You are on page 1of 1

SAUDI ARAMCO ID/PID - 18-May-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Bulding Components/Materials Receiving Inspection SAIC-M-1031 18-May-05 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
The materials furnished shall include the structural framing, roofing,
siding, anchor bolts, flashing and trim, leveling plates, doors, windows,
12-SAMSS-014
A1 hardware, fasteners, sealants, and any other component parts for the
Sec. 4.1
metal buildings as specified in the order and as required to make a
complete system.
Unless otherwise provided in the Purchase Order the metal building does
not include:
a) Reinforced concrete foundations, grade beams and/or floor slabs.
b) Grouting or filling of any kind under columns or door jambs or in a
recess at the base of wall covering panels.
c) Interior downspouts or their drains for valley or parapet gutters, either
under floor or otherwise.
d) Materials which are required for the assembly or installation of 12-SAMSS-014
A2
accessories supplied by others. Sec. 4.2
e) Glass for openings other than doors and windows.
f) Interior finishing material, including partition material, except for liner
panels.
g) Electrical equipment and wiring.
h) Mechanical equipment, including exhaust fans.
i) Masonry materials.
j) Field painting.
The building type and dimensions shall be in accordance with the 12-SAMSS-014
A3
drawings or detailed description attached to the Purchase Order. Sec. 4.3.1
All framing members shall be made from structural steel designed and
12-SAMSS-014
A4 shop fabricated for bolted field assembly, unless otherwise noted on
Sec. 4.3.1
erection drawings.
12-SAMSS-014
A5 All framing members shall carry an easily visible identifying piece marks.
Sec. 4.5

REMARKS:

REFERENCE DOCUMENTS:
1- 12-SAMSS-014 -- Pre-Engineered Metal Buildings, 30 June 2002

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 1

You might also like