Project Partner / Contracting Body

„Urban Nature“ Berlin Programme for Urban Berlin Senate Department for Urban Development,
Section VI, Ministerial Affairs of Building
Ecological Model Projects www.stadtentwicklung.berlin.de /bauen/oekologischesbauen
Most of the plant species found in Block 6 emer-
ged as a result of the plantation process, while Based on the Federal State Programme for Expe- in recent years regarding the enhancement of Owner
some other species cropped up spontaneously. rimental Housing and Urban Development the housing and urban development sector, de- Dessauer Straße 9-12 KG Kärntnerhof GmbH & Co.
info@aurag.de
(EXWOST), the “Urban Ecological Model Projects”, a velopment of new systems and technologies and
Several years following shut-down of the old Berlin State programme, was developed in 1988. as guidelines for public as well as publicly-funded Project Management:
plant and discontinuation of the water supply, The Berlin model projects like Block 6 in Kreuz- building projects. Head of Technical Division
many plant and animal species typically found in berg rank as some of the pioneers of ecological The aim of the model project was and is to Dipl.-Ing. Brigitte Reichmann
Email: brigitte.reichmann@senstadt.berlin.de
wetlands but rarely in inner cities are still found building. prepare, implement and manage the planning,
on some site areas, even after the reconstruction New interlinked concepts are being field tested, as building and operation of the projects in such a Attorney Andreas Stöffel
and start-up phases of the rainwater concept. the requirements for planning and building have way that: Auffermann Law Firm
Among these are also plant species which are become increasingly complex. - t he environment and natural resources can be Email: stoeffel@aurag.de
considered endangered and worthy of preservati- The exemplary residential site appeals particularly conserved Nature Conservation Expertise
on from the perspective of nature conservation. to ecologically interested persons who appreciate - a maximum level of environmental and social State Commissioner for Nature Protection and Landscape
The emergence of different willow species the value of combining the proximity to Potsda- tolerance can be achieved Conservation in Berlin
including purple willow, goat willow and osier mer Platz with the “urban nature” found there. - s ustainable healthy living and working condi- Dipl.- Ing. Bernd Machatzi
in addition to wetland species such as hemp- Through the different projects of the Berlin State tions can be realised and secured. Email: bernd.machatzi@senstadt.berlin.de
agrimony, buck bean, and purple loosestrife in an Programme, important insights have been gained Further aims are the adaptation of the ecological
Rainwater Management/ Greywater Recycling
inner courtyard in Kreuzberg in the centre of Ber- standards for the public and publicly-funded Concept development, Planning and Plant Operation
lin is worth noting. These have usually run to seed building measures to up-to-date knowledge, the Nolde & Partner
from other cultivated areas and have established development and testing of new procedures and Engineering Consultants for Innovative Water Concepts
themselves there. technologies in selected projects and the reduc- Dipl.-Ing. Erwin Nolde
Trees which have been felled for traffic safety tion of costs during planning and construction as Email: mail@nolde-partner.de
reasons were replaced with new plantations. well as the minimisation of the future running and
Construction
Besides different bird species, numerous inverte- life cycle costs. Lokus GmbH
brate animal species benefit from the vegetation Rudi Büttner
stock and the reactivated water surface area of Email: lokus-wasserrecycling@web.de
the inner courtyard. When observed closely, one
can see a vast number of water flees in the water Development and Manufacture of the Greywater
which form the staple food for predatory dragon- Recycling Plant „AquaCycle“
Pontos GmbH / Hansgrohe AG
fly larvae, water beetles and water scorpions. Michael Hasenbeck / Otto Schinle
It is assumed that in a few years the site will
become colonised by many animal and plant
Email: info@pontos-aquacycle.de With friendly support from:
Block 6
species that are typically found in wetlands. Open Space Design
Engineering and Construction Consultants Ahner / Brehm
Dipl.–Ing. Britta Bauer
Email: bbauer@ahner-brehm.de
Integrated Water Concept
Operations Building
Ecological Integrated Concept
Zahn Architecture
Architecture, Ecological Building, Energy Consultancy IBN
Dipl.-Ing. Klaus Zahn Bauen
Email: info@klauszahn.com

Photos and Drawings


B. Reichmann, E. Nolde, B. Machatzi, H. Loidl, M. Schubert
Project Description
Site: Berlin Kreuzberg, The Project Service Water Concept Rainwater Management Operations Building
Dessauer Straße / Bernburger Straße
Completion Date: 1987 within the scope of the International Building - water-saving facilities in households The aim of the Federal State of Berlin was, with As intended in the Experimental Housing and Rainwater from 2,350 m2 of roof surface area and For the housing of the greywater recycling plant,
Exhibition (IBA 1987) - a cold water metre in each apartment the consent of the owner, to secure and optimise Urban Development (EXWOST) project, the 650 m2 of sealed open space is discharged into it was necessary to construct an operations buil-
Accompanying research: financed up to 1993 by the German Federal Ministry - constructed wetland in the inner courtyard the plant as a “technical monument” and enable separation of the household wastewater into the original constructed wetland, which is then ding integrated in the overall ecological concept,
of Regional Planning, Building and Urban Develop- (utilisation of service* water from greywater) operation management under economically two streams has been retained. Phosphorus either subject to evaporation or a time-delayed which also provides an opportunity for environ-
ment and the Federal State of Berlin - a rainwater pond bordering the constructed feasible conditions. and nitrogenous blackwater (faeces and urine) infiltration into the adjacent trough following mental education.
Optimisation/ wetland continue to reach the existing wastewater heavy rain events. The available polishing pond protrudes 1.4 m
Restructuring: 2006 / 2007 Objectives: sewer of the Berlin Water Company. The com- The evaporation of the rainwater contributes to into the ground and was an integral part of the
Following the completion of construction in 1988 - s ubstantial utilisation of the available plant and paratively low-nutrient wastewater from bath the improvement of the micro-climate in the original water concept.
and a subsequent research and optimisation plant components tubs, showers, handbasins as well as the waste- local residential environment, especially during Today the reinforced concrete basins serve as the
phase, the constructed wetland was shut down in - preservation and restoration of a biotope water from kitchens and washing machines, the summer months. A further positive impact load-bearing foundation of the new building,
Historical Background December 1993 after Phase II of the research pro- - o ptimisation of the plant as a „technical monu- which has a high organic composition is is the relief of the strain on the combined sewer which houses the greywater treatment plant. As a
ject had been finalised. This was due to technical ment“ coupled with a new innovative water designated as greywater. This water undergoes (environmental relief ). result, the generation of building and demolition
The “Integrated Water Concept” in Block 6 in Berlin and economical reasons. concept for service water utilisation and rain- a purely mechanical-biological treatment with As a result of being uncoupled from the sewer, wastes and the new sealing of valuable open
Kreuzberg was originally developed as a project water management a low energy input and without the addition the rainwater fees paid to the Berlin Water space were evaded and resources conserved.
of the International Building Exhibition 1987 (IBA Many of the project approaches stemming from - realisation of an operator model of chemicals in the modern, environmentally Company will no longer be levied. Consequently, The outer wall of the operations building follows
87) as well as a model project of the Experimental that period have progressed from experiment to -m  inimisation of the running costs for the tenants. friendly AquaCycle system to yield service water the running costs can be reduced by more than exactly the physically curved basin form. Building
Housing and Urban Development (EXWOST) re- norm such as: which is hygienically safe. The treated water 2,000 € per year. Last but not least, a valuable area materials were selected taking into considera-
search programme. It was financed by Federal and - the water-saving sanitary engineering and cold The development and implementation of mea- is used to flush 90 toilets and to a lesser extent for “urban nature” has also been developed. tion their environmental compatibility. By using
State funds and was researched and documented water metres sures were carried out within an ecological inte- to irrigate the tenants’ gardens. a wood construction that is open to diffusion
within the “Urban Ecology and Environmentally- - interlinked concepts of rainwater management grated concept which especially had to illustrate and requires a low primary energy input, a short
Sound Building” research field. - technologies for greywater recycling how the aspects of energy and water, open space Although the former concept required 790 m2 construction period was facilitated. The partitions
During the initial planning phase, the project - quality requirements for service water design, material selection, dealing with residual of planted soil filter and a 110 m2 large polishing of the pre-fabricated wood racks were insulated
incorporated different sub-concepts of ecological - separate collection of wastes material and solid waste and the impact on the pond for the treatment of the greywater, the with a 16 cm thick cellulose material.
building. * Service water: recycled, clean
- integration of as well as supply of information to running costs were to be handled. overall treatment takes place today in 12 plastic The aim is to heat the building solely with the
non-potable water tenants and users. containers, each having a capacity of 1.5 m3, residual heat originating from the greywater. The
The model project is a cooperation project between over the area of the former polishing pond. The wood profiles made from larch wood were left
the Federal State of Berlin and the plant owner. system is designed to treat 10,000 litres of water untreated.
The integrated water concept used an in- a day. Extensive greening of the far-projecting roof
teresting approach to the local water supply and (constructional wood protection) was carried out
wastewater disposal. It included, among other as an integral part of the rainwater management
aspects, the installation of the following elements: scheme as well as to protect against overheating
during the summer months.
-w
 ater-saving facilities in households The three dome lights allow seven times as much
daylight into the building than vertical windows
do, thus minimising the need for artificial lighting.