Professional Documents
Culture Documents
IS-Limiter
IS-Limiter
IS-limiter
The world’s fastest
switching device
Reduces substation cost
Solves short-circuit problems
in new substations and substation extensions
Optimum solution for interconnection of
switchboards and substations
In most cases the only technical solution
Tried and tested in thousands of installations
Worldwide in service
The peak short-circuit current will never be
reached
The short-circuit current is limited
at the very first current rise
© ABB AG -2-
- 6549 E 24-02-05 -
IS-Limiter
IS-limiter
Link between
in-plant generation The world’s fastest
and switching device
public systems
© ABB AG -3-
- 6550 E 24-02-05 -
IS-Limiter
Technical Data
Rated voltage Rated current Interrupting
current (RMS)
- 6554 E 24-02-05 -
IS-Limiter
Insert holder and insert
- 6553 E 24-02-05 -
IS-Limiter
Breaking of a short-circuit current by IS-limiter
i=i1+ i2 without
IS-limiter
CB
i=i1+ i2
with IS-limiter
IS-limiter
- 6552 E 24-02-05 -
IS-Limiter
IS-limiter
installed in bus-tie
Advantages:
Improving power quality,
Increasing the reliability of the system,
IS-limiter Reduction of the network-impedance,
Optimal load flow,
Existing busbar system has not to be changed.
© ABB AG -7-
- 6555 E 24-02-05 -
IS-Limiter
IS-limiter in generator feeder
Advantages:
Generator can be connected independent on
the short-circuit capability of the system,
Existing busbar system has not to be changed,
No need of expensive generator breaker.
© ABB AG -8-
- 6556 E 24-02-05 -
IS-Limiter
IS-limiter for connection of a
IS-limiter in the bus-tie generator
with current-direction
comparison to a fully loaded system
Advantages:
Private / industrial generator feeder can be
Tripping of IS-limiter
connected to the (fully loaded) grid,
No Tripping of IS-limiter
Selective tripping of the IS-limiter (IS-limiter will
operate only for short-circuit faults in the grid)
© ABB AG -9-
- 6557 E 24-02-05 -
IS-Limiter
IS-limiter in parallel with
reactor
Advantages:
Avoid coppers losses of the reactor,
Avoid voltage drop of the reactor,
No electro-magnetical field on the reactor
Outgoing feeders
© ABB AG -10-
- 6558 E 24-02-05 -