 Introduction
 Importance & Relevance of Solar Energy in India
 Objectives & Targets
 Mission Strategy (Phase I & II)
 Proposed Roadmap
 Policy & Regulatory Framework
 Research & Development

National Solar Mission India / JNNSM / Solar India / Nov 2009


2
11/24/2009

 Human Resource Development

 Institutional Arrangements for Mission

 International Collaboration

 Financing Mission Activities

National Solar Mission India / JNNSM / Solar India / Nov 2009


3
11/24/2009

 Major initiative by GOI & State Governments

 Aims at promoting ecologically sustainable growth

 Also addresses energy security challenge

 Will contribute to the global effort to meet the


challenges of climate change

National Solar Mission India / JNNSM / Solar India / Nov 2009


4
11/24/2009

 Cost
◦ Solar is high on absolute cost as compared with other power
such as coal
◦ Objective of Solar Mission is to drive down the cost by
 Rapid scale-up of capacity
 Technological innovation
◦ Mission anticipates to achieve
 Grid parity by 2022
 Parity with coal-based thermal power by 2030

National Solar Mission India / JNNSM / Solar India / Nov 2009


5
11/24/2009

◦ Cost trajectory depends on


 Scale of global deployment
 Technological development & transfer
◦ Cost projections vary - from 22% for every doubling of
capacity to a reduction of only 60% with global deployment
increasing 16 times the current level
◦ Mission recognizes a number of off-grid applications for
meeting rural needs which are cost-effective & requires
rapid expansion

National Solar Mission India / JNNSM / Solar India / Nov 2009


6
11/24/2009

 Scalability
◦ About 5000 Trillion Kwh energy potential is incident over India’s
land area with most parts receiving 4-7 Kwh/Sq.mt/Day
◦ Technologies that can be used to harness the resource & provide
huge scalability of solar in India– Solar Photovoltaics & Solar
Thermal
◦ Advantages of Solar technology
 Ability to provide power in a distributed basis
 Enable rapid capacity addition with short lead times.
 Apt solution for rural electrification
 Can work in diffused radiating conditions as well
National Solar Mission India / JNNSM / Solar India / Nov 2009
7
11/24/2009

 Environmental Impact
◦ Zero emissions while generating heat and emissions
 Security of source
◦ Available abundantly
◦ Small fraction of total incident solar energy can meet the entire
country’s power requirements

National Solar Mission India / JNNSM / Solar India / Nov 2009


8
11/24/2009

 Objective is to establish India as a global leader in solar


energy
 Mission adopts 3-phase approach
◦ Phase I (up to 2012/2013) – remaining period of 11th five yr
plan & first yr of 12th yr plan
◦ Phase II (2013-2017) – remaining 4 yrs of 12th five yr plan
◦ Phase III (2017-2022) – 13th five yr plan

National Solar Mission India / JNNSM / Solar India / Nov 2009


9
11/24/2009

 End of each plan there will be


◦ Evaluation of progress
◦ Review of capacity
◦ Targets for subsequent phases
 Above evaluations will be based on emerging cost and
technology trends, both domestic and global
 Aims to protect government from subsidy exposure &
expects cost reduction does not materialize or is more rapid
than expected

National Solar Mission India / JNNSM / Solar India / Nov 2009


10
11/24/2009

 Mission Targets
◦ Create an enabling policy framework for the deployment of
20,000 MW of solar power by 2022
◦ Ramp up capacity of grid-connected solar power generation
◦ 2013 – 1000 MW
◦ 2017
 Additional 3000 MW (mandatory use of renewable purchase
obligation by utilities backed with preferential tariff)
 Capacity could increase to 10,000 MW installed power by 2017 or
more, based on enhanced & enabled international finance &
technology transfer

National Solar Mission India / JNNSM / Solar India / Nov 2009


11
11/24/2009

◦ 2022 – 20,000 MW or more – will be dependent on “learning” of first


two phases
 Create favorable conditions for solar manufacturing capability
(solar thermal for indigenous production & market leadership)
 Promote programmes for off grid applications (1000 MW –
2017 & 2000 MW – 2022)
 Achieve 15 million sq. meters – 2017 & 20 million sq. meters
-2022 of solar thermal collector area
 2022 - deploy 20 million solar lighting systems for rural areas

National Solar Mission India / JNNSM / Solar India / Nov 2009


12
11/24/2009

 Will provide broad framework to achieve objectives


 Will create necessary environment to attract industry &
project developers to invest in research, domestic
manufacturing & development of solar power generation
 Hence will help in creating the critical mass for a domestic
solar industry
 Mission to work closely with State Govts., Regulators,
Power utilities & Local self govt. bodies to ensure activities
& policy framework being laid out can be implemented
effectively

National Solar Mission India / JNNSM / Solar India / Nov 2009


13
11/24/2009

 Utility connected applications: constructing the solar grid


◦ Promoting solar power through Renewable Purchase Obligation
(RPO) mandated for power utilities, with specific solar
component
◦ RPO will drive utility scale power generation (solar PV or solar
thermal)
◦ RPO will gradually increase where as the tariff fixed for solar
power purchase will decline over time
 The below 80°C challenge – solar collectors
◦ Mission sets an ambitious target for ensuring that applications,
domestic & industrial, below 80°C are solarised

National Solar Mission India / JNNSM / Solar India / Nov 2009


14
11/24/2009

 Key strategy to make necessary policy changes to meet


this objective
◦ Making solar heaters mandatory, through building byelaws and
incorporation in the National Building Code
◦ Ensure the introduction of effective mechanisms for
certification and rating of manufacturers of solar thermal
applications
◦ Facilitate measurement and promotion of these individual
devices through local agencies and power utilities
◦ Support the upgrading of technologies and manufacturing
capacities through soft loans, to achieve higher efficiencies and
further cost reduction
National Solar Mission India / JNNSM / Solar India / Nov 2009
15
11/24/2009

 The off-grid opportunity – lighting homes of the


power- deprived poor
◦ Key problem to find optimum financial strategy to pay for the
high-end initial costs in these applications through appropriate
Government support
◦ Government has promoted the use of decentralized applications
through financial incentives and promotional schemes
◦ Solar Mission has set a target of 1000 MW by 2017, which may
appear small, but its reach will add up to bringing changes in
millions of households
◦ 30 % capital subsidy for promoting innovative applications of
solar energy

National Solar Mission India / JNNSM / Solar India / Nov 2009


16
11/24/2009

 Mission plans to
◦ Provide solar lighting system under the ongoing remote village
electrification programme of MNRE to cover about 10,000
villages & hamlets
◦ Set up stand alone rural solar power plants in special category
States and remote and difficult areas such as Lakshadweep,
Andaman & Nicobar Islands, Ladakh region of J&K. Border
areas would also be included
◦ Promotion of other off grid solar power applications would
also be encouraged (includes hybrid systems to meet power,
heating & cooling energy requirements currently being met by
use of diesel & other fossil fuels)

National Solar Mission India / JNNSM / Solar India / Nov 2009


17
11/24/2009

 Solar energy to power computers to assist learning in


schools & hostels would
 Consider up to 30 per cent capital subsidy for promoting such innovative
applications
 Also structure a non-distorting framework to support entrepreneurship, up-
scaling and innovation
 Manufacturing capabilities: innovate, expand and disseminate
◦ Requires India’s leadership role in low-cost
◦ High cost solar manufacturing, including balance of system components
◦ Proactive implementation of Special Incentive Package policy to
promote PV manufacturing plants
◦ SME sector forms the backbone for manufacture of various components
and systems for solar systems

National Solar Mission India / JNNSM / Solar India / Nov 2009


18
11/24/2009

 R&D for Solar India: creating conditions for research and


application
◦ Focus on
 Improvement of efficiencies in existing materials, devices and
applications and
 Reducing costs of balance of systems,
 Establishing new applications by addressing issues related to
integration and optimization
 Developing cost-effective storage technologies which would address
both variability & storage constraints
 Targeting space-intensity through the use of better concentrators
 Application of nano-technology & use of better & improved materials

National Solar Mission India / JNNSM / Solar India / Nov 2009


19
11/24/2009

◦ Solar Research Council to be set up to oversee the strategy


◦ Human resource development programme to be established
◦ In phase I – 1000 young scientists & engineers would be
incentivized to get trained on different solar energy
technology as mission’s long-term R&D & HRD plan
◦ Pilot demonstration projects would be closely aligned with
the Mission’s R & D priorities and designed to promote
technology development and cost reduction
◦ In Phase I - mission envisages setting up of the following
demonstration projects which are already initiated by
MNRE & those which may be set up by corporate investors

National Solar Mission India / JNNSM / Solar India / Nov 2009


20
11/24/2009

◦ 50-100 MW Solar thermal plant with 4-6 hours’ storage (which can meet
both morning and evening peak loads and double plant load factor up to
40%)
◦ A 100-MW capacity parabolic trough technology based solar thermal plant
◦ A 100-150 MW Solar hybrid plant with coal, gas or bio-mass to address
variability and space-constraints
◦ 20-50 MW solar plants with/without storage, based on central receiver
technology with molten salt/steam as the working fluid and other emerging
technologies.
◦ Grid-connected rooftops PV systems on selected government buildings and
installations, with net metering.
◦ Solar-based space-cooling and refrigeration systems to meet daytime and
summer season peak load. These could be installed on selected government
buildings and installations
National Solar Mission India / JNNSM / Solar India / Nov 2009
21
11/24/2009

◦ Bidding process will be adopted for better price discovery of


determining tariff for solar power
◦ It is expected that the plants will be commissioned in the 12th
plan period

National Solar Mission India / JNNSM / Solar India / Nov 2009


22
11/24/2009

 To ensure large-scale deployment of solar generated power


for grid-connected as well as distributed and decentralized
off-grid provision of commercial energy services

Sl. Application Target for Phase Target for Phase Target for Phase
No. Segment I (2010-2013) II (2013-2017) III (2017-2022)
7 million sq 15 million sq 20 million sq
1 Solar Collectors meters meters meters
Off grid solar
2 applications 200 MW 1000 MW 2000 MW

Utility grid
power, including
3 roof top 1,000-2000 MW 4000-10,000 MW 20000 MW

National Solar Mission India / JNNSM / Solar India / Nov 2009


23
11/24/2009

 Provide a predictable incentive structure that enables rapid


& large-scale capital investment in solar energy
applications
 Encourage technical innovation & lower the costs
 In long run, mission would seek to establish a sector-
specific legal & regulatory framework for solar power
development
 In short run, it embeds the activities of the mission within
the existing framework of Electricity Act of 2003

National Solar Mission India / JNNSM / Solar India / Nov 2009


24
11/24/2009

 National Tariff Policy 2006 mandates the State Electricity


Regulatory Commissions (SERC) to fix a minimum
percentage of energy purchase from renewable sources of
energy (availability of resources & impact on retail tariff)
 Solar power purchase for states

Phase I 0.25%
By 2022 Up to 3%

National Solar Mission India / JNNSM / Solar India / Nov 2009


25
11/24/2009

 In order to encourage rapid scale-up a scheme is being


introduced in co-operation with the Ministry of Power, NTPC
& Central Electricity Authority, to simply off-take of solar
power & reduce the financial burden on govt.
 Also aims to bring down the gap between average cost of
power and sale price of power
 NVVN (wholly owned subsidiary - NTPC) (NTPC Vidyut
Vyapar Nigam Ltd ) is chosen as the nodal agency for entering
into a Power Purchase Agreement (PPA) with solar power
developers

National Solar Mission India / JNNSM / Solar India / Nov 2009


26
11/24/2009

 PPA
◦ Shall be signed with the developers who will be setting up Solar
Projects within next three years and are connected to the grid at 33
KV level and above
◦ Will be valid for a period of 25 years
 Mission will encourage rooftop solar PV and other small solar
power plants, connected to LT/11 KV grid, to replace
conventional power and diesel-based generators
 Generation Based Incentive payable to the utility to cover the
difference between the solar tariff determined by CERC, less
the base price of Rs. 5.50/kWh with 3% p.a. escalation

National Solar Mission India / JNNSM / Solar India / Nov 2009


27
11/24/2009

 State Governments would encourage to promote and establish


solar generation Parks with dedicated infrastructure for setting up
utility scale plants to ensure ease of capacity creation
 Fiscal Incentives
◦ Custom duties and excise duties concessions/ exemptions be made
available on specific capital equipment, critical materials ,
components and project imports
 Solar Manufacturing in India
◦ Aims to take India on a global leadership role in Solar
Manufacturing

National Solar Mission India / JNNSM / Solar India / Nov 2009


28
11/24/2009

 Targets 4-5 GW equivalent of installed capacity by 2020


including setting up of dedicated manufacturing capacities
for poly silicon material to annually make about 2 GW
capacity of solar cells
 India’s current PV module manufacturing capacity 700 MW
 Some plants likely to be set in public & private sector
 To achieve installed target capacity, mission recommends
◦ Local Demand Creation

National Solar Mission India / JNNSM / Solar India / Nov 2009


29
11/24/2009

 Financing & Incentives


◦ SEZ like incentives to be provided to the manufacturing parks
which may include
 Zero import duty on capital equipment, raw materials and excise duty
exemption
 Low interest rate loans, priority sector lending
 Incentives under Special Incentive Package (SIPs) policy to set up
integrated manufacturing plants;
 from poly silicon material to solar modules; and
 thin film based module manufacturing plants
 It is also recommended that solar components be covered under the
Bureau of Energy Efficiency’s star rating programmes to ensure high
standards

National Solar Mission India / JNNSM / Solar India / Nov 2009


30
11/24/2009

 Committee may be set up to formulate a policy for


promotion of solar thermal manufacture in the country
◦ Ease of Doing Business
◦ Infrastructure & ecosystem enablers
 2-3 large solar manufacturing tech parks
 Should have 24x7 power and water supply
 need to be located near large urban centers with good linkages to ports
and airports to ensure rapid access to imported raw materials and high
quality engineering talent

National Solar Mission India / JNNSM / Solar India / Nov 2009


31
11/24/2009

 Mission will launch a major R&D programme in Solar


Energy, which will focus on improving efficiency in
existing applications, reducing costs of Balance of Systems
 To support the R&D Strategy, the Mission may include the
following
◦ Setting up a high level Research Council comprising eminent scientists,
technical experts and representatives from academic and research
institutions, industry, Government and Civil Society to guide the overall
technology development strategy
◦ National Centre of Excellence (NCE) shall be established to implement
the technology development plan formulated by the Research Council
and serve as its Secretariat

National Solar Mission India / JNNSM / Solar India / Nov 2009


32
11/24/2009

◦ Research Council, in coordination with the National Centre of Excellence,


inventorize existing institutional capabilities for Solar R&D and encourage the
setting up of a network of Centres of Excellence, each focusing on an R&D area
of its proven competence and capability
◦ These centers to be located in research institutes, academic institutions or even
private sector companies
◦ NCE will provide a national platform for networking among different centers of
excellence and research institutions, including foreign R&D institutions and
high-tech companies
◦ NCE will serve as the funding agency to support performance-linked solar R&D
programmes (funding, or co-funding of pilot demonstration projects) in areas
relevant to Mission objectives

National Solar Mission India / JNNSM / Solar India / Nov 2009


33
11/24/2009

◦ NCE will coordinate with the IMD, ISRO and other concerned agencies, the
detailed mapping of ground insulation, particularly in high potential solar
regions of the country
◦ To provide support for incubation and start ups, the Mission could tie up with
institutions like Centre for Innovation, Incubation and Entrepreneurship (CIIE)
based in IIM Ahmedabad to incubate solar energy start-ups and SMEs in India
through mentoring, networking and financial support
◦ Fund aims to support at least 50 start ups developing & deploying solar related
technologies across India over next 5 yrs & would be managed by a professional
entity
◦ Initiative shall be structured ideally in a private-public partnership model, to be
able to provide risky capital to the aspiring entrepreneurs
◦ It would also attract contributions from private stakeholders, amounting to, at
least 10% of that of the Government

National Solar Mission India / JNNSM / Solar India / Nov 2009


34
11/24/2009

 Requires a concomitant increase in technically qualified


manpower of international standard
 Steps required for HRD
◦ IITs & premier Engineering Colleges will be involved in designing &
developing specialized courses in Solar Energy
◦ Government Fellowship programme to train 100 selected engineers /
technologies and scientists in Solar Energy in world class institutions abroad will
be taken up
◦ Setting up of a National Centre for Photovoltaic Research and Education at IIT,
Mumbai drawing upon its Department of Energy Science and Engineering and
its Centre for Excellence in Nano-Electronics

National Solar Mission India / JNNSM / Solar India / Nov 2009


35
11/24/2009

 Autonomous Solar Energy Authority embedded within the


existing structure of the Ministry of New and Renewable
Energy
 To monitor technology developments, review and adjust
incentives, manage funding requirements and execute pilot
projects

National Solar Mission India / JNNSM / Solar India / Nov 2009


36
11/24/2009

 Strategic international collaborations and partnerships


 Effective technology transfer mechanisms and strong
IPR protection
 Co-operation through bilateral and multilateral
arrangements would be facilitated

National Solar Mission India / JNNSM / Solar India / Nov 2009


37
11/24/2009

 Budgetary support for the activities under the National


Solar Mission established under the MNRE
 International Funds under the UNFCCC framework, which
would enable up scaling of Mission targets

National Solar Mission India / JNNSM / Solar India / Nov 2009


38