The Environment, Industrial Hygiene and Safety (E/H/S) Policy of the SAINT-GOBAIN Group is
founded on respect for people and the environment, which is an integral part of good economic
results.
• The continuation and expansion of its activities (production, distribution, trade) along with
a still more stringent control of its environmental impacts while supplying markets with
products having always improved performances.
• Moving towards zero accident, zero occupational disease, zero non-recovered waste and
keeping up to it.
Hygiene and Safety objectives are backed up by the control of all unsafe situations and the obligation
to take into account the short, medium and long-term health and safety effects of activities
linked to processes and products.
In environmental terms, objectives are based, on the one hand, on reduced consumption of
natural resources (raw materials, energies …), reduction of waste, of dumping in natural
environments (air, water, ground), and of any other nuisance such as noise, odor … and on the
other hand, on the development of energy saving products and/or processes.
This document constitutes the frame of reference for Environment, Industrial Hygiene and
Safety (E/H/S) of the SAINT-GOBAIN Group.
This frame of reference explains how to reach those objectives. In order to implement this frame of
reference, systems have to be drawn up and implemented with the participation of all the
collaborators, according to current situations and specific decisions in each Branch or Company. The
implementation of a continuous improvement process thus contributes to meet the requirements of the
frame of reference.
It specifies results to be reached and allows to acquire the E/H/S culture of the SAINT-GOBAIN
Group.
*
NB: Italics refer to definitions in the appendix.
2. - General outline of the approach
Group
Group Management
Branch Management
Division Management
Company Management
Site Management
3. - Frame of reference for Environment,
Hygiene and Safety (E/H/S)
Legal requirements
Management Internal requirements
review Objectives
E/H/S Management Programme
The management defines and draws up its policy, objectives and commitment regarding environment,
industrial hygiene and safety.
Site Management ensures that this policy is totally applicable and compatible with local requirements
and that, in addition :
• it is appropriate to the nature and extent of environmental impacts and risks regarding
safety and industrial hygiene on site ;
• It allows, at all level, the appropriation of the E/H/S/ culture of the SAINT-GOBAIN Group ;
• it is periodically reviewed in order to ascertain that it is still relevant and appropriate to the
activities of the site.
The implementation of the EHS Policy and Process is declined by the delegation, division,
company, entity... this according to the level of responsibilities defined in each organization.
Thus the term ”site” employed in this frame of reference refers in most of the cases to an entity of the
"lowest organizational level " (ex: a plant factory, a distribution agency...), but in certain cases it must
be taken in the broad sense to hold account of the specificities of each organizations.
3.3. - Identification and planning
3.3.1. - Identification of environmental aspects , hazards and evaluation of risks
The site identifies the environmental aspects of its activities, products and services in order to
appraise which are likely to have significant environmental impacts.
The site assesses the risks concerning the collaborators, service providers, visitors, the
neighbourhood and the environment. To this end, the site :
The site draws up means of prevention and protection, through the implementation of a set of
coherent actions integrating technique, work organization and training.
The collaborators of the site have well-documented and updated risk analyses dealing with:
During design studies (buildings, equipments, products), all parties operating in the lifetime of the
product or project are taken into account. A multidisciplinary team defines and validates E/H/S
requirements which are then integrated into the specifications. Before the beginning of operation, it is
verified that:
• all means of prevention and protection anticipated during study are effective and
sufficient ;
• E/H/S procedures are drawn up, circulated and explained.
E/H/S procedures are updated and implemented properly.
The management provides and sets up a permanent E/H/S watch, particularly in the scientific field in
order to identify hazards as soon as possible and take effective and appropriate measures.
The site management identifies concerned parties which are sent relevant information on the E/H/S
performances of the site.
This information is up to date, and taken into account in the setting of the EHS management system
of the site.
The site identifies other applicable E/H/S requirements (best practices, Branch agreements, internal
regulations of the Group, etc.).
This information is up to date, and taken into account in the setting of the EHS management system
of the site.
The site communicates relevant information on those internal requirements to the collaborators and
concerned parties.
3.3.4. - Objectives
The site sets E/H/S objectives at all appropriate functions and levels.
The objectives are documented and consistent with the site policy, legal requirements and the
analyses of environmental aspects and risks.
The site draws up an E/H/S management programme to reach previously defined objectives.
This programme appoints a person in charge of each concerned mission and level, and specifies the
resources committed and the time limits to meet the objectives.
3.4. - Implementation and Functioning
3.4.1. - Structure and responsibility
Roles, responsibilities, authority and relationships in E/H/S matters concerning all the collaborators
are defined, documented, distributed and circulated.
The site appoints one (or several) member(s) of Management to ensure that the implementation of the
E/H/S management system is in accordance with requirements and that it is in line with a continuous
improvement process and that the practices comply with it.
Prevention, Occupational Health and Environment functions are defined and their collaborators are
properly trained.
Responsibilities are formally shared between those services and hierarchical setup.
Staff representatives take part in the implementation of the E/H/S policy of the site.
The site management must bring into play all (human and financial) resources necessary to the
proper operation of the E/H/S Management System.
The site identifies E/H/S awareness and training needs for all the collaborators. The training is an
essential part of an overall common E/H/S culture and must develop their involvement and their self-
evaluation capabilities in these fields. It is specially followed up and mainly deals with:
• training for identification of hazards, assessment and prioritization of risks, auditing of the
effectiveness of developed actions (process of risk management);
The collaborators are made aware of occupational risks and means of prevention and protection.
The collaborators training takes into account the different levels of responsibility, competency and
understanding.
Training is suited to the collaborators who are led to hold several jobs and functions in turn.
Knowledge checking systems are set up. Retraining periods are provided for. Permanent records are
kept.
Moreover, collaborators are made aware of E/H/S consequences of its activity and of beneficial effects
achieved through the improvement of their personal commitment ; specifically the acquisition and the
maintenance of the E/H/S/ culture are obtained through a daily and permanent training approach.
3.4.3. - Information
The site informs the collaborators about the risks and hazards linked to their activities and specifies
means of prevention and protection implemented and provided for.
All E/H/S documents and data intended for work places are available, accessible and understandable
to everyone.
The site draws up and updates management procedures for all documents and data.
Documents and data are regularly reviewed, updated when necessary and approved by authorized
collaborators.
Updated versions are available at useful locations to ensure an efficient operation of the E/H/S
system.
An identified person within each site submitted to the Group Reporting fills out at defined frequency
the questionnaires his/her entity must fill.
Design – Modification
Files on design, plans for new installations and significant modifications are formally approved at
E/H/S level by a multidisciplinary team.
For any kind of project, an identification and assessment of E/H/S risks linked to processes, products,
and activities from cradle to grave is carried out in order to decide on proper equipment, organization
and use, along with associated operating instructions.
For any kind of modification made to existing activities, processes, installations or products, safety and
health protection levels are improved at work places along with environmental impacts.
Purchasing
Purchasing of hazardous substances and products goes through a specific procedure.
Before ordering products, materials and services, E/H/S requirements are defined and integrated into
the specifications.
Specific instructions are given for acceptance of purchases to check conformity to specifications.
Process management
It is verified that all due means of prevention and protection are efficient and adequate and that
working procedures are implemented.
Inventory of risks linked to traffic in the site, handling, storage, loading and conveyance is compiled
and corresponding means of prevention and protection are set up.
Those operations take into account environmental aspects, proper procedures being carried out.
Outside contractors contractually conform to the E/H/S rules of the site and operate in accordance
with regulation in force.
Their capacity to conform to the E/H/S policy and rules of the Group is checked.
• collaborators entering building site are informed of E/H/S risks and existing means of
controlling them.
All the collaborators integrates the E/H/S/ culture in their daily work activities.
Within the continuous improvement process, proposals and initiatives of collaborators are promoted
and taken into account ; the management reaction considers the risks nature and the achievement
delays.
Potential anomalies are detected by risk analysis, audit, management audit, self-audit and self-
diagnostic ; they are analyzed and corrected.
Statistics on potential anomalies are kept and used within continuous improvement programmes.
3.4.8. - Communication
The site Management is responsible for the contents, addresses and circulation procedures of E/H/S
information.
Communication within the site is organized to spread and develop daily work spirit at EHS level.
Potential accident situation (collective risk) or emergencies cases are duly considered.
After an emergency, causes are analyzed and preventive actions are provided for.
The crisis management is duly considered and controlled. It is the same for the communication in
crisis management.
Their consequences in terms of E/H/S risks are assessed regarding the collaborators, concerned
population and environment.
Training sessions are planned and set up. Lessons drawn from those sessions help to review the
emergency plans.
3.5 - Assessment and control
The site identifies technical controls, in accordance with regulations and/or analyses of risks to be
enforced. It carries them out or has them carried out and keeps an account thereof.
The site identifies all necessary means and qualified collaborators to carry out controls and
maintenance. Control equipment is identified, controlled, calibrated, tested and maintained in order to
ensure its reliability.
The results of technical controls are properly reported and recorded. Corrective actions are initiated
when necessary. People in charge of the follow-up are duly appointed.
The assessment and follow-up of accidents, incidents and unsafe situations are carried out to:
The assessment and follow-up of the level of the collaborators exposure regarding all work constraints
and the effects on health and occupational diseases likely to occur are carried out to:
A medical follow-up of consequences of exposure is drawn up. Indicators are chosen to assess the
conformity and effectiveness of medical follow-up.
The assessment and follow-up of the level of environmental impacts and hazardous situations as
regards environment are carried out to:
Indicators of means
Indicators of means are drawn up to check the conformity of the system with E/H/S management
programme and requirements in force.
3.5.2. - Handling anomalies
Anomalies (accidents, incidents, unsafe situations and non-conformities) are dealt with in accordance
with specific procedures.
Risks brought about by such events are reported, recorded, analyzed and all previously designated
concerned people are informed of them.
Their analysis leads to the establishment of corrective and preventive actions for all identical
situations.
A competent person is appointed to set up corrective actions within a time limit set beforehand. The
effectiveness of corrective actions is checked.
3.5.3. - Records
The site draws up procedures of identification, filing and destruction of records linked to E/H/S
matters.
The specificities of the procedures of each domain are taken into account, especially with regard to
Health and industrial hygiene.
3.5.4. - Self-diagnostic
The site sets up audits to appraise the implementation and effectiveness of the E/H/S management
system.
The site sets up audits to appraise the implementation and effectiveness of the E/H/S management
system.
Auditors are trained, objective, impartial and remain independent from the audited service.
The detection of unsafe situations for collaborators and situations likely to cause environmental risks is
part and parcel of audits.
An audit report is drawn up for the site management who decide on actions to be taken. The site
management keeps a copy of this report.
3.6.- Reaction and adjustment actions
The existing E/H/S system with its performance and means indicators is examined at suitable intervals
(at least once a year ) by site management who make sure it remains continuously effective and
allows to acquire the E/H/S/ culture of the SAINT-GOBAIN Group.
E/H/S objectives, along with the EHS policy if necessary, are drawn up within an overall strategy of
continuous improvement. These objectives also deal with behaviour along with judgements and
decisions.
The site management defines and sets up indicators to follow up behaviours/judgements and
decisions.
Under the impetus of the E/H/S function, the analysis of anomalies comprises the
behaviour/judgements and decisions dimension.