You are on page 1of 7

INSTRUCTION SHEET IS-RCB5304

6 CORPORATE PARKWAY
GOOSE CREEK , SC . 29445 STYLE NUMBER: RCB5304MA
www . quoizel . com

PACKAGE CONTENTS ISSUED 01-2011

PART DESCRIPTION QUANTITY


A
A Crossbar 1 pc
1 pc B
B Green Ground Screw J
2 pcs C
C Hex Nut
Nipple 1 pc D
D
E Lock Washer 2 pcs E
K
F Canopy Chain Loop 1 pc
F
G Canopy Lock Ring 1 pc L
H Fixture Chain 1 pc G

I Ceiling Canopy 1 pc M
H
J Fixture Loop 1 pc N
I
K Long Stem 1 pc
L Short Stem 1 pc
M Finial 1 pc
N Band A 1 pc
O Band B with Socket Assembly 1 pc
O
P Band C 1 pc
Bead Kit: P
Q A) - Bead String A [12pcs] 1 pc Q
B ) - Bead String B [1 2 pcs]
A)

B)

WARNINGS AND CAUTIONS


WARNING:
● Before beginning the installation, turn off electricity at the circuit breaker box or the main fuse box by switching
off the circuit breaker or removing the fuse.
CAUTION:
● These instructions are provided for your safety. It is very important that they are read completely before the
installation of your fixture. We strongly recommend that a professional electrician install the fixture.
● Disconnect fixture from the power source before replacing the bulb(s), making sure that bulb(s) had sufficient
time to cool down. DO NOT subject the lamp to any shock while lit as shattering of lamp may result.

1 OF 7
PREPARATION STYLE NUMBER: RCB5304MA

● Before beginning installation of product, make sure all parts are present. Compare parts with package contents
list and diagram above. If any part is missing or damaged, do not attempt to assemble, install or operate the
product. Contact customer service for replacement part.
● Estimated Assembly Time: 30 - 45 minutes
● Tool Required for Assembly (not included): Flathead screwdriver, Phillips screwdriver, Pliers, Electrical tape,
Wire cutter, Safety glasses and (4) 60W B10 candelabra base bulbs .
● Helpful Tools (not included): Wire strippers.

INSTALLATION INSTRUCTIONS

STEP 1:
a. Thread the beaded end of the Short Stem into the
bottom center of the Junction Box. Hand tighten until
snug.
b. Place the Band C over the end of the Short Stem and
secure with the Finial. Hand tighten until snug. Please Band B with
line up Spokes on Band B and C during assembly. (See Socket Assembly
Fig. 2 )
Junction Box

Short Stem

Fig. 1 Band C
Finial

Band B with Socket Assembly

Front View

Spoke

Bottom View

Front View

Spoke
Line up
Bottom View Spokes during
Band C assembly
Fig. 2

2 OF 7
INSTALLATION INSTRUCTIONS STYLE NUMBER: RCB5304MA

STEP 2:
a. Thread the short nipple end of the Long Stem into the Fig. 1 Fixture Loop

top center of the Band B. Hand tighten until snug. Band A


b. Place the Band A over the top end of the Long Stem and
secure with the Fixture Loop. Hand tighten until snug.
Please line up Spokes on Band A, B and C during
assembly. (See Fig. 2 )

Long Stem

Band B with
Socket Assembly

Band A
Spoke
Top View

Front View

Band B with Socket Assembly

Front View

Spoke

Bottom View

Front View

Spoke
Line up
Spokes during
Bottom View assembly

Fig. 2 Band C

3 OF 7
INSTALLATION INSTRUCTIONS STYLE NUMBER: RCB5304MA

STEP 3:
a. Secure the Crossbar onto the Outlet Box with Outlet
Box Screws. Tighten until snug. Outlet Box

Crossbar

Outlet Box
Screw

STEP 4:
a. Thread one Hex Nut onto top end of the Nipple.
b. Place one Lock Washer over the top end of the Nipple
and then thread the Nipple into the center lock hole of
the Crossbar. Lock Washer
c. Using pliers, thread the Hex Nut against the Crossbar Crossbar
and hand-tighten until snug. Hex Nut

Nipple

STEP 5:
a. Thread another Hex Nut onto the end of the Nipple.
b. Place the Lock Washer over the end of the Nipple and
then thread the Canopy Chain Loop onto the end of the
Nipple.
c. Using pliers, thread the Hex Nut against the Canopy Nipple
Chain Loop and hand-tighten until snug.

Hex Nut

Lock Washer

Canopy Chain Loop

4 OF 7
INSTALLATION INSTRUCTIONS STYLE NUMBER: RCB5304MA

STEP 6:
a. Push the Ceiling Canopy upward over the Outlet Box. Outlet Box
Thread the Canopy Lock Ring onto the Canopy Chain
Loop and tighten until snug to secure the Ceiling
Canopy.

Canopy Chain Loop

Ceiling Canopy

Canopy Lock Ring

STEP 7:
a. Adjust the Fixture Chain to your desired length by
removing the links if needed. You may need to use
pliers to open the chain links. If so, put a cloth over the
chain to protect the finish from the pliers. Canopy Chain Loop
b. Attach one end of the Fixture Chain onto the Canopy
Chain Loop and then attach the other end of the Fixture
Chain onto the Fixture Loop on the top of the fixture.

Fixture Chain

Supply Wires

Fixture Loop

5 OF 7
INSTALLATION INSTRUCTIONS STYLE NUMBER: RCB5304MA

STEP 8:
a. Pull the Supply Wires up through the Fixture Chain
alternating links. Push the wires up through the Canopy
Chain Loop into the outlet box. Canopy Chain Loop

Fixture Chain

Supply Wires

STEP 9:
a. Un-thread the Canopy Lock Ring and slide Canopy Outlet Box
Lock Ring and Ceiling Canopy down the Fixture Chain.
b. Push all slack fixture wire through Canopy Chain Loop
into Outlet Box. Trim excess fixture wire leaving a
minimum of 6 in. Hanging out of the Outlet Box.
c. Refer to STEP 10 to connect the wires. Canopy Chain Loop
d. Re-attach the Ceiling Canopy as shown in STEP 6.
Fixture Chain

Ceiling Canopy

Canopy Lock Ring

6 OF 7
INSTALLATION INSTRUCTIONS STYLE NUMBER: RCB5304MA

STEP 10:
Use Wire Connectors to connect the wires.
WHITE OR RIBBED WHITE OR RIBBED
a. Connect the House Ground Wire to the Fixture Ground
Wire. FROM HOUSE FROM FIXTURE
b. Connect the House White (or Ribbed) Wire to the
Fixture Supply Wire (Black or Smooth Side).
c. Connect the House Black (or Red) Wire to the Fixture BLACK (OR RED) WIRE BLACK OR SMOOTH
Supply Wire (Black or Smooth Side).
FROM HOUSE FROM FIXTURE
d. Wrap each connection with approved electrical tape
and carefully stuff all of the connected wires into the
Outlet Box. GROUND WIRE GROUND WIRE

FROM HOUSE FROM FIXTURE

STEP 11:
a. Attach one end of the Bead String A to the hanger
inside of the Band A. Attach the another end of the
Bead String A to the corresponding hanger in the top
edge of Band B.
Hanger
b. Attach one end of the Bead String B to the hanger in the
bottom edge of the Band B . Attach the another end of Band A
the Bead String B to the corresponding hanger at Band
C.
c. Bead String A and B should hang parallel to the center
stem of the fixture. If the strings are not parallel,
slightly rotate Band A or Band C to obtain parallel
alignment.
Bead String A

Band B Hanger

Hanger

Bead String B
Band C

Hanger

STEP 12 :
a. Install correct Bulbs referring to fixture markings and/or labels for maximum wattage.

Your installation is completed now. Restore electricity. Retain this sheet for future reference.

7 OF 7

You might also like