You are on page 1of 34

The Scientific Estimating System

ildSYSTEM
Bu
Building Construction Cost Solution

2008

Information Set

Jointly Developed & Owned by :

USA INDIA

Integrated Project Management Group Pvt. Ltd.


23, Community Centre, East of Kailash, New Delhi - 110 065
Tel : 4658 1560 (4 Lines) z Fax : 4658 1564
E-mail : info@ipmg.net.in z Website : www.buildcost - ipmg.com
Developing Uniformity in Databases & Systems for the Construction Industry
In technical collaboration with RS Means, USA.
BuildSYSTEM – Table of Contents

S. No. Enclosure Page

1. Foreword 1

2. Messages 2

3. BuildSYSTEM - An Overview 4

4. BuildSYSTEM - Linkage with Item of Work, Analysis 7


and Material Rate Breakup

5. MasterFormat - Titles in Levels 1 & 2 8

6. BuildSYSTEM - Titles in Levels 1 , 2 & 3 10

7. BuildSYSTEM - Selected CD Screens ( 10 Nos.) 12

8. BuildSYSTEM Report - Detailed Estimate from IPMG SOR 17

9. BuildSYSTEM Report - Estimate from IPMG SOR 18

10. BuildSYSTEM Report - Estimate from CPWD DSR 19

11. BuildSYSTEM Report - Head wise Estimate from IPMG SOR 20

12. BuildSYSTEM Report - Head wise Estimate from CPWD SOR 21

13. BuildSYSTEM Report - Estimate Breakup from IPMG SOR 22

14. BuildSYSTEM Report - Component Rate Breakup from IPMG SOR 23

15. BuildSYSTEM Report - Manufacturer Wise Material Rates from IPMG SOR 24

16. BuildSYSTEM Report - List of Manufacturers in Material Database 25

17. BuildSYSTEM Report - Analysis of Rate from IPMG SOR 26

18. BuildSYSTEM Report - Analysis of Rate from CPWD DSR 28

19. BuildSYSTEM - Partial List of Buyers 30

20. BuildSYSTEM - Online Presentation, Training & Support 31

21. BuildSYSTEM - Order Form 32


Foreword

S. B. Mookherjee EX-MINISTER OF STATE


STATISTICS &
PROGRAMME IMPLEMENTATION,
PLANNING, ATOMIC ENERGY, SPACE
AND COMMERCE & INDUSTRY
GOVERNMENT OF INDIA
NEW DELHI

The last decade has seen our country take giant strides in development. Infrastructure and construction
industry are integral part of this development process. The 10th Plan envisages a growth of 8% in the
GDP. This requires development of infrastucture projects in power, road (highways and rural road
connectivity), telecommunications, petroleum exploration and refining, railways, irrigation sectors,
etc. at a faster pace. The role of the construction industry in the infrastructure development is well
recognised. It is imperative that the performance of these industries should be not only at par with the
technological advances, but also match the efficiency of the modern management practice.

Another important factor is the integration of the Indian economy with the global economy, through the
processes of liberalisation and globalisation. This has enabled many multinational organisation to
participate in the process of development, both directly and in collaboration with local firms. In this
context, the need for a level playing field,common and consistent parameters, reliable cost databases
cannot be overlooked. The Government's objectives of minimising time and cost overruns, maximising
quality and optimising the utilisation of resources can be achieved through standardisation of cost
estimation procedures.

In this background, the publication BuildCOST: Building Construction Cost Data (Book + CD), is a
welcome step. For an industry, which has largely relied on an unorganised schedule of rates, this
would be a giant leap forward. This book has itemised works under 16 divisions, based on the
internationally accepted MasterFormat system, which most of the multinationals currently operating
in India are familiar with. The 16 divisions cover the entire range of activities in the construction industry,
including electrical, mechanical and air-conditioning, amongst others.

This book facilitates easy referencing by the client organisations, architects , consultants and the
constructors. It would enable the development of in-house databases by minimising the efforts for
every new project or venture. Moreover, the concomitant CD provides enough flexibility to add, wherever
required, items which are special in nature or specific to any region. This would be updated on an
yearly basis initially, but subsequently on a quarterly basis. This will help cost estimation of construction
projects at the prevalent prices.

My heartly congratulations to Integrated Project Management Group (IPMG) and Tata McGraw-Hill
Publishing Company Limited for publishing BuildCOST, which I believed will prove to be a powerful
tool of immense use to the clients, consultants, and the project owners, both in the public and private
sectors. This will add a 'new quality dimension' in project management in the country.
I hope that the construction industry will, by and large, benefit from this publication.

S. B. MOOKHERJEE
Messages
Shri. K. C. Pant
Ex - Deputy Chairman
Planning Commission
Govt. of India

“I have glanced through the publication “Build COST - Building Construction Cost Data”. I have no
doubt that it will prove to be a very useful practical guide for all those involved in formulation, imple-
mentation, evaluation and monitoring of construction projects.

I congratulate Integrated Project Management Group and Tata McGraw Hill Publishing Company
Limited for bringing out this publication ”.

Shri. Arun Jaitley


Ex -Union Minister for
Commerce & Industry
Govt. of India

“I have no doubt that BuildCOST will prove to be a powerful tool of immense use for all those
involved in formulation, implementation evaluation and monitoring of construction projects.

I complement Integrated Project Management Group (IPMG) and Tata Mc-GrawHill Publishing
Company Ltd. for bringing out this publication.”

Shri. Bandaru Dattatraya


Ex - Minister of State for
Urban Development
Govt. of India

“The compilation & analysis of Building Construction Cost Data, commonly known as Schedules
of rates have generally been in the domain of the Government Public Works Departments in the
Country.

I am happy to see that a Private Sector entity like the Integrated Project Management Group
(IPMG) has brought out a publication titled, "BuildCOST : Building Construction Cost Data" which
covers the entire range of activities in the Construction Industry, including electrical, mechanical
and air-conditioning works. Based on the internationally accepted MasterFormat System, and
being available on an electronic platform, BuildCOST will benefit the Construction Industry in the
country.

I congratulate the Integrated Project Management Group in this laudable endeavour. ”


Messages

SHEILA DIKSHIT
CHIEF MINISTER
GOVT. OF NATIONAL CAPITAL TERRITORY OF DELHI

I am happy to learn that the Integrated Project Management Group has conceived and developed
building construction cost data and based on it, is bringing out a comprehensive book and CD for
use by interested groups and individuals.

I appreciate the efforts made by IPMG and Tata McGraw Hill and wish their forthcoming
publication all success.

Shri. Tarun Das


Ex -Director General
Confederation of Indian Industry

“ Against this backdrop, I am delighted to note that the Integrated Project Management Group (IPMG)
and Tata McGraw Hill Publishing Company has launched the BuildCOST - Building
Construction Cost Data, which includes the costs of items in the entire gamut of the building
construction industry.
I am sure this publication could be of immense help in making estimates & managing the cost of the
projects. ”

Shri. Deepak Parekh


Chairman
Housing Development Finance Corporation

“Standardisation is the key. The industry needs to rise to the occasion to meet the emerging
challenges, by enhancing productivity, introducing new technology, developing a comprehensive
market data on construction activity, adapting best management practices and modernisation.
I am happy to note that the Integrated Project Management Group (IPMG) and Tata McGraw Hill are
publishing 'BuildCOST' based on MasterFormat which is a scientific costing manual based on the
international practice for costing and estimation developed with inputs from top consultants in
several fields. This, I am sure, will serve as a useful guide for all those involved in the industry of
building and construction projects and will also help enhance communication across the industry.
My congratulations to all those involved in this marathon project and best wishes for the future. ”
BuildSYSTEM – An Overview

Integrated Project Management Group Pvt. Ltd.

IPMG, since 1985, has been providing project management services, for building projects, to various
clients, right from concept stage through construction and completion. IPMG believes in the total
project management concept, covering planning and systems, scheduling, monitoring and control,
with main emphasis on project cost and time.

IPMG and R.S. Means, USA have jointly developed a comprehensive database on construction
costs and products, based on MasterFormat, which is the international numbering & titling system.
The technical collaboration between IPMG and R.S. Means, USA has been approved by the
Ministry of Commerce & Industry , vide their letter no. 51 (2004) / 31 (2004) / PAB-IL, dated
30th July, 2004. The Ministry’s approval is for “Database Development for Construction Industry”.

R.S. Means, USA – The Authority in Cost Data :

R.S. Means is North America’s leading provider of and authority on construction costs. For more
than 60 years, project planners have drawn on R.S. Means products and services for up-to-date,
comprehensive cost data for accurate estimating, based on MasterFormat. Data covers every aspect
of construction and is delivered in a variety of formats. Offerings include cost guides, reference
sources, consulting, databases, software, seminars, training, and insurance services. For further
information, visit their website www.rsmeans.com

MasterFormat – The International Numbering and Titling System :

MasterFormat is a master list of numbers and titles classified by work results or construction practices,
primarily used to organize project manuals, organize detailed cost information, and relate drawing
notations to specifications.

Construction projects use many different kinds of delivery methods, products, and installation methods,
but one thing is common to all – The need for effective teamwork by the many parties involved to
ensure the correct and timely completion of work. The successful completion of projects requires
effective communication amongst the people involved, and that in turn requires easy access to essential
project information. Efficient information retrieval is only possible when a standard filing system is
used by everyone. MasterFormat provides such a standard filing and retrieval system that can be
used throughout the construction industry.

MasterFormat is a product of The Construction Specifications Institute (CSI), USA. For further
information, visit their website www.csinet.org

CSI, USA has developed industry standard documents comprising :

• The Project Resource Manual - 5th Edition, Published by McGraw - Hill, USA.
• Formats - MasterFormat, UniFormat, SectionFormat and PageFormat.
• Uniform Drawing System.
BuildSYSTEM – An Overview

BuildSYSTEM – The Scientific Estimating System :

IPMG and RS Means have developed BuildSYSTEM , which is a construction cost database, with an
estimating software. The major features of BuildSYSTEM are :

• Comprises of the following construction cost databases :

- IPMG’s 5000 Items of Work relating to civil , plumbing , electrical , mechanical and HVAC
- 2008, with Analysis of Rates .

- CPWD’s Delhi Schedule of Rates - 2002, with Analysis of Rates .

- Ministry of Road Transport & Highway’s Standard Data Book – 2003, with
Analysis of Rates.

• The codification of all the items of work, materials, labour and equipments, in BuildSYSTEM,
is in 12 digits. The first 5 digits, for grouping, are based on MasterFormat. The next 3 digits, for
further grouping, are based on R.S. Means system. The last 4 digits are IPMG specific, based on
the description of the items of work, materials , labour and equipments , as specified in India .

• The analysis of rates include coefficients and rates of all the materials, labour and equipments in
the analysis.

• Allows quick preparation of estimates by entering quantities in the items of work.

• Gives an estimate breakup , which totals all the materials, labour and equipments, with quantities,
rates and amounts , in the estimate .

• Facility to modify coefficients and change rates of materials, labour and equipments in analysis
and estimate. Also to add and remove materials, labour and equipments in analysis.

• Facility to change overhead percentage in items of work individually, and also in the estimate
collectively. Also, add additional taxes ie VAT , excise , octroi etc.

• Facility to copy the items of work and analysis from the master database, modify them and create
new items of work and analysis.

• The master section includes location master, unit conversion , unit master , tax setup ,
manufacturer master , vendor master , component master ( materials, labour and equipments ),
item master and import component.

• The 4,500 material rates, in IPMG database, are linked to price lists from over 100 manufacturers
and 110 vendors. IPMG updates these material rates on a yearly basis. The user can also update
them by contacting the manufacturers and vendors, whose contact details are given in
BuildSYSTEM. There is also a provision to add new manufacturers and vendors to the material
rates.

• The user can digitally import his items of work, materials, labour and equipments from their project
file, in MS-Excel, into BuildSYSTEM.
BuildSYSTEM – An Overview

• Facility to generate various reports in different coding systems i.e. 12 digits, user defined, or
with no code. All reports can be exported to Ms-Excel for customization.

• Has a demo, help messages and a user manual.

The 12 Digits Codification System in BuildSYSTEM:

All the items of work, materials, labour and equipments , in BuildSYSTEM CD , have been
codified in 12 digits, based on MasterFormat, R.S. Means and IPMG coding system. An
example is given below :

Number Title Source


Level 1 - 04 Masonry - MasterFormat
Level 2 - 04200 Masonry Units - MasterFormat
Level 3 - 04210 Clay Masonry Units - MasterFormat
Level 4 - 04210 130 Brick Masonry, - R. S. Means
Conventional Bricks
Level 5 - 04210 130 3610 Description of Work / Product - IPMG

Contributors to BuildSYSTEM Cost Database :

The following professionals have contributed to the development of BuildSYSTEM cost


database :

1 Dr. Vinod Gupta Architect


2 Dr. Rommel Mehta Architect
3 Mr. A. R. Ramanathan Architect
4 Mr. Anurag Roy Architect
5 Mr. T. P. Wadhwani Construction Management Consultant
6 Mr. Karan Mahajan Consulting Engineer, Civil
7 Mr. K. A. Patel Consulting Engineer, Civil
8 Mr. S. G. Deolalikar Consulting Engineer, Plumbing
9 Mr. Phani Kumar Consulting Engineer, Plumbing
10 Mr. Harsha Anne Consulting Engineer, Electrical
11 Mr. Navin Krishen Consulting Engineer, Electrical
12 Mr. Nirmal C.Gupta Consulting Engineer, Mechanical
13 Mr. G. C. Modgil Consulting Engineer, Mechanical
14 Mr. T. K. Ramanathan Chief Consultant, IPMG
15 Mr. Shyam Kishore Chief Engineer (Retd.), CSQ, CPWD
16 Mr. Ram Bhatia Executive Engineer (Retd.), Civil, CPWD
17 Mr. Dina Nath Vig Executive Engineer (Retd.), Civil (Plumbing), CPWD
18 Mr. Sarup Singh Executive Engineer (Retd.), Electrical, CPWD
19 Mr. Kanshi Ram Executive Engineer (Retd.), Electrical (Mech), CPWD
20 Mr. K. K. Singhal Asst. Engineer (Retd.) Civil, CPWD
21 Mr. T. P. S. Verma Asst. Engineer (Retd.) Civil, CPWD
BuildSYSTEM - Linkage with Item of Work , Analysis and Material Rate Breakup

Project Name : Demo Project Estimate : Estimate 1


Description : Demo Project Description : Estimate 1
Printed On : 8-Jan-08
Table A : Item of Work
Bare Total
SNo Qty Code Description UOM OHP
Material Labour Equip. Others InclOHP

1 1 04210 130 3610 Providing brick work with bricks of class Cum 1530.03 350.60 17.50 0.00 284.72 2182.85
75, joints finished flush/raked to 12 mm
depth, cured including necessary
scaffolding complete in cement mortar 1:6
with coarse sand, in : Foundations and
plinths (1.5 m below and upto 1.2 m above
GL)
1530.03 350.60 17.50 0.00 284.72 2182.85

Table B : Analysis
Row Code Description UOM Qty. Rate Amount
M1 03060 020 1010 Ordinary Portland Cement Grade 43 Tonne 0.0630 5555.00 349.97
M2 02720 220 5010 FPS Bricks class 75 Thsd. 0.4940 2070.00 1022.58
M3 02455 220 5010 Coarse Sand ( Zone III ) Cum 0.2680 587.60 157.48
L1 01570 400 0100 Common Labour Day 1.6797 125.00 209.96
L2 01570 400 1100 Mason Grade - II Day 0.6641 180.00 119.54
L3 01570 400 0200 Semi - Skilled Labour Day 0.1563 135.00 21.10
E1 01590 400 0200 Concrete Mixer 0.14 Day 0.0125 1400.00 17.50
Total Cost 1898.13
OHP 284.72
Total Cost Incl OHP 2182.85

Table C : Material Rate Breakup


Sl.No. Mat Code Description UOM
1 03060 020 1010 Ordinary Portland Cement Grade 43 Tonne

Sl.No. Manufacturer Manufacturer Name Location Rate Before


Code Discount
1 BIR003 Birla Cement Ltd Ghaziabad 5500.00

Sl.No. Manufacturer Vendor Code Vendor Name Location Rate Before Disc. Rate After Discount
Code Discount %
1 BIR003 BUI001 Biloman Jain & Co. New Delhi 5500.00 0.00 5500.00

Rate Before Tax: 5500.00

Tax/Charges:
Tax Description Add / Sub. Value / %age / Formula Amount
1 Cartage Add R0 * 1 /100 55.00
Rate After Tax 5555.00
MasterFormat - Titles in Levels 1 & 2

01 GENERAL REQUIREMENTS 05 METALS


01100 Summary 05700 Ornamental Metal
01200 Price & Payment Procedures 05800 Expansion Control
01300 Administrative Requirements 05900 Metal Restoration & Cleaning
01400 Quality Requirements
06 WOOD AND PLASTICS
01500 Temporary Facilities & Controls 06050 Basic Wood & Plastic Materials & Methods
01600 Product Requirements
06100 Rough Carpentry
01700 Execution Requirements 06200 Finish Carpentry
01800 Facility Operation 06400 Architectural Woodwork
01900 Facility Decommissioning 06500 Structural Plastics
02 SITE CONSTRUCTION 06600 Plastic Fabrications
02050 Basic Site Materials & Methods 06900 Wood & Plastic Restoration & Cleaning
02100 Site Remediation 07 THERMAL AND MOISTURE PROTECTION
02200 Site Preparation 07050 Basic Thermal & Moisture Protection Materials
02300 Earthwork & Methods
02400 Tunneling, Boring & Jacking 07100 Dampproofing & Waterproofing
02450 Foundation & Load-Bearing Elements 07200 Thermal Protection
02500 Utility Services 07300 Shingles, Roof Tiles & Roof Coverings
02600 Drainage & Containment 07400 Roofing & Siding Panels
02700 Bases, Ballasts, Pavements & Appurtenances 07500 Membrane Roofing
02800 Site Improvements & Amenities 07600 Flashing & Sheet Metal
02900 Planting 07700 Roof Specialties & Accessories
02950 Site Restoration & Rehabilitation 07800 Fire & Smoke Protection
07900 Joint Sealers
03 CONCRETE
03050 Basic Concrete Materials & Methods 08 DOORS AND WINDOWS
03100 Concrete Forms & Accessories 08050 Basic Door & Window Materials & Methods
03200 Concrete Reinforcement 08100 Metal Doors & Frames
03300 Cast-In-Place Concrete 08200 Wood & Plastic Doors
03400 Precast Concrete 08300 Specialty Doors
03500 Cementitious Decks & Underlayment 08400 Entrances & Storefronts
03600 Grouts 08500 Windows
03700 Mass Concrete 08600 Skylights
03900 Concrete Restoration & Cleaning 08700 Hardware
08800 Glazing
04 MASONRY
08900 Glazed Curtain Wall
04050 Basic Masonry Materials & Methods
04200 Masonry Units 09 FINISHES
04400 Stone 09050 Basic Finish Materials & Methods
04500 Refractories 09100 Metal Support Assemblies
04600 Corrosion - Resistant Masonary 09200 Plaster & Gypsum Board
04700 Simulated Masonry 09300 Tile
04800 Masonry Assemblies 09400 Terrazzo
04900 Masonry Restoration & Cleaning 09500 Ceilings
09600 Flooring
05 METALS 09700 Wall Finishes
05050 Basic Metal Materials & Methods 09800 Acoustical Treatment
05100 Structural Metal Framing 09900 Paints & Coatings
05200 Metal Joists
05300 Metal Deck 10 SPECIALITIES

05400 Cold-Formed Metal Framing 10100 Visual Display Boards

05500 Metal Fabrications 10150 Compartments & Cubicles

05600 Hydraulic Fabrications 10200 Louvers & Vents

05650 Railroad Track & Accessories 10240 Grills & Screens


MasterFormat - Titles in Levels 1 & 2

10 SPECIALITIES 12 FURNISHINGS
10250 Service Walls 12800 Interior Plants & Planters
10260 Wall & Corner Guards 12900 Furnishings Restoration & Repair
10270 Access Flooring 13 SPECIAL CONSTRUCTION
10290 Pest Controls 13010 Air - Supported Structures
10300 Fireplaces & Stoves 13030 Special Purpose Rooms
10340 Manufactured Exterior Specialties 13080 Sound, Vibration & Seismic Control
10350 Flagpoles 13090 Radiation Protection
10400 Identification Devices 13100 Lightning Protection
10450 Pedestrian Control Devices 13110 Cathodic Protection
10500 Lockers 13120 Pre - Engineered Structures
10520 Fire Protection Specialties 13150 Swimming Pools
10530 Protective Covers 13170 Tubs & Pools
10550 Postal Specialties 13175 Ice Rinks
10600 Partitions 13200 Storage Tanks
10670 Storage Shelving 13280 Hazardous Material Remediation
10700 Exterior Protection 13600 Solar & Wind Energy Equipment
10750 Telephone Specialties 13700 Security Access & Surveillance
10800 Toilet, Bath & Laundry Accessories 13800 Building Automation & Control
10880 Scales 13850 Detection & Alarm
10900 Wardrobe & Closet Specialties 13900 Fire Suppression

11 EQUIPMENT 14 CONVEYING SYSTEMS


11010 Maintenance Equipment 14100 Dumbwaiters
11020 Security & Vault Equipment 14200 Elevators
11030 Teller & Service Equipment 14300 Escalators & Moving Walks
11040 Ecclesiastical Equipment 14400 Lifts
11050 Library Equipment 14500 Material Handling
11060 Theater & Stage Equipment 14600 Hoists & Cranes
11100 Mercantile Equipment 14700 Turntables
11130 Audio - Visual Equipment 14800 Scaffolding
11140 Vehicle Service Equipment 14900 Transportation
11150 Parking Control Equipment 15 MECHANICAL
11160 Loading Dock Equipment 15050 Basic Mechanical Materials & Methods
11170 Solid Waste Handling Equipment 15100 Building Services Piping
11190 Detention Equipment 15200 Process Piping
11280 Hydraulic Gates & Valves 15300 Fire Protection Piping
11300 Fluid Waste Treatment & Disposal Equipment 15400 Plumbing Fixtures & Equipment
11400 Food Service Equipment 15500 Heat - Generation Equipment
11450 Residential Equipment 15600 Refrigeration Equipment
11470 Darkroom Equipment 15700 Heating, Ventilating & Air Conditioning Equipment
11480 Athletic, Recreational & Therapeutic Equipment 15800 Air Distribution
11500 Industrial & Process Equipment 15900 HVAC Instrumentation & Controls
11600 Laboratory Equipment 15950 Testing, Adjusting & Balancing
11700 Medical Equipment
16 ELECTRICAL
12 FURNISHINGS 16050 Basic Electrical Materials & Methods
12050 Fabrics 16100 Wiring Methods
12100 Art 16200 Electrical Power
12300 Manufactured Casework 16300 Transmission & Distribution
12400 Furnishing & Accessories 16400 Low - Voltage Distribution
12500 Furniture 16500 Lighting
12600 Multiple Seating 16700 Communications
12700 Systems Furniture 16800 Sound & View
BuildSYSTEM - Titles in Levels 1, 2 & 3

No. Titles in Levels 1, 2 & 3 No. Titles in Levels 1, 2 & 3

01 GENERAL REQUIREMENTS 04 MASONRY


02 SITE CONSTRUCTION
04200 Masonry Units
02200 Site Preparation 04210 Clay Masonry Units
02210 Sub-surface Investigation 04215 Sand Lime Bricks
02220 Site Demolition 04220 Concrete Masonry Units
02225 Selective Demolition 04230 Stone Masonry
02230 Site Clearing 04270 Glass Masonry Units
02240 Dewatering
02260 Excavation Support / Protection 05 METALS
02300 Earth Work
02310 Grading 05050 Basic Metal Materials & Methods
02315 Excavation and Fill 05090 Metal Fastenings
02360 Soil Treatment 05100 Structural Metal Framing
02450 Foundation & Load Bearing Elements 05120 Structural Steel
02455 Driven Piles 05500 Metal Fabrication
02465 Bored Piles 05517 Metal Stairs
02500 Site Development Services 05720 Ornamental Railings
02510 Water Distribution
02530 Sanitary Sewerage 06 WOOD AND PLASTICS
02540 Septic Tank Systems
02600 Drainage 06100 Rough Carpentry
02630 Drainage 06110 Wood Framing
02700 Roads and Pavements 06170 Pre-fabricated Structural Wood
02720 Water Bound Macadam 06200 Finish Carpentry
02730 Aggregate Surfacing 06220 Millwork
02740 Flexible Pavement 06240 Timber Panelling
02750 Rigid Pavement 06250 Pre-finished Panelling
02770 Kerbs and Gutters 06260 Board Panelling
02780 Unit Pavers 06400 Architectural Wood Work
02800 Site Improvement & Amenities 06430 Stairs, Railings and Balusters
02820 Fences and Gates
02890 Traffic Signs and Accessories 07 THERMAL & MOISTURE PROTECTION

03 CONCRETE 07100 Damp-proofing & Waterproofing


07110 Damp-proofing
03050 Basic Concrete Materials & Methods 07150 Sheet Waterproofing
03060 Basic Concrete Materials 07160 Cementitious Waterproofing
03100 Concrete Form Work & Accessories 07200 Thermal Protection
03110 Form Work / Centring and Shuttering 07210 Building Insulation
03150 Concrete Accessories 07220 Roof and Deck Insulation
03200 Concrete Reinforcement 07260 Vapour Barriers
03210 Reinforcing Steel 07300 Shingles, Tiles & Roof Coverings
03220 Welded Wire Fabric 07320 Roof Tiles
03300 Cast-In-Place Concrete 07400 Roofing
03305 Plain Cement Concrete 07410 Metal Roof
03310 Structural Concrete 07430 Asbestos Roofing and Panels
03325 Lime Concrete
03350 Concrete Finishing 08 DOORS AND WINDOWS
03400 Precast Concrete
03410 Plant Precast 08100 Metal Doors & Frames
03450 Architectural Precast 08110 Steel Door and Frames
08200 Wood & Plastic Doors
08210 Wood Doors and Windows
BuildSYSTEM - Titles in Levels 1, 2 & 3

No. Title in Levels 1, 2 & 3 No. Title in Levels 1, 2 & 3


08 DOORS AND WINDOWS (Cont.) 15 MECHANICAL

08300 Speciality Doors 15050 Basic Mechanical Materials & Methods


08330 Coiling Doors and Grilles 15082 Duct Insulation
08500 Windows 15100 Building Services Piping
08520 Aluminium Doors and Windows 15107 Metal Pipe and Fittings
08700 Hardware 15108 Plastic Pipe and Fittings
08710 Door and Window Hardware 15110 Valves
08900 Glazed Curtain Walls 15120 Piping Specialities
08911 Glazed Aluminum Curtain Wall 15155 Drainage Specialities
15180 Heating and Cooling Piping
09 FINISHES 15400 Plumbing Fixtures & Equipment
15410 Plumbing Fixtures
09200 Plaster & Gypsum Board 15411 Commercial / Industrial Fixtures
09206 Expansion / Contraction Control in Plaster 15418 Residential / Commercial / Industrial Fixtures
09210 Gypsum Plaster 15450 Water Storage Tanks
09220 Portland Cement Plaster 15480 Domestic Water Heaters
09230 Pointing 15500 Heat Generation Equipment
09250 Gypsum Board 15510 Heating Boilers & Accessories
09500 Ceilings 15600 Refrigeration Equipment
09510 False Ceilings 15620 Packaged Water Chillers
09550 False Ceiling Frame Work 15640 Packaged Cooling Towers
09600 Flooring 15700 Heating / Ventilating / Air Conditioning
09631 Brick Flooring Equipment
09632 Concrete Flooring 15720 Air Handling Units
09633 Tile Flooring 15730 Unitary Air Conditioning Equipment
09634 Cast-In-Place Terrazzo Flooring 15761 Air Coils
09635 Marble Flooring 15765 Fan Coil Unit / Unit Ventilators
09637 Stone Flooring 15800 Air Distribution
09638 Granite Flooring 15810 Ducts
09648 Wood Strip Flooring 15820 Duct Accessories
09658 Resilient Flooring 15830 Fans
09700 Wall Finishes 15860 Air Cleaning Devices
09720 Stone Lining 15900 HVAC Instrumentation & Controls
09900 Paints & Coatings 15905 HVAC Instrumentation
09910 Paints and Coatings
16 ELECTRICAL
10 SPECIALITIES
16000 Basic Electrical Materials & Methods
10520 Fire Protection Specialities 16060 Grounding and Bonding
10525 Fire Protection Specialities 16100 Wiring Methods
10800 Toilet, Bath & Laundry Accessories 16120 Conductors and Cables
10820 Bath Accessories 16131 Cable Trays
16132 Conduit and Tubing
13 SPECIAL CONSTRUCTION 16134 Wireway and Aux Gutters
16136 Boxes
13100 Lightning Protection 16138 Wiring
13105 Lightning Protection 16140 Wiring Devices
13800 Detection & Alarm 16400 Low-Voltage Distribution
13851 Detection and Alarm 16410 Encl Switches and Circuit Breakers
13900 Fire Suppression 16440 Switch Boards, Panels & Control Centers
13910 Basic Fire Protection Materials & Methods 16500 Lighting
13930 Wet - Pipe Fire Supply Sprinklers 16510 Interior Luminaires
BuildSYSTEM – Selected CD Screens s

Home Page

Item Cost Grid


BuildSYSTEM – Selected CD Screens s

Search By Drop Down

Search By Description
BuildSYSTEM – Selected CD Screens s

Estimate Details

Analysis
BuildSYSTEM – Selected CD Screens s

Component Rate Breakup

Estimate Breakup
BuildSYSTEM – Selected CD Screens s

Component Master

Item Master
BuildSYSTEM Report - Detailed Estimate from IPMG SOR
Project Name : Demo Project Estimate : Estimate 1
Description : Demo Project Description : Estimate 1
Printed On : 8-Jan-08
Bare Total
SNo Code Description Unit Qty OHP
Material Labour Equip. Others InclOHP
1 02510 800 3315 Providing, fixing and testing wafer type CI Ea. 5 9351.25 319.85 0.00 0.00 1450.65 11121.75
butterfly valves, conforming to IS:13095,
PN 1.0, MS hand lever operated with galvanised
steel fasteners and 3 mm thick compressed
neoprene gaskets, complete, of nominal size : 100
2 03310 260 0120 mm
Providing and laying in position, specified Cum 5 14506.60 2000.45 440.30 0.00 2542.10 19489.45
mix of RCC, including compaction and curing
complete but excluding centring, shuttering and
reinforcement, 1:2:4 nominal mix : In foundation
and plinth (1.5 m below and upto 1.2 m above
G.L.)
3 08210 970 0880 Providing and fixing panelled or panelled and Sqm 5 6677.40 1070.25 0.00 0.00 1162.15 8909.80
glazed or glazed shutters with selected quality,
seasoned and chemically treated wood to doors,
windows and clerestory windows including
necessary beadings, mouldings, aluminum butt
hinges with necessary CP Brass screws, complete
(panelling will be paid for separately), of shutter
thicknesses : 50 mm thick Ghana teak wood
4 09220 220 0100 Providing 18 mm thick plaster with terrazo Sqm 5 483.40 732.80 14.70 0.00 184.65 1415.55
finish, rubbed and polished, complete, under
layer 12 mm thick cement plaster 1:3 with coarse
sand and top layer 6 mm thick with white, or
coloured marble chips of 3 mm and down size
laid in cement marble powder mix 3:1
(3 cement : 1 marble powder) by weight, in
proportion 4:7 (4 cement marble powder mix
: 7 marble chips) by volume.
5 15107 620 3010 Providing, fixing and testing galvanised steel m 5 556.55 150.45 0.00 0.00 106.05 813.05
pipes conforming to IS:1239 (Medium Class)
with necessary malleable galvanised steel
fittings and clamps, including cutting and
making good the walls, complete, (Internal
work) of nominal dia : 20 mm
6 15418 460 0300 Providing and fixing white vitreous china wash Ea. 5 8335.20 1138.00 0.00 0.00 1421.00 10894.20
basins with CI/ galvanised steel brackets, CP
brass wastes with overflow, 32 mm CP cast
brass heavy bottle traps, unions, pipes to wall
and wall flanges, rubber adopters for waste
connections including, painting of brackets, cutting
and making good the walls, complete, of
nominal size : 550 x 400 mm
7 15765 200 1620 Providing, installing & testing ceiling mounted, Ea. 5 80324.95 6200.00 0.00 0.00 12978.75 99503.70
nonductable, horizontal fan coil unit, fan motor,
cooling coil, filter plenum with filters, fan,
thermostat with built in switch etc., chilled
water type, suitable for operation on 1 ph, 50
Hz,230 V, AC electric supply, complete: 1 TR,
air quantity 680 cum/hr.
8 16138 350 1480 Wiring for light / power plug with Flame Retardent m 5 1016.80 232.10 0.00 0.00 187.35 1436.25
Low Smoke (FRLS) PVC insulated, single core
copper conductor cable conforming to
IS:694, along with 2.24 mm dia bare
copper conductor wire for loop earthing in surfarce
/ recessed conduit, conforming to IS:9537: 4 x 4
sqmm cable with 2 number loop earth wire : MS
conduit
Total : 121252.20 11843.90 455.00 0.00 20032.70 153583.80
BuildSYSTEM Report - Estimate from IPMG SOR

Project Name : Demo Project Estimate Name : Estimate1


Description : Demo Project Description : Estimate1
Printed On : 8-Jan-08
S.No Code Description Unit Qty RatePerUnit Total incl OHP
1 02510 800 3315 Providing, fixing and testing wafer type CI butterfly valves, Ea. 5 2224.35 11121.75
conforming to IS:13095, PN 1.0, MS hand lever operated with galvanised
steel fasteners and 3 mm thick compressed neoprene gaskets, complete, of
nominal size : 100 mm

2 03310 260 0120 Providing and laying in position, specified mix of RCC, including Cum 5 3897.89 19489.45
compaction and curing complete but excluding centring, shuttering
and reinforcement, 1:2:4 nominal mix : In foundation and plinth
(1.5 m below and upto 1.2 m above G.L.)

3 08210 970 0880 Providing and fixing panelled or panelled and glazed or glazed shutters Sqm 5 1781.96 8909.80
with selected quality, seasoned and chemically treated wood to doors,
windows and clerestory windows including necessary beadings,
mouldings, aluminum butt hinges with necessary CP Brass screws,
complete (panelling will be paid for separately), of shutter thicknesses :
50 mm thick Ghana teak wood

4 09220 220 0100 Providing 18 mm thick plaster with terrazo finish, rubbed and Sqm 5 283.11 1415.55
polished, complete, under layer 12 mm thick cement plaster 1:3
with coarse sand and top layer 6 mm thick with white, or coloured
marble chips of 3 mm and down size laid in cement marble powder
mix 3:1 (3 cement : 1 marble powder) by weight, in proportion 4:7
(4 cement marble powder mix : 7 marble chips) by volume.

5 15107 620 3010 Providing, fixing and testing galvanised steel pipes conforming to m 5 162.61 813.05
IS:1239 (Medium Class) with necessary malleable galvanised steel
fittings and clamps, including cutting and making good the walls,
complete, (Internal work) of nominal dia : 20 mm

6 15418 460 0300 Providing and fixing white vitreous china wash basins with CI/ Ea. 5 2178.84 10894.20
galvanised steel brackets, CP brass wastes with overflow, 32 mm CP
cast brass heavy bottle traps, unions, pipes to wall and wall flanges,
rubber adopters for waste connections including, painting of brackets,
cutting and making good the walls, complete, of nominal size : 550 x 400
mm

7 15765 200 1620 Providing, installing & testing ceiling mounted, nonductable, Ea. 5 19900.74 99503.70
horizontal fan coil unit, fan motor, cooling coil, filter plenum with
filters, fan, thermostat with built in switch etc., chilled water type,
suitable for operation on 1 ph, 50 Hz,230 V, AC electric supply,
complete: 1 TR, air quantity 680 cum/hr.

8 16138 350 1480 Wiring for light / power plug with Flame Retardent Low Smoke m 5 287.25 1436.25
(FRLS) PVC insulated, single core copper conductor cable
conforming to IS:694, along with 2.24 mm dia bare copper
conductor wire for loop earthing in surfarce / recessed conduit,
conforming to IS:9537: 4 x 4 sqmm cable with 2 number loop earth
wire : MS conduit
Total 153583.80
BuildSYSTEM Report - Estimate from CPWD DSR

Project Name : Demo Project Estimate Name : Estimate1


Description : Demo Project Description : Estimate1
Printed On : 8-Jan-08
S.No DSR Code Description Unit Qty Rate Amount IPMG Code
1 2.6.1 Earth work in excavation over areas (exceeding 30cm in depth. Cum 5 91.50 457.50 02315 400 5610
1.5m in width as well as 10 sqm on plan) including disposal of
excavated earth, lead upto 50m and lift upto 1.5m; disposed earth
to be levelled and neatly dressed. All kinds of soil

2 3.2101 Lime mortar 1: 1 : 1 (1 lime putty : 1 surkhi : 1 fine sand) Cum 5 1154.75 5773.75 04060 450 0510

3 4.5.1 Providing and laying in position cement concrete of specified grade Cum 5 2652.90 13264.50 03305 200 0710
excluding the cost of centring and shuttering - All work upto
plinth level 1:1:2 (1 cement : 1 coarse sand : 2 graded stone
aggregate 20 mm nominal size)

4 5.1.1 Providing and laying in position specified grade of reinforced Cum 5 2722.55 13612.75 03310 260 1010
cement concrete excluding the cost of centring, shuttering, finishing
and reinforcement - All work upto plinth level 1:1:2
( 1 Cement : 1 Coarse sand : 2 graded stone aggregate 20 mm
nominal size )

5 9.25.2 Providing and fixing ISI marked flush door shutters, non- Sqm 5 825.90 4129.50 08210 970 5810
decorative type, core of block board construction with frame
of 1st class hard wood and well matched commercial 3 ply
veneering with vertical grains or cross bands and face veneers on
both faces of shutters : 35 mm thick including ISI marked
Stainless Steel butt hinges with necessary screws.

6 11.1.1 Bricks on edge flooring with bricks of class designation 75 Sqm 5 205.40 1027.00 09631 100 2010
including cement slurry etc. complete in Cement mortar with F.P.S.
bricks: 1:4 ( 1 cement : 4 coarse sand)

7 19.1.1 Providing and fixing water closet squatting pan ( Indian type Ea. 5 1350.80 6754.00 15418 900 6010
W.C pan) with 100mm sand cast iron P or S trap, 10 litre low
level white P.V.C. flushing cistern with manually controlled device
(handle lever) conforming to IS : 7231, Parryware/
Hindware/Seabird/Orient (Coral) with all fittings and fixture
complete including cutting and making good the walls and floors
wherever required. White Vitreous china Long pan pattern W.C pan
of size 580 mm

8 20.1A .1. 1 Providing and fixing Polyethelene-Aluminium-Polyethelene m 5 107.20 536.00 15108 540 1520
(PE-AL-PE) Composite Pressure Pipes U.V. stabilised with
carbon black confirming to ASTM F - 1282-1995 for water supply
including clamps at one metre spacing, cutting and making good the
walls etc., (Internal work) Exposed on wall 1216 (16mm
OD) pipe

Total 45555.00
BuildSYSTEM Report - Head Wise Estimate from IPMG SOR

Project Name : Demo Project Estimate Name : Estimate1


Description : Demo Project Description : Estimate1
Printed On : 8-Jan-08
S.No Code Description Unit Qty RatePerUnit Total incl OHP

02 Site Construction
1 02510 800 3315 Providing, fixing and testing wafer type CI butterfly valves, Ea. 5 2224.35 11121.75
conforming to IS:13095, PN 1.0, MS hand lever operated with
galvanised steel fasteners and 3 mm thick compressed neoprene
gaskets, complete, of nominal size : 100 mm

Total Carried Out to Summary 11121.75

03 Concrete
2 03310 260 0120 Providing and laying in position, specified mix of RCC, including Cum 5 3897.89 19489.45
compaction and curing complete but excluding centring, shuttering and
reinforcement, 1:2:4 nominal mix : In foundation and plinth (1.5 m
below and upto 1.2 m above G.L.)

Total Carried Out to Summary 19489.45

08 Doors & Windows


3 08210 970 0880 Providing and fixing panelled or panelled and glazed or glazed Sqm 5 1781.96 8909.80
shutters with selected quality, seasoned and chemically treated wood
to doors, windows and clerestory windows including necessary
beadings, mouldings, aluminum butt hinges with necessary CP Brass
screws, complete (panelling will be paid for separately), of shutter
thicknesses : 50 mm thick Ghana teak wood

Total Carried Out to Summary 8909.80

15 Mechanical
4 15107 620 3010 Providing, fixing and testing galvanised steel pipes conforming to m 5 162.61 813.05
IS:1239 (Medium Class) with necessary malleable galvanised steel
fittings and clamps, including cutting and making good the walls,
complete, (Internal work) of nominal dia : 20 mm

5 15418 460 0300 Providing and fixing white vitreous china wash basins with CI/ Ea. 5 2178.84 10894.20
galvanised steel brackets, CP brass wastes with overflow, 32 mm
CP cast brass heavy bottle traps, unions, pipes to wall and wall flanges,
rubber adopters for waste connections including, painting of
brackets, cutting and making good the walls, complete, of
nominal size : 550 x 400 mm

6 15765 200 1620 Providing, installing & testing ceiling mounted, nonductable, Ea. 5 19900.74 99503.70
horizontal fan coil unit, fan motor, cooling coil, filter plenum with
filters, fan, thermostat with built in switch etc., chilled water type,
suitable for operation on 1 ph, 50 Hz,230 V, AC electric supply,
complete: 1 TR, air quantity 680 cum/hr.

Total Carried Out to Summary 111210.95

Total 150731.95
BuildSYSTEM Report - Head Wise Estimate from CPWD DSR

Project Name : Demo Project Estimate Name : Estimate1


Description : Demo Project Description : Estimate1
Printed On : 8-Jan-08
S.No DSR Code Description Unit Qty Rate Amount

2 Earth Wok
1 2.6.1 Earth work in excavation over areas (exceeding 30cm in depth. 1.5m Cum 5 91.50 457.50
in width as well as 10 sqm on plan) including disposal of excavated
earth, lead upto 50m and lift upto 1.5m; disposed earth to be levelled
and neatly dressed. All kinds of soil

Total Carried Out to Summary 457.50

3 Mortars
2 3.2101 Lime mortar 1: 1 : 1 (1 lime putty : 1 surkhi : 1 fine sand) Cum 5 1154.75 5773.75

Total Carried Out to Summary 5773.75

4 Concrete work
3 4.5.1 Providing and laying in position cement concrete of specified grade Cum 5 2652.90 13264.50
excluding the cost of centring and shuttering - All work upto plinth level
1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm
nominal size)

Total Carried Out to Summary 13264.50

5 Reinforced Cement Concrete


4 5.1.1 Providing and laying in position specified grade of reinforced cement Cum 5 2722.55 13612.75
concrete excluding the cost of centring, shuttering, finishing and
reinforcement - All work upto plinth level 1:1:2 ( 1 Cement : 1 Coarse
sand : 2 graded stone aggregate 20 mm nominal size )

5 5.20 Providing, hoisting and fixing upto floor five level precast reinforced Cum 5 3438.00 17190.00
cement concrete in small lintels not exceeding 1.5m clear span upto
floor five level including the cost of required centring, shuttering and
finishing smooth with 6 mm thick cement plaster 1:3 (1 cement : 3 fine
sand) on exposed surfaces but excluding the cost of reinforcement with
1:2:4 (1 cement : 2 coarse sand: 4 graded stone aggregate 20mm
nominal size).

Total Carried Out to Summary 30802.75

9 Wood Work
6 9.25.2 Providing and fixing ISI marked flush door shutters, non-decorative Sqm 5 825.90 4129.50
type, core of block board construction with frame of 1st class hard wood
and well matched commercial 3 ply veneering with vertical grains or cross
bands and face veneers on both faces of shutters : 35 mm thick including
ISI marked Stainless Steel butt hinges with necessary screws.

Total Carried Out to Summary 4129.50

Total 54428.00
BuildSYSTEM Report - Estimate Breakup from IPMG SOR

ESTIMATE BREAK UP

Project Name : Demo Project Estimate Name : Estimate1


City : New Delhi Estimate Date : 8-Jan-08
Code Description Unit Qty Rate Amount
Material
02455 220 5010 Coarse Sand ( Zone III ) Cum 2.3020 587.60 1352.66
02510 800 3315 Cast Iron Butterfly Valve, IS-13095, PN 1.0, Hand Lever Ea. 5.0000 1845.79 9228.95
Operated, 100 mm
02730 010 0460 Stone Aggregate 10 mm nominal size Cum 1.1000 954.72 1050.19
02730 010 0530 Stone Aggregate 20 mm nominal size Cum 3.3500 973.44 3261.02
03060 020 1010 Ordinary Portland Cement Grade 43 Tonne 1.6580 5555.00 9210.19
05060 010 9010 CI Brackets for Wash Basin Ea. 5.0000 131.97 659.85
08210 970 1150 Ghana Teak wood in planks 10Cdm 16.8980 323.84 5472.25
08710 010 8050 Anodised aluminium butt hinges - 125 x 75 x 4 mm Ten 1.3890 640.74 889.99
08770 010 1055 Chromium plated brass Screws of size - 50 mm Cent 1.3890 226.89 315.15
09220 022 9010 Add for scaffolding for stone grit wash plaster / plaster with Sqm 5.0000 5.30 26.50
terrazo finish
09220 220 0100 Marble Chips upto 4 mm and down size : Baroda Green Qtl 0.1450 193.87 28.11
09400 045 1010 Marble Chips upto 4 mm and down size : Chocolate, Grey or Qtl 0.1450 238.61 34.60
Yellow
09400 045 2030 Marble Chips upto 4 mm and down size : White & Black Qtl 0.1450 178.96 25.95
09400 045 3000 Marble Dust / Powder Qtl 0.0050 164.04 0.82
15107 620 3010 GI Pipe, IS-1239, Medium Class, 20 mm dia m 5.2500 95.30 500.33
15416 010 6310 CP Brass Pipe to wall, union & wall flange 32 mm nominal Ea. 5.0000 231.75 1158.75
size
15416 015 7020 CP Brass Waste, 32 mm Ea. 5.0000 208.85 1044.25
15416 015 7050 CP Brass Bottle Trap, Cast Heavy, 32 mm Ea. 5.0000 650.64 3253.20
15418 460 0300 Wash Basin, Vitreous China, White, Flat Back, 550 x 400 mm Ea. 5.0000 433.92 2169.60
15765 200 1620 Non Ductable Fan Coil Unit, 1 ph, 50 HZ, 230V, A.C, 1 Ea. 5.0000 15946.88 79734.40
TR, air quantity 680 cum/hr.
16060 800 7290 Bare Copper Earth Wire, 2.24 mm dia m 10.1000 13.13 132.61
16132 210 0750 MS Conduit (IS:9537 - Part 2) 25 mm dia m 5.0000 49.95 249.75
16138 330 1430 MS Inspection /Solid Bends, 25 mm dia Ea. 0.4000 13.66 5.46
16138 330 1440 MS Sockets 25 mm dia Ea. 1.5000 22.53 33.80
16138 330 1450 MS Stapples/Saddles/Screws for Conduit 25 mm dia Ea. 8.5000 1.36 11.56
16138 340 1380 FRLS, PVC Insulated Copper Conductor Single Core m 20.2000 27.78 561.16
(IS:694 4.0 sq mm
120411.10
Labor
01570 400 0100 Common Labour Day 38.8065 125.00 4850.81
01570 400 0200 Semi - Skilled Labour Day 7.0115 135.00 946.55
01570 400 0500 Carpenter Grade - 1 Day 4.2810 200.00 856.20
01570 400 0700 Plumber Grade -1 Day 2.8075 200.00 561.50
01570 400 0800 Plumber Grade - II Day 0.8860 180.00 159.48
01570 400 1000 Mason Grade - 1 Day 2.4530 200.00 490.60
01570 400 1100 Mason Grade - II Day 3.5505 180.00 639.09
01570 400 1400 Painter Day 0.0505 180.00 9.09
01570 400 2000 Wireman Day 5.4025 200.00 1080.50
01570 400 2100 Mechanic HVAC Grade I Day 10.0000 225.00 2250.00
11843.82
Equipment
01590 400 0200 Concrete Mixer 0.14 Day 0.3250 1400.00 455.00
455.00
Extra
Sundries 841.18
841.18

Total : 133551.10
OHP : 20032.70
Total Cost Inc OHP : 153583.80
BuildSYSTEM Report - Component Rate Breakup from IPMG SOR

COMPONENT RATE BREAKUP

Component Code : 15418 460 0300

Description : Wash Basin, Vitreous China, White, Flat Back, 550 X 400 mm

Unit : Ea

Manufacturer :

Code Manufacturer Location Rate


CER001 Cera Sanitaryware Ltd. New Delhi 480.00

Vendor :

Manu Code Code Vendor Location Discount Rate at Site


CER001 MLS001 M. L. Sharma & Co. New Delhi 22.00 374.40

Rate Before Tax : 374.40

Tax / Charges :-

Tax Description +/- Value / % age / Formula Amount


R1 VAT + 12.50% 46.80
R2 Cartage + ( R0 + R1 ) * 1 / 100 4.21
R3 Breakage + ( R0 + R1 + R2 ) * 2 / 100 8.51

Rate After Tax / Charges : 433.92


BuildSYSTEM Report - Manufacturer Wise Material Rate from IPMG SOR

MANUFACTURER WISE MATERIAL RATE

Manufacturer Code : JIN001

Manufacturer Name : Jindal Pipes Ltd.

SNo Code Description UOM Rate Rate Date


1 15107 020 0060 MS Pipe, IS-1239, medium class, threaded, 25 mm dia m 122.20 1/1/2008
2 15107 020 1060 MS Pipe, IS-1239, heavy class, threaded, 20 mm dia m 98.45 1/1/2008
3 15107 020 5100 MS Pipe, IS-3589, 4.85 mm thick, 200 mm dia m 1297.00 1/1/2008
4 15107 020 5200 MS Pipe, IS-3589, 4.85 mm thick, 250 mm dia m 1603.00 1/1/2008
5 15107 020 5300 MS Pipe, IS-3589, 4.85 mm thick, 300 mm dia m 1922.00 1/1/2008
6 15107 620 3005 GI Pipe, IS-1239, Medium Class, 15 mm dia m 68.75 1/1/2008
7 15107 620 3010 GI Pipe, IS-1239, Medium Class, 20 mm dia m 88.35 1/1/2008
8 15107 620 3015 GI Pipe, IS-1239, Medium Class, 25 mm dia m 126.25 1/1/2008
9 15107 620 3020 GI Pipe, IS-1239, Medium Class, 32 mm dia m 159.10 1/1/2008
10 15107 620 3030 GI Pipe, IS-1239, Medium Class, 50 mm dia m 239.30 1/1/2008
11 15107 620 3035 GI Pipe, IS-1239, Medium Class, 65 mm dia m 302.00 1/1/2008
12 15107 620 3040 GI Pipe, IS-1239, Medium Class, 80 mm dia m 400.60 1/1/2008
13 15107 620 3045 GI Pipe, IS-1239, Medium Class, 100 mm dia m 560.10 1/1/2008
14 15107 620 3048 GI Pipe, IS-1239, Medium Class, 125 mm dia m 765.60 1/1/2008
15 15107 620 3050 GI Pipe, IS-1239, Medium Class, 150 mm dia m 912.20 1/1/2008
16 15107 620 3205 GI Pipe, IS-1239, Heavy Class, 15 mm dia m 77.90 1/1/2008
17 15107 620 3210 GI Pipe, IS-1239, Heavy Class, 20 mm dia m 99.75 1/1/2008
18 15107 620 3215 GI Pipe, IS-1239, Heavy Class, 25 mm dia m 137.60 1/1/2008
19 15107 620 3220 GI Pipe, IS-1239, Heavy Class, 32 mm dia m 177.45 1/1/2008
20 15107 620 3225 GI Pipe, IS-1239, Heavy Class, 40 mm dia m 218.35 1/1/2008
21 15107 620 3230 GI Pipe, IS-1239, Heavy Class, 50 mm dia m 278.70 1/1/2008
22 15107 620 3235 GI Pipe, IS-1239, Heavy Class, 65 mm dia m 365.40 1/1/2008
23 15107 620 3240 GI Pipe, IS-1239, Heavy Class, 80 mm dia m 453.20 1/1/2008
24 15107 620 3245 GI Pipe, IS-1239, Heavy Class, 100 mm dia m 651.70 1/1/2008
25 15107 620 3248 GI Pipe, IS-1239, Heavy Class, 125 mm dia m 836.10 1/1/2008
26 15107 620 3250 GI Pipe, IS-1239, Heavy Class, 150 mm dia m 1006.60 1/1/2008
27 15107 620 4910 MS Pipe, IS-1239, heavy class, threaded, 25 mm dia m 150.55 1/1/2008
28 15107 620 4920 MS Pipe, IS-1239, Heavy Class, Threaded, 32 mm dia m 186.55 1/1/2008
29 15107 620 4930 MS Pipe, IS-1239, Heavy Class, Threaded, 40 mm dia m 220.30 1/1/2008
30 15107 620 4940 MS Pipe, IS-1239, Heavy Class, Threaded, 50 mm dia m 297.80 1/1/2008
31 15107 620 5050 MS Pipe, IS-1239, Heavy Class, Plain Ends, 65 mm dia m 385.90 1/1/2008
32 15107 620 5060 MS Pipe, IS-1239, Heavy Class, Plain Ends, 80 mm dia m 487.20 1/1/2008
33 15107 620 5070 MS Pipe, IS-1239, Heavy Class, Plain Ends, 100 mm dia m 698.60 1/1/2008
34 15107 620 5080 MS Pipe, IS-1239, Heavy Class, Plain Ends, 150 mm dia m 1029.50 1/1/2008
35 15107 620 5110 MS Pipe, IS-3589, 6.00 mm thick, 200 mm dia m 1660.00 1/1/2008
36 15107 620 5130 MS Pipe, IS-3589, 6.00 mm thick, 250 mm dia m 2075.00 1/1/2008
37 15107 620 5140 MS Pipe, IS-3589, 6.00 mm thick, 300 mm dia m 2480.00 1/1/2008
38 15180 150 1390 MS Pipe, IS-1239, Heavy Class, Plain Ends, 125 mm dia m 871.80 1/1/2008
39 15180 150 1490 MS Pipe, IS 3589, 6 mm thick 550 mm dia m 5250.00 1/1/2008
40 15180 150 1500 MS Pipe, IS 3589, 6 mm thick 600 mm dia m 5580.00 1/1/2008
41 15180 150 1700 MS Pipe, IS 3589, 6 mm thick 350 mm dia m 2581.00 1/1/2008
42 15180 150 1710 MS Pipe, IS 3589, 6 mm thick 400 mm dia m 4084.00 1/1/2008
43 15180 150 1720 MS Pipe, IS 3589, 6 mm thick 450 mm dia m 4700.00 1/1/2008
44 15180 150 1730 MS Pipe, IS 3589, 6 mm thick 500 mm dia m 5219.00 1/1/2008
BuildSYSTEM - List of Manufacturers in Material Database

S.No. Name S.No. Name


1 3M Electro & Communication India Pvt. Ltd. 54 Kitply Industries Ltd.
2 Acro Paints Ltd. 55 K. K. Manholes & Gratings Co. Pvt. Ltd.
3 Acutech Mfg. Co (P) Ltd. 56 K. K. Spun Pipes
4 Advance Valve Pvt. Ltd. 57 Larsen & Toubro Ltd. (ECC Division)
5 Agni Safety (I) Pvt. Ltd. 58 Laxmi Spun Pipes
6 Airtech 59 Legrand (India) Pvt. Ltd.
7 Air Flow Pvt. Ltd. 60 Llyod Insulations India Ltd.
8 AKG Industries 61 Malanpur Entech Private Limited
9 Allied Traders & Exporters 62 Manrow Switches & Switchgears
10 Almonard Pvt. Ltd. 63 Modern Door Devices Pvt. Ltd.
11 Ambassador Coolers Pvt. Ltd. 64 Mor Storage India Pvt. Ltd.
12 Anchor Electricals. Pvt. Ltd. 65 National Cables
13 Aquolac Group of Companies (Aquolac Paint) 66 NGEF (Hubli) Ltd.
14 Argent Industries 67 Nitco Marble & Granite Pvt. Ltd.
15 Argus Coatings & Polymers Pvt. Ltd. (Chemsol) 68 Oceanic Cooling Tower Pvt. Ltd.
16 A. R. Shining Foundry & Engg. Works 69 Orient Ceramics & Industries Ltd.
17 Arun Manufacturing Services (P) Ltd. 70 Orient Fans
18 Asahi India Glass Ltd. 71 Paharpur Cooling Towers Ltd.
19 Beacon Weir Ltd. 72 Parryware Roca Pvt. Ltd. (EID)
20 Berger Paints India Ltd. 73 Parkash Brassware Industries Ltd.
21 Biltech Building Elements Limited 74 Plasto Craft Sanitary India Pvt. Ltd.
22 Birla 3M Ltd. 75 Plaza Cables Electric Pvt. Ltd.
23 Birla Cement Ltd. (Grasim Industries Ltd.) 76 Prayag Polymers Pvt. Ltd.
24 Blue Star Limited 77 Prince Valves Industries Ltd. (Sant)
25 Build Scaff 78 Prince Pipes & Fittings Pvt. Ltd.
26 Cable Corporation of India Ltd. 79 Priya Clay Products Private Limited
27 Carrier Aircon Limited 80 Raj Iron Foundry
28 Castle Valves Ltd. 81 Rajan Wire Industries
29 Century Plyboards (India) Ltd. 82 Rapid Controls Pvt. Ltd.
30 Cera Sanitaryware Ltd. 83 Raychem R.P.G. Ltd.
31 Crompton Greaves Ltd. 84 RDC Concrete (India) Limited (Unitech India)
32 Dowells Elektro Werke Ltd. 85 R. J. Mineral Industries (P) Ltd.
33 Eta Engineering Private Ltd. 86 Saint Gobain India Gypsum Ltd.
34 Everite Agencies Pvt. Ltd. 87 Setia Plastic Industries (Dimple Plastic Pvt. Ltd.)
35 Fedders Lloyd Corporation Ltd. 88 Shalimar Petro Product Pvt. Ltd.
36 Finolex Industries Ltd. 89 Siemens Ltd.
37 Gemat Soil & Material Testing Engineers (P) Ltd. 90 Sintex Industries Ltd.
38 Gem Sanitary Appliances Pvt. Ltd. 91 Skytone Electricals (India) Ltd.
39 GSC Toughened Glass Pvt. Ltd. 92 Steelage Industries Ltd. (Gunnebo)
40 Havells India (Crabtree) Ltd. 93 Supra Enterprise
41 Hindustan Sanitaryware & Indust. Ltd. 94 Swastik Sanitaryware Ltd.
42 Hindustan Tiles 95 The Supreme Industries Ltd.
43 Hitachi Home & Life Solutions (India) Ltd. 96 Thermax Limited
44 Indo Asian Fuse Gear Ltd. 97 Thermopack Industries
45 Jain Brothers Sanitations Pvt. Ltd. 98 Ultra Tile Private Limited
46 Jaquar & Company Ltd. 99 Unique Manufacturing Co.
47 Jayaswal Neco Ltd. 100 U. P. Twiga Fiberglass Ltd.
48 Jindal Pipes 101 Utkal Asbestos Ltd.
49 Kajeco Industries 102 Veer Sanitary Appliances Pvt. Ltd.
50 Kalinga Cables Co. 103 Venus Home Appliances Pvt. Ltd.
51 Kansai Nerolac Paints Ltd. 104 Voltas Limited
52 Kirloskar Brothers Limited 105 Woven Gold Acrylic (India) Pvt. Ltd.
53 Kitec Industries India Ltd. 106 Zoloto Industries
BuildSYSTEM Report - Analysis of Rate from IPMG SOR

ANALYSIS NO. 1

Item Code: 03310 260 0120 Unit: Cum

Item Description: Providing and laying in position, specified mix of RCC, including compaction and curing complete but
excluding centring, shuttering and reinforcement, 1:2:4 nominal mix : In foundation and plinth (1.5 m
below and upto 1.2 m above G.L.)

Row Code Description Unit Qty Rate Amount


M1 03060 020 1010 Ordinary Portland Cement Grade 43 Tonne 0.3200 5555.00 1777.60
M2 02730 010 0530 Stone Aggregate 20 mm nominal size Cum 0.6700 973.44 652.20
M3 02730 010 0460 Stone Aggregate 10 mm nominal size Cum 0.2200 954.72 210.04
M4 02455 220 5010 Coarse Sand ( Zone III ) Cum 0.4450 587.60 261.48
L1 01570 400 0100 Common Labour Day 2.0958 125.00 261.98
L2 01570 400 1100 Mason Grade - II Day 0.1497 180.00 26.94
L3 01570 400 0200 Semi - Skilled Labour Day 0.8234 135.00 111.16
E1 01590 400 0200 Concrete Mixer 0.14 Day 0.0629 1400.00 88.06
Total Cost : 3389.47
OHP : 508.42
Total Cost Incl OHP : 3897.89

ANALYSIS NO. 2

Item Code: 09220 220 0100 Unit: Sqm

Item Description: Providing 18 mm thick plaster with terrazo finish, rubbed and polished, complete, under layer 12 mm thick cement
plaster 1:3 with coarse sand and top layer 6 mm thick with white, or coloured marble chips of 3 mm and down size laid
in cement marble powder mix 3:1 (3 cement : 1 marble powder) by weight, in proportion 4:7 (4 cement marble powder
mix : 7 marble chips) by volume.

Row Code Description Unit Qty Rate Amount


M1 03060 020 1010 Ordinary Portland Cement Grade 43 Tonne 0.0116 5555.00 64.43
M2 02455 220 5010 Coarse Sand ( Zone III ) Cum 0.0154 587.60 9.05
M3 09400 045 2030 Marble Chips upto 4 mm and down size : White & Black Qtl 0.0290 178.96 5.20

M4 09400 045 1010 Marble Chips upto 4 mm and down size : Chocolate, Qtl 0.0290 238.61 6.92
M5 09220 220 0100 Marble Chips upto 4 mm and down size : Baroda Green Qtl 0.0290 193.87 5.62

M6 09400 045 3000 Marble Dust / Powder Qtl 0.0010 164.04 0.16
M7 09220 022 9010 Add for scaffolding for stone grit wash plaster / plaster Sqm 1.0000 5.30 5.30
with terrazo finish
L1 01570 400 0100 Common Labour Day 0.2105 125.00 26.32
L2 01570 400 1000 Mason Grade - 1 Day 0.2105 200.00 42.11
L3 01570 400 0200 Semi - Skilled Labour Day 0.5789 135.00 78.15
E1 01590 400 0200 Concrete Mixer 0.14 Day 0.0021 1400.00 2.94
Total Cost : 246.18
OHP : 36.93
Total Cost Incl OHP : 283.11
BuildSYSTEM Report - Analysis of Rate from IPMG SOR

ANALYSIS NO. 3

Item Code: 15418 460 0300 Unit: Ea

Item Description: Providing and fixing white vitreous china wash basins with CI/ galvanised steel brackets, CP brass wastes
with overflow, 32 mm CP cast brass heavy bottle traps, unions, pipes to wall and wall flanges, rubber
adopters for waste connections including, painting of brackets, cutting and making good the walls,
complete, of nominal size : 550 x 400 mm

Row Code Description Unit Qty Rate Amount


M1 05060 010 9010 CI Brackets for Wash Basin Ea. 1.0000 131.97 131.97
M2 15418 460 0300 Wash Basin, Vitreous China, White, Flat Back, 550 x Ea. 1.0000 433.92 433.92
400 mm
M3 15416 015 7050 CP Brass Bottle Trap, Cast Heavy, 32 mm Ea. 1.0000 650.64 650.64
M4 15416 015 7020 CP Brass Waste, 32 mm Ea. 1.0000 208.85 208.85
M5 15416 010 6310 CP Brass Pipe to wall, union & wall flange 32 mm Ea. 1.0000 231.75 231.75
nominal size
L1 01570 400 0100 Common Labour Day 0.7003 125.00 87.54
L2 01570 400 0700 Plumber Grade -1 Day 0.4202 200.00 84.04
L3 01570 400 1000 Mason Grade - 1 Day 0.2801 200.00 56.03
R1 Sundries 9.91
Total Cost : 1894.64
OHP : 284.20
Total Cost Incl OHP : 2178.84

ANALYSIS NO. 4

Item Code: 16138 350 1480 Unit: m

Item Description: Wiring for light / power plug with Flame Retardent Low Smoke (FRLS) PVC insulated, single core copper
conductor cable conforming to IS:694, along with 2.24 mm dia bare copper conductor wire for loop
earthing in surfarce / recessed conduit, conforming to IS:9537: 4 x 4 sqmm cable with 2 number loop earth
wire : MS conduit

Row Code Description Unit Qty Rate Amount


M1 16132 210 0750 MS Conduit (IS:9537 - Part 2) 25 mm dia m 1.0000 49.95 49.95
M2 16138 330 1430 MS Inspection /Solid Bends, 25 mm dia Ea. 0.0800 13.66 1.09
M3 16138 330 1450 MS Stapples/Saddles/Screws for Conduit 25 mm dia Ea. 1.7000 1.36 2.31
M4 16138 330 1440 MS Sockets 25 mm dia Ea. 0.3000 22.53 6.76
M5 16060 800 7290 Bare Copper Earth Wire, 2.24 mm dia m 2.0200 13.13 26.52
L1 01570 400 0100 Common Labour Day 0.1410 125.00 17.62
L2 01570 400 2000 Wireman Day 0.0805 200.00 16.11
L3 01570 400 1100 Mason Grade - II Day 0.0604 180.00 10.87
L4 01570 400 1400 Painter Day 0.0101 180.00 1.81
M6 16138 340 1380 FRLS, PVC Insulated Copper Conductor Single Core m 4.0400 27.78 112.23
(IS:694 4.0 sq mm
R1 Sundries 2.47
R1 Sundries 2.04
Total Cost : 249.79
OHP : 37.47
Total Cost Incl OHP : 287.26
BuildSYSTEM Report - Analysis of Rate from CPWD DSR

ANALYSIS NO. 1

DSR Code : 4.5.1 Unit: Cum


Related IPMG Code : 03305 200 0710

Item Description: Providing and laying in position cement concrete of specified grade excluding the cost of centring and
shuttering - All work upto plinth level 1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm
nominal size)

Row Code Description Unit Qty Rate Amount


M1 0295 Stone Aggregate (Single Size) 20mm nominal size Tonne 0.6400 357.00 228.48
M2 0297 Stone Aggregate (Single Size) 10mm nominal size Cum 0.2100 360.00 75.60
M3 0367 Portland Cement Day 0.6100 2566.00 1565.26
M4 0982 Coarse Sand ( Zone III ) Cum 0.4250 308.00 130.90
C2 2202 Carriage of Stone Aggregate below 40mm nominal size Cum 0.8500 67.95 57.76
C3 2203 Corase Sand Cum 0.4250 91.31 38.81
C1 2209 Carriage of Cement Ton 0.6100 34.01 20.75
E1 0002 Concrete Mixer 0.14 Cubic metre Day 0.0700 250.00 17.50
E2 0012 Vibrator (Needle type 40mm) Day 0.0700 150.00 10.50
L2 0101 Bhishti Day 0.7000 99.40 69.58
L3 0114 Beldar Day 1.6300 93.00 151.59
L1 0155 Mason (Average) Day 0.1000 120.00 12.00
S1 9275 Sundries 1Time 5.5000 1.66 9.13
Total Cost : 2387.85
OHP : 265.05
Total Cost Incl OHP : 2652.90

ANALYSIS NO. 2

DSR Code : 5.1.1 Unit: Cum


Related IPMG Code: 03310 260 1010

Item Description: Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering,
finishing and reinforcement - All work upto plinth level 1:1:2 ( 1 Cement : 1 Coarse sand : 2 graded stone aggregate 20
mm nominal size )

Row Code Description Unit Qty Rate Amount


M1 0295 Stone Aggregate (Single Size) 20mm nominal size Cum 0.6400 357.00 228.48
M2 0297 Stone Aggregate (Single Size) 10mm nominal size Cum 0.2100 360.00 75.60
M3 0367 Portland Cement Ton 0.6100 2566.00 1565.26
M4 0982 Coarse Sand (Zone 3) Cum 0.4250 308.00 130.90
C1 2202 Carriage of Stone Aggregate below 40mm nominal size Cum 0.8500 67.95 57.76
C2 2203 Corase Sand Cum 0.4250 91.31 38.81
C3 2209 Carriage of Cement Ton 0.6100 34.01 20.75
L2 0101 Bhishti Day 0.9000 99.40 89.46
L3 0114 Beldar Day 2.0000 93.00 186.00
L1 0155 Mason (Average) Day 0.1700 120.00 20.40
E1 0002 Concrete Mixer 0.14 Cubic metre Day 0.0700 250.00 17.50
E2 0012 Vibrator (Needle type 40mm) Day 0.0700 150.00 10.50
S1 9275 Sundries 1Time 5.5000 1.66 9.13
Total Cost : 2450.54
OHP : 272.01
Total Cost Incl OHP : 2722.55
BuildSYSTEM Report - Analysis of Rate from CPWD DSR

ANALYSIS NO. 3

DSR Code : 3.2101 Unit: Cum


Related IPMG Code : 04060 450 0510

Item Description: Lime mortar 1: 1 : 1 (1 lime putty : 1 surkhi : 1 fine sand)

Row Code Description Unit Qty Rate Amount


M1 0773 Lime Unslaked Qtl 3.0100 230.00 692.30
M2 0983 Fine Sand (Zone 4) Cum 0.4750 191.00 90.72
M3 1182 Surkhi Cum 0.4750 320.00 152.00
C1 2208 Carriage of Lime Cum 0.3900 38.26 14.92
C2 2261 Carriage of Fine Sand (1 part badarpur sand : 2 parts Cum 0.4750 54.35 25.82
jamuna sand)
C3 2266 Carriage of Surkhi Cum 0.4750 52.09 24.74
L1 0101 Bhishti Day 0.4500 99.40 44.73
L2 0114 Beldar Day 0.9000 93.00 83.70
S1 9015 Average cost of running & upkeep of the mortar mill 1Time 10.3500 1.66 17.18

S2 9275 Sundries 1Time 5.2000 1.66 8.63


Total Cost : 1154.74
OHP : 0.00
Total Cost Incl OHP : 1154.74

ANALYSIS NO. 4

DSR Code : 11.1.1 Unit: Sqm


Related IPMG Code : 09631 100 2010

Item Description: Bricks on edge flooring with bricks of class designation 75 including cement slurry etc. complete in Cement mortar
with F.P.S. bricks: 1:4 ( 1 cement : 4 coarse sand)

Row Code Description Unit Qty Rate Amount


M1 2602 F.P.S. Bricks class designation 75 Thd 0.5650 1298.00 733.37
M2 0367 Portland Cement Ton 0.0200 2566.00 51.32
C1 2201 Carriage of Bricks 1000N 0.5650 150.99 85.31
C2 2209 Carriage of Cement Ton 0.0200 34.01 0.68
I1 3.2113 Cement mortar 1 : 4 (1 cement : 4 coarse sand) Cum 0.4340 1517.78 658.72
L1 0101 Bhishti Day 0.2700 99.40 26.84
L2 0114 Beldar Day 0.2500 93.00 23.25
L3 0115 Coolie Day 1.6200 93.00 150.66
L4 0124 Mason (For Brickwork) 2nd class Day 1.0800 110.00 118.80
Total Cost : 1848.94
OHP : 205.06
Total Cost Incl OHP : 2054.00
Cost of 1 Sqm : 205.40
BuildSYSTEM - Partial List of Buyers

Architect Builder / Contractor

D.A.S. Innovators Pvt Ltd New Delhi National Building Construction Corp. Ltd. Vadodara
Design Plus New Delhi National Projects Construction Corp. Ltd. Faridabad
EFNRA Consultants Delhi Odeon Builders Pvt. Ltd. New Delhi
Khurmi Associates New Delhi PSG Developers & Engineers Ltd. New Delhi
Javed Inayat Noida Saamag Constuctions Limited New Delhi
M.C Orient Consultants Pvt Ltd Noida Sahyog Infrastructures Pvt Ltd Noida
Mathur & Kapre Associates ( Pvt. ) Ltd. New Delhi Smart Homes Constructions Pvt Ltd Mumbai
Nirman Consultants New Delhi Sumit Goel New Delhi
Prem Chaudhery & Associates Pvt. Ltd New Delhi YFC Projects (P) Ltd Gurgaon
Rommel Mehta New Delhi
Satish Khanna New Delhi Consulting Engineer
Shri Ratnesh Enterprise Ahmedabad
Space Design Consultants New Delhi Asiatic Engineers CS & E New Delhi
Tevatia Chauhan & Sharma Architects New Delhi Currier & Brown New Delhi
V. Raju & Associates Hyderabad Deolalikar Consultants Pvt. Ltd. New Delhi
XEBEC Design and Facilities Pvt. Ltd. New Delhi Gherzi Eastern Limited New Delhi
Indrajit Maitra Associates New Delhi
Builder / Contractor Mahendra Raj Consultants Pvt. Ltd. New Delhi
RITES Limited Gurgaon
Anant Raj Industries Limited New Delhi RRA Project Management New Delhi
Ansal Properties & Infrastructure Ltd New Delhi Sterling India Pvt. Ltd. New Delhi
Arwin Projects Pvt. Ltd. New Delhi STUP Consultant Pvt. Ltd. New Delhi
Astha Engineers & Construction New Delhi Worxpace Consulting Pvt. Ltd. New Delhi
ATS Infrastructure Ltd. Noida
Balakrishna Engineers & Contractors New Delhi Project Owner
Complete Dewatering Systems Pvt. Ltd. New Delhi
C.R. Sons Builders & Developers Pvt Ltd New Delhi BMTPC New Delhi
Emaar MGF Land Pvt. Ltd. New Delhi Delhi Metro Rail Corporation New Delhi
Engineering Projects (India) Ltd. New Delhi Garrison Engineer (P) West New Delhi
Gannon Dunkerley & Co. Ltd. New Delhi Indian Farmers Fertiliser Cooperative Ltd. New Delhi
Gurucharan Singh New Delhi Jindal Power Limited New Delhi
G.S.P.L Hyderabad Jindal Steel & Power Limited Raigarh
IRCON International Limited Allahabad Mazagon Dock Ltd. Mumbai
IRCON International Limited Jhansi Mumbai International Airport Pvt Ltd Mumbai
Jaycon Infrastucture Limited New Delhi The Continental Group New Delhi
M & M Pro-Con Pvt. Ltd New Delhi
National Building Construction Corp. Ltd. New Delhi
National Building Construction Corp. Ltd. Gandhidh.
National Building Construction Corp. Ltd. Guwahati
National Building Construction Corp. Ltd. Imphal
National Building Construction Corp. Ltd. Rajasthan
BuildSYSTEM - Online Presentation, Training & Support

IPMG provides online presentation, training and support on BuildSYSTEM.

This training is web-based. IPMG uses “Go To Meeting” portal to connect with the client in an
interactive way.

The “ Go To Meeting “ portal is the easiest and most cost-effective way to organize and attend
online meetings. This patented technology enables client and IPMG to view BuildSYSTEM
application running at both ends, in real time.

The client participates as a guest of IPMG in the following ways :

• The client opens the email which is sent by IPMG.


• The client is requested to click the link provided in the email to join the meeting.
• The “Go to Meeting” site web page appears where it is asked to click ‘Yes or Always’ to start
the download of software “Go To Meeting”.
• After the download completes, the client enters his name and email id.
• The desktop screen of computer at IPMG end will appear at client end.
• The communication between client and IPMG can now start.

The benefits to the client are as under :

• Easy way to have online presentation, training and support.


• Free of cost for the client.
• The client can work online on BuildSYSTEM.

The system requirement is as under:

• Internet Explorer® 5.0 or newer version.


• Windows® 2000, XP, 2003 Server or Vista.
• Stable 56k, cable modem, ISDN, DSL, or better Internet connection.
• Minimum of Pentium® III, with 356 MB of RAM (recommended)
• Yahoo Messenger, Google TalkTM or Windows Live Messenger.
• Microphone for communication.

It is suggested that the client should have a microphone with speaker. It costs Rs. 200/- approx.
This will enable him for online communication with IPMG. Otherwise, the communication will be
through land line or mobile.
BuildSYSTEM - Order Form
Please send me the BuildSYSTEM CD by Registered Book Post / Courier to the
address given below :

I understand that BuildSYSTEM CD is Jointly Developed & Owned by IPMG &


RS Means, USA
 CUT HERE

NAME :

COMPANY :

ADDRESS :

PIN :

CITY : PHONE : FAX :

E - mail :

Quantity : ____ , CD @ Rs. 25,000/- + 4% Tax, Rs._________Amt. :__________

The above price includes :


1. Single user with hardware key.
2. IPMG cost data only. Other published cost data are provided free of cost.
3. Training at client premises for 3 hrs., at one stretch, in NCR only.
4. Online training for clients outside NCR.
5. Telephonic support.

Enclosed is a Cheque to “ Integrated Project Management Group Pvt. Ltd. ”

for Rs.

drawn on

Signature : Date :
CUT HERE

( Please attach your Visiting Card )

Please send this Order to :


Integrated Project Management Group Pvt. Ltd.
23, Community Centre, East of Kailash, New Delhi - 110 065


Tel. : 4658 1560 (4 Lines) • Fax : 4658 1564


E-mail : info@ipmg.net.in
Website : www.buildcost - ipmg.com

THANK YOU FOR YOUR ORDER

You might also like