You are on page 1of 1

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Metal Doors and Windows Pre-Installation Inspection SAIC-M-1047 18-May-05 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Doors Pre-installation Inspection

The floor and headers shall be level and true; The jambs shall be SAES-M-100
A1
straight, plumb and square with the sill. (1997 UBC, Sec. 1003.3.1.6) Sec. D

Door and Frame size and type shall be correct for the opening, including
SAES-M-100
A2 tolerances on plumbness, level and squareness.
Sec. D
(1997 UBC, Sec. 1003.3.1.3)

Door assembly fasteners shall be compatible with the materials joined to SAES-M-100
A3
prevent galvanic corrosion. (1997 UBC, Sec. 1003.3.1.8, .9 & .10) Sec. D

B Windows Pre-installation Inspection

The rough opening shall be of the correct size to install the window in a
SAES-M-100
B1 square, plumb and level condition in accordance with the manufacturer's
Sec. D
instructions. (1997 UBC, Sec. 2401.4.1 & 2401.4.2)

The window frame shall be the correct size and type for the opening,
SAES-M-100
B2 including tolerances on plumbness, level and squareness.
Sec. D
(1997 UBC, Sec. 2401.4.1 & 2401.4.2)

Window assembly fasteners shall be compatible with the materials joined SAES-M-100
B3
to prevent galvanic corrosion. (1997 UBC, Sec. 2401.4.1 & 2401.4.2) Sec. D

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-M-100 -- Saudi Aramco Building Code, 29 January 2003
2- 1997 UBC -- Uniform Building Code, 1 January 1997

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 1

You might also like