Professional Documents
Culture Documents
Workshop in Xiengkhuang
Presented By:
Mr. Thongsanti B. VONGSALY
Mr. Sopha SOULINEYADETH
1
LIRE Staffs
2
Presentation Outline
About LIRE
LIRE Partners
LIRE Projects
Pico Hydro Project
Workshop Objectives
Findings
Conclusions
Discussion
3
LIRE IN GENERAL
4
About LIRE
5
LIREs’ Partners
6
LIRE PROJECTS
7
1.Biofuels
8
2.Biomass Gasification
9
3.Biogas
10
4. Solar-powered water purification
11
5.PICO HYDRO PROJECT
For end-users
Improve the quality, safety, efficiency
Promote increased use and sharing of pico hydro
units
For shopkeepers
Be able to distinguish between different types
and qualities of units to provide better goods &
service to customers
Provide information that enables shop owners to
sell more variety of goods related to pico
Find more market opportunities
Workshop Objectives
Bearing
Winding
Cable
Light bulbs
Well sold
300-1000 Watts
Price between 350 000-850 000 kip
Sources of goods
from China
from Vietnam
No instructions available
18
Propeller (low-head)
Load Controller
Stabilizer 21
Problems for shop owners (con’t)
Lack of prefab draft tube and channel
22
End Users Comments
Low output
Installation problems
Location not available
Broken light bulbs
Low quality of pico unit
Short life time
Frequent broken
Need manual
Chinese manual
23
Type of installation
Lying
Used in flat area
Low efficiency
Standing
Good draft tube and channel Bad draft tube and channel
Cable use
Chinese Cable
Vietnam Cable
Thai Cable
Villages visited
Total
Village Pop Nr.pico
HH
Nongbone-Nameuang 563 69 8
Naxay-Nasay 638 91 26
Hinh 521 86 7
Sopjam 376 62 9
Meuang Ngoi Kao 754 143 40
Sobkhan 443 82 22
Nalin 539 113 50
Hatsaykham 281 57 26
Nr Pico Vs Nr Pico Shared
Nr. Pico and Nr. Shared Pico(Kham Dist)
30
26
25
20
15 13
10 8 8
7
0
0
Nr Pico Nr Shared Nr Pico Nr Shared Nr Pico Nr Shared
Pico Pico Pico
Nongbone Nameuang
Naxay Nasay
Hinh
Nr. Pico and Nr. of Shared Pico(LPB)
60
50
50
40
40 34
30 26 25
22
20 15
9 8
10
2
0
co
co
co
co
co
co
co
co
co
co
Pi
Pi
Pi
Pi
Pi
Pi
Pi
Pi
Pi
Pi
ed
ed
ed
ed
ed
ar
ar
ar
ar
ar
Sh
Sh
Sh
Sh
Sh
29%
71%
92%
Non Users HH Nr HH End users Non Users HH Nr HH End users
43%
57%
0% 27%
73%
100%
Non Users HH Nr HH End users Non Users HH Nr HH Use Pico
27%
42%
58%
73%
32
CONCEPTS RESULTS
8 Concepts Presented to End Users
34
A: Draft Channel and Tube
35
B: Electronic Load Controller
36
C: Better Cables (only for end users)
37
D: Community Owned System
38
E: Purchasing Aids
39
F: Installation Toolkit
40
G: Installation Advice
41
H: Shop Owner Workshop(only for shop
owners)
43
Results after concepts presented
Score of Concepts for HH(Kham
District)
3.5 3
3 2.8
2.6
2.5 2.2
2 2
2 1.5
1.5
1
0.5
0
A B C D E F G
45
Concepts
Electronic Load Controller
EASE/Energy Access Partner Meeting 2008, Kilimanjaro, Tanzania 47
Installation and Use Guides
48
Informational Workshops for Shop Owners
49
Technical Advisors
50
So what do think of these four
concepts?
Let’s discussion begins