Contractor is encouraged to submit the price for any of, or both options of pipeline:
Only one of the above construction material types will be selected by the Company
during Commercial Evaluation stage.
1. Pipeline Route
The pipeline shall initiate from Munhamir-1 Well location and shall be tied in to the 10”
Shams Export Condensate pipeline at BVS-2. The co-ordinates of Munhamir-1 and BVS-
2 is illustrated in below table:
PTTEP Oman has performed the site survey and the route for the pipeline is proposed in
accordance with drawing No. OS-1522-06 Munhamir -1-BVS-2/1. The drawing has been
appended here in Appendix.
The pre-construction survey shall confirm and establish that the proposed route:
Page 2 of 18
by 1000 hour survival test on the product family representative at the qualification
test temperature.
• The minimum distance for pipelines installed in a separate trench
alongside an existing buried pipeline shall not be less than 2 m.
However this distance can be reduced to a safe minimum distance at
BVS-2 Where the pipeline is proposed to be tied in with the Existing
Condensate Pipeline.
• The crossing of existing pipelines, cables, power lines, roads, railways
and waterways are at an angle between 60 and 90 degrees.
• When installing a pipeline along power lines, the horizontal distance
from any of the power cables and posts is at least 10 m for power lines
at 110 kv and above, and 4 m for power lines below 110 kv.
Page 3 of 18
Figure 1 Shams and Munhamir Road Distance
The survey findings as stipulated in the drawing No. OS-1522-06 Munhamir -1-BVS-2/1
shall be verified prior to finalizing the route of the pipeline. Based on the confirmation of
survey data, A final route for the pipeline shall be established.
2. Pipeline Crossings
The proposed route of the pipeline is expected to cross the service and graded roads at
Page 4 of 18
minimum two locations.
The crossings shall be designed using casings for the crossing of roads or railways. The
Crossing design shall comply with the requirements API RP 1102 and Amendments
/Supplements; if any established during design.
The Road Crossings shall be constructed using most suitable method for the
Construction. Directional drilling is particularly suitable for long crossings, e.g. rivers
and waterways; the method can achieve large burial depths, and it is insensitive to
current, river traffic, etc.
The pipeline at Crossing Location shall comply with cover as well as separation
requirements. The recommended minimum covers at crossings can be found in Table
below:
It is to be noted that Public Roads does not includes the service roads and graded Roads.
Only Road in Location Class 3 & 4 shall be considered as Public Roads.
The pipeline and any other buried structures, e.g. existing pipelines, cables, foundations,
etc. shall be installed with a minimum vertical separation of 0.3 m.
It shall be established that the Over burden due to the cover at the crossing location shall
not burst the pipe when it is empty and is filled with water & fluid.
3. Wadi’s
Page 5 of 18
In accordance with Drawing No. OS-1522-06 Munhamir -1-BVS-2/1, there are no wadi’s
along the proposed route of the pipeline; However as a result of the verification of the
survey data, If any wadi is found, then PTTEP Oman shall provide sufficient historical
data from MOG Oman so as to identify the type of wadi’s and accordingly design the
pipeline protection.
4. Other Crossings
In accordance with Drawing No. OS-1522-06 Munhamir -1-BVS-2/1, There are no
Historical Structures, Monuments, Falaj etc enroute the pipeline; however during
verification of the Survey data, it shall be verified.
5. Survey’s
During Pre-Construction Survey, The survey data shall be verified. The survey data as a
minimum shall contain:
Page 6 of 18
7. Proximity to Other facilities
The requirements of separation between the pipeline (including pig traps) and other
facilities within the plant fences or on the offshore platform should be in accordance with
Hazardous Area Classification.
8. Sizing
The following pipeline sizes have been found suitable for the designed capacity of 10,000
BPD:
Any change in the either capacity of the pipeline or any of the designed, Process and
Operating parameter that has impact on the Pipeline sizing shall warrant revalidation of
the pipeline size.
The above established sizes shall be verified / optimized during engineering or prior to
finalizing the size of the pipeline.
This shall be done by performing a steady state hydraulic analysis. The roughness of the
internal surface of the pipe shall be assumed as below:
The Fluid Velocity in the pipeline may be limited due to the following concerns:
• Pressure Losses
• Prevention of Cavitations at pumps and valves
• Prevention of transient overloads (water hammer)
• Reduction of Erosion and noise
• Prevention of Wear in the components such as Valves
• Pipe diameter and Geometry
Page 7 of 18
The Hydraulic Analysis shall take full account of possible changes in flow rates and
operational modes, over the complete operational life of the pipeline.
The maximum fluid velocity in the pipeline shall not be more than the superficial velocity
in the pipeline (as an extreme case) and shall not be less than the fluid velocity in 10”
Shams Export Condensate pipeline at Tie in Point. If the pipeline has been designed for
superficial velocity, it shall be established that the pipeline shall not have erosion
problem.
For the proposed pipe size, fluid properties and flow rate, the steady state hydraulic
analysis shall provide:
• The pressure and temperature profiles along the pipeline for steady
state conditions.
• Data to address: surge pressure during shut-down of a liquid line,
liquid catching and slug control requirements at the downstream end of
two phase lines.
9. Material Selection
• Carbon Steel.
The Line Pipe manufacturer shall design and manufacture these pipes to meet the Project
Design requirements and to comply with the Designed and Operating Conditions. The
Pipe line made up of these Line pipes shall be suitable to Operate under the
Environmental conditions and shall transport the fluid having properties indicated in the
Article 3.9 of this document.
The line pipes shall comply with Project Specific Documents, “Specifications of
Spoolable Reinforced Fiber Line Pipes.” and “Line Pipe Specifications” appended here to
in Appendix 6.
Page 8 of 18
11. Location Class
The Pipeline shall be transporting Category B Fluid ( in accordance with ASME B31.8
Article 840.2 There is no specific requirement apart from access requirements during
construction and for maintenance and emergency services during operations.
The pipeline route falls under Location Class 1 Div.2. The Strength (SMYS) of the pipe
shall be increased in consideration with the Design factor considered at a particular
location & wherever required the route selection shall take due regard for the cost impact
on pipeline sections in location classes of higher category.
The Line Pipe manufacturer shall design the minimum required thickness for the said
application and thereby shall establish that the D/t Ration is not detrimental to the
construction and in-situ integrity of the pipeline.
Design Factors
The following design factors for the establishing the adequate strength of the pipeline
shall be used.
Page 9 of 18
Design Factor for Pipeline
Note 1: ANSI/ASME B31.4 does not makes any provision for using design factors other
than 0.72, which are inappropriate at critical locations (e.g. crossings, within plant
fences), and for fabricated assemblies. In such conditions, design factors in accordance
with ANSI/ASME B31.8 location Class 1 shall be used.
Note 2: ANSI/ASME B31.8 differentiates crossings with casings and without casings.
Because of the poor experience of cased crossings (i.e. annular corrosion), the same
design factor is recommended, whether a casing is used or not. Design factors for
crossings of rivers, dunes and beaches, not included in ANSI/ASME B31.8, are provided.
Note 3: Parallel encroachments are defined as those sections of a pipeline running
parallel to existing roads or railways, at a distance less than 50 metres.
Note 4: Fabricated assemblies include pig traps, valve stations, headers, finger type slug
catchers, etc.
Note 5: Concentrations of people are defined in ANSI/ASME B31.8 Article 840.3.
Note 6: This category, not specifically covered in ANSI/ASME B31.8, is added for
increased safety.
Equivalent Stresses
Page 10 of 18
The wall thickness for pipeline made up of Carbon Steel, derived from hoop stress
considerations based on design factors indicated above, should be such that the
longitudinal, shear, and equivalent stresses in the pipe wall under functional and
environmental loads do not exceed by 96% during Installation, 100% during Hydrotest
and 90% for Operational Load Case.
There are three types of stresses to be considered in the calculation of the equivalent
stress: the hoop stress, the longitudinal stress and the combined shear stress.
Hoop stress:
Longitudinal stress:
Page 11 of 18
Combined shear stress:
The equivalent stress shall in all cases be less than 72% of SMYS.
The design of Spoolable reinforced polymer pipes shall comply with the
requirements of API15S or API17J. The Line pipes shall comply further with
the stress requirements as indicated above for Carbon Steel.
• Pressure Containment
• Equivalent Stresses
Page 12 of 18
14. Corrosion
The line pipes do not contain steel; thereby no Corrosion phenomenon takes place. This
covers Internal as well as external Corrosion. There by no provision of Corrosion
Monitoring, Corrosion Protection in any form is envisaged.
1.0.1 a) Internal
The internal Pipe surface does not contain Steel in any form thereby no Internal
Corrosion can take place.
1.0.2 b) External
The external Pipe surface does not contain Steel in any form thereby no External
Corrosion can take place.
The pipeline shall have continuous Internal coating for flow enhancement. No Chemical
Injection has been envisaged during the entire designed life. The Coating condition and
the possible Internal Corrosion of the pipeline shall be monitored by:
• E/R Probes
Pipeline design & Layout shall make the required provisions at both ends of the pipeline.
External Corrosion of the pipeline shall be mitigated either by using the 0.5 mm thick
FBE.
The above External Anti Corrosion Coating shall be supplemented with Cathodic
Protection System. Contractor shall design a suitable Impressed Current Cathodic
Protection System for this pipeline.
The Pipeline shall be installed in accordance with Project Specific document “Pipeline
Construction Specifications” (see Appendix 7).
Page 13 of 18
Burial Philosophy / Pipeline Protection
The pipeline if made up of Carbon Steel shall be buried to protect it from mechanical
damage, fires and tampering. The recommended minimum covers are given in the below
Table:
In determining depth cover in agricultural areas, the depth of ploughing and of drain
systems shall be considered. A cover of 1 m would be adequate in most cases. In grazing
land, where fencing activities are common, a depth cover of 0.8 m is in general adequate.
Page 14 of 18
The pipeline shall be protected by Installing Windrows along the route.
The location of buried pipelines shall be clearly identified by markers. In areas where the
risk of interference by mechanical excavators is high, a warning tape should be installed
in the excavation above the pipeline to further lower the risk.
Page 15 of 18
Over pressurization by the upstream facility
The design of Overpressure Protection system shall ensure that in case of the pressure
immediately upstream of the pipeline is in excess of the evacuation requirements, the
pipeline may be designed to operate at lower pressures. In such case a pressure control
system shall be installed to limit the pipeline inlet pressure. However, any type of
pressure control system shall not be considered as an overpressure protection system.
When, following failure of the pressure control system, the maximum pressure which
may be generated by the upstream facility is such that it results in pipeline pressures in
excess of MAIP, an overpressure protection system shall be fitted between the upstream
facility and the pipeline. Two methods can be considered:
The protection against overpressure due to thermal effects may be effected by applying
relief valves. Except on assemblies which can be isolated such as pig trap systems and
Page 16 of 18
slug catchers, an isolation valve may be installed between the pipeline and the relief
valve for maintenance purposes, provided that procedural controls are in place to ensure
that the isolation valve remains normally in the open position, and that the pipeline is not
shut in while the relief valve is out of service.
The pipeline shall be tied in to the Condensate pipeline at BVS-2. The piping
arrangement at BVS-2 is shown in Figure 8.
TIE – IN
FLANGE
A fanged end concentric reducer shall be utilized to connect the pipeline to the existing
8” Flange provided for the Future Connections. Pipeline shall be terminated at BVS-2
with ITAG Pig Valve.
Contractor shall propose the adequate Tie in Arrangement at BVS-2 which will be
approved by PTTEP Oman.
As the pipeline does not passes Location Class 3 and 4 No formal quantitative risk
assessment (QRA) is required.
Page 17 of 18
The risk depends on the expected frequency of failure, external loading, material or
construction defects, and operational mishaps. The risks also depends on the
consequences of the failure, based on the nature of the fluid in terms of flammability,
stability, toxicity and polluting effect, the location of the pipeline in terms of ignition
sources, population densities and proximity to occupied buildings, and the prevailing
climatic conditions.
The expected frequency of failure and the possible consequences may be time-dependent
and shall be analyzed over the entire life of the pipeline.
Risks levels shall be reduced by using lower design factors (e.g. higher wall thickness or
stronger steel), rerouting, providing additional protection to the pipeline, application of
facilities to minimize any released fluid volumes, and controlled methods of operation,
maintenance and inspection.