SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Concrete Coatings Pre-Installation Inspection SAIC-H-1003 18-May-05 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Surface preparation, moisture testing and environmental condition


A
inspection

New concrete shall be cured for a minimum of 28 days prior to coating.


Shorter cure times shall only be allowed if the concrete passes either
ASTM D4263 Concrete Moisture Content by the Plastic Sheet Method or
SAES-H-003
by the Elcometer conductivity test.
A1 Sec. 5.1.1, 5.1.2
& 5.1.3
Note: Test report SATR-H-1003 " Concrete Moisture Field Test
(For Coating Purposes)" shall be avaible for review/verification of
concrete moisture condition.

Atmospheric relative humidity shall be less than 85% during surface SAES-H-003
A2
preparations for coating. Sec. 5.2.1

Surfaces shall be tested for dryness after rain, water blasting, or heavy SAES-H-003
A3
overnight fog. Sec. 5.2.2

Wind conditions shall be such as to allow complete clean up of dust and SAES-H-003
A4
dirt on areas to be coated. Sec. 5.2.3

SAES-H-100
A5 Paints shall not be used from a container showing a sign of leakage.
Sec. 6.3

Coatings or their components which have exceeded the Manufacturer's


recommended shelf life shall be set aside and must not be used unless SAES-H-100
A6
written authorization is given by Saudi Aramco Consulting Services Sec. 6.4
Department.

Remove any protrusions and sharp edges with an abrasive


SAES-H-003
A7 carborundum brick, power grinding, or power brushing prior to coating
Sec. 5.3.1.a
concrete.

Surfaces shall be sound such that a metal object run over the concrete SAES-H-003
A8
shall not loosen any particles. Sec. 5.3.1.a

Form oils, grease, laitance, etc. shall be removed by steam cleaning with
SAES-H-003
A9 a water emulsifiable detergent added. Laitance can be removed by wire
Sec. 5.3.1.b
brushing.
Materials that cannot be removed by steam cleaning or abrasion can be
removed by Hydochloric acid etching; The adequacy of the water SAES-H-003
A10
flushing shall be checked by placing litmus paper on the wet surface to Sec. 5.3.1.b
ensure that it is fully neutralized.
New concrete shall be roughened to the texture of medium grit
SAES-H-003
A11 sandpaper by grit blasting when it has a troweled or "formed" smooth
Sec. 5.3.1.c
surface.
The tensile strength of heavy duty surface concrete by ASTM D4541
SAES-H-003
A12 shall meet or exceed 175psi for immersion service and 260 psi for
Sec. 5.3.2
industrial floors.

Page 1 of 2
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Concrete Coatings Pre-Installation Inspection SAIC-H-1003 18-May-05 Civil
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Remove all loose concrete, sealants, and old coatings by abrasive
SAES-H-003
A13 blasting. Remove approximately one inch of concrete beyond any visible
Sec. 5.3.3.b.1
contaminated surface.
Neutralize acidic surfaces with an alkaline cleaner such as soda ash SAES-H-003
A14
(sodium carbonate) followed by a high pressure fresh water rinse. Sec. 5.3.3.b.2
Concrete surfaces (such as acid waste neutralizing tanks) that have
SAES-H-003
A15 been in prolonged contact with acids require a minimum soak of 24
Sec. 5.3.3.b.2
hours at a pH of 7-8, agitating the solution during soaking.
After rinsing, force air dry surfaces for at least 24 hours prior to making SAES-H-003
A16
any repairs to the concrete. Sec. 5.3.3.b.2
Neutralize alkaline surfaces by steam cleaning. ASTM D4262 ---
SAES-H-003
A17 "Standard Test Method for Determining pH of Chemically Cleaned or
Sec. 5.3.3.b.3
Etched Concrete Surfaces" shall be performed.
A strip of pH Test Paper is dipped in the rinse water remaining on the
surface. The pH reading obtained should not be more than 1.0 pH units SAES-H-003
A18
lower or 2.0 pH units higher than readings taken on the fresh water rinse Sec. 5.3.3.b.3
before being applied to the concrete surface.

B Primer/sealer application inspection

Cracks less than 10 mm wide and holes not exceeding 10 mm in


SAES-H-003
B1 diameter shall be filled using a qualified epoxy filler or grout before
Sec. 5.4.1
applying primer/sealer to the surface.
Expansion/construction joints, when removed, shall be cleaned out and
SAES-H-003
B2 masked off prior to coating. When not removed, they must be masked
Sec. 5.5
off; Remove masking and replace sealants as required.
Voids (including holes with diameters exceeding 10 mm) shall be SAES-H-003
B3
prepared and primed using an epoxy prior to being filled. Sec. 5.6

Surfaces subject to immersion conditions shall have internal corners SAES-H-003


B4
rounded with a 25mm fillet using epoxy grout. Sec. 5.7
Primer/Sealer shall be applied in a thin coat; filling and coating shall be SAES-H-003
B5 done after sealing; Application of primer/sealer shall be by spray except Sec. 5.10, 5.10.1,
for touch-up (areas < 0.1 m²). & 5.10.2
REMARKS:

REFERENCE DOCUMENTS:
1- SAES-H-003 -- Coating Requirements for Concrete Surfaces, 30 September 2001

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED