ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION

Petition O. P. No.10 of 2010, Order dated 06.7.2010

Sl.No Description Summary


1 Title To pass order fixing tariff for Rooftop and Small solar
projects of 1 MW to MW to be connected at
distribution sub station at HT level below 32 KV level,
registered in FY 2010-11 and to be commissioned in
FY 2011-12
2 Date of issue 06.07.2010
3 Quantum of RPPO 0.25% out of 5% quantum of RPPO specified shall be
from solar power purchased as solar RPO by the Discom from solar
power generation covered by the MNRE schemes of
Govt. of India.
4 Tariff a) For bundled power from NTPV Vidyut Vyapar
Nigam (NVVN) shall be at the CERC regulated
price.
b) Levelised tariff for rooftop and small solar power
projects connected to distribution network shall be
CERC determined tariff and shall remain constant
for 25 years
c) Levelised tariff shall be applicable keeping the base
rate of Rs.5.50/ kWh (or the modified base rate with
escalation factor 3% per annum) as stipulated in
the scheme of rooftop and small solar power plants.
d) The RPPO obligation tariff mentioned above shall
be applicable only for selected solar projects that
finally become eligible for Generation Based
Incentive in terms of guidelines dated 16.6.2010 on
rooftop PV and small solar power generation
programme.
The levelised tariff, for Roof Top and Small solar
power projects connected to distribution network,
shall be the CERC determined tariff (i.e. the tariff
that is used for computing GBI) and shall remain
constant for 25 years
5 Cost of evacuation In respect of rooftop and small solar power plants
connected to distribution network, the cost of power
evacuation up to AP Discom existing substation and
necessary metering at substation shall be borne by
the project proponent.
6 General All other terms and conditions not specifically covered
in this order shall be as per the guidelines dated
16.6.2010 for rooftop and other small power plants
connected to distribution network (below 33 KV)

46
ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION

NEDCAP Petition No.17 of 2010 dated 14.7.2010

Sl.N Description Summary


o
1 Title NEDCAP Petition No.17 of 2010 dated 14.7.2010
Tariff payable by Discom to Project proponent

2 Tariff Levelised tariff, for Roof top and small solar projects
connected to distribution net work, to be the CERC
determined tariff (i.e. the tariff that is used to
computing GBI) and remain constant for 25 years.
3 Levelised tariff

Year of Solar PV Projects Solar Thermal projects


Commissioni
ng of project.
Tariff without Tariff with Tariff without Tariff with
accelerated accelerated accelerated accelerated
depreciation depreciation depreciation depreciation
benefit benefit benefit benefit
2010-11 17.91 14.95 15.31 12.85
2011-12 17.91 14.95 15.31 12.85
2012-13 -- -- 15.31 12.85

Tariff indicated in the above chart included Generation Based Incentive (GBI)
calculated with a base rate (effective net cost of the Discom) of Rs.5.50 / kWh (or
the modified base rate with escalation factor of 3% per annum) available under
the scheme of Roof Top and Small Solar Power Projects and shall be subject to
the terms and condition stipulated in the scheme.