You are on page 1of 94

J o ur n a l

U.S. ARMY

of Installation Management

E
H he
M
S et
O

SPRING 2011
Y’ r
M A

SUSTAINABILITY EDITION
R e
A W

N in
Y
IT
U s
M er
M n
O rt
C Pa

V IRONMENTA
L
EN
CO
Y
U.S. ARM

MM
AND
SU

NG
ST

IN
EI
A

AB -

U.S. ARMY
B

IL IT Y LL
WE
READINESS
IN

T
EN

AL
ST

LA NM
TIO RO
NS AND ENVI

Integrated Sustainability Planning


p. 1, 74, 82

Energy and the Environment


p. 7, 19, 24, 48

Fiscal Sustainability
p. 13, 29, 35, 42,

Human Capital
p. 58, 63, 69
A SUSTAINABLE
INSTALLATION…
• Operates as a living system
• Serves as the “land mass” and “air space” that
optimizes military training while contemplating
future impacts to training capability given the
decisions made and actions taken today
• Provides for the readiness and well-being of
Soldiers, Civilians, and Families
– Energy efficient and environmentally
sustainable facilities (built and natural)
– Strong minds, bodies, and spirits through
exemplary cultural/community services
– Knowledge sharing, innovative, and
collaborative working environment
• Adds value to and has mutually-beneficial
relationships with the local community (inside
and outside the fence-line)
• Is life-cycle cost-effective to operate and
proactive in doing so
– Eliminating the concept of “waste”
– Understanding the true financial (hidden) cost
of decisions and actions
• Proficiently incorporates appropriate technology
and competent expertise
• Demonstrates its understanding of regenerative
limits associated with natural resource use (does
not use natural resources at a rate faster than
nature is able to regenerate) and its responsibility
to systematically eliminate its addiction to:
– Non-renewable energy sources (fossil fuels)
– Non-biodegradable and toxic compounds
– Resources derived from
environmentally annihilative
sources/processes
From the

C ommanding G eneral We are the Army’s Home

(ASCP) in 2010 to coordinate and synchro- need for operational energy in base camps.
nize the Army’s sustainability requirements as set Following Ms. Hammack’s article, we have an
forth in the E.O. Elements of the ASCP are incor- article from USAG Vicenza about their experi-
porated in nearly every aspect of the Installation ence building an entirely new, LEED certified
Management Campaign Plan (IMCP). installation on the site of an old Italian airfield.

The ASCP states, “sustainability is an orga- The IMCOM G-8 and Southeast
nizing principle that is being instilled throughout Region lead the fiscal discussion, but articles
everything the Army does, including planning, from Picatinny Arsenal, Fort Jackson and
Sustainability: The Key to the Future training, equipping, and operations, to ensure Fort Drum show us the fiscal benefits of
The term sustainability came into our Soldiers are capable of achieving any task waste management--and even maple syrup!
common use around the year 2000 as in- given them, now and in the future.” We have an article from Fort Huachuca
stallations that had once been intentionally about their water program and their quest to
isolated from urban populations began to For IMCOM, sustainability is even
achieve net zero water usage. The IMCOM
see residential and commercial develop- more complex than the declining availabil-
G-1 contributes an article on sustaining the ci-
ments creeping across those once-isolated ity of resources. We rely on resources such as
vilian workforce through health and fitness pro-
acres, right up to the installation fence. This water, land, energy and building materials to
grams, and from Fort Stewart and Joint Base
surge in development introduced another run our installations, but at the same time,
Lewis-McChord we get ideas on building and
word—encroachment—into the Army’s our workforce is aging and we will be losing
sustaining a high-performing workforce. This
vocabulary as installations found themselves an irreplaceable amount of expertise over the
is only a sample of the more than 25 articles
in competition with their new neighbors next ten years. Our military communities are
that were submitted for this issue, which co-
for access to land, water, airspace and fre- under stress in the wake of a decade of per-
incides with and will serve as a great take-
quency spectrum to the extent that Army sistent conflict, and needs exist for better and
away for our April Installation Management
units on those installations were threatened more varied services to maintain the appro-
Symposium in San Antonio. Once again, we
with the inability to carry out their missions. priate quality of life for Soldiers and Families.
have the luxury of abundant articles-- more
Meanwhile our monetary resources are sure
Since those days, the Department of than the printed journal will hold. We will
to shrink, requiring even greater stewardship
Defense, the Army, and now IMCOM, have publish the best possible cross-section of arti-
of the finances entrusted to us. Our chal-
invested considerable intellect into address- cles in the print edition and post the remain-
lenge for the coming years is to close the gap
ing sustainability. Once considered mostly ing articles to the Journal’s website edition.
between what is needed for the future and
an environmental preservation issue, sus- If you’re not checking the website for jour-
what we can provide now. It will not be easy.
tainability planning introduced programs nal content, I recommend you start because
such as Army Compatible Use Buffers This issue of the Journal is dedicated to there is a lot of great additional content there.
(ACUB), which have helped shield instal- Sustainability, and it focuses on three large
Thanks as always to all who volunteered to
lations from encroachment while build- areas: Energy and Environmental, Human
contribute their experience and insight.
ing partnerships with communities to set Capital, and Fiscal Sustainability. We are em-
aside wild lands for environmental protec- phasizing these three areas to point out that
tion. Sustainability planning has evolved to sustainability has come to mean much more
drive initiatives for green buildings, renew- than just environmental protection and en-
able energy projects, water conservation, ergy conservation. However, these three areas
waste reduction and range management. are inextricably linked in strategic planning,
as an article by the IMCOM G-5 points out.
In recent years, the Army has pub-
We are honored once again to open
Lieutenant General Rick Lynch
lished strategies for the Environment, Commanding General
Energy, Water, and Green Procurement. In the journal with an article from the Assistant U.S. Army Installation
response to Executive Order 13514, Federal Secretary of the Army for Installations, Management Command
Leadership in Environmental, Energy, and Energy and Environment (ASA-IE&E), that Assistant Chief of Staff
discusses net zero installations, private sector for Installation Management
Economic Performance, the Army published
the Army Sustainability Campaign Plan investment in installations and reducing the “Defender 6”

i
ii
J o ur n a l
U.S. ARMY

of Installation Management
Spring 2011

CONTENTS:

1 Energy and Sustainability Priorities and Opportunities


by Hon. Katherine Hammack, Assistant Secretary of the Army, IE&E

7 USAG Vicenza Manages Present and Future Costs in Building Italy’s Newest U.S. Army Installation
by Anna Ciccotti, Transformation Construction Management Office, USAG Vicenza

13 Picatinny Arsenal, Using Public Investment to Improve Infrastructure and Reap Millions in Energy Savings
by Nicholas Stecky, Resource Efficiency Manager, & Eric Kowal, Public Affairs Specialist, USAG Picatinny Arsenal

19 Sustainable Water: Reaching Net Zero


by COL Timothy Faulkner, Commander, USAG Fort Huachuca

24 Flatlined - IMCOM’s Progress with Municipal Solid Waste


by Greg Kuhr, G-4, IMCOM

29 Achieving Fiscal Sustainability in an Era of Persistent Conflict: A Leadership Challenge


by BG Thomas A. Horlander, G-8, IMCOM

35 Cost Management vs Budget Management: Performance Based Band of Excellence


by Joe Staton, Management Integration Branch Chief, IMCOM-SE Region

42 Fort Drum Forest Management: Innovation Brings Sweet Profits


by Jason Wagner, Chief of Natural Resources Branch, USAG Fort Drum

48 Solid Waste Diversion on Fort Jackson


by Tameria Warren, Sustainability Management System Coordinator, Environmental Division, Fort Jackson, SC,
Ken Burghardt, Environmental Division Chief, Fort Jackson, SC , and COL JJ Love, Commander, USAG Fort Jackson, SC

54 There’s Gold in Those Woods—the Accounting is Clear


by Robert R. Baumgardt, Public Works Director, USAG Fort Stewart

58 What if 5,000 Army Civilians didn’t show up for work… for a year?
by Karen Perkins, G-1, IMCOM

63 Sustaining a High Performing Workforce - Doing the Right Thing!


by Beverly S. Fordham, Workforce Development Program Manager, USAG Fort Stewart/Hunter Army Airfield

69 We the People: Joint Base Lewis McChord takes the pulse of its sustainability program
by COL Tom Brittain, Garrison Commander, Miriam Easley, Sustainability Outreach Coordinator, JBLM

74 IMCOM Strategic Planning through a Sustainability Lens


by S. Lynn Odom, Ph.D., G-5 Program Analyst, HQ IMCOM

82 Integrated Installation Planning: Fort Leonard Wood ensures a sustainable future


by COL Charles Williams, Commander, USAG Fort Leonard Wood

The icons below represent three pillars of sustainability on which we focus our concentration. Each article in this edition is marked with
one, two, or all three of these to tell the reader at a glance which pillar or pillars are represented in the article text. These designations
are somewhat subjective, so other perspectives may also be valid. Comments are welcome by email or discussion on the website.

Environmental & Energy Sustainability Fiscal Sustainability Human Capital Sustainability


iii
Journal of Installation Management
Contributors’ Guide
Topics and Contributors Standard article structure normally Writers should include a short biog-
The U.S. Army Journal of Installation proceeds from a thesis statement, to raphy that mentions current duty as-
Management is the Army’s print fo- three main points of discussion, fol- signment, education, and any creden-
rum for ideas, experiences, case stud- lowed by conclusion, recommenda- tials or experiences that establish the
ies and opinions relating to the many tions, and summary. Proposal outlines writer’s topical authority. Also include
disciplines that pertain to the broad or abstracts are not required, but will contact information that allows edito-
area of installation management. Each be considered and feedback provided rial staff to reach you. We will not pub-
edition will feature articles from a se- if writers want to test an article idea. lish contact information.
lect group of garrison leaders and oth-
er contributors discussing topics re- The Journal does not require adherence Accompanying Material
lating to the issue’s designated theme, to a particular academic style, but rules Photographs, charts, and other sup-
which will ordinarily stem from some of good writing always apply. A good porting visuals are encouraged, but
part of the Installation Management and widely available reference book will often have to be modified or recre-
Campaign Plan (IMCP). The IMCP is The Elements of Style, by Strunk ated by the designers for reproduction
is available at the IMCOM Web site, and White. For articles with several quality. Photos must be print qual-
http://www.imcom.army.mil/hq/. citations, an academic style such as ity—normally 300 DPI or higher. Do
the American Psychiatric Association not embed visuals into the text of an
Articles will be evaluated for consis- (APA) Style or the Chicago Style can article—instead, submit them sepa-
tency with commander’s intent and be helpful in managing references. rately, with identifying information
for topical fit within the theme. All Word processing programs have made and relevance to the article.
submissions are carefully reviewed and these citation protocols much more
may be shared with a subject matter user friendly than in the past. Clearance
expert to provide a second opinion as All articles and supporting visuals
to accuracy and relevance. Where ap- The following stylistic guidance is
offered to answer the most frequently must have any required clearance for
propriate to maintain consistent focus operational security. Editors will also
and high editorial quality, authors may asked questions:
screen for public releasability.
be asked to clarify or expand on some - Military ranks are denoted in the mil-
aspect of their papers. itary style, i.e. LTC, MG, SGT, etc. Engage the Audience
- Names of people and organizations Authors wishing to invite discussion
All articles should be titled and des- are spelled out on first reference
ignate the name of the author(s) of from community members are wel-
with the acronym, if any, in paren- come to reference their articles in posts
record, along with a short bio of ap- theses following. Thereafter, people
proximately 50-60 words. to IMCOM Garrison Commanders’
are normally referred to by last name Net, an Army Professional Forum
only—organizations by acronym. established for members of the IM
Length - IMCOM style calls for capitalizing Community. Just log in to www.gar-
Articles should be of adequate length Soldier, Civilian and Family, listed risoncommand.com and register
to engage a reader in a substantial in that order. with your CAC or AKO account if
exploration of the topic. A good - Senior Commander and Region you’re not already a member Garrison
average length is about 2,000-3,000 Director are capitalized, garrison Commanders’ Net is not affiliated
words, although longer articles are commander is not. with the Journal.
acceptable. Articles lacking in depth
or substance will be returned to Although most of the audience is senior
the writer with suggestions for bring- installation management profession-
ing the work up to standard. If the als, vocabulary should be accessible to
standard is not achieved, the article a general college-level audience, with
will be excluded. technical or function-specific language
used only as necessary and explained
Manuscript Style to the extent practical. The editorial
Writing should be clear and concise, staff will edit all manuscripts for gen-
ideas should be the author’s own, eral rules of good grammar and style.
and cited material must be prop- Substantive changes will be referred to
erly accredited. We are looking for a the author for clarification. Editors will
scholarly or expository text—not a also consider security and appropriate-
Command Information news story. ness when editing manuscripts.

iv
IMCOM Commander
Lieutenant General
Rick Lynch

Deputy Commander /
Chief of Staff
Major General
Al Aycock

Executive Director
Mr. John Nerger

Command Sergeant Major


Neil L. Ciotola

Editorial Staff
Director of Public Affairs and
Strategic Communication
Michael P. Thiem

Managing Editor
Ned Christensen

Design / Print Procurement


Army Publishing Directorate

U.S. Army Journal of EDITOR'S NOTE:


Installation Management In this and future copies of the Journal, you will see these codes from
Produced by the United States Army Installation time to time and place to place. Known as Quick Response Codes (or
Management Command Public Affairs Office. QR Codes), they are similar to the familiar barcodes and they contain
11711 North IH 35, San Antonio, TX 78233. information. You can read the code with a smart phone that has a QR
The journal is published quarterly for senior Code reader installed on it. There are a multitude of code readers available
leaders and stakeholders in the installation from the Apple App Store or your phone's equivalent, and they range in
management community. Email the Journal cost from nothing to a few dollars. The code here will take you to the
at imcomjournal@conus.army.mil Installation Management Community Facebook page, which you need to
see if you haven't yet. There is another one in this issue that will take you
to more sustainability resources. We hope you enjoy this new technology.

v
Energy and Sustainability
Priorities and Opportunities
by Hon. Katherine Hammack, Assistant Secretary of the Army, IE&E

Albert Einstein said, “The world will strides and allow us to obtain secure
not evolve past its current state of cri- energy well into the future. They are
sis by using the same thinking that net zero installations, leveraging op-
created the situation.” portunities for private sector invest-
ments and reducing operational en-
As an Installation Management ergy in base camps.
Community, we are at a turning point.
We are faced with limited natural re- NET ZERO
sources, yet we require access to those The Army’s net zero installation
resources in order to meet the Army’s strategy is important to our nation
mission. Securing and sustaining our and national security.
energy and water sources is operation-
ally necessary and financially prudent. Net zero is more than just achieving
greater efficiencies and reducing en-
As a means of continuing our effort to ergy consumption. Net zero is about
seek ways to improve efficiency and re- building on our existing programs and
duce overhead expenditures as good accomplishments, going beyond the
stewards of our nation’s valuable re- call to simply promote sustainability
sources, Lt. Gen. Rick Lynch and I have through a series of isolated proj-
placed energy and sustainability issues ects, to integrating all of these
among the top priorities for installations. existing efforts towards one end
goal: achieving installations that
We’re working on several initiatives that are self-sustaining.
will help us continue to support the
mission and our most precious assets, A net zero installation applies while benchmarking energy consump-
our Soldiers, Civilians, and Families. an integrated approach to the man- tion to identify further opportunities.
agement of energy, water, and waste
Securing energy is critical for our in- to capture and commercialize the re- The next step is to utilize waste energy—
stallations, our operations and our source value and/or enhance the eco- that is, to “repurpose” energy. Boiler
mission. It is operationally necessary logical productivity of land, water, and stack exhaust, building exhausts or other
and financially prudent. For all of us, air. A net zero installation has three in- thermal energy streams can all be utilized
energy security is also a responsibility terrelated components: net zero ener- for a secondary purpose. Co-generation
that requires personal commitment gy, net zero water, and net zero waste. recovers heat from the electricity gen-
and accountability. eration process. The balance of energy
A net zero energy installation produces needs then are reduced and can be met
Today, as part of the Installation as much energy on site as it uses over by renewable energy projects.
Management Community, we are fo- the course of a year. To achieve this,
cused on three Army energy goals. the installation starts with aggressive Similarly, a net zero water installation
These goals will help us make great conservation and efficiency efforts limits the consumption of freshwater

1 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
The pilot installations will be showcasing their efforts, strategies and prac-
tices and providing lessons learned as they strive to achieve net zero.

resources and returns water back to the We have identified installations that
same watershed so not to deplete the have committed to be net zero by
groundwater and surface water resourc- 2020. They include five net zero energy
es of that region in quantity or quality installations, five net zero waste instal-
over the course of a year. To achieve a lations, five net zero water installations
net zero water installation, efforts be- and one installation to be all three.
gin with conservation, followed by ef-
ficiency in use and improved integrity Net zero energy installations were
of distribution systems. Water is repur- identified based on energy security
posed by capturing and reusing water needs, the installation’s leadership sup-
generated from sources such as show- port, energy costs as an indicator for
ers, sinks, laundries or cooling towers renewable and alternative energy eco-
(grey water) and by capturing precipi- nomic viability, project development
tation and storm water runoff for on- capabilities of the installation, renew-
site use (purple pipe). Wastewater can able energy resource availability and
be treated and recharged into ground- the local policy environment.
water aquifers. Several Army installa-
tions are already well down the path to Net zero water installations were iden-
reaching net zero water goals. tified based on the command’s willing-
ness and commitment to participate,
A net zero waste installation reduces, the level of water supply constraints and
reuses, and recovers waste streams, vulnerabilities, water efficiency project
converting them to resource values capabilities and progress made in reduc-
with zero landfill over the course of a tion goals, access to alternative water
year. Every day, more recycling strat- sources, water and wastewater costs as
egies are developed, moving beyond an indicator for economic viability, the
metals, paper and cardboard to in- local policy environment that may re-
clude mattresses, glass, plastics, bat- strict the use of alternative water sources
teries, computer printers and motor and the impact of utility privatization.
oil. The best strategy is to consider the
waste stream when purchasing items, Net zero waste installations were also
reduce the volume of packaging, reuse identified based on the command’s tion program team and the potential
as much as possible and recycle the willingness and commitment to par- for impact. Larger reduction is better.
rest. A true cradle-to-cradle strategy ticipate, as well as recycling program
considers the end state at the time the availability in the community, waste The pilot installations will be showcas-
purchase decision is made. A net zero diversion programs in the community, ing their efforts, strategies and practic-
waste strategy eliminates the need for ability to deploy waste-to-energy, avail- es and providing lessons learned as they
landfills, protects human health, op- ability of community solid municipal strive to achieve net zero. Achieving
timizes use of limited resources and waste to supplement a waste-to-energy net zero will require significant com-
keeps the environment clean. plant, existence of an installation pol- mitment from installation personnel
lution prevention and waste minimiza- to appropriately plan for, implement

W e a r e t h e A r my ’s Hom e 2
I encourage all installations to continue working toward net zero goals and communicate
good news stories, since there are many benefits. In 2014, we will be expanding the program
focus to include 25 installations in each category with a target net zero date of 2030.

and report on net zero progress. While Times columnist and Nobel Laureate Since energy projects cost money,
selection does not guarantee that ad- said “When the U.S. Army desegre- Congress authorized federal agencies
ditional funding will be available for gated, the country really desegregated; to use private sector financing in the
achieving these goals, the intent is to le- when the Army goes green, the coun- Energy Policy Act of 1992 (EPAct) to
verage available resources and expertise, try could really go green.” implement energy savings opportunities.
as well as providing training and techni-
cal support throughout the pilot process. As I have travelled to installations and Four major authorized sources of financ-
met leadership, I have come to believe ing are: Energy Savings Performance
I encourage all installations to contin- that the Army is ready to engage in a Contracts, Utility Energy Savings
ue working toward net zero goals and challenge. We can help to lead the na- Contracts, Enhanced Use Leasing and
communicate good news stories, since tion through appropriate resource man- Power Purchase Agreements.
there are many benefits. In 2014, we agement. To that end, we have imple-
will be expanding the program focus to mented the Army’s net zero installation Energy Savings Performance
include 25 installations in each catego- strategy to manage natural resources. Contracts (ESPC)
ry with a target net zero date of 2030. One authorized source of financing is
LEVERAGING OPPORTUNITIES provided by Energy Service Companies
A key element of the Army’s FOR PRIVATE SECTOR (ESCOs) through ESPCs.
Sustainability Campaign Plan is to re- INVESTMENT
duce the natural resource demands of Our second goal is to work closely Private sector ESCO contracts allow
our installations. Better management with the private sector to increase pri- installations to improve their infra-
will ultimately reduce the Army’s oper- vate sector investment in Army instal- structure and implement energy proj-
ating costs and maintain mission per- lations to increase our savings. The ects while paying for the measures with
formance capability and quality of life, Army is evaluating our processes and the anticipated savings being generated
while continuing to enhance relation- support level provided to garrisons. We by the project over time (10-25 years).
ships with local communities. By fully hear from many of our energy manag- An ESCO performs services that in-
integrating sustainability into Army ers that this is an area where they need clude: evaluation, design, financing, ac-
operations at the installation level, we support, training and guidance. We quisition, installation and maintenance
will preserve our flexibility to operate are working diligently on a strategy to of energy efficient equipment; altered
in a constrained economic future and address those challenges. operation and maintenance improve-
with limited natural resources. ments; or technical services for the Army.
Through contractual agreements formed The ESCO receives compensation based
When the Army changes the way it between the Army and a private sector on the verified energy savings generated.
does business, there is an enormous entity, the private party provides a ser-
shift in throw-weight that accompa- vice or project to the Army and assumes Perhaps more importantly, ESPCs give
nies that change. For the Army, instal- substantial financial, technical and op- Army facility managers a solution to fa-
lations alone make up over 954 mil- erational risk in the project. Capital in- cility problems with minimal up-front
lion square feet of space within the vestment is made by the private sector cost. Applied with care and consider-
U.S. and abroad. It is for this reason on the strength of a contract with the ation, ESPCs can help facility managers:
that Thomas Friedman, New York Army to provide agreed services.

3 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
The program to date has helped private development execute projects of tremendous range
such as General Motors Hot Weather Test Track in Yuma, AZ, projects of scope such as our
award winning Central Utilities Plant in Frederick, MD, or traditional use…

• reduce equipment breakdowns and Enhanced Use Leasing (EUL) projects throughout the U.S.
emergency repair requests, EUL is part of a legislative authoriza-
• provide better, more productive living tion for the Army to lease underuti- The EUL program can meet the needs
and working conditions for people, lized real property. Started in 2001, the of private developers with a value
• reduce costs, Army Enhanced Use Lease program proposition on par with or better than
• meet environmental mandates, has progressed from an ambitious con- that of the private sector.
• save energy and meet management goals. cept to a successful reality. The EUL
Program engages through a competi- Power Purchase
The EPAct of 2005 reauthorizes ESPCs tive process, private sector entities to Agreements (PPAs)
through Sept. 30, 2016. The Energy acquire and leverage value from under- PPAs cover up-front equipment and
Independence and Security Act of 2007 utilized non-excess real estate assets on installation costs for renewable energy
(EISA) permanently reauthorized ESPC Army Installations. Mirroring a pri- systems while the customer pays only
for Federal agencies and eliminated vate sector transaction, the EUL’s value a monthly amount.
Congressional notification requirements. proposition is competitive on cost and
speed of execution. PPAs involve a third party who pays
Utility Energy Savings for and owns the system. With a PPA,
Contracts (UESCs) The law requires the lessee to pay in- the installation purchases the kilowatt
UESCs are similar to ESPC’s. The kind consideration in an amount that hours used monthly at a pre-set rate
most notable difference is that the is not less than the fair market value that may or may not incrementally in-
projects are financed and implemented of the lease interest. However, the cat- crease over the term of the agreement.
through utility companies. UESC’s are egories of in-kind consideration that
contracts that allow utilities to provide may be accepted include construction PPAs make operational power costs
the Army with comprehensive energy of new facilities, restoration (including predictable. The advantage to inves-
and water efficiency improvements and environmental), acquisition, alteration tors is that they have the long-term
demand reduction services. The utility and other services. Further, the Service security of a system that will produce
provides comprehensive assessment of Secretary may now accept in-kind con- revenue from electricity generated for
cost effective energy efficiency, renew- sideration for any property or facility more than 20 years, while the Army
able energy or water efficiency opportu- under the control of that Service, rath- gets affordable electricity, typically be-
nities to the Army for our evaluation. er than just at the installation where low the retail electricity rate, for the
the property was leased. life of the contract.
The utility also provides the capital costs
of the assessment, design, construction, The program to date has helped pri- Among the barriers to PPAs is that
performance testing, and other optional vate development execute projects of they are relatively complex, incorpo-
services like Operation and Maintenance tremendous range such as General rating legal obligations, procedures
(O&M), Commissioning, and Motors Hot Weather Test Track in and technical requirements that are
Measurement and Verification (M&V). Yuma, AZ, projects of scope such as well beyond the ability of the average
The Army agrees to pay for the costs our award winning Central Utilities facility manager to understand, requir-
of services and equipment replacement Plant in Frederick, MD, or traditional ing a consulting engineer and legal
from generated savings. use such as our office and residential counsel. An alternative is hiring a solar

W e a r e t h e A r my ’s Hom e 4
management and diversifying supply. quirements are the same as traditional
bases. However, the supporting infra-
Fuel and water make up 70-80 percent structure, personnel, and operational
of our resupply weight into the combat controls are much different for contin-
zone and there is one casualty for ev- gency bases than traditional installa-
ery 24 convoys. So our efforts on tions and can be significantly different
contingency bases will not only for sites that are only occupied for a
save money but will save lives. few weeks or months.

Contingency bases are Everything that we learn and imple-


evolving locations that sup- ment in our permanent installations
port military operations by with regard to net zero operations can
deployed units and provide be leveraged into contingency basing
the necessary support and strategy to reduce the consumption
services for sustained opera- of fuel and water through better effi-
tions. They support tenants ciency, recovery and reuse, local pro-
and their equipment. While not duction and lighter weights. Efforts
permanent bases or installations, employed in shelters, energy genera-
the longer they exist, the more they tion and distribution, waste water and
require the same functions and fa- solid waste processing all contribute to
cilities as permanent locations. They reduced operational energy.
can contain one or more units and be
multi-service. They have a defined CONCLUSION
perimeter and established New Army policies, such as requiring all
access controls, which light bulbs acquired for use in facilities
take advantage of natural and structures owned, leased or con-
and manmade features. trolled by the Army to meet higher en-
ergy efficiency standards, reinforce our
Contingency bases include the efficiency goals. The goal is a complete
integrator, a company that can handle full spectrum of humanitarian, peace- replacement of all inefficient incan-
financing details and system installa- keeping, theater engagement and descent lighting on Army installations
tion from design to commissioning. combat actions and all their potential within five years. New efficient lighting
PPAs also mean that the developer can mission requirements. They can be es- will use 3-5 times less electricity than an
receive tax deductions, cash incentives, tablished and operated in any region incandescent bulb over the same period.
utility rebates and, some, but not all of of the world. They can be small (com-
the renewable energy credits. PPAs have pany size or less), medium (battalion I have also signed policy that establish-
their pluses and minuses, but when +/-) or large (brigade combat team or es a new comprehensive process that
money is not available for a capital in- larger) bases and may be established makes energy and sustainability con-
vestment in solar power, they can turn and occupied for a short duration. siderations a fundamental part of every
visions of cleaner power into reality. component of a new facility design and
Experience in Iraq and Afghanistan building renovation. This strengthens
BASE CAMP has shown that the period of occu- construction practices and encourages
OPERATIONAL ENERGY pancy can extend for several years. The incorporation of new and innovative
Our third major goal is to reduce demands for facilities, security, energy, approaches. The policy specifies sus-
our operational energy in base camps logistics services, contracting, envi- tainable design and development prin-
through increased efficiency, demand ronmental management and other re- ciples, following guidance as detailed

5 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
in the American Society of Heating, to clean, secure energy. Ms. Katherine Hammack is the Assistant Secretary of the
Refrigerating and Air-Conditioning Army for Installations, Energy and Environment, serving
Engineers (ASHRAE) Standard 189.1. Through hard work and a deliberate as the primary advisor to the Secretary and Chief of Staff
approach to readiness, the Installation of the Army on all matters related to Installation policy,
Through strategies such as strategic sit- Management Community has put in place oversight and coordination of energy security and man-
ing, cool roofs (in appropriate climate many practices to help launch us into en- agement. Ms. Hammack has more than 30 years experi-
zones only), solar water heating, storm ergy security and sustainability projects in a ence in energy and sustainability advisory services. She
water management and water effi- meaningful and measurable way. holds a Bachelors Degree in Mechanical Engineering from
ciency, the Army will reduce its impact Oregon State University and an M.B.A. from the University
on the environment. Through a net zero approach, we can of Hartford. Ms. Hammack is a founding member of the
secure our future energy. U.S. Green Building Council inWashington, D.C.
Our commitment to sustainable design
and development extends beyond con- We can increase utilization of private
struction or renovation savings. While sector investment to save the Army
the benefits will vary based on loca- money and engage the expertise of
tion, preliminary analysis by the U.S. the private sector.
Army Corps of Engineers indicates the
energy savings over a standard building We can take the lessons learned and
will be 45 percent or greater. transfer them to our warriors who are
fighting in Afghanistan. Deploying
The Army’s “Building Energy new solutions to increased efficiency,
Efficiency” Tax-Deduction Policy demand management, and diversifying
dated Dec. 17, 2010, will assist Army supply will be critical to the mission.
contractors in validating and obtaining
tax deductions for the costs of install- I am committed to an Army where we
ing certain energy-efficient systems in have secure energy and water sources
Army buildings. The Army can assign that will help us complete our mission
a tax deduction of up to $1.80 per and be a better fighting force. I am
square foot, for energy efficient design committed, my team is committed and
and construction in new construction we need your continued commitment
or remodeling. Tax Deduction 179D to leadership to make this happen.
can be leveraged to reduce the cost of
LEED certification or other design fees I look forward to meeting and talking
associated with increased efficiency. with you at the Installation Management
Symposium in San Antonio later this
The Army is committed to assigning month and announcing the instal-
the deduction to qualified contractors lations that are stepping up to the
who are supporting the Army’s ener- net zero challenge.
gy-efficiency goals and seek to derive
greatest value from building energy ef- Thank you for what you do on Army
ficiencies developed and implemented installations. Army Strong.
by its contractors.

Through the efforts of our installa-


tions the Army is already boasting
significant progress that will lead

W e a r e t h e A r my ’s Hom e 6
USAG Vicenza Manages Present and Future Costs


in Building Italy’s Newest U.S. Army Installation


by Anna Ciccotti, Transformation Construction Management Office, USAG Vicenza

The U.S. Army Garrison (USAG) reduces overall project costs and
Vicenza, Italy, is two years into one The $400 million dollar construction time.
of the largest and most sustainable mil-
program is the largest MILCON
itary construction (MILCON) projects 2. Show how implementing sustain-
ever undertaken on the European con- project ever built in Italy, and ability principles can turn an old air
tinent. When the project is complete one of the largest in Europe. field into one of the Army’s most
in 2012, U.S. Army Africa (USARAF) environmentally friendly installations.
headquarters and the 173rd Airborne
Brigade Combat Team (ABCT) will Navy Facilities Engineering Command 3. Highlight how integrating sustain-
occupy a new home on 151 reborn (NAVFAC) along with multiple Italian ability themes from the Installation
acres of Dal Molin, former site of military and civilian agencies. Management Campaign Plan
an old Italian air base. The project (IMCP) helps foster ties with
is nearly 40 percent complete now and The Design/Build MILCON contract the local communities and reduces
is progressing rapidly. for the multiple-facilities complex was political opposition.
awarded March 28, 2008, supporting
The $400 million dollar program is the the LEED initiatives as project in- From the Dal Molin project’s initial
largest MILCON project ever built in scope. In coordination with NAVFAC, planning to the final approval, sustain-
Italy, and one of the largest in Europe. the construction agent for U.S. Army ability has been a key driver for long-
Once completed in 2012, it will also be projects in Italy, it was decided to adopt term strategic thinking and has helped
the first Department of Defense (DoD) a fast track approach with a contract overcome a wide array of potential
installation to obtain Leadership in time of about four years from design obstacles that could have slowed down
Energy and Environmental Design to occupancy. Such an aggressive time- the overall program. Given the mag-
(LEED) Silver certification, with po- line was required to meet the deadlines nitude of the scope of work and its
tential to achieve LEED Gold, for an directed by the Army’s transformation compressed schedule, systematically
entire On-Campus project. While program to consolidate four battalions preventing any type of construction
demonstrating leadership in sustain- of the 173rd ABCT currently based in delay has been of paramount impor-
able design, the project is on track to Germany with the Brigade headquar- tance and has set the paradigm for the
be delivered within scope, on time and, ters at Dal Molin by 2012. best possible approach.
most importantly, within budget.
In an effort to demonstrate how a From a sustainability perspective, this
The Army Installation Management sustainable development plan has implies identifying and managing cur-
Command-Europe (IMCOM-E), ul- been integral to the success of the Dal rent issues with a long-range vision.
timately responsible for the manage- Molin project to date, the purpose It also means adopting an integrated
ment and use of natural and cultural of this article is to: ethic that enables a step-up from a
resources, as well as lands under their compliance-based approach to a more
administrative control, is coordinat- 1. Explain how properly clearing a performance-based model.
ing a team effort that involves several construction site of unexploded
organizations, including USARAF, U.S. ordnance, underground storage From a strictly environmental perspec-
Army Europe (USAREUR), and the U.S. tanks and archeological artifacts tive, there were many potential concerns

7 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
Dal Molin Construction: The $289 million Design/Build contract for Dal Molin was awarded March 28, 2008 to a joint venture of the Italian
firms, CMC and CCC with bid savings of $33.5 million. Twenty-six facilities are under construction and five already covered to the roof:
recreation/BOSS, brigade headquarters, both parking garages and two company commands. With the consolidation of the 173rdABCT in
Vicenza in 2012, Vicenza will be the second largest American community in continental Europe.

coming from the consignment of a proj- meant coping with an extraordinary the area over to a general contractor
ect site vacated by the Italian air force in combination of exceptional challenges for its building purposes. In reality,
2008 after over 70 years of operations to in a complex, fragile environment. due to initial delays in the transfer of
the U.S. Army for the purpose of enlarg- Located in a densely populated urban Dal Molin, preparation activities such
ing their military footprint in Vicenza. area within a renowned historical con- as demolition of old facilities had to
USAG Vicenza embarked on the Dal text and protected habitat, and zoned be done concurrently with the design
Molin redevelopment effort in line with as a military industrial site, Dal Molin phase and the construction work.
its mission to provide standardized, posed most of the environmental issues
effective and efficient services, facilities and that program managers hope to avoid In the spirit of removing any potential
infrastructure to Soldiers, their Families in the execution of MILCON project. project-adverse factors from the site,
and Civilian employees commensurate In fact, preparing the site for construc- the initial site development program
with the quality of their service. tion required an extraordinary amount included clearance of World War II-
of innovative thinking from all stake- era ordnance - the legacy of intense
Part of that mission involves balanc- holders, who had to come up with aerial bombing on the Vicenza air-
ing sound environmental practices the best solutions to properly manage port in 1944. Technically, it would
that demonstrate compliance with all a clean-up plan first, and then an ad- not be strictly required by the Italian
host nation and U.S. requirements equate redevelopment plan of action. laws to carry out a UXO removal plan
with a commitment to be exceptional and clear the footprint of each build-
stewards of Italian lands. The project’s Understanding the “chain-effect” of de- ing and/or its utility lines prior to any
teams have proven themselves able to lays and their associated time and cost activity. However, a preliminary study
rise to the challenges inherited and consequences, the teams’ effort demand- produced physical evidence of buried
make them opportunities for advance- ed an aggressive strategy to identify an munitions on site. Balancing safety risks
ment and innovation. approach with the greatest benefits and and potential work stoppages due to de-
lowest cost. This was an absolute condi- tection of subsurface ordnance, it was
If preparing and clearing a site for tion for a seamless construction phase. highly recommended to proceed with
construction demands a great deal of an extensive clearance of the entire site
resources and coordination under any In theory, a site development plan beforehand. This approach proved to be
circumstances, clearing Dal Molin should be performed prior to turning successful for two important reasons.

W e a r e t h e A r my ’s Hom e 8
Construction Debris: The contractor has crushed, stockpiled, and recycled the concrete from demolished buildings on-site. This material will
be used in the construction of the new project. Material reuse cuts down on landfill waste, reduces the demand for virgin materials, and
reduces the project costs. Photo courtesy of the U.S. Army Garrison, Vicenza

First, it added to the safety of the work As underground storage tanks pose mented at two additional locations to
site, the safety of the future tenants and significant environmental hazards, improve groundwater quality.
that of the surrounding community. In with threats to soil, surface water and
fact this investment is paying dividends groundwater, a thorough investigation An additional prerequisite to begin-
in environmental stewardship, as it has was performed to identify, contain and ning any construction in Italy involves
helped increase public awareness and mitigate any hazard. A plan for priori- the archeological clearance. To obtain
continued to foster host nation support. tizing removal and remediation activi- the final authorization and allow unim-
ties in parallel with other on-site activi- peded construction, and in compliance
Secondly, as the clearance campaign re- ties was developed and executed. with current host nation’s requirements,
sulted in the detection and safe dispos- the Army hired a team of highly quali-
al of 46 explosive items, ranging from A total of 65 USTs, ranging in size from fied archeological consultants to work
2-inch bullets to 500-pound bombs, 10,000 to 55,000 liters, were safely re- the procedure under the scientific guid-
its well-timed execution prior to con- moved and disposed of in compliance ance of the Sovrintendenza dei Beni
struction helped avoid costly delays to with Italian requirements. Individual Archeologici, the Italian regional office
the contractor and, most importantly, storage tank removals, including soil for Archeological Heritage. The SBA
kept the project moving forward. excavation, sampling and analysis, has the final authority on releasing a
and closure reporting, were completed site for construction and the clearance is
The same pervasive strategy was chosen within the required 30-day timeframe. obtained only after it has been properly
for another important phase of site rede- A remediation plan followed for sev- investigated and documented.
velopment, i.e. the removal and disposal eral UST locations and included re-
of old underground storage tanks (UST) mediation designs, soil removal and The methodology of excavation and
previously used by the Italian military for disposal. Groundwater extraction and the time required to obtain the clear-
gasoline and other combustibles. treatment systems have been imple- ance are dependent on the findings.

9 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
Archeological Investigation at Bldg 18: While construction continues to move ahead, accredited project archeologists complete their Neolithic
investigation of the footprint of one of the future vehicle maintenance facilities. Construction of this building is planned to start immediately after
archeological clearance. Archeological assessments are integral and mandatory pre-construction activities on constructions projects throughout Italy.

Knowing the area to be ‘eligible’ for The Neolithic findings from Dal Investigation is still ongoing and slated
thorough investigations and signifi- Molin are considered among the most to be completed in a few months so that
cant discoveries, all stakeholders agreed important for this period ever discov- construction can move on accordingly.
to an accelerated approach based on a ered in Italy. Collected artifacts include The historical significance of the Dal
phased clearance process instead of the fragments of polished stone tools, pot- Molin archeology and success stories in
traditional and prolonged final ap- tery pieces and a series of postholes. the project coordination, implementa-
proval obtained at the completion of Although the wooden posts have long tion and artifact recovery will result in a
all surveys at the entire site. since rotted away, the holes suggest research publication by the SBA.
the position of a number of circular
To this end, the entire project site was split hut-like structures likely inhabited Archeological sites such as those at
into many small archeological sites to be by prehistoric humans. Dal Molin are rare and offer extraor-
investigated and cleared individually.
To date, 90 per cent of the project site
is clear, with anticipated clearance of
the last area in April 2011. Thousands
of artifacts are being discovered from
various historical periods, including
Modern Age (Eighteenth century)
Roman-era and Neolithic Period
(approximately 7,000 B.C.).

Arch of Roman Aqueduct: Previously


known and unknown Roman archeological
resources have been encountered during
the preliminary archeology investigation of
the site. Shown are the remains of an arch
of the Roman aqueduct that intersects the
installation fence line. The structures of
the aqueduct, part of the Vicenza
monumental heritage, have been properly
recorded and then reburied to preserve
their integrity for future generations.

W e a r e t h e A r my ’s Hom e 10
4th of July celebrations at Caserma Ederle, Viceza: To help foster partnering and engagement with the local community, USAG Vicenza is managing
an active, year-long calendar of community relations activities. These include school exchange programs, combined sports, mayors’ days, base tours,
cultural and outdoor recreation events that outreach to the citizens of Vicenza as well to those of the nearby municipalities.

dinary challenges and opportunities. erations and maintenance of high per- The overall strategy was to approach
The USAG Vicenza’s team consisted formance green buildings, the LEED the design of the new facility as one
of experts in the field of archeology certification of a Campus Project offers large urban complex, comparable to
and construction who negotiated with even greater opportunities to reduce a pedestrian-friendly campus. The
the Italian authorities on a process the impact of the buildings, sites and complex features 34 buildings master
that was not the norm. The success- infrastructures. In a Campus Project, planned into command, residential
ful management and unique approval each building must meet the LEED and operational areas. The design has
that USAG Vicenza received from SBA requirements to be certified; the same maximized open space, minimized
to process the sites in segments, while prerequisites are also mandated for the building footprints and preserves
continuing the MILCON project, is in- shared utilities, amenities, site land- more than 1.8 million sq ft of open
dicative of the strong working relation- scape, efficiencies and infrastructure. green space, which is more than twice
ship and trust built over the years. The The certification of the entire campus the building footprint. Additionally,
salient lessons learned and successes are well demonstrates sustainability at a higher building design includes environmen-
documented and can be used as a roadmap level by enhancing the ease of future tally preferable purchasing, through
by any military installation Europe-wide. operation and maintenance. This the use of regionally harvested, extract-
economy of scale ensures a sustain- ed and manufactured materials.
When complete, Dal Molin will be able approach to the entire Dal Molin
one of the most modern Army in- multi-facility complex. Within the installation, two parking ga-
stallations worldwide and the first rages are strategically located in a central
to achieve, at a minimum, a LEED Sustainable design principles were uti- position to drastically reduce reliance on
Silver Certification under the rating lized to develop a coherent strategy for automobile use and foster an interactive
System for New Construction for On- the site that uses less energy and water, and walkable community. A shuttle ser-
Campus Building projects. Dialogue provides a better user environment, re- vice to and from the facility will also re-
is ongoing to get the Green Building duces operating costs, and creates less duce personal automobile use.
Council Italia certification. waste in construction and operation. The
Dal Molin Campus Project achieves a Water use will be reduced almost 36 per
As the internationally accepted bench- multitude of sustainable objectives while cent compared to conventional con-
mark for the design, construction, op- reducing impact on the environment. struction techniques by installing low-

11 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
flow water fixtures and high efficiency construction program, the Army ad- efforts required to execute this program
drip irrigation systems, which will save opted the most stringent sustainability helped leverage new and cross-level
4.3 million gallons of water annually. policies to master plan an installation partnerships between Italian and the
that would blend harmoniously into the American stakeholders, ranging from
A Central Energy Plant will provide existing urban environment. This was a public institutions to private businesses
energy for the buildings and will opti- first tangible effort made to address the at the local, regional and national levels.
mize the use of fossil fuels to generate concerns of the local community.
electricity and heat. The design of the Today, Dal Molin is a vibrant site that
energy systems is estimated to reduce The project commenced after the shows how shared interests foster deep
total energy use and save more than 42 Italian government appointed a dedi- ties between the two nations. Its sus-
per cent of the annual costs. cated commissioner to oversee de- tainability has set a standard for an
velopment of the base at Dal Molin, institutionalized, innovative approach
The project will have Zero CFC use, and the final site location was identi- that reaches out to our Italian military
which is a refrigerant known to contribute fied. The sustainable aspect of the re- and civilian partners and can be a cata-
to ozone depletion and global warming. use of an existing military installation lyst for similar results elsewhere.
was fundamentally important to make
Every building will have locations to the difference in public opinion and Building a new installation overseas is
recycle solid waste and reduce the im- helped gain support. In fact, the rede- more than pouring concrete and steel
pact on community landfills. In addi- velopment of Dal Molin was perceived to meet our Army’s mission. It is also
tion, the construction contractor is on as a fairly acceptable solution reached about the ability of building capacity
track to divert 95 per cent of construc- to meet the requirements of the Army’s and fostering relationships with our host
tion waste from the landfills, including mission in Italy, as it provided an alter- nation, maintaining the trust that al-
the debris generated removing the run- nate option to developing on a green- lows the U.S. Army to operate in a sup-
way and old Italian air force buildings. field site. It also offered solid existing portive and permissive environment.
An on-site batch plant maximizes the infrastructure economically viable for This way, USAG Vicenza remains an
recycling process, reduces transporta- redevelopment. Reuse and sustainable enduring Army community and charts
tion costs and traffic pollution while design were key factors in the approval the way for a sustainable future.
ensuring continuity of supply. procedure. In 2009, the final authoriza-
tion to build Dal Molin issued by the
From a Strategic Communication Italian Ministry of Defense was the result
point of view, the sustainability of of intermediate endorsements from the Anna Ciccotti works for the U.S. Army Garrison,
Dal Molin has been fundamental to host nation’s local and national agencies, Vicenza serving as the Strategic Communicator for
the success of the entire program. The both military and civilian, entitled to the Transformation Construction Management
project site area was transferred from evaluate the impact of the new installa- Office. She has extensive experience in develop-
the Italian military to the U.S. Army tion on the existing urban setting. ing strategic public relations and communica-
after a long process involving politi- tions plans with international implications. She
cal discussion at the national level and Highlighting the environmental, is a graduate of the Army Management Staff
amid rising complaints and protests economic, and community-related College and of the Defense Information School.
from the local population. Vicenza benefits of this redevelopment is a She holds a Bachelors Degree in Modern Foreign
is a city full of history and culture wide-ranging effort that currently en- Languages from the University of Padova, Italy.
and a UNESCO World Heritage gages several organizations. The proj-
site. Initially, the decision to build a ect stands as a clear demonstration
new U.S. military base was not well to the Italian people and citizens of
received by local residents. Vicenza of the importance that the
U.S. Army places on the stewardship
Keenly aware of the impact of such a of Italian lands. The coordination

W e a r e t h e A r my ’s Hom e 12
Picatinny Arsenal, Using Public Investment


to Improve Infrastructure and Reap


Millions in Energy Savings
by Nicholas Stecky , Resource Efficiency Manager, & Eric Kowal, Public Affairs Specialist, USAG Picatinny Arsenal

Figure 1: Former Sergeant Major of the Army Kenneth O. Preston looks out from behind a Picatinny designed Objective Gunner Protection
Kit. U.S. Army Photo by Eric Kowal

Home of American Firepower the other military services. Picatinny in collaborative efforts early in the re-
Situated on a 6,500-acre military in- is a joint service armament research search and development process.
stallation in the northwest corner of and development center.
New Jersey, Picatinny Arsenal plays a Picatinny Arsenal uses unique laborato-
unique role in the United States’ abil- Picatinny Arsenal’s mission is to sup- ries and special facilities to evaluate pro-
ity to wage war. Dating back to the port Army transformation goals. In totype designs, thus reducing develop-
Revoluntary War period, there is no an effort to streamline the acquisition ment cycle time. These facilities are also
other comprehensive armaments facil- process and deliver the armaments available to Picatinny Arsenal’s contrac-
ity like it in the country; it is a one- Soldiers need when they need them-- tors and other government agencies
of-a-kind facility that provides virtu- and at an affordable price--Picatinny that are part of the national energy con-
ally all of the lethal mechanisms used Arsenal has established increasingly sortium established by Picatinny and
in Army weapon systems and those of close partnerships with universities the Army Research Laboratory.
and industry partners, involving them

13 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
…the 70-year-old heating plant was designed and operated as a cogeneration plant, producing electricity and
steam, to serve the large energy demands related to munitions production that existed through the 1940’s to 1960’s.

Picatinny Energy 1940’s to 1960’s. Over time, changes Actions Taken


Twelve years ago, Picatinny Arsenal in Picatinny Arsenal’s everyday mis- A multidisciplinary team was estab-
recognized the need to reduce costs, sion and operations brought about lished to look at methods to ensure
save energy and maintain a competi- a greatly reduced demand for steam, long term heating capabilities for the
tive position with other Army instal- especially high pressure process steam. installation. The team consisted of
lations, and began an evaluation of The backpressure steam turbines and representatives from engineering, le-
its major energy-saving opportuni- electrical generator were no longer in gal, environmental, safety, fire and
ties. The single largest user of energy use, and the heating plant had primar- resource management offices, as well
was the central heating plant because ily become simply a source of central- as the acquisition center. The team
it provided cold weather heating for ized heating for the approximately 650 initially focused on privatization of
most buildings on-site and year-round mixed-use buildings on site. the central heating plant and steam
process steam for special operations, distribution system. However, upon
thus the plant became the most obvi- By this time, Picatinny Arsenal had further study, a decision was made to
ous opportunity for energy savings. evolved to its current state, primarily look at energy savings performance
as a research and development facility, contracting (ESPC) for decentral-
A Picatinny Arsenal Energy Project with many support facilities, adminis- izing the steam distribution system.
Team was assembled to determine the trative operations offices, and military That approach was approved by the
way ahead. It included the director of housing. Gone was the actual produc- Armament Research, Development
Public Works, a contracting officer, tion of munitions that had required and Engineering Center (ARDEC)
a project manager contracting office the much larger central heating plant. board of directors.
representative (COR), a program sup- The size of the steam lines and the high
port specialist, and an environmen- pressures supplied were well in excess of Chevron Energy Services developed
tal coordinator. After much prelimi- current needs for space heating. Steam the design build project which was
nary study, Picatinny Arsenal selected lines were leaking, had partially missing awarded in Sep. 2003. The project
Energy Masters International, EMI, insulation, failed steam traps, leaking required extensive coordination and
to perform a site survey report. Note valves, broken drip legs and more. innovative approaches to overcome a
that EMI has since become Chevron multitude of issues and concerns raised
Energy Services, CES. There was also no condensate return sys- by requirements relative to each team
tem, which wasted not only energy, but on the committee. Each issue, whether
Existing Conditions in 2000 water and treatment costs. The site survey it be an acquisition, environmental,
The report, dated April 2000, summarized report also noted that the central steam legal, safety, or engineering concern,
the existing conditions and suggested de- plant was an energy security risk because had to be carefully and thoroughly
centralizing the existing central steam heat- one plant was essentially the sole source addressed before moving forward. An
ing plant based upon their findings. of space heating for the entire installation. innovative agreement had to be devel-
oped with the local natural gas trans-
Originally, the 70-year-old heating Summarizing, the plant was expensive portation company in order for them
plant was designed and operated as a to operate, and wasteful of energy, wa- to extend the natural gas line 11 miles
cogeneration plant, producing elec- ter and resources. The ultimate deci- throughout the installation. Prior to
tricity and steam, to serve the large sion was to investigate the potential award, consultants from Construction
energy demands related to munitions replacement of the heating plant. Engineering Research Laboratories, the
production that existed through the Defense Contracting Audit Agency,

W e a r e t h e A r my ’s Hom e 14
perature infra-red heating units, fur- MMBtu within 18 months;
naces, unit heaters, electric heat, and • The largest satellite boiler plant has
propane-to-gas conversion systems. three Cleaver-Brooks 500 HP steam
The use of multiple heating technolo- boilers located near the old central
gies created logistical challenges dur- plant and provides steam to explo-
ing construction, but it also ensured sives testing areas;
that building occupants were provided • Decentralization project related
the most energy-efficient heating so- construction occurred in a total
lutions that met their needs. Several of 275 buildings;
methods of heat production were em- • 135 buildings have new or converted
ployed to replace the central heating heating systems while the remainder
plant heat energy but heating systems are fed by satellite boilers;
and controls within buildings have, for • 6,000 feet of existing steam distribu-
the most part, remained unchanged. tion system was refurbished for the
Preliminary analysis had shown that satellite boiler plants;
adding the upgrades of HVAC systems • More than eight miles of deterio-
within the buildings to the project rated and leaking steam lines were
scope would be very costly and signifi- decommissioned. In the main of-
cantly detract from the economic vi- fice areas of the Arsenal, 1.4 miles of
Figure 1: A coarse strainer/filter that takes ability of the project. It was decided to steam line were demolished, which
lake water and prepares the non-potable
service water for use in the boiler to replace focus on completing the heating plant significantly improved aesthetics;
what used to be potable water consumption. decentralization initially and consider • The existing natural gas distri-
U.S. Army Photo by Nicholas Stecky.
the HVAC upgrades after several years bution system was extended for
and the Huntsville District Corps of of familiarity with the project. more than 11 miles in order to
Engineers joined the team and provid- supply 130 buildings and to provide
ed an independent project review. One notable highlight of the new for future expansion;
heating system is the “boiler in a box.” • At the height of construction nearly 200
The Project Due to space constraints and other is- workers covering all trades were on site.
The basic scope of the Steam sues, this innovative product was used
Decentralization Project was to design to incorporate a boiler and all neces- The system was constructed as a design-
and install a distributed heating system sary support equipment in a shipping build partnership between Picatinny
at Picatinny Arsenal to replace the ag- container. Boilers ranging in size from
ing central steam plant. The new system small residential units to large industrial Figure 2: Housing for final water filtration
system, super fine, prior to using in the boilers as
required installation of an arsenal-wide type boilers were installed in containers. feedwater. U.S. Army Photo by Nicholas Stecky.
natural gas distribution system to sup- Additionally, explosive safety quantity-
ply the new equipment. The project distance requirements restricted the use
also required a major expansion and of natural gas equipment in large areas
upgrade of the energy management and of the Arsenal. In these instances, satel-
control system to allow remote moni- lite boilers were installed to service sev-
toring and operation of the new system, eral facilities and existing steam distri-
and to realize significant labor savings. bution lines were renovated.

A wide range of available heating Additional project highlights include:


technologies were applied, including • Designed and installed heating sys-
steam and hydronic boilers, low-tem- tems with more than 400 pieces
of equipment totaling over 211

15 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
Arsenal, Chevron Energy Solutions, the steam distribution system. The ings to be included or excluded from
and New Jersey Natural Gas (NJNG). board chose to pursue decentralization. the projects. Unit energy costs were
Work began on Sep 30, 2003 and was Once the project was under develop- fixed based on rates in effect in 2001
completed May 20, 2006. The final ment, the central plant boilers failed to determine baseline energy costs.
shutdown of the central steam plant while undergoing burner renovations • FY 2005 energy savings were calcu-
occurred on July 1, 2005. for environmental emissions. A tempo- lated using actual energy use and ad-
rary boiler plant had to be constructed justing for buildings that were deleted
Effectiveness of Investment and operated for a period of two years to or added to the project and for actual
Economic Analysis/Consideration meet the installation’s heating needs. At weather conditions. Savings for the
of Alternatives the time of this project’s award the instal- full year were then estimated using en-
Privatization was initially looked at by lation had virtually no viable option left. ergy savings calculated in the Chevron
the team up until the solicitation was ES Implementation Proposal and ad-
close to being announced in fiscal year ECONOMIC JUSTIFICATION justing for actual energy savings expe-
1999. At that time, the ARDEC board SUMMARY rienced in FY 2005 and 2006.
of directors directed that the use of an • Investment costs were calculated
ESPC be considered because of the po- using the actual financed project Financial Summary
tential savings that could be achieved,. costs as detailed in the contract with Total Investment ...........$36,124,711
Three options were initially consid- the primary contractor. Life Cycle of Project 25 years
ered under the ESPC. Those options • Yearly savings were calculated by Annual Energy Savings . ..$2,536,326
included upgrading the existing cen- first setting the baseline energy and &............................ 272,375 MMBTU
tral plant boilers, replacing the existing weather data to 2001 actual energy Annual Non- . .................$2,856,000
central plant boilers, or decentralizing use and adjusting for the build- Energy Savings
First Year Savings . ...........$5,392,326
(Energy plus Non-
FY 2010 ENERGY CONSUMPTION & COSTS
Energy Savings)
PPG PPG
Simple Payback ................... 6.7 years
0.4% 0.8%

E LC Total Net .....................$96,691,365


33.1%
NAG
36.8%
ELC
Discounted Savings
NAG
66.1% 62%

FSD Actual Experience with the


0.5%
Decentralization Project
FSD
0.4% After two years’ experience with the
CONSUMPTION CO S T project, the decentralization proj-
ect was found to be generating sav-
ings beyond the conservative estimate
FY 2005 ENERGY CONSUMPTION & COSTS that was originally contracted for.
Picatinny Arsenal officials decided to
PPG PPG modify the existing ESPC to generate
0.7% 1.5%
E LC
18.7% additional investment dollars which
NAG
FSD
NAG
41.4%
ELC
37.8% could be used to fund additional en-
41.4%
17.7%
ergy upgrades that were purposely left
FSR
14.4% FSR
6.0%
FSD
13.3%
out of the original contract scope of
work. By modifying the existing en-
ergy conservation contract, Picatinny
CONSUMPTION CO S T

W e a r e t h e A r my ’s Hom e 16
ARMY ENERGY & WATER REPORTING SYSTEM ENERGY REDUCTION GLIDE PATH additional $10,069,338 in energy-re-
lated capital improvements.
300 F Y 2 0 1 5 E UI G o a l 1 8 8

269.5 268.2
249.2 The following projects were completed
250 in fiscal years 2008 and 2009:
192.9
198.5
190.4 • conversion of two buildings from oil
200 171.0
181.7
and propane to natural gas;
• installation of new boilers for a group
150 of buildings called the “1400 Enclosure
Area” to eliminate steam distribution
100 lines, which eliminated about 5,000
feet of steam line and associated losses;
50 • rebuilt service water pump station, in-
stalling high-efficiency pump motors
0 with variable speed drives and high-ef-
FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10

ficiency filtration for sediment control;


• expanded a postwide energy manage-
Arsenal gained additional energy and reduce use of petroleum-based fuels; ment system to include heating and air
water improvements and savings. • Conserve and protect potable water conditioning controls for 13 buildings;
by rebuilding the nonpotable service • upgraded steam system by installing
In order to develop the workscope for water system to improve its distribu- boiler stack economizers and boiler
the additional energy work, Picatinny tion and quality so that it would re- wastewater, called “blowdown,” heat re-
Arsenal officials established an Energy place potable water use in industrial, covery units at the two boiler plants; and
and Water Team consisting of operations nonpotable water applications; • Installed a filtration system and con-
and maintenance personnel; the resource • Improve energy performance, use verted the two largest boiler plants from
energy manager; the energy savings per- heat recovery, reduce water con- potable water use to service water.
formance contractor, Chevron Energy sumption, replace potable water
Services; and the on-site, government- with service water, reduce water Although the individual energy and
owned/contractor-operated potable treatment chemical use and re- water saving measures stand alone as
water plant operator, Veolia Water. Its duce sewage wastewater discharge good projects, it is the holistic integra-
mission was to develop a holistic, com- flows at a 1,500-horsepower and a tion of some measures that magnifies
prehensive plan to address energy, water, 500-horsepower boiler plant; and the effect. This is especially true of the
safety and environmental concerns. • Increase energy efficiency, occupant largest steam plans called E-1 and E-3.
comfort and productivity by improv-
The goals were to: ing heating, ventilation and air con- These steam plants serve space-heating
• Optimize energy efficiency and reduce ditioning with new equipment and and process related loads. Space-heating
energy costs by eliminating wasted additional building controls systems. demand is limited to the winter season,
energy and installing more efficient but the process loads are year around.
equipment and heat recovery systems; Picatinny Arsenal chose to modify an This plant uses 100 percent makeup
• Reduce energy costs for those build- existing energy conservation project water as it has no condensate return due
ings not included in decentralization contract rather than create a new ESPC to process uses and long distances to the
by replacing higher cost oil and pro- project. This approach saved two years loads. Condensate returns were ana-
pane use with lower cost natural gas. in delivery time and achieved savings lyzed and found to be a poor payback.
This would reduce the environmen- two years earlier. The modification
tal risks and reporting requirements increased the guaranteed savings by Operational issues included very hard
associated with oil storage tanks and $1,020,000 per year and installed an potable water, frequent backwashes of

17 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
the boiler water softener system, the use. It also saves money, avoids potable Program, FEMP, awarded Picatinny
need for quenching boiler blowdown, water plant expansion, preserves the Arsenal an Energy Efficiency Award
scaling of sewage piping due to high long-term sustainability of the potable for Small Groups. Picatinny Arsenal
water hardness and lack of adequate water well aquifer and reduces the sew- was the only Army installation to win
service water. In addition, the onsite age flow rate by 140,000 GPD. a FEMP Energy Award in 2010.
potable water plant was operating near
its maximum output of 1 million gal- Program Achievements Summary The success of this effort was the re-
lons per day, and a capital expansion after Five Year Experience sult of close teamwork, planning and
was being considered. The boiler plant During the period of the decentral- execution between Picatinny Arsenal,
used an average of 200,000 gallons per ization project’s startup in FY2005 to Chevron Energy Services, the ESPC
day of potable water. five years later in FY2010, Picatinny contractor, and VEOLIA Water Inc,
Arsenal has surpassed the Army’s FY15 the GOCO water plant operator.
The water and energy team developed a 30 percent Energy Reduction Goal,
strategy to replace the hard potable wa- ERG, five years ahead of schedule. The
ter uses with much softer service water Picatinny Arsenal Energy Utilization
and an energy-savings plan using heat Index, given as MBTUS/KSF for the
recovery techniques. When the service Energy Baseyear of FY2003 was 269.5 Nick Stecky is currently the SEA Associates resource
water plant was upgraded, soft service and the FY15 Goal was 188, which efficiency manager at Picatinny Arsenal. He is a
water displaced the hard potable water. has been surpassed by the actual EUI certified energy manager, and LEED AP with a BS
This change also reduced the work load of 181.7 in FY10. in Engineering and an MS in Systems Science. He
on the water softening system, the back- has forty years of experience in the construction,
washes and treatment chemicals use. This performance exceeds the federal operation and management of various facilities
energy reduction requirements of the including DoD, DOE, industrial, corporate head-
A boiler blowdown heat recovery sys- Energy Policy Act (EPAct) of 2005, quarters and R & D Facilities. Leadership activi-
tem was installed to preheat the make- Executive Order 13423 and the Energy ties have included vice president of the Assn. of
up water before sending the blowdown Independence and Security Act (EISA) Energy Engineers, Chair of The American Society
water to the sewer. This process also of 2007. Picatinny Arsenal has striven of Heating, Refrigerating and Air-Conditioning
reduces the blowdown’s high tempera- to comply with all aspects of the ref- Engineers (ASHRAE), Technical Research Group 7
ture, which means it no longer needs erenced Federal requirements by using for Sustainable Buildings. Active in the New Jersey
the hard potable water previously used ESPC and sustainable design and de- chapters of ASHRAE and AEE, including Chapter
as quench water that fouled the sewer velopment initiatives to deliver energy President. He is one of the founders of the New
piping with scale. Quench water has reduction performance. In addition, Jersey U.S. Green Building Council Chapter and on
just about been eliminated, and sewer Picatinny Arsenal has greatly reduced the Chapter’s Board of Directors.
piping scaling has been eliminated. its water use intensity from the 62.1
GAL/SF of the Water Baseyear FY07 Eric Kowal has been assigned as both a public af-
Only 60,000 GPD of service water are down to 56.6 GAL/SF in FY10. All fairs and protocol specialist with Picatinny Arsenal
now needed as opposed to the previous this was achieved despite a 26 percent for more than three years. Prior to becoming a DA
requirement of 200,000 GPD of pota- increase in population from about Civilian employee, Kowal served in and was honor-
ble water. In addition, the boiler stack 4,100 in FY05 to 5,100 in FY10. ably discharged from the Marine Corps as a Staff
economizers that preheat the boiler Sergeant, E-6. Kowal spent more than six years
makeup water save energy and reduce In 2010, the Army recognized Picatinny in the Corps and served as a Marketing and Public
boiler exhaust stack temperatures. Arsenal’s energy saving efforts by award- Affairs Specialist. He holds both a Bachelors and a
ing them Annual Secretary of the Army Masters of Business Administration in the field of
This holistic approach reduces energy Energy and Water Management Award Marketing, as well as being a 2010 graduate of the
consumption, green house gases, pota- for FY09 Accomplishments. In addi- Defense Information School.
ble water use and chemical treatment tion, the Federal Energy Management

W e a r e t h e A r my ’s Hom e 18
Sustainable Water: Reaching Net Zero
by COL Timothy Faulkner, Commander, USAG Fort Huachuca

The most critical resource that will Fort Huachuca is a high desert post supplies our community of approxi-
challenge military installations’ sus- that has faced water resource challeng- mately 78,000 residents with their po-
tainability in the 21st century is water. es for more than a decade. The water table water. The U.S. Army Garrison,
Once thought of as a problem west- efficiencies gained from 1989 to 2010 Fort Huachuca (USAG-HUA) knew
ern states faced, it now has become reduced the fort’s water pumping by that a holistic water management sys-
critical to the survivability to the entire more than 60 percent, from 3207 tem, combined with a long-range plan
United States and nations worldwide. acre feet per year to 1142, even as for water sustainability could make it
According to the U.S. Government, 36 the installation’s employee population possible for an installation to zero-bal-
states will face a water shortage in the increased by more than 30 percent. ance their impact on the regional water
next five years. (Associated Press, 2007) Synonymous with water pumping is source. Planning, processes, technolo-
The vulnerability of military installa- the energy savings that are afforded to gy, projects and transformation think-
tions is a key concern of the U.S. Army an installation. Other conservation ef- ing by leaders and installation person-
and presents a particular challenge forts have brought the installation to a nel are required to meet this challenge.
to military installation sustainability. net zero impact on the regional aqui- Recognizing the need to minimize
Military installations fer, meaning that the installa- impacts to the region’s water resources,
and operations tion replaces USAG-HUA implement-
throughout the ed a Groundwater
nation and R e s o u r c e s
around the Management
world are System (GRMS)
already sub- and water re-
ject to water source manage-
resource is- ment plan with a
sues to include variety of strategies
water supply ad- as much to improve water use
equacy, water quality, or more water than it uses. efficiency both on and off-
cost of delivery, and competition with These results have brought the instal- post. The Community Covenant ap-
ecosystem water needs (Jenicek, et.al, lation to the forefront of water sus- proach to solving a regional issue was
2009). In fact, one of the goals of the tainability within the Department instrumental to make the necessary
2005 Base Realignment and Closure of Defense (DoD), garnered the gains in water efficiencies.
was to have fewer but more sustainable President’s White House Closing the
installations worldwide. At the bed- Circle Award for Sustainability, and The GRMS is an effective and sys-
rock of sustainable installations are the has allowed the fort to secure its role in tematic process that manages multiple
requisite efficiencies needed to sustain supporting the warfighter. aspects of the fort’s groundwater and
our Army. Barry Nelson, a senior pol- its associated uses. The fort’s GRMS
icy analyst with the Natural Resources Fort Huachuca is in southeastern program includes a management plan,
Defense Council stated that “The last Arizona, near the U.S./Mexico bor- goals, measures, community educa-
century was the century of water en- der and typically receives 15 inches of tion, and feedback. The approach ad-
gineering. The next century is going rain per year. Groundwater within the dresses legal requirements, Army goals
to have to be the century of water ef- watershed not only supports perennial and requirements, management of
ficiency.” (Energy Bulletin, 2010). flow in the San Pedro River but also shared resources, and societal respon-

19 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
Standard thinking is that water is a limitless commodity of negligible cost, which leads to the
perception of minimal value. From this perception, we do not question water use, why we are using
it and whether the function using water can be accomplished with less or no water.

sibilities in the broader community. process is required to sustain person- thinking makes the presence of water-
Elements of the process include con- nel and missions on post by providing less urinals a given, and the sight of a
servation, efficiency, command policy, high quality potable water in amounts flush urinal unconscionable. This one
education, technology deployment, re- needed, but with minimal waste. By simple change saves us 25 million gal-
source recovery and reuse, community reducing waste, we also conserve the lons of water annually. This percep-
outreach outside the fort boundary, energy needed to pump water from tion transformation is particularly
and partnerships with non-profit or- 500 feet below the ground. Therefore, important to the Directorate of Public
ganizations. The community outreach our water mitigation efforts decrease Works (DPW) personnel, especially
serves a dual purpose in the fact that annual energy costs due to water no the engineers and engineer technicians
it supports the Community Covenant longer needing to be pumped from who will be responsible to find and
and supports regional planning efforts depth. The annual energy savings for implement the changes.
in a greater watershed. pumping 410 million gallons less in
FY 10 than the original baseline was The second transformation, cost-
The 2009 garrison strategic plan Line more than $2 million. benefit analysis, in thinking is also
of Effort (LOE) #6, Sustainability, important to the process. It ‘breaks
mirrors the Installation Management Transformation in thinking is one of the code’ on the true value of conser-
Campaign Plan (IMCP) LOE #6, the key ingredients to starting water vation. Standard cost-benefit analyses
Energy Efficiency and Security. This sustainment. Three major changes in for water-related practices are usually
practice of strict groundwater resource thinking are: perception of water as based on a fragment of the ‘cradle to
management directly relates to Key To a limited and valuable resource, cost grave’ cycle of water management. We
Success EN 1 – Reduction of Energy benefit analyses that reflect that value, overcame this by determining the full
and Water Consumption. Managing and education at all levels to spread this cost of water use. It includes all these
groundwater is imperative to our way of thinking. Without these critical cost elements: the commodity, pump-
ability to provide resources, services ingredients, garrisons will struggle to ing, potability treatment, distribution,
and infrastructure to our customers. change behaviors, rethink water cost waste water collection, wastewater
Failure to protect this limited, criti- and redirect sustainment planning. treatment, wastewater disposal and the
cal resource has direct implications on often overlooked cost, commodity re-
our ability to support ARFORGEN, The garrison and Senior Commanders plenishment for any water consumed.
our tenant organizations, and our in- must lead a community-wide change in All these costs must include the cost of
stallation partners. The broader im- how we think about water. The trans- the energy as well as personnel and in-
pact on DOD was the fact that Fort formation of thought is about how frastructure. Once the true cost to the
Huachuca is home to 1000 square personnel, especially on post, perceive installation is understood, many addi-
miles of restricted air space and 2600 water. Standard thinking is that water tional technologies become cost effec-
square miles of Joint Command, is a limitless commodity of negligible tive. Using this methodology, the water
Control, Communications, cost, which leads to the perception of management team made three lists, all
Computers, Intelligence, Surveillance, minimal value. From this perception, calculated to compare cost per 1,000
Reconnaissance (C4ISR) test range we do not question water use, why gallons of water use. Projects were se-
that supports Unmanned Aircraft we are using it and whether the func- lected for funding based on the highest
System (UAS) and Counter Improvised tion using water can be accomplished water yield for the funding available.
Explosive Device (IED) efforts. This with less or no water. Transformation Treated effluent reuse started mak-

W e a r e t h e A r my ’s Hom e 20
ing good economic sense. Technology methods, we have grown mission and As these new devices are implement-
implementation such as 1.5 gallon per population while reducing our use of a ed, the education aspect alerts per-
minute (gpm) showerheads, dual flush critical resource. The policy and tech- sonnel to both the new fixtures and
toilets and horizontal axis washing ma- nology implementations in the plan the reasons why. Additional tips are
chines become extremely cost effective can be easily exported to and imple- taught through education programs
based on this full accounting of the mented at other installations, based on and command information venues.
cost of water. Some of these had pay- what they can afford or are willing to The USAG-HUA WaterWise-Energy
back periods of less than one year. put into policy. For example, the in- Smart conservation education im-
stallation’s irrigation policy cost almost proves conservation awareness and
The third transformation in thinking nothing to implement, yet reduced actions among all demographics on
is led by installation leadership, from pumping by 10 percent, or more than the fort. The off-post community
the top down. The imperative that wa- 300 acre feet (97 million gallons) per had a “WaterWise” program provid-
ter management and conservation is year. The accompanying energy cost ed through the University of Arizona
as important as other cost savings and savings at Fort Huachuca, for just Cooperative Extension. Because the
training measures must be measured this policy implementation, using to- basic elements of our need were cov-
and modeled by leadership. It becomes day’s electrical rates, is approximately ered by the program, we contracted
a part of the quarterly leadership briefs $500,000 per year. Included in this with the University to make some
to all tenants. Articles are written, me- policy was a prohibition on irrigating changes to the program for use on post,
ters installed, and report cards issued. with unattended hoses. Violation of and added the energy conservation el-
Pride in accomplishment and leader- the policy carries serious consequences ement. The WaterWise-Energy Smart

Through the continuous education, innovation and application of multiple methods, we have
grown mission and population while reducing our use of a critical resource.

ship accelerates a change in action. for repeat offenders. No longer will program includes elements from wa-
Water is serious business for Soldier high installation water bills be the price ter and energy checklists for quarters
and Family support and leaders under- for ‘yard of the month’ competitions. and administration buildings, to facil-
stand progress in their efforts will gar- ity conservation audits and children’s
ner more new conservation technology Low cost efficiencies are the low hang- programs through youth services. The
for their units. ing fruit that every commander can program stressed doing the right thing,
cultivate with little investment. The saving the installation money and the
The four pillars of the program imple- first area to attack in the short term high desert location of the installation.
mentation are education, conservation, was technology implementation. When residents and employees under-
reuse, and recharge. Water is measured at Much of the water used on post is for stand why the urinals are waterless,
the well-head, at points of recharge and personal hygiene, showers, and toilets. why there are strictly enforced lawn-
diversion for reuse, so all consumption Inexpensive adaptations include the watering hours and why they cannot
and waste are included in the accounting. change to 1.5 gpm shower heads, 1.5 hold limitless fund-raising car washes
The GRMS maximizes the beneficial use gpm faucet aerators, dual flush toilets on post, they accept and become part
and reuse of water, and minimizes waste and waterless urinals. These can be in- of the process – often reporting the bro-
from leaks and poor practices. stalled as funding permits and when ken valves or running water themselves.
fully implemented can reduce your
Through the continuous education, water bill by 20 to 25 percent. Longer-time horizon projects must
innovation and application of multiple also be planned and executed. Other

21 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
other federal agencies, Fort Huachuca
has been able to purchase conservation
easements on over 5,200 acres of land.
These conservation easements, which
enhance mission viability by maintain-
ing open space on adjacent ranches
and retire agricultural land use, reduce
current and future water use by an es-
timated 1,400 acre-feet/year. Funds
for these conservation easements were
either locally-derived Army funds,
from grants from the Arizona Military
Installation Fund program, or obtained
through the Army Compatibility Use
Buffer (ACUB) program. These ease-
ments also ensured the post could sustain
and increase the use of its restricted air-
space and have the capability to support
four Predator Class UASs, all Shadow
training for the US Army and Marine
Corps, Army and Joint C4ISR testing,
specific reduction measures include: used for irrigating its golf course since two Air Force Wings, and the Air Guard
demolition of more than a million the mid 1970s and more recently, has Combat Assault Training Center.
square feet of old, leaky facilities and been used to recharge the ground-
infrastructure; leak detection and re- water system through its East Range Fort Huachuca is a founding mem-
pair or replacement of pipes; installa- Recharge Facility, a MCA project con- ber of a consortium of 21 agencies
tion of artificial turf; broad implemen- structed in 2001. A recent upgrade to and organizations working together
tation of low-flow technology such as the golf course’s irrigation system and to achieve sustainable yield of the
horizontal axis washing machines and conversion to a desert-style course (i.e., area’s groundwater resources. The
replacement with evaporative cool- reduced fairway widths and overall irri- purpose of this consortium, known
ers with refrigerated air conditioning. gated turf footprint) allows the course to as the Upper San Pedro Partnership
Waste water is treated to EPA Class use roughly half the water of comparable (USPP), is to coordinate and cooper-
B or B+ quality and used to irrigate golf courses in the region. The saved wa- ate in the identification, prioritization
the golf course and some landscaping. ter is then available for recharge. and implementation of comprehen-
Remaining treated effluent is recharged sive policies and projects to assist in
into the aquifer. Other recharge on Capitalizing on a multi-year Army- meeting the region’s water needs in-
post includes several rainwater basins. wide whole neighborhood revitaliza- cluding those of the San Pedro River.
Artificial turf has the ancillary benefit tion program, Fort Huachuca has been Through the USPP, Fort Huachuca
of saving grass maintenance, fuel cost able to save an estimated 200 acre-feet/ has contributed to community-wide
and provides the Soldiers the great year through installation of xeric land- programs to reduce groundwater use
hand to hand combat training areas scaping and water efficient plumb- including participation in the USPP
with the proper cushioning. ing fixtures in new Military Family Water Conservation Business Grant
Housing (MFH) units. Program. This program funds water
Fort Huachuca operates its own waste- conservation improvements in area
water treatment plant producing a Through partnership with The Nature schools and businesses with recurring
high quality effluent that has been Conservancy and cooperation with water savings of over 20 acre-feet/year.

W e a r e t h e A r my ’s Hom e 22
3500 survey the environment for technology
that will bring reasonably priced water
3000 use reductions to Fort Huachuca. Net
zero is not the end of our requirement,
2500
Pumping
just a spot to stop and audit what we
2000 Population have accomplished and look forward
to ensuring we can stay here through
1500 the many changes to the Army at War.

1000

500
COL Timothy Faulkner is the garrison commander
0 of the U.S. Army Garrison Fort Huachuca. He’s a
graduate of the University of North Carolina at
Chapel Hill, Central Michigan University, Command
Other USPP efforts have resulted in Community Covenant and embraces a and General Staff College, Joint Forces Staff College
substantial water savings, including holistic approach to water sustainabil- and the U.S. Army War College. From Field Artillery
the funding of a reclaimed water dis- ity. Many elements of the GRMS are to Military Intelligence, he has commanded sev-
tribution system for a community golf exportable to other installations. eral times in both CONUS and OCONUS units and
course with 300 acre-feet/year of treat- served in various staff assignments including Chief
ed effluent, and the funding of a sew- These environmental benefits are both Intel Planner in the III Corps G3 War Plans section,
age treatment and recharge project to actual realized gains in water savings Deputy G2, Assistant Chief of Staff V Corps and
replace an evaporative sewage lagoon. and environmental stewardship that National Security Agency. He has authored articles
It is important that partnerships like put the Army at the forefront of water on leadership, intelligence priorities, operational
this with your outlying communities sustainability. The practice has resulted and strategic planning synchronization and re-
are fostered as an integral part of your in a 60 percent reduction in the annual forming U.S. Nation Building Strategy.
overall water management strategy. groundwater pumped in 2010 versus
1993, more than 410 million gallons References:
1
http://www.msnbc.msn.com/id/21494919/
Monthly and annual progress reports of conservation. The energy to pump
ns/us_news-environment/, Associated Press,
are published in the fort and local city this water would have added more 10/27/2007
newspaper, and announced on local than $2.4 million to our 2010 fund- 2
http://www.energybulletin.net/53777, Published
radio stations. Education and technol- ing requirements. This reduction has Aug 12 2010
3
. U.S. Army Corps of Engineers Engineer Research
ogy deployment are installation-wide, allowed Fort Huachuca to reach the
and Development Center (ERDC)/Construction
engaging the 54 tenant organizations, net zero position for water use – we re- Engineering Research Laboratory (CERL) Army
the elementary and middle schools and duce, capture, reuse, or recharge more Installations Water Sustainability Assessment:
the families of military personnel liv- water than we consume. An Evaluation of Vulnerability to Water Supply,
Jenicek, et.al, September 2009
ing on the fort. Many practices within 4
Army Water Resources Plan, Fort Huachuca
the GRMS extend to the surround- Where do we go from here? We have Directorate of Public Works, Environmental and
ing community through partnerships more projects on the books, including Natural Resources Division, April 2009
5
Comprehensive Energy and Water Management
that support or are supported by the additional stormwater capture with re-
Plan, Fort Huachuca Directorate of Public Works,
USAG-HUA. USAG-HUA has helped use or recharge projects and exploring Engineering Plans and Services, April 2010
export these practices into the larger facility net-zero concepts for new and
watershed with our USPP govern- existing buildings. We continue to re-
ment and land management partners. quire education of incoming Soldiers,
This partnership exemplifies the Army Civilians and Families. We continue to

23 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
Flatlined — IMCOM’s Progress with
Municipal Solid Waste
by Greg Kuhr, G-4, IMCOM

It comes as no surprise, but Americans In this article I want to present the lat- (ISWM) - A comprehensive approach
generate more municipal solid waste est data points that indicate the status to managing non-hazardous solid
than any other country. Per the EPA, of municipal solid waste management waste that encompasses waste pre-
in 2009 we generated a national aver- (MSW) on IMCOM installations. I vention, recycling, composting, and
age of 4.34 pounds per person per day will provide a snapshot assessment and disposal programs. Through ISWM,
with 1.46 of those pounds recycled and propose a way ahead to meeting statu- DoD Components seek to determine
.52 pounds sent for combustion.i The tory waste reduction goals. This article the most cost-effective, energy-effi-
rest--2.36 pounds per person per day-- focuses on solid waste management, cient, least-polluting ways to deal with
went to the landfill, netting a national excluding construction and demoli- the various segments of, and the items
landfill diversion rate of 45 percent. tion (C&D) debris. typically found in, an installation or
FY10 data for IMCOM installations facility solid waste stream.
indicates a command-wide landfill di- Definitions
version rate of only 33 percent --well First let me cover a few definitions and our Qualified Recycling Program (QRP)
below the national average. This clear- goals (per OSD memo, 1 February 2008, -A recycling program that requires
ly indicates a need for improvement subject: DoD Integrated (Non-Hazardous) diversion or recovery and sale of recy-
in order to demonstrate federal gov- Solid Waste Management Policy.) clable materials from the non-hazard-
ernment leadership, as mandated in ous solid waste stream. QRP proceeds
Executive Order 13514. Integrated Solid Waste Management are distributed in accordance with

W e a r e t h e A r my ’s Hom e 24
10 U.S.C. 2577 to first cover the cost b. Divert at least 50 percent of C&D which include entropy, hence “waste
of processing recovered materials, with waste by FY10. happens” but on a limited predict-
any remaining funds available to des- able basis, with optimal efficiency
ignated other projects, and ultimately OSD has now set goals which put the
to MWR activities. agency on a glide path to achieve the How is IMCOM doing?
50 percent diversion goal for all non- IMCOM G4/Public Works (PW) re-
Source Reduction - Effecting changes hazardous waste by 2015. cently completed the FY10 annual
in the design, manufacturing, purchase, report on the Solid Waste Diversion
or use of materials or products (includ- The Assistant Secretary of the Goal. Overall, IMCOM met FY10 sol-
ing packaging) to reduce the amount of Army (Installations, Energy and id waste goals due to the high diversion
toxicity before they are discarded. Environment), has also proposed a rate for construction and demolition
goal of net zero waste for installations. materials (78%). In FY10, 714,437
What are our goals? This means an installation reduces, re- tons of MSW were generated, with
Executive Order 13514, signed on uses, and recovers waste streams, con- 233,190 (33%) recycled and 481,247
October 5, 2009, promotes pollution verting them to resource values, with (67%) tons land-filled. For municipal
prevention and elimination of waste zero landfill. Its key attributes are: solid waste, 52 of 88 installations did
by minimizing the generation of waste – Implementation of a sustainable not meet the 40% diversion rate, with
and pollutants through source reduc- supply change to eliminate nearly 43 of those also failing to meet the goal
tion. It establishes the goal to divert all discharges to land, water, or air in FY09. More telling is our historical
at least 50 percent of non-hazardous and reuse of all products used on diversion rates: FY07 – 36%, FY08 –
solid waste, excluding C&D debris, the installation to eliminate waste 40%, and FY09 – 34%. We have been
by the end of FY15. The Department or environmental damage. essentially FLATLINED since FY07.
of Defense memorandum on the – Designing, procuring, and managing How do we compare to the nation?
Integrated (Non-Hazardous) Solid products and processes to dramati- As would be expected, we are lag-
Waste Management Policy dated cally reduce the volume and elimi- ging behind the rest of the nation
February 01, 2008 required installa- nate the toxicity of waste, conserve with only 33 percent diverted and not
tions to achieve the following goals: and recover all resources, and not making progress from year to year. In
a. Divert at least 40 percent of non- relocate or postpone handling them. 2009 the United States recycled 25.2
hazardous solid waste, excluding percent, composted 8.6 percent, and
C&D waste by FY10. – Mimicry of natural processes eliminated 11.9 percent through com-
bustion. This resulted in a 54.3 per-
cent diversion rate from the landfill.
IMCOM FY 10 Solid Waste Diversion from Landfill ii
We lack the data to compare com-
post and combustion rates, but most
60% of IMCOM’s diversion is reportedly a
result of recycling.
50%
How do garrison commanders
40%
assess their programs?
30% 32% Garrison informal responses to a
recent CG IMCOM Defense Connect
20% On-line (DCO) session provided
some excellent feedback. Generally,
2008 2009 2010 2011 2012 2013 2014 2015
most garrison commanders reported
positive progress and emphasis on im-
NOTE: Construc ti o n & D e m o l i t i o n D i ve r s i o n G o a l = 5 0 % ; Cu r re nt l y O p e rat i n g at 7 8 %

25 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
These used plastic bottles found a new life in California, where recycling reached an all-time high last year due to a deposit law, but
nationwide the rate has been dropping, in large part due to the growth of plastic water bottle sales.

proving programs. Many commanders runs their recycle center and USAG- of electronic waste recycled.
expressed concern over the current stat- Hawaii DPW also manages a center. o Litter Free events with unit
utory moratorium on deforming brass • Successful recycling programs adver- financial incentives (Fort Bliss).
for resale (DODI 4715.4) and the loss tise and incentivize their programs.
of revenue to an MWR account or their Examples include Fort Meade’s Given the plateau our program
recycling program. From these messages “Green Meade” program, Baden seems to be on, how can
I drew the following conclusions: Wuerttemberg’s “Rumbling Rubbish” we move forward?
and school education programs and Most have heard of Albert Einstein’s
• Garrisons are dependent on their sur-
Fort Sill’s “Cash for Trash” program. famous quote, “We can’t solve prob-
rounding community recycling pro-
lems by using the same kind of think-
grams. Those located in areas with • Partnerships strengthen the program.
ing we used when we created them.”
robust programs, like Europe, had Several garrisons have integrated all
Managing an installation’s waste
the benefit of integrating the on-post on-post recycling by including their
stream is complex business. It involves
program. Those without local pro- Residential Communities Initiative
changing behaviors and in many cases
grams, like Alaska, generally had a (RCI) partners. Some commanders
inconveniencing people. Establishing
minimal or non-existent program. expressed an interest in partnering with
and managing a recycling program is
• Program management is not stan- AAFES and DeCA, both of which
also complex. Waste must be sorted and
dardized within IMCOM as manage their own recycling programs,
transported, recycled product markets
Directorates of Morale, Welfare and particularly for plastics and cardboard.
identified and sourced, and revenues
Recreation and Public Works manage • Several garrisons are also working on managed, all in compliance with federal
these programs. DMWR manage- enforcement by issuing blotters to government appropriations and acquisi-
ment evolved from the application households which fail to sort their re- tion laws. Overcoming these challenges
of recycled product revenues into the cyclables or by inspecting dumpsters will require leadership, innovation and
non-appropriated funds account (AR for material which should be recycled. hard work. Below are my thoughts on
420-1, paragraph 23-11). significant actions which would enable
• Some exemplary programs included–
• Several installations were managing o Fort Bliss’s Single Stream Recycling IMCOM to accelerate its progress.
their own recycling centers, which increased recycling by 64 percent.
sorted and packaged materials for ship- o Electronics Waste Recycling at Commit to Source Reduction. This is
ment. For example, Fort Sill DMWR Fort Bliss resulted in 11.4 tons the most significant action we could

W e a r e t h e A r my ’s Hom e 26
take to break through the current remove packaging waste or refund the efforts on post in order to reduce
stalemate and make significant prog- government for its disposal. overhead costs and increase recycling
ress. Source reduction will have many • Extended Product Responsibility. revenue with volume increases.
facets. These could include: IMCOM can incentivize our in-
• Establish and Communicate dustry partners by mandating their Standardize Recycling Program
Alternatives. Once an installation responsibility to remove wastes Management. Standard organizations
identifies the major components of generated by their products. This and procedures enable IMCOM to
its waste stream, what are the alter- would require mandatory contract improve program management and
natives to generating this waste in language for all purchases which seek enterprise-wide efficiencies. Given
the first place? We need a campaign requires suppliers to remove packag- IMCOM’s commitment to a standard
against petroleum-based products ing waste or refund the government garrison organization, we should estab-
such as plastic bags, plastic water for its disposal. lish which garrison office manages the
and soda bottles and containers. • Strategic Partnerships. Establish recycling program. Other areas requiring
This will require us to identify alterna- strategic partnerships with AAFES, some level of standardization include –
tive products and practices which can DeCA, MWR vendors and others to • Incentivize waste minimization
be used. IMCOM can demonstrate reduce the waste stream while also among non-paying tenants. Given
federal leadership with a campaign to partnering with the installation on on-post Army tenants do not reim-
minimize these and other products. recycling efforts. We can’t keep fight- burse garrisons for waste manage-
• Extended Product Responsibility. ing against ourselves with garrisons ment, reducing wastes generated in
IMCOM can incentivize our industry working to recycle products while oth- barracks and other on-post Army ac-
partners by mandating their responsi- er on-post agencies do not constrain tivities is challenging. In order to get
bility to remove wastes generated by the introduction of these products all tenants working to meet statutory
their products. This would require into the waste stream. Additionally, diversion goals, the garrison should
mandatory contract language for all there are likely significant advantages market the program and readdress
purchases which requires suppliers to to combining our waste diversion the situation with installation leaders.

Spc. Dean Kalogris charges the installation’s command sergeant major’s electric car on Fort Bliss, Texas, April 14, 2010.The base leaders
drive the cars, which are made from recycled plastic and can reach speeds of 25 mph, to demonstrate their commitment to helping keep
energy costs down and protecting the environment.

27 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
• Establish waste minimization in tainer are charged the least; whereas pollution from incinerator operations,
Army and privatized housing. Using those households which routinely disposal of ash residue and the loss of
the same concept as above, on-post generate more waste and need larger materials to the recycling stream, caus-
housing residents should be finan- or more waste containers would be ing further degradation of natural re-
cially incentivized to minimize their charged a higher rate. According to sources. Other installations are purchas-
waste streams. See the Pay-As-You- the EPA, PAYT communities generate ing and operating waste compactors in
Throw description below. about 49 percent less waste than those order to produce marketable products.
leaving the cost of trash in the tax base
Strengthen HQ IMCOM Program or in a fixed fee.iii Could Army instal- Way Ahead
Management. HQ IMCOM program lations apply the PAYT methodology Identifying 5 installations to reach net
management should provide leader- onto Army installations? This would zero waste by 2020 will serve as a cata-
ship and guidance to assist garrisons in clearly require a change in resourcing lyst and provide pilot sites for experi-
meeting and exceeding their goals. HQ policies but could incentivize all of menting with new approaches. As stat-
can assist in several areas: those current waste generators. ed above, a multi-prong approach is
• Conduct annual IMCOM-wide as- recommended which includes source
sessments to evaluate progress to- Single-stream recycling, where all recy- reduction, strategic partnerships, pro-
ward diversion goals. clables are placed into the same bins, gram standardization and improved
is also claimed to significantly increase command program management.
• Seek innovative solutions to assist recycling by removing the generator’s With renewed focus IMCOM can lead
garrisons which lack access to re- burden of sorting papers, cardboard, the federal government and the nation
cycled material markets and local glass, and metals. As mentioned above, in waste reduction.
community programs. Evaluate in- Fort Bliss reported a 64 percent in-
dustry best practices for application crease in recycling. Application to
on Army installations. other installations is dependent on the
• Share garrison best practices and infrastructure and resources to further
evaluate which should become sort into marketable waste streams. Greg Kuhr is the IMCOM HQ G-4, Director of Facilities
IMCOM policy. and Logistics. He previously served as the Pacific
• Track financial aspects of the Integrated Waste-wise is an EPA program to part- Region Chief of Staff
Solid Waste Management Program, ner with businesses, institutions, non-
with the goal of landfill cost reductions profit organizations and government References:
agencies to prevent waste, recycle, and i Report, Municipal Solid Waste in the United
funding diversion opportunities. States, 2009 Facts and Figures, Environmental
buy and manufacture recycled content Protection Agency, Office of Solid Waste (5306P),
Nationwide Programs for products. IMCOM should consider EPA530-R-10-012, December 2010, www.epa.gov

IMCOM Consideration. adopting Waste-wise accomplishments ii Report, Municipal Solid Waste in the United
States, 2009 Facts and Figures, Environmental
The following are a few interesting into enterprise-wide initiatives.
Protection Agency, Office of Solid Waste (5306P),
trends in the management of munici- EPA530-R-10-012, December 2010, www.epa.gov
pal solid wastes. Several installations are supported by iii Bulletin, EPA Pay-As-You-Throw Summer 2010
local (or on-post) waste-to-energy at www.epa.gov/payt.

Sweeping across America is the Pay- (WTE) plants. These plants provide
As-You-Throw (PAYT) program. In an excellent opportunity for further
lieu of funding waste pickup with a landfill diversion while also providing
broad-based tax scheme, households a source of renewable energy. Current
are charged a variable rate based upon Army policy does not recognize MSW
the volume of their waste containers. waste-to-energy as a diversion and/or
Those needing only the smallest con- a recycling program, but we will work
to change that. Some concerns are air

W e a r e t h e A r my ’s Hom e 28
Achieving Fiscal Sustainability in an Era of
Persistent Conflict: A Leadership Challenge
by BG Thomas A. Horlander, G-8, IMCOM

financial impacts of this persistent con- flict to learn from and the time to bet-
“…But this country’s dire fiscal sit- flict and the resultant deficit spending. ter understand the security challenges
of the 21st Century, we can now make
uation – and the threat it poses to The task at hand is a balancing act. better decisions on how to resource
American influence and credibility The nation’s leaders have no choice the nation’s security. “Well planned
around the world – will only get but to make some difficult decisions and measured reductions and redistri-
about where to invest limited finan- bution of resources realized over time”
worse unless the U.S. Government cial resources in the national security should be the watch words that guide
gets its finances in order. And as apparatus. We must decide where we our efforts and serve as the mainstay
can become more efficient without in the development and implementa-
the biggest part of the discretionary
sacrificing effectiveness, and where we tion of this inevitable undertaking of
federal budget, the Pentagon can- must reduce certain capabilities and rebalancing and reprioritizing our in-
not presume to exempt itself from potentially assume a greater level of vestments in the nation’s national secu-
risk. Neither of these options stands rity. While there is much we can do to
the scrutiny and pressure faced by alone as the optimal solution and the help ensure we achieve fiscal sustain-
the rest of our government.” iii answer lies somewhere between them. ability, fundamental to our success is
Maintaining national security spend- strong, sound and decisive leadership
~Robert M. Gates ing at its current level would continue at every level to reverse the tides of
Secretary of Defense to overly burden the federal budget, unconstrained spending that we have
driving the nation deeper into debt grown accustomed to over the past de-
and perpetuating its dependence on cade and embrace the cultural change
In October 2010, the United States of foreign wealth for security. Flat-lining that is necessary given the realities of
America entered its ninth consecutive the national security budgets will serve today’s economic environment.
year of armed conflict with mass for- as the forcing function to achieve great-
mations deployed in Southwest Asia er efficiencies and drive leaders to make In most Americans’ minds, national
and costly security measures imple- critical decisions about which capabili- security equates to national defense
mented across the home front to en- ties the country should invest in and and the military. A quick study of the
sure Americans and the American way which capabilities are no longer rel- distribution of the federal budget, and
of life are safeguarded from the evils of evant in 21st Century warfare. one would arrive at the same conclu-
terrorism and those who perpetrate it. sion. While the U.S. government does
The price of war is both measurable and Timing is everything. To flat-line or spend U.S. tax dollars for numerous
immeasurable. In the case of the current reduce spending on national security purposes other than the country’s na-
conflict, the measurable cost of con- too quickly could create unintended tional security, the money trail clearly
ducting full spectrum warfare over this detrimental impacts to any number indicates that most of the discretionary
extended period of time has come with of critical national security capabili- portion of the federal budget is spent
a hefty price tag for the U.S. and has ties. Move too slowly and the nation’s on national security, and most of this
progressively burdened the nation’s eco- economy continues to suffer the perils national security wedge is spent on the
nomic capabilities to the point where of deficit spending. With almost ten country’s military (defense) capability.
measures must be taken to mitigate the years of persistent, full-spectrum con- Of the $846 billion requested in the

29 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
US Federal Budget and risk, capabilities and efficiencies,
( i n B i l l i o n s o f D ollars) all while ensuring we are successful
in the current conflict and any future
2011: -$3,728 ones that may be on the horizon.

We as a nation have been here before


$530 / 14% $846 / 23% – kind of. You are familiar with the
Non-S ecur it y Discretionar y S e c u r i t y D i s c re t i o n a r y
adage, “a picture is worth a thousand
words.” The graph (figure 2) is tes-
timony to a road traveled four times
in the last half of the 20th century.
Perhaps unique to our challenge is the
$730 / 20%
S ocial S ecur it y $250 / 7%
fact that the current conflict persists
N o n I nte re s t today and likely will continue well
into the next decade in one form or
another. This will require the country
and the Department of Defense to re-
main on a solid war footing, continu-
$846 / 23%
ing to compete for the nation’s pre-
$492 / 13%
O t h e r M a n d ato r y Pro gra m s cious resources while simultaneously
& D i s a s te r Co s t s
M edicare $271 / 8% changing how we resource our armed
M edicaid
forces. Secretary Gates has provided the
department with a broad road map on
SOURCE: http:// w w w. w h i te h o u s e. g ov / o m b / b u d g e t / f y 2 0 1 1 how to do this, articulated in his guid-
ance to pursue four tracks: 1) find more
than $100 billion in overhead savings
Figure 1 over the next five years; 2) seek efficien-

“security discretionary” category of the of Defense Robert Gates in May “But as a matter of principle and
2011 federal budget, the 2011 defense 2010 when he said the Department
budget request accounts for $548.9 of Defense, in order to maintain and political reality, the Department
billion, or 65 percent of this categoryi. modernize America’s key military ca- of Defense cannot go to America’s
The conclusion one must take from pabilities at a time of war and fiscal
elected representatives and ask for
this is inescapable. As military leaders, pressure, would need to fundamen-
we must all come to terms with the tally change the way it does business. increases each year unless we have
reality of this situation and the prox- Shortly thereafter, in June 2010, he es- done everything possible to make
imity of our decisions to the federal tablished savings targets for DoD and
every dollar count. Unless there
budget. Said another way, all leaders each military department starting in
throughout the national security com- 2012 and going through 2016 that in is real reform in the way this
munity and DoD must clearly see the the aggregate total $100 billionii. Since department does its business and
direct linkage between the defense these announcements, senior lead-
budget and the future health of the ers across the Department of Defense
spends taxpayer dollars. iv”
federal budget and the U.S. economy. have been grappling with how to re- ~Robert M. Gates
This stark reality is clearly reflected in alize these adjustments and exact the
the announcement made by Secretary right balance between requirements
Secretary of Defense

W e a r e t h e A r my ’s Hom e 30
lenge and focuses on the fiscal sustain-
DoD Budget Authority Since WWII
ability of our Army —not just the
700
$698B 40%
immediate needs and wants of his/her
$635B
650
WW II $604B
respective organization. Absent this
600
WW II $577B dimension in every leader’s decision
550 37.5% $513B
30%
making process, the Army will struggle
500
War on to succeed in this mission. And while
Korea Terrorism
450
the Army is fortunate to have capable
Reagan
400
Buildup and experienced higher headquarters
Vietnam
350 20%
elements with cadres of highly skilled
300 2.9% 1999-2001 -- Lowest
since prior to World War II
staff officers, this is not a mission for
Korea
250
11.1%
Vietnam
the higher headquarters to figure out.
200 8.9% Reagan
Buildup 2009 10%
It is a leadership mission at every level
150 5.9% GWOT and must be pursued as one.
4.3%
100

50 An undertaking of this magnitude has


0 0% led to a reemergence of the term “fiscal
1945 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010

DoD Budget Authority


sustainability” in our lexicon. While
many may consider this term synony-
mous with good stewardship, it con-
Figure 2
notes a greater long-term approach to
how we make decisions and manage the
required to be successful in this time Army’s resources. Today’s current cor-
…our Army has realized its great of persistent conflict. porate process is known as Planning,
victories and triumphs of high Programming and Budgeting System
A key leadership challenge in today’s - a system designed by then SECDEF
achievement for a myriad of reasons;
Army is, “how do we as an Army Robert McNamara during the Vietnam
but for certain, good leadership has maintain and further develop the criti- War era. It has matured over time and
been at the heart of each one of them. cal capabilities that ensure we can suc- served the Defense establishment well
cessfully protect America’s national during the Cold War and times of
security interests while simultaneously peace, however the persistent conflict
cies from outside normal channels; 3) achieving substantial savings for the of the last 9 years has stressed it and
conduct a broad review of how DoD is nation?” We as an Army and a pro- forced deviations from its otherwise
organized and operates to inform the fession take great pride in planning, rigid process. Leaders at every level are
President’s 2012 budget process; and organizing and training our forces for grappling with reconciling three ma-
4) reduce headquarters and support any mission we are given and achiev- jor forces that will define the Army’s
bureaucracies while instilling a cul- ing victory no matter the difficulty. future resourcing program: 1) the in-
ture of cost consciousness. From these Clearly, our Army has realized its great stitutional resourcing solution generated
four tracks, the Army and its subor- victories and triumphs of high achieve- through the Planning, Programming,
dinate commands have established ment for a myriad of reasons, but good Budgeting and Execution System; 2)
efficiency tasks and goals comple- leadership certainly was at the heart of the rapidly and ever-changing needs of an
mentary to these objectives and have each of them. It is with this belief that Army at war and; 3) the need for our coun-
dedicated an extraordinary amount of I assert that the fundamental key to the try to reduce spending on national security
time and energy to developing a plan success of this undertaking is the same without sacrificing critical capabilities.
to reduce over time the Army’s top - to ensure every leader takes owner-
line without sacrificing the capabilities ship of this fiscal and operational chal- To lead change is one of the top lead-

31 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
in order to achieve short term savings.
By anyone’s measure, this is no small The question that must be prevail- …the Army has recognized the need
undertaking and, given the magni- ing in every decision made is, “How for and is implementing a more ro-
does this resourcing decision impact
tude and complexity of the operation, bust effort to develop its people to
the Army’s current readiness and fu-
requires every leader in our Army to ture capabilities?” This means look- make better resourcing decisions by
understand and embrace the chal- ing beyond the immediate needs of growing some segments of the work-
one’s command and considering the
lenges and the way ahead. force and investing in the training
enterprise as a whole. This is not an
easy question to answer, however if we and education of that workforce.
cannot or do not address it during our
ership challenges most senior leaders
decision making process, then perhaps
face. To lead belt-tightening change af- 4. Are we developing the right skill
we have more work to do.
ter a decade of fiscal largesse is surely at sets? Said another way, “are we train-
the top of the list and there is certainly ing and educating our leaders and their
2. Is this the best way or the easi-
no sure-fire way to get all the right workforces for the skills they will need
est way to do the job? As a former
people “on the right bus” to ensure an to achieve fiscal sustainment and op-
Special Weapons Officer, my peers and
enduring change that will safeguard erate in this rapidly changing fiscal
I were taught to ask the simple ques-
the fiscal sustainability of our Army. environment?” Do we have the req-
tion, ‘right tool for the right job?’ In
By anyone’s measure, this is no small uisite skill sets at the right levels to
resource management parlance, this
undertaking and given the magnitude enable staffs to develop sound, cost-
equates to, ‘are we making the right
and complexity of the operation, re- informed recommendations to leaders,
sourcing decision?’ Should this mis-
quires every leader in our Army to un- thereby empowering them to make
sion or task be performed by military
derstand and embrace the challenges the right resource-informed decisions?
personnel, DoD/DA Civilians, con-
and the way ahead. Corporately, the Army has recognized
tractor manpower equivalents (CME),
another source, or some combination the need for a more robust effort to
While I do not profess to be a pioneer develop its people to make better re-
thereof? And we must find the bal-
or an expert at 21st Century “fiscal sus- sourcing decisions by growing some
ance between “good, fast and cheap”
tainability,” I will offer a few thoughts segments of the workforce and invest-
understanding that we rarely can have
for leaders to consider as we jour- ing in the training and education of
all three. Sourcing decisions drive ef-
ney through the next decade of fiscal that workforce. This is evident in: 1)
fectiveness, drive cost and ultimately
change, however I caution the reader the recent decisions to grow and de-
drive fiscal sustainability.
to not expect a cookbook solution to velop the Acquisition and Contracting
the road ahead but a visitation of many workforce (i.e. decisions made as a
3. Am I properly task organized and
of the same leadership and manage- result of the 2007 Gansler Commission
structured for the mission? This goes
ment principles we learned as young Study); 2) including these subjects in
beyond organizing our forces for a tac-
Officers and NCOs. the Army’s Senior Leaders Courses
tical mission and resides in more en-
during force structure decisions that curricula (i.e. development and inte-
1. Make and Enforce Balanced gration of procurement and contract
are critical to ensuring both operation-
Decisions. Demand thoughtful analy- management training for General
al effectiveness and efficiency and fiscal
sis and prudence in every decision – Officers and SES’s into the Army’s
sustainability. Examining the necessity
considering the sizeable savings that Senior Leadership Development pro-
for intermediate layers of command
the U.S. Army and the other Armed gram): and 3) providing training op-
and control and redundant capabilities
Services are seeking to achieve, leaders portunities for mid-level managers in
that do not enhance the capabilities of
must not lose sight of the operational key areas like cost management (i.e.
our formations is key to our efforts.
and long term impact of our decisions starting in FY10, the Army’s ASA-

W e a r e t h e A r my ’s Hom e 32
FMC developed and sponsors the Cost and ultimately ensuring the Army things and then make the right de-
Management Certification Course can fiscally sustain itself in an eracision? If our current processes are
(CMCC) conducted at the Naval of persistent conflict. focused in those areas that do not
Post Graduate School in Monterey, constitute where the majority of our
California). Achieving fiscal sustainabili-6. Am I focused on the right things? capabilities lie, then our processes are
ty requires a long-term investment to de- As leaders, our most precious resource not serving us well. This question begs
velop the right skills in our most preciousis time. In today’s operating environ- the follow-on question of whether
resource, our people. We cannot forego ment, most leaders are challenged to these processes are well integrated in
this small investment today, for the sake accomplish everything they consider the other systems we utilize, to ensure
of current year savings, to the detriment important to the mission. In the area leaders are not making fragmented
of future critical capabilities. of resourcing, I recommend leaders decisions but more holistic ones. For
focus their efforts on “the big things” example, in an Army that relies heav-
5. What should this capability cost? -- those areas that are the largest cost ily on contracted capabilities, we must
This is probably the most elusive of drivers or impact their resourcing pro- dedicate leadership energy throughout
questions to try to answer. In recent gram the most. This will vary from one the contract management process, es-
years, the U.S. Army has made an ad- organization to another. In a tactical pecially in the requirements genera-
mirable attempt and some progress in unit, leaders will likely need to focus tion, planning and post-award review
changing its culture from a consump- on training events and supply manage- stages. Equally important to involving
tion-based to a cost-based leaders in this process is to
culture. Perhaps not visi- ensure that these venues
ble to an outside observer, “In any organization that spends a large portion of are integrated into the op-
the Army developed and erational and resourcing
its annual funding program on contracts, a leader
implemented such initia- activities of an organiza-
tives as 1) the creation of cannot afford to not have a contract management tion, ensuring the same
four core enterprises to program where the leaders and managers of the leaders can make better
ensure we gain a broader integrated operational and
organization are integrally involved.”
understanding of corpo- resourcing decisions.
rate processes to inform ~BG Thomas A. Horlander
leaders’ resourcing deci- 8. “We’ve always done it
sions; 2) the conduct of this way!” Better stated,
capability portfolio reviews (CPRs) ment; at an installation level, leaders “Are we stuck in the past?” Have
to help understand requirements and would need to focus on workforce and we leveraged modern day technol-
identify redundant capabilities across contract management to ensure instal- ogy where it makes sense to do so and
the force and where the Army could lation services are adequately resourced thereby identified and implemented
achieve greater efficiencies; 3) the re- to the desired capability level; and at more efficient ways to produce the
quirement to conduct a cost benefit the strategic and/or higher headquar- same or better results? What are those
analysis for certain requirements before ters level, leaders may need to focus legacy capabilities that we either need
they can be considered for resourcing; more on leveraging existing capabilities to divest ourselves of completely or
4) the development and conduct of the external to their organization or ensur- change? The Army today is field-
Army’s CMCC to educate mid-level ing the right processes and procedures ing several new automated business
managers on cost management so that are in place to ensure subordinate orga- systems to improve its management
they can take their skills and expertise nizations manage resources properly. capabilities, thereby empowering lead-
and apply them in their respective or- ers to make better informed decisions.
ganizations, etc. All of these initiatives 7. Do our current processes enable The fielding of the General Fund
are aimed at achieving a cost culture us to make decisions about the right Enterprise Business System (GFEBS)

33 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
is but one of those systems that can bilities and thereby achieving a level BG Thomas A. Horlander currently serves as the U.S.
provide leaders a great appreciation of fiscal sustainability that ensures our Army Installation Management Command G-8/
for the cost of their operations and Army is capable of safeguarding our Resource Manager. He is a U.S. Army Master Strategist
enable them to conduct analysis to national security in a 21st Century of and holds Master’s Degrees in Business Administration,
make cost-informed decisions. persistent conflict. Many have referred Military Arts and Science – International Relations
to this persistent conflict as the “long and National Security. He is a sitting member of
9. Follow through. Once a plan has war.” The United States’ ability to fis- ASMC’s CDFM Certification Commission.
been decided upon and enacted, are cally sustain its Armed Forces through-
we following through by monitoring out this “long war” is a key to our suc- References:
its execution? Critical to the success cess as a nation and a leader of the free
i
These figures were pulled from the 2011 Budget
of the Federal Government found at www.white-
of ensuring that we “achieve the bal- world. The Armed Forces’ role in this house.gov/omb... and the author recognizes
ance” and ensure fiscal sustainability of is greater than just being the most ca- that they are subject to change given that cur-
our Army, is to monitor the progress pable and ready military force in the rently the USG is operating under a Contining
of each organization’s implementation world, always capable of protecting the Resolution and it is possible that this budget re-
quest could be modified.
of the necessary changes. Much like U.S. National security interests but it
we would check the development and must also do so in a more economic ii
SECDEF memo to the Service Secretaries dated
readiness of a tactical formation pre- and efficient manner. This is partially 04 June 2010
paring for a mission by monitoring the achieved through some of those ideas iii
SECDEF Speech delivered at the Pentagon,
execution of their scheduled training I have represented above but undeni- January 06, 2011
or maintenance readiness reports, we ably, the fundamental key to the suc-
must also monitor our implementa- cess of achieving fiscal sustainability is
iv
SECDEF Speech delivered in Abilene, KS on 08
May 2010
tion of this resourcing operation. This in a word - Leadership.
step is easily neglected but imperative to
our success and must be planned for.

10. Strategic Messaging. I referred to


“getting on the bus” previously in this
article as a portent to this final asser-
tion. Have we ensured everybody who
needs to know, knows? We have all
seen the greatest of plans suffer because
of less than adequate strategic commu-
nication plans that did not ensure the
right people were “on the right bus”
and/or had an adequate understand-
ing of the mission and the concept of
operation. This is fundamental to any
successful operation and cannot be
over-emphasized in this undertaking.

While my offerings are broad and con-


ceptual, they hopefully serve as refer-
ence points for us as we plan for the
implementation and execution of our
Army’s mission to reduce its resourcing
requirements without sacrificing capa-

W e a r e t h e A r my ’s Hom e 34
Cost Management vs Budget Management:
Performance Based Band of Excellence
by Joe Staton, Management Integration Branch Chief, IMCOM-SE

Introduction ment is about “doing the right things” we do business by assisting leaders in
“In today’s resource-constrained envi- and “doing things right.” Continuous identifing,quantifying, and evaluating the
ronment, the Army must exercise wise process improvement focuses on doing costs and benefits of alternative solutions.
stewardship of every dollar it manages. things right. Strategic management and
A key element in that stewardship is leadership define what the right things Cost Management vs.
to develop and use sound cost-benefit are. Garrisons require good business Budget Management
analysis (CBA) practices throughout strategies, solid business rules and effi- No one executes their household
all requirement/resourcing processes. cient operations to deliver cost-effective budget like we manage resources in
For every proposed program, initiative services to our customers. the Army. “In the past, the Army’s
or decision point that is presented to budget-oriented culture defined suc-
decision makers, it is important to pro- In the 2010 Army Posture Statement, cess as spending every appropriated
vide an accurate and complete picture the Headquarters, Department of the dollar to accomplish assigned mis-
of both the costs to be incurred and the Army defined cost management as, sions, and this frequently resulted
benefits to be derived.”1 “the effective and efficient manage- in cost considerations entering the
ment of business operations through decision process as an afterthought
Leadership and operational manage- the accurate measurement and thor- rather than as a key element of deci-
ment complement each other, so both ough understanding of “full cost.” sion making.”2 This technique is dif-
must be assessed to determine the orga- Cost management provides full cost ficult to control because garrison
nization’s capacity to meet today’s and awareness of an organization’s busi- services and missions are based on
the future’s challenges. Cost manage- ness processes, products, and services unconstrained requirements that vary
that deliver the best value to wildly between installations. It is a sys-
the organization’s customers.” tem that rewards programs for spend-
ing all of their budgeted resources.
We are compelled to change Efficient use of resources is usually
our decision processes to weigh an afterthought. Terms like process
tangible and intangible costs cycle efficiency, cost-performance, and
and benefits. We must evalu- process capacity are not connected
ate new and current pro- to management decisions.
cesses, codifying the bene-
fits they provide to the Army, In a cost management environment,
not just to any one garrison. resources are driven by docu-
Garrisons are connected or- mented requirements. Garrisons’
ganizationally and best prac- budget performances in and of
tices, even at the lowest levels, themselves cannot be compared
must be documented and – it’s apples and oranges. Assuming
shared with other Army orga- garrison budget equals the direct ob-
nizations. The purpose of this ligation, the only conclusions that
essay is to highlight the can be drawn from our current bud-
need to change the way get system are that Fort J obligated

35 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
Service 800 Garrison Comparison bottom line). Customer feedback is
Obligations represent 100% spend plan executed one element of “doing things right;”
and regulatory requirements and
$ leadership tell us if we are “doing the
15,000,000 right things.” Leaders balance customer
requirements against resources using
$
12,000,000 exceptional stewardship to measure per-
formance, quantify process efficiencies,
benchmark garrisons and implement
$
9,000,000 best practices. Within available resourc-
es, garrisons provide a variety of services,
supporting Soldiers, Family members,
$
6,000,000 Civilian Employees, and retirees. The
services have a capacity that is tied to
$ available resources. From a business
3,000,000
stand point, without measuring process
capacity and customer through-put,
$
0 how do we know how efficiently we are
A B C D E F G H J
“doing the right things?”
$3,935,802 $8,880,856 $6,886,822 $2,741,854 Linking End-to-End Processes
Obligations $4,559,549 $3,097,202 $4,905,750 $3,635,668 $12,024,030 Garrisons provide 55 services as defined
in the Installation Status Report (ISR).
Garrison commanders are responsible
Figure 2
for reporting performance and quan-
tity data in five key Army systems:
the most money and Fort A the least. and win; support well-being, and have Army Stationing and Installation Plan
The cost management analyst may a safe and healthy infrastructure and (ASIP), Real Property Planning and
consider comparative budget execu- environment in which to live.3 The Analysis System (RPLANS), Common
tion based on a common denominator Garrison’s challenge is to not compro- Levels of Support (CLS), Installation
(population, size, area, etc) or “cost per mise the quality of services our Soldiers Status Report (ISR) (Figure 3 -
unit” and process capacity. These two and Families deserve, but to provide Garrison Gunnery Tables), and
views enable analysts and planners to quality services within a resource con- Continuous Process Improvement.
normalize garrisons, allowing bench- strained environment. Accurate data reporting is essential
mark comparison, deeper understand- since these feed Army-level decision
ing, and best practices indicators. By The Installation Management making tools. Additionally, the AR
analyzing how garrisons are executing Campaign Plan (IMCP) provides stra- 5-10 Stationing Process complements
their budgets, better decisions can be tegic direction and a foundation for the garrison gunnery tables. It uses the
made to allocate resources based on continuing to provide quality services staff-study methodology that should
needs instead of wants. and infrastructure into the future. synchronize installation services and
Figure 3 depicts a way to display the facilities requirements against resourc-
Tactical-level Execution Map IMCP application at the tactical level, es. Although the stationing process
IMCOM is dedicated to ensure that or the resources-to-customer relation- does not require installations to syn-
our Soldiers, Families and Civilians, ship: it takes money to provide ser- chronize services and infrastructure
today and in the future, have the re- vices and infrastructure to the Mission, requirements with the budget pro-
sources they need to train, deploy, fight Community and Environment (triple cess, the stationing process results in a

W e a r e t h e A r my ’s Hom e 36
recommendation that is acceptable System (RPLANS) is the primary and services. The ISR program can
from a garrison perspective, satisfying means for the Army leadership to allo- assist garrison commanders to as-
environmental concerns, and high- cate facility resources to support Army sess overall installation condition and
lighting any risk considerations. roles and missions. It translates Office readiness, articulating needs identified
of the Secretary of Defense (OSD) in the ISR data, estimating resource
Army Stationing and Installation Plan programming guidance and congres- requirements, assisting in prioritizing
(ASIP) establishes the foundation for sional guidance into planning decisions programs and projects, and measuring
master planning and base operations based on a detailed allocation of forces, progress.6 ISR consists of three reports:
resource programming at the installa- manpower, and funds. It produces the
tion. It provides a single data source Army’s proposal for a balanced alloca- ISR Infrastructure (ISR-I) provides an
that contains the official HQDA au- tion of its resources among centrally evaluation of the facilities and infrastruc-
thorized planning populations by lo- managed programs for manpower, op- ture on a base. ISR–I assesses the quality,
cation and fiscal year. It gives Army erations, research, development and ac- quantity and mission support of rated
planners and programmers consistent quisition, and stationing and construc- facilities and provides estimated costs to
information to determine facilities and tion within specified constraints.5 improve the base’s current infrastructure
other authorized planning populations through revitalization or modernization.
or unit driven requirements for all as- Common Levels of Support (CLS)
signed units, activities, and tenants at is on a strategic pause for evaluation ISR Natural Infrastructure (ISR–NI)
Army installations. It is used to vali- and improvement in FY11. CLS is assesses the capability and capacity of an
date and justify many services and pro- a decision process enabling successful ISR reporting organization’s ability to
grams, Army and Reserve Component uniform delivery of Army installation support the current and future mission
military construction, Army family services, within available funds, by requirements with its natural infrastruc-
housing (AFH), and non-appropriated defining an Army-level approved level ture assets (air, land, water, and energy).
fund (NAF) projects that are submit- of service (quality and/or quantity).
ted to Congress for approval.4 CLS is based on a comprehensive ISR Services and ISR-S (Service Based
understanding of the Army’s Base Costing) (ISR–S and ISR–S (SBC))
Operations Support (BOS) evaluates the cost and quality of service
services, standards, and costs. delivery performance for base support
Within CLS, each service services provided at each Army base.
and subservice is described These components assess cost, quan-
by tasks, conditions, and stan- tity, and quality of services provided
dards. CLS enables Enterprise to organizations and individuals as-
leaders to identify risk and sociated with Army bases. ISR–S and
determine acceptable stan- ISR–S (SBC) are used in the Standard
dards of service delivery within Service Costing model to calculate cost
available resources. estimating relationships (CER) that are
used by the Base Operations Support
Installation Status Report Requirements Model (BRM) to develop
(ISR) provides data for assess- base operations support requirements.
ing key elements of an instal-
lation at a specific point in Continuous Process Improvement
time. The ISR program assists (CPI) is a Department of the Army
Army leaders to make ap- sponsored initiative committed to
propriate decisions to sustain promoting and sustaining a culture of
or improve facility manage- improvement throughout all levels of
ment, natural infrastructure, the Army. It provides a mechanism to

37 Real Property Planning and


U . S Analysis
. A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
IMCOM-SE Service 800 Cost Comparison
Adjusted Average* = $186/Soldier • Best Practice = $150/Soldier
*Average excludes fort H-I as Outliers

Fort A Fort B Fort C Fort D Fort E Fort F Fort G Fort H Fort J

FY10
$4,559,549 $3,935,802 $3,935,802 $8,880,856 $4,905,750 $6,886,822 $3,635,668 $2,741,854 $12,024,032
Direct Obligation
Soldiers 30,438 25,522 5,522 51,543 26,041 32,924 13,943 5,330 17,649

$/Soldier $150 $154 $154 $172 $188 $209 $261 $514 $681

Delta $0 $0 $0 $0 $3 $23 $75 $329 $496


Potential
Cost Savings $0 $0 $0 $0 $68,349 $770,828 $1,045,603 $1,751,748 $8,745,537

Delta $0 $4 $4 $23 $39 $59 $111 $365 $531

Potential $
0 $
112,660 $
112,660 $
1,159,822 1,004,862
$
1,954,875
$
1,547,036
$
1,943,431 $9,380,249
$
Cost Savings

Potential Average Cost Savings = $12.4M


Potential Best Practice Cost Savings = $17.4M

Figure 4

stimulate an environment for healthy ity that causes the change of an activ- certified by Garrison Commanders
competition, promoting ideas and op- ity cost. Cost drivers are developed through other systems and top-loaded
portunities to learn new techniques from the execution of the business into SBC. When comparing garrison
and methods for improving IMCOM’s activities (such as capacity utilization, performance, marrying ISR-S cost
processes and delivery of services. CPI plant layout, workforce involvement, data with the ISR-S pacing measures
is simply a way of looking at how we etc.) in relationship to the amount of make it possible to benchmark garri-
can do our work better. When we take money to perform the activity. For a sons and identify efficiency indicators,
a problem solving approach, we en- cost driver to be effective, the obligations highlighting potential best practices.
gage in process improvement, seek to must be directly proportional to the pro-
learn the root causes and then use this cess outcome. One cost driver may not Model and Analyze
knowledge to reduce process variation, be enough. For example, in Service 800 Most of us have heard some version
remove activities that have no value to (Military Services) it may require cost of the standard performance measure-
the organization, and improve custom- per identification card or cost per Soldier ment cliché: “if you can’t measure it,
er satisfaction. To foster collaboration due to other processes performed. you can’t control it; if you can’t con-
and sharing of best practices, CPI re- trol it, you can’t manage it; if you can’t
sults are reported in the Army Business The Army Stationing and Installation manage it, you can’t improve it.”7 The
Transformation web page at (https:// Plan is the source database for several fundamental reason for measurement
bt.army.mil/usarmycorp/Home.page) performance measures in ISR-S and is to benchmark and improve perfor-
and at www.garrisoncommander.com. pacing measures in Army Service Based mance. Benchmarking involves leaders
Costing. The remaining ISR-S pacing identifying the best garrisons in their
Effect Major Cost Drivers measure data come from ISR-I (facility region or any other region where simi-
In and of themselves, the Garrison square footage) and ISR-NI (environ- lar processes exist; comparing the re-
Gunnery Table data do not drive cost. ment, and improved and unimproved sults and processes to one’s own results;
A “cost driver” is the unit of an activ- acreage). The pacing measure data are and learning how well the processes

W e a r e t h e A r my ’s Hom e 38
analysis is required to reach a resource
Average Cost per Soldier
informed decision. Is the lowest cost
$800 really the best? Maybe the employees
are dissatisfied and leaving the organi-
$700 zation. Through additional research,
the tangible and intangible benefits
$600
can be documented and considered in
$500 a Cost Benefit Analysis. After a deci-
sion is reached, the benchmark practice
$400
may not be exportable to all garrisons;
$300 or only portions of it are exportable.
Although some improvement can
$200 be achieved, one cannot assume that
you will realize a 100 percent savings.
$100
Due to location, wage differences, and
$0 other factors; it is more likely garrisons
A B C D E F G H J
could achieve 60-75 percent savings.
Soldier $3,935,802 $8,880,856 $6,886,822 $2,741,854
$270 $270 $270 $270 Lean Out Inefficiencies
Average
Figure 5a shows the average IMCOM-
$4,559,549 $3,097,202 $4,905,750 $3,635,668 $12,024,030
$270 $270 $270 $270 $270
SE Service 800 cost is $277/Soldier.
Assuming cost management efforts re-
Figure 5a
duce the cost per soldier at Forts H and
J, the average cost will eventually reach
perform against targets and, more im- sures are available through ISRWeb the adjusted average in Fig 5b at $186
portantly, how they do it. (https://isrtrain.hqda.pentagon.mil/). per soldier. The band of excellence is
defined by the UCL of $227 per sol-
IMCOM has been conducting What is the average cost per driver? Is ider and the LCL of $125 per soldier.
Performance Management Reviews the garrison performance statistically Forts A-F are in the band of excellence:
(PMR) for three years using Common acceptable? Can we realize cost sav- Forts A-D are at or below the average
Levels of Support and reported service ings by garrisons moving toward the cost per soldier and represent potential
costs. The PMR has progressed from a average cost? By comparing delivery best practices. Forts E-G are in the band
by-service side-by-side garrison review of service through financial obligations of excellence, but above the average.
to statistical execution comparison to among the garrisons, the region can Forts H and J are well above the average
a process of comparing normalized identify potential best practices and ar- cost, and are highlighted as potential
service performance among garrisons. eas for further investigation. Our band process improvement initiatives.
Typically, dividing the garrison’s direct of excellence is defined as the area
obligations by the SBC pacing mea- between the upper and lower control Forts E-J differential between their
sure standardizes garrison costs, allow- limits (UCL and LCL, respectively). costs and the $186 average represents
ing benchmarking and identification From accepted business practice, the a savings potential of $12.4M. These
of potential best practices (Figure 4). UCL and LCL are each a three-sigma garrisons are identified as opportuni-
One source available to anyone, for distance from the average.8 ties for process improvement. Forts
garrison obligations is through the A-D are opportunities for best practic-
Cost and Performance Portal (https:// The comparison should not be taken es. Both require detailed investigation
cpp.army.mil) and SBC pacing mea- at face value for action. Deeper cost and cost-benefit analysis. The Region
Director can decide to launch tiger

39 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
teams to document best practices or as- ing resources to see the cost culture stakeholders will have greater con-
sist a garrison to reach the cost manage- change evolve within their organiza- fidences that IMCOM is balancing
ment band of excellence. Once Forts H tion. Employees will buy in when the needs against available resources.
and J reach the band of excellence, the leadership empowers and encourages
next step is to analyze all installations creative thinkers and critical reasoners Leaders must continuously evaluate
around the validated best practice. If all to discover trends and outliers leading the cost-benefit process contribution.
installations in this example approach to greater efficiency and savings. The Are customer needs being met? Are
the best practice cost, the Region would employee must be empowered to cross- employees rewarded for increasing effi-
realize a cost savings of $17.4M. coordinate and present innovative new ciencies? How are other organizations
ideas. If the employee cannot accept the improving? A policy for rewarding
Championing Change cost culture methodology, the Army teams and individual practices should
Change is inevitable, and turmoil exists will have a distinct disadvantage com- be implemented to cement the leader-
in its wake: budgets will shrink, jobs peting for necessary future resources. ship’s commitment to employees for a
may be in jeopardy, and time is a val- long-term cost culture pledge.
ued commodity. To convert the hearts The entire organization will improve
and minds to cost management, cost as everyone participates in the cost Exceptional Stewardship
managers must maintain a flexible ap- management process. Future resource The future will require exceptional
proach to deal with leaders, employees, requirements will be available because stewardship to ensure that our Soldiers,
and customers. While each constituency budgets are derived using actual costs Families and Civilians have the re-
requires a different approach, it is generally to meet needs, rather than wants. sources required to train, deploy, fight
described as awareness, buy-in/acceptance, Leaders and employees indoctrinate and win; support well-being, and have
participation, and evaluation/reward. cost management tools every day into a safe and healthy infrastructure and
their daily activities for truer continu- environment in which to live. Garrison
The concepts of cost management ous process improvement. When cost commanders will be continuously chal-
must be methodically introduced to culture measures and activities are lenged to operate within the cost man-
build awareness. Active listening, gen- common practice, the customers and agement band of excellence and balance
uine concern, and balancing triple bot-
tom line requirements will build cost-
Figure 5b
awareness and program confidence.
Cost managers must present leaders BAND OF EXCELLENCE: Based on Adjusted Cost Average
with viable cost-effective options in a $800
timely manner. Employees need to see
$700
the leadership “walk the talk” by lead- $8.7M
ing change through the incorporation $600

of cost management techniques in $500


their normal business. Carefully crafted Indicator for Potential Best Practice. Requires Cost Benefit Analysis
$400
strategic messages must inform Leaders,
Band of Excellence “Sweet Spot”
Soldiers, Family Members and Civilian $300

employees of changes and results. $200

The organization benefits through uni- $100

ty of command and discipline. Leaders $0


A B C D E F G H J
will buy in when cost management
$/Soldier $150 $154 $166 $172 $188 $209 $261 $514 $681
increases their effectiveness by leaning UCL $227 $227 $227 $227 $227 $227 $227 $227 $227
out inefficiencies. Management must Adj Average $186 $186 $186 $186 $186 $186 $186 $186 $186

be willing to invest the time and train- LCL $145 $145 $145 $145 $145 $145 $145 $145 $145

W e a r e t h e A r my ’s Hom e 40
the triple-bottom-line customers. Joe Staton is the Management Integration
Branch Chief for the IMCOM-SE Region. He re-
As leaders, we are entrusted to respon- cently joined the civil service after serving 21
sibly execute the resources provided to years as a regular Army officer. Mr. Staton’s
meet directed service levels. The per- last assignment was the Deputy Garrison
formance objectives we choose must Commander for Transformation at Fort Bragg, NC
add value to the process. We cannot af- from 2007-2010. He earned a Bachelor of Science
ford to rely on metrics that emphasize Degree from the Colorado School of Mines and a
the immediately measurable and ig- Masters Degree from the Command and General
nore high value measurements simply Staff College, Fort Leavenworth, KS. He is also
because they seem harder to measure. a recent graduate of the Cost Management
If closely tied to outputs, performance Certificate Course at the Naval Postgraduate
metrics encourage improvement, effec- School in Monterey, California.
tiveness and appropriate levels of con-
trol. We must make resource-informed References
decisions to ensure that the costs, 1 GEN Peter Chiarelli (VCSA) and Hon Joseph
Westphal (USA), Memorandum on Cost Benefit
projected benefits and trade-offs were Analysis, 30 Dec 2009
considered before obligating resources. 2. 2010 Army Posture Statement, Cost
The available data and cost manage- Management Information Paper
ment techniques must be incorporated 3. Installation Management Campaign Plan
(IMCP) 2010-2017, ver 2.0, October 2010, pg. i
to supplement our professional experi- 4. Army Regulation (AR) 5-18, pg 2
ence and military judgment. 5. AR 210-20, pg 1
6. AR 210-14, pg 2
7. Peter Drucker, date unknown
Cost management is about balanc-
8. Wheeler, Donald, Making Sense of Data
ing “doing the right things” and “do- (Knoxville: SPC Press, 2003), 157
ing things right.” Continuous process
improvement focuses on doing things
right. Strategic management and lead-
ership define what the right things are.
Garrisons require good business strate-
gies, solid business rules and efficient
operations to deliver cost-effective ser-
vices to our customers.

41 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
Fort Drum Forest Management:
Innovation Brings Sweet Profits
by Jason Wagner, Chief of Natural Resources Branch, USAG Fort Drum

With over 65 percent of the installation covered in some type of forest land, historically there have
been no conflicts between mission, training needs, timber harvest objectives and funding.

As an installation Natural Resources Since the 1960s, the Fort Drum Forest ment projects. This centralized fund-
Manager with 10 years experience as Management Program has practiced ing mechanism is a critical element of
an Army forester, my notion of sustain- sustainable forest management, origi- the program. Timber markets, like any
ability encompasses forest management nally focusing on commercial timber agricultural product, tend to be cycli-
principles and sound ecosystem man- harvesting and tree planting for soil cal. If Fort Drum has a low income
agement. Sustainability, in this perspec- stabilization and erosion control. Until year due to low markets, cutting re-
tive, has been the primary goal of my the late 1980s, the primary program strictions or training requirements that
professional career, to include develop- driver was to capture available tim- wouldn’t allow harvests to occur, then
ing timber management objectives, em- ber value from Army real estate while the program would be funded through
phasizing sustainable forest products, planning ways to grow more forest for the centralized reimbursable forestry
manipulating the forested environment future harvests. Forestry staff marks program. Generally the funding in the
for direct mission support, and ensur- trees to be harvested with paint and accounts comes from an installation
ing ecosystem sustainability and bio- then sells that standing timber on the in another region that had net prof-
diversity. This sustainability focuses on open market to the highest bidder uti- its that year. Historically, the Army
the environmental stewardship part of lizing an Army Corps of Reimbursable Conservation Forestry
the Army’s mission. Engineers contract. The program has a net profit yearly and
revenue generated from after basic operating costs are funded
these sales, from every they then fund installation requests for
installation, is depos- forestry and natural resources projects.
ited into a centralized
Army Reimbursable In 1992 the Army developed a new
Conservation Environmental Strategy that was based
Forestry account. on four pillars, conservation, restora-
Funding is then tion, pollution prevention, and compli-
provided back ance. This led to the development of the
to the installa- Conservation Branch at Fort Drum and
tion level Forest the hiring of new biologists which tripled
Management the staffing levels from 2 to 6 personnel.
Program to Up until that time the 2 foresters handled
cover operat- all natural resources related issues on the
ing expenses, installation. The Army’s new emphasis
such as man on conservation began to shift the forest
power, equipment, management strategy from purely maxi-
and other forest manage- mizing yields to ecosystem management

W e a r e t h e A r my ’s Hom e 42
Fort Drum Forester Travis Ganter collects the days run of maple sap. On a good day each tap can produce up to 2 gallons of sap.

centered on diversity, wildlife habitat, cies--the Indiana bat (Myotis sodalis). kets due to the economic slump the
air and water quality, soil conservation This tree-dwelling bat lives and raises country is experiencing, especially in
and watershed protection. young during the summer in large the housing industry. Historic average
mature trees with exfoliating bark. prices of $1.50 a board foot for qual-
Forest management activities in the Through consultations with the US ity maple and cherry hardwoods have
last ten years have reflected the needs Fish and Wildlife Service, Fort Drum dropped to an average of $0.50. The
of the “missionscape” development, has a conservation protocol in place to Army’s Reimbursable Conservation
the creation and maintenance of for- not cut down any standing trees be- Forestry Program’s funding levels,
ested environments requested by the tween April 15 and October 1, effec- which historically covered the pro-
training community. Regardless of the tively losing 6 months of commercial gram’s operating expenses, have subse-
primary objective, requirements still saw timber operations. quently been reduced.
followed the model of cutting and sell-
ing saw timber to provide income to Another challenge to the Forest With all these compounding issues, the
cover the program’s operating expenses. Management Program is on-post de- Forest Management Program fund-
With over 65 percent of the installa- velopment. For the past three years, ing quickly became unsustainable.
tion covered in some type of forest land, Fort Drum has seen a sharp increase In looking for other opportunities,
historically there have been no con- in infrastructure and facility develop- the program began researching other
flicts between mission, training needs, ment with a new brigade combat team marketable forest products or com-
timber harvest objectives and fund- and Army transformation. This con- modities. Other installations have been
ing. However, the last few years have struction has permanently removed a successful marketing their pine straw
brought some significant challenges to large acreage of mature forest from the while still others have large agricultural
the Forest Management Program. available timber inventory. leases that augment their timber harvest-
ing program income. The Fort Drum
One challenge arrived in the discovery Simultaneously, there has also been a area has the annual educational ”Maple
of Fort Drum’s first endangered spe- drastic down turn in the timber mar- Days.” Why not capitalize on the success

43 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
of Maple Days and create a commercial
maple syrup processing operation, an
idea that is pure “North Country”?
New York is one of the leading states in
maple syrup production in the United
States, and the bulk of that produc-
tion takes place in the three counties
surrounding Fort Drum. Historically,
maple syrup prices have been excep-
tionally stable ($30-$35 gallon in New
York) and are currently trending up-
ward due to increased global demand.
Maple syrup is a North American prod-
uct, native to southeastern Canada
and the northeastern United States.
Producers in the U.S. and Canada
provide syrup for the rest of the world,
and are struggling to keep up with
global demand. In September 2008,
New York Senior Senator Charles E.
Schumer released a statement in sup-
port of the New York State maple
industry and called for increased uti-
lization of the state’s maple resource.
In the press release, Senator Schumer
supports the establishment of a maple
syrup bottling plant in Lewis County, Fort Drum Forester Rodger Voss gets the evaporator started for a day of
education at the “Sugar Shack”.
one of Fort Drum’s neighboring coun-
ties. The creation of a bottling plant
would allow local producers the oppor- syrup was demonstrated. Of the 25 at- The goal of Maple Days, a unique
tunity to sell bulk syrup locally, instead tendees, 20 of them had no idea where outreach program is to provide a truly
of sending it out of state for bottling. pure maple syrup came from, nor had unique experience in the Department
they ever tasted it. It was a shock- of Defense by educating Soldiers,
Fort Drum Forestry’s first foray into ing realization that Soldiers and their Families, Civilians, contractors and Fort
the maple syrup arena began on a Families living and serving on post Drum neighbors on another sustainable
rainy spring day in 2006 at our first had very little experience with what forest product. It has grown into a huge
Maple Days event. This event featured Northern New York had to offer. This success story for everyone involved.
25 trees tapped with buckets to collect realization validated the creation of a
the sap and a 2 foot by 4 foot wood- small maple syrup processing demon- Since 2006, on the last two Saturdays in
fired evaporator set up in a parking lot stration area for the following year’s March we hold our Maple Days event
next to a sugar maple stand. Twenty- Maple Days event. The demonstration and provide proof to Fort Drum’s new
five brave souls from the Fort Drum area consists of a small shed to house residents that winter’s blowing cold
community came out to see what was the evaporator, a stack of firewood and and deep snow is about to end and that
happening. The process of collecting approximately three acres of mature spring will indeed come. As daytime
and boiling maple sap into pure maple sugar maple trees to collect sap from. temperatures start to rise above freez-
ing, sap begins to flow from the roots of

W e a r e t h e A r my ’s Hom e 44
Almost syrup! Fort Drum Forester Rodger Voss explains the boiling process.

the sugar maple trees. The alternating maple syrup. The demonstration area taste of a sample of maple syrup, cooled
freeze-thaw (night/day) cycle creates gives visitors the chance to see the from the boiling process.
pressure in the tree which pushes high process first hand. Foresters lead tours
levels of sap up the tree. We “tap” trees through the woods explaining the parts Capitalizing on this great event,
by drilling a quarter inch hole into the of the tree, how we tap and collect sap in 2011, the Forest Management
tree, into which a small metal spout is as well as the importance of non-wood Program is starting a commercial scale
inserted to direct this flowing sap into based forest products management. sugaring operation. Over a thousand
a bucket hanging on the tree. When The syrup season can last anywhere trees will be tapped with an additional
day/night temperatures are optimum, from about 2 to as many as 8 weeks 4,000 taps planned in the future. Due
a steady drip/dribble occurs. When the but 4-6 weeks is the norm. It comes to to the classic tap and bucket approach
sap comes out of the tree it is approxi- an end once the trees begin to sprout being very labor intensive, the program
mately 97 percent water and 3 percent buds. When this occurs, the syrup will utilize a plastic tubing collection
sugar. Sap is collected and then boiled loses it maple flavor. In 2010, over 500 system. A network of tubing will run
in a wood-fired evaporator. Once it is visitors attended the event, learned how from tree tap to tree tap which pipes
boiled long enough to remove 65 per- to make syrup from trees in their back- the sap into a 500 gallon tank on the
cent of the water, all that’s left is pure yard and most of all, enjoyed the sweet side of the road. This allows one per-

45 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
son to pump out the tank from each Maple Syrup Processing Potential:
“sugar bush” (forested area dominated Historic and Current Conditions
by and managed for sugar maple trees) FORT DRUM MILITARY INSTALLATION

in a matter of minutes versus multiple


people carrying buckets for the whole
day. Another advantage of tubing/pipe-
line systems is it allows for the freshest
sap to be collected and transported to
the evaporator. The faster sap can be
processed the higher the quality of
the resulting syrup. Since higher qual-
ity syrup commands a higher price, it
makes sense to collect and boil sap as
quickly as possible. Some small areas N

will still utilize the tap and bucket ap-


proach to avoid conflicts with training Scale: 1:200,000
activities. A reverse osmosis machine
0 5 Kilometers
will also be used to increase efficiency.
Reverse osmosis is typically used for Map Legend

water desalination operations where a Historic Sugarbush Site (34 Sites)


Installation Boundary
semi-permeable membrane is used to Sugar Maple Species

separate water from minerals and im- Most Dominant (5,103 Acres)
Second Most Dominate ( 1,639 Acres)
purities. In the maple syrup production
world, water is the by-product and the
sugar concentrated sap is the product. Figure 1
This process removes up to 50 percent
of the water resulting in about a 70
percent reduction in fuel costs associ- quisition in 1940-1944, the land that log. A tree of this size will yield ap-
ated with boiling. An operation of this is now Fort Drum played a major role proximately 320 usable board feet. At
size can be expected to produce around in local maple syrup production. The the current average of $0.50 per board
2,300 gallons of syrup in one season. included map (Figure 1) illustrates all foot, this equates to potential revenue
Due to the weather-dependent nature of the known historic processing sites of $160 per tree. In comparison, this
of maple syrup production, this num- once located on Drum proper. The map same tree put into syrup production
ber could be slightly higher or lower. also shows all of the sugar maple stands could conservatively be tapped for
Using a conservative estimate of $30 currently on the installation with the approximately 50 years. Over that
per gallon, this equates to potential potential for syrup production. 50 year period, each tree has the po-
gross revenue in the range of $69,000 tential to produce a minimum of 0.5
per year for about 9 weeks of work. To accurately compare economics be- gallons annually. This equates to the
tween a classic timber harvest system production of approximately 25 gal-
By utilizing this management strategy and a maple syrup processing opera- lons of syrup throughout the life of the
in the cantonment area, which is dom- tion, it is necessary to assess revenue tree. At an average of $30 per gallon,
inated by mature sugar maple forests derived from an individual tree. On each tree would yield $750. As a tree
interspersed across the area, we pro- average it takes 90-120 years for a sugar reaches its expected life span, sap pro-
mote and educate people on the natu- maple tree to reach adequate size (18- duction will decrease. At this point the
ral and cultural heritage of Northern 22 inches diameter at breast height) tree can be harvested and sold, which
New York. Prior to government ac- and form for use as a high quality saw should still yield a quality saw log

W e a r e t h e A r my ’s Hom e 46
(bottom 6-8 feet removed due to stain producers in the surrounding commu- Jason Wagner is chief of the Public Works,
caused by tapping). The revenue poten- nities is done by holding the annual Environmental Divisions, Natural Resources
tial for a previously tapped tree will con- event and directing our Soldiers and Branch at Fort Drum. He holds a Masters Degree
servatively bring $100. This means that Families to purchase their syrup. We in Forest Management and Silviculture, as well as
a tree used for maple syrup production provide samples and sell small souvenir a Bachelors Degree in Environmental and Forest
could provide $850 in revenue over its bottles (enough for a pancake or two) Biology concentrating in Wildlife, both from
expected life span. In summary, putting but we do not sell the popular half-gal- the State of New York College of Environmental
a tree into maple syrup production has lon to gallon sizes. This avoids direct Science and Forestry.
the potential to provide five times more competition with the small family op-
revenue than simply harvesting the tree erations that surround the installation.
for saw log production. The commercial sale of syrup will be
done by selling 40 gallon drums into
Anyone who has ever lived or worked the wholesale market, which helps pro-
on Fort Drum will most likely recall mote and feed into local bulk sales and
the beautiful fall colors across much of the commercial viability of the syrup
the landscape, in large part due to sugar industry in the North Country.
maple trees. Between mid September
and late October, the hardwood forests Our outreach program is also directly
of New York and New England draw a aligned with the IMCOM Community
million tourists and generate $1 billion Campaign Plan’s Soldier, Family and
in revenue. Sugar bush management Civilian Well Being line of effort. The
strategies directly lend to the preser- Maple Days event is not only education-
vation of these unique, aesthetically al and fun but provides a great outdoor
pleasing, and historically significant activity for everyone who may be suffer-
qualities of Fort Drum, New York. ing a little cabin fever from the legendary
north country winter. It is rewarding for
These installation sugar maple stands, this garrison to provide our Soldiers and
which are managed for maple syrup Families this unique experience available
production, also solve another prob- only in the north country.
lem by providing suitable habitat
requirements for the endangered Indiana The Fort Drum Forest Management
bats. The retention of large diameter trees program challenges other garrison
allows for suitable roosting habitat. The Natural Resource teams to take a step
open understory structure of these stands back from the way things have always
also provides travel corridors for the bats been done and use some innovation to
and protection from predation. With the increase the sustainability of your pro-
recent changes in suitable bat habitat due grams. The results can be “Sweet!”
to construction and changing land use in
the cantonment Area and surrounding
communities, it is critical to maintain and
enhance the remaining suitable Indiana
bat habitat. Sugar bush management di-
rectly supports Fort Drum’s endangered
species conservation measures.

Promotion of the local maple syrup

47 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
Solid Waste Diversion on Fort Jackson
by Tameria Warren, Sustainability Management System Coordinator, Environmental Division, Fort Jackson, SC,
Ken Burghardt, Environmental Division Chief, Fort Jackson, SC , and COL JJ Love, Commander, USAG Fort Jackson, SC

Many of the aspects of Fort Jackson’s sustainability policy - particularly continual improvement, pollution
prevention, and sustainable programs - are evident within the initiatives executed on the installation.

Introduction - Why It Matters Always be in compliance, Look Installation Management Campaign


The Army’s strategy for the environ- to prevent pollution, Manage sustain- Plan (IMCP). It includes increased ac-
ment, “Sustain the Mission - Secure able programs, and Sustain natural quisition of environmentally-preferable
the Future”, is the base on which Fort and cultural resources. and recycled-content goods and services
Jackson has built our over-arching en- and increased diversion of both non-
vironmental programs. Being the larg- The Scope and Effort hazardous solid waste and construction
est and most active initial entry training The installation has a massive and demolition (C&D) waste, plus
center in the Army, we have a large- effort ensuring waste is properly man- other applicable laws and regulations.
scale task of preparing generations of aged, especially given the number
the nation’s future leaders for combat of Soldiers, Civilians, tenants, and Our program utilizes an Integrated
action and international and domes- visitors on the installation on a recur- Solid Waste Management Plan
tic security. While proudly executing ring basis. We train approximately (ISWMP) which outlines the objec-
this mission, we have also undertaken 50,000 Soldiers with basic and ad- tives, strategies, and responsibilities for
the responsibility of ensuring the en- vanced individual training annu- improving solid waste management
vironment and resources impacted by ally. Fort Jackson trains an additional through source reduction, reuse, recy-
training are preserved for both current 12,000 soldiers in the U.S. Army cling, composting and mulching, and
and future needs. Fort Jackson has em- Soldier Support Institute (SSI), U.S. “green” or affirmative procurement
braced environmental stewardship as Army Chaplains Center and School, for items such as furniture and bio-
a key to success in implementing the and Drill Sergeant School. In addition, based penetrating lubricants. Many of
Installation Management Campaign Fort Jackson accomodates 3,900 active the aspects of Fort Jackson’s sustain-
Plan and ultimately what makes the duty Soldiers, 14,000 Family mem- ability policy - particularly continual
installation a viable presence in our bers, 5,200 Civilian workers, 36,000 improvement, pollution prevention,
local community – in this case - the retirees, and over 100,000 visitors (for and sustainable programs - are evident
Midlands area of South Carolina. Our graduation activities) annually. within the initiatives executed on the
dedication to serving this great coun- installation. One of our biggest pro-
try, the shared responsibility for the Fort Jackson’s Environmental Division grams, managing a portion of solid
well-being of its surrounding neigh- established a solid waste manage- waste on the installation, is one we
bors, and the “bootprint” left on ment program to address the chal- are most proud of – our Qualified
the land are what lead Fort Jackson lenges pertaining to the generation Recycling Program (QRP).
on our quest for sustainability. Our and disposal of solid waste by this
motto, based on our location in the large and diverse population. Our Fort Jackson’s QRP spans over 25 years,
“Palmetto State” of South Carolina, is program aligns with the goals and when initial activities were overseen by
appropriately articulated as “PALMS” metrics outlined in Executive Orders a recycling planning board represent-
- Promote continual improvement, (EOs) 13423 and 13514 and the ing Community Affairs, Maintenance,

W e a r e t h e A r my ’s Hom e 48
Environmental, and various installa- • Improve direct sales and unit vide a learning center for interested
tion units and activities. In 1991 re- incentive programs visitors and school children; and coor-
cycling activities were formalized into • Maximize net dollar sales and savings dinate programs essential to the QRP.
the Fort Jackson Recycling Program, for installation recycling funds The center accepts numerous catego-
and in June 1998, Fort Jackson’s lead- ries of waste for recycling, all of which
ership formally signed and established The installation’s Recycling Planning are outlined in the Reuse/Recycle/
the Memorandum of Instruction Board, which is chaired by the garri- Disposal (R2D1) Guide, Disposal
(MOI) for the QRP, making it man- son commander, is the governing body Guide for Housing Residents, and Fort
datory for all Fort Jackson military for recycling activities on Fort Jackson. Jackson Environmental Guidebook.
and civilian personnel to incorpo- Aside from reviewing projects submit-
rate waste prevention and recycling ted to the board for funding, the board Diversion – A Key Component
into daily operations. From the MOI, meets semiannually to review and Diversion practices have steadily
we developed the Qualified Recycling track financial solvency of the QRP, grown over the years and with the in-
Program Handbook. Our handbook, review Recycling Center operations clusion of new and expanded recycling
developed in consonance with DOD, and projects, consider recommenda- categories, diversion numbers are on
U.S. Army Office of the Assistant Chief tions for proposed expenditures, and track to increase. Figure 2 is a snap-
of Staff for Installation Management promote the QRP. What is outstand- shot of the generation and diversion of
(OACSIM) and Army guidance, ad- ing about the Recycling Planning non-hazardous solid waste - expressed
dresses the following goals: Board is that it includes membership as Municipal Solid Waste (MSW):
• Increase recovery of recyclable from throughout the installation to
materials via the diversion of non- ensure both mission and garrison con- Increased diversion has not only pro-
hazardous solid waste (exclud- cerns are addressed. Figure 1 is the pelled the amount of recyclable mate-
ing C&D debris) and increased representation of the board: rials collected on the installation, but
recycling categories has generated substantial savings.
HOW IT WORKS…
AND WHY Construction and demolition (C&D)
Through the op- waste is excluded under the QRP, but
erations of Fort its impact on diversion is substan-
Jackson’s Recycling tial. Nowhere is this more evident
Center, waste di- than in the construction, demolition,
version and re- and renovation projects occurring on
cycling efforts the installation. In order to meet ex-
are realized on a ecutive orders to increase sustainable
larger scale. Our practices in new construction and ma-
Recycling Center jor renovation, projects are required
personnel man- to meet Leadership in Energy and
age and operate Environmental Design (LEED)® cer-
recycling drop- tification for Silver as set by the U.S.
off services; co- Green Building Council (USGBC).
ordinate the Fifty percent of the project waste must
pick-up and de- be diverted to meet the requirement,
livery of recycla- and in some cases, contractors or proj-
ble materials for ect managers have diverted at least
units, organizations, seventy five percent to generate ex-
and housing residents; pro- tra LEED® points. These efforts have
played a huge role in increasing Fort

49 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
MICC brought a good price and
MSW Diverted the funds were received for the re-
2500 cycling program the day of the sale.
Under the ban, Fort Jackson is sell-
2000 ing undeformed brass through DLA
Disposition Services and receiving a
1500 good price, but receipt of funds is de-
layed by up to three months. When
1000 the ban is eventually lifted and we are
able to deform the brass and sell locally
500 through MICC, we will regain the flex-
ibility to sell through either MICC or
0 DLA Disposition Services depending on
QDP DRMO Compost Misc
which option will bring the best price.
FY95 (Tons) 838.71 1075.74 150 86.53

FY10 (Tons) 2193.97 1361.01 750.38 260.3 Another initiative being pursued
through the QRP is the used grease and
D I V E R TED = Reuse, Rec ycle, and Co m p o s t Ac t i v i t i e s
cooking oil program. Fort Jackson has
various facilities in which used grease
Figure 2
and cooking oil are generated in large
Jackson’s C&D waste diversion efforts. ported to the Ammunition Supply quantities and would benefit from an
With the inclusion of C&D waste Point (ASP) for processing. The DLA established reclamation process. Until
generated from numerous projects, Disposition Services [formerly the recently, the waste was collected and
we have processed and crushed over Defense Reutilization and Marketing managed by an independent contrac-
12,000 tons of concrete and 1,200 tons Office (DRMO)] is then responsible tor with no costs incurred by the instal-
of asphalt at its concrete and asphalt for soliciting bids for sales. lation. Unfortunately, we were missing
reuse site. The site has been in exis- During FY10, collections an opportunity to financially profit
tence for approximately eight years and for the recycling program from the waste
has been the central location for C&D totaled $1,092,000.00 of
waste generated by both Fort Jackson which $744,000.00 was
personnel and contracted groups. By from brass sales. The sale
crushing the waste onsite, the instal- of small arms brass car-
lation has avoided nearly $351,000 in tridge casings has re-
landfill tipping fees -which does not cently been impacted
include transportation costs. This is by the current ban
not only financially beneficial, but the on deforming small
C&D waste serves as fill for roads and arms brass cartridges
stabilizer for erosion control. and selling them
locally through
The QRP oversees another aspect of the Mission and
waste diversion with the sales pro- Installation
gram for expended small arms brass Contracting
cartridge casings generated at rifle Command
ranges. The brass cartridge casings (MICC). Brass
are collected by the units and trans- sales through

W e a r e t h e A r my ’s Hom e 50
Club, the bowling centers, and an in-
UIP Collected Recyclables for FY10 stallation school). Fort Jackson’s goal is
200,000 to better reclaim the waste stream while
benefitting monetarily.
180,000
Benefits –What We Achieve
140,000 Activities and initiatives associated
with the QRP have allowed Fort
100,000 Jackson to amass funds that would
benefit organizations financially and
6000 further promote the installation’s sus-
tainability commitment of preventing
2000 pollution. The Unit Incentive Program
(UIP) encourages military units to
0 actively recycle on a continual basis.
1st Quarter 2nd Quarter 3rd Quarter 4th Quarter
Units that participate in the UIP de-
Pounds 163,472 172,340 137,750 188,960 liver their recyclables to the Recycling
Center and receive points based on the
Figure 4 number of pounds delivered. The UIP
distributes a total of $5,000 in monetary
awards each quarter to participating
units based on the number of points ac-
Largest Unit Payout FY10 cumulated during the quarter. Figures 4
580 and 5 highlight the success in promot-
ing unit recycling aggressiveness. Figure
560 6 depicts unit payouts and amount col-
lected for the 4th quarter of FY10
540
While the military units benefit di-
520 rectly from their recycling efforts, oth-
er organizations at Fort Jackson can
500 take advantage of the recycling funds
as well. Money generated through the
480 QRP can be used to fund projects
approved by the Recycling Planning
0 Board for pollution abatement, energy
1st Quarter 2nd Quarter 3rd Quarter 4th Quarter
conservation, and occupational safety
Dollars 570 490 530 500 and health. This has proven benefi-
cial for programs and initiatives lack-
Figure 5
ing financial support or qualifications
from other funding sources. In addi-
tion, recycling funds are transferred to
stream. The installation has estab- services approximately 25 locations the Directorate of Family and Morale,
lished a contract with a regional ven- onsite (including the dining facilities Welfare, and Recreation (DFMWR)
dor to manage the waste at the current (DFACs), the Fort Jackson Recycling for various projects such as the con-
Southeast market value. The vendor Center, the NCO Club, the Officers struction of Fort Jackson’s walking

51 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
trail and gym renovations. DFMWR
received approximately $395,000 from
the recycling program FY10 profits.

Figure 7 depicts a snapshot of some of


the projects funded under the QRP:

Our Way Forward


Fort Jackson’s QRP has been very in-
strumental in increasing diversion and
recycling initiatives over the years, and
we are pursuing an expanded set of
goals and objectives. The exciting thing
is that in addition to our QRP, other
programs and objectives have been es-
tablished and are making significant
progress across the installation.

Acknowledging our QRP is limited in


the kinds of waste that can be recycled,
our Environmental Division has ex-
panded the Solid Waste Management the
program and the opportunity to re- reus-
cycle more items. The post mulch able items,
site accepts yard waste, broken wood- the Reuse Center is
en pallets, some compostable food right direction. One of the best prac- a drop-off location for used cell phones
waste, and bulky trash; the Auto Craft tices we have implemented, however, and universal waste (light bulbs, re-
Shop accepts used motor oil, anti- is our Reuse Center. chargeable batteries, and mercury-con-
freeze, and oil filters; the Army and taining equipment). As the installation
Air Force Exchange Service (AAFES) Fort Jackson’s Reuse Center sets the has increased recycling efforts and un-
Tire Center accepts used POV tires; bar for conserving natural resources dergone numerous internal and external
and the Thrift Store accepts clothes, and reducing environmental pollution compliance audits, units and organiza-
furniture, toys, appliances, and other by providing a haven for reusable ma- tions have been diligent about using the
household items. Fort Jackson is also terials. The center serves as a central lo- Reuse Center in a constructive way.
collaborating with Goodwill Industries cation where used and recyclable ma-
to donate used clothing, appliances, terials can be dropped off and possibly From the Recycling Center to the
other personal and household items. used in other locations on the installa- Reuse Center, there are various outlets
Additionally, we have partnered with tion. Paint (both new and used) is the on Fort Jackson to divert and recycle
the City of Columbia in the Nike largest stocked item, but other prod- materials. In an effort to continuously
Reuse-a-Shoe campaign; a sustain- ucts are just as popular, including gen- improve, the installation is pursuing
able program that grinds used ath- eral cleaning supplies, automotive ma- a new initiative that could save Fort
letic shoes into material used in track terials, and building or maintenance Jackson thousands of dollars and lower
surfaces, gym flooring, playground supplies. There are also office supplies its impact on local landfills. We are
surfaces, basketball and tennis courts, (i.e. pens, pencils, and folders), arts exploring a partnership with Waste 2
and in some cases, new Nike products. and craft supplies, and even books that Energy (W2E), an organic waste man-
All of these are positive steps in the are turned in for reuse. In addition to agement facility that uses a closed-loop

W e a r e t h e A r my ’s Hom e 52
over 55 percent. pollution, manage sustainable pro-
grams, and sustain resources, we are
Conclusion decreasing our “bootprint” on the sur-
Fort Jackson has witnessed the rounding and expanding environment.
growth of our Solid Waste
Management Program beyond
general refuse pick-up to a so-
phisticated diversion and rec- Ms. Tameria Warren is the coordinator of
lamation system. We are no Fort Jackson’s Sustainability Management
longer restricted to a lim- System (SMS). Her environmental experience
ited selection of recycling extends both in the public and private sector,
categories, but offer a diverse previously working as an environmental engi-
grouping that benefits an ever- neer at General Motors for over six years.
growing population of employees,
contractors, tenants, units, and visitors. Ken Burghardt is Chief of the Fort Jackson
an- We have also extended the realm of sus- Environmental Division where he has worked for
aerobic tainability and environmental responsibil- over 28 years, serving as Chief for the past 22 years.
digestion system ity from beyond the borders of the can- He is a retired Army engineer LTC and served on
to break down organic waste tonment to the training sites impacted by active duty and in the Army Reserve for 28 years.
into biogas, compost, and liquid our Soldiers and our local community.
fertilizer. The resultant material COL James J. Love is the Commander of USAG
(which surprisingly is minimally odor- As our sustainability policy implies, Fort Jackson and has been in command since June
ous) can be used for local agricultur- we are firmly committed to continu- 2010. Previous assignments include Commander
al, commercial, and residential land ously improving - including tackling 1st Squadron 10th Cavalry in Iraq and Fort Hood,
applications. In addition, W2E could challenges now and in the future. To TX as well as other operational assignments as
supply the organic power into exist- guarantee that all individuals and or- an Armor Officer over his 23 years of service.
ing electrical grids and potentially ganizations adhere to and support the
provide electricity, green natural gas, recycling initiatives on an installation
and green compressed natural gas. the size of Fort Jackson is a huge task,
The W2E Columbia facility is the but through continued support from
first of its kind in the United States leadership and committed person-
and will be the prototype for six other nel the effort will be less challenging.
projects. Since W2E uses organic waste, Fort Jackson’s sustainability manage-
Fort Jackson would be an ideal suppli- ment system (SMS) is based on the
er because of the large amount of food premise of continual improvement
waste generated from the DFACs. and all of its programs from the QRP
Of the total amount of MSW disposed to daily environmental management
of each year, approximately 45 percent are a true reflection of that.
is food waste. Diverting this waste
from the landfill could reduce land- Fort Jackson is working hard to sustain
fill tipping fees by as much as $123,000, its immediate and long-term mission,
as well as generate additional savings as well as secure its future by imple-
from decreased dumpster mainte- menting goals and initiatives that
nance and pickup costs. It is estimated are sustainable. By standing on its
that pursuing this initiative could in- policy to promote continuous im-
crease Fort Jackson’s diversion rate to provement, be in compliance, prevent

53 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
There’s Gold in Those Woods—
the Accounting is Clear
by Robert R. Baumgardt, Public Works Director, USAG Fort Stewart

Fort Stewart is poised to save approximately $2.5 million off its annual utility bill while
increasing its renewable energy component from zero to at least 62 percent.

In Fiscal Year 2010, Fort Stewart and increasing its renewable energy compo- other use of steam is to drive two heat
Hunter Army Air Field consumed over nent from zero to at least 62 percent. To absorption chillers, which produce
305,000 Megawatt-hours (MWH) of do this, we will double the amount of chilled water to cool the same build-
energy at a cost of $14.7 million. On reportable energy that we consume to- ings on the distribution system.
average a MWH of energy cost just day. An interesting conundrum: Should
$47.88. Compared to Europe or ma- we save money and increase the amount In January 2011 boiler #4 came on
jor metropolitan areas in the United of renewable energy used or reduce the line. This boiler is wood fired and is
States this cost seems very moderate. amount of reportable energy used? the cheapest source for producing
One might be tempted to quickly con- steam. In fact, wood-fired steam costs
clude that little else can be done to ec- Current Energy Mix and Costs the installation just 60 percent of the
onomically save energy and dollars; but Electricity and natural gas are the two larg- cost of gas-fired steam. This is graphi-
that is far from the truth. Fort Stewart est energy carriers at Fort Stewart making cally shown at figure 4.
is poised to save approximately $2.5 up nearly 97 percent of their energy mix.
million off its annual utility bill while Fuel oil and propane make up the rest of Wood-fired steam compares favor-
the energy pie as shown at Figure 1. ably to gas-fired steam and electricity
Figure 1 when it comes to cooling buildings.
Figure 2 depicts electricity as the main Compared to natural gas, wood re-
cost driver at 57 percent of the ener- duces the cost of cooling by 40 per-
ENERGY MIX - FY 2010 gy used and 77 percent of the dollars cent. Compared to electricity, wood
306,97 0 M w- H r s
spent. A review of average commodity has a 22 percent advantage over the
prices shown at figure 3 shows that fuel average annual electric cost of $64.82/
FUEL OIL
2% oil and electricity are the two highest MWH in FY 2010. However this is
cost energy carriers while natural gas understated. Fort Stewart’s electricity
and wood are the two lowest. No wood is priced at hourly intervals, which go
was used in FY 2010 due to ongoing up and down with demand. Last year
NATUR AL GAS
40%
repairs to the wood-fired boiler. the cost reached a peak of $195.40/
ELEC TRICIT Y
MWH during the height of summer
57%
Central Energy Plant and Boiler #4 cooling season. Against this extreme,
The biggest single user of energy is the the wood advantage grows to over 74
central energy plant which uses natural percent. It is anticipated that producing
gas to produce steam, used for heating steam from wood instead of natural gas
PROPANE and domestic hot water use at over 120 will save the installation up to a million
1% buildings in the cantonment area. The dollars a year. Even so, only a fraction

W e a r e t h e A r my ’s Hom e 54
of the boiler’s capacity will be used. This ENERGY COST - FY 2010
underutilized asset presents the installa-
Total $ 14.7 M
tion with an interesting opportunity to
save even more money going forward.
P RO PA N E
2%
Boiler #4: An Underutilized Asset
Even converting all current steam pro-
duction to Boiler #4, it is a severely N AT U R A L G A S
underutilized asset. In the past, all the FUEL OIL 19% Electricity ......... $11.4
steam that the boiler produced was 3% Natural Gas ........$2.7
used, and even then it was not enough.
ELECTRICITY Propane ...............$0.1
However, new hot water and chilled wa-
77% Fuel Oil ................$0.5
ter distribution lines, coupled with oth-
TOTAL ........... $14.7
er energy-saving projects have reduced
the demand to the boiler to approxi-
mately 40 percent of its designed capac-
ity. A more interesting use of boiler #4 P RO PA N E
might be to produce electricity. 1%

An ongoing study of Boiler #4 seems


Figure 2
to indicate that an investment of ap-
proximately $12 million is needed
to generate 10 MW of electricity or largest logging operations in the Army. taminated with unexploded ordnance
80,000 MWH per year. At current and are considered dangerous. These
wood prices, electricity could be pro- On average, the installation harvests bullet contaminated trees could easily be
duced at $49.00 per MWH versus approximately 110,000 tons of tim- used to fuel boiler operations if the wood
last year’s average price of $64.82 per ber annually. These operations also is properly processed before it is burned.
MWH. Incorporating a recently an- produce nearly 30,000 tons of waste,
nounced 10 percent rate hike, this plant which is burned or abandoned on site. It is unreasonable to assume that the
might generate $1.8 million in annual Some of the timber is sold for just over installation could meet all of its fuel
savings; however there is even more po- one dollar per ton while other wood requirements from training area tim-
tential that is ripe for harvesting. is just cut and burned to support the ber. Military training and endangered
RCW habitat. In comparison, Fort species habitat issues will always trump
Fort Stewart’s Training Area Stewart currently buys wood at $28.00 logging operations. However it might
Fort Stewart and Hunter Army Air per ton, much more than what we re- be a source of fuel that could help mit-
Field is home to the Army’s Third ceive for selling the wood. We also have igate and stabilize fuel prices going for-
Infantry Division and sports the larg- the largest prescribed burn program in ward. Depending on harvesting costs
est training area east of the Mississippi the nation. This is directly associated and the amount of fuel that could be
River. The training area is used first and with maintaining RCW habitat and harvested, the electricity savings could
foremost for training Soldiers to per- supporting warfighters and their high easily exceed $2 million and even ap-
fect their warrior skills. It is the home training OPTEMPO. proach $3 million in the best of years.
for the Red Cockaded Wood Pecker Choosing an average of $2.5 million
(RCW) and other endangered species Additionally, other trees in the train- in annual savings, Fort Stewart’s elec-
which demand special protection and ing area are contaminated from weap- trical generation project could be re-
habitat management. It is also a tim- ons fire and cannot be sold. This is not paid in about 5 years. That translates
ber resource that supports the second to be confused with trees that are con- to only $31.25 per MWH of self pro-

55 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
AVERAGE UNIT COST OF ENERGY - FY 2010 80,000 MWH of electricity. In the case
of self generation the fuel that is used to
$80 generate the electricity is reported. This is
thermodynamics of producing electricity
$70
and is no different than what is experi-
$60 enced by any other commercial utility.

$50 Accounting Rules


If the accounting rules were changed
$40
to treat self produced electricity as com-
$30 mercially procured electricity, our re-
portable energy would remain constant
$20 (all other things remaining constant).
The renewable component would range
$10
between 26 percent and 52 percent de-
$0 pending on the sourcing of fuel.

$$$ FUEL OIL PROPANE WEIGHTED Changing the accounting rules seems
$67.29 $22.46 AVERAGE
$47.88 to make sense. The amount of renew-
ELECTRICITY NAT. GAS WOOD
$64.82 $270 $10.62 able electricity that is produced by so-
lar, wind or hydro power is measured
Figure 3 at the electrical outlet as opposed to
the amount of sunlight that hits a
duced electricity or less than half of the this could grow to 124 percent. (Fuel photovoltaic solar cell to produce the
average commercial rates. that is grown and used on the installa- electricity. In the southeast, solar, wind
tion is counted twice according to cur- and hydro power are not economically
Renewable Energy rent accounting rules). Actual FY10 viable sources of energy. Here, biomass
Assuming all other things remain the energy mix data is compared to what or wood is king. In essence the Fort
same, Fort Stewart could expect its the energy mix might look like using Stewart’s training area can be looked
wood or renewable energy component producing electricity with boiler num- at as a giant solar panel that uses so-
to grow to at least 62 percent. If it har- ber four is shown at figure 5 and 6. lar energy to produce a renewable
vested all of its own fuel requirements, fuel. Unlike a photovoltaic solar cell,
Reportable Energy will Explode it must be burned to produce steam
Figure 4 To save $2.5 million a year the garri- which is run through a turbine to gen-
son would increase its reportable en- erate electricity. Thus, this process falls
COST OF PRODUCTION - 1,000 lbs. of Steam
ergy consumption by 62 percent. This under the laws of thermodynamics. A
$8
explosion is tied to the way we report lot source fuel has to be consumed to
$7
energy consumption. If one uses a produce lesser amount of electricity.
$6
kilowatt hour of electricity at an elec-
$5

$4
trical outlet, the installation reports If the accounting rules are not changed,
$3
one kilowatt hour of consumption. any other energy savings measures that
$2
But that does not truly represent the are implemented will pale in compari-
$1
energy used to generate that electricity. son with the potential explosion. It is
$0
In the case of Fort Stewart we will have not reasonable to think that anyone can
$$$ NATURAL GAS WOOD to have to burn about 140,000 tons or reduce their energy consumption by 62
$7.07 IDIQ CONTRACT
$4.22 370,000 MWH of wood to generate percent just to get back to the starting

W e a r e t h e A r my ’s Hom e 56
ENERGY COST - FY 2010 Robert (Bob) R. Baumgardt has been the direc-
tor of Public Works at Fort Stewart/Hunter Army
PROPANE
2% Airfield since 2009, as part of a civil service career
in science and engineering that began in 1982.
FY 2010
Ac tual 306,970 $ 14.7 MWH He entered federal civilian service as a nuclear
engineer with the U.S. Navy at Mare Island Naval
FUEL OIL Electricity ........... 57%
3%
GAS Shipyard, Vallejo, CA followed by an assignment
40% Gas ....................... 40%
ELEC TRICIT Y
as a project engineer with the Navy’s Trident
57% Fuel Oil ..................2%
Missile Program at Bangor, WA. He served in vari-
Propane .................1%
ous Public Works positions in Germany, and has
TOTAL ...........100%
supported four combat deployments to Kosovo,
Bosnia, and Iraq.
FUEL OIL
FUEL OIL
1% 2%

Figure 5

POTENTIAL ENERGY MIX


F U T U R E N OTAT I O N A L E N E RG Y M I X 596,150 MWH

ELEC TRICIT Y
Electricity ....... 95.370 MWH ............................ 16% 16%
Gas ..................122,090 MWH ............................ 20%
Fuel Oil ...............7,180 MWH ...............................1% WOOD GAS
Propane .............2,330 MWH ...............................1% 62% 21% FUEL OIL

Wood ..............369,180 MWH ............................ 62% 1%


PROPANE
TOTAL ........596,150 MWH ................... 100%
0%

Figure 6

point, let alone think that further savings From a national security perspective it
would ever be economically possible. makes sense to use a domestic source of
fuel that is immune to world markets
The Conundrum or other interruptions. Finally from a
Actually there is no conundrum. planetary perspective some might ar-
Accounting rules are just that, ac- gue that this will help alleviate the af-
counting rules. It is much more im- fects of global warming. While the sci-
portant to remain viable as an Army ence of global warming is beyond the
installation of choice. Therefore it is scope of this article this project would
imperative that we continue to work err on the side of safety and that seems
at lowering the cost of operating and to make a whole lot of sense.
maintaining the installation that sup-
ports the world’s finest warfighters.

57 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
What if 5,000 Army Civilians didn’t
show up for work… for a year?
by Karen Perkins, G-1, IMCOM

Last year, the equivalent of nearly whether through sickness, injury, dis-
5,000 Army Civilians called in sick- ability, or death? What about the em-
-for the whole year. According to the ployee who leaves to find an employer
Defense Finance and Accounting that values employee well-being? How
able,
Service (DFAS), in FY10, Army civil- do we compute cost avoidance for
a n d
ians used 10.1 million hours of sick averted injuries? While all aspects of
healthy
leave, totaling a yearly equivalent of lost productivity are important, per-
workforce.
4,860 Civilian employees not available haps most costly is sick leave usage.
Physical fitness is one of the five pillars of
for work. Of course the perceived im-
wellness that enables Army command-
pact at the time was not as dramatic Organizations play a tremendous role in
ers to promote reducing overweight/
as it sounds because those 4,860 lost establishing a culture of health promo-
obesity and increasing physical activ-
man-years were distributed across a tion. As the Department of Defense’s
ity through aggressive employee health
workforce of some 325,000. Yet, if largest Civilian employer, the Army,
promotion and wellness programs.
we assume an average grade of about and, by extension, our Installation
The goal of a workforce and leaders
GS-11 at a salary of approximately Management Community, has a respon-
capable of being competent stewards
$60,000, we are expending about sibility to promote national objectives as-
of human resources, through focus on
290 million badly needed dollars on sociated with improving the health and
sustaining our workforce, is well with-
lost productivity for people who would physical fitness of our employees.
in sight and IMCOM is at the fore-
probably rather be at work than sick.
front of Civilian employee wellness
Army leaders have an opportunity On June 23, 2010, President Barack
programs within Army.
to improve efficiency and improve Obama signed an amendment to
quality of life for a lot of people by re- Executive Order 13265 from 2002,
Army leadership has made Civilian
ducing days and months lost to sick- directing the Secretary of Health and
employee wellness a priority for good
ness and injury. It’s time to develop Human Services to ‘develop and coor-
reason. The health and fitness of U.S.
a plan of action to promote wellness dinate a national program to enhance
citizens is in crisis and the Army
among Army Civilians. physical activity and sports participation.’
Civilian workforce is not exempt.
Titled the President’s Council On Fitness,
Physical inactivity and overweight/
Sustainability Sports, And Nutrition the amendment
obesity are the leading U.S. health
Army leaders are very familiar with the adds nutrition as a component of the ear-
concerns.i As obesity rates swell around
concept of sustainability, but typically lier order, recognizing that nutrition plays the globe, in America they are balloon-
in reference to infrastructure and the a vital role in people’s ability to adopt and ing. Between 1980 and 2008 the num-
environment. Investing in the sustain- sustain physical activity. ber of overweight and obese people in
ability of our Civilian human capital --
the U.S. doubled. This trend raises stra-
today to meet the challenges of tomor- DoD promotes physical activity tegic concerns because of the correla-
row -- is a new notion of sustainability, through its policy and working groups, tion between body weight and elevated
but every bit as relevant to the bottom and in our Installation Management risk of heart disease, diabetes, cancer
line since the Civilian payroll is one of Campaign Plan (IMCP) Line of Effort and the increased severity of disease as-
the highest Army budget items. (LOE) 3, we have addressed this as sociated with hypertension, arthritis,
How do we measure lost productivity, a priority to build a resilient, sustain- and other musculoskeletal problems.

W e a r e t h e A r my ’s Hom e 58
Cost of Physical Inactivity for the past ten years range from $166
Studies have shown that worksite pro- …sick leave was reduced by to $181 million, or almost $2 billion
grams leading to increased physical in the last decade. On average, that
28 percent, health costs by
activity tend to produce significant equates to 64,000 lost work days per
improvements in employee health, 26 percent, and worker year. This area alone offers a significant
decreasing the organization’s costs and opportunity for cost reduction. The
compensation and disability
absences associated with illness and cost of long-term compensation cer-
injuries.ii In documented research of average costs were reduced tainly results in “sticker shock” when
corporate worksite wellness programs, considering long-range projections as
by 30 percent
sick leave was reduced by 28 percent, every employee who does not return
health costs by 26 percent, and worker to work will cost an average of $1.5
compensation and disability average the U.S. were increasing an average of million dollars over their lifetime, not
costs were reduced by 30 percent.iii $160 billion annually – on par with including any medical expenses associ-
Overall, these studies provided positive the cost of the war in Iraq.v Trends sug- ated with the disabling injury.vii
evidence linking wellness programs gest that the Army could potentially
and decreased costs to the Army as well reduce the health care costs of its civil- Historically, slips, trips, falls, and back
as to the employee.iv ian workforce by more than 25 percent strain are the most prevalent Army
simply through prevention programs.vi Civilian job injuries, and the single
While sick leave usage is certainly an leading cause of lost workdays.viii They
employee entitlement, in one recent As costs rise, corporations and gov- are also the most likely to be reduced
year, Army Civilians earned an average ernment agencies, including the by health promotion, increased fitness,
104 hours of sick leave time, but used Department of Defense, have rightfully and wellness programs. Physical activ-
121 hours. This is an alarming trend, become concerned about employee ity provides a quick return on invest-
but one upon which Army leaders can wellness. Private sector companies ment and a speedy return to work in
exert some direct control…or flex some around the globe have learned that pre- the event of injury.
muscle, if you will. Leaders can influ- vention is the key. The outdated model
ence identified trends by promoting of focusing exclusively on treatment in Next Generation Workforce
employee health and wellness. Reducing lieu of prevention can no longer be jus- Without action, hope for generational
sick leave usage by only ten percent can tified in an era of shrinking budgets and improvement is bleak as America’s chil-
gain 500 equivalent years annually and rapidly increasing treatment costs. dren are well on their way to becoming
a 20 percent reduction saves over 1,000 heavier and more sedentary than their
equivalent years. How much more could Sustainability also includes the need to parents. Early health behaviors devel-
the Army do in 1,000 years? Promoting prevent or reduce the number of em- oped as a child are generally perpetu-
Civilian well-being is a critical element ployees injured on the job. Although ated as an adult and are likely to mani-
to reversing these trends. injuries are covered by the Federal fest into health-related problems.ix This
Employees’ Compensation Act (FECA), defines the root problem. We must
Health Care and Worker no appropriated funding is provided to surge ahead by implementing strategies,
Compensation Costs cover these costs. Therefore, injuries plans and actions focusing on preven-
There are more undeniable business and the costs associated with them di- tion, rather than treatment, as the best
reasons for the Army to aggressively rectly decrease the Army’s buying power means to minimize workforce impact.
promote and resource Civilian work- for other strategic needs.
force health promotion programs. Leaders, both military and civilian,
Currently, the U.S. spends more on In 2010, the Army’s FECA cost was must “Win the Global War for Talent,”
health per capita than any other coun- $177 million – of which nearly $130 by attracting and retaining a healthy,
try and those figures continue to esca- million was for pay and compensa- fit and ready workforce. We have dem-
late. As of 2008, health care costs in tion. This wasn’t an anomaly; figures onstrated that healthier employees

59 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
of Personnel Management (OPM)

50 percent of the federal workforce will


leave government service in the next five years
projects 50 percent of the federal
workforce will leave government ser-
vice in the next five years, mostly due
to retirement.xi The Army population
mirrors this trend. With the looming
talent shortage quickly approaching,
health promotion programs will be a
key ingredient for workforce recruit-
ing as the Army markets itself as an
“employer of choice.”

Building Blocks for Success


Workplace health-risk challenges cannot
be successfully overcome at the individ-
ual level -- action must occur at the or-
ganizational and institutional levels. The
essential building blocks for improving
the future fitness in the Army Civilian
workforce are in place, but remain frag-
mented. Regulations, policies, and our
culture, infrastructure, personnel pro-
grams, and strategic plans must be inter-
twined to establish a model program.

AR 600-63, Health Promotion


Program, provides an avenue to “maxi-
mize readiness, war fighting ability,
and work performance” and enhance
the “well-being of all Soldiers, Army
Civilians…” encouraging “lifestyles
that improve and protect physical,
behavioral, and spiritual health.”xii
The regulation serves as a catalyst for
the Army to revitalize programs and
pursue civilian fitness and well-being
reap long-term savings in health care In a competitive labor market, employ- as a strategic objective. However, the
costs, workers’ compensation, and sick ers must distinguish themselves from regulation limits use of on-duty time
leave; yet, these are only a portion of their competitors to attract the best and for participation in wellness programs.
the cost savings. What is the intangi- brightest new employees, as well as en- Our leaders are challenged by this limi-
ble cost to an organization of a shorter sure long-term workers remain healthy. tation to achieve desired results. As a
career due to chronic disease or injury result, IMCOM commanding general
and what is the cost of training a new Human resource planners are eyeing LTG Rick Lynch has requested Army
employee? In reality, organizations with a strategic concern as the leading edge change the regulation, and has received
a “wellness culture” also realize cost of the Baby Boom generation (1946- commitment that the requested change
savings in recruitment and retention.x 1964) reaches retirement. The Office will come. In the meantime, we strongly

W e a r e t h e A r my ’s Hom e 60
Institutionally, the Army
values fitness, yet leaders
have rarely focused on
Civilian team members.
While many leaders are
personally committed
to their own fitness, that
traditionally does not
translate to an expecta-
tion that employees
do the same.

encourage our leaders to find all possible Need for Leadership modifying the organization’s environ-
means to increase unit-sponsored activi- Leaders will make the difference. ment to promote desired behavior,
ties to get people moving and to enhance Through mentoring and coaching we and recognizing success. Without vis-
educational programs on duty time. can make the critical link to a culture ible leader support from the top of the
of wellness. Institutionally, the Army organization to the unit level, there is
Regulation and policies alone can- values fitness, yet leaders have rarely little hope of achieving results.
not serve as a change catalyst without focused on Civilian team members.
well-planned initiatives and committed While many leaders are personally Take Aways
leaders. Absent endorsements, personal committed to their own fitness, that Army Civilians spend at least one-third
leadership and strong command policy traditionally does not translate to an of their day at work. This makes the
statements, we can only aspire to mod- expectation that employees do the workplace an important place to in-
erate success. In order to achieve results, same. Leaders are the most influential stitute behavioral changes. The Army
we must promote awareness, monitor cog in shaping culture, institutional- Civilian Corps is a large, discrete popu-
change, and evaluate trends. IMCOM is izing policy and process, and influ- lation easily targeted to influence be-
leading the Army in establishing a viable, encing a work environment in which havior changes where opportunities for
enduring, and accountable program that employees either fail, survive or thrive. mentoring, reinforcement, and support
achieves desired, measurable results. This includes a shared wellness vision, can yield significant results. As an enter-

61 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
prise, we can provide a supportive en- (Vance Penn, Civilian Wellness Coordinator U.S. Army War College, 2000), 3.
X
U.S. Corporate Wellness. White Paper: ROI-based
vironment, leveraging existing services for the G-1, contributed to this article.)
Analysis of Employee Wellness Programs.
and infrastructure to offer low-cost, yet XI
Partnership for Public Service, “Where the Jobs
effective, intervention programs. Karen Perkins is the IMCOM G-1/Director of Are: Mission Critical Opportunities for America,
Human Resources. She has previously served 2nd Edition – 2007;” available from http://www.
ourpublicservice.org/OPS/publications; Internet;
As we hurtle towards the goal, you as the Director, Human Resources for HQ accessed 2 February 2008.
shouldn’t feel as if you need to jerk the Department of the Army in the Office of the XII
U.S. Army Regulation 600-63, 2.
wheel to keep from careening over the Administrative Assistant to the Secretary of the
cliff. However, the warning lights are Army. Her previous IMCOM assignments include
flashing and it is imperative that we Human Resources Chief, Northeast Region. She
take swift action. Establishing a cul- is a 2008 graduate of the U.S. Army War College.
ture of wellness in the local commu-
nity begins with leadership. There is References:
help readily available - just a phone call
I
Leading Health Indicators, linked from U.S.
Department of Health and Human Services
or email away. The G1 Workforce & Healthy People 2010; available from http://www.
Sustainment Branch, and the Civilian healthypeople.gov/LHI/lhiwhat.htm; Internet; ac-
Wellness Coordinator in particular, cessed 12 December 2007.
II
Larry S. Chapman, “A WELCOA Expert Interview with
oversee Civilian wellness, health in-
Larry Chapman, Principal and Co-founder, Summex
formation, and injury prevention for from WebMD,” interview by Dr. David Hunnicutt,
IMCOM installations. By provid- May 2007; available from http://www.welcoa.org/
ing oversight for these programs, we freeresources/pdf/chapman_proofpos_051807.pdf;
Internet; accessed 15 December 2007.
serve as a valuable resource to assist III
Larry S. Chapman, Proof Positive, 32.
our commanders and leaders in their IV
Larry S. Chapman, “Meta-Evaluation of Worksite
efforts to establish a wellness culture Health Promotion Economic Return Studies:
locally. Who knows what we could ac- 2005 Update,” The Art of Health Promotion (July/
August 2005): 10.
complish if our portion of those 5,000 V
Joanne Wojcik, “Employers Spot Link Between
Army Civilians showed up for work Health, Profit: Business Issues Drive Efforts
healthy and ready to work! to Ingrain Wellness,” Business Insurance, 10
December 2007 [journal on-line]; available from
http://www.businessinsurance.com/wellness;
Internet; accessed 15 January 2008.
VI
Larry S. Chapman, “Meta-Evaluation of Worksite
Health Promotion Economic Return Studies:
2005 Update,” 10.
VII
U.S. Department of Defense, “IC Program
Statistics, FY 92 – FY 07” linked from the Welcome
to Injury and Unemployment Compensation
Home Page at “Injury Compensation;” available
from http://www.cpms.osd.mil/ASSETS/4B93
7741D734456BB02BBCB75983417C/icstats07.
ppt#282,23,GOVERNMENT-WIDE FECA COSTS IN
BILLIONS OF DOLLARS FY 92 - FY 07; Internet; ac-
cessed 18 January 2008.
VII
U.S. Department of the Army, Army Health
Promotion, Army Regulation 600-63 (Washington,
D.C.: U.S. Department of the Army, 7 May 2007), 16.
VIII
John Duncan, Mark A. Vaitkus, and William F.
Barko, “The U.S. Army War College and the Road
to Executive Health and Fitness,” in Guide to
Executive Health and Fitness, ed. COL William F.
Barko and LTC Mark A. Vaitkus (Carlisle Barracks:

W e a r e t h e A r my ’s Hom e 62
Sustaing a High Performing Workforce -
Doing the Right Thing!
by Beverly S. Fordham, Workforce Development Program Manager, USAG Fort Stewart/Hunter Army Airfield

“Today, we have the world’s greatest formation resources from government human capital strategic performance
workforce serving the world’s greatest and private industry, we developed a objectives and measures. From this
customers. Our challenge is to contin- comprehensive, systematic Strategic vantage point, we identify, design
ue to improve the skills of our work- Human Capital Planning process. and implement programs to meet
force and to grow leaders for tomor- specific workforce needs. Our SHCP
row. This is why we put such a high The 2010–2015 Strategic Human objectives are incorporated into our
emphasis on workforce development.” Capital Plan (SHCP) is the third gen- Installation Strategic Plan (ISP) and
COL Kevin W. Milton, Garrison eration product of what has proven to our Installation Planning Board (IPB)
Commander, USAG, Fort Stewart/ be a critical process in shaping our hu- process. By including our SHCP ob-
Hunter AAF, Georgia. man resource objectives, measures, pro- jectives in the ISP process, we address
grams and, ultimately, our success. The human capital requirements in conso-
Being a four-time Army Community of Installation Management Campaign nance with other operational require-
Excellence (ACOE) between 2004 and Plan, Line of Effort 3 (LOE 3), Leader ments. The result is a level playing field
2009, suggests that something is being and Workforce Development, brought that allows equal priority to our work-
done right among the garrison team at new emphasis and exciting opportu- force needs while addressing total re-
the USAG Fort Stewart/Hunter Army nities for our workforce development quirements. For example, we are able to
Airfield, Georgia. High performance is efforts. The five-year anniversary for match workforce needs to programs that
no surprise here; it is the way business review of our overall Strategic Human build resilience, improve morale, devel-
is done. Drawing from an array of in- Resources Plan (SHRP) in 2010 and op skills and promote continued sustain-
formulation of ability. By focusing attention on growing
LOE 3 provid- a diverse, technically competent, high-
ed the impetus performance workforce, we increase
needed to engage our productivity, leverage resources, im-
in a full-scale prove our environment, and increase our
realignment of worth to the Army as a whole.
our SHCP. Our
SHRP process Our SHCP Process is no mystery and
creates a profile one who is mildly familiar with this
of the workforce, topic will readily recognize many of its
the environment, components. The basic steps of the pro-
and the overall cess are found in Figure 1. The value of
key challenges this process is that it consists of a com-
to be negotiated bination of elements from other similar
within the next models combined with specific local re-
five years. With quirements. Most important, however,
this knowledge, is that the process is systematically ap-
we pinpoint areas plied and results are employed.
requiring manage-
ment’s attention to develop Some worthwhile outcomes of this

63 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
process are the segmentation of the military to the Civilian component. An important part of the SHCP pro-
workforce and the development of However, new Civilian employees cess is our analysis of the external and
workforce and employee profiles. For need familiarization with performing internal environmental influences. We
example, we found that our average in a Civilian capacity. For example, included the following areas:
employee is 49 years old; is not retire- training and development to provide
ment eligible; is in or below General awareness and skills in garrison pro- Occupational Trends:
Schedule (GS) grade GS-11; has prior cesses and systems may be needed. DoD identified the following posi-
military service; and is male. Based Similarly, training in Civilian person- tions as hard to fill: engineers; sci-
upon these data and the DA 2006 nel programs, processes, benefits, and entists; mathematicians; physicians,
Civilian Employee Attitude Survey, the Civilian workforce culture may nurses and pharmacists; security spe-
we deduced that the average employee also be needed. Such specific infor- cialists and police officers; intelligence
is highly interested in career progres- mation about the target audience is specialists; financial management,
sion since they will not be immediately vital when deploying new programs, budgeting and accounting specialists;
eligible to retire for five years or more. e.g., the President’s Fitness Challenge contracting specialists; logistics man-
Civilians having prior military service Program, the Civilian Health and agement specialists; quality assurance
are familiar with the Army culture, Resiliency Program, etc. Knowledge of specialists; information technology
values, and mission. Their familiarity our workforce characteristics helps us specialists; and human resource spe-
with the Soldier as a customer provides develop and deliver programs that fit cialists. Local Labor Pool statistics are
a unique perspective on customer ser- the needs of employees, as well as the also considered to determine the avail-
vice, as well as a general understanding garrison’s needs as an employer. By se- ability of needed skills within the local
of many of the services and benefits lecting methods and media tailored to community. Knowing the skill short-
available to Soldiers and Families - our specific employee group characteristics, ages within the Army, we determine
primary customer groups. These ex- we are more effective and efficient in the best approaches to filling these
periences are valuable and some skill delivering quality programs and effec- types of positions.
sets are directly transferable from the tively managing employee expectations.
Local Labor Market:
The labor pool in the local geo-
graphic area has direct impact
on the intake of new employees.
Assessments of local area influ-
ences help identify our workforce
focus - recruitment, workforce
development or a combination
of the two. According to the
Georgia Department of Labor
(DOL) August 2010 statistics,
Southeast Georgia’s unemploy-
ment rate was 10 percent com-
pared to the U.S. rate of 9.5
percent, suggesting that the lo-
cal area has an abundance of job
seekers. Availability of special
employment programs for prior
military personnel, veterans, spous-
es, and students combined with lo-
cal available job seekers results in

W e a r e t h e A r my ’s Hom e 64
The economic downturn results in an abundance of job seekers with the U.S. unemployment rate
at 9.5 percent and the Georgia unemployment rate at 10 percent as of August 2010. These
conditions combined with the Army being rated as one of the best places to work…
in the federal government for 2007 generate a surplus of potential workers

an abundance of potential employees Program to determine our posture. We stated that they would retire in more
from the local area. compared our federal civilian minor- than five years while only 36 percent of
ity population percentage with the non-supervisory employees responded
Future Occupation Growth: local civilian labor force population that they would retire in more than
Occupations with the largest growth in in surrounding counties and the na- five years. Supervisor responses to this
private business do not affect garrison tional minority civilian labor force question: “If you had to decide wheth-
recruitment since these skills are typi- population. Data from the DCPDS er to continue to work for your organi-
cally privatized. Fort Stewart’s mission database, showed our minority civil- zation, how likely are you to choose to
requires providing service in an environ- ian population to have increased by 10 stay,” resulted in 68 percent respond-
ment increasingly reliant on information percent since 2004. The EEO Officer ing they would stay. Comparably in
technology coupled with network securi- is included as a key member of work- 2005, supervisors responded that they
ty. Insourcing of privatized functions will force development planning efforts to would not stay beyond their retire-
likely increase federal employee popula- ensure tenets of diversity are included ment eligibility date; and 21 percent
tions within the next few years. in our programs. responded they would take early retire-
ment if offered. Supervisors and leaders
Diversity: Customer Input: compose 12 percent of the total appro-
We seek to sustain a diverse workforce. The FY 2006 Army Civilian Attitude priated fund workforce.
We considered data from the FY 2008 Survey provided insight into the retire-
FS/Hunter AAF Annual EEO Program ment plans of the workforce. Of the Recruitment Picture:
Status Report Affirmative Employment supervisors responding, 43 percent According to Tony Whitehouse,
Deputy Assistant G-1 for Civilian
Personnel in the FY 2008 CHR
Evaluation, despite efforts to simplify
the hiring system, it continues to grow
more complex. New hiring authori-
ties and changes in veteran and spouse
preference programs create additional
complexity and workload. The civilian
personnel population has also grown
due to new programs designed to take
care of Soldiers and Families; base re-
alignments, retirements, attrition, and
in-sourcing of some contractor posi-
tions. The economic downturn results
in an abundance of job seekers with the
U.S. unemployment rate at 9.5 per-
cent and the Georgia unemployment
rate at 10 percent as of August 2010.

65 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
These conditions combined with the to fill positions. Mandatory Priority mental factors, retirement projections,
Army being rated as one of the best Placement Programs protect current local labor market, and occupational
places to work in the federal govern- employees from job loss, but at the outlook, we would likely be concerned
ment for 2007 (by the Partnership same time tend to limit the number with: an increase in the number of po-
for Public Service and American of vacant positions into which new sitions to be filled in part due to our
University’s Institute for the Study of employees (first time workers with high attrition rate; a steady but predict-
Public Policy Implementation) gen- government) may enter. Hiring mo- able loss of employees to retirements
erate a surplus of potential workers. bile employees contributes to higher during the next five years; high avail-
Civilian voluntary retirements are attrition rates. Internal recruitment ability of applicants with some lacking
projected to remain stable for the next and formal trainee positions lead- the right skills, thus requiring training
five to six years according to Dr. Susan ing to promotions increase employee and development; prior military and
L. Duncan, Assistant G-1 for Civilian morale, benefit the community, and spouses being key recruitment sources;
Personnel, in her report to the Senate give employees the opportunity for and a continued use of student trainees
in May 2009. Economic trends may growth and career advancement. The to meet skill requirements.
affect this projection, but the next po- Student Trainee Experience Program
tential retirement bulge may be in FY (STEP) and Student Career Experience From these conclusions, we devel-
2015 as retirement eligible employees Program (SCEP) are being used to en- oped a model to further quantify and
under the FERS system may increase. courage both education and employ- categorize workforce segments for re-
ment. These programs may also be used cruitment, training and developmental
A variety of recruitment sources, for- to promote diversity in the workforce. programs. An example of this model is
mer Soldiers, Family members and shown in Figure 2. The model is based
the public, provide ample candidates Based upon all considered environ- upon a standard gap analysis model
with which many are likely familiar.
Figure 2 The “gap” identifying the workforce
positions to be filled is then further
Succession Planning Model evaluated to determine the skill needs
that can be met through recruit-
ment, and which will require train-
ing and development. The Individual
Development Plan (IDP) is the vehicle
used to identify the training and de-
SUPPLY GAP DEMAND velopmental needs of those with skill
deficits. IDP contents are then consol-
idated, analyzed, and annual training
plans are crafted to meet the needs.

Additional gap analysis revealed that


RECRUITMENT & INTERNAL
adequate supplies of candidates to fill
DEVELOPMENT (IDP) GS 3 – 5 positions and GS-12 and
above positions exist, pinpointing em-
ployees in GS-7 through GS-11 posi-
tions to be the primary target for de-
velopmental programs. Segmentation
of the workforce and subsequent gap
FUTURE WORKFORCE
analysis led to the development of two
strategic performance objectives: (1)

W e a r e t h e A r my ’s Hom e 66
o Continue to emphasize recruit-
This alignment enables us to leverage both Army and ment of developmental employees
to enable growth within the work-
community resources. Additionally, we can identify force, e.g. (STEP, SCEP and other
and focus on areas that provide the best return on developmental positions).
o Annually, review the Human Capital
investment both dollar-wise and people-wise. Strategic Plan to update mission and
workforce demographics.
to use the Civilian Education System a core of mid-level positions GS-7
(CES) as developmental opportunities through GS-11 that require training In summary, through our SHCP pro-
for non-supervisory employees; and (2) and development of critical skills. cess we are able to systematically and
to use the Student Career Experience continuously translate broad corpo-
Program (SCEP) and other competi- Implementation Strategy: To achieve rate goals into local installation stra-
tive developmental programs to grow the objectives of this plan, the follow- tegic objectives and measures that are
needed skills. Then, based upon the ing course of action was identified: aligned to unique needs within the
following conclusions, we developed workforce. This alignment enables us
• Employ recruitment strategies that
an implementation strategy: to leverage both Army and community
provide for current/future skill re-
resources. Additionally, we can iden-
quirements and diversity
Conclusions tify and focus on areas that provide
• Provide training in critical skill areas the best return on investment both
• Broad knowledge and skill sets will for current and future workforce (de-
be needed for multi-disciplined and dollar-wise and people-wise. This per-
fined in the FY 11 Annual Training spective allows us to strengthen com-
leadership/management positions. Plan of Action) munity partnerships and meet com-
• Leader development will be empha- • Continue to emphasize and provide munity responsibilities for workforce
sized at all levels within the workforce. leader development to the mid-level skill requirements. Simultaneously we
• Mission critical occupations are: workforce. can develop programs that are tailored
engineers, physicians, nurses, phar- • Resource the SHCP through the to meet the needs of the Fort Stewart/
macists, security specialists, police Command Budget Execution Program. Hunter Army Airfield workforce. The
officers, intelligence specialists, fi- Army culture is common to us but ev-
• Evaluation:
nancial management, budgeting and o Continue to track strategic per- ery installation has unique characteris-
accounting specialists, contracting tics that apply only to that locale. By
formance objectives/measures
specialists, logistics management systematically and strategically consid-
in the Leader and Workforce
specialists, quality assurance special- ering the environmental influences and
Development Quality Management
ists, information technology special- exigencies that are unique to that specif-
Board (LWQMB) and further
ists, and human resource specialists. ic location, one may define what is right
align with IMCOM Campaign
• Fewer supervisors and employees Plan, Line of Effort 3, Leader in that particular set of circumstances.
will retire during the next 5 years. and Workforce Development. We are convinced that our SHRP pro-
• Workforce diversity will be monitored o Add strategic performance ac- cess is paying big dividends by enabling
and considered in recruitment strategies. tion/measures in the LWQMB to us to “do the right thing” in our stra-
• Sufficient applicants exist for entry- track leader development training tegic human capital management and
level positions (GS-3 to GS-5). Some of the workforce. would most likely have similar positive
positions GS-12 through GS-15 o Add strategic performance action/ outcomes for other installations.
and NSPS equivalents will be filled measure in the LWQMB to provide
through Placement Programs and and track career development plan-
other recruitment sources. This leaves ning and training for the workforce.

67 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
Beverly S. Fordham serves as the Workforce gplaw2m/

Development Program Manager for the OPM Guide, Building and Maintaining a Diverse
Directorate of Human Resources, USAG Fort High-Quality Workforce, http://www.opm.gov/
diversity/guide.htm
Stewart/Hunter Army Airfield, GA. She was a
2003 “Outstanding Student” graduate of Army
Management Staff College; served as AMSC
Adjunct Faculty for eight years; and served
as Army Center for Civilian Human Resource
Management Adjunct Faculty for 10 years. She
assisted on numerous panels and taskforces,
such as the ATLDP, helping to shape Army
Workforce programs and systems. She attended
Georgia Southern College.

References:
Briefing to the Senate Committee Homeland Security
and Governmental Affairs, 7 May 2009, by Dr. Susan L.
Duncan, Assistant G1 for Civilian Personnel

DOD Instruction Number 1400.25, Volume


250, 18 November 2008, Subject: DoD Civilian
Personnel Management System: Volume 250,
Civilian Strategic Human Capital Planning (SHCP)

Defense Report from AUSA’s Institute for Land


Warfare, “Transforming the Army’s Civilian
Workforce: A New Vision,” 23 July 2008

OPM Strategic Human Resources Policy


Center for Workforce Information and Systems
Requirements Report, “An Analysis of Federal
Employee Retirement Data, Predicting
Future Retirements and Examining Factors
Relevant to Retiring from the Federal Service”,
March 2008, http://www.opm.gov/feddata/
RetirementPaperFinal_v4.pdf .

DOL statistics, 2009, www.dol.gov

U.S. Census Bureau 2008 statistics, www.census.gov


Army Civilian Attitude Survey, FY 2006, www.
cpol.army.mil

US Army Civilian Human Resource (CHR) FY 2008


Evaluation, http://cpol.army.mil/library/civplans/
chr-eval/08eval/toc.html

US Army Installation Management Command


Campaign Plan, 2010 – 2017, 5 March 2010.
http://www.imcom.army.mil/hq

The President’s Management Agenda, 2002,


http://www.whitehouse.gov/omb/budget/
fy2002/mgmt.pdf

The Government Performance Results Act,1993,


http://www.whitehouse.gov/omb/mgmt-gpra_

W e a r e t h e A r my ’s Hom e 68
We the People: Joint Base Lewis McChord takes
the pulse of its sustainability program
by COL Tom Brittain, Garrison Commander, & Miriam Easley, Sustainability Outreach Coordinator, JBLM

Introduction leaders, subject matter experts, and oth- program began to sense a waning en-
“I love this job working with the sus- er early adopters from around Forces thusiasm in some quarters of the in-
tainability program – every year for 10 Command (FORSCOM), it proved stallation. Program leaders soon recog-
years has been a different experience.” to be the first step in the evolution nized a need for more precise feedback
from a compliance based program to a from installation personnel in order
“I’ve accomplished more Soldier support sustainability focused one. to understand and address this chal-
in the past 5 years guided by sustainabil- lenge, so we determined to pilot-test
ity concepts than I did in the previous 20 This initial effort and a subsequent our sensing sessions with Joint Base
years of traditional management.” February 2002 community work- Garrison Public Works personnel first.
shop involving approximately 250
Do your people talk like this? Ours do, participants produced ambitious 25- To obtain this feedback, program
and keeping this positive attitude and year sustainability goals in the areas leaders just needed to ask the right
motivation up requires leadership, di- of Air Quality, Energy, Infrastructure, questions. Based on the concepts of
rect involvement and reinforcement. Products and Materials Management, Doug McKenzie-Mohr’s “Fostering
Sustainable Training Lands, and Water Sustainable Behavior”(1999) an effort
Joint Base Lewis McChord (JBLM) is Resources. Team Leaders and subject was initiated to obtain in-depth quali-
located in the Pacific Northwest—a re- matter experts organized themselves tative information regarding attitudes
gion that is legislatively, corporately and immediately afterwards and began the and behaviors pertaining to sustain-
communally very active in sustainabil- transition to ‘triple bottom line (eco- ability. Initial efforts focused on the
ity. Being a leader in sustainability is no nomic, social, and environmental suc- JBLM Directorate of Public Works
easy feat but outreach by members of cess) thinking’ and planning. Our team (PW) given its close operational rela-
the Installation Sustainability Program turned first to low-hanging fruit and tionship to the sustainability program.
(ISP) to neighbors and counterparts has achieved quick victories. These achieve- To lead the effort, the installation
helped establish and build up sustain- ments such as an 85 percent waste diver- asked a trusted and respected former
ability programs and plans which have sion rate in 2010; robust fish and wildlife garrison commander to interview a
benefited the entire South Puget Sound. and forestry programs that include ex- cross section of personnel from every
tensive prairie restoration, species preser- PW division and at every level of re-
When Fort Lewis (now JBLM) be- vation, and a Forest Stewardship Council sponsibility. In order to acquire valu-
gan writing a sustainability baseline certified forest; and a sustainable master able feedback, we had to consider the
document in 2001, the net was cast plan that breaks with the usual planning best way to conduct these interviews.
far and wide to gather needed data model of urban sprawl, reduces need for
and coordinate discussion. Fort Lewis personal transportation, preserves train- Conducting a sensing session
had already established a good base ing lands, and improves quality of life. Forming appropriate questions is a cru-
for systemic, sustainable management, cial first step when conducting interviews.
through a Public Works Environmental With these early achievements met, the The way a question is phrased and de-
Management System that was third- program faced the usual challenges of livered can elicit different responses. For
party ISO 14001 certified in September personnel departures and increasingly instance, in “The Leader’s Handbook”
2000. When sustainability training was complex opportunities. Although our Dr. Peter R. Scholtes (1998) suggests
provided in 2001 to local military lead- program matured to meet these chal- that many organizations ask “…‘who’
ers, a cross section of organizational lenges, leaders in our sustainability questions. ‘Who is accountable?’...In the

69 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
new organization we ask ‘why’ or ‘how’
questions: ‘Why has the problem oc-
curred?’ How can we improve the sys-
tem and eliminate the cause of this
problem?’” (p. 263). This avoids a language
of blame and opens up the dialogue to
receive honest and constructive input.

It is also important to conclude the in-


terview with a question that asks about
a positive experience. Questions such
as “What is one of your proudest mo-
ments in your current position?” or
“What positive impact have you made
in your job?” end the session on a
positive note and leave the interviewee
with a sense of pride in their work. It
also gives the interviewer input into
what’s important to the employees and
what motivates them.

To set the tone of the interviews, the


JBLM Director of Public Works, Mr.
Steve Perrenot, P.E., sent out an email
to PW employees commending the
hard work of all in the directorate;
acknowledging the decreased empha-
sis on the sustainability program; and
requesting their sincere feedback and
suggestions. “We are a busy directorate
and my hat is off to all of you that have
made us successful over the past years
as well as your efforts that continue to
allow us to perform at an exceptional
level... In order for PW to continue our
efforts toward organizational improve-
ment, I request your full assistance
in this effort.” Having this leadership
support and encouragement was vital
to the success of this endeavor.
environment to get reliable responses While some of the responses and find-
Results that would help us determine the next ings were no surprise to our team,
With all of these things in place – well steps. The interview team selected in- many responses shed new light on the
thought-out questions, a trustwor- terviewees from a cross section of the source of the waning motivation to-
thy and honorable interviewer, and organization conducted interviews in ward sustainability. Some of the key
leadership support – we created an both individual and group settings. revelations from these interviews can

W e a r e t h e A r my ’s Hom e 70
be summarized as follows: How are we doing on those goals anyway?
– Some employees requested to have
Sustainability is just an environmental more communication on the progress
program, right? – Some employees did and successes of the program.
not see how sustainability fit into their
daily operations and perceived sustain- Re-energizing with a top-down approach
ability as being a program for which only needs to occur – When the sustainabil-
the environmental staff is responsible. ity program started a lot of excitement
and energy went into it. It was new and
How do I apply this to my job? – cutting edge and leaders were eager to
Integration into employees’ daily be one of the first installations to imple-
operation needs to be clarified. One ment a sustainability program within
possible mechanism for doing so al- Department of Defense. Employees sug-
ready exists on JBLM in the form of gested that this excitement and motiva-
an Environmental Operating Permit tion needs to be sparked again by leaders.
(EOP). At JBLM, the installation
Environmental Management System Sustainability is a great thing. I stand
(EMS) Coordinator creates EOPs as behind it and try to incorporate it into
a means to incorporate military units my own life – There was a consensus
(but not most garrison elements) into that sustainability was the right thing
the EMS. Units are given a customized to do and most had a positive outlook
EOP to detail how environmental and on the concepts. It is important to
EMS requirements can be incorpo- make the most of this general goodwill
rated into their jobs. This method may and, where possible, make it easier for
also prove successful with all organiza- employees to do the right thing.
tions within JBLM.
After conducting these interviews, we
The sustainability goals are ambitions know it’s important that we act on
and lofty. We need to know the steps re- what was discovered. Not only is it
quired to get there. – Although JBLM incredibly useful information that was
utilizes its EMS to bridge this gap by obtained, it will also give my employ-
providing annual objectives and tar- ees the message that they’ve been heard
gets leading to the 25-year sustain- and that their input is valuable.
ability goals, this response informed
the sustainability program that they The path forward
needed to do a better job of commu- The discussion generated by the an-
nicating the connection between the swers to our sensing questions is the
Installation Sustainability Program basis for improving our sustainability
(ISP) and the EMS. It occurred to the program and its communication plan,
team that a strategy to communicate which is currently under revision.
how these two programs are function- The first step is to reinvigorate the
ally combined needed to be developed. many people who made this sustain-
Two possible approaches include in- ability program such a success in the
depth education and outreach on the re- first place -- internal communication
lationship of the programs and combin- is key. Posting monthly sustainability
ing the programs under the same name. highlights on an internal website will

71 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
serve to inform everyone; will provide of Environmental Leadership and
updates on progress towards sustain- Green Government Award.
ability goals, and may also encourage
increased collaboration between the Sustainability Communication Plan
various Garrison elements. The pilot testing of sensing sessions
within Public Works proved highly
A specific component of that effort will worthwhile. Additional sensing ses-
be the JBLM Sustainability Annual sions will be used throughout the in-
Report, which is an effective commu- stallation to acquire useful qualitative
nication tool both inside and outside information to update and expand the
the fenceline. It communicates the installation-wide sustainability com-
progress JBLM is making on our sus- munication plan. Interviews will be
tainability goals, and it acknowledges used to determine what the perceived
the hard work done by everyone on barriers and benefits are to sustainable
the installation. The sensing sessions af- behaviors – we need to avoid making
firmed the importance of periodically assumptions about what individuals
updating this report, and once prepared, see as barriers and benefits to an action.
print copies will be placed in prominent For example, we might assume that
locations across the installation and all an individual did not recycle because
annual reports will remain online on there was not a recycling receptacle
our sustainability website. next to the trash can. Instead, it may
be because they were uncertain about
Joint Base Garrison or directorate-wide whether or not the article in question
events can also be leveraged to inform was recyclable and did not want to do
and encourage. For example, each di- the “wrong” thing. By relying on facts
rectorate holds an annual summer pic- instead of assumptions, we can then
nic that brings its many employees to- deduce the best possible action, which
gether in one location filled with fun. in this example may be to post highly
This might be an excellent opportunity visible and clear signs that provide in-
to have leadership show their support formation on what can and can’t be
for the program by sharing success placed in the recycling bin. This will
stories; discussing the path forward; then remove barriers impeding desired
requesting feedback; and recognizing a behavior and make it easier for every-
few sustainability champions. one to do the right thing.

In addition, it’s important that the By using this method we can deter-
ISP increase publicity of its successes mine effective steps to take in our
to the JBLM community, thereby communication plan. The finished
emphasizing the external recognition plan will consist of events, initiatives,
of their hard work and dedication; and projects for each of the six sus-
and we plan on highlighting individ- tainability teams. It will proceed from
ual contribution towards our recent high level detail listing the action, the
recognitions with the Secretary of audience, and the reasoning behind
the Army Environmental Award in it to a step-by-step plan on how to do
the category of Sustainability and that action including contact informa-
the EPA Region 10 Champions tion, useful links, timelines, and helpful

W e a r e t h e A r my ’s Hom e 72
hints. This will not only make outreach COL Thomas H. Brittain took command of Joint
more effective and efficient, it will ensure Base Garrison at (then) Fort Lewis in August
continuity of the sustainability message 2009. Since then, he has overseen the merger of
being delivered to the installation. Fort Lewis and McChord Air Force Base into Joint
Base Lewis-McChord. As joint base commander,
Conclusion he manages installation support to more than
JBLM’s sustainability goals rely on the 40,000 Army and Air Force service members,
involvement of everyone on our instal- plus about 55,000 Family members and a Civilian
lation, and the continued motivation workforce of about 14,000.
of our personnel to strive for greatness
is the responsibility of JBLM leader- Miriam Easley is the Sustainability Outreach
ship. Becoming a completely sustain- Coordinator for Joint Base Lewis-McChord. In
able installation will remain a difficult 2010, Miriam obtained her Masters in Sustainable
task, but we must remain diligent. Business from the Bainbridge Graduate Institute.
Sustainability is a crucial component of She is enthusiastic about her role and strives to
our mission to support our customers, engage the community in issues of sustainabil-
the war fighter and the Department of ity. She brings her passion for sustainability to
the Army, both today and in future gen- each endeavor she pursues.
erations. JBLM leadership has full confi-
dence in the sustainability team’s dedica- References:
tion and continued success in reaching McKenzie-Mohr, Doug & Smith, William (1999).
Fostering Sustainable Behavior. Gabriola Island,
our sustainability goals and more im- B.C. New Society Publishers.
portantly faith in the sustainability con- Scholtes, Peter R. (1998). The Leader’s Handbook.
cepts which are enabling us to enhance New York, NY. McGraw Hill.
traditional management concepts and
improve Servicemember support.

73 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
IMCOM Strategic Planning
through a Sustainability Lens
by S. Lynn Odom, Ph.D., G-5 Program Analyst, HQ IMCOM

Will you be a commander or leader How these perceived competing and


who truly understands and operational- independent LORs are met can be
izes sustainability, or will you uninten- extremely resource intensive, thus the
tionally endorse stovepipe operations battle for (financial) resources begins.
which squander precious capital in a Justifications are based on a plethora of
time of dwindling resources? Will your decision criteria such as legal citations
decisions improve or impede our instal- and statements such as “if this is not
lations’ ability to support their critical completed, we will…” And unless the
missions in 2020, 2030 and even far- ending of this sentence is “go to jail…”
ther into the future? Will your decision the requirement may or may not make
set into motion a culture of endurance? it above the (financial) cut line.

With respect to installation manage- Instead of looking at IMCOM’s LORs


ment, one of the most important re- as competing and independent, they
sponsibilities of a garrison commander should be viewed as collaborative op-
is to direct a comprehensive vision and portunities to enhance mission capa-
lead integrated long-term planning, bilities. Remember, issues that can be
based on the Senior Commander’s addressed through mutual agreement
priorities, that encompasses installa- with regulators do not require legisla-
tion-wide aspects and impacts, and tive solutions. The installation should
fully engages all affected stakeholders. be recognized as a complex system of
Astute commanders comprehend the systems, each capable of being cogni-
revelation that our installations are irre- zant of the others and operating in an
placeable assets to our nation’s defense. optimal manner. Creating a sustain-
Utilizing them and managing them for able installation means examining and
future use go hand in hand. It is a joint changing the way we plan for, invest
venture of garrison operations teamed in, and operate our installations. It
with the Senior Commander, tenants, means identifying approaches, tech-
and the outside community that en- nologies, and incentives that will best
sures an installation’s long-term mission support the military mission, improve
capability and operational readiness. the quality of life in our military com-
munities, conserve nature’s capacity
Our IMCOM installations have tra- to provide resources, and reduce our
ditionally been managed as compart- operational costs within a competing ral, land, air, built infrastructure, et al)
mentalized operations driven by legal objectives system of systems. Stepping begs for collaboration, innovation and
and other requirements (LORs) — all back to take a good long look at how willingness to stop doing things ‘the
of which are considered as imperative to make the most of the resources way they have always been done.’ I
by those charged with their execution. available (e.g. financial, human, natu- know, it’s a big ship that doesn’t turn

W e a r e t h e A r my ’s Hom e 74
easily, but in times of continual re-
source reductions, we have to roll up
our sleeves. The question that should
Installation Sustainability in ACTION: be crossing your mind right about now
is “will my installation still be an as-
Fo r t B ra g g Fre e d o m C i t y Tra i n i n g
set to the Army and the community in
which it resides in 25 years based on
SITUATION: The crowded schedule at Fort
Bragg’s two other MOUT training villages the decisions I am making today?” It
threatened to hold back the deployment of is time to take on the critical thinking
units during March 2004. Over one third of required to effectively move our instal-
48,000 soldiers training on the installation lations from resource intensive to re-
were being deployed to Iraq at any given source generating operations. It’s time
time, in addition to thousands of reserve and to understand sustainability and build
NG soldiers mobilized for the then termed Global War on Terror???. In addition, upon the successes already achieved.
the existing urban training sites were built to simulate more traditional towns,
Are you up for the challenge?
not realistic Iraqi villages. Fort Bragg needed another training facility and they
needed it fast! First thoughts conjure up traditional a vision of funding and build
out taking several months…if not longer….to construct at a cost of hundreds of ‘Sustainability’ is not the Army
thousands of dollars that was not allocated in the budget. This left Range Officer buzz word de jour, it is an
(Mr. Bill Edwards) thinking ‘out-of-the-box’. He and the Director of Plans, Training evolution in systems thinking
and Mobilization decided to put their sustainability hats on and build a facility Sustainability is not a program — it is
completely using in-house labor and available materials already on the installa- an ethos that has been under develop-
tion, including material located in the installation landfill. The results are impres- ment for some time. It is a set of guid-
sive… Fort Bragg’s range control staff built the entire village in 3 months, working
ing principles, requiring critical think-
with only photographs of buildings located in Iraq (no blueprints). Fifty salvaged
ing, from which a systems approach to
steel transport containers became the buildings enhanced by plywood to
round the corners of arches and domes. The structure was painted using one managing and organizing complex sys-
hundred gallons of paint that came from the recycling center. The roads, like tems (i.e., installation management) is
most dirt tracks on Fort Bragg, are surfaced with tons of ground concrete from derived. Operationalizing sustainabili-
the foundations of deconstructed buildings. ty at IMCOM installations has evolved
over the past two or three decades from
IMCOM Principles of Sustainability applied: several points of reference (depending
Mission Excellence: Soldiers are provided realistic training prior to deployment in theater. upon where one sits within this system
Community Collaboration: Teamwork amongst the Fort Bragg staff to coordinate of systems). Thus, it is not solely en-
the reuse of salvaged materials from the installation’s landfill and reuse center. vironmental or infrastructure or finan-
Environmental Stewardship: Materials were diverted from traditional disposal cial or human. For example:
the installation landfill thus lessening solid and hazardous waste (paint) genera- • In the mid to late 1990s, “green
tion and eliminating the burden on natural resources (materials, water, energy) building” concepts were being ex-
that would have resulted in the traditional use new virgin materials.
plored and adopted within the ser-
Economic Benefit: Project financial cost was roughly $4,500 and cost avoidance includ- vices. A feasibility study for imple-
ed more than$420,000 of new building material (based on standard construction cost).
menting sustainable development
Systems Thinking: Even today this project supports LOE 1 Soldier, Family & Civil- concepts and principles into the
ian Readiness, LOE 3 Leader and Workforce Development, and LOE 4 Instal-
lation Readiness. Personnel innovativeness in this project brings home Army, Navy, Air Force and Marine
an understanding of the human capital (level of knowledge and will- Corps land and facilities plan-
ingness to apply that knowledge in non-traditional ways) contri- ning processes and programs titled,
bution towards a sustainable installation.
Sustainable Planning: A Multi-
Service Assessment 1999, was the first

75 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
service-wide attempt by the DoD
to address sustainability and sus-
tainable infrastructure planning at Installation Sustainability in ACTION:
a policy level.1 Meanwhile, the U.S. Dealing with encroachment is MAJIC at Ft. Jackson
Army Corps of Engineers established
engineering technical guidance on Situation: Fort Jackson completed its ISSP process in May 2006. The process identified
sustainable design and construction Mission-Military Training (M-MT) as one of five installation core functions and as part of devel-
oping the M-MT team, folks from DPTMS, ITAM, DPW Environmental, Engineering and Master
in 1999 and the Army issued its first Planning, Unit Commands, South Carolina Army National Guard (SCARNG), state and local
sustainable design and development government, community conservation and regional planning group representatives were
policy in 2001. In June 2008, AR brought together to collaborate on issues and challenges for the future of Fort Jackson. This
team established four 25-year sustainability goals, one of which was “Optimal utilization of all
420-1 Army Facilities Management existing Fort Jackson lands for training purposes.” At the core of this goal were the facts that
was revised to incorporate sustainable regional population growth was beginning to encroach on the military installations ability to
design and development principles. utilize land within the fence-line for training. A second team, the Regional Interaction team
developed three 25-year sustainability goals, one of which was complementary to the M-MT
• In June 2000, the Senior Readiness goal, “Integrated compatible regional land use.” Before the dust could settle, Mr. Bryan Hall,
Oversight Council (SROC) began SCARNG Conservation Manager and Mr. Bill Hayes, Fort Jackson ITAM Coordinator built on
these teams’ momentum and marched forward with establishing MAJIC, the Midlands Area
reviewing encroachment issues to Joint Installation Consortium to affect a reduction of future encroachment pressures on the
include endangered species habi- area’s military bases and installations. Members of MAJIC include DoD partners: Fort Jackson,
tat on military installations, unex- McCrady Training Center, McEntire Joint National Guard Base, Shaw Air Force Base and Poin-
sett Bombing Range together with non-DoD partners: state and local government agencies
ploded ordnance and munitions & NGO’s to facilitate projects like a region-wide Joint Land Use Study (JLUS) and the develop-
constituents, competition for radio ment of Joint Compatible Use Buffers (JCUBs). Without losing a beat, Mr. Hall and his team
frequency spectrum, protected ma- at SCARNG (Ms. Karen Ellett) developed a GIS-based model to appropriately prioritize land
― based primarily on risk of incompatible development and high value ecological/threatened
rine resources, competition for air- and endangered species habitat ― on properties where landowners were identified as willing
space, air pollution, noise pollution, to enter into a conservation easement within the delineated MAJIC area. In the early sum-
and urban growth around military mer of 2007, MAJIC armed itself with facts related to the impending encroachment threat
then prepared and submitted a Range Environmental Protection Initiatives (REPI) request
installations.2 Awareness of these is- for $2.4M to leverage $11.7M of partner contributions for 8 tracts of land totaling 5,541 acres
sues grew over time. Encroachment is within the focus area of the five installations. During 2008, MAJIC received $1.4M which en-
now viewed in three broad categories: abled the conservation of 3,506 acres of land. MAJIC continues to submit REPI request, secur-
ing another $1.5M to date. The consortium continues to meet, and in addition to working the
1) Competition of resources (for ex- JCUB program, has completed a JLUS for the two counties within the MAJIC boundary and is
ample access to land, water, air- working on the resulting land use recommendations.
space, and frequency spectrum). IMCOM Principles of Sustainability applied:
2) Development near military Mission Excellence: Conservation of land around the boundary of our military bases
training areas. allows installations to provide the precious resource of land for training up to the fence-line
thus eliminating future voluntary training restrictions.
3) Environmental enforcement and
compliance issues. 3 Community Collaboration: Regional collaboration enables landowners to keep their land
without being pressured to sell and/or develop in ways incompatible with military missions.
• Research on how to manage Army
Environmental Stewardship: Undeveloped land close to a military base allows
owned land for continued mission for expanded habitat for endangered species while lessening the burden for providing
training and readiness became the for that habitat on federal land.
Army‘s Integrated Training Area Economic Benefit: A comprehensive economic analysis has not yet been completed.
Management (ITAM) program
Systems Thinking: Regional DoD and non-DoD partnerships such as MAJIC
in 1988. The ITAM program is a support LOE 1 Soldier, Family & Civilian Readiness (SR5), LOE 3 Leader and
core component of the Sustainable Workforce Development (LW3 and LW4), and LOE 4 Installation Readiness (IR1, I
Range Program and is responsible R4, and IR6). The ISSP process initiated teamwork that encouraged a
partnership promoting regional support for the military mission,
for maintaining the land to help the utilized technology to depict encroachment threats, and allowed for
Army meet its training requirements leveraging of resources to meet compatible goals.
to ensure long-term sustainability.

W e a r e t h e A r my ’s Hom e 76
The proponency for this focus on December 2007 Army Regulation croachment. In March 2000, US
the doctrinal capability of the Army’s (AR) 200-1, Environmental Army leadership met at the Senior
ranges and training land transferred Protection and Enhancement was re- Environmental Leadership Conference
from the Environmental Quality vised to incorporate legislative re- in Washington, D.C., to discuss its
Program to the Deputy Chief of quirements associated with environ- concerns about environmental issues
Staff for Operations in 1993.4,5 mental components of installation and Army missions. The conference
• The Communications Act of 1934 sustainability and outlines associ- mandate, published in An Operational
and the Communications Satellite ated commander responsibilities. Directive and Campaign Plan signed by
Act of 1962 govern frequency man- • The National Energy Conservation the Vice Chief of Staff of the Army on
agement and how the frequency Policy Act (EPCA) of 1978 required November 17, 2000, was to develop “an
spectrum is controlled. According to federal agencies to perform energy integrated strategy, with a defined end-
the June 2002 General Accounting surveys in order to reduce consump- state, that ties resources to objectives
Office report, titled DoD Lacks tion of nonrenewable energy resources and engages stakeholders at all levels
a Comprehensive Plan to Manage in buildings, vehicles, equipment, to sustain the mission.” FORSCOM’s
Encroachment on Training Ranges, and general operations and replaced Installation Sustainability Program
DoD has lost approximately 27 the minimum energy performance (ISP) was developed to meet this
percent of the total frequency spec- standards set by EPCA 1975. With mandate under the guidance of MG
trum allocated for aircraft telemetry the release of EO 13123—Greening Geoffrey D. Miller, the FORSCOM
since 1992 due to the reallocation the Government Through Efficient Deputy Chief of Staff for Personnel
of some radio frequency spectrum Energy Management in June 1999, the and Installation Management.7
from federal to non-federal control. Army as a defense agency was required
This loss of frequency spectrum is to submit an energy management re- At Fort Hood in May 2000,
due to pressure from the telecom- port to the Office of the Deputy Under FORSCOM convened for an initial
munications industry for consumer Secretary of Defense (Installations & working group comprising environ-
communications services.6 There Environment). EPCA 1978 was later mental managers from FORSCOM
is concern about the availability amended by the Energy Policy Act installations. The working group re-
of adequate spectrum to support (EPAct) of 1992 and EPAct 2005 fol- viewed and discussed various planning
increased military operations and lowed by the Energy Independence frameworks and decided that aca-
training. Increased airspace con- and Security Act of 2007. The Army demic, civil community and industry
gestion, caused by airline industry Energy Security Implementation sustainability concepts and planning
demands, is an additional DoD Strategy (AESIS) was developed in were best suited to address their instal-
concern as it is seen as a limitation January 2009 and established five lations’ inextricably linked needs. This
on the ability of pilots to train as strategic energy goals for the Army. session resulted in the creation of an
they will fight. Implementation of AESIS is now a evolving long-range planning process
specified task outlined in the Army that requires active engagement of oper-
• The passage of the Federal Facilities
Sustainability Campaign Plan (ASCP). ators, installation personnel, regulators,
Compliance Act in 1992 sent the
and the local community to create and
message to federal agencies that
Historically, the concepts of Army achieve strategic sustainability goals. In
public expectations with respect to
installation sustainability planning 2001, the FORSCOM deputy com-
environmental responsibilities had
began to take root in U.S. Army manding general issued a requirement
changed. The Army could no longer
Forces Command (FORSCOM). and schedule for FORSCOM installa-
ignore its environmental compliance
FORSCOM responded to SROC tions to initiate the ISP.8
burdens due to several significant
events at Army installations involv- encroachment concerns by examin-
ing approaches to address mission, The first installation to host an instal-
ing legal challenges and notices of
community and environmental en- lation-wide sustainability planning
violation that had high visibility. In
session and develop a comprehensive

77 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
WHERE WE ARE planning process. Even though ‘owner-
W H E R E W E WA N T TO B E ship’ of the process was shifting, Army
A installations have continued to vol-
Awa re n e s s
untarily request centralized assistance
H OW W E G E T T H E R E
and have embraced the value-add
B associated with the integrated long-
C
Baseline
CLEAR... term planning concepts.
G Vi s i o n
G et B etter Mission
Goals
D
D ow n to
E To date, 28 IMCOM installations
Eva l u at i o n
Ac t i o n
worldwide have made a deliberate ef-
fort to plan through a sustainability
lens as a formal course of action (see
F
Figure 2), while many others have im-
FEEDBACK (continual improvement)
plemented projects that demonstrate
willingness to take up the challenge to
Figure 1: “A-B-C-D-E-F-G” Strategic Planning Model operationalize sustainability principles.
As garrisons were reaching out to their
sustainability plan was Fort Bragg in oversight transitioned from FORSCOM stakeholders inside and outside the
2001. The ISP process was further to Installation Management Agency fence line to make innovative changes
refined with working sessions at Fort (IMA) in 2004, with assistance from the a reality as part of implementing their
Lewis, Fort Hood, and Fort Carson Office of the Assistant Chief of Staff for plan, it has become apparent that co-
(2001 - 2003). The sustainability plan- Installation Management (OACSIM) operative roles and responsibilities are
ning process continued to evolve based during 2005-2007. In late 2006, the not being accepted by some stakehold-
on installation experiences and input U.S. Army Environmental Command ers, causing implementation to re-
from outside experts into a series of (USAEC) inherited the sustainability semble a “sticky noodle being pushed
working sessions based on the “A-B-C-
D-E-F-G” Strategic Planning Model de-
picted in Figure 4, which was formalized
and used at Fort Campbell in 2003.

As installations began delving into this


systems-thinking approach to instal-
lation planning and decision making,
early successes caught eyes and ears at
HQDA. In 2004, the Chief of Staff of
the Army and the Secretary of the Army
signed Army Strategy for the Environment:
Sustain the Mission – Secure the Future,
formalizing the Army’s commitment
to sustainability. The strategy codified
Army leadership intent in protecting the
availability of mission critical resources
and community support.

Sustainability-focused strategic planning Figure 2: Installation Stability Planning as of FEB 2011. Map depicting where the ISSP process
has been provided to spur the transition to a Sustainable Army Community of Excellence.

W e a r e t h e A r my ’s Hom e 78
uphill.” Thus, the task of operational- stand and embrace sustainability as a (5) Systems Thinking — IMCOM’s
izing sustainability across an installa- valuable planning concept and frame- proficiency in identifying and ex-
tion’s complex system of systems will work that is today referred to as the ploiting interrelationships within
not be embraced as just another Army Integrated Strategic and Sustainability and between LOEs and operations
program. It will be embraced when Planning (ISSP) process. that optimize resource allocation
stakeholders accept sustainability as an and process performance.
ethos, a personal commitment to co- The first step in operationalizing sus-
operatively and collaboratively work as tainability on a personal level is to be- To operationalize sustainability, all
a team in support of the current mis- come educated in the concepts of sus- stakeholders who have a role in instal-
sion with the future mission in mind. tainability and aware of what academia, lation management must understand
industry, communities, and other and apply the principles of sustain-
Due to the very real multi-disciplined installations have achieved (through ability to enterprise operations and the
nature of developing and implement- successes and lessons learned). Two of fulfillment of LORs. We must begin
ing a 25-year installation-wide sustain- the numerous installation sustainabil- to ask and clearly define — what is
ability strategy and the recognition ity successes are highlighted early in the service we need? — what is the re-
that there was a need for long-range this article. As Army sustainability has quirement we must fulfill? — followed
integrated planning, IMCOM in- evolved from the narrowed scope of by, how can we attain that service or
stallations (having completed the environmental systems to the broader fulfill that requirement while building
sustainability planning process) re- scope of resource security and stability, our future installation capabilities? A
quested that sustainability oversight the IMCOM principles of sustainabil- prime example is the concept of demo-
move from the narrowed scope of the ity have evolved— lition. What is the service the instal-
environmental staff to the broader (1) Mission Excellence — IMCOM’s lation requires? The installation needs
scope of the plans staff. To facilitate proficiency in managing its re- a building removed. Can the building
this responsibility, HQ IMCOM, sources necessary to support the be removed by a means that enhances
chartered the Center for Future installation tenants’ ability to future installation capability? Yes, the
Installation Strategies, Sustainability achieve their missions. building could be deconstructed (in
and Emerging Technologies Branch in (2) Community Collaboration — whole or in part) so that useful build-
February 2009, which is now known IMCOM’s proficiency in ensuring ing materials can be salvaged for fu-
as G5 (Strategic Planning Division the long-term viability of its instal- ture use in the Army construction and
(SPD)). The IMCOM Sustainability lations through active local and re- maintenance program (see AR 405-90;
Working Group (ISWG), formed in gional partnerships supporting mu- 6-5c.(1)(a)). Concrete from a decon-
June 2009 and co-chaired by SPD and tually beneficial goals and objectives. structed building can be stockpiled and
U.S. Army Environmental Command crushed for use to refortify tank trails
(3) Environmental Stewardship —
(USAEC), defined sustainability as the and low-water crossings, thus enhanc-
IMCOM’s proficiency in meet-
proficient and efficient management of ing mission capabilities. The World
ing mission requirements through
resources — financial, human capital War II wood can be planed for reuse.
prudent life-cycle use of resources,
(personnel, information, institutional Changing the mindset from one of “it’s
active environmental management,
knowledge, technical expertise), infra- always been done that way” to one of
and replenishable conservation.
structure, natural capital (land, water, “we can do that” will take leadership
air, airspace), energy, technology — (4) Economic Benefit — IMCOM’s
support and integrated planning so that
so they are available when needed to proficiency in realizing true cost
resources will be there when needed for
support current and future mission re- savings, eliminating duplication
mission support. Managing resources
quirements at our installations. of effort and expanding services
requires accountability — it is impera-
through cross-functional planning
tive that IMCOM move away from
As installations successes have mount- and cooperative resourcing.
the concept of “what we can’t do,” and
ed, many in the Army grew to under-

79 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
build on our vision by collaborating on planning efforts drive an integrated overall (installation) system is a necessity
“what we can do.” The deconstruction installation-wide strategic action plan, for successful planning, execution, evalu-
example represents a minuscule sample not a compartmentalized garrison ation and continual process improve-
of what is possible when we move from strategic plan or independent tenant ment. David Barber (IMCOM-EU
a mindset of ‘resource intensive’ to ‘re- plans. This installation-level process Environmental Division), in reflecting
source generating.’ We do not have has proven itself with value-add results on the planning and implementation
to keep cutting up the pie; we need to in resource-efficient initiatives and ef- sides of the sustainability coin said, “It
share recipes for making pies. fective community-wide partnerships is one thing to go through this inspiring
as described in the enclosed cited suc- process and develop a plan, but without
The ISSP Process as it has evolved cesses. It is time to take this effort to leadership commitment to resource that
AR 5-1 requires installations to “devel- the next level to ensure that the process plan it is easy to fall back into the rou-
op and periodically update, as appro- continually improves to fully support tine. As a leader you cannot say, ‘let’s be
priate, macro-level, cross-functional current and future campaign plans of a sustainable installation,’ then put your
strategic plans that support continu- our Senior Commanders. resources elsewhere. We have to bridge
ous organizational performance im- the gap between the [ISSP] process that
provement based upon customer re- The ISSP process, as stated earlier, fol- ‘brings the cream to the top’ and provid-
quirements and feedback.” AR 200-1 lows the “A-B-C-D-E-F-G” Strategic ing the resources needed to harvest that
requires Senior Commanders to “par- Planning Model depicted in Figure 1. cream.” As installation action plans are
ticipate in the installation’s planning, Key features that attribute to the suc- developed and aligned with resource
sustainability efforts, and EMS” and cess of the ISSP process include: [human, financial, natural and man-
garrison commanders to “ensure that • a long-term planning period (25-year made capital] requirements via time-
the installation strategic planning of- goals) that transcends command and lining, it becomes apparent today what
fice (or equivalent) incorporates sus- reflects an enduring installation; short- and mid-term POM cycle human
tainability principles into strategic resource priorities are needed in the fu-
• active participation from garrison
and other installation management ture. Through collaboration, inside and
staff, installation tenants and com-
plans; coordinate installation strategic outside the fence-line, installations can
munity stakeholders (inside and
plans with the [Senior Commander] leverage resources with their partners.
outside the fence line);
prior to finalization.” Personnel who
understand how the principles of sus- • collaborative cross-functional teams
tainability are inextricably linked to that know how to plan for and Figure 3: Army Triple Bottom Line, Plus.
one another and directly relate to the optimize resource allocations for
Army’s tenets of sustainability outlined mutual benefit;
in Army Sustainability Campaign Plan • resourced operational implementa-
(ASCP) and Lines of Effort (LOEs) tion initiatives (3-5 years) and tacti-
outlined in Installation Management cal action plans (1-3 years) that are
Campaign Plan (IMCP) are able to pro- reflective of installation-specific
duce an effective plan that conveys the issue and challenges; and
installation’s vision, mission and goals,
• an agreed upon gover-
AND how AND with what resources
the installation will move from point A nance structure with
to point B in its 25-year journey. clearly articulated roles
and responsibilities
Applying the principles of sustain- within a complex instal-
ability is an evolution in planning and lation-wide hierarchy.
execution. Following the ISSP pro-
cess, cross-functional installation-wide Prudent management of the

W e a r e t h e A r my ’s Hom e 80
The six IMCP LOEs are a reflection of ‘embedded’ the need in many of the innovation and efficiency resulting in
the IMCOM commander’s intent to cre- participants (not just in the USAG) enhanced mission capability?
ate Sustainable Army Communities of and they continue towork the issues,
Excellence and are the commander’s pri- more than two years after.”
orities over the next 6 years (2010-2017).
As such, these will be the foundation for IMCOM installations that have em- Dr. S. Lynn Odom has more than 15 years experi-
development and integration of future braced the sustainability planning chal- ence working within the realm of sustainability,
installation strategic action plans being lenge understand that their local com- including seven years working on Army sustain-
developed via the ISSP process. munities look to the installation for ability efforts preceded by being a founding
leadership, inspiration and momentum member of the Laboratory for Sustainability
Conclusion for achieving regional sustainability. at the University of South Carolina, where she
It has been demonstrated that col- Forts Bragg, Jackson, Benning, Lewis, received her Doctorate Degree in Mechanical
laborative installation-wide planning Carson and Hood et al have welcomed Engineering in 2001.
with visible command support and their local community as a team player
community participation will drive in this joint endeavor of shaping sus- References:
1.
integrated long-term partnerships and tainable installations. Sustainable Fort http://www.afcee.af.mil/shared/media/docu-
ment/AFD-090713-042.pdf
execution efforts that operationalize Carson received the 2010 Community 2.
U.S. General Accounting Office, Military
sustainability at our IMCOM instal- Sustainability Award in November
Training: DOD Lacks a Comprehensive Plan to
lations. Mary Barber, USAG Fort 2010. Cindy McLaughlin, wife of Manage Encroachment on Training Ranges,
Carson Sustainability Coordinator the Garrison Commander, USAG GAO-02-614 (Washington, D.C.: June 11, 2002).
since their planning sessions in 2002 Fort Carson stated during the 18-19 (http://www.gao.gov/new.items/d02614.pdf )
3.
recently commented, “Our garrison November 2010 Southern Colorado Office of the Secretary of Defense Under
Secretary of Defense, Personnel and Readiness
Commander-hosted monthly break- Sustainable Communities Conference,
(2007) Report to Congress on Sustainable Ranges
fasts, annual conference and other “What I learned at the conference is 4.
http://www.cecer.army.mil/facts/sheets/LL23.html
educational events in partnership that “sustainability” is far reaching and 5.
https://srp.army.mil/SrpWeb/
with the community, our attempts to means so much more than being good IntegratedTrainingAreaManagement
be transparent and accountable to all stewards of our environment. There is 6.
U.S. General Accounting Office, Military
stakeholders, and our team’s visibil- opportunity in everything we do, from Training: DOD Lacks a Comprehensive Plan to
Manage Encroachment on Training Ranges,
ity throughout southeastern Colorado the foods we choose; to the time we
GAO-02-614 (Washington, D.C.: June 11, 2002).
demonstrate our commitment and take to make sure we are caring for
(http://www.gao.gov/new.items/d02614.pdf )
understanding that sustainability re- ourselves which all contribute to a 7.
http://www.denix.osd.mil/awards/upload/
forscom.pdf
quires a shared vision and direction.” stronger, more sustainable family and 8.
Magruder, L.W, III, LT-GEN (2001) Memorandum
Gretchen Kent, Fort Huachuca PAIO community. And, for me, it was great Forces Command Installations, Subject: Forces
Command Installation Sustainability Program,
Chief recently stated with respect to the to see in real programs that the army Fort McPherson, GA: Headquarters U.S. Army
IMCOM ISSP process, “One direct recognizes this and is putting effort be- Forces Command
result of the Sustainability planning hind making our team, the army fam-
[process] was the basic understand- ily, as resilient as possible.”
ing that the issues were complex and
we needed some expert advice.” She If you were able to travel into the future,
continued with specific reference to what would those serving in your posi-
the 2008 Fort Huachuca ISSP efforts, tion be saying about the installation you
“What is really interesting to me is that left behind? Would you find that the de-
even though we have not done a formal cisions you are making today contribut- Scan with your smartphone and QR Code
update of the sustainability plan, many ed towards a reduced mission capability reader for more on Army Sustainability
of the issues continue to be worked -- or even the closure of your installation?
something about the planning process Or would you find a thriving legacy of

81 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
Integrated Installation Planning: Fort Leonard
Wood ensures a sustainable future
by COL Charles Williams, Commander, USAG Fort Leonard Wood

Garrison commanders (GC) have the (FORSCOM) presence with deploy- Clearly, FLW is an extremely complex
combined responsibilities to provide able units including the 4th Maneuver installation, and the GC balances daily
the infrastructure, services and facilities Enhancement Brigade Headquarters operations in order to manage and meet
to ensure that the installation’s military as well as four battalion headquarters or exceed the widely varying customer
mission requirements are met, and at and 25 subordinate or separate com- expectations. This is accomplished
the same time, to ensure that Service panies. FLW is also home to the en- through integrated planning, coordina-
Members, Family Members, and tire Department of Defense (DoD) tion and effective communications that
Civilians are afforded the highest stan- truck driver training and has a large optimize use of finite resources
dard of living possible. The GC must international student detachment with
also incorporate the current priorities representation from more than 120 Integrated long-term and
of the Senior Commander, the re- countries. Add to these the strength of sustainability planning
quirements of IMCOM Headquarters our retirees, families, civilians, resident As the new Senior Commander, MG
and the impact on the surrounding school district presence, and industry David Quantock, began developing
communities while concurrently an- and academic liaisons, and you have his campaign plan covering a two- to
ticipating changing realities and future the full picture of FLW’s current pop- five-year window. Quantock and his
requirements including deployments, ulation served – more than 100,000 - staff, as well as the GC and garrison
mission changes and fiscal restructure. competencies and contributions to the staff, realized that to have long-term,
Army and nation. Our estimated re- sustainable services and products,
Fort Leonard Wood (FLW) is a thriv- gional economic impact is $3 billion. we had to find a methodology to
ing and prosperous post that trains
80,000-90,000 Military and Civilians
each year. It is home to the U.S. Army
Chemical, Biological Radiological
and Nuclear School, the U.S. Army
Engineer School, the U.S. Army
Military Police School, the Army’s
largest Non-Commissioned Officers
Academy, 1,700 interservice person-
nel including Navy, Marines, and Air
Force, the 102nd U.S. Army Reserve
Training Division headquarters, and
the 35th Engineer Brigade, Missouri
Army National Guard. FLW is a prov-
en valued Army investment. In ad-
dition to the Training and Doctrine
Command (TRADOC) mission, over
the past several years, it has received
numerous additional responsibilities,
which includes supporting and tak-
ing care of a large Forces Command

W e a r e t h e A r my ’s Hom e 82
This phase was somewhat challenging since many of the objectives are very long-term without a
clear, actionable path to accomplishment; however, we have acknowledged that this is a living
document and are comfortable working toward long-term, one step at a time.

incorporate FLW’s mission, energy, ducted analyses on strengths, weak- As previously mentioned, the team
environmental, infrastructure and nesses, opportunities and threats for went to great lengths to follow and
resource planning not only into the each area and the major challenges. cross-walk efforts with other orders
two- to five-year planning cycle, but Next, cross-functional teams devel- and regulations; in addition, we cross-
also into a long-term strategy that sup- oped long-term strategic goals to walked with the IMCOM Campaign
ported the DoD and Army goals. capitalize on identified strengths and Plan (IMCP), the Senior Commander’s
opportunities and to improve and campaign plan and other related staff-
With the assistance of Army counter weaknesses and threats. ing actions. Our goal was to ensure
Environmental Command (AEC), that efforts were not duplicative but
HQ IMCOM, the Army Corps of The team held battle rhythm interim were complementary. In our cross-
Engineers Research and Development progress reviews and azimuth checks walk activities, the ISSP teams’ analysis
Center (ERDC) Construction Engineer with the Senior Commander, the GC found that the majority of the sustain-
Research Laboratory (CERL), and and other key leaders. The teams also ability initiatives were already included
the Center for Sustainable Solutions, conducted cross-walks and compari- and inherent in the IMCP.
we initiated our process for develop- sons of the sustainability strategic goals
ing a 25-year Integrated Strategic to various executive orders, directives The ISSP teams met in February to
Sustainability Plan (ISSP). The Senior and regulations to ensure that the goals review the draft goals, objectives and
Commander and the command team were coordinated and nested. actions, and to establish metrics as well
fully support the initiative, and after as define resource requirements. The fi-
gaining buy-in from other key staff or- Once goals were in place for each line nal draft is being staffed to all installa-
ganizations, Quantock issued an oper- of effort, subordinate objectives were tion organizations for feedback. Once
ations order (OPORD) for the process drafted. With the help of CERL, the the staffing is complete, our intent is
to ensure that his intent was clear and long-term sustainability plans of other to input it into an automated applica-
to maximize participation from all key installations were examined for les- tion that will allow us to easily com-
organizations on FLW. Although the sons learned and other considerations. municate and coordinate the elements
garrison has the responsibility for this FLW team representatives were sent of the plan on a regular recurring basis.
process, nearly every organization on to installations with proven success in
post has touch points and participates. sustainability planning to gather addi- We have studied various methods of
tional information. At this point, ob- automating our plan to include the
The sustainability planning process be- jectives were refined and subordinate Army’s Strategic Management System,
gan with organizational leaders iden- action plans were developed to ensure which is used to track other campaign
tifying the installation’s key business success along the line of effort. This plans including IMCP. At this time,
areas or lines of effort, which are: (1) phase was somewhat challenging since we are working with ERDC-CERL
Infrastructure and Energy; (2) Mission many of the objectives are very long- to design and establish a secure web-
Services; (3) Community Engagement; term without a clear, actionable path based application that will be acces-
(4) Caring for Service Members, to accomplishment; however, we have sible behind Engineering Knowledge
Families and Civilians; (5) Workforce acknowledged that this is a living doc- Online (EKO). The application will be
Development; and (6) Training Lands, ument and are comfortable working accessible for viewing the ISSP goals and
Ranges and Facilities. The teams con- toward long-term, one step at a time. supporting objectives and actions, for

83 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
“Army’s net zero goal is for installations to be net zero, based on net zero energy, net zero water and
net zero waste, all striving towards sustainable installations. We are creating a culture that recog-
nizes the value of sustainability measures in terms of financial, mission capability, quality of life,
local community relationships, and preserving the Army’s future options.”

inputting data, and for conducting per- being explored, as well as the impacts with the Senior Commander’s staff as
formance updates. This is a collaborative of highly technical systems on future they developed and made changes to
system that will allow the key business maintenance and operations. The proj- his campaign plan, which designates
managers to stay coordinated with a plan ect will help in setting the Army’s strat- garrison as lead for a line of effort ti-
that will run more than two decades. egy and design guides to maximize net tled “Take Care of People and Ensure
gains on a systems, building and com- Quality of Life.” This line of effort’s
In a related effort, FLW was selected in munity scale that will result in the con- purpose is generally to ensure execu-
December 2010 as the site for the U.S. struction of a net zero energy, net zero tion of the IMCP and GCP as well
Army Corps of Engineers’ (USACE) water and net zero waste area develop- as ISSP. This provided a perfect oppor-
2030 Integration Project, which will ment that meets or exceeds specified tunity to integrate all existing garrison
directly support our ISSP infrastruc- sustainability and energy mandates up and IMCOM sustainability planning ef-
ture and energy goals and objectives. to fiscal year 2030. forts into the senior commander’s battle
Recently, the Assistant Secretary of rhythm and governance. Three objec-
the Army for Installations, Energy The challenges ahead will be to main- tives were included in the line of effort.
and Environment (ASA-IE&E) said tain these ISSP planning instruments
“Army’s net zero goal is for installa- and automated systems and to orient The first objective was to establish FLW
tions to be net zero, based on net zero the changing commanders and staff on as an Army Community of Excellence
energy, net zero water and net zero the goals and objectives. As personnel (ACOE). The objective was a match
waste, all striving towards sustainable changes take place across the installa- to executing the GCP, which aligned
installations. We are creating a culture tion, new members of the ISSP plan- with the IMCP and is the basis for
that recognizes the value of sustain- ning teams will have to step up and the ACOE recognition.
ability measures in terms of financial, work the plan. One thing is certain,
mission capability, quality of life, local communication and leader involve- The second objective was to establish
community relationships, and preserv- ment will be a must and key to car- and coordinate a strategic sustainabil-
ing the Army’s future options.” rying forward our accomplishments to ity plan with nested energy studies.
date and realizing the long-term goals. This objective was a match to the ISSP
The Integration Project and our ISSP that was already under development.
key business areas are right on track Nesting and integrating with
with the Army goal. The Integration IMCOM’s and the Senior The third objective was to develop a cus-
Project study team is focusing on Commander’s plans tomer focused sustainment organiza-
our Basic Training Barracks projects The garrison staff conducted a detailed tion. This objective was a match for the
and Advanced Individual Training analysis of the IMCP and developed a Customer Relationship Management
Complex 2 as examples to develop subordinate Garrison Campaign Plan System keynoted by our Interactive
strategies for creating net zero facili- (GCP), which seeks to execute and Customer Evaluation System (ICE).
ties that reduce demands on energy, implement the IMCP.
water and solid waste disposal. The lat- By building the garrison’s planning
est technology and design methods are The garrison staff also worked closely tools into the Senior Commander’s

W e a r e t h e A r my ’s Hom e 84
campaign plan, it made our plans ac- ICE results were discussed for the last COL Chuck Williams assumed command of USAG
tionable to him, and it institutionalizes two quarters and issues were developed Fort Leonard Wood in May 2009. He began his
our plans into the overall systematic for follow-on actions. career as a Military Policeman and was later
process. In addition, it gives visibil- commissioned as an Armor Officer through the
ity to milestones, issues and decision The key advantage is that the plans Officer Candidate School at Fort Benning. He
points with the Senior Commander. and processes are now integrated into earned his Bachelor of Science in Criminal Justice
the Senior Commander’s plan and at Eastern Kentucky University and his Masters
The garrison briefs the line of effort’s are systematically reviewed. of Science in Counseling Psychology and Leader
status once per quarter to all installa- Development from Long Island University. His
tion leaders at the Senior Commander’s Summary military education includes the Armor Officers
Executive Session, which is actually By integrating the garrison plans into Basic Course, Military Police Officer Advanced
a campaign synchronization meet- the Senior Commander’s plans, we Course, Combined Arms Services and Staff
ing. Updates on the integrated plan- are making the plans actionable for School, and the Command and General Staff
ning process are also provided at the him and are able to bring the IMCP College. He was selected for the Senior Service
Chief of Staff’s staff calls, the GC’s staff through the GCP and the ISSP to an College in 2006.
meetings and the town-halls that the installation focus. This provides a pre-
GC conducts for garrison employees. viously unrealized opportunity to have
Details of each of the line of effort ob- a coordinated planning effort, not only
jectives are further discussed in other at the garrison level but also at the
planning meetings. The GCP is re- Senior Commander level. This allows
viewed at the semi-annual Installation us the opportunity to create a culture
Planning Board. The ICE results are that recognizes the value of sustain-
discussed at the quarterly Installation ability measures in terms of financial,
Action Council (IAC). mission capability, quality of life and
local community relationships, while
We have successfully integrated the also preserving the Army’s future op-
garrison plans and planning pro- tions through appropriately steward-
cess into the Senior Commander’s ing available resources, managing costs
plans and planning process. At the and providing our service Members,
December 2010 Maneuver Support Families and Civilians with a sustain-
Center of Excellence offsite, we briefed able future. This assures us that we are
our line of effort with extensive detail correctly integrating IMCOM and
on the three objectives. The Senior Department of Army priorities into
Commander and his staff actively par- our planning. This process also bene-
ticipated in the development and the fits us in building vital relationships to
planned governance for the line of ef- provide continuity and resilience both
fort. Integration is also shown in the on the installation and with surround-
reporting processes already in place. At ing communities for creating long-
the last Installation Planning Board, term sustainability initiatives.
the Installation Priority List was devel-
oped from the priorities that are listed
in the GCP and are thus in the Senior
Commander’s campaign plan under
the “Take Care of People and Ensure
Quality of Life” line of effort. At the
recent Installation Action Council, the

85 U . S . A r my J o u r n a l of I n s ta l l at i on M a n a g e m e n t
A
R
w
e
M
a S
Y’
re
th O
H
e M
E
IN

T
EN

AL
ST

LA NM
TIO RO
NS AND ENVI

U.S. Army Installation Management Command


11711 North IH 35, San Antonio, TX 78233
www.IMCOM.army.mil

Social Media Addresses


http://twitter.com/armyimcom
http://www.facebook.com/InstallationManagementCommunity
http://www.youtube.com/installationmgt
http://www.scribd.com/IMCOM
http://ireport.cnn.com/people/HQIMCOMPA
http://www.flickr.com/photos/imcom/

You might also like