You are on page 1of 143

Detailed Project Report

for

ERP based e-Governance at

Pune Municipal Corporation

Pune Municipal
Corporation

Prepared by ΠωΧ
Detailed Project Report for ERP based e-Governance

Table of contents

GLOSSARY OF TERMS ..................................................................................... 4

EXECUTIVE SUMMARY ....................................................................................5

1. Sector Background Context and Broad Project Rationale .............................. 6


1.1 Other Projects under JNNURM .......................................................... 6
1.2 Existing e-Governance projects ........................................................ 6
1.3 Project Rationale ............................................................................ 8
1.4 Project Approach ............................................................................ 9

2. Project Definition and Salient Design Features ........................................... 10


2.1 Project Definition ...........................................................................................10
2.2 Broad Scope ...................................................................................................10
2.3 Salient Features of the Proposed e-Governance Application ....................12

3. Project Scope in Detail ........................................................................... 13


3.1 MIS ..................................................................................................................13
3.1.1 Birth & Death department .................................................. 13
3.1.2 Property Tax Department ................................................... 18
3.1.3 Water Supply Department .................................................. 25
3.1.4 Grievance information system ............................................ 31
3.1.5 Building Permission Department.......................................... 33
3.1.6 E- Procurement ................................................................ 38
3.1.7 Project systems Department .............................................. 40
3.1.8 Food & Market Licenses ..................................................... 45
3.1.9 Solid waste Management ................................................... 49
3.1.10 Fleet Management ............................................................ 51
3.1.11 Accounts Department ........................................................ 56
3.1.12 Establishment Department ................................................. 60
3.1.13 Employee self service module ............................................. 70
3.1.14 Web portal Module ............................................................ 72
3.1.15 Citizen service centre module ............................................. 75
3.1.16 DMS and Workflow Management module.............................. 79
3.1.17 Welfare scheme module ..................................................... 82
3.1.18 Hospital management ........................................................ 83
3.1.19 Asset management Department .......................................... 87
3.1.20 Land and Estate management ............................................ 90
3.1.21 Material management Department ...................................... 92
3.1.22 Residence ID .................................................................... 95
3.1.23 Legal Department ............................................................. 96
3.1.24 Municipal Secretary ........................................................... 99
3.1.25 Audit Department Module ................................................ 101
3.2 GIS ................................................................................................................ 102

4. Implementation Methodology ................................................................ 105


4.1 Proposed Solution Architecture .................................................................. 105
4.2 Solution Features ......................................................................................... 109

Pune Municipal Corporation Page 2 of 143


Detailed Project Report for ERP based e-Governance

4.3 Implementation Approach .......................................................................... 111


4.4 Implementation Schedule ........................................................................... 112
4.5 Key Challenges / Risks ................................................................................ 112
4.6 Capacity Building ......................................................................................... 113
4.7 Change Management .................................................................................. 113

5. Cost Estimates .................................................................................... 114


5.1 Server Infrastructure Costs ........................................................................ 114
5.2 MIS ................................................................................................................ 115
5.3 GIS ................................................................................................................ 115
5.4 Other Costs .................................................................................................. 115
5.5 Total Capital Cost ........................................................................................ 116
5.6 Operational Expenditure (Per Year)........................................................... 116
5.7 Year-wise Break-up of Project Costs ......................................................... 116
5.8 Project Financing Structuring………………….…………… ……………………………………………….112

6. Benefits Envisaged and Assessment Framework ...................................... 119


6.1 Benefits envisaged from the project ......................................................... 119
6.2 Assessment Framework .............................................................................. 123

Annexure I : Business Process Re-engineering being undertaken at PMC as a part of


the project ............................................................................. 126

Annexure II : Analysis of Existing Modules at PMC .......................................... 129

Annexure III : Specifications for IT Infrastructure Components ........................ 135

Pune Municipal Corporation Page 3 of 143


Detailed Project Report for ERP based e-Governance

GLOSSARY OF TERMS

Sr. No. Acronym Full Form


1 BOOT Build-Operate-Own-Transfer
2 CAPEX Capital Expenditure
3 CPU Central Processing Unit
4 DPR Detailed Project Report
5 GIS Geographic Information System
6 GoI Government of India
7 GoM Government of Maharashtra
8 ICT Information and communication Technology
9 ISP Internal Rate of Return
10 IT Information Technology
Jawaharlal Nehru National Urban Renewal
11 JNNURM
Mission
12 LAN Local Area Network
13 NPV Net Present Value
14 NSG National Steering Group
15 O&M Operation and Maintenance
16 OPEX Operating Expenditure
17 OS Operating System
18 PC Personal Computer
19 PMC Pune Municipal Corporation
20 PPP Public Private Partnership
21 RFP Request for Proposal
22 SI Systems Integrator
23 TAG Technical Advisory Group
24 ULB Urban Local Body

Pune Municipal Corporation Page 4 of 143


Detailed Project Report for ERP based e-Governance

EXECUTIVE SUMMARY

The National e-Governance Plan (NeGP) approved by the Government of India


includes many high impact e-Governance initiatives and projects that have been
identified as Mission Mode Projects (MMP’s). One such MMP focuses on e-
Governance at Municipalities. Ministry of Urban Development (MoUD), has
announced the scheme to assist the e-Governance projects at Urban Local Bodies in
35 cities with population of above 10 lakh as per 2001 census and would be
implemented as a part of JNNURM. The present document is a Detailed Project
Report for the e-Governance Project at Pune Municipal Corporation and has been
prepared as per the guidelines published by Govt. of India (GoI) for the above
mentioned scheme.

PMC’s Vision (as articulated in the CDP)


“An economically vibrant and sustainable city with diverse opportunities and
rich culture; where all citizens enjoy a safe and liveable environment with good
connectivity”

PMC’s Mission (as articulated in the CDP)


“Commitment to being the principal facilitator and provider of services through
dedication to achieve excellence in civic amenities’ provision and a Responsive,
Accountable, Modern, Simple, and Transparent Administration”.

PMC believes that e-Governance is an opportunity to transform the corporation’s


commitment to be citizen centric, provide cost-effective services and enhance
governance through improved access to accurate information and transparent and
responsive democratic institutions. Thus e-Governance is no longer an experiment
in administrative reform but a permanent part of the governing process. For both
government organizations and citizens, its advantages are far reaching in
comparison to investment in establishing e-governance.

This document covers detail scope of the proposed e-Governance project, the cost
estimates and Project Management Strategy.

Pune Municipal Corporation Page 5 of 143


Detailed Project Report for ERP based e-Governance

1. Sector Background Context and Broad Project Rationale


Pune Municipal Corporation (PMC) is one of the largest and leading Urban Local
Governance Body in Maharashtra. It is committed to provide transparent,
accountable and efficient local governance through the use of modern
technologies especially in management and administration fields. It has decided
to embrace Information Technology in the form of e-Governance as a tool
towards this goal.

PMC covers an area of over about 237 Square Kilometres, catering to the civic
needs of over 25 lakh citizens. Most of the functions carried out by this
Corporation are service oriented, and have been already computerized to larger
extent as mentioned under section 2 of this document. There are 144 wards
and 42 Citizen Facilitation Centres (CFC’s) across Pune through which various
services are rendered to the citizens. Better IT systems are required to
integrate all the workflows seamlessly for a faster and efficient service to the
citizens, employees, administrators and compotators.

1.1 Other Projects under JNNURM

Sharing of Project Cost (in lakhs)


Sr.
Project Title
No.
GoI State PMC

Augmentation up gradation of sewage


1 treatment plant and pumping station in city of 1076.6 430.65 645.97
Pune
Renewal & Management of sewerage of
2 1222.25 488.9 733.35
drainage disposal system in Pune
Construction & Improvement of Drains to
3 Prevent contamination of natural water bodies 1249.5 499.8 749.7
& development of heritage site along in Pune.
4 Road network & urban transport- BRT-Pilot 2337 934.8 1401.75
BRTS (Development & Infrastructure for
5 13258.13 5303.25 7954.88
Commonwealth Youth Games 2008)
Bus Rapid Transit (Phase-I) for Pune City 11903.85 4761.54 7142.33

6 Subways On Baner Road 90.75 36.3 54.45

7 Sangamwadi Approach Road 97.75 39.1 58.65

8 Construction of Subways (4nos) on Nagar Road 82.63 33.05 49.58

Total 31318.46 12527.39 18790.66

Grand Total 62636.51

1.2 Existing e-Governance projects


Pune Municipal Corporation (PMC) has always been on the forefront of ICT
enablement of services and departments to render faster and more
efficient services to the citizens. PMC is truly on its way to become a

Pune Municipal Corporation Page 6 of 143


Detailed Project Report for ERP based e-Governance

complete e-Governed Urban Local Body in the country. Some of the


unique initiatives of PMC are –

Registration of Births and Deaths: Birth and Death registration is


already computerized. Online registration facilities are available and
computerized certificates are being issued to citizens.

Public Grievance Redressal: As part of interactive web portal of PMC


grievance readdressal system already in place.

Property Tax Management: Property tax database is computerized and


demand notes are issued by this database. Property tax dues are
regularly updated online. Property tax payments and collection is also
facilitated through ICICI Infinity Internet gateway.

Municipal Accounting System: The present Cash based Double Entry


accounting system is already computerized. This system is proposed to be
converted to computerized Double Entry Accrual System on an ERP
platform and the process for the same is already initiated.

E-Procurement: Interactive website for information on tenders of all


departments is in place.
Personal Management: Payroll & Pension System is already
commissioned This includes Biometric Time & Attendance System .The
system is currently being integrated with the payroll system.

Payment of Property Tax, Utility Bills and Management of Utilities that


come under the ULBs Online windows for payment of Property Tax &
Water Bills have been initiated from the Head Qtrs., zonal offices & Citizen
Facilitation Centers of the PMC.

Building Plan Approval: Building plan permission process is fully


automated and made available online on the interactive website of PMC.

G.I.S.: GIS based property tax reforms are planned to be implemented

Unwire Pune : PMC is one of the first governance bodies in the country
to launch a project for providing Wi-Fi connectivity across the city.
Through this initiative “Unwire Pune”, Pune Municipal Corporation (PMC)
proposes to deliver a solution to the citizens, businesses and academic
institutions to enable to seamlessly connect to the internet in a relatively
easy manner. As much as providing basic facilities such as drinking water
supply, sewerage, power, roads etc, PMC would like to provide basic IT
infrastructure such as stable internet connectivity to its citizens and also

Pune Municipal Corporation Page 7 of 143


Detailed Project Report for ERP based e-Governance

offer compelling business and cost models to attract and sustain major
ISP businesses in Pune.

1.3 Project Rationale


Looking at the challenges faced due to rapid growth of Pune city, there is
increasing need to have a comprehensive, integrated, ERP based e-
Governance model. Such a system will also help administration to adhere
to the reforms agenda set by PMC in it’s CDP. This reform agenda is given
below:
 Promote people centric administration : Common citizens should
get the benefits of the system of accurate billing. Corruption should be
avoided.
 Move from process accountability to productivity accountability
and from transactional to transformative governance : The
process is computerized to increase productivity. Each department of
the corporation has reports giving exact statistics of how accountability
is achieved through the system.
 Reduce delays and ensure promptness in delivery of services :
Computerization would ensure timely delivery of accurate service.
 e-Administration : Improve administrative processes by cutting cost,
managing performance, making strategic connections within the local

Pune Municipal Corporation Page 8 of 143


Detailed Project Report for ERP based e-Governance

bodies and creating empowerment E-Citizen and E–Services: Connect


citizens to the local government by talking to citizens and supporting
accountability, by listening to citizens and supporting democracy and
by improving public services.
 Citizen Centric Organisation : PMC has taken a lead in e-
governance projects. Presently it has displayed a true citizen centric
project through Citizen Facilitation centres. PMC would like to augment
this citizen centricity by providing many more services at different
service delivery channels.

1.4 Project Approach


In order to implement a comprehensive, integrated, ERP based e-
Governance model, PMC, through an open tender appointed M/s.
PricewaterhouseCoopers Pvt. Ltd. (PwC) as the Project Management
Consultant. Tasks undertaken by PwC are given below :
 Detail study of the PMC departments and preparation of AS-IS
document
 Preparation of Functionality Scope for the To-Be processes in
consultation with the department.
 Objective Analysis of the existing e-Governance solutions at PMC.
Details of this analysis is given in Annexure II. As per this analysis, it
is recommended to continue with AutoDCR and Octroi Software while
other software needs to be replaced by functionally and technically
superior software. The current software, although work satisfactorily in
isolation, it will be difficult to integrate them with the proposed ERP
based e-Governance model. However, PMC has taken steps to ensure
that the valuable data generated by these systems gets appropriately
used.
 PMC now intends to publish open tenders to identify the Systems
Integrator to supply, implement and support the comprehensive e-
Governance system. Detail scope of these tenders and the project
timelines is given in the following sections.

Pune Municipal Corporation Page 9 of 143


Detailed Project Report for ERP based e-Governance

2. Project Definition and Salient Design Features

2.1 Project Definition


The objective of the current project is to provide efficient services to
citizens, administrators and comparators by implementing ERP Based
Solutions to enable PMC’s processes and workflows. Key objectives of this
project are as follows:
 Improve the quality of Citizen Service Delivery System and offer these
services with optimal effectiveness and transparency.
 Allow data sharing across different departments, thus bringing about
the efficiency in administration functioning.
 Facilitate the decision making process of top management by
furnishing the right information at right time.
 Help different departments to improve their revenue collection
efficiency.
 Harness the use of technology to create sense of achievement
amongst employees and citizens

2.2 Broad Scope


The project can be broadly divided in 4 sub-sections as given below :
A] Management Information System (MIS)
MIS is envisaged to undertake Enterprise Wide Resource Planning
approach, enabling PMC to use various data in most optimal way and
provide services to citizens in efficient and effective manner. Various
functional modules to be covered under MIS are given below:
a) Birth & Death Department Module
b) Property Tax Department Module
c) Water Department Module
d) Grievance Information System
e) Building Permission Module
f) e-Procurement Module
g) Project Systems
h) Licenses (Food & Market) Department Module
i) Solid Waste Management Module
j) Fleet Management System
k) Accounts Module
l) Human Resource Management System
m) Employee Self Service Module
n) Web Portal
o) Citizen Service Center Module
p) Document & Workflow Management System

Pune Municipal Corporation Page 10 of 143


Detailed Project Report for ERP based e-Governance

q) Welfare Schemes Module


r) Hospital Management System
s) Asset Management System
t) Land and Estate Management Module
u) Material Management System
v) Resident ID Registration Module
w) Legal Module
x) Municipal Secretary Department Module
y) Audit Department Module

B] Geographical Information System (GIS)


GIS is a boon for urban managers and can be used to bring in much
needed effectiveness in city planning and it’s management. Main aim
envisaged while planning GIS at PMC is the creation of decision
support system to assist the administration in effective management
of the Urban Local Body.

Broad Scope of GIS Project is given below :


 Supply and maintenance of GIS Platform
 Customised GIS Application (to integrate Spatial information with
the proposed MIS)
 Creation of geo-spatial data on Buildings, Water Drainage, Roads,
Sewerage, and other Public utilities
 Procurement of Satellite Image of 0.6 meter resolution and
creation of final up-to-date base map of PMC.

C] Other IT Applications
In order to support the proposed MIS and GIS applications, various
other IT Management solutions are required. The list of such
requirements is given below :
a. RDBMS
b. Application Server for MIS
c. Application Server for GIS
d. Web Server

D] Server Side Infrastructure


Along with IT Management Applications specified in above section,
PMC would also require the basic Server Side Infrastructure to host
various Applications. List of such Infrastructure Components is given
below :
a. Database Server
b. Application Servers
c. Web Servers
d. Domain Server

Pune Municipal Corporation Page 11 of 143


Detailed Project Report for ERP based e-Governance

2.3 Salient Features of the Proposed e-Governance Application


A] Citizen Interface features
The proposed system is expected to establish an extremely smooth
citizen interface. The focus has to been on maximizing the citizen
convenience in availing various services of PMC and obtaining them
with speed and certainty.

Certain design features with reference to Citizen Interface are


described below:
a. Simplification of the Application Forms : Application forms for
all the citizen services will be simplified and will have common
design. These will be available even on PMC Web Portal for citizens
to fill them up and submit electronically.
b. Multiple Channels for Service Delivery : Citizen will be able to
avail various PMC services through multiple channels as listed
below:
i. Online Portal
ii. Un-manned KIOSKs
iii Agents appointed by PMC (Internet Cafes, CSCs, etc.)
ii. Citizen Facilitation Centres

B] Integrated Application Software


PMC intends to implement the holistic and integrated e-Governance
system. Different modules need to be seamlessly integrated with
Accounts and other modules so that data duplication doesn’t happen
and PMC is able to build strong foundation for decision support
system. PMC thus has planned for ERP based Application
Software.

C] Scalable Application Design


The Project will mark beginning towards building Information Base for
tomorrow’s hi-tech Pune. It is thus imperative that the Application
Software has the capability to scale up to tomorrow’s requirements
like given below :
 Managing the entire Property Life Cycle (Data Collaboration
between various govt. departmental systems right from Land
Records Department, Registration Department, Building
Permission Department, Property Tax Department, Water
Department, Licenses Department, Electricity Department, etc.).
 Maintaining Information on Citizen Life Cycle (Right from Birth to
Marriage, Health, Education, Driving License, Interactions with
PMC, Death)

Pune Municipal Corporation Page 12 of 143


Detailed Project Report for ERP based e-Governance

3. Project Scope in Detail


Entire Software Application is being divided into two broad categories – MIS and
GIS. MIS will cover entire e-Governance System except for GIS. Reason for
separating GIS from other systems is that it is a specialized field and
competition will get restricted if PMC decides to procure the services for both
these systems from a single Systems Integrator.

3.1 MIS

3.1.1 Birth & Death department


Introduction
Health department takes care of the health in general of the people
within the corporation limits. The department runs many health schemes
like D.P.T., Polio, Measles and other deceases. Most important customer
centric process the department has is the registration of Birth and death
of the citizens. Also department has the responsibility of issuing the food
licenses.

Birth & Death department objective is to register the Birth and Death
within the corporation limit, also issue the certificate for the same.

General statistics
Number No. of PMC run Hospitals / Nursing Homes:
• General hospital :2
• Nursing home : 14
• Mother child care :5
• Family planning centre :7
• ICDS : 2 +5(New)
• Dispensary : 29

Services delivered by the department:


• Birth and Death Certificate
• Birth and Death Registration
• Birth and Death Registration-Delay
• Correction of Registration details
• Cremation Certificate
• Registration and Certificate for still birth
• Registration of birth for delivery at home

Issues with current functionality and how to address the same

a] Software is not designed as per the Corporation requirements and


requires quite frequent changes.

Pune Municipal Corporation Page 13 of 143


Detailed Project Report for ERP based e-Governance

[Resolution] Software need to be rebuilt considering the certificate


format and necessary validation.

b] Old data is not available through the system. For old data the still
manual register are looked in, consuming lot of time and delay ion
customer service.

[Resolution] All the past record needs to be feed-in into the system on
priority.

To Be Departmental Functionality

 Birth and Death certification application will be part of the citizen


services delivery module.

 Authorization based access rights to the registered Hospitals / nursing


homes for registration of Birth & Death.

 Workflow solution will be used for the approval of the process.

 Web based interface for delivery of the certificates for the existing
users through CFC / Kiosk or any other delivery mechanisms.

 Complete audit trail will be maintained to track the total certificate(s)


printed by each user id.

 It will have integration with the accounts for real time analysis of the
collection made and the certificates issued.

 Integration with the GIS system.

Pune Municipal Corporation Page 14 of 143


Detailed Project Report for ERP based e-Governance

Pune Municipal Corporation Page 15 of 143


Detailed Project Report for ERP based e-Governance

Functional Scope of the Proposed Birth & Death Module

Integration
Functionality required
with
A] Registration of Birth / Death
 Registration of Birth (Hospital / Home / Jail / etc.)
o Normal & Delayed Registration
o Child Details – Gender, DOB, Time, Weight, Name,
Birth Place etc. GIS

o Parent Details – Name, Address, Qualification, (for


Occupation marking the
hospital +
o Delivery Method, Informant Details, Attachments in parents
case of delayed registrations address)
 Registration of Still Birth
o Feotal Death Cause along with other birth registration
details
 Child Name Insertion
 Registration of Death
o Normal & Delayed Registration
o General Details – Gender, DOD, Time, Name,
Attention type, Pregnancy related Death
GIS (for
o General Details –Death place type, death place, marking the
Cemetery type, Informants Details location)
o Medical Certificate Details - Death Cause, Death
Manner
o Create link with Birth Database by giving lookup while
registering the death
 Online Registration of Birth / Death by Hospitals through
Web
proper Authentication
 Defining charges For Birth and Death Services
o Delay Charges based on no. of days of delay
o Birth Certificate charges
Accounts
o Death Certificate charges
o NOC charges For Birth & Death
o Child Name Insertion charges
 Linking of Birth / Death with Property Tax & GIS Property
Database Tax / GIS
B] Citizen Services
 Issue of Birth Certificate
o Free Copy as per rule.
CFC,
o Charges for additional copies
Accounts
o Search Charges
 Generation of On-line Certificate with auto generated

Pune Municipal Corporation Page 16 of 143


Detailed Project Report for ERP based e-Governance

letter by the department confirming the authenticity of


the Certificate
 Birth Registration Correction
 Issue of NOC for Birth
 Death Certificate
 Death Registration Correction
 Issue of NOC for Death
 Issue of Cremation Certificate
Web portal,
 Online Birth / Death Certification
Accounts
 Integration with Web to validate the Birth / Death
Web Portal
Certificate
C] MIS
 Variety of Reports to be sent to State / Central govt.
authority
 Monthly Summary Report of Birth
 Monthly Summary Report of Still Birth
 Monthly Summary Report of Death
 Birth Reports for Polio Vaccination Drives
 Birth / Death reports for various Health Schemes
 PNDT report
 Reports to Health Department w.r.t. Death Causes in a
GIS
particular period, for particular location
 Reports to analyse services delivered through various
delivery channels
D] Other Requirements
 Data Porting / Data Entry Suite
 Search of Registration No. by various parameters like
name, date of birth / death, hospital name etc.

Pune Municipal Corporation Page 17 of 143


Detailed Project Report for ERP based e-Governance

3.1.2 Property Tax Department


Introduction
Property tax is one of the main sources of revenue for the PMC.
Residential and commercial properties, situated within the limits of PMC,
are assessed for tax. Property tax is tax on immovable or tangible real
property such as land, buildings and permanent improvements. Based on
such assessments, all the property holders are expected to pay the
property tax. Property Tax may comprise of basic house/building tax plus
service taxes such as street tax, and conservancy/scavenging tax. It is
collected either half yearly or annually.

Property tax department is responsible for billing & collection of property


tax for all residential, commercial, open plots and other types of
properties within PMC limits held privately or by government (state &
Central).

General statistics:
No. of Properties upto 30-June 2008
Residential : 590000
Open Plot : 24000
Non Residential : 71000
Residential + Non Residential : 14000

Various Citizen Services given by the Dept.


Title transfer
Self assessment
NOC
Solar system benefit
Vermiculture project benefit
Rain water harvesting benefit
Freedom fighter benefit
Owner occupancy benefit
Slum rehabilitation properties
Exempted properties

Total Demand for 2007 – 08


Rs 688 Crores (Approx)

Total Recovery for 2007 – 08


Rs 265 Crores (Approx)

Total Staff strength in Prop. Tax Dept.


Approx. 120 departmental staff.
Approx. 100 Ward office staff.

Pune Municipal Corporation Page 18 of 143


Detailed Project Report for ERP based e-Governance

Issues with current functionality and how to address the same


a] Building completion certificate should accompany list of property / flat
owners, flat numbers and carpet area. Currently this is not provided
resulting in additional efforts in the Property tax department.

[Resolution] ERP will help Property tax department and Building


permission department share their data. As soon as the building
completion certificate is issued, the same information will be available
to the property tax dept. The information available could be Flat no,
carpet area, owners and other details.

b] Ward wise reporting of arrears and Yearly Tax Demand of property tax
details are not available online in ward wise civic centre collection
report.

[Resolution] MIS will help generate Ward wise reporting of arrears,


Yearly Tax Demand property tax details and ward wise collection
details.

c] Cases where the ARV is changed and a differential bill is generated,


total arrears till date is not printed on the assessment difference bill
(green colour bill).

[Resolution] ARV values for each of the region will be decided once
and updated into the ERP solution, System will auto calculate the ARV
for each registered property in PMC and generate the bills.

d] For change of ARV value / change of name /change of flat number etc
should be reflected in the application (date of change) and even tax
arrears should be reflected for old status and new status.

[Resolution] ERP will have relational data base. Any change in the
mentioned will be reflected all across.

e] Particulars of the occupant is not similar on bill and receipts.

[Resolution] Standard forms will be designed which will access


information from single database.

f] Only few activities of the department are automated. Most of the


processes are Manual and requires file movement.

[Resolution] Putting workflow and Document management System in


place will help most of the department processes automated with
inbuilt logic for the file movement.

Pune Municipal Corporation Page 19 of 143


Detailed Project Report for ERP based e-Governance

g] At time the payment gateway does not work properly. Resulting into
citizen dissatisfaction and employees extra effort to resolve the issues.

[Resolution] The system should be designed in using standard set for


the web based application and comply the requirements of the
gateway payment.

To Be Departmental Functionality

RV calculation & Property Tax Generation

Billing & Payment of Property Tax

Pune Municipal Corporation Page 20 of 143


Detailed Project Report for ERP based e-Governance

Generation of Notice

Citizen Services

Pune Municipal Corporation Page 21 of 143


Detailed Project Report for ERP based e-Governance

MIS Reports

Demand / Collection Register Integration GIS

Assessment Register Integration GIS

Closing Register

Ward wise / Zone wise Recovery Reports Integration GIS

Tax Defaulter Report Integration GIS

Tax wise Recovery details

Tax wise Demand details

Advance Payment Reports

Objection / Hearing Details

MIS reports for self assessment, concessions.

Functional Scope of the Proposed Property Tax Module

Integration
Functionality required
with
A] Capture of various details of the Property
 Ward/ Zone/ Block/Route – Administration or
Geographical divisions
 Property Holder’s Name – One or multiple owners
 Property Holder’s Email ID / Mobile No.
 Property Holder’s Address (Present Address, Permanent
Address)
 Property Location details (Survey No., Chalta No., etc.) GIS
 Property address
 Linkage with Building Permission Module to carry forward
building details

Pune Municipal Corporation Page 22 of 143


Detailed Project Report for ERP based e-Governance

B] Capture of various details required for Property Assessment


 Type and Sub Type of Property
 Usage of Property
 Construction Class / Vicinity Factor / Amenity Factor
 Age of Building
 Property tax as per rent assessment.
 Any other factor required for Assessment
C] System based calculation of Ratable Value
 Room-wise / Flat-wise/ Whole Property Assessment
D] Tax Generation
 Tax Generation as per Rate Chart
 Tax Exemptions
 Bifurcation of rates for General Tax, Fire Fighting,
Vermiculture, etc.
E] Other relevant Details for Property
 Property history
 Advance property tax payment
 Property Rental details
F] Other Departmental Process
 Generation of Special Notice
 Objection
 Hearing
 Property Billing Accounts
o Individual flat-wise billing/ Property wise billing
o Interest Calculation
o Consideration of Advance paid earlier
 Demand Notice Generation
 Issue of Warrant Notice
 Seizure of Property
 Auction of Property
 Rebate Calculations Accounts
 Automatic mailing of Bills / Notices to the E-Mail ID
 Advance / Excess Collection / Refunds Accounts
 Cheque Dishonor and Outstation Cheque charges
 Facility for online tracking of bounced checks
 E-Mail / SMS to be sent to the owner upon transactions SMS
Gateway /
Web Server
G] Citizen Services
 Change in Property Ownership Accounts

Pune Municipal Corporation Page 23 of 143


Detailed Project Report for ERP based e-Governance

 Splitting of Property Tax Assessment


 Duplicate Bill
 Assessment Certificate
 Copy of Property Tax Assessment Extract
 No Dues Certificate
 Payment of Property Tax
 Linkage with Grievance module for Property Tax related Grievance
grievances Redressal
H] MIS
 Demand / Collection Register GIS
 Assessment Register GIS
 Closing Register
 Ward-wise / Zone-wise Recovery reports GIS
 Top Defaulters Report GIS
 Occupancy wise / Flat wise report
 Tax-wise Recovery Details
 Tax-wise Demand Details
 Advance Payment Reports
 Objection / Hearing Details
 Inspector wise report (Assessment of property as per
Building permission / Citizen request / Inspection)
 Assessment as per citizen / Assessment as per inspector
 MIS reports for self assessment, concessions.
 Alerts from License Module upon New License / change in License
business Module
I] Other Requirements
 Data Porting / Data Entry Suite
 Query of Property Dues CFC, Web
 Scope to link up to Land Records / Registration system

Pune Municipal Corporation Page 24 of 143


Detailed Project Report for ERP based e-Governance

3.1.3 Water Supply Department


Introduction
The water supply department is involved with supplying of water from
the reservoir to the consumer.

The major responsibilities of the Water supply (distribution) department


are:
• Issuance of new water connection
• Plumber License
• Water disconnection, Transfer
• Billing & Collection

General statistics:

No. of projects handled (approx.) :90-100


Total Capital Expenditure Budget (for 08 – 09) :75 Crores
No. of Technical Staff (grade-wise) :25 Persons

Issues with current functionality and how to address the same

a] The process for issue of new water connection is manual, the


scrutiny is done manually. Often there is delay in giving connections
and tracing the application manually is cumbersome.

[Resolution] System to calculate size of Water Connection based on


various parameters like pressure in source line, length of water
connection, no. of families, etc. A workflow can be integrated in the
application for online sanction as per DEP and scrutiny of application.

b] The process of getting NOC from Property Tax at the time of new
connection is manual.

[Resolution] NOC’s from Property Tax department not to be taken if


the required data is available in database. The application should have
the Property ID.
Citizen need not separately submit NOC from Property Tax Dept.

c] There is no process for handling complaints regarding wrong bills.


Tracking of complaints not available.

[Resolution] Citizen complaints module should be integrated with


water billing departments. The complaints should be automatically
addressed to concerned authorities and should be escalated if action

Pune Municipal Corporation Page 25 of 143


Detailed Project Report for ERP based e-Governance

is not taken in stipulated time. A facility of tracking applications can


also be integrated in web portal for citizen facilitation. Services like
Duplicate Bill, No Dues Certificate, etc. to be given across the counter.

d] Information is sought manually from road department for road


digging charges. No GIS integration is available.

[Resolution] Road Digging Charges to be taken from the GIS


system. This will ensure that Road Department’s time is not wasted in
scrutinizing the application.

e] GIS integration is not available for recovery of bills.

[Resolution] GIS integration with water distribution will help in


finding out maximum defaulters in a particular area, concerned
officer. Top management can take effective action and decision with
the help of GIS.

f] Only billing is partially automated and the system is using 2 tier


architecture.

[Resolution] The system should be deployed on robust 3 tier


architecture and web enabled. The process for new connection,
integration with accounts, payment collection should be automated
and integrated.
The system should give MIS reports with ward/zone wise collection
details.

Pune Municipal Corporation Page 26 of 143


Detailed Project Report for ERP based e-Governance

To Be Departmental Functionality

Pune Municipal Corporation Page 27 of 143


Detailed Project Report for ERP based e-Governance

Charges for connection are paid by cash/credit card/


Integration Accounts
cheque at CFC

SMS notification sent to site engineer for the particular


Integration HRMS
ward/zone

End

Functional Scope of the Proposed Water Supply Module

Integration
Functionality required
with
A] Citizen Services
 New water Connection
 Closing of Connection (Permanent / Temporary)
 Change of use
 Reconnection Accounts
 Issuance of Plumber license
 Water testing for citizens within PMC limits
 Renewal of Plumber license
B] Defining Various Charges
 Water consumption Charges for metered and non-
metered connections
 Water connection charges
Accounts
 Scrutiny Charges
 Deposit for various connection size & category.
 Water testing rates
C] Departmental Process
 Capture of various details of the Water Connection
o Consumer Details- Property Details, Owners Details,
Link to Property Number. Property
o Metered/ Non Metered Connections Tax, GIS
o Multiple Usage type - Domestic, Commercial, etc.
Tariff Category.

Pune Municipal Corporation Page 28 of 143


Detailed Project Report for ERP based e-Governance

 Connection Details- Connection Size, Distribution Line,


GIS
Pressure
 Pressure drop due to new connection on a line.
Property
 Compliance for ‘No dues’ for property Tax
Tax
 Meter Information - Meter No. / Make / Cost
 Meter Restoration Details
 Scrutiny at various levels for citizen services
 Road digging charges to be taken from GIS system GIS
 Facility for recording details of site scrutiny through PDA
 Work Order Printing for new connections, re-connections
and closing of connections.
 Meter Reading Entry
o Meter Reading Data Entry
o Meter Cut off- Restoration
 Scope for PDA based Meter Reading Capture & Bill
Generation and uploading of PDA data to system
 Temporary Disconnection
 Bill Generation
o Billing for Metered and non-metered connections
o Billing schedule for different connection category
Accounts
o Consideration of advance paid if any
o Interest calculation on arrears
o Bill correction
 Bill Printing
 Collection from CFC Accounts
 Handling Cheque dishonor and outstation Cheque charges Accounts
D] MIS
 Connection Outstanding Register
 Bill Acceptance Register
 Meter reading report
 Consumption statement
 List of consumers ward, category & size wise
 List of connections
 List of closed connections GIS
 Ward-wise / Zone-wise Recovery reports
 Top Defaulters Report
 Tax-wise Recovery Details
 Tax-wise Demand Details
 Advance Payment Reports
 Bill status for bill generation

Pune Municipal Corporation Page 29 of 143


Detailed Project Report for ERP based e-Governance

 Faulty Meter Report


 Illegal connection reports (Based on complains)
 Water quality test report
 Ward wise / zone wise / line water pressure report
E] Other Requirements
 Data Porting / Data Entry Suite
 Query Water Dues CFC, Web
 Scope for integration with SCADA system

Pune Municipal Corporation Page 30 of 143


Detailed Project Report for ERP based e-Governance

3.1.4 Grievance information system


Introduction
The main objective behind the Grievance information is that all the
complains made by the citizen must be addressed and updated to
the citizen. In current scenario most the complains are taken up on
phone or mail. Citizen do write letters also to register the complain.

Issues with current functionality and how to address the


same

a] There is no mechanism to track the complaints.


[Resolution] The complaints will be monitored and status will be
updated to the citizen via SMS / Mail.

b] Only way to launch complains are through the phone or writing


letters.
[Resolution] Complain can be launched from Mobile / Email / Web.

c] Difficult to find the resources to address the complaint.


[Resolution] Based on certain parameter the system will
automatically route the complain to the respective department.

Other Benefits
- System will have easy to use Web interface for complain
registration. Also the user can register the complain via Phone/
Mail.

- Status of the complain will be available online. Also through SMS


and mail the citizen will be updated.

- Customer feed back can be taken from phone / SMS / mail.

Pune Municipal Corporation Page 31 of 143


Detailed Project Report for ERP based e-Governance

Functional Scope of the Proposed Grievance information system Module

Integration
Functionality required with
A] Masters & Initial Setup
 Complaint Type, Sub-types, Capture of Mobile No. of
citizen
HRMS
 Mapping of Roles to Complaint Sub-type (Employee
Master)
Property Tax,
Water,
 Integration of Complaint Type / Sub-type with Licenses,
Departmental Modules Asset
Management,
etc.
 Citizen Charter for each Complaint Type (Define duration
of complaint redressal & escalation path in case of non-
redressal)
B] Complaint Management
Web /
 Complaint Acceptance through Citizen Facilitation
KIOSKs /
Centers / Internet / KIOSKs
GIS
 Facility to make Resident ID compulsory for certain Property /
complaints Water /
 Facility to check PMC dues for allowing certain Licenses
complaints Modules

 SMS alert to concerned employee


 Facility to mention the action on complaint
 Automatic escalation of Complaints (beyond stipulated
time frame)
 SMS alert to citizen upon Action Taken Report
 Facility to accept citizen feedback on the Administration
Action
 Facility to mark a complaint as fake / invalid (for not
considering it in the normal reports or report for Project
System)
C] MIS
 Pendency reports (complaint-wise / Dept.-wise)
 Top Performers / Least Performers
 Complaints pending beyond stipulated time frame GIS
(complaint type-wise, department-wise, ward-wise,
officer-wise)

Pune Municipal Corporation Page 32 of 143


Detailed Project Report for ERP based e-Governance

3.1.5 Building Permission Department


Introduction
Building Permissions is one of the main activity of PMC. The department
is involved in granting Building Permissions to Licensed Architects /
Engineers / Structural Engineers for construction of buildings within the
PMC jurisdiction area. The department works in close association with
the Development Plan Section, carries out demolitions of unauthorized
constructions, represent PMC in legal matters (affidavits, etc.), resolves
complaints about Building Control.

The main functions of the department are :


• Providing Building Permissions to applications from licensed
Architects / Engineers / Structural Engineers
• Involves activities of Plinth Checking and provision of Occupancy
Certificates after Commencement Certificate for construction is
given to the applicants
• Carrying out demolitions of unauthorized constructions
• Represent PMC in legal matters (affidavits, etc.)
• Resolve complaints about Building Control

General statistics
No. of application accepted through AUTODCR (Year 07-08)

Total applications received per year : 4500


New applications approved per year : 4000

No. of application manually


Nil.

Issues with current functionality and how to address the same

a] NOC is required from Property Tax department for providing


sanctions to vacant plots / plots with existing structure where
extension to the structure is to be constructed.
NOC’s are required to be taken from various departments like Land
Acquisition, Water supply, Roads, Garden, Encroachment,
Development Plan, Drainage, TDR section, Traffic police, Fire, Health
etc.

[Resolution] NOC’s from different departments not to be taken if


the required data is available in database.
ERP will have help in integration of various departments like Property
Tax , Land Acquisition, Water supply, Roads, Garden, Encroachment.

Pune Municipal Corporation Page 33 of 143


Detailed Project Report for ERP based e-Governance

The system will provide data and a lot of time of PMC & Architect will
be saved.

b] There is no intimation from Building permission department to


Property Tax after the completion of respective stages like Plinth
Certificate, Completion Certificate, Occupancy Certificate.

[Resolution] Integration is required with Property Tax department


to give information as soon as Plinth Certificate, Completion
Certificate & Occupancy Certificate is given.

c] There is no intimation from Building permission department to Water


, Roads , Drainage, Traffic after giving Plinth Certificate, Completion
Certificate & Occupancy Certificate for advance planning & resource
allocation.

[Resolution] Integration with Water , Roads , Drainage, Traffic


required for giving these departments information soon as Plinth
Certificate, Completion Certificate & Occupancy Certificate is given
for doing further planning & resource allocation in advance.

d] Facility for Digital Signature is not available for approval of proposals.

Pune Municipal Corporation Page 34 of 143


Detailed Project Report for ERP based e-Governance

To Be Departmental Functionality

Building Permission : ToBe


Format of the application for Building Permission to be made available on the web
portal with the checklist of the documents to be attached.

Applicant Applicant

Application is given through a single


Application is given Online with
window system (on CD with necessary
necessary docs
docs)

Details of property / Intelligence


Integration GIS
generated

Integration with Departments like


NOC to be taken through workflow
Property Tax, Water, Drainage
from various departments through Workflow for NOC
,DP, Health, Fire, TDR, Traffic
integrated workflow
police

The application is checked for all the


documents & comments are entered in
the system

Scrutiny fee is paid through cash/credit


card and the challan is issued through
system

Application No. is auto generated &


Plan and Drawings uploaded into the
system

SMS Notification for site visit , if


required is sent to Building Inspector & Integration HRMS
Architect

Building Inspector (J.E.)

Rejection if Site visit is done by the Architect and


Details of the property
documents are not the Building Inspector (with the help of Integration
to be taken from GIS
correct PDA for photo/data of site visit)

Approved
Building Inspector (J.E.)

Scrutiny is done (Document validation,


Objection Scrutiny to be handled
Non-technical & Technical Scrutiny Integration
by workflow system
using AutoDCR software)

Asst. Engineer

Higher Authority
Objection Approval & Modifications done if any
Workflow for approval for Discretionary
through system
Power etc.

Development charges are paid by the


applicant by cash/credit card/online Integration Accounts
and receipt generated through system

A trigger through workflow to be


given to Property Tax, Water,
Commencement of Issuance of
Drainage dept that building
certificate to be generated from the workflow
permission is given. The attribute
system
details should be filled in GIS
layers on base map.

Manual Auto / System

Pune Municipal Corporation Page 35 of 143


Detailed Project Report for ERP based e-Governance

Functional Scope of the Proposed Building Permission Module

Integration
Functionality required
with
A] Citizen Services
 Layout Approval
 Building Permission / Commencement Certificate
 Revised Building Permission
 Renewal of Building Permission
 Plinth Completion Certificate CFC,
Accounts,
 Occupancy Certificate GIS
 Cancellation of License
 Architect License
 Zone Certificate
 Transfer of Development Rights
 Certified copy of plan
 Old property data retrieval
 RTI – Apply online for information related to proposal
 Single complaint can be handled by multiple department
 Online submission facility should be made available for
registered Architects
B] Defining Charges
 Development Charges
 Scrutiny Charges
 Other Charges
C] Departmental Process
 Scrutiny of Applications AutoDCR,
 Site Reports GIS, HRMS
Workflow
 NOCs from different departments
System
 Alert to be sent to Property Tax Department after
Property
issuance of Building permission, Plinth , Completion &
Tax, GIS
Occupancy Certificate (Color code based GIS system)
 Versioning of proposal for more than one iterations AutoDCR
 Facility for query for the stage of completion to be made AutoDCR,
available GIS
 Advocate dates for departmental cases Legal
 Audit objection / para for departmental cases Audit
Land &
 TDR awarded information
Estate
D] MIS

Pune Municipal Corporation Page 36 of 143


Detailed Project Report for ERP based e-Governance

 Application Pendency Report


 Building Permissions / Occupancy Certificates taken for a
particular period
GIS
 List of Building Permissions taken but Occupancy
Certificate not Taken
 Impact analysis for Drainage / Water based on the
building permission give.
 Revenue Related Reports (Scrutiny Charges /
Development Charges)
 E-Mail / SMS to be sent to the applicants SMS
Gateway /
Web Server
A] Other Requirements
 Data Porting / Data Entry Suite
 Integration with AutoDCR
Workflow,
 Generation of Alerts to other departments w.r.t. Projects,
infrastructure requirements, upon completion certificate SWM,
Water

Pune Municipal Corporation Page 37 of 143


Detailed Project Report for ERP based e-Governance

3.1.6 E- Procurement
Introduction
The tender cell in the corporation is responsible for the publication and
sale of the tenders. The publication of the tenders is outsourced to an
organization and the same organization do the publication and upload of
the tenders on the online system. Also the sale of the tender happens
online. The proposed E-Procurement module will empower the PMC to
Covers full life cycle of purchasing (indent to receipt of goods), Connects
buyers and suppliers through electronic exchange of Tenders, catalogs,
contracts, POs, invoices etc

The basic responsibility of the Tender Cell of PMC is the sale and
processing of tenders of various departments of PMC. Currently only the
sale of the Tenders is done through online system.

Issues with current functionality and how to address the same

a] Only the sale of the tender is online and rest other activity is still
being done manually.

[Resolution] E-Procurement module will be Online and will allow all


the activity to be carried out through computerization.

b] Most of the time the tender document requires multiple interaction


with the concern department, this is very time consuming activity.

[Resolution] Web based workflow system will help enhance real


time interaction with the departments and will empower to take quick
decision.

Functional Scope of the e- Procurement Module

Integration
Functionality
required with
A] E-Tendering Web-Site Functionality
 Firms should be able to register with various essential Web Portal,
data Payment
 FAQs for all tender related queries Gateway

 Registered firms should be able to view various


published tenders and essential information in user
friendly manner
 Secure Login authentication
 Auto-generation of various communications to the
registered bidders (SMS / E-Mails)

Pune Municipal Corporation Page 38 of 143


Detailed Project Report for ERP based e-Governance

B] Tendering Functionality
 Raise Indents as per the requirement. Web Portal
 Receive indents
 Generation of information for press Advertisements
 Check-list for Tender Notice
 Publish Tender Notice Web Portal
 Check-list for Tender Terms & Conditions
 Publish Tender Document
 Reports to assist Tender Document preparation
Accounts,
 Purchase of Tender Documents Web Portal,
CFC
 Submission of bids (Commercial & Technical) Web Portal
 Technical bid evaluation
 Cross-check of vendors with Vendor Database and
their previous records
 Commercial bid evaluation
 Cross-check of rates with similar projects in past
 Award of contract Projects
C] MIS
 Technical Bid Comparison Reports
 Financial Bid Comparison Reports
 List of Vendors registered

Pune Municipal Corporation Page 39 of 143


Detailed Project Report for ERP based e-Governance

3.1.7 Project systems Department


Introduction
The projects department will cater to set departments those execute
large public works. These departments includes Roads, Drainage, Water
Projects, etc.

Issues with current functionality and how to address the same

a] Information exchange with Land Acquisition, Tender, Water Supply,


Roads, Development plan department is manual.

[Resolution] System can allow seamless data exchange with


respect to Land Acquisition, Tender, Water Supply, Roads,
Development plan etc. System alerts can help to avoid delays in
different departments, GIS can help in integrating information with
respect to reservations, water pipelines, etc.

b] The activities in the Project department are mostly manual. Billing is


done manually & there is no integration with Accounts.

[Resolution] Billing has to be done through the Project Systems


(WMS) module. The activity milestones can be incorporated in
system for Project monitoring and approval of bills. The scrutiny of
the work-item bill should be done in the system by the engineer and
remarks are to be entered in the system. Integration with Accounts
required for budget sanction, Asset creation, Project cost monitoring.
The process of checking & measurement of the bills is to be done in
the system and sent online for approval as per DEP to concerned
officers. System should calculate penalties in case of delays in
achieving milestones. The bills are to be sent online to audit dept. for
checking & payment to contractors.

c] No system support to define Project Milestones & track work


execution.

[Resolution] Project Milestone definition can be done through


Project system Module (WMS). The activity milestones are to be
incorporated in system for Project monitoring and approval of bills.
System should calculate penalties in case of delays in achieving
milestones. Monitoring of the project cost against the estimated
value should be done through Project system Module (WMS). Time &
Resource monitoring against the planned milestones & estimated
resources can be done through Project system Module (WMS).

Pune Municipal Corporation Page 40 of 143


Detailed Project Report for ERP based e-Governance

To Be Departmental Functionality
Start

Project initiation is done by dept. by defining new project Integration GIS

Selection of Department, Officers for scrutiny Integration HRMS

Selection of Budget Code Integration Accounts

Project estimation : Identification of different items, defining


units, Selection of DSR / ESR / WSR rates

Preparation of Measurement Sheet, Abstract Sheet, Rate


Integration Accounts
Analysis sheet, Recapitulation sheet

Defining various Milestones

Technical sanction as per chart of competant authorities Integration Workflow system

Administrative sanction as per delegation of powers Integration Workflow system

Generation of information for press tender, checklist for


tender notice

Publish Tender Notice & document , check list on Web


Integration Web Portal
Portal

Purchase of Tender Documents by participants by cash, Accounts, Web


Integration
credit card, Account Portal, CFC

Is bid
No submission
online ?
Submission of bids manually
Yes

Online Submission of bids Integration Web Portal

Technical bid evaluation through system as per chart of


Integration Workflow system
competant authorities

Commercial bid evaluation through system as per chart of


Integration Workflow system
competant authorities

Award of contract

Milestone entry for the project

A Manual Auto / System

Pune Municipal Corporation Page 41 of 143


Detailed Project Report for ERP based e-Governance

Project execution : Measurement Book Entry , quality


control, Monitoring of progress through system

Notices to vendors (for delay, for poor quality, any other


reason)

Levy of Penalty Integration Accounts

Generation of Account Bills & Billing for extra items through


Integration Accounts
system

Generation of Completion certificate on completion of


project

MIS reports for Milestone monitoring, Budgeted


Expenditure Vs. Actual Expenditure,Measurement Sheet /
Abstract Sheet / Rate Analysis Sheet / Recapitulation Sheet
& Project Summary Sheet

End

Manual Auto / System

Functional Scope of the Proposed Project Systems Module

Integration
Functionality required
with
A] Project Initiation
 Defining New Project
 Selection of Department, Officers for scrutiny HRMS
 Selection of Budget Code Accounts
B] Project Estimation
 Identification of different items, defining units
 Selection of DSR / ESR / WSR rates
 Preparation of Measurement Sheet
 Addition of specifications not included in standard DSR
(for special items)
Accounts
 Preparation of Abstract sheet
 Preparation of Rate Analysis Sheet
 Preparation of Recapitulation Sheet

Pune Municipal Corporation Page 42 of 143


Detailed Project Report for ERP based e-Governance

 Defining various Milestones


C] Technical Sanction
 Workflow for Technical sanction as per chart of
competent authorities Workflow
 Workflow system to support To & Fro movement of System
proposal
D] Administrative Sanction
 Workflow for Administrative sanction as per Delegation of
Powers(DEP) Workflow
 Workflow system to support To & Fro movement of System
proposal
 Negotiation
E] Tendering
 Generation of information for press Advertisements
 Check-list for Tender Notice
 Special conditions for contract if any
 Publish Tender Notice on Web Portal Web Portal
 Publish Tender Document on Web Portal
 Reports to assist Tender Document preparation
 Check-list for Tender Terms & Conditions
Accounts,
 Purchase of Tender Documents Web Portal,
CFC
 Submission of bids Manual
 Submission of bid Web Portal
 Technical bid evaluation
 Cross-check of vendors with Vendor Database and their
previous records
 Commercial bid evaluation
 Cross-check of rates with similar projects in past
 Award of contract
 Milestone entry
F] Project Execution
 Project Scheduling
 Measurement Book Entry
 Monitoring of progress
 Quality Control
 Notices to vendors (for delay, for poor quality, any other
reason)
 Levy of Penaly Accounts
G] Billing & Completion Certificate
 Running Account Bills Account

Pune Municipal Corporation Page 43 of 143


Detailed Project Report for ERP based e-Governance

 Billing for Extra items


 Completion certificate on completion of project
H] MIS Reports
 Project wise comparison of Budgeted Expenditure Vs. Accounts
Actual Expenditure
 Milestone Monitoring Report GIS
 Measurement Sheet / Abstract Sheet / Rate Analysis
Sheet / Recapitulation Sheet
 Technical Bid Comparison
 Financial Bid Comparison
 Billing Information
 Project Summary Sheet
 Reasons for delay in achieving milestones to be tracked.
The responsible party for delay to be identified like any
PMC dept. or contractor.
 Reports / Alerts through other systems for New Projects
 Building Permission Module
 Grievance Redressal Module
 Alerts for Road Re-surfacing / Repairing
 Cross-departmental information as alerts while defining
new projects
 Eg. : Water Department shd get alerts for Pipeline GIS
laying, if the Road is being prepared / re-surfaced /
Repaired
I] Other Requirement
 Registration of contractors
 Up-gradation of contractors data / Blacklisting of
contractors
 Contractors Register
 Confidential Register of Contractors
 Road register (Traffic / Road history / Defect liability)
 PWD register (Works manual/ accounts manual/)
 IRC standard
 Bridges register (history / annual maintenance /
Continuous monitoring)
 Monitoring of Sewerage treatment plants. History & all
the relevant data like BOD, COD, Suspended solid etc for
raw sewage & effluent, electricity consumption, MPCB
reports etc)
 Monitoring of Hot mix plant (material stock, consumption
etc)

Pune Municipal Corporation Page 44 of 143


Detailed Project Report for ERP based e-Governance

3.1.8 Licenses department


Introduction

PMC issues various types of licenses like Food Licenses, Market Licenses,
Nursing home registration, Dog licenses, Pre conception & pre natal
diagnostic techniques licenses, etc. License department’s main objective
is to issuance of new license keeping in mind various pre-requisite
factors. Also renewal of the existing licenses is undertaken.

General statistics for Food Licenses:


Type of food License
- 44 types of Manufacturing & Packaging
- 12 types of Retail

No. of Licenses by Food Department


• Licenses under P.F.A. - 11745
• Licenses under B.P.M.C. Act. - 3329
• Nursing home registrations - 530
• Dog Licenses - 367
• P.N.D.T. Registration - 380

Issues with current functionality and how to address the same

a] All the processes of the departments are not mapped. Still file travels
manually to the Department head, causing delay in issuance.

[Resolution] Workflow & DMS will enable movement of files


electronically and faster approval of the same.

b] Certificates are not computer generated.

[Resolution] Computer prints can be accepted as legal licenses.

Pune Municipal Corporation Page 45 of 143


Detailed Project Report for ERP based e-Governance

To Be Departmental Functionality

CFI
Applicant

 The solution will be part of the citizen services delivery module.


 Citizen can submit the application online and once approved will be
able to pay the license fee online through Payment gateway.
 Also the citizen will be able to see the status of its application online.
 The system will have integration with the Accounts section.

Pune Municipal Corporation Page 46 of 143


Detailed Project Report for ERP based e-Governance

Functional Scope of the Proposed Licenses Module

Integration
Functionality required
with
B] Citizen Services
 Issue of New License
 Duplicate License
 Change in Name of Business
CFC,
 Change in Business
Accounts
 Transfer of License
 Renewal Of License
 Cancellation of License
C] Issuance of License
 Capture of License Details
o License Holder’s Details – One or multiple owners
o Capture of Mobile No. / E-Mail ID
o License holder’s photograph(s) (optional)
o Link to Property Number (optional) Property
Tax
o License Details – Temporary/ Permanent License,
Assessment
Name of Business, Business Address,
o Trade/ Business Details – License Type, Subtype -
multiple levels to define types and sub types.
o License type, sub-type, unit of measure wise license
amount.
 Calculation of License Fee
 License Certificate
D] Other Departmental Process
Workflow
 Scrutiny of Applications
System
 Inspection Entry
 Generation of Show cause Notice
 Hearing
 Reminder Notice for Renewal
 Cancellation of License by Force
E] MIS
 License Register
 List of Defaulters GIS
 Reminder Notice for Renewal
 Demand / Collection Register
 Reports showing Changes in License Types, Business
Partners, Cancellation Licenses, etc.

Pune Municipal Corporation Page 47 of 143


Detailed Project Report for ERP based e-Governance

 Facility to forecast the impact of reduction / deduction of


License Fee
 Reports w.r.t. Bills / Notices generated
 E-Mail / SMS to be sent to the owner upon transactions SMS
Gateway /
Web Server
F] Other Requirements
 Data Porting / Data Entry Suite

Pune Municipal Corporation Page 48 of 143


Detailed Project Report for ERP based e-Governance

3.1.9 Solid waste Management


Introduction
The basic responsibility of the Solid waste management department of PMC is
the collection, transportation and disposal of solid waste.

Solid waste collection in PMC is handled through primary & secondary


collection. Primary involves house to house collection while secondary is
through the containers placed at identified locations in the PMC limits.
Secondary collections through containers is phased based on the location,
the expected waste generated in the area and the availability of vehicles for
collection. Around 700 containers are identified for daily collection while some
may have the waste collected at a lesser frequency.
Manpower of over 7500 persons supports the Solid waste management
department. The department has over 65 dumper vehicles, 45 bulk refuse
contractors and 75 ghanta trucks.

Issues with current functionality and how to address the same

a] There is no provision of tracking of vehicles for Garbage pick and


dump.

[Resolution] Identification of Vehicles for Tracking, Online Tracking


of Vehicles, Linking of SWM vehicles with Dust Bins, Dumping Ground
through GIS can be done. The vehicles can be fitted with GPRS SIM
cards and the vehicles can be traced through GPS (Global Positioning
System) via satellite which can be sent to server and centrally
monitored.

b] Difficult to maintain the physical standards of Bins.

[Resolution] Life of each different types of Bin is maintained in ERP


solution and system will alert for each Bin replacement time. This will
help in achieving the proactive maintenance of the Bins.

Functional Scope of the Proposed Solid Waste Management Module

Integration
Functionality required
with
A] Area details
 Area information (Zone / Ward / Colony / Society)
 Population details
 Volume of the Solid waste which includes Wet & Dry waste
(Recycled & Non Recycled)

Pune Municipal Corporation Page 49 of 143


Detailed Project Report for ERP based e-Governance

 Resources required
 Collection procedure ( i.e. Primary : House to House & Secondary :
Community Bin to Garbage transport centre or mix)
B] Garbage Collection Scheduling
 Assign SWM Vehicles to pick-up the Garbage. Category wise
GIS, Fleet
assignment like A : Highly in demand , B : Medium , C: Low
Mngt
Demand.
 Assignment of Ghanta Gadi
 Location-wise assignment of Sanitation Staff GIS, HRMS
 Scheduling of garbage collection and cleaning activities with
the objective of maximizing citizen friendliness on the one
hand and optimum use of resources on the other.
 Assigning routes to the SWM vehicles / Ghata Gadi’s / Dumper GIS, Fleet
placers / Compactor bucket vehicles /BRC / Hotel gadi Mngt
C] Primary Garbage Collection & Disposal
 Record the volume of garbage collected and disposed on a Fleet Mngt
daily basis. Source segregation like Quantum of wet waste
collected with further segregation for vermiculture, Bio dispose
can be kept on Monthly / Yearly basis. The same can be used
for RV benefit.
Grievance
 Linkage with Garbage Bins / Land Fill Sites, in case of Citizen
Redressal
Grievance
Module
 Keeping certain Checks as per environmental regulations, like
minimum frequency of lifting garbage etc.
D] MIS
 Monitor the deployment of pickup trucks and personnel based GIS
on the schedule originally drawn.
 Info on the use of Land Fill Sites GIS
 Land fill site: How much garbage received?
 Land fill site : How much as per target recycled?
 Alerts if the use of Land Fill sites is above some thresh-hold
 Generation of registers like: Contracts Register for SWM, Site
Register (land fills), Contractors Register, etc.
 SWM Contract Wise Status Reports, Site Wise Progress
Summary, Contractor wise Performance Analysis, etc.
 Comparison of expenditure on SWM activities over different GIS
geographical areas, years, agencies, etc.
 Daily / Monthly reports of comparison for how much garbage
has to be lifted as per target & how much garbage is actually
lifted. If less lifted then reasons for the same for eg.
Breakdown / Labour problem.
Fleet Mgmt.
 MIS report for expenditure incurred on transportation
System

Pune Municipal Corporation Page 50 of 143


Detailed Project Report for ERP based e-Governance

3.1.10 Fleet Management


Introduction
The basic responsibility of the Vehicle depot department of PMC is the
procurement, maintenance and disposal of vehicles and spare parts.

The step by step processes involved are as follows.

Procurement:
• An annual budget is prepared based on the requests initiated by
other departments and the expansion strategies thought upon by
the department itself.
• The budget is given to the Standing Committee for its approval.
• Tenders are then passed giving the specifications of the vehicles
and spare parts required. Vendors are then appointed
accordingly.
• New vehicles are deployed accordingly and are registered in the
name of the commissioner. Performa is prepared by vendors (in
case of vehicles and chassis only) and given to the department for
payment. Similarly, challans are given by other vendors. The
same is given to the Audit department for processing.
• Besides the vehicles, this department also procures spare parts,
tyres, oil, batteries & fuel.

Maintenance:
• Maintenance is done on a case to case basis in a random manner.
Currently, no records are maintained regarding the maintenance
history of vehicles.
• For every maintenance activity, a job card is made and the spare
parts & service required are recorded on the same.

Disposal:
• After a specific period of deployment/ distance travelled, the
vehicles are disposed off by auctioning them.

Additional information:
• The department is responsible for ensuring availability of vehicles
for municipal operations like garbage collection and solid waste
management.
• Detailed operational plan is prepared to deploy vehicles depending
on the requirements specified by the SWM. The operational plan
lays down the details of the zone/ward wise vehicle requirement,
number of return trips etc.
• Unavailability of drivers is a major concern.
• Stores: Currently, around 40,000 different spare parts are stored
as inventory. No records are maintained in this regard. Store

Pune Municipal Corporation Page 51 of 143


Detailed Project Report for ERP based e-Governance

operations are entirely manual. No Item master or vendor


master.
• There is no system to track the group-wise expenditure done on
various vehicles and spare parts. Therefore, the parts that are
spoilt within the warranty period cannot be tracked.
• Currently, around 800 drivers are working in PMC. There is no
system in place to track their records.
• There is no system to track the maintenance history of various
vehicles.
• Currently, the working hours of the drivers is not tracked
effectively.
• Daily fuel consumption of the vehicles is not being tracked.

Workshop
Besides the vehicle depot , the department is also responsible for the
operations at the PMC workshop. The activities in the workshop are
• Repairing of garbage containers.
• Manufacturing furniture for PMC owned dispensaries, schools etc.
• Manufacture of boards, name plates etc
• Black smithy
• Manufacturing wheel barrel, cycle rickshaw etc.

General statistics
Total no. of vehicles with SWM Dept (category-wise)

• Compactor : 44
• Bulk refuse carrier : 47
• Dry waste keeper : 40
• Tipper : 61
• Dumper : 85
• Lifting Truck : 2
• Total SWM vehicles : 279

Total no. of other administrative vehicles

• Ambassador : 38
• Indica : 34
• Jeep : 42
• Tata spacio gold : 12
• Total : 126

Issues with current functionality and how to address the same

Pune Municipal Corporation Page 52 of 143


Detailed Project Report for ERP based e-Governance

c] Vehicle Scheduling, Fuel Management, Vehicle Maintenance is done


manually.

[Resolution] Fleet Management system will have Vehicle


Scheduling & Fuel Management incorporated. Vehicle scheduling can
be done through system which will help in tracing vehicles, efficiently
schedule the vehicles.

d] No availability of MIS reports is available.

[Resolution] Various MIS reports can be generated from the fleet


management system. Department-wise Vehicle Inventory, Fuel
consumption report for various vehicles, Route Tracking for SWM
Vehicles can be generated.

Pune Municipal Corporation Page 53 of 143


Detailed Project Report for ERP based e-Governance

To Be Departmental Functionality

Fleet Management : ToBe


Vehicle Scheduling & Fuel Management

Identification of vehicles Integration Asset Module

Scheduling of vehicles

Assigning of driver for the vehicles Integration HRMS

Re-filling of Fuel in the vehicle

Vehicle Maintenance

Reason for vehicle maintenance entered in the system

Approval from the respective authority for vehicle Document Mngt


Integration
maintenance is taken System, Accounts

The entry for receipt of Vehicle, repair work details is done

Purchase of New Items like Tyres, Battery, etc. required for Asset Module,
Integration
maintenance is done. Accounts

MIS Reports

MIS report for Department-wise Vehicle Inventory Integration Asset Module

MIS report for Fuel consumption report for various vehicles

MIS report for Route Tracking for SWM Vehicles & their
Integration GIS
Idlying time ,

MIS report for Route Tracking for SWM Vehicles & their
Integration GIS
Idlying time ,

MIS report for Average Fuel expenditure for various


vehicles & No. of trips to the Dumping Ground. Integration GIS

System Alerts if petrol expense claimed is more , lesser no


Integration GIS
of trips, dust bin not covered.

Pune Municipal Corporation Page 54 of 143


Detailed Project Report for ERP based e-Governance

Functional Scope of the Proposed Fleet Management Module

Integration
Functionality required
with
A] Vehicle Scheduling & Fuel Management
Asset
 Vehicle Scheduling
Module
 Assigning Driver HRMS
 Re-filling of Fuel
B] Vehicle Tracking
Asset Mngt
 Identification of Vehicles for Tracking
System
 Online Tracking of Vehicles
 Linking of SWM vehicles with Dust Bins, Dumping Ground GIS
C] Vehicle Maintenance
 Entry of the reason for repair
Document Mngt
 Approval from the authority System,
Accounts

 Vehicle Issuance details


 Receipt of Vehicle, entry of repair work details
 Purchase of New Items (like Tyres, Battery, etc.) Asset,
 Insurance Cross-check Accounts
D] MIS
Asset Mngt
 Department-wise Vehicle Inventory
System
 Fuel consumption report for various vehicles
 Route Tracking for SWM Vehicles
 Analysis of Time spent by SWM vehicles while idling
 Average Fuel expenditure for various vehicles (based on
the mileage & traveled distance)
 No. of trips made to the Dumping Ground
 System Alerts GIS
o If the petrol expense claimed by the driver is more
than system calculated
o If No. of trips made to the Dumping ground are less
than proposed
o If any particular Dust Bin was not covered
E] Other Requirements
 Data Porting / Data Entry Suite

Pune Municipal Corporation Page 55 of 143


Detailed Project Report for ERP based e-Governance

3.1.11 Accounts Department


Introduction
Accounts department is the back bone of any ULB and constitute of both
Accounts and Audit. The major responsibilities are To receive all moneys
payable to the Corporation and credit the same in the bank Account of the
Corporation, To make payment on account of Municipal Fund, To estimate
Income & Exp. statement for the next financial year, To make payment of
Salary and pension of the employees, To control the budget sanctioned by
the Corporation, To make scrutiny of every financial proposal on behalf of
Hon. Commissioner.

Accounts department is one of the vital departments of any ULB and


controls the overall budgeting of the local body. It has to undertake the
balancing act of getting the maximum possible funds to the ULB and then
undertake the expenditure in a planned manner.

Issues with current functionality and how to address the same

a] Cash based entry of the transaction.

[Resolution] ERP accounts module will have help the department to


perform the Accrual based double entry.

b] Build chart of accounts, Cash Book maintenance, Bank reconciliation


are not as per NAM standards.

[Resolution] ERP accounts module will have help perform such tasks
according to NAM.

c] Accounts department software is not integrated with any other


application software systems being used by the corporation for
collection and issuance.

[Resolution] ERP accounts module will have help the department to


integrate with other software solution to give the exact and real time
report of the collection and issuance.

d] Accounts department software is designed on two tire architecture,


which makes its accessibility limited to certain location only.

[Resolution] ERP accounts module will be designed on 3 tire architecture


and will have user friendly interface to generate entries.

To Be Departmental Functionality

Pune Municipal Corporation Page 56 of 143


Detailed Project Report for ERP based e-Governance

The account module will be based as per NAM And will have integration
with all the departments for budget provisioning and salary processing.
The accounts module will also have the integration with the all revenue
generation based services of the corporation. Following pictorial
representation shows the proposed integration of Accounts with other e-
Governance systems.

Building
License
Permission
(Food /
Market)
Octroi
Department
Fees for citizen services like
Layout approval, bldg. permission,
Fees for issue of new & duplicate, Certificates like permission,
Licenses. Renewal of licenses plinth & Completion
Water Octroi collection, transit pass
Amount, daily collection report
generation
Fees for new connection, scrutiny
Charges. Bill generation, advance &
Interest. Payment collection
Investments,
Asset Mgmt.
Op. balance, estate
Materials Mgmt., insurance
Mgmt.
Tendering,
Indent mgmt.
Payment & disposal

Accounts Module Application fees


acceptance.
Account head definition, Grouping & Sub grouping, Bank Payment acceptance
For Prop. Tax, CFC
details, vendor details, Budgeting, Receipts & payments water,lic,
Audit para
Entry, Loans, grants, Investment mgmt., Tender etc
Audit inspection Bank Reconciliation & various MIS reports
of bills

Display of financial data


during scrutiny process
charges For Birth and Death Services,
additional copies of certificates, Certification
DMS &
Workflow
mgmt.
Property billing, Rebate Calculations
Payroll mgmt., & Refunds. Citizen services like
Birth and Retroactive calculations Pro. Tax payment, fees for services
Death
Budget code selection,
estimation, purchase of
tender docs, Billing & penalty Payment of Reg. fees,
ward mgmt.
Purchase / Maintenance
Approval mgmt. Info for RTI, Tenders,
Online services Property
HRMS Tax

Project
Systems Hospital
Mgmt.
system
Fleet
Mgmt.
Web Portal

Pune Municipal Corporation Page 57 of 143


Detailed Project Report for ERP based e-Governance

Functional Scope of the Proposed Accounts Module

Integration
Functionality
required with
A] Masters
 Account Head Definition
 Account Grouping and Sub-Grouping
 Bank Account Details
 Vendor Details
B] Departmental Process
 Budget Preparation, Distribution and Management
System
o Budget Classification
o Department-wise estimated provision, revision for
income and expenditure
o Budget Appropriation between different budget
heads through approval process
o Administrative approval / dis-approval of works
linked to budget availability
 Receipts through Internet / CFCs / KIOSKs
o Counter-wise Collection Detailed and Summary
Reports
o Revenue Stamp Management
o Cheque/ Cash Deposit Slips into Bank
o Capture of Cheque Dis-honour cases, Remittance
entry
 Payment Management
o Bill / Liability Entry
o Payment Authorisation
o Payment Voucher (Full or Partial Amount)
o Maintaining Check details, Check Printing
o Recording of Check Issuance Details
o Recording of Cheque Cancellation details
 Security Deposit / Earnest Money Deposit Management
 Loans Management
o Maintenance of Loan Details
o Alerts for Loan Installment Payments
o Loan Installment Payments
 Grants Management
o Maintenance of Grant Details
o Utilisation Details
o Utilisation Certificates

Pune Municipal Corporation Page 58 of 143


Detailed Project Report for ERP based e-Governance

 Debt Management
 Accrued Payment Management
 Investment Management
o Maintenance of Investment Register
o Alerts on due dates
o Comparison of different options for Investments
 Advance Managements
 Bank Reconciliation
 TDS/ VAT Register, Online Payment of Tax
 Maintenance of Bank Account wise balances
 Integration of Ledger A/c with ECS Payment
C] Reports
 Cost Centered Accounting Reports
 Ratio Analysis, Trend Analysis
 Department-wise, Cost Center-wise Income /
Expenditure reports
 Generation of Deposit Slips
 Security Deposit Register
 Grants Register
 Loans Register
 Investment Register
 Advance Register
 Bill Register
 Payment Register
 Outstanding Bill Register
 Reports on Receivables
 Cash Book (Detailed & Summary)
 Function-wise Expense Subsidiary Ledger
 Journal Book
 Ledger Book
 Cheque Issue Register
 Trial Balance, Income & Expenditure Statement
 Balance Sheet
 Bank Reconciliation Statement
 Cheque Dis-honour Report
 Analysis on unspent amount of previous years
 Various reports required for submission to Standing
Committee

Pune Municipal Corporation Page 59 of 143


Detailed Project Report for ERP based e-Governance

3.1.12 Establishment Department


Introduction
The department is responsible to maintain the employee details working for
corporation on regular basis or contractual basis. The department keeps
record of the transfer, leaves, salary, pension etc. Also the department is
responsible for new recruitment. Conduction the examination and selection
process for the right candidate. The Establishment department also keeps
track of the service book of each employee.

The department ensures the corporation has the sufficient employee strength
of desired skills in each of the departments to support the smooth
functionality of the corporation in day to day activities.

General statistics

Class Count Earning Deduction Net Payment

1 88 3244799.50 604260.11 2640539.39

2 275 8484722.83 1723175.24 6761547.59

3 4040 61704937.13 18642036.13 43062901.00

4 12309 116476966.47 38320364.18 78156602.29

Total 16712 189911425.93 59289835.66 130621590.27


*
Figures mentioned in table are approximate.

Issues with current functionality and how to address the same

a] Each month the salary is prepared by each department which involves lot
of calculation, it should be automatically done.

[Resolution] ERP will have HRMS module which will take care of the salary
processing of each of the employees on payroll of the corporation.

b] Difficult to track the employee strength various department.

[Resolution] ERP will be capable of delivering such reports in fraction of


time.

c] No repository for the employees data.

[Resolution] HRMS will be able to hold the complete details of all the
employees, even after retirement.

Pune Municipal Corporation Page 60 of 143


Detailed Project Report for ERP based e-Governance

To Be Departmental Functionality

DMS &
Accounts Web Portal Workflow
mgmt.

Selection of Department,
Employee login
Officers for scrutiny Upload employee docs, Asset
Retroactive calculations, Role based access to
Payroll mgmt. the documents. Mgmt.
system

Allotment of House
to the employee

HRMS Module
Recruitment & and Manpower Planning
Employee Master Data
Payroll Management
Employee Promotions / Transfers and Development
Time Management and Leave Management
Performance Appriasal
Details of Doctor
Departmental Enquiry
for OPD / IPD
Employee Self Service / surgery, utilisation reports
Reporting For Nurses/ Doctors

Hospital
Mgmt.
Allocation of advocate
& PMC officer
system

Selection of department
Officers for scrutiny

Assigning driver,
vehicles Mapping of Designation / Roles
to officers to Complaint Sub-type

Legal
Project
Systems

Fleet Grievance
Mgmt. Redressal
System

Pune Municipal Corporation Page 61 of 143


Detailed Project Report for ERP based e-Governance

Functional Scope of the Proposed Establishment Module

Integration
Functionality required with
A] Generic Features – Mandatory requirements
 System should provide for Retrospective calculations to
be handled for all types of scenarios (employee joining, Accounts
leaving, pay hike, promotions, etc.)
 System should be able to handle all statutory regulations
and maintain the details directly in the screens provided
for data entry. All rules related to such acts should be
preconfigured in the system.
 Vendor to provide for Legal change patch to take care of
any statutory changes.
 System should provide the capability to upload
Document
documents of employees like certificates, transfer,
Mngt.
promotion letters in a scanned format into the system
System
and ability to retrieve them whenever required
 Capability to integrate with PMC web portal for employees
Web Portal
self service
B] Recruitment and Manpower Planning
 Facility to carry out recruitment for different types of
employees separately viz., Officers, Special Officers, Clerks,
subordinates, Sanitation Staff, etc.
 Provision to define requirement plans (periodic) in terms of
specific skills, Qualifications, experience, designation, etc.
 Provision for mainstream, specialist and part time
employee recruitment
 Provision for Compassion ‘Anukampa’ recruitment
 Support to analyse the cadre-wise / ward or office-wise /
department – wise staff strength – sanctioned/working
strength and the gap for which recruitment is required
 Facility to capture the data relating to resignations /
retirements / VRS / suspend etc.
C] Employee Master Data
 System should be able to record and store Master Data
Information for an Employee for following areas and should
be able to provide a snapshot of employee’s history at any
point in time on a click
 Name
 Address
 Education Qualification
 Previous Employment
 Phone Numbers / Contact Information / E-Mail ID
 Date of birth

Pune Municipal Corporation Page 62 of 143


Detailed Project Report for ERP based e-Governance

 Work Experience
 Languages known
 Family Information
 Employee photo, Signature
 PAN No./ Passport / PF number/GPF No/ TAN No. for dept.
 Bank account information
 Employee blood group
 Property Tax No. Property Tax
Module
 Any other information that company may require should be
easy to enter and report on
 Employee Type– (Permanent / Temporary / contract
workers / Project Based)
 Employee category (SC/ST/OBC/Others)
 Ex service man / Handicap / Sports man etc.
 Location (HO/zone/ward/Election ward/branch)
 Department
 Job code/designation/ Class with scale efficiency bar
 Grade/cadre
 Job history covering details of appointments
 History of election duties attended
 Promotions, transfers
 Deputation, temporary transfers
 Increments
 Increment for passing of Govt. Exams.
 Date of pay rate change, etc – Increment
 Date of joining
 Date of probation/confirmation
 Date of termination/retirement
 Previous employment details
 Union Information (if applicable)
 Compensation data including components of pay
 Compensation of pay for calculation of gratuity and pension
 Family photo in case of pension, nominee photograph.
 Provision to define Roles and Designations as per PMC
requirements and assigning employee to the same.
D] Payroll Management
 Ability to define flexible periods such as day, week, month
for pay calculation Accounts
 Ability to enable multiple payrolls that are generated based

Pune Municipal Corporation Page 63 of 143


Detailed Project Report for ERP based e-Governance

on employee’s assignment
 Ability to define payroll for pensioners
 Ability to define the employee bank to credit the salary
 Facility for Electronic Clearing system (ECS)
 Bank-wise / Bank branch wise summary statement
 Ability to provide automatic calculation of deductions /
earnings based on leave, bonus declaration, GPF Loan,
Home Loan, Computer loan , tax deductions, etc.
 Ability for rule based pay calculation in case of pay hikes /
Pay Commission with retrospective effect
 Ability to define unlimited pay elements/types. These pay
elements should be classified as Earnings,
Reimbursements, deductions, tax deductions, PF, etc. Pay
elements should be also classified as Recurring & non-
recurring
 Ability to apply the payment rules at personal / department
/ designation / organization level
 Ability to allow exception definitions at employee /
designation / department level
 Ability to define all India specific taxation rules.
 Ability to automate increments (based on pre-defined rules
– employee / designation / department / organization
specific)
 Facility to run payroll processing any number of times
before authorization to ensure accurate pay calculation
 Provision to allow deductions for specific purposes (like
earthquake relief fund, CM relief fund, etc.)
 Ability to share information with Accounting module of the
current e-Governance solution with respect to payment or
receipt related transactions
 Ability to share information with the Accounting module of
the current e-Governance solution for all necessary Double
Entry Accounting related information (salary payable at the
end of financial years, etc.)
E] General Provident Fund Management
 Issuing GPF no. to employees
 Application acceptance for advances / Loan against GPF
 Scrutiny of the applications
 Payment of Advance / Loan to Employees Accounts
 Interest Rate for GPF calculation
 Repayment Installment adjustment against salary
 Generation of various MIS (Monthly / Yearly)
F] Employee Promotions / Transfers and Development

Pune Municipal Corporation Page 64 of 143


Detailed Project Report for ERP based e-Governance

 Transfers
 Time bound Promotions
 Grade and Pay changes
 Ability to create standard career paths in the Corporation in
terms of various possible moves from the current level /
grade in the Corporation
 Ability to define grade advancements within a level on the
basis of time based as well as merit based criteria
 Ability to define the rules for promotion eligibility in terms
of tenure, consistent achievement of high performance
grades, etc.
 Ability to define additional rules specific to service in terms
of suspensions, disciplinary actions
 Facility to intimate employees of promotion / rejection
through mail / workflow / letters
 Facility to create offer letter on promotion
 Ability to define short / long term goals for employees and
provide a framework to assess and update completion of
the same
 Ability to identify key positions for the purpose of
succession planning
 Ability to plan for vacancy of the key position in advance
 Identify the gaps / developmental areas between the slated
employees and requirements of the key position
 Maintenance of complete history of employee transfers
since his recruitment
 Transfer/redeployment of officers based on
requirement/sanction strength of different regions/zones
 Generation of seniority list
 Posting / transfer of officers upon their promotions
 Maintenance of records for officers transferred out of
parent state and also officers to be transferred back to
home state on completion of required tenure
 Maintenance of transfer records of specialist transfer,
identification of vacancies and issue of transfer orders
based on the recommendations received from the
respective specialist departments
 Provision to maintain lateral transfer details and transfers
on promotion
 Generation of list of eligible staff members for transfer
based on the user defined criteria (like those who ining 3
years service at one place, those who working more than
10 years in one region, those who have not worked outside
the state in a particular scale or overall position
 Maintenance of exemptions given in transfers with a facility

Pune Municipal Corporation Page 65 of 143


Detailed Project Report for ERP based e-Governance

to record the reasons for the same


 Provision to record the transfer orders
cancelled/deferred/modified and follow up with the
respective regional/zonal offices for implementation
 Capture of details of officers on deputation to outside
agencies, etc.
G] Time Management and Leave Management
 Support attendance entry from various sources such as
direct entry, rule-based and automatic (through biometric
device / swipe card / smart card)
 Definition and maintenance of leave calendars for different
types of leave depending upon the scales of the employee
 Provision to maintain all types of leave like CL, PL, ML SL
extra-ordinary leave, special leave etc
 Ability to maintain leave eligibilities for each type of leave
depending on the rules specified by KDMC
 Facility to identify Collisions when Employee goes for Leave
and take appropriate action
 Ability to maintain rules for leave taken in terms of rules for
availing leave, enchasing leave, accrual of leaves, lapsing
of leaves, ceilings for accumulation of leaves, rules for
combination of leave types, etc.
 Ability to record actual leaves taken
 Ability to calculate actual leave balance at any point in time
 Link Leave management to payroll and employee history
 Provision to accounting of leave including automatic credit
of leave and also provision with manual credit / debit /
modification / cancellation etc.
 Leave cancellation and leave extension / amendments
advancement, postponement of leave
 Supports extra-ordinary leave on loss of pay
 Leave availment / carry-over processes administration as
per the statutes laid down by the government / KDMC
H] Performance Appraisal
 Capability to create Performance documents for employees
depending on the cadre / grade in the organization
 Ability to define competency wise / parameter wise desired
levels of performance for each cadre / grade in the
organization
 Ability to define proficiency descriptions for each parameter
for each cadre / grade so as to ensure that the same
measures of performance are communicated to the
appraiser as well as the appraisee
 Facility to attach different rating model (5 point scale, 7
point scale) depending upon the cadre / grade in the

Pune Municipal Corporation Page 66 of 143


Detailed Project Report for ERP based e-Governance

organization
 Ability to define the period for which appraisal is being
carried out
 Capture appraisal details as given by the appraising
authority, reviewing authority
 Support parameter wise ratings, final ratings, strengths /
weakness and suggestions / recommendations for
improvements by the appraising/reviewing authority
 Facility to give weightage to each parameter and points
against each rating attained
 Facility to consolidate the overall points and calculate an
overall grade for the appraisee
 Facility to import Short / Long term goals (particularly at
officer level and above) in the Performance appraisal
document
 Support maintenance of history of performance appraisals
and promotions
 Support maintenance of automatic release of time based
increments
 Release of increments for qualifications acquired
 Increments released should automatically be integrated
with the payroll module and other relevant modules
 Support generation of increments due for each month or
for user defined period for employees – cadre wise/scale
wise/other user defined combination
 Support to generate reminder letters / mails / workflows to
the employees / appraising authorities in case of non-
submission of self-appraisals, etc.
 Support memo letters / mails / workflows to be issued to
the employee in case of unsatisfactory performance
I] Departmental Enquiry
 Ability of software to record the details of sanction given by
Commissioner or Additional Commissioner for departmental
enquiry.
 Ability of software to note charges against the employees
 Ability of software to record the clarification given by the
employee under charge
 Ability of software to record the appointment of Enquiry
Officer & Presentation Officer
 Ability of software to record the enquiry scrutiny details like
history, evidence, papers submitted, relevant documents ,
photographs etc.
 Ability of software to record the ‘Finding Report’ of Enquiry
Officer & Presentation Officer
 Ability of software to record the ‘Explanation details’ given

Pune Municipal Corporation Page 67 of 143


Detailed Project Report for ERP based e-Governance

by the employee
 Ability of software to record the details of ‘ Proposal for
action’ submitted to commissioner
 Ability of software to record the order given by the
commissioner
 Ability of software to generate the ‘Show Cause
Notice/Enquiry Notice’
 Ability of software to record the clarification given by the
employee under charge sheet
 Ability of software to record the punishment order or
penalty
 Ability of software to record details of suspension &
suspension order.
 Ability of software to capture details of resetting of service
 Ability of software to record the ‘enquiry start date’ &
‘enquiry finish date’
 Ability of software to record the inward/outward details like
inward/outward number & date
J] Reporting
 Reporting capabilities for AdHoc Reporting
 Reports on Demographic
 Reports on Vacancies
 Report on Employees Salary Details
 Report on Leave Availed
 Report on Leave Entitlements
 Employee Attendance List for a Business Event
 List of the Departmental Enquiries being conducted at a
point of time or for a specific time with drill down option to
get further details on the enquiries
 Headcount Report
 Report on time spent in a grade / employee tenure
 Transfer List
 Form 16 with Form 12 BA
 Report for ‘E’ forms
 Income Tax related reports
 Summarized Pay Register
 Form 24
 Provident Fund Returns: Monthly returns to the Regional
Provident Fund Commissioner for joining (Form 5) or
leaving employees (Form 10) and the contributions paid
(Form 12A) as well as monthly returns for Pension
contributions for exempted trusts for joining (Form 4) or
leaving employees (Form 5) and the contributions paid

Pune Municipal Corporation Page 68 of 143


Detailed Project Report for ERP based e-Governance

(Form 6)
 Professional Tax returns
 Form 6 and Form 7, the Quarterly / half yearly returns to
be generated by the payroll for the eligible employees with
the relevant annexure listing the employees and the
amounts earned and deducted
 Facility to configure and use the system to develop
additional reports on a need basis with tools like Crystal
Reports
K] Additional Features
 Ability to define organizational events like training, Training
records. Record of Examinations, Certificates after passing Hospital
exams, seminars, workshops and capture the attendance Mgmt.
for the same system
 Maintain comprehensive record of employee grievance
 Track disciplinary action taken against employees,
capturing the costs incurred along with the activities
undertaken as part of the disciplinary action. Automate
salary deductions, if proposed.
F] Other Requirements
 Data Porting / Data Entry Suite
 E-Mail / SMS to be sent to all / selected categories / SMS
Selected employees Gateway /
 Pay-Slips / Regular Communications Web Server
 Urgent Communications
 Notices

Pune Municipal Corporation Page 69 of 143


Detailed Project Report for ERP based e-Governance

3.1.13 Employee self service module

Introduction

In PMC the Establishment department hold the responsibility to keep tract of


the updated information about the employees. Some information like leaves
and attendance is updated in the service book of each employee by the
respective department. This is a tedious activity for both establishment
department as well as the department where employee is working.

When employees have access to ever changing work information, they are
better informed to make decisions about work related activities and time off
requests, further reducing the burden on management. In addition,
employees can also monitor the exceptions generated by their punch times,
so tardies and missing punches can be addressed as soon as they occur.
Information empowers employees and gives them confidence in themselves
and their employer.

Employee self service will provide employees of the company with the ability
to view relevant information such as personal information, updating personal
information with web - enabled PC without having to hassle the HR staff.

Issues with current functionality and how to address the same

a] Difficult to maintain the records of each employee and updation of the


same.

[Resolution] Employee Self Service Module will help the employees “Help
yourself” environment or self service mechanism and employees will be able
to update their information on own & can see the pending Leaves. This will
ensure that employees don’t have to run for self information to
Establishment Department.

Functional Scope of the Employee self service Module

Integration
Functionality
required with
A] Employee Self Service
 Ability to allow employee request to modify personal, skill,
family details HRMS,
Workflow
 Employee should be able to make leave requests
Management
 Supervisory officer should be able to get an alert when any System
Self Service Request of sub-ordinate staff is received by

Pune Municipal Corporation Page 70 of 143


Detailed Project Report for ERP based e-Governance

him
 Supervisor authorization of modification of the employee
requests or leave application
 Employees should be able to view the status of their
requests
 Ability to facilitate self-appraisal by employees
 Ability to undertake online appraisal of the sub-ordinates
(CRs)
 Ability to define customized NOC requests (like NOC for
Passport application, etc.)
 Various health benefits available to employee
 Register Employee Complaints Grievance
Redressal
 Allow employees to request any other information from any
other department
B] Reports
 Salary Details HRMS
 Leave Availed
 Income Tax related reports

Pune Municipal Corporation Page 71 of 143


Detailed Project Report for ERP based e-Governance

3.1.14 Web portal Module


Introduction
Web portal is the single window for the outside world to interact with
the corporation online. Various services can be accessed and
delivered through the secure web portal. Web portal has
departmental links for detailed information. Using the web portal
citizen can pay the Property tax, apply for any service, launch a
complain and many more other activity.

Issues with current functionality and how to address the


same

a] Most of the time the services of the web portal is not working.

[Resolution] Application deployed are not designed properly, so


need to be re-designed. Also the software deployment strategy need
to be defined. 3 tire based architecture need to be adopted to deploy
the application.

b] Web portal in not secure.

[Resolution] Antivirus policy needs to be implements. Also security


audit need to be conducted frequently. Access rights are to be only
with the Administrator.

c] Web portal capabilities are limited and it is difficult to upload


various information useful under RTI.

[Resolution] Proposed web portal shall have integration with all


departmental modules. This will allow real time information to be
made available to public. Lot of RTI queries can be answered through
such a dynamic web portal.

Functional Scope of the Web portal Module

Integration
Functionality required
with
A] Home Page
 Message from Mayor, Commissioner
 Vision, Mission, Objectives
 Link to various sub-sections
o City Information
o Online Services

Pune Municipal Corporation Page 72 of 143


Detailed Project Report for ERP based e-Governance

o About PMC
o Projects
o Citizen Grievances
o RTI
B] City Information
 History of Pune
 Tourist Locations
 City Map with citizen related GIS information GIS
C] About PMC
 Administrative Information
 Information on Elected Representatives, Various
Committees
D] RTI Projects,
 Names of PIO. Accounts,
HRMS,
 Departments/Wards: Intro, Objectives, responsibilities, Material
powers & duties of officers, employees with gross salary, Mgmt.,
activities, time limit, directory with telephone no. Fleet
 Committee: Members, purpose, type, freq. of meeting, Mgmt.,
docs available for public. Hospital
 Projects/ Activities: Budget head, work activities, Mgmt.,
allocated amount, current statistics. Asset
Mgmt.
 Details of concessions, subsidies given, computerization
done in various depts.
 Integration required for updation of data for RTI with
projects, accounts, HRMS, Fleet, material ,asset.
 Scope as per RTI Act 2005 sec. 4(1).
 Opinion Poll
 Photo Gallary
 Tenders Accounts,
Projects
 FAQ’s
 Emergency Information
 Employee Login using LDAP
 Feedback HRMS
 Contact Us
E] Online Services
 Application acceptance for various services / certificates Accounts,
o Birth / Death Certificates Correspond
ing Module
o Duplicate Bills
o Building Permission related services
o Water Connection
o No Dues Certificates

Pune Municipal Corporation Page 73 of 143


Detailed Project Report for ERP based e-Governance

 Downloading of Forms
 Online Tendering
o Sale of Tender Forms
o Acceptance of Tenders
 Complaints
o Acceptance
o Status Tracking
 Status on Applications / Complaints
 Payment Details, Bill Details
 Online Payments
 Self Assessment of Property Tax Property
Tax Module

Pune Municipal Corporation Page 74 of 143


Detailed Project Report for ERP based e-Governance

3.1.15 Citizen service centre module


Introduction
Citizen Service module will take care of all kind of citizens services.
All the services will be delivered from the single window. Any service
irrespective of department, citizen can make at single window and
the service will be delivered to him from the same window.

Citizen services module objective is to ensure the delivery of the


services to the citizen.

Issues with current functionality and how to address the


same

a] There is no single system in place to register the citizen services


and deliver.

[Resolution] The Citizen service module will be web enabled


solution, so that they can launch from internet itself. It will be
supported by workflow for faster approval.

b] Citizen services are not delivered through the single window, the
citizen will have to run from Pillar to Post.

[Resolution] all services will be delivered from single window.


Where any fee is not applicable citizen will be able to get that
information online.

c] No system in place to tell the status of the citizen request. For


any type of request the citizen will have to make several visits to
the CFC or Ward office.

[Resolution] update of the registered complain will be send through


Mail/ Phone. If Citizen wants can check the status online as well.

Pune Municipal Corporation Page 75 of 143


Detailed Project Report for ERP based e-Governance

To Be Departmental Functionality

Start

Citizen Help Desk facility to lodge New Complaints, Check Grievance Redressal
Integration
Status Module

Citizen Help Desk Facility to check citizen data like Birth /


All Departmental
Death registrations, Bill Dues, Application Status, Payment Integration
Modules
Status, Renewal Status

Citizen Charter to be made available at Citizen Help Desk


facility

Application are accepted for services, Application No. is


generated ,Department-wise categorization, system
accepts service specific inputs, Mobile No. of Applicant,
Check-list

Re-submission of rejected application after compliance

Fees are accepted Integration Account

The application is marked to Corresponding Department /


Integration Workflow module
Ward / Officer

Delivery of the output through CFC / Internet / KIOSK, SMS


Integration Departmental Modules
alert given to citizen

Payment is accepted for Property Accounts, Departmental


Integration
Tax,Water,License,Tender Document Fees Modules

General citizen services like Nursing Home Registration ,


Accounts, Departmental
Marriage Certificate, NOCs for other govt. department, Tree Integration
Modules
Cutting / Trimming Service is done

End
Manual Auto / System

Pune Municipal Corporation Page 76 of 143


Detailed Project Report for ERP based e-Governance

Functional Scope of the Proposed Citizen Service Centre Module

Integration
Functionality
required with
A] Citizen Help Desk
Grievance
 Facility to lodge New Complaints, Check Status Redressal
Module
 Facility to check citizen data
o Birth / Death registrations
o Bill Dues All
Departmental
o Application Status Modules
o Payment Status
o Renewal Status
Grievance
Redressal
 Citizen Charter
Module,
HRMS
B] Application Acceptance & Delivery of Outputs
 Department-wise categorization
 Allow system to accept service specific inputs
 Capture of Mobile No. & E-Mail of Applicant
 Re-submission of rejected application after compliance
 Check-list for documents to be submitted along-with
application
 Define citizen charter (list of the officers & duration for
service delivery)
 Fees to be accepted Accounts
 Generate Token of Application acceptance
 Rejection Note in case of inadequate application
 Marking the application to Corresponding Department / Workflow
Ward / Officer Module
Departmental
 Delivery of the output through CFC / Internet / KIOSK
Modules
C] Payment Acceptance
 Property Tax
 Water Bills
 License Accounts,
Departmental
 All Departmental Services Modules
 Tender Document Fees
 Any other
D] Citizen Services (General)
[ Such services won’t have any department specific functionality. CFC

Pune Municipal Corporation Page 77 of 143


Detailed Project Report for ERP based e-Governance

module, by using Workflow Management System should be able to


deliver these services]
 Nursing Home Registration
 Registration of Hospitals for Sonography
 Marriage Certificate Accounts,
 NOCs for other govt. departments Departmental
 Tree Cutting / Trimming Service Modules

 Road / Water / Drainage / Electrical


 Any other Service
E] MIS
 SMS alert to applicant upon decision
 Services Statistics
 CFC-wise / KIOSK-wise
 Department-wise
 Officer-wise list of services pending beyond the HRMS
stipulated time

Pune Municipal Corporation Page 78 of 143


Detailed Project Report for ERP based e-Governance

3.1.16 DMS and Workflow Management module


Introduction
Currently there is no system in place to move the documents from
one location to other. The staff of the corporation himself have to
visit from one desk to other, in order to move the documents.
Also the records in most of the departments are maintained in
manual register.

The objective of this module is to electronically move the documents


within the corporation, across the departments.

Issues with current functionality and how to address the


same

a] Still the movements of the file is to be taken by the employees


himself.

[Resolution] The workflow will move the files from desk to desk.

b] Delay in getting the information from various departments.

[Resolution] workflow has the capability to collect the information


from various departments and collectively present.

c] Still the old data are present in register and in some departments
the data is still captured on papers and maintained in stores.

[Resolution] DMS will store the data electronically in organized


manner.

Pune Municipal Corporation Page 79 of 143


Detailed Project Report for ERP based e-Governance

To Be Departmental Functionality

Municipal
Secretary HRMS CFC

Role based access to the documents,


Facility to mark the Applications to predefined
hierarchy Marking application to corresponding
Distribution of Resolution
Ward / Officer. Tracking of the inward

Materials
Mgmt.

Workflow for proposal


submission for Individual
Orders

DMS & Work Flow Mgmt.

File Tracking System


Document Management
Workflow Management System

Display of all application data during scrutiny process.


NOC’s from various departments upload documents of employees like certificates, transfer,
promotion letters in a scanned format into the system
and ability to retrieve them whenever required

Movement of Proposals on
various parameters Approval from the authority for
Workflow for Technical & Purchase/ Maintenance
Administrative sanction

Building
Permission HRMS

Fleet
HRMS Mgmt.

Pune Municipal Corporation Page 80 of 143


Detailed Project Report for ERP based e-Governance

Functional Scope of the Proposed DMS and workflow Module

Integration
Functionality
required with
A] File Tracking System
 Scanning & Marking the inward to the respective
CFC
department
 Incorporation of separate hierarchy for RTI letter
movements CFC, Web,
 Fresh applications KIOSK
 Appeals
 Tracking of the Inward CFC
B] Document Management
 Storing of document (Image & Metadata)
 Support for viewing a large number of file formats
without the need of having the parent application. The
system should support all commonly used file formats
as MSOffice, Acrobat, TIF, JPEG, GIF, BMP, etc.
 Association of the document with Workflow
Management System
 Movement of the document based on selected
parameters
 Provision to edit the document Metadata
 Versioning of the document
 Provision for marking comments
 Archival of data on pre-defined parameters
 Role based access to the documents HRMS
 Final Decision by the Decision Authority
C] Workflow Management System
 Movement of Proposals on various parameters Projects
 Facility to mark the application to pre-defined hierarchy HRMS
 Inbox for officers (listing applications received)
 FIFO principle for taking action on application
 Creation of a Note Sheet for Scanned Documents
 Alerts for delay in action
 Pre-defined scrutiny for citizen applications
 Display of all application data during scrutiny process Accounts
 Check-list for rejection
 Facility to mark the application to other officer
 Facility to mark the application to other department for Workflow
their NOC / Comments / Input Module
 Final Decision by the Decision Authority

Pune Municipal Corporation Page 81 of 143


Detailed Project Report for ERP based e-Governance

3.1.17 Welfare scheme module


Introduction
There are multiple departments that run various welfare schemes for the
benefits of the citizens of the Pune. Currently these schemes are purely
maintained on papers and registers.

The proposed “Welfare schemes module” will benefit each department to


plan, track and update the schemes. Also the module will be capable of
delivering MIS reports for each of the schemes. The information from
other modules will help on decision making for implementation of the
schemes and monitor utilisation of funds earmarked for these schemes.

Functional Scope of the Proposed Welfare Scheme Module

Integration
Functionality required
with
Master Entry of the different Schemes
a. AIDS awareness
b. Family planning and MCH
c. School health program
d. Janani Suraksha Yojana
e. Jeevan Dayi Yogna
f. RCH programs
g. Self employment slum / Non slum
h. Training schemes
i. Education
Resident ID
Creation of Database of beneficiaries / Property
Tax
Recording and accounting of the grants / funds received for
Accounts
implementation of various schemes
Preparing of the budgets for the implementation of the schemes Accounts
Allocation of work and fund required for implementation Accounts
Recording and accounting for the expenditure incurred for the
Accounts
implementation of the project
Generation of necessary reports needed to monitor the
implementation of the schemes

Pune Municipal Corporation Page 82 of 143


Detailed Project Report for ERP based e-Governance

3.1.18 Hospital management


Introduction
There are 2 hospital 14 nursing home and 24 dispensaries are run by
corporation. Hospital management is not an easy talk for the corporation.
People not only from the corporation limit comes for the treatment but
also from the near by rural areas.

Corporation has to deliver the best of the service to ensure every


individual come for treatment must gets proper treatment.

General statistics:
Number of Hospital / Nursing Homes
2 General hospital-2
3 Nursing home-14
4 Mother child care- 5
5 Family planning centre- 7
6 ICDS – 2 +5(New)
7 Dispensary- 29

Issues with current functionality and how to address the


same

a] Difficult to manage the roaster of the employees.

[Resolution] Hospital management system will have ability to


manage staff according to OT/ OPD /Ward etc.

b] Patient disease history is never maintained, or its very difficult to


maintained.

[Resolution] Hospital management system will help maintain the


patient details in electronic form. This will enhance the image of PMC
run hospitals in the public.

Pune Municipal Corporation Page 83 of 143


Detailed Project Report for ERP based e-Governance

To Be Departmental Functionality

Preparation of Discharge Card

Payment of Registration Fees Integration Accounts

Entry of patient details

Admission of patient to General / special / ICU /


NICU

Allocation of patient to bed in respective ward

Entry of Medicines proposed in discharge card

Issue of medicines from stores Integration Material Mgmt.

Discharge summary at the time of discharge

Billing & payment collection at the time of


Integration Accounts
discharge

Functional Scope of the Proposed Hospital management Module

Integration
Functionality
required with
A] Registration of Patients & Inquiry
 Preparation of Case Papers
 Payment of Registration Fees Accounts
 Patient Inquiry
 Date for next visit should be automatically generated.
Facility for manual setting of date if patient does not
turn up.
B] OPD / IPD Management
 Doctor Managing the OPD / IPD HRMS
 Consultation / Investigation Detail
 Medicine Proposed

Pune Municipal Corporation Page 84 of 143


Detailed Project Report for ERP based e-Governance

 Billing Accounts
C] Ward Management
 General / special / ICU / NICU
 Patient Allocation to various Beds
 Daily visit report Accounts,
Departmental
 Discharge Summary Modules
 Tender Document Fees
 Billing at the time of Discharge
D] OT Management
 OT Scheduling
 Surgery Details
 Doctor Details HRMS
 Output Details
 Billing Accounts
E] X-Ray & ECG
 Case details
 Records & Data management
 Generation of reports for PNDT & ANC
F] Special Disease (ARV / TB / AIDS)
 Case details
 Location GIS
 Forms
 Auto Reports generation based on predefined time
schedule
G] Lab Management
 Sample Collection details
 Inward details
 Technician details
 Report preparation
 Record management
 Pathology report
 Culture report
 Reports on various types of test conducted
H] Medical Board
 Employee details HRMS
 Inward, Case preparation
 Test reports
 Issuance of certificates
I] Other Details
 Casualty Case Details
 Utilisation Reports for Nurses / Doctors HRMS
 Capture of Patient Feedback

Pune Municipal Corporation Page 85 of 143


Detailed Project Report for ERP based e-Governance

B] Knowledge Centre
 Patient Information on Web-site Web Portal
 Area wise list of Multi Special Hospitals with contact Web Portal
numbers
 Area wise list of Ambulance services & Numbers Web Portal
 Area wise list of Crematoriums Web Portal
J] MIS
 Patient Analysis
 Casualty Case Details
 Occupancy reports
 Patient Feedback Analysis
 Generation of Daily/Monthly/Quarterly reports
 Generation of reports required for Governmental bodies
for AIDS control society (MSACS), Vaccination, TB, ARV,
PNDT, ANC care, various diseases, Birth & Death
statistical reports.
 Generation of monthly expenditure for procurement Accounts
‘Tasalmat’ reports
 Code Numbering for hospitals for easy collection of
reports
 Provision for cumulative reporting for each hospital
 Stock report for each vaccine Material
Mgmt.

Pune Municipal Corporation Page 86 of 143


Detailed Project Report for ERP based e-Governance

3.1.19 Asset management Department


Introduction
Assets reflect the wealth of the corporation. Based on the nature of
the assets it get appreciated or depreciated. Also for the double entry
accounting system asset register is must. Asset register is required
to prepare the balance sheet.

Issues with current functionality and how to address the


same

a] Currently the assets are maintained at the department level, so


consolidated information is available.

[Resolution] Asset management system will be integrated with the


accounts and Projects, so as soon as a project get completed it got
added into the corporation asset management section.

b] For double entry system asset register is must.

[Resolution] Asset module will be helpful in identifying the assets at


any given point of time for valuation and book keeping.

c] Management of various assets given on Rent / Lease is very


difficult.

[Resolution] Estate management functionality within Asset mgmt.


will take care of this requirement.

Pune Municipal Corporation Page 87 of 143


Detailed Project Report for ERP based e-Governance

To Be Departmental Functionality

Functional Scope of the Asset management Module

Integration
Functionality required
with
A] Classification of Assets
 Immovable Assets
GIS
o Land

Pune Municipal Corporation Page 88 of 143


Detailed Project Report for ERP based e-Governance

o Building
o Roads, Footpaths
o Bridges, Culverts, Flyovers, Subways & causeways
o Drains including underground drains
o Water Works Distribution
o Public Lighting System
o Lakes and Ponds
o Capital Work-in Progress
 Movable Assets
o Plant and Machinery – including machinery of Water
Works & Drainage, Road dept. machinery
o Vehicles Vehicle Mngt
o Furniture & Fixtures System
o Office Equipments
o Other Equipments
o Live Stock
 Investments Accounts
 Capture Various details for the Assets
o Ownership
o Cost Details (construction / Purchase / Transfer)
o Depriciation Principles
o Other details to arrive at Current Value
 Preparation of Opening Balance for Asset Valuation Accounts
B] Asset Transactions
 Purchase of New Assets
 Acquisition of Land Municipal
Secretary,
 Asset Sale Projects,
 Investment on Assets (like construction of new floors, Accounts
road re-surfacing, etc.)
 Insurance Details
 Insurance Claim Related Information capture Accounts
C] MIS
 Asset Register GIS
 Revenue Report
 Outstanding Register GIS
 Search facility for various information (like search for
GIS
name of road)
D] Other Requirements
 Data Porting / Data Entry Suite

Pune Municipal Corporation Page 89 of 143


Detailed Project Report for ERP based e-Governance

3.1.20 Land and Estate management

Introduction
The basic responsibilities of the Land & Estate Management department of
PMC are
• Land/ asset acquisition
• Estate management : Land/ asset allocation, Tendering of land lease
contracts for specific purposes, Records maintenance, and Contract
management.

Issues with current functionality and how to address the same

a] The Land & Estate Department has already digitised information with
respect to Land & Estate. However, there is no linkage with Accounts
and monitoring of receivables is difficult.

[Resolution] Proposed Estate Management would be linked with GIS and


Accounts and thus allow department / wards to keep tight control on
defaulters.

b] Land acquisition requires collective effort of various departments. In


manual system the entire process takes very long time.

[Resolution] Automation of the Land Acquisition process and it’s


integration with GIS would allow the department to monitor the process
efficiently. Various departments involved will get the required data through
workflow management system.

Functional Scope of the Land and Estate management Module

Integration
Functionality required
with
A] Land Management
 Proposal for Land Acquisition GIS
WorkFlow
 Scrutiny of Land Details Mngt.
System
 Valuation of Land
 TDR Process & Possession of Land
 Transfer of Details to Concerned Department (Bhavan for
Legal
Construction, Other department for Information)
B] Estate Management

Pune Municipal Corporation Page 90 of 143


Detailed Project Report for ERP based e-Governance

 Creation of Record in the Estate Register


o Hand-over from other agencies
Projects
o Hand-over by Builders
o Construction by Projects Dept.
 Issuance of Municipal Property on rent / lease
 Generation of Bills Accounts
 Acceptance of Payment
 Renewal of Rent / Lease agreement Legal
 Allotment of House to the employee HRMS
 Maintenance of Property on Contract
 Maintenance Inspection report
C] MIS
 PMC Land Register GIS
 Land Acquisition related reports
 Revenue Reports for Estate on Rent / Lease
 Outstanding Register for Estate on Rent / Lease
GIS
 Top Defaulters List
D] Other Requirements
 Data Porting / Data Entry Suite

Pune Municipal Corporation Page 91 of 143


Detailed Project Report for ERP based e-Governance

3.1.21 Material management Department


Introduction
Inventory management is one of the huge task for any corporation
or other government organisation. Currently the corporation has the
inventory of Vehicle parts, IT infrastructure, projects, and many
more other related unrelated departments.

The main objective of the material management is to keep the record


of the inventory for each type of the item.

Issues with current functionality and how to address the


same

a] Few department maintains their own stock for inventory in stock


register. Its difficult to track the item remaining in stock and
consumed.

[Resolution] Material management will help in tracking the item, its


location, etc...

b] Sometimes purchase is done in excess for materials and go


waste.

[Resolution] Material management will help in generating the


accurate report of the stock in hand and improve utilization of the
same.

c] Centralised monitoring of material procurement by various


departments is not possible. This leads to a lot of wrong
decisions. Also quality audit of materials procured is not
undertaken.

[Resolution] Various industry proven Material management


solutions are available in the market. The best practices inbuilt into
these modules will help remove many of the inherent inefficiencies of
PMC material management.

Pune Municipal Corporation Page 92 of 143


Detailed Project Report for ERP based e-Governance

To Be Departmental Functionality

Hospital Electric :
Asset Mgmt.
Management Street
Module
System Lighting

Integration in Asset Register, disposal of dead stock


Maintaining Maintaining
Hospital Inventory for
inventory Street light stores

Materials Management
Masters for central stores, Hospital stores, street,
water, road.
Water Rate Contracting or Individual Orders
Inventory for
Water Labs Indent Processing
supply Disposal of Dead Stock
MIS List of Vendor-wise / Material-wise orders
MIS List of Material-wise, Department-wise
consumption report
MIS List of Disposal of Dead Stock

Workflow for proposal


Indent of material, order & payment to vendor, approval for procurement
Disposal of dead stock
Maintaining
Inventory for
hot mix plants
For Roads dept

Accounts Workflow
Module Project mgmt. system
Systems

Functional Scope of the Material management Module

Integration
Functionality required
with
A] Masters
 Categorisation of Stores
o Central Stores
o Hospital Stores
o Vaccine stock
o Street Light Department Stores
o Water Supply Dept.

Pune Municipal Corporation Page 93 of 143


Detailed Project Report for ERP based e-Governance

o Road Dept.
o Other Stores
 Defining Various Items under each category
 Vendor List Accounts
 Price-list for the Rate Contract Items
B] Rate Contracting or Individual Orders
 Tendering Accounts
Municipal
 Sanction from Standing Committee
Secretary
 Proposal submission for Individual Orders Workflow
Mngt
 Purchase Orders System
C] Indent Processing
 Facility to each department to indent material Accounts
 Issue of Material by Stores Staff
 Order to vendor by Stores Dept. Accounts
 Material receipt forecast
 Reminder to vendor in case of delay in delivery
 Receipt of Material, Stock Updation, Capture of Sr. No.,
Batch No.
 Capture of Date of Manufacture & Validity Date for Food /
Medical Items
 Maintenance of Reorder level i.e. procurement after
reaching reorder level.
 Payment to Vendor Accounts
D] Disposal of Dead Stock
 Department-wise submission of details
Portal,
 Tendering by Stores Dept.
Accounts
 Disposal of Dead Stock Accounts
E] MIS
 List of Vendor-wise / Material-wise orders
 Material-wise, Department-wise consumption report
 Disposal of Dead Stock Accounts
 Status report to department w.r.t. their order
 Comparison of price bids with history prices
 Alerts if the Batch No.s or Sr. No. is not in order
 ABC Analysis
F] Other Requirements
 Data Porting / Data Entry Suite
 Logins to suppliers to update their status

Pune Municipal Corporation Page 94 of 143


Detailed Project Report for ERP based e-Governance

3.1.22 Residence ID

Various Residents of PMC require different services at different point of


time and have to submit their details again and again. Scrutiny of
these documents also requires time of PMC officers and it also means
time loss for citizens. Creating od database of residents would solve
this problem and would facilitate citizens to avail various services in
hassle free manner. This would also save PMC officers time and allow
them to concentrate on policy matters.

Resident ID would also help PMC to monitor the defaulters in a more


efficient manner. People having more than one property or water or
licenses can be issued common notices for their dues. Various services
or complaints can also be linked to the citizens responsibility towards
PMC dues.

Functional Scope of the Residence ID Module

Integration
Functionality
required with
A] Resident ID Generation
Workflow /
o Acceptance of Application + Documents Document
Mngt System
Property Tax
o Creation of Link with Property (Either owner / Tenant)
Module
o Verification of Documents Workflow /
o Scanning of Documents Document
o Cross-checking with similar names Mngt System

o Capture of Thumb Impression


o Capture of Photograph
o Cross checking of the picture with others in
database
 Generation of unique Resident ID
 ID Generation algorithm should be able to cross-check
the validity of ID
 Printing of Smart Card
B] Use of Resident ID in other modules
Property Tax /
o Use of Resident ID as the foreign key in all modules Water /
(wherever there is reference of PMC Citizen) Licenses /
Grievance, etc
o Documents verified for the Resident ID should not be
CFC
asked during Service Delivery
o Scope to define different s

Pune Municipal Corporation Page 95 of 143


Detailed Project Report for ERP based e-Governance

3.1.23 Legal Department


Introduction
The department is mainly involved in giving legal opinion to other PMC
departments as and when requested by the latter. It also handles the
legal cases filed against the PMC departments in court. Depending on the
complexity of the case, advocate is chosen from the in-house panel or is
appointed from outside. The in-house panel of advocates is also renewed
periodically as and when the need arises.

The objective of the department is to provide legal assistance to all the


PMC departments in an efficient and timely manner.

Issues with current functionality and how to address the same

a] The inward & outward register is maintained manually. The process is


very cumbersome as a lot of documents are involved.

[Resolution] An online intra & inter-departmental work-flow process


for the purpose of providing legal opinion as well as handling legal cases
would reduce the need of maintaining the register. A data-entry type
online register could be developed for bulkier documents (which are
difficult to scan) and for documents received/ sent to third party
agencies.

b] Data from other PMC departments is obtained manually by issuing


letters to the latter.

[Resolution] By linking all the departmental modules through the ERP


application, most of the statistical data could be obtained online by the
legal department.

Pune Municipal Corporation Page 96 of 143


Detailed Project Report for ERP based e-Governance

To Be Departmental Functionality

Pune Municipal Corporation Page 97 of 143


Detailed Project Report for ERP based e-Governance

Functional Scope of the Proposed Legal Module

Integration
Functionality
required with
A] Masters
 Advocates, their fees
 Court Master
B] Case Management
 Registration of new cases, allocate advocate, allocate HRMS
PMC officer
 Facility to attach various documents related to the case
 Entry of Date of Hearing
 Alerts to officers w.r.t. hearing date
 Entry of hearing details
 Capture of judgment
 Details of payments to the advocates
Departmental
 Linkage to the departmental data
Modules
 Linkage to GIS to capture locational reference for cases GIS
C] Legal Opinion on various departmental queries, agreement Document
formats Mngt. Module
D] MIS
 Case Pendency reports (Department-wise / advocate-
wise / Officer-wise)
 Reports w.r.t. Cases won / Lost / Appeals made
 Payments to the Legal Advisors
 Repository for various act and provision with search
option
 Integration / Link to maharastra government site for GR
references.
 Repository of all the cases since 1950 by High court and
Supreme Court with search feature.

Pune Municipal Corporation Page 98 of 143


Detailed Project Report for ERP based e-Governance

3.1.24 Municipal Secretary


Introduction
Municipal Secretary Department is an important interface between
Elective Representatives and the Administration. Various tasks
undertaken by this department are Preparing the agenda and for the
committee meetings, Documenting the decisions taken by the
committees and getting the signatures of various authorities on the
same.

Issues with current functionality and how to address the


same

a] Storing and retrieval of Meeting Agenda or Minutes is a challenge


in manual system.

[Resolution] Entire data with respect to Meeting Agenda or


Minutes of Meeting can be stored on system. Thus retrieval can
be at click of the button. This would also mean less effort of the
Municipal Secretary Department in case of RTI queries.

Functional Scope of the Proposed Municipal Secretary Module

Integration
Functionality required
with
A] Executive Wing Database
 Database of members of various committee corporators,
Web
mayors etc
B] Agenda Preparation
 Preparation of Goshwara by Department & submission to
Projects
Municipal Secretary Dept.
 Submission of proposals from various Councellors
 Selection of Type of Meeting (General Body / Standing
Committee / Special committee / Tree Authority
committee / Name committee / Ward Committee / special
committee’s like Women & Child welfare committee, Law
committee & City improvement committee)
 Selection of different Goshwara’s received for a meeting
 Schedule of meetings of various committees
 Generation of Agenda Copy
 Issue of Agenda to Members & Administration after
Work-flow
approval.
 Issuance of letters received from the office bearers to
various departments.

Pune Municipal Corporation Page 99 of 143


Detailed Project Report for ERP based e-Governance

C] Minutes of Meeting
 Capture of Proceedings
 Capture of Attendance of the members
 Printing of Minutes after approval Work-flow
 Printing of Minutes
D] Resolution Preparation
 Preparation of Resolution
Document
 Distribution of Resolution
Management
 Publishing of resolutions on Web Portal Web Portal
E] MIS
 List of issues discussed department-wise & committee
wise in a specific time period
 Attendance Details
 Resolution Details
 Data required for the preparation of annual report (Total
number of resolutions passed, meetings held etc)

Pune Municipal Corporation Page 100 of 143


Detailed Project Report for ERP based e-Governance

3.1.25 Audit Department Module


Introduction
The Audit Department is responsible to audit various expenditure and
check the Accounts of Corporation as per provisions and procedures laid
down. Major functions of the department are:
• Audit of Municipal Fund
• Follow the orders of Standing Committee
• Framing of rules for Auditing
• Control and Check on Accounts of Corporation

Functional Scope of the Proposed Audit Department Module

Integration
Functionality
required with
A] Departmental Process
 Pre-Audit of Tenders, Estimates Accounts
 Audit Para Entry Accounts
 Post Audit of the Departments
 Capture of ‘A’ Form & ‘B’ Form
 Inspection of Contractor & Supplier Bills
 Inspection of Other Bills like Telephone Bills Accounts
 Inspection of Advance Adjustment proposals
B] Reports
 Department-wise Budget Provision v/s Expenditure
Report
 Status report on Audit Para
 Various statutory reports to be submitted to Standing Accounts
Committee
Accounts,
 Exception Reports (w.r.t. deletion of records,
Other
adjustment entries, etc.)s
Modules

Pune Municipal Corporation Page 101 of 143


Detailed Project Report for ERP based e-Governance

3.2 GIS
Geographic information system (GIS) is being considered a boon for urban
managers and can be used to bring in much needed effectiveness in city
planning and it’s management. Ultimate aim while planning GIS should be
creation of decision support system. Distinct objectives identified for GIS
implementation at PMC are:
 Better monitoring of the recovery of Property, Water & other taxes
 Effective Monitoring of Complaint Management System
 Up-to-date & user friendly maintenance of ULB assets
 Effective tool to Monitor Un-authorised constructions
 Efficient maintenance of Public utilities like Roads, Street Light, Water
Supply Network, Sewerage Network, etc.

Proposed GIS integration with MIS

Pune Municipal Corporation Page 102 of 143


Detailed Project Report for ERP based e-Governance

Functional Scope for the proposed GIS Project

Integration
Functionality
points
A] Software Platform to run GIS Application Software & Satellite Image
Procurement
 For viewing Spatial Data on Intranet (max. 25 users
any point of time)
 For viewing Spatial Data on Internet (max. 25 users
any point of time)
 For editing Spatial Data (max. 05 users any point of
time)
 Procurement of 0.6 mtr resolution image and
creation of base map
B] Creation of various layers of Geo-Spatial Information
 PMC Boundary / Wards / Zones
Town
 Development Plan with reservation areas
Planning
Asset
 Roads, Footpaths
Management
Property Tax
 Buildings (Pvt., Govt., PMC, etc.)
/ Water
 Street Light Network Asset Mngt,
 Water Supply Network & Water Tanks Water

 Storm Water & Drainage Network


Asset
 PMC Hospitals, Pvt. Hospitals
Management
 Schools (Pvt. & PMC)
 Utilities (Banks, Pharmacy, Hotels, etc.)
 Dust Bins Asset
 Gardens, Playground Management

 Slums
C] Customised Application Software
 Assistance to Building Permission Dept. during AutoDCR
application scrutiny
 Rejection of Building Permission Applications if the
area is falling under reservation zone
 Assistance to Water Department during New Water Water
Connection Scrutiny
o Guidance in selection of Source Line
o Calculation of Length of Connection
o Calculation of Road Digging Charges
 Preparation of reports by fetching data from Property Tax
departmental modules / Water /

Pune Municipal Corporation Page 103 of 143


Detailed Project Report for ERP based e-Governance

o Demand / Collection Register (Property Tax, Licenses /


Water, Licenses) Projects
o Assessment Register
o Ward-wise / Zone-wise Recovery reports
o Top Defaulters Report
o Buildings not Assessed for Property Tax / Less
Assessed
o New Building Permissions / Completion
Certificates
o New Projects
 To identify various utilities within PMC area
 PMC Fixed Assets (in different colour codes) Estate
Development
 Buildings on Reservation Area
Plan
 Structures built in a particular time period (to be
taken by comparing New Satellite Image with old
one)

Pune Municipal Corporation Page 104 of 143


Detailed Project Report for ERP based e-Governance

4. Implementation Methodology

4.1 Proposed Solution Architecture


Proposed Software architecture diagram for the e-Governance at PMC is
given below :

As described in the above schematic, the proposed solution will be 3-tier


architecture with web enabled user interface. The Middle tier i.e.
Application Layer will reside between the web enabled user interface top
tier i.e., Presentation Layer and the Database tier/Layer.

The user system interface top tier i.e., Presentation Layer shall perform
user services such as session, text input and display management.

The Middle tier ie. Application Layer shall provide process management
where business logic and rules shall be executed and should
accommodate required number of users by providing functions such as
queuing, application execution, and database staging. The middle tier
shall provide process management services (such as process
development, process enactment, process monitoring, and process
resourcing) that are shared by multiple applications.

The Database tier shall provide database management functionality and is


dedicated to data and file services that can be optimized without using
any proprietary database management system languages. The data
management component ensures that the data is consistent throughout

Pune Municipal Corporation Page 105 of 143


Detailed Project Report for ERP based e-Governance

the distributed environment through the use of features such as data


locking, consistency, and replication. Connectivity between tiers can be
dynamically changed depending upon the user's request for data and
services.

The three tier architecture is used when an effective distributed


client/server design is needed that provides increased performance,
flexibility, maintainability, reusability, and scalability, while hiding the
complexity of distributed processing from the user.

The diagram below describes the architecture concept of the system in


more details :

Security
The data of PMC is a valuable resource and key component of Technical
Architecture. Information security is very important to maintain Integrity,
Confidentiality & Availability of data.

Data needs to be protected against following threats.

Pune Municipal Corporation Page 106 of 143


Detailed Project Report for ERP based e-Governance

• Unauthorized access to database or application


• Accidental modifications or deletions
• Confidentiality, Integrity & Availability breeches of data during data
transport & physical storage.
• Disasters

Information security will be implemented using Firewalls by deploying


appropriate security model. IT security policy implementation will have
guidelines for securing our IT assets and shall be binding on all PMC
personnel plus the IT vendors of PMC.

Network
The network infrastructure for deployment of solution will be manageable
using SNMP with support for both 10 and 100 Mbps Ethernet as well as
gigabit and fiber ports. Intelligent switching to be used for segmenting the
network logically to keep the cross traffic to minimum. Routers shall be
used for connectivity between logical network segments and disparate
LAN topologies.

Solution deployment diagram


It is proposed that the e-Governance solution at PMC will have ERP /
COTS ( Commercial Off the Shelf) Modules at the core. These modules will
be integrated with the existing legacy applications, GIS application,
Customized applications & any other applications. The web enabled user
interface which forms the outer core will be accessing the solution. The
web enabled user access will be available at Departments, CFC’s, Ward
Offices, Kiosks, Web Portal & PDA’s etc.

Pune Municipal Corporation Page 107 of 143


Detailed Project Report for ERP based e-Governance

Pune Municipal Corporation Page 108 of 143


Detailed Project Report for ERP based e-Governance

4.2 Solution Features

Various features proposed in the proposed e-Governance system at PMC


are given below :

Architecture

 Centralized Server Architecture (3-tier architecture with web enabled


user interface)

 The presentation logic should be decoupled from the business


components logic

 Data access layer will be on RDBMS platform. Backend RDBMS to be of


latest version of leading RDBMS (one of the top 2 RDBMS player in
Indian Market)

User Interface

 User should get option to select Marathi or English for User Interface.
All Inputs & Outputs should be in Marathi / English.

 Single Sign-on for accessing all the modules

 Any item of data needs to be entered once and is then should be made
available as often as necessary to all the systems that need to use it

 All modules should be homogeneous with respect to Keyboard use,


screen layout and menu operations with Graphic User Interface (GUI)
support

 GUI Form Administration should support


o Changing fields or tab labels
o Hiding fields or tabs.
o Changing the position or size of field or labels
o Adding restrictions like mandatory or not
o Setting default value in a field
o Changing list of value (LOV) contents
o Capability to setup logic to trap conditions to pop messages in
response to conditions like logical data entry errors, certain
conditions etc. For example State is Maharashtra and Country is
United States
o Ability to provide these configurations down to the user level so
that the screen can be made to have different functionality for a
given user

Pune Municipal Corporation Page 109 of 143


Detailed Project Report for ERP based e-Governance

 Disparate information can be consolidated from a number of systems


as required to produce reports and carry out ad hoc analysis and
reporting

Access & Data Security

 Role based authentication to various functionalities mentioned in


different modules with encrypted passwords. Rights can be given to
Individual Users or Groups

 Flexibility to define separate Role and Designation to the users. Upon


transfers of officers / employees, applications / letters / complaints
pending with the employee shall remain to the role and new employee
will be able to take action on these applications / letters / complaints.

 User rights to various forms should be either Create New Record or


View existing Record or Edit existing record.

 System should be easy to support & reduce tampering

 Should capture exceptions to detect frauds / mistakes

 An audit trail of changes to data in the system shall be maintained to


identify the users responsible for the modification. There should be a
facility to create reports on audit logs.

 Information Security i.e. Integrity, Confidentiality & Availability of data


to be maintained.

Scalability

 System should be built using Service oriented, Open Architecture

 It should be possible to add more fields to the data input screens for
capturing additional business specific information without having to
write any code (for COTS modules)

 Capability to modify existing forms to suit the requirements without


requiring additional development tools

 The Project will mark beginning towards building Information Base for
tommorow’s hi-tech Pune. It is thus imperative that the Application
Software has the capability to scale up to tommorow’s requirements
like given below :
o Managing the entire Property Life Cycle (Data Collaboration
between various govt. departmental systems right from Land
Records Department, Registration Department, Building Permission

Pune Municipal Corporation Page 110 of 143


Detailed Project Report for ERP based e-Governance

Department, Property Tax Department, Water Department,


Licenses Department, Electricity Department, etc.).
o Maintaining Information on Citizen Life Cycle (Right from Birth to
Marriage, Health, Education, Driving License, Interactions with
PMC, Death)

General

 The system requires continuous availability (24 * 7)

 System should store and display defaulted values

 The system shall be designed in such a way so as to ensure that the


loss of data is minimized due to network ‘drop outs’

 Automatic refreshing of data at specified time intervals. The


information shall be refreshed from the database and shall not require
user intervention

 System should provide a user driven data archiving capability, with


support for flexible archiving periods and selected tables

 System should have an online help capability, which should be


customizable. Should have a facility for online learning and
collaboration

 All reports should be query based and should have options like
departments, wards, employees, from date, to date, etc.

 PMC Users will access the system using Ethernet LAN / Lease Line / RF
/ Internet

4.3 Implementation Approach


Since MIS and GIS require different kind of expertise, two different
tenders will be floated for the selection of System Integrators (SI) for
these projects. For MIS, focus is given on ERP based solution and it is
expected that SI will suggest the use of COTS Modules to deliver
functionality of most of the modules. Bespoke development for certain
departmental Modules shall be allowed. SI will be also asked to provide
the required Server Hardware and Software.

Pune Municipal Corporation Page 111 of 143


Detailed Project Report for ERP based e-Governance

4.4 Implementation Schedule


The broad Bar Chart for Project Implementation Schedule is given below:
Project Activities 2008 2009

Months  9 10 11 12 1 2 3 4 5 6

Selection of System Integrators (for GIS & MIS)


Submission of DPR to SLNA
Approval from SLNA
Submission of DPR to GoI
Approval from GoI
Tender Process
Technical Bid Evaluation
Commercial Bid Evaluation
Acceptance of Tenders by
Standing Committee

Project Implementation Phase


Work Order to SI and Resource
Moilisation
SRS and Preparation of To_Be
Document by SI
Customisation of COTS, Bespoke
Development, Installation of S/W
Procurement & Installation of
Servers, System S/W
Acceptance Testing of the
Software
Project Go Live

4.5 Key Challenges / Risks


Key Risks / Challenges and the Mitigation Mechanism planned is given
below :
Challenges / Risks Mitigation Mechanism

Maintaining Time Lines Use of Project Management Tools and


Weekly review at Commissioner level
Sr. Management Buy-in / Change Management to be given
Priority by Sr. Management special focus, Weekly review meetings
by Commissioner
Successful and On-time Data Fixing responsibities at the early stage
Digitisation of project and close review of the
digitization process
Training & Capacity Building Three level Training :
• Sr. Management
• Departmental Champions
• End User Staff

Pune Municipal Corporation Page 112 of 143


Detailed Project Report for ERP based e-Governance

4.6 Capacity Building


PMC has already started addressing this aspect by following means :
- Giving Blackberry & Laptop to officers, thus motivating these officers
to become technology savvy
- Giving training to all the administrative staff
- Recruitment of over 100 computer qualified clerical staff.
- Appointment of PwC as Project management Consultant to extend
end-to-end consutancy to PMC for the e-Governance project

4.7 Change Management


Our natural reaction to change, even in the best circumstances, is to
resist. Since use of ICT is going to bring in few changes in basic
functioning of PMC, it is very important to look at this change from
employee perspective. Careful consideration to Change Management can
ease out many teething problems in the implementation of the project.

One of the important element in managing Change Management is to


identify, assess and manage the stakeholders. There are five distinct
stakeholder roles in this project. The same is depicted in the picture below.
It would also be found that some people would have more than one role –
for example, project team members who are responsible for implementing
the change (change agents) may also be at the receiving end of the
changes themselves (change participants).
Shaping Delivery

 Views must be  Responsible for


considered, does achieving
Change
Customer not authorise, change and has
a contract with a Agent
often
participates in change leader -
projects and Leadership for example
programmes project
managers,
 Demands and
Change trainers.
authorises
Leader change - e.g..
the Sponsor or
Supports, line manager
  Must change for
influences and benefits to be
sometimes delivered - for Change
Influencer initiates change example, users Participant
but cannot lead it - of the changed
key member of a solution
support function

PwC shall assist PMC in undertaking the Change Management for this
project in a professional manner.

Pune Municipal Corporation Page 113 of 143


Detailed Project Report for ERP based e-Governance

5. Cost Estimates

5.1 Server Infrastructure Costs


Component Unit Cost No. Total
Civil Work & Electrical
Civil & Furniture Work for the Data
Centre 20,00,000 - 20,00,000
Electrical & LAN 100,000 - 100,000
UPS (15 KVA with 2 hrs backup) 10,00,000 2 20,00,000
Sub-Total 41,00,000

IT Infrastructure Components
Racks 75,000 2 150,000
Firewall 7,50,000 1 7,50,000
Intrusion Protection System 15,00,000 1 15,00,000
Center Core Switch 400,000 1 400,000
SAN 25,00,000 1 25,00,000
NAS 25,00,000 1 25,00,000
Database Server 20,00,000 2 40,00,000
Application Server for MIS 15,00,000 1 15,00,000
Application Server for GIS 15,00,000 1 15,00,000
Web Server 15,00,000 1 15,00,000
Domain Server 5,00,000 1 5,00,000
Backup Device 1,00,000 1 1,00,000
Backup Media 10,000 5 50,000
PCs 25,000 100 25,00,000
Scanners (with ADF) 12,000 50 6,00,000
Desktop Laser Printers 10,000 50 5,00,000
Router 67,200 1 67,200
Sub-Total 193,97,200

Software (CPU based Licenses)


RDBMS (Production & Backup Server) 18,00,000 4 72,00,000
Application Server (MIS) 9,00,000 2 18,00,000
Network Management System 12,00,000 1 12,00,000
Sub-Total 102,00,000

Total 336,97,200

Pune Municipal Corporation Page 114 of 143


Detailed Project Report for ERP based e-Governance

• Specifications for Various Hardware & Server Room Infrastructure components are given
in Annexure III.
• For Cost Estimation purpose, RDBMS & Application s/w (MIS) cost is considered for Oracle
Products while GIS s/w cost is considered for ESRI Products.
• Disaster Recovery Site is considered to be the State Data Center, which is being setup at
New Administrative Building, Mantralaya, Mumbai; and expected to be operational by May
2009.

5.2 MIS

License /
Sr. Customisation
Components Development Total
No. Cost
Cost

License Cost of the Basic


1 ERP Modules (Approx. 850,00,000 212,50,000 1062,50,000
1000 Licenses)

Hospital Management
2 50,00,000 12,50,000 62,50,000
System

3 Fleet Management System 60,00,000 2,50,000 62,50,000

Bespoke Development &


4 150,00,000 - 150,00,000
Implementation

Total 1337,50,000

5.3 GIS
Sr. Estimated
GIS Components
No. Expenditure
1 Enterprise GIS Software for Web Based GIS Implementation 48,00,000

2 Customised GIS Software 30,00,000

Latest Satellite Image (0.6 mtr resolution) & Preparation of


3 500,000
Base Map

Physical Survey and Creation of various Layers of Geo-


4 200,00,000
Spatial Information

Total 283,00,000

5.4 Other Costs


Sr. Estimated
Details
No. Expenditure
e-Governance consultancy for preparation of DPR, Bid
1 98,50,500
Management and Project Management
2 Training (MIS) 10,00,000

Pune Municipal Corporation Page 115 of 143


Detailed Project Report for ERP based e-Governance

3 Training (GIS) 500,000


4 Data Entry 25,00,000
5 Implementation (MIS) 24,00,000
6 Implementation (MIS) 13,00,000
7 IT Audit Cost 500,000

Total 180,50,500

5.5 Total Capital Cost


Sr. Estimated
Details
No. Expenditure
1 Server Infrastructure Costs 336,97,200
2 MIS 1337,50,000
3 GIS 283,00,000
4 Other Costs 180,50,500

Total 2137,97,700

5.6 Operational Expenditure (Per Year)


Key Components Amount

Post implementation support for MIS (@ 22% of License Costs) 294,25,000

Post implementation support for GIS (@ 22% of License Costs) 17,16,000

ATS for Database, Application Servers (@ 22% of License Costs) 22,44,000

Maintenance of IT Infrastructure (@ 10% of Capital Costs) 21,39,720

Connectivity Costs for DR Site (2 MBPS Lease Line) 25,180

Total 355,49,900

5.7 Year-wise Break-up of Project Costs


One of the essential factors important for the success of proposed e-
Governance project at PMC is to have a professional approach in
implementation. All the activities need to be planned in holistic manner
with due provision for Operations and Maintenance.

Detail cost break-up for this project over the period of next 5 years is
given in the bar chart below:

Pune Municipal Corporation Page 116 of 143


Detailed Project Report for ERP based e-Governance

Years
Activities
2008 – 2009 – 2010 – 2011 – 2012 – 2013 –
2009 2010 2011 2012 2013 2015

Server Side
33,697,200
Infrastructure

MIS 33,437,500 100,312,500


35,549,900 35,549,900 35,549,900 71,099,800

GIS 7,075,000 21,225,000

Other Costs 4,000,000 14,050,500

Capital Cost + Operational Cost for 5


INR Rs. 39,15,47,200/-
Years

Pune Municipal Corporation Page 117 of 143


5.8 Project Financing Structuring
Breakup of the project finance is given in the table below :

Project Operating Expenditure


Sr. % share by Capital
Party Contribution st nd Total
No. govt. entity Expenditure 1 Year 2 Year 3rd Year 4th Year 5th Year
source
PMC & Govt. Contribution

1 Central ACA Grant 50 % 105,898,850 17,774,950 17,774,950 - - - 141,448,750

2 State Grant
towards its
42,359,540 7,109,980 7,109,980 56,579,500
share in 20 %
- - -
project

3 PMC Own Funds 30% 65,539,310 10,664,970 10,664,970 35,549,900 35,549,900 35,549,900 193,518,950

Total 213,797,700 35,549,900 35,549,900 35,549,900 35,549,900 35,549,900 391,547,200

• Civil & Furniture Work for the Data Centre of Rs.20,00,000/- not considered for Central / State funding as per the guidelines.

• Central / State Funding considered for Capital Cost and recurring cost of 2 years as per the guidelines.
6. Benefits Envisaged and Assessment Framework

6.1 Benefits envisaged from the project

Citizens

The benefit of the e-Governance solution will be delivered to citizens in the


form of Quick response time, multiple access points/ locations, Web enabled
services, minimum personal visits, Quality of service (QOS), paperless
transactions, transparency, multiple mode of payment & reduction in service
charges.

Get timely services:


E-Governance solution will benefit the citizens with state of the art
information updates relating to the progress of the services requested. The
same can be achieved by means of SMS, Email, Web.

The backend processing of the Corporation will be supported by Workflow


and Document Management System and ERP solution to reduce the service
delivery time to the Citizens.

Correct information:
As the information is available in digitized format in the ERP solution, this will
help the citizen to get the accurate and upto date information available
publicly or by request.

The departments of PMC will be interlinked by ERP solution which will enable
citizen to get true picture of the status / state of the information.

Availability to provide feedback:


The e-Governance solution will be equipped with the Citizen Grievance
Redressal module which will help citizen not only register the complaints but
also to provide the feedback mechanism. This helps both Corporation &
Citizen to work together in more harmonious environment.

Employees:

Operating guidelines:
The departmental processes as well as intra department processes will be
standardized. This will help effective and efficient way of working within the
Corporation and benefit the different levels of employees to work in
collaborative manner.

Appropriate Technology:
Detailed Project Report for ERP based e-Governance

With the help of e-Governance solution & the ERP the data, information will
be available at single location & same information will be available to all users
resulting in seamless information flow. The file movement from one desk to
another desk will be taken care with the help of Document Management
system & Workflow Management system.

Other technologies will be used for effective performance of the corporation


are Mail & Messaging solution, Web portal, SMS solution.

The e-Governance solution is designed as such to support latest equipments


like PDA’s, Mobile phones, GPS, Laptop.

For the City Engineering department, GIS Technology solution is integrated


with the ERP solution for detailed information, availability & support.

Efficient process
E-Governance solution will transform the working of the departmental
processes by undergoing BPR which will reduce the cycle time, eliminate
unwanted processes & enhance the productivity.

Quality Training Mechanism


For the e-Governance implementation program from each department one
technical & one functional have been identified and selected. These resources
are involved throughout the e-Governance exercise. Another initiative for the
effective training of the employees will be, by means of conducting
workshops for each level of employees. For effective e-Governance
implementation a Change Management program is incorporated.

Effective supervision
E-Governance solution will have MIS Reporting mechanism for effective
monitoring of projects, initiatives taken by corporation. MIS reporting will
have detailed analysis of Cost, Time & Resources for the various projects.
Milestone tracking mechanism is also incorporated in e-Governance solution.

The e-Governance will help department champions to focus more on strategy


making, revenue generation and creating new lines of services for Citizens.

Vendors / Contractors

Clear cut and quality service delivery mechanism:


For the benefit of the Vendors and suppliers the e-Governance solution will
be offering them the online publication of the tender information, acceptance
of the bids, notifications/ guidelines, submission of tender, display of the
selected vendors in transparent manner.

Pune Municipal Corporation Page 120 of 143


Detailed Project Report for ERP based e-Governance

Payment arrangements:
Online tendering mechanism will provide the facility of online payment
through payment gateways and net banking system. Also the suppliers can
raise their bills online and get the payment credited in their account directly
without any hassle or going through difficult processes.

NGO / Other Agencies

Correct updated and reliable information:


The e-Governance solution will have the Web portal which will help NGO’s
and other agencies to get the information about the initiatives/ projects of
the corporation. The Portal will have information like RTI, Citizen Charter,
Budget, etc. The other information related to water lines, Roads, Drainage,
electoral wards, population statistics, tress, Gardens, slums will be available
through GIS and Web Portal.

General Body / Standing Committee / Decision making


Authorities:

Key performance indicator based Decision support system


The e-Governance solution will have seamless integration between GIS and
the ERP system. This will help generating informative MIS reports for
effective decision making and future planning. The MIS reports will be
detailed enough to go the minute levels of departmental data which will cover
every aspect of each of the department.

Summary of benefits of the project to various stake-holders given below :

Stakeholders &
Key Measures
Objective
• Quick response time for a service
• Multiple access points/ locations
• Web enabled services
• Minimum personal visits
Citizens • Quality of service (QOS)
• Paperless transactions
• Multiple mode of payment
• Reduction in service charges

• Correct and updated information delivery to the


citizens
• Standardised way of working within department
Corporation
and across departments
Employees
• Encourage paperless working environment
• Reduction in number of desk for work
processing

Pune Municipal Corporation Page 121 of 143


Detailed Project Report for ERP based e-Governance

• Transparency in working

• Focus on revenue collection improvement


• Strategy design and implementation
Policy maker • Reducing the cost of delivery of the services
• Devising new source of revenue generation

• Updated information about the various projects


• Detail statistics about the cost utilization on
NGO / PPP projects
• Help in initiating new projects

Pune Municipal Corporation Page 122 of 143


Detailed Project Report for ERP based e-Governance

6.2 Assessment Framework

PMC understands that the e-Governance project envisaged in the present


document cannot attain it’s required success level if it is not continuously
assessed and monitored. PMC has thus appointed a reputed industry
consultant (M/s. PricewaterhouseCoopers Pvt. Ltd.) as a Project
Management Consultant.

Scope of work for the Project Management Consultant (PwC)


a) Liaise with PMC authorities and carry out study to identify the ERP
based Solutions requirements at PMC and incorporation of all the
existing modules working in the corporation.
b) The ERP based Solution requirements at PMC to include:
- Finance
- Fixed Assets
- Material Management
- Human Resource
- Employee Self Service
- Complaint Management
- Project Systems
- Fleet Management
- Integration to Systems Legacy
- Plus other modules found to be necessary by the consultant
during study.
c) Provide consultancy to implement “Single Window” Municipal services
to the Citizens of PMC.
d) Follow a single and integrated approach of all the PMC departments.
e) To inspect various branches of PMC, and collecting the data available
with PMC and Various Branches and analyzing the same. And then
prepare the tender document for the ERP based Solution
requirements at PMC.
f) Suggest appropriate specification for ERP based Solution.
g) Preparation of Tender, Tender Bill of Material (BOM) and Commercial
Format, Specifications, Estimated Cost, etc. for the ERP based
Solution at PMC.
h) Preparation of guidelines, qualification criteria, timelines, etc. for ERP
based Solution at PMC.
i) Evaluation of Bids received from 3r4 Party vendors for the ERP based
Solution.
j) Providing Supervision of services procured from successful Vendor for
commissioning of the ERP based Solution at PMC.
k) Providing Project Management Services required during the delivery,
development, installation and commissioning of the ERP based
Solution by the Successful Vendor.

Pune Municipal Corporation Page 123 of 143


Detailed Project Report for ERP based e-Governance

PMC would also appoint a High Power Committee to continuously monitor


the project and ensure that the end objectives are attained. PwC would be
asked to submit the reports to the High Power Committee, which would
meet every month to take a snapshot of the entire project.

PMC herewith undertakes to try to achieve following objectives


and outcomes specified in the NMMP guidelines:

Stakeholders
Key Measures Illustrative Targets
and Objectives
Citizens (Quality  Minimising the number of  Six monthly independent
of Service) customer visits citizen survey / feedback
 Reducing the time required for a period of five years
to request the service from the time of go-live
with 95% satisfaction
 Reducing the time required level with respect to
to deliver a service meeting the specified
 Reducing the fees and service levels
charges associated with a  95% resolution of
service grievances received
 Reducing the time spent by through the Grievance
the customer to follow-up Redressal Model within
and track the progress of the defined service level
the requested service
Municipalities  Enhancing existing  Growth in own revenues
(Process efficiency revenues by atleast 25% on year
and effectiveness)  Setting up new revenue to year basis for first
streams three years

 Reducing cost of processing  Banning of manual


transactions records

 Delivering intangible  Accrual based accounting


benefits (Boosting image of system
PMC as a service oriented
organization)
Service providers  Service Level Agreements  Deployment of a system
/ suppliers (Internal & External) for meeting the
(Monitoring & requirements contained
Evaluation of in the Right to
Quality of Service) Information Act
Funding agencies  Sustainability and  Revenue surplus
/ PPP players Government investment
(Economy) optimisation through PPP
models
 Return on Investment (ROI)
 Cost Benefits
Programme Office  %age of customers of each  Over 75% ciizens using
(Progress type using e-Governance alternate channels for
tracking) services accessing services of PMC
 %age of unicipal services  Over 75% citizens facing
transformed into e- services delivered using
Governance ICT
 %age of municipal service
information published over

Pune Municipal Corporation Page 124 of 143


Detailed Project Report for ERP based e-Governance

e-Governance
 %age of transactions of
each service executed
electronically

PMC also herewith undertakes to try and achieve following service


levels specified in the NMMP guidelines :

Key Objectives Key Goals


Financial  Revenue enhancement to achieve growth in revenues by
Sustainability atleast 25% on a year to year basis for first three years
 Use of PPP to make the project cost effective
Enhanced  Effective citizen redressal system with atleast 80%
Transparency and resolution of grievances within the defined service levels
Accountability  Deployment of system for meeting the requirements
contained in the Right to Information Act
 Banning of manual records
Process Reform  Online financial and management information system
through implementation of Accrual based double entry
accounting system
 Implementation of standards and guidelines suggested in
the design document through necessary policy decisions
by the General Body
Clearly Defines  Web Portal for PMC, linked to all other modules and
Citizen Service updated dynamically
Levels  Availability of forms, citizen charters, etc.
 Online submission of forms with immediate
acknowledgement
 Online Birth and Death Registration (individuals /
hospitals) in less than 15 minutes
 Online Calculation and payment of property tax in less
than 15 minutes
 Online Payment of utility bills (water bills) in less than 15
minutes
 Building approvals in time bound manner (Residential in
less than 7 days; Commercial and others in less than 15
days)
 Issue of Licenses in less than 5 days; renewal in less than
30 minutes
 Finalisation of Accounts through accrual based double
entry accounting system in less than 3 months
 Transparency in Development projects (information to
public within 1 day of project approval, physical and
financial progress with 5 days, request for public
comments for 7 days after project completion)
 E-Procurement
 Transparent and Accountable Grievance handling
(Immediate Acknowledgement through service points or
online, online monitoring)

Pune Municipal Corporation Page 125 of 143


Detailed Project Report for ERP based e-Governance

Annexure I : Business Process Re-engineering being undertaken at


PMC as a part of the project

Department /
BPRs Proposed
Module
 Standard Formats for Application
 Standard Formats for Outputs
 FIFO for application scrutiny
 Reduction table / administrative movements which don’t
Citizen add value to the scrutiny
Facilitation
 Generation of Rejection Note in case of incomplete
Module
application or negative scrutiny by the department
 Various services which are data based (and don’t require
departmental scrutiny) can be delivered directly at CFC
across the counter (eg. Duplicate Bills, No Dues
Certificates, etc.)
 Services like Duplicate Bill, Extract of Property, No Dues
Certificate to be given across the counter
 Printing of Single Bill / Demand Notice
Property Tax
 Alerts to be generated after Building Permission /
Completion Certificate. Use of Building data from Building
Permission database.
 Budget Provision verification for Project Approval or
Payment to be handled by System. File need not go to
Accounts Dept. for budget verification.
 System will check he budget provision for account head
and prompt if there are not enough funds. System will
not allow Payment Sanction if budget provision not
available.
Accounts
 Budget re-appropriation to be handled through the
system
 Standardized format for Payment Receipt
 Implementation of Accrual Based Double Entry System.
 System will have statutory compliance with respect to
Deductions & Returns
 Services like Duplicate Bill, No Dues Certificate, etc. to be
given across the counter
 Link with Property Tax for ensuring payment of Property
Tax. Citizen need not separately submit NOC from
Property Tax Dept.
Water
Connections  System to calculate size of Water Connection based on
various parameters like pressure in source line, length of
water connection, no. of families, etc.
 Road Digging Charges to be taken from the GIS system.
This will ensure that Road Department’s time is not
wasted in scrutinizing the application.
Food License  Linkage of Licenses with Property Tax record. Citizen

Pune Municipal Corporation Page 126 of 143


Detailed Project Report for ERP based e-Governance

need not separately submit NOC from Property Tax Dept.


 Services like Duplicate License, Renewal, No Dues
Certificate, etc. to be given across the counter
 Online Services (which are data based, and don’t require
departmental scrutiny) can be delivered directly at CFC
Web Portal
across the counter (eg. Duplicate Bills, No Dues
Certificates, etc.)
Building  NOC’s from different departments not to be taken if the
Permission required data is available in database
Grievance  Marking of the complaint to the action taking personnel
Redressal (i.e. Junior Engineer / Sanitary Inspector, etc.)
System  Automatic Escalation of Complaints
Hospital  Display of Patient Information through Web Portal
Management
System  Use of Patient history

Municipal
Secretary  Publishing of resolution through Web Portal
Module
Human
Resource  Centralised Payroll generation
Management
 Common Work-flow Management System for
departmental file movement
 SMS alert to citizen upon complaint Redressal or Service
Completion
 Printing of Single Receipt (No copy to be kept at PMC
Others
since the data is available in system)
 Use of Scanned signature of the sanctioning authority to
generate LoIs, Work Orders, etc.
 Linking of Dues of Property Tax / Water / License for
service delivery

Pune Municipal Corporation Page 127 of 143


Detailed Project Report for ERP based e-Governance

Flow-chart for the Citizen Interactions to be standardized in


following manner:

Citizen walks in the Citizen Service Center

Fills up the application in a standardized application


format & gives to the counter

Application require No
any other
document ?

Generate Necessary output (Duplicate Bill


Yes
/ LOI / Work Order / Certificate / License
Copy) and hand over to citizen

All documents No
attached ?

Yes

Accept payment (if required), Give Token Slip to Generate the Rejection
Citizen Note and hand over to
citizen

No
Departmental
Scrutiny reqd?

Yes

Pre-defined work flow from one officer to another


(Creation of role based organizational tree is required
for this purpose)

Objective, pre-defined scrutiny of the application

If the application requires scrutiny from different


departments, system should be able to handle it
internally, without citizen required to visit these
departments

System Generated output based on the scrutiny


decision (possibly with scanned signature of the
decision authority)

Pune Municipal Corporation Page 128 of 143


Detailed Project Report for ERP based e-Governance

Annexure II : Analysis of Existing Modules at PMC

PMC has undertaken various initiatives in last few years. Some of the initiatives
have been quite successful within the limited scope of the department. PwC
analysed these applications technically and functionally to see to it that the good
initiatives stay and get integrated with the proposed holistic e-Governance solution.

The parameters for assessment of each of the existing modules for their viability to
continue in parallel existence are given below:

Generic Parameters for all Modules


Maximum
Area Parameters
Score
The complete backend process has been automated 5
The Software Module and the Website/Web Portal are
5
integrated
An RDBMS is used at the backend 5
A 3-Tier Architecture is used for designing the Software
5
module
The Database Design (Normalized Data Model) allows
5
generation of standard and necessary reports
The module has been linked with the Accounts Module 5
Technical The Software module is interlinked with the other
5
modules like property assessment / license / water etc.
The Software module has been designed keeping in
mind interoperability options, so that it can be linked
4
easily to future applications like ERP, GIS, Data Mining
Capabilities
Master Data of the Software Module is available in
4
digitized (in Unicode) form
Data Search and Retrieval facility is available 2
TOTAL 45
The inputs and outputs have been standardized across
8
all applications concerning the Software module
All the process functionalities are captured by the
8
software module, and there is no manual dataflow
Functionality or Process changes can be captured with
Functional 5
minimal changes in software module
Scrutiny of all applications concerning the Software
5
module can be performed in an objective manner
New departmental services can be added with
4
incremental efforts

Pune Municipal Corporation Page 129 of 143


Detailed Project Report for ERP based e-Governance

TOTAL 30
All services are delivered through a Single Window
20
Citizen System
Centricity Citizens can track module related services on web 5
TOTAL 25

The score obtained by each of the modules by assessing through the table above
shall be called Score 1 (or SCR1)

Module Specific (Non-Generic) Parameters

Birth and Death

Maximum
Area Parameters
Score
Bill generation for Birth/Death certificate charges 10
Receipt generation against payment collected 10
Processes
Printing of Certificates 10
TOTAL 30
Registration of Birth 10
Registration of Death 10
Registrations of Still Birth 10
Registration of Adoption of Child 10
Correction of details in birth registration 5
Citizen
Correction of details in death registration 5
Services
Issuing Birth Certificate 5
Issuing Death Certificate 5
Issuing Cremation Certificate 5
Informing non-availability of Birth/Death certificates 5
TOTAL 70

Water Department

Maximum
Area Parameters
Score
Application Entry 10
Issuance of Letter of Intimation 10
Issuance of Work Order/Rejection Letter 10
Processes
Bill generation 10
Payment Collection 10
TOTAL 50

Pune Municipal Corporation Page 130 of 143


Detailed Project Report for ERP based e-Governance

New Water connection approval 15


Closing of connection (Disconnection) 10
Citizen Reconnection 10
Services Change of Ownership 10
Issuance of License for Plumber 5
TOTAL 50

Property Tax

Maximum
Area Parameters
Score
Processes Application entry 8
Issuance of Special Notice 8
Bill Generation 7
Payment Collection 7
Adjustments 6
Property Enhancements / Changes 6
Issuance of Demand Notice 5
Issuance of Warrant Notice 5
Issuance of Warrant Execution Letter 4
Objection entry against Special Notice
Total
Property Tax Assessment Certificate 10
Extract of Property 8
Permission for Property transfer through heredity 6
Citizen
Permission for Property transfer through other modes 6
Services
No due certificate for arrears of Property 6
Issuance of duplicate tax bills 4
TOTAL 40

Building Permission

Maximum
Area Parameters
Score
Application acceptance and issue token 10
Scrutiny of application 10
Processes DC Rule Verification 20
Printing of Permissions 10
TOTAL 50
Citizen Layout Approval 10
Services New Building Permission 10

Pune Municipal Corporation Page 131 of 143


Detailed Project Report for ERP based e-Governance

Revised Building Permission 10


Plinth Completion Certificate 10
Building Completion Certificate 10
TOTAL 50

Accounts

Maximum
Area Parameters
Score
Build chart of accounts 10
Cash Book maintenance 10
Bank reconciliation 10
Enter bank balances 8
Grouping of account heads 8
Receipts entry 6
Deposit slips 6
Processes Deposits 6
Grants 6
Bills and payment vouchers 6
Liability booking 6
Loans 6
Advances 6
TDS 6
TOTAL 100
The accounts module lacks citizen services parameter as it has minimal or no direct
interaction with the citizens.

Licenses (Market / Food)

Maximum
Area Parameters
Score
Application entry 10
Site inspection (details updation) 7
Processes Nomination 7
Hearing 6
TOTAL 30
Providing new license 10
Renewal of licenses 10
Permission of license transfer under nomination 7
Citizen
Permission of license transfer under selling of business, 7
Services
partnership and by other means
Change in name of business / profession 7
Change of business / profession 7

Pune Municipal Corporation Page 132 of 143


Detailed Project Report for ERP based e-Governance

Addition / deletion of partners 7


Increase / reduction in lines of business 7
Cancellation of license 4
Issuance of duplicate copy of license 4
TOTAL 70

Works Management System

Maximum
Area Parameters
Score
Budget Provision Validation 5
Block Estimation
 Identification of different items, defining units 5
 Selection of DSR / ESR / WSR rates 5
 Preparation of Measurement Sheet, Abstract Sheet, 10
Rate Analysis, etc.
 Defining various Milestones 5
Technical Sanction through workflow 10
Administrative Sanction through workflow 10
Tendering
 Generation of Tender Notice & Document 2
Processes 2
 Uploading of the Documents on Web Portal
 Capture of details of Tender Sale 2
 Technical Bid Evaluation 2
 Commercial Bid Evaluation 2
Project Execution
 Maintenance of Measurement Book 10
 RA Bill 10
 Billing for Extra Items 5
Completion Certificate 5
Various MIS Reports 10
TOTAL 100

Web Portal

Maximum
Area Parameters
Score
Define grievance types and subtypes 10
Define citizen charter 10
Processes
Action taken reports by concerned officers 10
Define workflow with durations 10

Pune Municipal Corporation Page 133 of 143


Detailed Project Report for ERP based e-Governance

Changes in workflow possible with ease 10


Grouping of grievances 10
Automatic escalation of complaints 10
TOTAL 70
Lodging of grievances through CFC & Web 15
Citizen Status enquiry of the grievance lodged through CFC & 15
Services Web
TOTAL 30

The score obtained by each of the modules after assessing through the table above
that is specific for that particular module shall be called Score 2 (or SCR2)

The overall score of a module that has been assessed through the generic
parameters and the module specific parameters would be the sum of 60% of the
generic parameter assessment score (SCR1) and 40% of the non-generic (module
specific) parameter assessment score (SCR2). Thus the overall score would be:

Overall Score = 60% of SCR1 + 40% of SCR2

PMC’s Consultant recommended that the module be retained if the Overall Score is
atleast 70. Even for the qualified modules, PwC would identify areas of
improvement and customization areas for integrating these modules with the
proposed e-Governance solution at PMC.

Score of various existing e-Governance solutions at PMC are given below:

Sr. No. Modules Over all Score


1 AutoDCR 81.6
2 Octroi 70
3 WMS 68
4 Licenses 64.2
5 Tender Cell 45.2
6 Accounts 45.4
7 Property tax 41.8
8 Birth & Death 42
9 Water Department 22
10 Web Portal 20.4

Pune Municipal Corporation Page 134 of 143


Detailed Project Report for ERP based e-Governance

Annexure III : Specifications for IT Infrastructure Components

A] Racks : For housing of all the Server Components


• 40” 42U racks , to be mounted on the floor with proper floor mounting kits.

• The racks should conform to EIA-310 Standard for Cabinets, Racks, Panels
and Associated Equipment and accommodate industry standard 19” rack
mount equipment.

• Front and Back doors should be perforated with atleast 63% or higher
perforations.

• All racks should be OEM racks with Adjustable mounting depth, Multi-
operator component compatibility, Numbered U positions, Powder coat paint
finish and Protective grounding provisions.

• All racks should have dual power strips, and redundant cooling fan sets.

• All racks must be lockable on all sides with unique key for each rack.

• All racks should have Two Modular Power Distribution Units for a minimum off
10 number of devices, Mounting Hardware 2 Packs, Blanking Panel.

• Racks should also have a provision for cable entry from the top.

• Server Racks should have the following things in addition to the above
mentioned hardware
o Rack mount Keyboard and Monitor
o PS/2 Interface adapter
o USB Interface adapter
o Serial Interface adapter with power supply

• The racks must have steel (solid / grill / mesh) front / rear doors and side
panels. Racks should NOT have glass doors / panels.
• Both the front and rear doors should be designed with quick release hinges
allowing for quick and easy detachment without the use of tools.
• Racks should have Rear Cable Management channels, Roof and base cable
access
• Racks should be compatible with floor-throw as well as top-throw data centre
cooling systems.
• KVM Switch should be IP based and 1 KVM switch per cluster of racks is
required
• Bidder shall only quote for rack & PDU from brands of APC, IBM, Dell and HP.

Pune Municipal Corporation Page 135 of 143


Detailed Project Report for ERP based e-Governance

Physical Specifications

• Enclosure dimensions, rack mounting compatibility and weight load ratings:

Internal EIA-310 External External External Static Dynamic


Height Height Width Depth Rating Rating

42U 19” 1991mm 600mm 1070mm 1364kg 1023kg


(78.40”) (23.62”) (42.13”) (3000lbs) (2250lbs)

B] Center Core Switch


• Hardware Architecture (Rack mountable)
o Redundant Supervisor / Switching / Routing engine. The switching &
routing performance claimed on the chassis should not degrade with
failure of any one of the switching/routing engine modules. Redundancy
should be on supervisor on different switching fabric.
o Internal Redundant Power Supply
o Power supply 230 Volt 50Hz input
o Modular Chassis

• Interfaces / Slots
o Minimum 8 Slots
o 4 x 48 Ports GE (10/100/1000Mbps) and upgradeable
o 1 x 24 Ports Gig Fibre

• Performance
o High back plane speed 600 GBPS or more
o Forwarding rate should be 200- 300 Mpps (non-blocking)

• L2 Features
o IEEE 802.1Q VLAN encapsulation
o 802.1s
o 802.1w
o IGMP snooping v1 and v2

• IP Routing Protocols
o Static Routing
o OSPF
o RIP
o HSRP /VRRP
o IPv6 support

Pune Municipal Corporation Page 136 of 143


Detailed Project Report for ERP based e-Governance

• Security
o Standard and extended ACL’s on all ports
o AAA and RADIUS authentication

• Manageability & Up gradation


o Console port for administration & management
o Support SNMP v1, v2
o Support management using CLI, GUI using Web interface
o Support FTP/TFTP for upgrading the operating System

• Standards
o IEEE 802.1x support
o IEEE 802.3x full duplex on 10BASE-T and 100BASE-TX ports
o IEEE 802.1D Spanning-Tree Protocol
o IEEE 802.1p class-of-service (CoS) prioritization
o IEEE 802.1Q VLAN
o IEEE 802.3 10BASE-T specification
o IEEE 802.3u 100BASE-TX specification

C] Firewall
• Physical attributes
o Should be mountable on 19” Rack
o Modular Chassis
• Interfaces
o 4 x GE
o Console Port : 1 number
• Performance and Availability
o Encrypted throughput: minimum throughput of 1.5 Gbps
o Concurrent connections: up to 10,000 numbers
o Simultaneous VPN tunnels: up to 10,000 numbers
• Protocols
o TCP/IP, PPTP
o RTP
o IPSec, GRE, DES/3DES/AES
o PPPoE, EAP-TLS, RTP
o FTP, HTTP, HTTPS
o SNMP, SMTP
o DHCP, DNS

Pune Municipal Corporation Page 137 of 143


Detailed Project Report for ERP based e-Governance

o support for IPv6

• Other support
o 802.1Q, NAT, PAT, IP Multicast support, Remote Access VPN, Time
based Access control lists, URL Filtering, support VLAN, Layer 2 Firewall,
Virtual Firewall, Radius/ TACACS
• Management
o Console, Telnet, SSHv2, Browser based configuration
o SNMPv1, SNMPv2, SNMP v3

D] Intrusion Protection System (IPS)


• Features
o Layer 7 Throughput of 1 Gigabit or more
o Minimum 4 Numbers of Gigabit segments support. Option for future
expansion to add 2 more Gigabit segments should be provided.
o Should support fail-open to four Gigabit segments in case of hw/sw
failure
o Should protect against DoS/ DDoS / SYN-flood/ TCP-flood /UDP-flood
o Capable of applying the security policies based on VLAN ID,
Source/Destination subnets
o Should protect against SSL based attacks by integrating with external
high capacity SSL accelerators.
o Should support peer to peer traffic detection & blocking and rate
shaping for P2P traffic.
o Should support bandwidth management and QOS provisioning
o Should protect against XML based crafted messages

• Action on detection
o Block attacks in real time, Drop Attack Packets, Packet Logging
o Reset Connections, Action per Attack
o Support for detailed intrusion alarms

• Stateful Operation
o TCP Reassembly
o IP Defragment
o Bi-directional Inspection
o Forensic Data Collection
o Access Lists
• Signature Detection
o Vendors Signature Database – min. 1500 signatures
o Device should have capability to add User Defined Signatures

Pune Municipal Corporation Page 138 of 143


Detailed Project Report for ERP based e-Governance

o Should support Automatic signature synchronization from OEM database


server on web
• Extensive protocol monitoring: should support monitoring of protocols such
as TCP/IP, ICMP, FTP, UDP, SMTP, HTTP, SNMP, DNS, RPC, NetBios, Telnet
etc
• Should also have the ability to monitor 802.1 (trunked) traffic.
• Alerting SNMP, SMTP support
o Log File, Syslog support

• Management
o Console, SSH, Telnet, HTTPS, HTTP, SNMP v1, v2, v3

E] Database Server
• 2 X 64 bit RISC / EPIC processors with 1.4 GHz or above Processor should
be latest series/generation for the server model being quoted
• Support for either of 64bit LINUX / UNIX / Windows Operating System, with
cluster support
• Cache to be min 4MB per processor/ on chip
• Minimum 4 GB ECC Fully Buffered DDR2/SDRAM Memory to be offered per
processor/ core
• 4 x 140 GB(or higher) SAS/Ultra III SCSI hot plug drives (15k rpm)
• 4 Ethernet Ports of 10/100/1000 Mbps
• Fiber Channel adapters/ports 2 x 4GBps
• PCI cards and slots should support hot-plug feature
• All cards should be on 64 bit PCI-X/PCI-e slots.
• 1 DVD Drive;
• 1 DAT Drive (36/72GB)
• Dual Redundant Power Supply;
• Provision for remote Management
• RAID Controller supporting RAID 0, 1, 5

F] Application / Web Server (Blade Servers)


• 7U to 12U Rack-mountable
• Hot Swappable, redundant power supply
• Blade Specifications:
o Blade can be half/full height

Pune Municipal Corporation Page 139 of 143


Detailed Project Report for ERP based e-Governance

o 2 Quadcore 2.3 Ghz/ 2 Dual core @ 3GHz with 4 MB shared L2 cache,


1333 MHz FSB
or
o 2 Dual Core RISC/1 Quad Core RISC/EPIC CPU @ 1.2 Ghz or more
o 4 GB DDR2 RAM with 2 No’s free slots for future expandable capability.
o Memory upgradeable to atleast 16 GB or higher per blade.
o The Blade should have redundant 1 Gbps Fiber Channel HBA
o 2 X (1000BASE-T) Tx Gigabit LAN ports support on blade server
o 4 X 144GB HDD hot plug system disk with mirroring using integrated
RAID 0,1,5 on internal disks
o VGA/Graphics port
o Support for either of 64bit LINUX / UNIX / Windows Operating System,
with cluster support

G] Domain Server
• Minimum 2x Quad core processor with 2.1Ghz or above with 1066Mhz FSB
expandable to four physical processor with 2MB l2 cache per processor
• Minimum Memory: 4 GB, Scalability to 16 GB
• HDD 4x146GB 2.5" 10K RPM HDD or More
• Redundant Power Supply
• 2 x 10/100/1000 Mbps Ethernet Ports
• RAID Controller with RAID 0/1/5 with 256 MB cache and does not occupy any
PCI slot
• 16x DVD ROM
• Server components should be UL, FCC, IEC,EN and ROHS complied.
• Rack Mountable - 4 U maximum
• Windows 2008 OS (Standard Edition)

H] SAN
SAN SWITCH

• Minimum 8 Active ports (each with minimum port speed 4Gb) scalable to 16
ports within same switch
• All cable and accessories for connecting Servers /Devices to SAN
• Should have capability of ISL trunking.
• Should have optical transceivers for short wave and long wave
• Should have dual Fans and Hot plug power supplies

Pune Municipal Corporation Page 140 of 143


Detailed Project Report for ERP based e-Governance

• Should have web based management software for administration and


configuration
• Should support zoning configuration
• All other necessary fibre cables and racking accessory should be supplied

SAN Storage

• Dual active-active storage Controllers and SAN raid array and accommodate
at least 10 or more FC hard disks in an end-to-end 4 Gbps architecture.
• The storage array should support industry-leading Operating System
platforms and clustering including : Windows Server 2003 (enterprise
Edition), Sun Solaris, HP-UX, IBM-AIX, LINUX/ UNIX etc.
• The storage array shall be configured with atleast 4 GB cache of total cache
mirrored across with dedicated interface / paths communication between two
storage controllers .
• All the necessary software to configure and manage the storage space, RAID
configuration, logical drives allocation, virtualization, snapshots (including
snapclones and snap mirrors) for configured capacity etc.
• Redundant and hot swappable power supplies, batteries and cooling fans and
data path and storage controller.
• Load balancing must be controlled by system management software tools
• Multi-path & Load balancing software for all SAN connected servers shall be
provided.
• The storage array must have complete cache protection mechanism either by
de-staging data to disk or providing complete cache data protection with
battery backup for upto 72 hours or more.
• The offered system should be pre-configured with at least 1 TB of useable
Storage Capacity. The Storage should have at least 4 Gbps port bandwidth
for the connectivity to servers and at least 4 Gbps port bandwidth
(aggregated) for disk connectivity.
• Storage should support hardware based RAID with all the RAID levels( 0, 1 ,
5)
• The storage array must have capability to do array/Controller based remote
replication.
• The system array should support synchronous and asynchronous replication.
• Storage should be scalable upto atleast 4 TB.

I] NAS
• Rack Ready, minimum 2.60GHz CPU
• Minimum 4GB Memory

Pune Municipal Corporation Page 141 of 143


Detailed Project Report for ERP based e-Governance

• 4*10/100/1000 Ethernet Ports,


• Storage space of minimum 1 TB, scalable upto atleast 4 TB
• Storage should support hardware based RAID with all the RAID levels( 0, 1 ,
5)
• Redundant and hot swappable power supplies, and cooling fans and data
path and storage controller.

J] UPS
• Input Standard Voltage, 380 /400 / 415 V 3 Phase, 3 or 4 wire, +10 %, -
15%
• Input Frequency, 50 Hz, +5% or -5%
• Output Steady State Voltage, 380 / 400 / 415 V +1% or -1%
• Output Frequency, 50 Hz, +0.25Hz to 0.5Hz
• Output Transient Voltage Stability, < 5% or –5% for a load change from 0%
to 100%
• Overload – 125% for 10 minutes and 150% for 60 seconds
• Efficiency at full rated load, Not less than 90%
• Total Harmonic Content – With Linear Load < 2% for 100 % linear load and
with 3:1 Crest factor load < 5%
• Input Harmonic Filter (for <10% Input current distortion)
• DC ripple (with & without Battery connected) < 1%
• Built In power factor correction
• Automatic shutdown of component for longer power outages
• Monitoring and logging the status of the power supply
• Displaying the voltage/current draw of the component
• Automatic restarting of component following a power outage
• Displaying the current voltage on the line
• Providing alarms on some error connections
• Providing protection against short circuits
• Operating Temperature range - 0 to 40 Celsius, Maximum 50 Celsius for not
more than 8 hrs
• Design compliance with IEC and ISO
• Software that must be installed and integrated suitable operating system
• Supplies True Online UPS Power
• Non-Linear load compatible
• Capability to handle high Crest Factor load

Pune Municipal Corporation Page 142 of 143


Detailed Project Report for ERP based e-Governance

• Ventilation- Air cooling with Integral Fans


• Built in Reliability & High Efficiency
• Low Audible Noise
• Compact Footprint
• Front Access for easy Maintenance
• The power factor of the UPS system shall be at 0.9 at all load conditions
• Input Current Harmonics < 10%
• The battery circuit breaker MCCB shall have O/L and U/V protection.
• PDU with isolation transformer shall be used for power distribution inside the
data center if the UPS location is more than 30 metres from the Data center.
• The UPS shall have built in isolation transformer for re-referencing and to
limit neutral- ground voltage to 1.50 volts as stipulated by server
manufactures.
• Battery Backup of 120 minutes (with SMF Batteries)

Pune Municipal Corporation Page 143 of 143

You might also like