Space and the accommodation will be
A NEW APPROACH TO SUSTAINABLE SPACE Network Space Limited is a joint venture between The business plan sets out a generic Network Village available to let on flexible lease terms. The residential
Network Village is a bold programme to deliver English Partnerships and Langtree Group plc set up scheme (based upon the Murton pilot) in order to land will be prepared for development and marketed
vibrant, exemplar and sustainable employment led in 1999 with a specific remit to deliver high quality develop the financial model and demonstrate the for sale on an unconditional basis with the benefit of
mixed-use developments in the former English employment space in the former English Coalfields size of site required to fund the delivery of the outline planning permission to attract experienced
Coalfield areas. The primary objective is the delivery regions. Langtree provides both development and network village concept. Sensitivity analysis has been house builders.
of high quality business space providing attractive management services. Langtree is a developer that carried out on key variables including residual land
accommodation for small and medium size business specialises in mixed-use regeneration and the price, residential values, and remediation costs. The parks and open space within the Network Village
and increasing the availability of wider and better development of high quality employment spaces developments are assets of the local community and
suitable for SMEs in regeneration areas. Network It is anticipated that Network Space will enter into
local employment opportunities. This will be therefore long term ownership and stewardship of
space has now delivered over 700,000 sq ft of development agreements with landowners for the
developed alongside a range of high quality housing the open space will be carefully considered in each
workspace, offices and serviced offices. Network delivery of the proposed Network Village schemes.
including affordable housing, to provide cross case. This may be through adoption by the local
subsidy where necessary, all carefully integrated Village is the next phase of Network Space authority or transfer to another body such as the
Community participation is one of the key objectives
into existing communities. development and the target is to secure the delivery Land Restoration Trust or local community trust.
in the Government’s reform of the planning system.
of 300,000 sq ft of employment space through
Network Space will undertake pre-application
INTEGRATION OF NEW BUILD USES
the development of six Network Villages within a
discussions at an early stage with the local authority, FUNDING
seven-year time frame. Network Space is primarily
community groups and local stakeholders. The This business plan has been prepared for the period
AND CROSS-SUBSIDY a commercial developer and therefore the delivery
company recognises the importance of maintaining
of the high quality employment accommodation will to June 2015. The delivery of Network Villages will be
The Network Village concept is entirely consistent ongoing engagement as proposals are developed funded by increased bank facilities from the current
be at the forefront of each scheme.
with the Government’s intentions for the delivery of and this will be achieved through public exhibitions level of £27m up to £50m. The increase can be
urban renaissance and the creation of sustainable and inviting feedback and comments from local people. provided with a Loan to Value ratio below 55% and
communities. Network Village is about sustainable SCOPE AND RANGE OF THE NETWORK The intention is to secure the fullest possible local with minimum interest cover of 1.5%. The net assets
economic diversification and high quality job VILLAGE CONCEPT community support for the Network Village proposals. are projected to grow in the period from £18m to £29m.
creation in former coalfield communities. Its aim
is to provide high quality employment space that The regeneration benefits of the Network Village The offices and workspace will be developed to
will retain and attract higher quality companies and proposals include re-use of brownfield sites in BRE Environmental Assessment Method (BREEAM) MARKETING & PR
encourage and support local start up ventures. The sustainable locations with a strong employment standard of Excellent. Network Space has already A marketing and PR action plan has been prepared
development of of high quality housing will fund led justification. This coupled with the commitment achieved the Excellent rating for the developments to raise the profile of Network Space at both regional
the delivery of the employment space where cross to deliver high quality development provides a at Allerton Bywater Millennium Community and i2 and national levels in order to promote the Network
subsidy is necessary and also create a truly sustainable cogent regeneration case. in Mansfield. The housing will aim to achieve current Village proposals.
mixed-use addition to the existing community. English Partnerships standards including Code for
The areas of operation cover the former English Sustainable Homes Level 4 and will be developed in
The developments will deliver fully integrated, Coalfields regions. The first site has been identified accordance with a strict design code prepared by
CONCLUSION
sustainable mixed-use employment and residential at Murton, Easington and the business plan proposes Network Space. Network Village will continue to deliver the
schemes which will include high quality managed the identification of a further five sites over the next regeneration of Coalfield communities through
business centres offering Grade A quality serviced three years. The initial site search programme will mixed-use development. The provision of attractive
office accommodation; flexible high quality workspace focus on the North East, Yorkshire and East Midlands. quality business premises will lead to the creation of
units designed for a mixed use environment; self It is anticipated that identification of sites will be economically and socially sustainable communities.
contained offices; high quality housing providing a through direct contact with senior executives and
mix of housing choice and tenure; and attractive decision makers involved in regeneration and a
open space designed to provide opportunities for programme of presentations and meetings with
community use and residential amenity. English Partnerships, RDAs and local authorities
has been prepared.

PAGE 04/05 EXECUTIVE SUMMARY


CONTENTS
08 1. Introduction 26 10. Marketing and PR
1.1 Background to Network Space 10.1 Introduction
1.2 Network Village 10.2 Aims and Objectives
1.3 Strategy 10.2.1 Target Audience
10 2. Network Village Elements 10.2.2 SMART Objectives
2.1 Employment 10.3 Communications Tactics
2.2 Residential 10.3.1 Direct Marketing
2.3 Open Space 10.3.2 Advertising
2.4 Retail, Commercial and Leisure 10.3.3 Events
10.3.4 Public Relations
12 3. Sustainability
10.3.5 Advertorials
14 4. Areas of Operation
10.3.6 Literature
4.1 Coalfield Areas
10.3.7 E-marketing
4.2 Suitable locations
10.3.8 Budget and Timing
16 5. Network Village Model
30 11. Risk Assessment and Management
5.1 Generic scheme
11.1 Governance
5.2 Appraisal
11.2 Acquisition
18 6. Site Identification Process 11.3 Construction
6.1 Site finding proposals
32 12. Monitoring and Evaluation
6.2 Site delivery programme
12.1 Performance Management Framework
6.3 Initial Site Assessment
12.1.1 Introduction
20 7. Financial Commentary 12.1.2 Monitoring
22 8. Development 12.1.3 Scheme Monitoring
8.1 Development Agreement 12.2 Evaluation
8.2 Planning 12.2.1 Overview
8.2.1 Policy 12.2.2 Interim Evaluation
8.3 Exit strategy 12.2.3 Full Evaluation
8.3.1 Employment 34 13. Way Forward
8.3.2 Residential
8.3.3 Open Space
8.3.4 Retail, Commercial and Leisure
24 9. Community Engagement and
Socio-Economic Impacts
9.1 Consultation
9.2 Planning process
9.3 Economic and social impact

PAGE 06/07 CONTENTS


1. INTRODUCTION
1.1 BACKGROUND 1.2 NETWORK VILLAGES 1.3 STRATEGY
Network Space Ltd is a joint venture company, The primary objective of Network Village is the Network Villages are about the delivery of high The key factors that make Network Villages
between Langtree Group plc and English Partnerships, delivery of high quality business space providing quality employment space as a key element of distinctive are as follows:
launched in October 1999 by the Deputy Prime attractive accommodation suitable for SMEs thereby sustainable mixed-use regeneration. Network Space
Minister the Rt Hon John Prescott MP. Its remit is to increasing the availability of wider and better local is a commercial developer therefore the delivery of Network Space’s track record of delivering high
develop high quality employment space in the former employment opportunities – generating sustainable the high quality employment accommodation will be quality business space
English Coalfields, providing quality employment economic diversification and high quality job creation at the forefront of each scheme. It’s remit is development in the former English
accommodation suitable for new and expanding in former coalfield areas. Developed alongside high Coalfields regions
small and medium-size enterprises (SMEs). quality housing and carefully integrated into existing The strategy is to secure the delivery of 300,000 sq ft
of employment space through the development of The design and delivery of business space
communities, the development of the housing will
The initial remit to deliver a minimum of 500,000 sq ft six Network Villages within a seven year timeframe. is primary not secondary
cross subsidise the delivery of the speculative high
(46,450 sq m) was achieved within the 6 year target quality employment space and also deliver truly Highly sustainable developments
time frame and as a result of this success, the joint The approach to identifying and securing suitable
sustainable mixed-use regeneration. Regeneration benefits in towns and villages
venture partners extended the programme to deliver development opportunities for Network Villages is
5 more schemes providing an additional 200,000 sq ft English Partnerships is at the forefront of the as follows: The support of English Partnerships and its ability
(18,580 sq m), without further funding support from Government’s response to climate change and the to highlight potential public sector opportunities
A programme of meetings and presentations
English Partnerships. The networkcentre product Network Villages programme is entirely consistent Provision of high quality business space suitable
to key regeneration people in EP, RDAs and local
has evolved, as the company responds to market with the Government’s intention for the delivery of for local SMEs
authorities
needs, to provide a range of workspace, offices and urban renaissance and the creation of sustainable
Through a carefully considered marketing and Well managed business centres offering flexible
serviced offices. communities. It accords with the Green Paper (July
PR strategy, highlighting the success of Network lease terms
2007) ‘Homes for the future: more affordable, more
Network Space has now entered a further phase of sustainable’ which sets out proposals for more homes Space and promoting the Network Village vision Aim to develop to high standards – BREEAM
development, through a new initiative named Network that are well designed, greener and more affordable rating of Excellent; Code for Sustainable Homes
A focus on the main former coalfield areas –
Villages, to deliver a minimum of 300,000 sq ft to rent or buy. level 4
initially North East, Yorkshire and East Midlands
(27,870 sq m) of high quality business centres, offices
followed by Staffordshire
and workspace accommodation in the former coalfield Network Village as part of the National Coalfields On behalf of Network Space, Langtree provides
areas over the next 7 years – integrated with and Programme, will deliver further benefits to coalfield . both development and management services. This
funded by sustainable high quality residential communities through brownfield regeneration and the extends from site finding, design and construction
development. provision of high quality housing and business space. through to letting, management and maintenance.
Langtree is a developer that specialises in developing
The new Homes and Communities Agency proposed high quality employment space suitable for SMEs in
in the Housing and Regeneration Bill, will have regeneration areas.

300,000
responsibility for land and funding to deliver new
greener and more affordable homes and infrastructure
SQ FT through sustainable development. (The definition of
infrastructure includes services; roads and transport

OF HIGH QUALITY facilities; retail and other business facilities; health,


educational, employment and training facilities; and

BUSINESS SPACE public open space).

PAGE 08/09 INTRODUCTION


2. NETWORK VILLAGE ELEMENTS
2.1 EMPLOYMENT The offices and workspace will be design with To enhance the sustainability – explore new There are opportunities to involve local people
the aim of achieving BREEAM excellent rating proposals for live/work zones where units can be when developing any art feature, perhaps
The basis of a Network Village scheme will include built as offices and or homes and occupied partly reflecting the history of the site of the area,
Where there are suitable existing buildings
a combination of the following employment space: or wholly for either use and possibly during the implementation phase
refurbishment and subdivision may be
an alternative Residential land disposal strategy – Network in planting trees, shrubs and bulbs
Critical mass of 2,322 to 6,503 sq m (25,000 to
70,000 sq ft) of high quality business space Space will obtain planning permission, part Recycled materials will be utilised wherever
High quality managed business centre typically 2.2 RESIDENTIAL outline and part detailed, for the mixed use possible in the construction of footpaths and
Network Village development then market the cycle ways. Durable natural materials should
2,322 sq m (25,000 sq ft) providing fully serviced The residential element of the scheme will include land available for residential development with be used for benches, boardwalks and fences
offices on flexible terms as recently completed the following: the benefit of outline planning permission for
at Matrix Business village, Keys Park, Hednesford Sustainable management practices are intrinsic
sale on an unconditional basis. Land remediation, in the long-term success of parks or open space
Out of hours community use of the meeting Network Space to obtain outline planning new roads, drainage and services will be delivered
permission and prepare land for sufficient as assets to the local community. Long term
rooms and conference facilities within business by Network Space as appropriate. The receipt for ownership and stewardship of the open space by
centres will be available to local community number of residential units (houses and the residential land will fund the remediation,
apartments) to cross subsidise the speculative the local authority or community trust or the Land
groups providing abnormal costs and infrastructure and cross- Restoration Trust, will be considered in each case
development of the proposed employment space. subsidise the speculative development of the
Multi-occupied office building providing high The amount of residential necessary to cross employment accommodation
quality offices suites offering grow-on space for subsidise the scheme will vary depending on the 2.4 RETAIL, COMMERCIAL AND LEISURE
SMEs. Mansfield i2 provides up to 18 suites in cost of abnormal works, residential values, Section
a high quality 3,252 sq m (35,000 sq ft) office 106 requirements, the supply and demand for
2.3 OPEN SPACE Certain sites may offer additional sustainable
building next door to Mansfield’s high technology employment space in any particular area community development opportunities and may
incubation centre The open space element of the scheme will include: require suitable provision of retail premises and
The agreed masterplan and design of the community facilities. Depending on the size of the
Networkcentres providing high quality workspace development will deal with access, safety, security, The open spaces, parks, play areas and landscaping
units suitable for SMEs and start-up businesses are important elements that will vary significantly proposed Network Village scheme there may be
outlook, play areas, traffic management and good opportunities for the development of additional
typically 1,858 to 3,716 sq m (25,000 to 40,000 sq ft) quality design reflecting local characteristics within each scheme. It is important to create well-
providing units ranging from 70 to 325 sq m used places that have a good perception of safety retail or commercial/leisure premises which will
and ensuring that the employment space is in enhance the sustainability and viability of the
(750 - 3,500 sq ft). Allerton Bywater and Sherwood an appropriate prominent position within the and provide valuable amenity for both existing
Energy Village, Ollerton are two recently completed and new communities proposals, to include:
development; creating a connective neighbourhood
schemes designed to be adjacent to housing integrated into the existing community Community involvement will be necessary during Neighbourhood centres that may include, local
In appropriate locations self-contained own front Affordable housing will be a key element within the detailed design process to foster a sense supermarket or general store, and small retail
door offices available for sale or to let, typical each scheme – providing a range of house types of ownership, and hopefully minimise risks of units for a range of occupiers
size 140 to 280 sq m (1,500 - 3,000 sq ft) will be to meet local requirements vandalism. The design of play areas will need to be Community facilities such as village or
considered. The developments at West Moor Park, targeted to local need and potential user groups community hall, library and crèche
Armthorpe and Sherwood Energy Village, Ollerton A Design Code for the delivery of energy efficient,
both offer own front door offices sustainable homes to be developed to a minimum Health care facilities including clinic, consulting
standard of Code for Sustainable Homes Level 4 rooms, dental and doctors’ surgeries
(rising in line with English Partnerships/Homes Other commercial opportunities will depend
and Communities Agency quality standards) on the size of the site, location and main
Building sustainable homes is not simply road frontage. Possible uses could include car
reducing CO2, but also looking at the materials showroom, hotel, pub and restaurant, garden
used in construction and minimising other centre, local trade park units, small and medium
environmental impacts such as reducing the use size industrial units
of water and the waste generated in construction
and in the way we live

PAGE 10/11 NETWORK VILLAGE ELEMENTS


3. SUSTAINABILITY
The strong regeneration benefits of the network The houses and apartments within the Network The offices and workspace will provide high quality In conjunction, the masterplan and design of the
village proposals include making use of brownfield Village will aim to achieve Code for Sustainable Homes employment space for local businesses. The majority developments will deal with access, safety and
sites in sustainable locations with a strong Level 4 (rising in line with current EP standards). This of occupiers in Network Space schemes are local security, English Partnerships’ minimum space
employment led justification. This coupled with a means the development will improve performance businesses and come from within 5 miles. standards, outlook, play areas, traffic management,
commitment to deliver an exemplar high quality in a range of areas including, water, waste, materials, and good quality design reflecting local characteristics
development provides a compelling regeneration drainage, energy and CO2, pollution, health and Secured by Design accreditation will be achieved by – creating a connected neighbourhood and delivering
planning case. well being, management and ecology. A Code for appointing an architectural liaison officer at an early diversity in housing choice and tenure.
Sustainable Homes pre-assessment will be prepared stage of the design process.
The proposals are for mix-use developments within by Network Space in order to provide house builders
or adjoining existing towns and villages therefore Network Space will work with key stakeholders on
with guidance on the particular site and English
maximising the use of infrastructure and facilities. cross cutting sustainability themes including:
Partnerships quality standards including Lifetime
Homes and Buildings for Life. Community engagement and management
Key aims will be to achieve CO2 reductions, energy
efficiency and reduce energy consumption. Sustainable Building sustainable homes is not simply reducing CO2, Promotion of design innovation using modern
energy design needs to be affordable and practical. but also looking at materials we use in construction methods of construction and energy efficiency
Improvements can be achieved by: and minimising the other environmental impacts – Provision of training and educational
reducing the use of water and the waste generated opportunities (to be developed through
Improving fabric performance
in construction and in the way we live. appointment of consultants by Network
Condensing boiler technology Space and English Partnerships)
Network Space will aim to achieve BRE Environmental
Natural ventilation Insuring the creation of a connected
Assessment Method (BREEAM) standard of Excellent
Daylight linked lighting control for the offices and workspace. (Network Space neighbourhood
Heat recovery schemes are developed as a minimum to very good
standard and BREEAM excellent has been achieved
Solar shading
for workspace schemes at Allerton Bywater and i2
Ground source heat pump in Mansfield).
Solar thermal water heating

PAGE 12/13 SUSTAINABILITY


4. AREAS OF OPERATION FORMER COALFIELD AREAS
4.1 COALFIELD AREAS NORTH EAST
The broad areas of operation cover the former CUMBRIA
English Coalfields. The agreed boundary of the areas
of the company’s operation is defined in the IMC
NORTH WEST
Consulting Engineers Ltd report entitled ‘Workspace STAFFORDSHIRE
Development Areas in the closed English Coalfields Newcastle
January 1999’. The former English Coalfields areas are WEST MIDLANDS upon Tyne
shown on page 15. Durham
FOREST OF DEAN Whitehaven
4.2 SUITABLE LOCATIONS
KENT
Suitable sites will be identified as opportunities that
require the delivery of high quality employment YORSKSHIRE
space as a key element for the delivery of exemplar
mixed-use regeneration. Site characteristics may NOTTINGHAMSHIRE
Leeds
include some or all of the following: York

Within existing towns and villages


Close to existing employment Liverpool
Manchester Sheffield
Near to adjoining residential
Convenient for the town or village centre
Stoke-on-Trent
Use existing infrastructure, services and
community facilities Nottingham

Highly accessible by public transport, walking


and cycling
Offer additional benefits to local people Birmingham
Brownfield land
Provide open space
Potential to sustain and enhance biodiversity Cambridge

SITES WANTED
and ecological interest
Suitable for a range of high quality homes
both affordable and market housing Oxford
Sites are likely to be 4 hectares (10 acres) or
more, but could be smaller in high density FOR EXEMPLAR MIXED-USE Bristol

urban locations
REGENERATION SCHEMES London

Dover

Southampton
Exeter

PAGE 14/15 AREAS OF OPERATION


5. NETWORK VILLAGE MODEL
5.1 GENERIC SCHEME 5.2 APPRAISAL
For the purposes of developing the business plan a Key assumptions: At a remediation cost of £1 million a site of Residential value – an increase in the residential
basic Network Village model based upon the Murton In order to develop the financial model the following approximately 16 acres with 12 acres for residential sales price of £10 per sq ft will reduce the land
pilot experience with sustainable site characteristics assumptions have been made: would be required. A summary of the development required by 3 acres
as highlighted in the previous section has been appraisal is set out below. Initial land price – an increase from £200,000 to
adopted and this comprises the following: A serviced offices building and workspace scheme £300,000 per acre will result in a increased land
would require approximately 4 acres Sensitivity analysis
Business centre providing high quality serviced requirement of 3 acres
Residential sales value – £175 per sq ft A sensitivity assessment has been carried out
offices 26,000 sq ft (GIA) to show the effects on the size of site that may Remediation costs – an increase from £1m to £2m
Workspace scheme of 15 units totalling Affordable housing (to be maximised as far as be required - by varying the land price per acre, will require additional land of 3 acres
26,000 sq ft possible) – assumed to be 20%for the purposes remediation costs and residential values.
of the model
Provision of serviced ‘oven ready’ residential land
with outline planning permission Section 106 contributions – there will be a range
of contributions in addition to affordable housing
High quality public open space at a cost of say £2,500 per unit
Brownfield site requiring remediation and Profit on cost – a standard developer’s profit of
construction of infrastructure 15% including costs of site acquisition,
remediation and infrastructure
An appraisal is attached for a 16-acre site
assuming a base initial land price of £200,000
per acre and remediation costs of £1 million

Network Space Residential


Revenue £’s Revenue £’s

Business Centre 21,000 sq ft (net) 3,500,000 Market housing 177,000 sq ft @ £175.00 31,000,000

Workspace units 26,000 sq ft 1,500,000 Affordable housing 41,000 sq ft @ £122.00 5,000,000

Residential land sale 12 acres 9,700,000 Total Revenue 36,000,000

Total Revenue 14,700,000

Costs £’s Costs £’s

Site 3,400,000 Site (serviced) 10,000,000

Planning 300,000 Construction & Fees 18,000,000

Construction & Fees 8,000,000 End payments S106, Marketing & Interest 3,000,000

Other costs & interest 1,000,000 Total costs 31,000,000

Total costs 12,700,000 Profit (excl interest) 5,000,000

Profit on cost 2,000,000

PAGE 16/17 NETWORK VILLAGE MODEL


6. SITE IDENTIFICATION
6.1 SITE FINDING PROPOSALS 6.3 INITIAL SITE ASSESSMENT
The target is delivery of six Network villages and We would also aim to meet with senior property Initial Site Assessments (ISA) will be considered The ISA will be carried out using available information
300,000 sq ft of employment space within a seven consultants who specialise in public sector at monthly Network Space Operations meetings. and will then be considered at the next Operations
year timeframe. The proposed programme for securing regeneration and development. These individuals Key points to be considered are as follows: Meeting allowing a minimum of two weeks for
further sites for development are two sites in 2008, have knowledge of local authority regeneration an assessment. The site will be considered against
two in 2009, and a sixth in 2010. initiatives and plans for high quality sustainable Timescale for delivery the key points and the ISA will take the form of a
mixed-use development where the Network Village Initial market assessment of supply/demand for concise report.
The first site at Murton is located in the north east concept would be appropriate. high quality employment space and housing
and therefore the proposed target is to identify and Following a positive ISA - a budget for the appointment
enter into agreements for two further sites in 2008 – It is anticipated that sites are more likely to be Site is of sufficient size to deliver residential that of a development team will be agreed along with a
say one in Yorkshire and one in the East Midlands. secured on a negotiated basis rather than open will fund the development of the site and the programme for the completion of an Outline Project
competitive tendering. provision of the employment space Proposal (OPP). This will be a more detailed assessment
A programme of meetings and presentations is Achieving high standards of development i.e. of the site and preparation of a proposed scheme to
being developed. Initial meetings and presentations Network Space has been developing in the coalfield BREEAM excellent and Code for Sustainable be considered by the Network Space Board.
will be at a regional level with a programme of areas since 1999. Langtree has in depth knowledge of Homes minimum of Level 4
presentations and meetings with key individuals in the market for employment space in many of these Following completion of the OPP, and subject to
English Partnerships and the RDAs. This will then areas and English Partnerships through its key role High level of sustainable development recommendations, approval would be granted by
progress to local authorities, HMR pathfinders and in the National Coalfields Programme has detailed Potential for wider benefits for the local Network Space Board to conclude negotiations
URCs. It is anticipated that there will also be ‘windfall’ knowledge of the communities and former colliery community with the landowners (enter into a development
type opportunities identified outside the initial sites within the coalfield areas. agreement) and proceed with the preparation of a
Overall scheme to be commercially viable
search areas. planning application and detailed site investigations
6.2 SITE DELIVERY PROGRAMME and assessments.

The indicative development programme outlined


below indicates that the period for delivery from
site identification through to completion is likely
to take 3 - 4 years.
An indicative programme for site identification and
development is as follows:

Site Identification Start Completion


Period Month no. & Agreement Construction

Initial Site Assessment 4 weeks 1


1 Murton 2007 2008 2010
Outline Project Proposal 2 months 2-3
2 2008 2009 2011
Masterplan & Planning Application 6 months 4-9
3 2008 2010 2012
Consideration of Planning Application 4 months 10 - 13
4 2009 2011 2013
Detailed design & tender 6 months 14 - 19
5 2009 2011 2013
Site remediation & Infrastructure 6 months 20 - 25
6 2010 2012 2014
Marketing & Sale of Residential Land 16 - 19
4 months 20 - 25

Construction of Buildings 12 months 26 - 37

PAGE 18/19 SITE IDENTIFICATION


7. FINANCIAL COMMENTARY
The following table sets out some of the key financial indicators for the Network Space Business Plan for the period Capital Programme Balance Sheet
to June 2015. The delivery of the six sites will require a significant The projection assumes that fixed asset values will
capital programme with spend averaging in excess remain at June 2007 levels. The above shows that net
of £10m per annum for the seven years to June 15. assets are projected to grow from £18m at June 2007
Jun 09 Jun 10 Jun 11 Jun 12 Jun 13 Jun 14 Jun 15 to £29m at June 2015.
£000 £000 £000 £000 £000 £000 £000 Profit and Loss Account
The results show profit being delivered every year up The year on year growth rates in net assets are also
1) Capital Programme (8,640) (14,351) (16,315) (12,320) (12,420) (8,440) (6,043) shown in the table above varying from 4.1% to 12.9%.
to June 2015. The projections show an interest cover
of at least 150%. The business plan assumes that The overall growth over the period is at an annualised
2) Profit & Loss Account growth rate of 7.3% from June 2008 to June 2015.
new workspace will continue to let up over fifteen
Pre interest profit 2,909 3,897 4,988 3,768 4,105 4,674 4,000 months, which has been the case historically. It also The Network Village programme will be funded by
assumes a serviced office element will let up over bank debt. It is expected that the bank facility would
Interest (1,851) (2,055) (2,472) (2,395) (2,655) (2,822) (2,694) twenty-one months. Peak occupancy is assumed need to increase from the current approved level of
Profit before tax 1,058 1,842 2,516 1,373 1,450 1,852 1,306 at 87.5%. £27m up to around £50m, and increasing bank debt
can be provided with a satisfactory loan to value
Bank interest cover (PBIT) 1.57 1.90 2.02 1.57 1.55 1.66 1.48 ratio of below 55%.

3) Balance Sheet

Tangible Fixed Assets £000 £000 £000 £000 £000 £000 £000

Estates - Investment 50,831 50,831 50,831 50,831 50,831 50,831 50,831

Estates - NV Phase III 2,356 8,724 11,306 16,580 21,859 22,086 28,891

Total Fixed Assets 53,187 59,555 62,137 67,411 72,690 72,917 79,722

Bank debt (24,466) (29,822) (29,858) (33,899) (37,515) (36,627) (42,136)

Other assets/liabilities (10,091) (9,815) (9,785) (9,133) (8,857) (8,676) (8,295)

Net Assets 18,629 19,919 22,494 24,379 26,318 27,614 29,291

Bank debt as % of INV & DEV 46% 50% 48% 50% 52% 50% 53%

Year on year growth rate 4.1% 6.9% 12.9% 8.4% 8.0% 4.9% 6.1%

Peak debt (32,316) (37,904) (40,949) (41,879) (45,596) (45,024) (42,136)

PAGE 20/21 FINANCIAL COMMENTARY


8. DEVELOPMENT
8.1 DEVELOPMENT AGREEMENT 8.2.1 Policy
The masterplanning, design and development and
Following the identification of a suitable site and the strong regeneration benefits of the Network
having completed an initial site assessment, Network Village proposals accord with the Government’s
Space will agree Heads of Terms and enter into a principal planning guidance, and it’s objectives
Development Agreement with the land owner for for sustainable development. This includes:
the delivery of the proposed Network Village scheme.
Under the terms of the Development Agreement Regional Spatial Strategies and Regional
Network Space will acquire the whole site and then Planning Guidance
arrange the disposal of the residential land and
PPS 1 Delivering Sustainable Development – states
commercial areas to cross subsidise the delivery
the importance of good design, pre-planning
of the development and the employment space.
discussions and community involvement 8.3 EXIT STRATEGY
8.2 PLANNING PPS 3 Housing – sets out the Government’s policy 8.3.1 Employment 8.3.3 Open Space
framework and housing The managed business centre/serviced office Sustainable management practices are intrinsic in
The development team will prepare an initial site A wider choice of quality homes that; buildings and workspace schemes will be retained the long-term success of parks or open space as
assessment based on available information and an and managed by Network Space. Own front door assets to the local community. Therefore long term
initial masterplan will be drafted for the purposes of - Widen opportunities for home ownership;
offices may be available to let or for sale and this will ownership and stewardship of the open space will be
early consultation. A scoping study for a planning - Improve affordability across the housing depend on the particular details of each scheme. considered in each case. Alternative options include:
application will then be agreed with the local market, including by increasing the supply
planning authority. of housing; and 8.3.2 Residential Adoption by the local authority;
Following pre planning consultation with the local - Create sustainable, inclusive mixed communities Serviced residential land will be marketed for sale Community or trust ownership and management
authority, local people and stakeholders, including in all areas with the benefit of outline planning permission company with service charge; and
public exhibitions, the masterplan will be revised and PPG 4 Industrial, commercial development and and full details of site investigations, infrastructure Transfer ownership to the Land Restoration Trust
prepared in more detail for the planning application. small firms – identifies that economic growth remediation proposals to be completed by Network (with a dowry payment), which was also created
In accordance with the agreed scoping study full and high quality environment have to be pursued Space, Code for Sustainable Homes, affordable by English Partnerships, and is a key operator in
reports will be prepared to support an outline together. That where appropriate small scale housing, and S106 Agreement and a strict Design the coalfield areas. Network Space has already
application for the site as a whole and detailed employment development should be integrated Code prepared by Network Space to ensure the held preliminary discussions with LRT who have
application for employment space and infrastructure. with residential delivery of high quality aspirational housing. confirmed potential interest
. PPS 9 Biodiversity and Geological conservation Marketing will take place following receipt of 8.3.4 Retail, Commercial and Leisure
PPG 13 Transport – focuses on promotion of planning permission with unconditional sale and
land receipt following remediation and infrastructure Opportunities and requirements may arise for
sustainable transport commercial development for uses such as hotel,
as appropriate. Network Space may also consider
PPG 14 Development on unstable land direct development of homes or apartments in pub/restaurant, local supermarket, neighbourhood
PPG 17 planning for open space spatial and live/work zones. centre, motor trade, or small/medium industrial units.
recreation Development or sale of plots will be on the basis of
maximising receipts through pre-let, turnkey or land
PPS 23 Planning and Pollution Control sale basis.
PPG 24 Planning and Noise
PPS 25 Development and flood risk – deals with
sustainable development – appraising, managing
and reducing the risk
PPS 1 draft supplement on Planning and
Climate Change – spatial planning should
reduce emissions

PAGE 22/23 DEVELOPMENT


9. COMMUNITY ENGAGEMENT AND
SOCIO-ECONOMIC IMPACTS
9.1 CONSULTATION 9.3 ECONOMIC AND SOCIAL IMPACT
Community participation is a key objective in the Additionally consultation and engagement would be The Urban White Paper, Our towns and Cities: The high quality employment space will bring
Government’s reform of the planning system. Network achieved using leaflets, press releases and interviews with the future, launched in November 2000, sets out additional quality employment and investment into
Space will undertake pre-application discussions at an journalists, meetings with residents and stakeholders, the agenda for the long term redevelopment of the area. Network Villages will result in additional
early stage with council officers, community groups and meetings with objectors to understand issues and the urban fabric with improving sustainability benefits of increased competitiveness as well as
and local stakeholders. The company also recognises to explain and clarify the proposals. established as the clear goal. The focus of the White local multiplier effects and social benefits from
the importance of maintaining ongoing engagement Paper is on achieving sustainable economic growth increased investment. Furthermore by diversifying
as the draft masterplan is developed. 9.2 PLANNING PROCESS through engaging local people to tackle problems and strengthening the local economic base, the
such as poor living environments, failing economies, ability of the area to withstand future economic
Following initial consultation and production of a draft As part of any planning application, the Design and inadequate services and weak social networks. changes would be enhanced.
masterplan the proposals would be displayed at a Access Statement would also include a Statement
public exhibition inviting feedback, comments and of Community Engagement outlining the stages of The Network Village concept is fundamentally in line Well-designed mixed-use development that includes
ideas from local people. A second public exhibition consultation undertaken with various stakeholders. with the strategic vision outlined within the White the supply of high quality open space will make the
would be arranged thereafter to display the revised Paper. As well as bringing brownfield sites back into area more attractive and improve its image.
masterplan and alterations as a result of the points productive economic use, high quality design will be
central to the Network Village proposals resulting Network Villages may also provide demonstration
raised at the first exhibition.
in the overall improvement of the urban fabric for effects in the form of sustainable redevelopment
the benefit of all within the local community. The that is compatible with the surrounding area and
proposals will provide new and better employment local community; as well as raising confidence
opportunities for the local community as well as and aspirations within the area; and assisting in
providing a high quality mixed residential environment. encouraging more speculative development and
stimulating other landowners to invest in their
The delivery of the business accommodation in support own sites.
of economic development objectives is financially
and strategically supported by the residential Network Village will deliver new high quality
development. The residential development not only employment space that will bring significant
secures the financial viability of the scheme, but socio-economic benefits to the local area creating
also supports local economic development through a more sustainable local community.
the provision of a better choice of homes as well
as supporting local services. The justification for
Network Villages is also based upon a market failure
argument as without grant assistance or cross-subsidy
from residential development the employment space
could not be delivered.

PAGE 24/25 COMMUNITY ENGAGEMENT AND SOCIO-ECONOMIC IMPACTS


10. MARKETING AND PR
10.1 INTRODUCTION 10.3 COMMUNICATIONS TACTICS 10.3.4 Public Relations Methodology
10.3.1 Direct Marketing Targeted public relations will help to raise awareness PR consultants will use the following tools to ensure
Network Space needs to gain a higher profile at and reinforce and support the marketing strategy. that Network Space and the Network Village brand
both regional and national levels in order to promote One-to-one appointments, meetings and presentations, Good news stories and press releases will be will receive regular media coverage:
the Network Village proposals. The majority of to key executives and decision makers; use of direct targeted at key media and quality coverage will be
networkcentres are in the East Midlands, Yorkshire and mail and e-mailers to named individuals; attending sought in local, regional and trade press and Focus on the key messages and benefits to
the North East and consequently this has led to the appropriate events in target areas. broadcast and national media where appropriate. former coalfield areas
profile of Network Space remaining relatively localised.
10.3.2 Advertising News – a regular stream of news releases
Aims and Objectives highlighting business success, planning
10.2 AIMS AND OBJECTIVES Targeted advertising in national and regional PR consultants have been appointed to deliver submissions, launches and successful
magazines and newspapers will be considered to tie an effective public relations strategy by:
10.2.1 Target Audience Photo opportunities – use photo caption stories.
in with events and milestones and direct marketing
The target audience are senior executives and initiatives. Raising and broadening brand awareness Surveys/research – any research undertaken by
decision-makers involved in regeneration initiatives Network Space can create a new press opportunity
10.3.3 Events Secure consistent PR coverage in target areas
within the former coalfield areas. This includes English
Position Network Space as an innovative Comment opportunities – proactively seek on
Partnerships regional teams, Regional Development Targeted event attendance and sponsorship
developer of high quality, exemplar workspace topics such as brownfield redevelopment,
Agencies, local authorities and property consultants offers opportunities for good public relations via
and homes in the former English coalfield areas legislation changes, sustainable buildings,
in regeneration and development. media coverage, networking, and promotion of accommodation for SMEs
Network Villages. Ensure key members of the Network Space team
10.2.2 SMART Objectives Forward feature opportunities – in target areas
are visually seen as the face/s behind the brand
Promote Network Space’s track record and Network Space corporate events – it is proposed at key events and networking opportunities Media one-to-ones – interviews with key
achievements to elevate the Matrix Business Village launch in journalists
June 2008 to an event to mark the completion of Drive footfall to all events
Raise awareness of the Network Village concept Awards – submit schemes for awards in order
the 700,000 sq ft milestone and further promote
Key messages to profile the success of the company and its
Encourage new land opportunities for Network Network Villages
Village sites The key Network Space messages to incorporate into future aims
Seminars/workshops – identify workshops and
all communications are:
Raise the profile of the expertise behind seminars on regeneration, housing, mixed-use 10.3.5 Advertorials
the brand and sustainable development for speaking Network Village is a unique and distinctive Place stories in regular magazines and newsletters of
Highlight the quality and sustainability opportunities mixed-use development initiative led by a local authorities, Chambers of Commerce, Business
of the initiative Property dinners & award ceremonies – consider commercial developer, where delivery of high Links and RDAs.
sponsoring awards and hosting tables quality employment space is at the forefront
Highlight involvement of English Partnerships
and the fit with the Government’s agenda Boardroom lunches – host boardroom lunches Network Space specialises in regeneration in
and presentations former coalfield areas, delivering high quality
workspace and exemplar homes
Track record – completed 22 sites, delivering
700,000 sq ft of workspace and offices with high
occupancy rates
Network Village will create six sustainable mixed-
use developments and deliver a further
300,000sq ft of employment space

PAGE 26/27 MARKETING & PR


10.3.6 Literature 10.3.7 E-marketing
All literature is professionally designed incorporating The proposed use of e-marketing includes the
the Network Space and Network Village branding: following:

Network Village vision brochure – has Websites


been produced to showcase the vision for A new website www.networkvillage.co.uk has
Network Villages been created using the design and content of
E-Newsletter – a four-page newsletter is currently the Network Village vision document. It has
produced on an annual basis. It is proposed to been designed so that it can be updated with
produce this as an e-newsletter on a more news features
frequent basis as this is a cost effective ways The website – www.networkspace.co.uk –
to reach an audience in a highly targeted, has a full content management system and
personalised manner. A personalised database is constantly up-dated
of senior executives and decision-makers in the
target areas has been created Analysis of the web traffic statistics reports will
help us to improve website content, graphics and
Factsheets – detailed case studies to demonstrate lay-out or add more links to other parts of the sites
various elements and Network Space success
such as BREEAM ratings and awards Search engine optimisation
Commencement business plan – sets out the Search engine optimisation is an effective way to
areas of operation and delivery plan for the generate targeted website traffic through strategic
period to 2015 selection of key phrases, and research shows 60-80%
of site traffic originates from search engines.

10.3.8 Budget and Timing

DISTINCTIVE
A marketing and PR action plan and budget have
been prepared. The action plan includes:

Updated and expanded database of key players

MIXED-USE for mail shots and events


Identify range of key events to attend and
possible speak opportunities

DEVELOPMENT Presentation and meeting dates in the diary


for EP, RDAs and regeneration contacts

DELIVERY OF EMPLOYMENT
SPACE IS AT THE FOREFRONT

PAGE 28/29 MARKETING & PR


11. RISK ASSESSMENT
AND MANAGEMENT
11.1 GOVERNANCE 11.2 ACQUISITION
The development process is managed by Langtree Through a combination of experience and advice
on behalf of Network Space involving highly from external consultants, during the acquisition
experienced external consultants and managed process risk is managed through the reporting
through four stages of reporting: system with valuations prepared by external
property agents and cost plans prepared by external
Initial site assessment – carried out to identify consultants. Legal risk is managed by independent
the risks on delivery, timescale, planning, funding lawyers who draft and negotiate development
and marketing agreements and prepare reports on title.
Outline project proposal – providing a more
detailed assessment 11.3 CONSTRUCTION
Pre planning report – a detailed report prepared
Tender process – A minimum of four established
prior to submission of the planning application
regionally based contractors with a proven track
Post tender report – prepared following receipt of record are invited to tender and normally three out
tenders and prior to letting construction contracts of four are contractors who Network Space has
used before. The tender process and assessment
On an on-going basis the joint venture partners attend
is managed by an experienced professional team
monthly Operations meetings dealing with asset
familiar with Network Space developments.
management and reviewing individual development
schemes. Board meetings are held quarterly. Post-contract – Contracts are normally awarded
on a Design and Build basis and are managed by
Network Space has a strong corporate governance
external project management consultants who liaise
regime following English Partnerships corporate
with the contractors on behalf of Network Space.
guidance and subject to annual assessment by their
internal auditors. Network Space has always received
a good rating.

PAGE 30/31 RISK ASSESSMENT AND MANAGEMENT


12. MONITORING AND EVALUATION
12.1 PERFORMANCE MANAGEMENT FRAMEWORK 12.2 EVALUATION
12.1.1 Introduction 12.1.3 Scheme monitoring 12.2.1 Overview 12.2.2 Interim evaluation
This section provides a framework for the systematic A clear and simple performance management Evaluation is the critical examination of projects and The evaluation will be undertaken in order to assess
collection of information in order to measure the system will be established to collect monitoring programmes in order to assess the extent to which the added value of Network Villages. It is proposed
performance of the Network Villages project in terms information for each of the schemes in line with the objectives of intervening have been achieved, that the evaluation will be based upon a review of
of monitoring and its subsequent evaluation. Langtree’s standard reporting format for Network additional impacts or changes that are attributable monitoring data collected to date coupled with a
Space. This will mean assembling and updating to the project or programme have resulted, to assess structured interview programme of partners and
12.1.2 Monitoring information on each scheme. the extent to which changes were secured in an other organisations.
Monitoring is the process of checking actual progress efficient and cost effective way, and to provide
and comparing this with the plans for a project This includes: lessons for the future. Monitoring data will be one 12.2.3 Full evaluation
when it was conceived or promoted. It can provide of the key inputs into any evaluation. A full evaluation of Network Villages will be
Finance Report
an early warning that things are not going to plan commissioned after 4 years of operation. This
and an opportunity to take timely corrective action. Lettings and Management Report – portfolio It is proposed that the evaluation of Network Villages evaluation would be undertaken by independent
Similarly, it can usefully highlight where performance statistics, current deals, vacancy summary, should comprise two components as follows: consultants. It would address a number of key
is significantly better than expected. The partners enquiry tracking, space available questions, including:
Interim evaluation – within the first year following
therefore recognise the importance of giving time Development Report the completion of the first few schemes – it is
and effort to developing and implementing an The impact of Network Villages;
PR and Marketing Report suggested that this would be after 2 years; and
effective monitoring system. Causality and attribution;
Full evaluation – an independent evaluation of
The following reporting arrangements are proposed: Additionality and value for money;
Establishing an appropriate framework for the Network Villages after the first 4 years of operation
on-going monitoring of Network Villages will be Monthly reports as part of the established Change processes;
essential in order to ensure that progress is in line Network Space accounting and reporting cycle Effectiveness;
with the objectives set by the partners. Accordingly, for Operations and Board meetings, focusing
an approach composed of two elements is proposed: on scheme performance; and Sustainability and equality; and

An Annual Report, for the joint venture partners – Key lessons


A bottom-up approach based upon the
assessment of individual schemes; and for use by both partners in line with their own
external communications strategies
An evaluation of the programme as a whole
In addition, an annual Business Plan and budget
Each of the approaches has its advantages and will be prepared for consideration of the Network
disadvantages. For example, while the bottom-up Space Board in its normal cycle for these in late
approach can provide a detailed understanding of spring of each year
the effects of the key schemes within Network
Villages and the communities within which it sits,
it may be difficult to discern the wider, induced or
less tangible impacts. On the other hand, a formal
evaluation can provide an overall understanding of
how Network Villages is performing, albeit that up-
to-date socio-economic indicators are often not
available, and it may be difficult to attribute impacts
to Network Villages or its elements as opposed to
external factors. The proposed methodology for this
Plan therefore seeks to use both approaches.

PAGE 32/33 MONITORING AND EVALUATION


13.WAY FORWARD
This Business Plan has the backing of English Partnerships and Langtree and during the first The Business Plan outlines the Network Space operational areas in the former English
twelve months we will aim to pass the following milestones: Coalfields regions and outlines the minimum size and type of sites to be considered.

Spring 2008 Autumn 2008 During the course of the business plan it may be necessary to review the business plan
A marketing and PR action plan to To have completed a programme of model based on ongoing experience of the planning and development for Network Villages.
be in place including a programme of presentations and meetings with senior Property market conditions will be constantly monitored and factored into reviews.
presentations and meetings with senior individuals, key stakeholders and delivery For further information on Network Village please contact:
executives and decision makers involved partners in the initial target areas
in regeneration in the initial target areas Network Space Ltd
December 2008
Centrix House
Summer 2008 To have identified and agreed terms for
Crow Lane East
To have secured planning permission for two further Network Village schemes
Newton-le-Willows
Murton Network Village with a target for
WA12 9UY
starting on site by December 2008
Tel: 0800 542 0402
By Spring 2009: Email: info@networkvillage.co.uk
Website: www.networkvillage.co.uk
The first Network Village scheme at A programme of presentations and
Murton will have obtained planning meetings will be underway in the second
permission and will be on site. During phase of target areas
the process key issues will have been
identified regarding masterplanning, Increased awareness of Network Space
consultation and costs in the target areas and Network Villages
is recognised by stakeholders as an
Further opportunities for Network Village innovative and sustainable mixed-use
schemes will have been identified and regeneration model
will be under assessment and negotiation

PAGE 34/35 WAY FORWARD