You are on page 1of 4

redhat.com | Choosing an I/O Scheduler for Red H... http://www.redhat.com/magazine/008jun05/feature...

Issue #8 June 2005

CHOOSING AN I/O SCHEDULER FOR RED HAT®


ENTERPRISE LINUX® 4 AND THE 2.6 KERNEL
by D. John Shakshober

The Linux kernel, the core of the operating system, is responsible for controlling disk access by
using kernel I/O scheduling. Red Hat Enterprise Linux 3 with a 2.4 kernel base uses a single,
robust, general purpose I/O elevator. The 2.4 I/O scheduler has a reasonable number of tuning
options by controlling the amount of time a request remains in an I/O queue before being
serviced using the elvtune command. While Red Hat Enterprise Linux 3 offers most workloads
excellent performance, it does not always provide the best I/O characteristics for the wide range
of applications in use by Linux users these days. The I/O schedulers provided in Red Hat
Enterprise Linux 4, embedded in the 2.6 kernel, have advanced the I/O capabilities of Linux
significantly. With Red Hat Enterprise Linux 4, applications can now optimize the kernel I/O at
boot time, by selecting one of four different I/O schedulers to accommodate different I/O usage
patterns:

Completely Fair Queuing—elevator=cfq (default)


Deadline—elevator=deadline
NOOP—elevator=noop
Anticipatory—elevator=as

Add the elevator options from Table 1 to your kernel command in the GRUB boot loader
configuration file (/boot/grub/grub.conf) or the eLILO command line. Red Hat Enterprise
Linux 4 has all four elevators built-in; no need to rebuild your kernel.

The 2.6 kernel incorporates the best I/O algorithms that developers and researchers have shared
with the open-source community as of mid-2004. These schedulers have been available in Fedora
Core 3 and will continue to be used in Fedora Core 4. There have been several good
characterization papers on using evaluating Linux 2.6 I/O schedulers. A few are referenced at the
end of this article. This article details our own study based on running Oracle 10G in both OLTP
and DSS workloads with EXT3 file systems.

Red Hat Enterprise Linux 4 I/O schedulers

1 of 4 03/20/11 15:41
redhat.com | Choosing an I/O Scheduler for Red H... http://www.redhat.com/magazine/008jun05/feature...

Included in Red Hat Enterprise Linux 4 are four custom configured schedulers from which to
choose. They each offer a different combination of optimizations.

The Completely Fair Queuing (CFQ) scheduler is the default algorthim in Red Hat Enterprise
Linux 4. As the name implies, CFQ maintains a scalable per-process I/O queue and attempts to
distribute the available I/O bandwidth equally among all I/O requests. CFQ is well suited for
mid-to-large multi-processor systems and for systems which require balanced I/O performance
over multiple LUNs and I/O controllers.

The Deadline elevator uses a deadline algorithm to minimize I/O latency for a given I/O request.
The scheduler provides near real-time behavior and uses a round robin policy to attempt to be
fair among multiple I/O requests and to avoid process starvation. Using five I/O queues, this
scheduler will aggressively re-order requests to improve I/O performance.

The NOOP scheduler is a simple FIFO queue and uses the minimal amount of CPU/instructions
per I/O to accomplish the basic merging and sorting functionality to complete the I/O. It
assumes performance of the I/O has been or will be optimized at the block device (memory-disk)
or with an intelligent HBA or externally attached controller.

The Anticipatory elevator introduces a controlled delay before dispatching the I/O to attempt to
aggregate and/or re-order requests improving locality and reducing disk seek operations. This
algorithm is intended to optimize systems with small or slow disk subsystems. One artifact of
using the AS scheduler can be higher I/O latency.

Choosing an I/O elevator


The definitions above may give enough information to make a choice for your I/O scheduler. The
other extreme is to actually test and tune your workload on each I/O scheduler by simply
rebooting your system and measuring your exact environment. We have done just that for Red
Hat Enterprise Linux 3 and all four Red Hat Enterprise Linux 4 I/O schedulers using an Oracle
10G I/O workloads.

Figure 1 shows the results of running an Oracle 10G OLTP workload running on a 2-CPU/2-HT
Xeon with 4 GB of memory across 8 LUNs on an LSIlogic megraraid controller. The OLTP load
ran mostly 4k random I/O with a 50% read/write ratio. The DSS workload consists of 100%
sequential read queries using large 32k-256k byte transfer sizes.

2 of 4 03/20/11 15:41
redhat.com | Choosing an I/O Scheduler for Red H... http://www.redhat.com/magazine/008jun05/feature...

Figure 1. Red Hat En terprise Lin ux 4 IO schedulers vs. Re d Hat En terprise Lin ux 3 for
database O racle 10 G oltp/dss (relative performan ce)

The CFQ scheduler was chosen as the default since it offers the highest performance for the
widest range of applications and I/O system designs. We have seen CFQ excel in both throughput
and latency on multi-processor systems with up to 16-CPUs and for systems with 2 to 64 LUNs
for both UltraSCSI and Fiber Channel disk farms. In addition, CFQ is easy to tune by adjusting
the nr_requests parameter in /proc/sys/scsi subsystem to match the capabilities of any given I/O
subsystem.

The Deadline scheduler excelled at attempting to reduce the latency of any given single I/O for
real-time like environments. A problem which depends on an even balance of transactions across
multiple HBA, drives or multiple file systems may not always do best with the Deadline scheduler.
The Oracle 10G OLTP load using 10 simultaneous users spread over eight LUNs showed
improvement using Deadline relative to Red Hat Enterprise Linux 3's I/O elevator, but was still
12.5% lower than CFQ.

The NOOP scheduler indeed freed up CPU cycles but performed 23% fewer transactions per
minute when using the same number of clients driving the Oracle 10G database. The reduction in
CPU cycles was proportional to the drop in performance, so perhaps this scheduler may work well
for systems which drive their databases into CPU saturation. But CFQ or Deadline yield better
throughput for the same client load than the NOOP scheduler.

The AS scheduler excels on small systems which have limited I/O configurations and have only
one or two LUNs. By design, the AS scheduler is a nice choice for client and workstation
machines where interactive response time is a higher priority than I/O latency.

Summary: Have it your way!


The short summary of our study indicates that there is no SINGLE answer to which I/O scheduler
is best. The good news is that with Red Hat Enterprise Linux 4 an end-user can customize their
scheduler with a simple boot option. Our data suggests the default Red Hat Enterprise Linux 4
I/O scheduler, CFQ, provides the most scalable algorithm for the widest range of systems,
configurations, and commercial database users. However, we have also measured other
workloads whereby the Deadline scheduler out-performed CFQ for large sequential read-mostly

3 of 4 03/20/11 15:41
redhat.com | Choosing an I/O Scheduler for Red H... http://www.redhat.com/magazine/008jun05/feature...

DSS queries. Other studies referenced in the section "References" explored using the AS scheduler
to help interactive response times. In addition, noop has proven to free up CPU cycles and provide
adequate I/O performance for systems with intelligent I/O controller which provide their own I/O
ordering capabilities.

In conclusion, we recommend baselining an application with the default CFQ. Use this article and
its references to match your application to one of the studies. Then adjust the I/O scheduler via
the simple command line re-boot option if seeking additional performance. Make only one
change at a time, and use performance tools to validate the results.

References
Axboe, J., "Deadline I/O Scheduler Tunables, SuSE, EDF R&D, 2003.

Braswell, B., Ciliendo, E., "Tuning Red Hat Enterprise Linux on IBMeServer xSeries Servers",
ibm.com/redbooks (ibm.com/redbooks) .

Corbet, J., "The Continuing Development of I/O Scheduling", http://lwn.net/Articles/21274


(http://lwn.net/Articles/21274) .

Heger, D., Pratt, S., "Workload Dependent Performance Evaluation of the Linux 2.6 I/O
Schedulers", Linux Symposium, Ottawa, Canada, July 2004.

Likins, Adrian. "System Tuning Info for Linux Servers", http://people.redhat.com/alikins


/system_tuning.html (http://people.redhat.com/alikins/system_tuning.html)

About the author


D. John Shakshober is a Consulting Engineer for Red H at in Westford, MA focusing on kernel and benchmark performance. Prior to Red
H at, John was Technical Director of Performance Engineering at H P, Compaq, and Digital, working on Linux and Tru6 4 Unix
benchmark performance engineering in Nashua NH . H e has an M.S. in Electrical Engineering from Cornell University and a B.S. in