T h e fig u r e s s u g g e s t t h a t d u r in g t h e l a s t d e c a d e o f t h e 2 0 th c e n t u r y t h e t o t a l
n u m b e r o f s u b s e a w e lls w a s o v e r 2 0 0 0 w o r ld w id e in 1 9 9 8 /9 a n d t h a t to d a t e
m o re th a n 2 7 0 0 s u b s e a w e lls h a v e b e e n d e p lo y e d . O f th e s e s o m e 2 0 0 0 a r e
c u rre n tly o p e r a tin g to d a y .
SATELLITE FIELD TO HOST
PLATFORM WITH CENTRAL
MANIFOLD AND CLUSTER
OF WELLS
PRODUCTION TREES
SMALL SATELLITE FIELD
TIED-IN TO HOST
PLATFORM WITH
INTEGRATED TEMPLATE
MANIFOLD SYSTEM
BALMORAL FIELD - FIRST USE OF
FLEXIBLE DYNAMIC RISERS IN THE
NORTH SEA
MARGINAL / SMALL FIELD
WITH FLOATER FPV
ABOVE INTEGRATED
TEMPLATE / MANIFOLD
SYSTEM
TWO MARGINAL FIELDS
WITH FLOATER FPV AWAY
FROM TWO MANIFOLDS /
W CLUSTER SYSTEM
GRYPHON FIELD -
FIRST FULL FIELD
DEVELOPED WITH AN
FPSO IN NORTH SEA
SMALL FIELD WITH FPSO
AND A NUMBER OF
INTEGRATED TEMPLATES /
MANIFOLD STRUCTURES
FIELD DEVELOPMENT OPTIONS (production and export)
USING SUBSEA PRODUCTION SYSTEMS (oil only/gas not shown for clarity)
SHORE FACILITY SHORE
oil
FPU / FPF
Production Sales Sea level Sales Production
Import Riser Riser
Riser Riser Riser
ESDV
ESDV ESDV ESDV
PLEM or
To Platform
To Floater
FLOWLINE MANIFOLD
TEMPLATE or
TEMPLATE
Subsea comingling Integral Modular
Seabed
6” Test Flow
TEMPLATE
MANIFOLD
MANIFOLD WITH
CLUSTER WELLS
Hydraulic/Chemical
OIL GAS Umbilical Electrical umbilical
EXPORT EXPORT 3”Service
14” Water Injection
Seabed
8” Gas Lift
12” 12” 6”
Production Test
PRODUCTION
PLATFORM
SUBSEA DEVELOPMENT
SCHEME
Electrohydraulic
10” Water
Seabed umbilical
Injection”
8” Production
8” Production
8” Water Injection
Electrohydraulic
umbilical
12 Well Template
Seabbed
FLEXIBLE DYNAMIC RISERS
SUBSEA CONTROL SYSTEMS
SCHEMATIC
BP’s GREATER PLUTONIO
FIELD DEVELOPMENT
Galio
Cromio Paladio
• Controls
• Reliability
URF CONTRACT - Acergy / Technip - Paris
ESPADARTE FIELD
LYELL FIELD (Conoco / Oryx)