Report

Hauāuru mā raki
Waikato Wind Farm
Connection to 220kV Main Grid
Undergrounding Study

Prepared for
Contact Energy Ltd

By
Energy Action Pty Ltd and
Electrix

March 2008
REPORT STRUCTURE

CONSOLIDATED
REPORT
(This document)

Attachment No. 1 Attachment No. 2

REPORT BY ENERGY REPORT BY ELECTRIX


ACTION
Focus: Focus:
Underground Cables Overhead Lines

EXECUTIVE SUMMARY

The scope called for an in-depth feasibility study of the benefits and
disbenefits of undergrounding a double circuit overhead transmission line,
each circuit of 600MVA.

The undergrounding study is based on a 600MVA single cable circuit;


however, the study also evaluates a double cable circuit (each 400MVA) for
grid security purposes.

The ratio of initial direct cost for single circuit underground cable versus
double circuit overhead line is 8.4 while for a double circuit cable the ratio Is
11.

The resulting conclusions, based on a single cable circuit, are conservative in


comparison to a double circuit underground cable option which would
exacerbate the economic, environmental and logistic issues during
construction.

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
1
Site inspections were undertaken during January, 2008.

BECA and Wind Farm Group were represented and provided required
assistance during site investigations.

Two undergrounding options were evaluated:

• Option 1: Cross country (green field) route and,


• Option 2: Using existing public roadways

In addition to the abovementioned total undergrounding options between


Limestone Downs & Orton, a partial undergrounding option at the Eastern
end, in the vicinity of Orton, was also evaluated.

Insertion of sections of single or double circuit underground cable into the


overhead line at intermediate points along the route was also considered but
disregarded on account of lack of access for installation and maintenance as
well as protection coordination difficulties between multiple O/H and U/G
sections.

An overhead line design option prepared earlier for Contact Energy by BECA
was also reviewed.

By all accounts the cross country route is totally unsuited to installing


underground (extra high voltage) cables except at exorbitant cost and
questionable system security. In essence the civil works involved would be
equivalent to creating a new roadway along the entire route plus the
associated cost for the supply and installation of the 220kV cable circuit.

The majority of roadways (Option 2) are on steep slopes with a multitude of


sharp bends and are too narrow for installation of a 220kV cable circuit
without major road upgrades.

Even if the necessary upgrades were undertaken, the Baker, Wairamarama


Onewhero and Matakitaki roads would still be subject to lengthy road closures
or severe traffic restrictions during cable installation with no alternative roads
available to the public.

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
2
Terrain is subject to landslides and native soils exhibit characteristics of poor
thermal resistivity. Such conditions would require large quantities of imported
special cable bedding & backfilling at cable installation to provide for reliable
cable operation.

Excavated trench material (1.3 to 2 cubic metres per metre length of trench)
followed by importation of an equal quantity of special cable bedding and
backfill and road restoration materials would lead to a construction time in
excess of 30 months even by utilising two simultaneous construction teams
for a single cable circuit.

To underground the total 38.3km route at any cost seems totally unusual by
any industry practice.

A double circuit O/H line provides a redundancy level of “N-1”. (One circuit
capable of transmitting full load with the other out of service).

To provide an equivalent level of redundancy by U/G cable, a double circuit


would be required. Such an option would lead to further substantial increases
in cost and construction time.

A cost comparison summary for a single & double circuit underground cable
installation and for a double circuit overhead line is given in Table 1.

An overhead line would result in least cost and least construction time. While
fault incidence with an overhead line would be relatively high repair times
would be short.

Visual impact, property easement issues and matters related to EMF could
raise some community concern even in a sparsely populated area.

An underground cable would incur much higher initial cost, longer construction
time and have major impact on community during construction.

Fault incidence would be low but repair times long.

Visual impact would be low, but contrary to public perception magnetic field is
higher than for an equivalent overhead line when measured at conventional
reference level; i.e. one metre above ground directly over a cable.

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
3
Table 1: Cost comparison between overhead (O/H) transmission line and
(U/G) underground cable

Initial Capex Capex plus


Route description O&M (NPV)
(M$NZ) (M$NZ)

Limestone Downs to O/H Line Double 33 66


Orton: Cross country Circuit (25km)
(green field) route
U/G Single Cct N/A (see Note) N/A (see Note)
(25km)

U/G Double Cct N/A (see Note) N/A (see Note)


(25km)

Limestone Downs to O/H Line Double 33 66


Orton: Circuit (25km)
O/H line
U/G Single Cct 278 298
(cross country)
(38.3km)
U/G cable
(in existing roads) U/G Double Cct 367 387
(38.3km)

Eastern end only: O/H Line Double 6 12


Circuit (5km)
O/H line
(cross country)
U/G Single Cct 58 62
U/G cable (8.7km)
(in existing roads)
U/G Double Cct 76 81
(8.7km)
Note:
Cross country route is totally unsuited to installing underground (extra high
voltage) cables except at exorbitant cost and questionable system security.

Whilst in many European countries there is local community pressure towards


installing underground cables for high voltage transmission networks, there is

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
4
still only a very small percentage of high voltage underground cable. Table 2
shows the relative percentages.1 .

Table 2: Installed Underground Cable European Countries

Extra High Voltage Networks

Country 220kV to 275 kV

Km of Network Km of %
U/ground

Netherlands 648 6 0.9%

UK 3 029 71 2.3%

Germany 21 545 35 0.2%

Denmark 5 578 375 6.5%

Belgium 267 - 0%

Norway 6 049 64 1.1%

Italy 13 641 387 2.8%

France 27 890 813 2.9%

Portugal 4 409 - 0%

Switzerland 5 822 22 0.4%

Despite significant developments in installation practices and wider


introduction of polymeric insulated cables it is evident that even in Europe,
which is densely populated, urban and extremely well developed from an
infrastructure point of view, underground cables still account for only a small
percentage of total networks.

1
Commission of European Communities- Background Paper- “Under grounding of Electricity
Lines in Europe” – Brussels 10 December 2003

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
5
TABLE OF CONTENTS

1. INTRODUCTION............................................................................................. 7

2. COMPARISON BETWEEN 220KV OVERHEAD LINES &

UNDERGROUND CABLES .................................................................................. 7

2.1. Cost Comparisons ................................................................................ 8

2.2. Environmental issues..........................................................................10

2.3. Reliability ...............................................................................................10

2.4 Repair times ..........................................................................................12

2.5 Efficiency ...............................................................................................13

2.6 Maintenance ..........................................................................................13

2.7 Timing and Constructability ..............................................................13

2.8 Comparative Summary .......................................................................14

3 CONCLUSIONS............................................................................................ 19

4 APPENDIX - Scope for Undergrounding Study .................................... 22

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
6
1. INTRODUCTION

Contact Energy (CEN) plans to construct a purpose-built transmission line to


transport electricity output from a new windfarm on the west coast of the
Waikato region to the main grid connection. The detail of this project is
contained in the final Project Description document prepared for the purposes
of applying for Resource Consents under the Resource Management Act.

The main transmission link to the Grid is proposed to be 220 kV. Current
plans are for the link to be a double circuit overhead transmission line on
tower construction.

CEN has received comments from some landowners whose properties will be
traversed by the proposed transmission line. Several landowners are opposed
to overhead cabling and want the company to instead install underground
cabling.

CEN is open-minded on this issue and has engaged Energy Action Pty Ltd
and Electrix to provide expert advice on the practicability of undergrounding
and comparisons (including benefits and disbenefits) between the two
alternatives – refer to APPENDIX “Scope for Undergrounding Study”.

The undergrounding study is based on a 600MVA single cable circuit;


however, the study also evaluates a double cable circuit (each 400MVA) for
grid security purposes.

2. COMPARISON BETWEEN 220KV OVERHEAD LINES &


UNDERGROUND CABLES

When comparing an overhead transmission line with underground cables it is


important to consider all issues related to the design, construction, operation
and maintenance of both transmission systems including:
• Design Criteria: number of circuits, route length, ratings, maximum
operating temperature, nominal voltage, conductor type, cable type,
earthing system, ground conditions, structure types, maximum electric field

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
7
strength, maximum magnetic flux density, audible noise level, radio
frequency interference and easement width etc.
• Line security status
• Reliability
• Terrain conditions through which the route passes
• Environmental impact during construction and final solution
• Aesthetic and visual impact
• Life cycle costs which include initial capital costs, cost of losses,
maintenance and refurbishment costs
• Constructability and timing, including impact on local community during
construction
• Current technology and future upgrading.

2.1. Cost Comparisons

CIGRE (International Council on Large Electric Systems) published a


guideline “Comparison of High Voltage Overhead Lines and Underground
Cables” [Attachment 1 – Ref 7] where, for 220 kV UG/OH circuits, the cost
ratio varies between 5.1 and 21.1.

The guideline cautions that cost estimates should be based on actual site &
environmental conditions as opposed to “ratios” that can only be a guide at
best.

Accordingly the cost estimates presented in summary Table 1 (Executive


Summary) and in sub-sections (a) to (e) below are based on actual site &
environmental conditions as they apply to this project.

a) Initial capital cost of double circuit, lattice tower, overhead transmission


line, route length 25km: M$NZ 33.

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
8
b) Initial capital cost of underground cable circuits in existing roadways in
existing conditions between Limestone Downs and Orton 220kV Switching
Station, route length 38.3km :

• Single circuit: M$NZ 278 (*)

• Double circuit: M$NZ 367 (*)

(*) The cost estimates do not take into consideration the cost to upgrade the
roads to meet cable installation conditions.

c) Cost of single or double circuit underground cable through green field


sites.

Lack of data associated with costs of civil works (access roads, bridges,
directional drilled ducts, etc) that will be necessary to meet cable installation
conditions in this type of terrain makes a budget estimate impossible without a
prior detailed civil engineering assessment. However, the cost would certainly
be significantly greater than that for option (b) above.

In addition to the abovementioned total undergrounding options between


Limestone Downs & Orton, a partial undergrounding option at the Eastern
end, in the vicinity of Orton, was also evaluated - refer to estimated costs in
(d) & (e) below.

d) Initial capital cost of single circuit underground cable in predominantly


sealed roads (Orton 220kV Switching Station to required Orton Transition
Point, route length 8.7 km): M$NZ58.
i.e. an increase of approximately M$NZ52 above that of a double circuit
overhead line.

e) Initial capital cost of double circuit underground cable in predominantly


sealed roads (Orton 220kV Switching Station to required Orton Transition
Point, route length 8.7 km): M$NZ76
i.e. an increase of approximately M$NZ70 above that of a double circuit
overhead line.

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
9
2.2. Environmental issues

For the purposes of this study Visual and EMF (electromagnetic fields) issues
were considered in particular. Comparative observations are as follows:
• Underground cables exhibit minimal visual impact.

• Overhead transmission lines on the other hand are large structures


and create a visual impact. However, particular design solutions can be
adopted to minimise the visual impact by keeping structures below ridgelines
and out of sight where possible. In addition the route can be selected to
minimise the impact on any natural bush, areas of environmental, ecological
or archaeological significance.

• Overhead lines generate electric fields whereas underground cables


do not exhibit any external electric field.

• When measured at reference level (one metre above ground line)


magnetic field generated by underground cable is substantially higher than
that produced by an equivalent overhead line. While there are some shielding
options to minimise magnetic field generated by underground cables the
reduction factor is modest.

In respect of other environmental issues a review of environmental factors


(REF) study is recommended on approval of the selected system option.

2.3. Reliability

A measure of underground and overhead transmission line reliability is the


rate at which they fail or are subjected to outages. Outages can be forced
(due to a problem on the network), or planned. Overhead transmission lines
are often subjected to transient faults which are normally cleared via an
automatic reclose. These faults are not considered in this analysis as they are
normally cleared within a few seconds.

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
10
Outage rates are measured by considering the number of outages per 100
circuit kilometres. Transpower prepared a report which highlighted the outage
rates for forced and planned outages. Since these figures are a record of the
10 year period between July 1992 and June 2004, they are considered
appropriate for this analysis. The results are as follows:

Forced Outage Rate 0.34 per 100km per annum


Planned outage rate 0.92 per 100km per annum

When considering underground cable outage rates, there is no data for New
Zealand since there is little 220kV cable installed. For the purposes of this
analysis, figures from the report “Commission of European Communities-
Background Paper- Undergrounding of Electricity Lines in Europe Brussels 10
December 2005” which indicate the following:

Average Failure Rate 0.072 per 100km per annum


Planned Failure Rate 2.5 per 100km per annum

This figure was confirmed by a DISCAB Group on figures over the past 12
years and was presented at the ICF Congress in Barcelona. Other reports
including CIGRE and various American studies show varying rates from 1.4 to
4.1 faults per circuit kilometre.

For this analysis the rate of .072 has been used which equates to the
following expected outages for a 25 km long overhead line and a 38.3 km long
underground cable.

O/H Line U/G Cable Ratio


Outage Rate- 0.34 /100km 0.072/100km -4.7
forced
No expected 0.085 per annum 0.027 per annum -3.1
outages/annum
Total no outages 3.4 outages 1.08 -3.1
40 years

Outage Rate- 0.92 /100km 2.5/100km 2.6


Planned
No expected 0.23 per annum 0.95 per annum 4.1
outages/annum
Total no outages 9.2 outages 38 outages 4.1
40 years

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
11
From the above it is evident that underground cables have a better reliability
rate based upon forced outages but require more planned outages. In
addition there are reported data which indicate the reverse, depending on the
sample size, type of cable analysed etc. However for the purposes of this
report and based upon recent developments in cable technology, the figures
used are believed to be representative.

Note: The abovementioned data is based on service experience related to


U/G cables installed in accessible and secure environments including
established roadways, parks and reserves.

A cross country route is more likely to be adversely affected by third party


damage and prevailing terrain conditions resulting in reduced system reliability
and security.

2.4 Repair times

Another important factor to be considered is the repair time and how that
affects the availability of the circuit. It is a well known fact that the repair time
of overhead lines is significantly shorter than that for underground cables. In
addition some repair activities for overhead lines can be performed live and
thus the outage rate can be reduced.

Results for the last 10 years from Transpower’s records for overhead lines
show the following:

Average repair time for forced outages 1.808 hrs


Planned maintenance average 17.45 hrs

Studies conducted by consultants Meritec show the following repair times for
underground cables specific to New Zealand conditions:

Average Underground (XLPE) Cable repair time 200hrs to 300 hrs.

Based upon the failure rate and the repair times, availability per unit can be
calculated. This is based upon the outage rate and the total number of hours

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
12
per year. Using the figures above, the following availability per unit is
expected.

Overhead Line Underground Cable Ratio


Availability per unit . 9962 p.u. 9802 p.u. 1.01

This availability is based upon the fact that the underground cable option is a
single circuit system. Introduction of a dual circuit will significantly enhance
the system availability.

2.5 Efficiency

The efficiency of a transmission system is dependent upon the losses. In


general losses in overhead lines are due to Joule heating i.e. the resistive
losses; however, in underground cables in addition to Joule losses there are
dielectric losses and losses in cable metallic sheaths. Reference: Attachment
1 Appendix 2 & 6.

The losses for overhead line (4145kW) and for a single circuit underground
cable (4125kW) specific to this project are included in the NPV calculations in
Attachments 1 and 2.

2.6 Maintenance

Maintenance aspects related to underground cables are given in detail in


Attachment 1 Section 4.6 and for overhead lines in Attachment 2 Section 6.4.

2.7 Timing and Constructability

Construction of a transmission line through a type of terrain encountered


between Limestone Downs and Orton is restricted by access to the tower
sites. In some cases access will possibly only be by helicopter due to the
restrictions of native bush and the terrain.

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
13
Construction of the overhead transmission line is dependent on the resources
allocated. With 4 foundation crews, 4 tower erection crews and 2 large
conductoring crews, the line could be constructed within 12 months. However
due to the nature of the terrain, winter work would be significantly more
difficult and hazardous, particularly in the Limestone Downs area. It is
therefore suggested that an 18month construction period be allocated to
ensure that optimum productivity is achieved during the summer months.

The estimated installation time for a 38.3km cable circuit in roadways is


approximately 62 months; however this period could be halved by utilising two
independent cable contractors.

2.8 Comparative Summary

Details of overhead line and the underground cable alternatives are discussed
in detail in the two attached reports focusing specifically on underground
cables (Attachment 1) and overhead lines (Attachment 2).

Since a number of attributes of both alternatives are quantifiable and others


are subjective, a comparison is given in Table 2 where each criteria is
weighted as either (+), (++), (+++) or (-), (- -), (- - -) depending on the scale of
the difference between the attributes.

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
14
Table 2
Summary of Comparison Table of Overhead line option vs. Underground Cable

Item Criterion Description Rating of Options


Overhead Line Underground Cable
Rating Discussion Rating Discussion
1 Economic cost A measure of the
economic attractiveness of
the solution
Initial Capital Sum of the total upfront $33 M Based on 25km route $278 M Based on 38.3km route, excluding
Cost investment amount single necessary road upgrades.
cct.

$367M
(+++) double
cct.

(- - -)
Life Cycle Cost Effective cost of the $66 M Life cycle cost including $298 M Life cycle cost including initial
investment brought back to initial capital cost; cost of single capital cost; cost of losses,
2008 costs (++) losses, maintenance, cct. maintenance and, faults expressed
refurbishment and, faults as a Net Present Value is far
expressed as a Net Present $387 M higher than the overhead line
Value is still lower than the double option
cable option cct
(- -)

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
15
2 Asset A measure of how reliable
Reliability and the system is based upon
Availability its availability
Failure rates Based upon current failure (-) This figure is based upon (+) Since 220kV failure rates are not
rates of existing equipment Forced the current Transpower Forced available for New Zealand, this
forced outage per outage recorded results of 220kV outage figure is based upon the
100km.yr rate transmission lines in New rate Commission of European
of.34 Zealand over the past 10 0.072 communities Background Paper –
per years. Auto recloses for failures Undergrounding of Electricity Lines
100km transient faults are not per in Europe- Brussels, December
/yr included in this analysis. 100km/y 2003. Cables
r
Repair times A measure of the time (++) Based upon Transpower (- -) Based upon research by MERITEC
taken to restore the circuit records of forced outage on 220kV cable repair times
to service under fault repair time of 1.808 hrs and ranging from 200hrs to 300 hrs.
conditions planned outage repair time
of 17.45 hrs. Overhead
lines can be maintained
using live line techniques
which further reduces the
repair times
Availability This is based upon the (+) Based upon P B Power (-) Based upon P B Power analysis on
measure of the circuits 0.996 analysis on historical 220kV .988 probable availability presented in
availability and is (p.u.) data as presented in (p.u.) Transpower Report -2005-
influenced by the circuit Transpower Report -2005- Comparison of Reliability of a
failure rate and repair Comparison of Reliability of 400kV Underground cable with an
times a 400kV Underground cable Overhead Transmission Line. The
with an Overhead figures indicate a slightly better
Transmission Line availability associated with the
overhead line configuration.

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
16
3 Environmental A measure of the impact
Impact the which each option has
on the environment
During Each option has a different (+ +) Overhead line construction (- -) Under ground cable requires the
Construction impact on the environment requires the excavation of excavation of approx 500,000 m3
and local community approx 25 m3 of soil per (single circuit of route length 38.3
during the construction tower- total of 2100m3. km) which has to be disposed with
phase Construction impact on severe community impact.
local traffic is minimal An equal quantity of special fill is
required to backfill trenches
Project The length of time taken to (+) The overhead line can be (- -) Underground Cable is expected to
Duration complete the site works constructed over a 12 take more than 30 months to
month period complete a 38.3km route
Final condition The final condition of each (- -) Overhead lines are (+ +) Cable systems pose a minimal
option reflects the relative imposing structures on the visual impact. Land use within the
impact on the environment landscape and have a cable corridor is subject to
negative visual impact. easement restrictions.
Land use is restricted within
the easement which is
much wider than the cable
easement

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
17
4 Operational A measure by which the
operation and
maintenance of the options
affects the community
Magnetic and Overhead lines generate (-) There have been concerns (-) While there are some shielding
Electric Fields electric fields whereas expressed regarding options to minimise magnetic field
electric and magnetic fields generated by underground cables
underground cables do
and at this point research is the reduction factor is modest
not. When measured at inconclusive. The overhead
reference level (one metre transmission line complies
above ground line) with the ICNIRP & EU
magnetic field generated recommendation 1999 -
by underground cable is 100µT
higher than that produced
by an overhead line.
Noise Noise emission from the (-) Overhead transmission (+) Underground cables have no noise
transmission system lines emit noise especially emission
when there is a high
moisture content in the air.
The design specification for
the Franklin district is
42dbA
Climatic Weather impacts on the (-) Overhead lines are affected (+) Underground cables are not
Influence system by lightening, winds, snow influenced by weather
and ice
Total Rating 11 (+) 5 (+)
6 (-) 13 (-)
Net Result 5 (+) 8 (-)

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
18
3 CONCLUSIONS

a) Installation of a high capacity underground 220kV cable circuit cross


country (green field site) between Limestone Downs and Orton is not
practical in terms of installation techniques & system security and
would be at very high cost. However, an overhead transmission line is
feasible and is the recommended option.

b) Installation of an underground cable circuit in existing public


roadways using the most direct route (Baker Rd., Wairamarama
Onewhero Rd., Matakitaki Rd., Highway 22; and Otuiti Rd) is feasible.
However, Baker; Wairamarama Onewhero and, Matakitaki Roads
would require significant widening to accommodate construction of a
220kV single or double circuit cable installation. No alternative road
options were considered due to extensive distances involved.

c) Should the road widening option be adopted cable installation would


be feasible. However, even under this option significant traffic
disruption and public inconvenience would occur during cable
installation (trench excavation, cable laying, back-filling and cable
jointing and road restoration).

d) Installation of cables in ducts, which would have a lesser


inconvenience level, is not feasible due to the proliferation of road
bends and terrain profile. The only option would be a “direct laid
installation” involving a series of trench excavations (each 500 to 700
metres long) to accommodate sequential installation works in
accordance with industry practice.

e) Outages of overhead lines are caused primarily by the following


factors:
• Flashovers due to lightning strikes
• Accidental contacts either due to man/machine, vegetation or
birds

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
19
• Flashover due to insulator contamination

Most of the outages on overhead lines are caused by temporary


phenomena and the lines are usually restored to service by automatic
re-closure.

f) Outages of underground cables are generally caused by either a


failure of the cable insulation or third party damage eg. excavation /
directional drilling etc in the vicinity of the cable.

Outages to underground cables are usually extensive and require


significant repair time before they can be restored to service.

g) Under the proposal a double circuit overhead transmission line is


envisaged which would provide “N-1” system reliability.

For an equivalent level of system reliability a double circuit


underground cable would be required - with its associated increased
installation time and cost.

h) In respect of environmental impacts the following comparisons apply:


• Underground cables exhibit minimal visual impact.
• Overhead transmission lines on the other hand are large structures
and create a visual impact. However, particular design solutions can
be adopted to minimise the visual impact by keeping structures
below ridgelines and out of sight where possible. In addition the
route can be selected to minimise the impact on natural bush, areas
of environmental, ecological or archaeological significance.
• Overhead lines generate electric fields whereas underground
cables do not exhibit any external electric field.
• When measured at reference level (one metre above ground line)
magnetic field level from an underground cable is substantially
higher than that from an overhead line. While there are some
shielding options to minimise magnetic field generated by
underground cables the reduction factor is modest and even so
remaining field is still high.

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
20
• Contrary to public perception high voltage underground cables also
require easements, 6 metres wide, along the entire cable route for
the safe operation and access for maintenance & repairs. Easement
restrictions are more severe than those for overhead lines.

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
21
4 APPENDIX - Scope for Undergrounding Study

Background

Contact Energy (CEN) plans to construct a purpose-built transmission line to


transport electricity output from a new windfarm on the west coast of the
Waikato region to the main grid connection. The detail of this project is
contained in the final Project Description document prepared for the purposes
of applying for Resource Consents under the Resource Management Act. A
copy of this report is attached to this scope.

The transmission lines both for internal lines, interconnecting the substations
and for the main line are proposed to be 220 kV. Current plans are for the
internal lines to be single circuit on pole construction, and the external line will
be double circuit on tower construction.

CEN has received submissions from some landowners whose properties will
be traversed by the proposed transmission line. Several landowners are
opposed to overhead cabling and want the company to instead install
underground cabling.

CEN is open-minded on this issue and has undertaken to seek expert advice
on the practicability of undergrounding and comparisons between the two
alternatives.

The company is not an electricity lines business and is not therefore


constrained by any New Zealand statutory regulation governing the pricing
aspects of its transmission lines. Instead CEN operates in a competitive
market for the pricing of its daily offer of electricity generation. CEN does not
have any material existing investment in overhead transmission assets, nor an
inventory to support such infrastructure.

The company requires an in-depth study of the benefits and disbenefits of


underground transmission lines versus overhead lines. The study should
address the following matters.

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
22
Scope of Study

• Analyse the preferred route in the context of terrain, geotechnical and


any other issues that would impact upon the practicability of
underground cabling of 220kV circuits;

• Consider whether a more efficient and lower cost route could be


adopted for an undergrounding project such as, for example, burying
cable along existing roading networks;

• Review overseas trends in underground cabling practices in developed


countries and assess any recent improvements in technology that
make undergrounding comparatively more practicable than in the past;

• Prepare typical installation concept (e.g. typical installation cross


sections of key aspects of the cables and terminal stations).

• Prepare an indicative route based on available contour data which


would provide at least the equivalent reliability, redundancy and
functionality of the alternative proposed overhead line.

• Compare and contrast advantages and disadvantages including such


aspects as:
o reliability,
o efficiency,
o maintenance,
o environmental impacts of the installation and ongoing operations
e.g. trenching, radiation effects etc
o typical easement width required to install and then operate,
o any restriction on the land during operations,
o construction timeline,
o installation techniques,
o equipment transport issues of undergrounding concept versus
overhead line in the context of this specific project; and

• Provide an estimate of the comparative costs of either methodology


assuming that most recent technology is adopted for undergrounding

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
23
and the optimal corridor is chosen to implement such an alternative.
The assessment should include, if possible, an assessment of
comparative ongoing maintenance costs, and possible incremental
revenue arising from lower transmission losses that might arise from
the selection of one or other alternative.

Waikato Wind Farm - Connection to 220kV Main Grid - Undergrounding Study – March 2008
24
Report
Hauãuru mã raki
Waikato Wind Farm
Connection to 220kV Main Grid
Undergrounding Study

ATTACHMENT No. 1 OF THE CONSOLIDATED REPORT

Prepared for
Contact Energy Ltd

By
Energy Action Pty Ltd

Authors: Henry Kent and


George Bucea

March 2008
TABLE OF CONTENTS

1. INTRODUCTION............................................................................................2
2. UNERDGROUND CABLE ROUTE OPTIONS BASED ON SITE
INSPECTIONS ......................................................................................................2
2.1 Option 1: Cross country (Green Field) route .........................................3
2.2 Option 2: Installing cables in existing roadways ..................................5
3. REVIEW OF OVERSEAS TRENDS IN HIGH VOLTAGE UNDERGROUND
CABLING PRACTICES ........................................................................................7
4. COSTS AND CHARACTERISTICS PERTAINING TO 220KV
UNDERGROUND CABLE OPTIONS ...................................................................9
4.1. Cost and basis for calculation ..................................................................9
4.2. Cable losses ...............................................................................................10
4.3. Availability...................................................................................................12
4.4. Reliability and repair times ......................................................................12
4.5. Efficiency.....................................................................................................13
4.6. Maintenance – XLPE insulated cables ..................................................13
4.7. Electromagnetic field (EMF) ....................................................................14
4.8. Easements...................................................................................................15
4.9. Reactive power compensation – Critical length of cable circuit .....16
5. CONSTRUCTION TIME FRAME – CASE STUDIES...................................16
5.1 Single circuit: Orton 220kV Switching Station (along Otuiti Rd) to
OH/UG transition point near Fleming Rd., 8.7 km route length ...................16
5.2 Double circuit: Orton 220kV Switching Station (along Otuiti Rd) to
OH/UG transition point near Fleming Rd., 8.7 km route length ...................17
5.3 Orton 220kV Switching Station – Limestone Downs 33/220kV
Substation – 38.3km route length ......................................................................18
6. REFERENCES.............................................................................................18
7. APPENDICES ..............................................................................................19

Waikato Wind Farm – Undergrounding Study - Attachment No. 1 To Consolidated Report – March 2008
1
1. INTRODUCTION

Contact Energy (CEN) plans to construct a purpose-built transmission line to


transport electricity output from a new wind farm on the west coast of the Waikato
region to the main grid connection. The detail of this project is contained in the
final draft Project Description document prepared for the purposes of applying for
Resource Consents under the Resource Management Act.

The main transmission link to the Grid is proposed to be 220 kV. Current plans
are for the link to be a double circuit overhead line on tower construction.

CEN has received submissions from some landowners whose properties will be
traversed by the proposed transmission line. Several landowners are opposed to
overhead cabling and want the company to instead install underground cabling.

CEN is open-minded on this issue and has engaged Energy Action Pty Ltd and
Electrix to provide expert advice on the practicability of undergrounding and
comparisons (including benefits and disbenefits) between the two alternatives.

2. UNERDGROUND CABLE ROUTE OPTIONS BASED ON SITE


INSPECTIONS

The high cost of underground cables determines that, at the initial planning stage,
the shortest possible route is considered. In this case this is a direct line, cross
country, between Limestone Downs and Orton.

Next it is necessary to examine practicalities imposed by the terrain for example,


access for plant & materials; geo-technical data (ground conditions including
ground stability and soil thermal resistivity); and, the requirement or otherwise of
special installation features such as cable bridges, micro-tunnels, flexible troughs
(in unstable ground); directional drilling options and the like.

More recently environmental considerations and community concerns have


played an increasing part in route selection – often eliminating shortest route
options.

Included in this context are:


• Impacts to flora & fauna during construction stages
Waikato Wind Farm – Undergrounding Study - Attachment No. 1 To Consolidated Report – March 2008
2
• Long term visual impacts by virtue of sterilising wooded areas by the
establishment of 6 metre wide easements for safe circuit operation and
maintenance access
• Disruption to traffic during construction
• EMF

It is recommended that on approval of the project a review of environmental


factors (REF) study be performed.

The sheer size and complexity of 220kV underground cable circuits pose greater
installation challenges in comparison to other longitudinal infrastructure projects
including gas and water pipelines. (refer to Appendix 5)

2.1 Option 1: Cross country (Green Field) route

The landscape between the proposed 33/220kV substation at Limestone Downs


and the point of connection of the proposed 220kV transmission link to the main
grid near Orton consists of undulating terrain, lightly wooded in places, with a
continuous interspersion of relatively deep gullies and ridges [Photo No. 1] –
moderating somewhat toward Orton [Photo No. 2]. See also Contour Maps (Ref.
Appendix 4)

Photo No. 1 Photo No. 2

The countryside is essentially rural in nature with very few dwellings along the
38.3 km road route.

Waikato Wind Farm – Undergrounding Study - Attachment No. 1 To Consolidated Report – March 2008
3
Composition of the ground is an overburden (soil) which may contain volcanic
ash and weak alluvial deposits prone to landslides [Photo No. 3].

Land slides

Photo No. 3

The overburden (soil) has a high thermal resistivity. This would present a barrier
to heat flow (from the cable to ambient air) and could lead to the cable becoming
overheated and fail unless the cable is bedded and back-filled with a thermally
stable mix such as a weak sand/cement mix or similar.

Such landscape presents many challenges to the installation of an underground


cable which, by virtue of the power it has to transmit from the wind farm complex,
would consist of three single-core cables for a single circuit and six single core
cables for a double circuit.

Note: Underground HV power cables of voltage above 132kV are only of single-core
construction.

Typical single-core HV cable Typical three-core HV cable

Waikato Wind Farm – Undergrounding Study - Attachment No. 1 To Consolidated Report – March 2008
4
A single core 220kV cable, rated 600MVA, would have a diameter of
approximately 120mm and weigh approximately 25 kg per metre.

Normally this type of cable is installed in a trench one metre deep and one metre
wide (for a single circuit) or around 1.6 metre wide for double circuit.

Major challenges include:


• Creating access from existing roadways for excavators and trucks to remove
approximately 1.2 to 1.7 m³ of spoil per lineal metre of cable trench.
• Transporting to site(s) approximately 200 drums of cable (each around 20
tonnes)
• Importing 1.2 to 1.7 m³, per lineal metre, of suitable cable trench backfill
material (comprising a weak mix of sand & cement having proper thermal
quality), protective concrete covers and backfill
• Re-vegetating & stabilising the route to original “green field” condition
• Negotiating with various land owners a continuous, six meter wide, easement
along the entire cable route and vehicular access to it from existing roadways.
In essence the exercise would be equivalent to creating a new roadway between
Limestone Downs and Orton suitable to accommodate heavy vehicles,
excavators and cranes – refer Section 5.2 below.

Contrary to existing roadways (which were constructed on ridge tops) the cable
corridor may require bridges, directional drilling, ducts & micro tunnels.

In summary, the green field sites are totally unsuited to installing underground
cables except at exorbitant cost.

2.2 Option 2: Installing cables in existing roadways

The shortest road route between Limestone Downs and Orton comprises
sections of Baker Rd., Wairamarama Onewhero Rd., Matakitaki Rd., Highway 22;
and Otuiti Rd.

Most roads are winding, unsealed and of insufficient width to accommodate


underground cables of the required capacity

Waikato Wind Farm – Undergrounding Study - Attachment No. 1 To Consolidated Report – March 2008
5
In particular, Baker Rd. [Photos 4 & 5], Wairamarama Onewhero Rd. and
Matakitaki Rd. are totally unsuitable for excavation of the required size cable
trench and installation of large capacity power cables without road upgrading.

Below are shown typical examples of roadways:

Photo No.4 Photo No.5

Waikato Wind Farm – Undergrounding Study - Attachment No. 1 To Consolidated Report – March 2008
6
There are issues with:
• Extended road closures for many weeks or even months continuously, with no
alternative routes available for other road users, during excavating 700 meter
long sections of trench at a time, installing cables, back-filling & reinstating
the area.

• Sections of road barely four metres wide requiring considerable upgrading to


accommodate conditions for cable installation – refer Section 5.

• The composition (high thermal resistivity) of the native ground (beneath the
gravel) – requiring vast quantities of special cable bedding to be obtained and
transported to site – (further road closures).

Installation of an underground cable in existing public roadways using the most


direct route (Baker Rd., Wairamarama Onewhero Rd., Matakitaki Rd., Highway
22; and Otuiti Rd) is feasible. However, Baker; Wairamarama Onewhero and,
Matakitaki Roads would require significant widening to accommodate
construction of a 220kV cable installation. No alternative road options were
considered due to extensive distances involved.

To underground the total 38.3km route without road widening is impractical


considering the size & weight of machinery involved for the project - refer Section
5.2.

Even if road widening was undertaken significant traffic disruption and public
inconvenience could still be expected during cable installation.

The situation is substantially improved closer to Orton where roads are wider and
generally sealed.

3. REVIEW OF OVERSEAS TRENDS IN HIGH VOLTAGE


UNDERGROUND CABLING PRACTICES

Recent developments in high voltage cable technology that make


undergrounding cable installation projects more practical and cost effective
include:

Waikato Wind Farm – Undergrounding Study - Attachment No. 1 To Consolidated Report – March 2008
7
a) Use of polymeric insulated cables, including polyethylene (PE) and cross-
liked polyethylene (XLPE) in lieu of paper insulated pressure assisted
cable types.
Significant savings in manpower and installation & maintenance times are
achieved through the use of polymeric cables.
The absence of impregnating fluid in paper insulated fluid-filled cable has
eliminated the possibility of potential environmental issues arising out of
fluid leaking from faulty or damaged cables.
b) Introduction of pre-fabricated joints and terminations specific to polymeric
cables - reducing complexity of installation and time.
Laborious application of taping insulated layers in jointing operations has
been replaced with assembling of pre-fabricated and pre-tested
component parts.

c) Use of mechanised systems for cable laying including motorised rollers,


hauling machines and winches all integrated via a computerised
monitoring system to control longitudinal & radial stresses during laying
operations.

d) Directional drilling and micro-tunneling


These methods eliminate expensive and time consuming deep trench
excavations to overcome natural and man-made obstacles

e) Special laying methods for use in unstable ground conditions for example
flexible troughing and bedding materials.

f) Modular, transportable jointing enclosures with associated facilities


including humidity, temperature & dust control and in-built facilities to
handle heavy components.

Waikato Wind Farm – Undergrounding Study - Attachment No. 1 To Consolidated Report – March 2008
8
4. COSTS AND CHARACTERISTICS PERTAINING TO 220KV
UNDERGROUND CABLE OPTIONS

4.1. Cost and basis for calculation

Prysmian provided cost estimates and technical data for supply and installation of
single and double circuit underground 220kV cables – refer Appendices 2 and 3.

Recent projects tend to suggest that the cost of civil works equates to the cost of
cable and accessories especially in difficult environments.

The abovementioned data is used in the following cost estimates:

a) Cost of underground cable circuits in existing roadways in existing


conditions between Limestone Downs and Orton 220kV Switching Station, route
length 38.3km :

CABLE CIRCUIT TYPE INITIAL COST (M$NZ) WHOLE OF LIFE COST


(M$NZ)

SINGLE 278(*) 298

DOUBLE 367(*) 387

(*) The cost estimates do not take into consideration the cost of necessary road
upgrades to meet cable installation conditions. It is estimated that the cost of
such road upgrades could be in the vicinity of half the “Initial Costs” stated above
albeit that a separate civil engineering review of road upgrades is required.

b) Cost of single or double circuit underground cable through green field sites
was not undertaken due to lack of data associated with costs of civil works
(bridges, directional drilled ducts, etc) that will be necessary to meet cable
installation conditions.
In addition to the abovementioned total undergrounding options between
Limestone Downs & Orton a partial undergrounding option in the vicinity of Orton
was also evaluated refer cost estimated (c) & (d) below.

Waikato Wind Farm – Undergrounding Study - Attachment No. 1 To Consolidated Report – March 2008
9
c) Initial capital cost of single circuit underground cable in predominantly
sealed roads (Orton 220kV Switching Station to Orton Transition Point, route
length 8 km): M$NZ58

d) Initial capital cost of double circuit underground cable in predominantly


sealed roads (Orton 220kV Switching Station to Orton Transition Point, route
length 8 km): M$NZ76

4.2. Cable losses

Cable losses were calculated from information provided by Prysmian (refer


Appendix 2) and included in the NPV calculations below.

NET PRESENT VALUE UNDERGROUND CABLE


SINGLE CIRCUIT 600 MVA
6
Ci.ug := 278 ⋅ 10 Initial Investment for Underground Cable ($ NZ)
6 Operational costs for underground Cable including
C o.ug := 1.137 ⋅ 10
losses and maintenance per annum ($ NZ)
3
C f.ug := 20 ⋅ 10 Fault costs for underground Cable per annum ($
NZ)
i := 5% Capitalisation Index
n := 40 Evaluation period 40 years -effective life of the
system

n j
1
NPVug := Ci.ug+ ( )
Co.ug+ Cf.ug ⋅
1+i
j=1

6
NPVug = 297.853 × 10

Waikato Wind Farm – Undergrounding Study - Attachment No. 1 To Consolidated Report – March 2008
10
DOUBLE CIRCUIT 2 X 400 MVA
6
Ci.ug := 367 ⋅ 10 Initial Investment for Underground Cable ($
NZ)
6
C o.ug := 1.137 ⋅ 10 Operational costs for underground Cable
including losses and maintenance per annum
($ NZ)
3
Cf.ug := 20 ⋅ 10 Fault costs for underground Cable per annum
($ NZ)
i := 5 % Capitalisation Index

n := 40 Evaluation period 40 years -effective life of


the system

n j
1
NPVug := Ci.ug + ( )
Co.ug + Cf.ug ⋅
1+i
j=1
6
NPVug = 386.853× 10

Waikato Wind Farm – Undergrounding Study - Attachment No. 1 To Consolidated Report – March 2008
11
4.3. Availability

Outages of underground cables are generally caused by third party damage, bad
workmanship during cable installation & jointing or manufacturing defects.
Outages to underground cables are usually extensive and require significant
repair time before they can be restored to service.

4.4. Reliability and repair times

Reliability is significantly affected by quality of materials, quality of workmanship


during installation & maintenance.

The incidence of underground cable faults is low, but outages are of long duration
due to repair times involved refer to example below:

Example:

Considering the most likely condition i.e. third party damage to one of three single
core cables in a cable circuit – the following actions are involved:
o Fault location and site assessment
o Mobile plant & personnel, excavate fault location & assess damage,
cut & cap cable
o Excavate trench & two joint bays
o Concrete joint bay slabs and install joint bay cover
o Transport to site cable & joints
o Lay & joint cable
o Bedding, back-filling, mechanical protection of cable & joints
o Electrical tests
o Reinstate area

Total time to repair a single fault, assuming availability of spares and local 220kV
jointers is estimated at 200 to 300 hours.

Waikato Wind Farm – Undergrounding Study - Attachment No. 1 To Consolidated Report – March 2008
12
4.5. Efficiency

The efficiency of a transmission system is dependent on electrical losses.

For underground cables, in addition to Ohmic losses, there are other component
losses dependent on cable configuration (single-core cables) and type of
bonding system of cable metallic sheaths or/and screens.

The basic concept of management of cable losses is presented in Appendix 6

4.6. Maintenance – XLPE insulated cables

Contrary to some popular perception underground transmission cables,


regardless of type, do require regular maintenance including:

o Perform electrical tests to verify integrity of anti-corrosion jacket:


2 x 2 mandays/pa
o Perform electrical tests to verify cross-bonding system including sheath
voltage limiters, link boxes and local earthing:
2 x 2 mandays/pa
o Inspect all above ground structures, cable termination supports, bridges,
cable route markers & general route patrol: 1 manday/pa
o Inspect termination including thermo-vision checks: 1 manday/pa
o Partial discharge tests; 2 x 5 mandays/pa
o Verify & interrogate/evaluate performance of DTS (distributed temperature
sensing) system: 2mandays/pa
Total:
o 8 km single circuit route: 22 mandays/pa @ $NZ60/hr = $NZ 11,000/pa
o 8 km double circuit route: 42mandays/pa @ $NZ60/hr = $NZ 21,000/pa
o 38.3 km route: 106 mandays/pa @ $NZ60/hr = $NZ 53,000/pa

Waikato Wind Farm – Undergrounding Study - Attachment No. 1 To Consolidated Report – March 2008
13
4.7. Electromagnetic field (EMF)

• For comparative circuit loads underground cables exhibit significantly higher


levels of magnetic fields in comparison to overhead lines. Field reduction
techniques, including special configuration of single core cables and shielding
methods can reduce levels by up to around 10 to 20%

• Underground cables exhibit no external electric field

The magnitude of magnetic field intensity [milliGauss] or [micro-Tesla] is not


related to the cable type, conductor size or metallic sheath. The geometric
arrangement of single-core cables plays a major role in EMF – magnetic field
intensity.

The single-core cables could be installed in trefoil, flat or “L” touching or spaced
formations.
Magnitude of EMF [mG] [mG]

1000
One circuit Single Circuit
600MVA/1420A
Reference
100

10

1
-20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 12 14 16 18 20

0.1

x - axis [m] - Lateral distance from cable circuit


Magnetic field magnitude produced by a single cable circuit carrying 600MVA

The trefoil touching formation produces the lowest level of magnetic field.

In case of double circuit the forward phase sequence phase sequence (R-Y-B /
B-Y-R) generates smaller magnetic field than (R-Y-B / R-Y-B) phase sequence.

Waikato Wind Farm – Undergrounding Study - Attachment No. 1 To Consolidated Report – March 2008
14
In this case, if the two circuits are in close proximity, the magnetic field intensity is
smaller that that produced by a single circuit.

Internationally there is not a consensus on magnetic field exposure levels.


Magnitude of EMF{mG] [mG]

1000
One circuit
two circuit
Reference 100

10

1
-2 -1 -1 -1 -1 -1 -8 -6 -4 -2 0 2 4 6 8 10 12 14 16 18 20
0 8 6 4 2 0
0.1
x - axis [m] - Distance from the median axis
Magnetic field magnitude produced by a double cable circuit carrying
400MWA (360MW) /1050A

4.8. Easements

• High voltage cables require easements, 6 metres wide, along the entire
cable route for the safe operation and access for maintenance & repairs.
Easement conditions apply.

Generally easements restrictions include:


o No buildings or other built encroachments

o No stored materials that affect heat dissipation from cables

o No deep rooted vegetation

o No inflammable materials

o No earthworks without prior asset owner approval

o Unrestricted access

Waikato Wind Farm – Undergrounding Study - Attachment No. 1 To Consolidated Report – March 2008
15
4.9. Reactive power compensation – Critical length of cable
circuit

In cases involving long cable circuits, the compensation of charging current


requires installation of shunt reactors connected at one end or both end of cable
circuits which are selected based on specialised system studies by taking into
consideration cable specific data and system parameters.

In consideration of a 38.3km long cable the effects of reactive power


compensation with respect to critical length was evaluated – refer Appendix 7.

From that evaluation it is concluded that the capacitive charge has no noticeable
impact on cable rating capacity.

5. CONSTRUCTION TIME FRAME – CASE STUDIES

A time line outlining actual installation works shall be prepared once detailed local
site conditions are established; however, the following guidelines apply for a large
capacity, single circuit underground cable installation:

5.1 Single circuit: Orton 220kV Switching Station (along Otuiti


Rd) to OH/UG transition point near Fleming Rd., 8.7 km
route length

The main activities & estimated times are as per Table following table:

Waikato Wind Farm – Undergrounding Study - Attachment No. 1 To Consolidated Report – March 2008
16
Construction activities and time estimates

Task Time Involved


Per 650metre
cable section
Excavate & remove spoil from site 2 weeks
Trench shoring & apply steel plates at road crossings concurrent
Construct joint bay 1 week
Place & compact cable bedding material 1 week
Pull in 3 power cables, evenly spaced and fixed in position 1 week
Pull in communication & DTS cables concurrent
Jointing operations concurrent
Place and compact controlled backfill 1 week
Install protective concrete cable covers & warning tape concurrent
Perform electrical tests to confirm integrity of cable sheath 1 day
Remove shoring material & steel plates at road crossings 2 days
Place and compact controlled backfill over slabs up to road base 1 week
level
Place & compact road base 1 week
Restore roads to initial condition 2 days
Apply cable markers as appropriate concurrent
Commissioning tests 2 days
Total time for the first cable section 7 weeks
Total time: Orton 220 kV switching station (along Otuiti Rd.) to 14 months
OH/UG Transition Point near Fleming Rd. 8.7 km
Following the first section a series of activities would be
performed concurrently on multiple sections leading to a total
estimated time for
14 cable sections of 56 weeks

5.2 Double circuit: Orton 220kV Switching Station (along Otuiti


Rd) to OH/UG transition point near Fleming Rd., 8.7 km
route length

The main activities are as for Section 7.1 with estimated total time 18 months

Waikato Wind Farm – Undergrounding Study - Attachment No. 1 To Consolidated Report – March 2008
17
5.3 Orton 220kV Switching Station – Limestone Downs
33/220kV Substation – 38.3km route length

Total time: 33 months utilising two construction teams – taking into account the
following issues with this route:

o Road widening necessary in particular Baker Rd., Wairamarama


Onewhero Rd. & Matakitaki Rd.
o Wider than normal trench excavations at ridge tops to compensate for dry
conditions & higher thermal soil resistivity
o Wider than normal trench excavations to snake cables in trench to
compensate for land slips / unstable grounds
o Export excavated soil to designated dumping areas and imports an equal
amount of bedding, back-filling and road restoration material.
o Long distance from quarry to source special back-fill materials
o Lengthy road closures with no alternative routes for residents

6. REFERENCES
1. Electric Cables Handbook (BICC Cables)
2. Underground Transmission Systems Reference Book – Power
Technologies, Inc
3. Rating of Electric Power Cables – George J Anders
4. General Guides for the Integration of a New Underground Cable System in
the Network CIGRE SC21
5. Maintenance for HV Cables and Accessories CIGRE TB 279 - Working
Group mB1.04
6. Construction, Laying and Installation Techniques for Extruded and Sel-
contained Fluid-filled Cable Systems – CIGRE TB 194 Working Group
21.17 /October 2001
7. Comparison of High Voltage Overhead Lines and Underground Cables –
CIGRE Report JWG 21/22-01
8. Budget estimate to supply and install 220kV cable (Prysmian)

Waikato Wind Farm – Undergrounding Study - Attachment No. 1 To Consolidated Report – March 2008
18
9. Cable technical information including losses (Prysmian)
10. Magnetic Field In HV Cable Systems Without Ferromagnetic Component –
CIGRE Technical Brochure 104

7. APPENDICES

Appendix 1: Scope for undergrounding study


Appendix 2: Cable technical information including losses (Prysmian)
Appendix 3: Budget estimates. Supply and install 220kV cables (Prysmian)
Appendix 4: Topographical maps showing the investigated cable routes
Appendix 5: Comparison between installing 220kV U/G transmission cables
and other U/G services
Appendix 6: Current rating and losses of HV power cable systems
Appendix 7: Reactive power compensation
Appendix 8: Curriculum Vitae

Waikato Wind Farm – Undergrounding Study - Attachment No. 1 To Consolidated Report – March 2008
19
Appendix 1

Scope for Undergrounding Study


Background

Contact Energy (CEN) plans to construct a purpose-built transmission line to


transport electricity output from a new windfarm on the west coast of the Waikato
region to the main grid connection. The detail of this project is contained in the
final draft Project Description document prepared for the purposes of applying for
Resource Consents under the Resource Management Act. A copy of this report
is attached to this scope.

The transmission lines both for internal lines, interconnecting the substations and
for the main line are proposed to be 220 kV. Current plans are for the internal
lines to be single circuit on pole construction, and the external line will be double
circuit on tower construction.

CEN has received submissions from some landowners whose properties will be
traversed by the proposed transmission line. Several landowners are opposed to
overhead cabling and want the company to instead install underground cabling.

CEN is open-minded on this issue and has undertaken to seek expert advice on
the practicability of undergrounding and comparisons between the two
alternatives.

The company is not an electricity lines business and is not therefore constrained
by any New Zealand statutory regulation governing the pricing aspects of its
transmission lines. Instead CEN operates in a competitive market for the pricing
of its daily offer of electricity generation. CEN does not have any material
existing investment in overhead transmission assets, nor an inventory to support
such infrastructure.
The company requires an in-depth study of the benefits and disbenefits of
underground transmission lines versus overhead lines. The study should
address the following matters.

Scope of Study

• Analyse the preferred route in the context of terrain, geotechnical and any
other issues that would impact upon the practicability of underground
cabling of 220kV circuits;

• Consider whether a more efficient and lower cost route could be adopted
for an undergrounding project such as, for example, burying cable along
existing roading networks;

• Review overseas trends in underground cabling practices in developed


countries and assess any recent improvements in technology that make
undergrounding comparatively more practicable than in the past;

• Prepare typical installation concept (e.g. typical installation cross sections


of key aspects of the cables and terminal stations).

• Prepare an indicative route based on available contour data which would


provide at least the equivalent reliability, redundancy and functionality of
the alternative proposed overhead line.

• Compare and contrast advantages and disadvantages including such


aspects as:
o reliability,
o efficiency,
o maintenance,
o environmental impacts of the installation and ongoing operations
e.g. trenching, radiation effects etc
o typical easement width required to install and then operate,
o any restriction on the land during operations,
o construction timeline,
o installation techniques,
o equipment transport issues of undergrounding concept versus
overhead line in the context of this specific project; and

• Provide an estimate of the comparative costs of either methodology


assuming that most recent technology is adopted for undergrounding and
the optimal corridor is chosen to implement such an alternative. The
assessment should include, if possible, an assessment of comparative
ongoing maintenance costs, and possible incremental revenue arising
from lower transmission losses that might arise from the selection of one
or other alternative.
Appendix 2

Cable technical information including losses


(Prysmian)
TECHNICAL ASSESSMENT - 2

1 INTRODUCTION
Further to our assessment of December 2007, we have been asked to consider a revised requirement, for
only one circuit, between Limestone and Orton, of which approximately 8km would consist of underground
cables.
The specified ratings for this circuit are:
• single group of cables carrying 600MVA
or
• two groups of cable each capable of carrying 400MVA.
We have assumed installation conditions the same as those that have been specified for other projects in
New Zealand.
When assessing the number of sections of cable, we have assumed nominal lengths of approximately
500m and the need to have a balanced cross-bonded system.

2 MAIN PLANT CHARACTERISTICS


The following main electrical, laying, environmental and operating data were specified or assumed:

3.1 Electrical data


Nominal rated voltage (specified) 220 kV
Power frequency (known) 50 Hz
Phase – phase short circuit (assumed) 40 kA for 1 second
Phase – earth short circuit (assumed) 40 kA for 1 second
Maximum conductor temperature (assumed) 90 °C
Current ratings 1575 A (600MVA)
or
2 × 1050 A (2 × 400MVA)

3.2 Installation conditions


We have assumed the following parameters when assessing the ratings of the cables:
Depth to top of cables 1000 mm
Maximum ground temperature 25 °C
Thermal resistivity of cable surround & trench backfill 1.2 °C.m/W

Client: Contact Energy January 2008


Project Name: New Zealand North Island Wind Farms 220kV
Subject: Technical Assessment 2 1 Revision 0 – Prepared: JMO
3 220kV CABLE DESIGNS
We have assumed that the 220kV cables would be manufactured at our factory in Gron, France, our centre
of excellence for extra-high-voltage power cables. A typical cross-section is shown at the end of this
document.
The significant features of the cables would be:

4.1 Conductor
Copper, Milliken construction, complying with IEC 60228 Class 2, with oxidised wires where required to
reduce the skin effect for conductors larger than 1600mm².

4.2 Conductor Screen


Extruded semi-conducting compound would be bonded to the insulation and applied in the same operation
as the insulation.

4.3 Insulation
Extruded cross-linked polyethylene (XLPE) suitable for operation at a maximum conductor temperature of
90°C. The insulation would be made of dry cured extruded cross-linked polyethylene (XLPE), extruded
simultaneously with the semi conductive conductor and core screen (triple head extrusion).

4.4 Insulation Screen


Extruded semi-conducting compound applied in the same operation as the insulation. The insulation screen
layer would be firmly bonded to the insulation.

4.5 Metallic Sheath and Screen


A welded aluminium sheath, with copper wire screen underneath if required to assist in carrying the phase-
earth short circuit.

4.6 Anti-corrosion sheath


The anti-corrosion protection consists of an extruded polyethylene oversheath.

4 220kV TERMINATIONS
We do not know what terminations would be required but we assume that they would be outdoor sealing
ends.
A drawing of a typical outdoor sealing end, with a polymeric insulator, is shown at the end of this document.

5 220kV JOINTS
The buried joints would have sectionalising insulation to enable the cable cleats to be cross-bonded, and
would be installed on reinforced concrete bases.
The GRP casing of the joint would be filled with a compound suitable for the prevailing conditions, e.g. the
depth of the water table.
A drawing of a typical joint is shown at the end of this document.

Client: Contact Energy January 2008


Project Name: New Zealand North Island Wind Farms 220kV
Subject: Technical Assessment 2 2 Revision 0 – Prepared: JMO
6 REQUIRED CABLE SIZES AND INSTALLATION

6.1 600MVA Circuit


Cables with 2000mm² Milliken conductors would be adequate for the specified rating.
The cables would be installed in flat formation, at 300mm between cable centres.

6.2 2 × 400MVA Circuit


Cables with 1200mm² Milliken conductors would be adequate for the specified rating. Copper wires would
be required in addition to the welded aluminium sheath.
The cables would be installed in flat formation, at 250mm between cable centres.
The groups would be installed with a minimum of 1000mm between centres, i.e. 500mm between the
adjacent cables of the two groups.

6.2.1 Rating of Single Cable Group


A single group of cables, operating thermally independently, would be rated at 1220A, equivalent to
465MVA.

6.3 Adjacent services or increased depths


Should the cables be installed close to other services, e.g. power cable circuits generating significant heat
or large pipes which inhibit heat flow, or if it were necessary to install the cables at depths significantly
greater than 1000mm, e.g. when crossing roads, the spacing between the cables could be increased to
maintain the rating capacity.

7 LOSSES

7.1 600MVA Circuit


The conductor temperature would be 90ºC and the losses, for the circuit, would be:
Conductor losses 95.8 W/m
Sheath losses 8.0 W/m
Dielectric losses 3.9 W/m
Total losses 107.7 W/m

7.2 2 × 400MVA Circuit


Conductor losses 2 × 65.7 W/m
Sheath losses 2 × 3.6 W/m
Dielectric losses 2 × 3.2 W/m
Total losses 2 × 72.5 W/m
= 145.0 W/m

Client: Contact Energy January 2008


Project Name: New Zealand North Island Wind Farms 220kV
Subject: Technical Assessment 2 3 Revision 0 – Prepared: JMO
8 SHEATH BONDING AND EARTHING
The metallic sheaths of the 220kV cables would be cross-bonded.
At the terminations the sheaths would be solidly bonded and earthed, either by three-way or 3-off single-
way link boxes and single core 300mm² bonding leads.
At every third joint bay the sheaths would again be solidly bonded and earthed, this time by buried 3-way
link boxes and concentric 300mm² bonding leads.
At the other joint bays the sheaths would be cross-bonded by buried three-way link boxes containing sheath
voltage limiters, again connected with concentric 300mm² bonding leads.
A typical cross-bonding diagram, for the Waikawau – Limestone, is shown at the end of this document.

Client: Contact Energy January 2008


Project Name: New Zealand North Island Wind Farms 220kV
Subject: Technical Assessment 2 4 Revision 0 – Prepared: JMO
9 SECTION LENGTHS AND SCHEDULE OF QUANTITIES
In order for the cross-bonding system to work correctly the circuits should be divided into a number of major
sections, each consisting of three minor sections.
We suggest that the 600MVA circuit would consist of 15 sections of 535m and the 2 × 400MVA circuit of 12
sections of 665m.

9.1 Schedule of Quantities

Item Detail 600MVA Circuit 2 × 400MVA Circuit


1200mm² - 72 × 665m
220kV cable
2000mm² 45 × 535m -
Terminations Not specified 6 12
Joints Sectionalised 42 66
3-way 2 4
Link box 3-way buried 4 6
3-way cross-bonding 10 16
Single-core 300mm² 130 230
Bonding lead
Concentric 300mm² 420 660

10 CABLE AND DRUM MASSES


The estimated masses are:

10.1 600MVA Circuit


2000mm² cable 28.8 kg/m
535m of cable 15.4 tonnes
Drum 2.5 tonnes
Gross mass of cable and drum 17.9 tonnes

10.2 2 × 400MVA Circuit


1200mm² cable 20.1 kg/m
665m of cable 13.4 tonnes
Drum 2.5 tonnes
Gross mass of cable and drum 15.9 tonnes

Client: Contact Energy January 2008


Project Name: New Zealand North Island Wind Farms 220kV
Subject: Technical Assessment 2 5 Revision 0 – Prepared: JMO
11 DRAWINGS

11.1 220kV Cable


This drawing shows a cross-section of a cable with a 1200mm² conductor.
Voltage Conductor Size Insulation : Max. Stress Earth Fault Current
220kV 1200mm² XLPE 8.9MV/m 40kA for 1s

Diagrammatic only - Not to scale

Nominal Nominal
Item Description Thickness Details Diameters
(mm) (mm)
1 Conductor - Copper Milliken 43.5
2 Binder - - -
3 Conductor Screen - Semi-Conducting Compound -
4 Insulation 19.5 XLPE 87.0
5 Insulation Screen - Semi-Conducting Compound -
6 WaterblockingTape - - -
7 Wires 1.075 98 Copper Wires 94.8
8 Equalising Tape - Copper -
9 Waterblocking Tape - - -
10 Metallic Sheath 1.2 Welded Aluminium 98.4
11 Oversheath 5.0 Polyethylene & Graphite 110.6

Client: Contact Energy January 2008


Project Name: New Zealand North Island Wind Farms 220kV
Subject: Technical Assessment 2 6 Revision 0 – Prepared: JMO
11.2 220kV Termination
This drawing shows an outdoor sealing end with a polymeric insulator.

Client: Contact Energy January 2008


Project Name: New Zealand North Island Wind Farms 220kV
Subject: Technical Assessment 2 7 Revision 0 – Prepared: JMO
11.3 220kV Joint
This drawing shows sectionalised joint and casing.

Client: Contact Energy January 2008


Project Name: New Zealand North Island Wind Farms 220kV
Subject: Technical Assessment 2 8 Revision 0 – Prepared: JMO
Schematic Bonding Diagram
600MVA Circuit

B X X S X X S X X S X X S X X B

Detail at solid Detail at cross- Detail at solid-


bonding positions bonding positions bonding positions
‘B’ ‘X’ ‘S’

Sectionalised 220kV Concentric Single core Solid-bonding


Termination Cross-bonding Solid-bonding
joint 2500mm² core 300mm² 300mm² B link box at X S
link box link box
XLPE cable bonding lead bonding lead terminations

Client: Contact Energy January 2008


Project Name: Contact Energy New Zealand Wind Farms 220kV
Subject: Schematic Bonding Diagram - Limestone to Orton 600MVA Revision 0 – Prepared: JMO
Schematic Bonding Diagram
2 × 400MVA Circuit

B X X S X X S X X S X X B

B X X S X X S X X S X X B

Detail at solid Detail at cross- Detail at solid-


bonding positions bonding positions bonding positions
‘B’ ‘X’ ‘S’

Sectionalised 220kV Concentric Single core Solid-bonding


Termination Cross-bonding Solid-bonding
joint 1200mm² core 300mm² 300mm² B link box at X S
link box link box
XLPE cable bonding lead bonding lead terminations

Client: Contact Energy January 2008


Project Name: Contact Energy New Zealand Wind Farms 220kV
Subject: Schematic Bonding Diagram - Limestone to Orton 2 × 400MVA Revision 0 – Prepared: JMO
Appendix 3

Budget estimate: Supply and install 220kV cable


(Prysmian)
Appendix 4

Topographical Maps Showing


Investigated Routes
Appendix 5

Comparisons between installing 220kV underground


transmission cables and installing other longitudinal
infrastructure for example, high pressure gas or water
pipe lines; underground distribution cables and
communication cables

Installation requirements and provision for maintenance & repairs differ


significantly between those for extra high voltage (220kV) underground
transmission cables and lower voltage underground distribution cables;
underground communication cables and high pressure gas or water pipe lines.

There are also variations in easement requirements and easement conditions

In simple terms:

Metallic or polymeric (plastic) gas or water pipes are transported to site and laid
in manageable sections (and manageable weights) and welded, or otherwise
connected together, as trench excavation progresses.

Trenches are narrow and, other than a bedding comprised of sand (to protect the
outer surface of pipes) there are no special trench excavation or back-filling
requirements.

Similar installation conditions to those for gas & water pipes may apply for lower
voltage underground distribution cables and communications cables (whether
electric or fibre optic). These are often laid in ducts.

Trenches are narrow (the width of a small back-hoe bucket) and other than for
sand bedding there are no special trench excavation or back-filling requirements.
In the case of extra high voltage underground power cables (including 220kV)
there are factors that impose significant differences in installation & maintenance
requirements to those for water or gas pipes or lower voltage circuits namely:

1. Dissipation of heat generated by underground cables.


As underground cables transmit energy (in this case from the wind farm to the
main grid) the cables generate heat which, if not efficiently dissipated, will cause
the cables to over-heat and eventually fail. (This was precisely one of the
contributing factors that led to the cable failures and eventual black-outs in
Auckland in 1998)

Soil samples taken from site in the Limestone Downs – Orton area are estimated
to have a high thermal resistivity – meaning the soil will impose a barrier to heat
wanting to escape from the cables to the surface. This shall be confirmed by
thermal resistivity test on site & in laboratory prior to proceeding with the project.

Well accepted practice, world wide, is to improve this situation by bedding and
covering the cables with a controlled medium comprised of a weak mix of sand
and cement. (Refer diagram below)

Vast quantities of this mix (equivalent to excavated spoil) would be required


adding substantial costs and transport difficulties in acquiring, delivering, placing
& compacting it over the entire cable route.

Typical cable installation in trench with cables in flat formation


2. Installing and jointing cables

Cables of this size and voltage are not manufactured in New Zealand. Each
cable drum, containing around 700metres of cable and weighing up to 20 Tones,
would require to be transported from Auckland on multi-wheeled vehicle to sites
at 700 m intervals, there to be “craned off”, winched/pulled into position (in the
cable trench), then to be bedded & covered with protective concrete cable covers
and special backfill and then to be jointed in a controlled environment in what is
known as a “joint bay” comprising a tented enclosure of the size, and with
features, as shown below. The duration of works associated with Joint bays
(construction and cable jointing) could be as long as 3 to 4 weeks.

Joint bay (4m x 12m) in roadway Interior of joint bay prior to jointing
(Would exceed width of Baker Rd.
in places)

3. Managing cable sheath losses


At transmission voltages, including 220kV, special bonding techniques termed
“cross bonding” provide the only practical means to mitigate losses in outer
metallic sheaths of underground power cables. (For technical explanation refer to
Appendix 6)

Cross bonding systems include surge arrestors and other equipment mounted in
underground link boxes that require testing at regular intervals (usually annually).
For that purpose that equipment is located within pits as shown below which, for
ready access and safety to testing staff, are located away from trafficable roads
in footpaths – see below.

Link box U/G concrete pit

Baker, Wairamarama and Matakitaki Rds. would present considerable challenges


in that they are very narrow and in many cases bounded by steep drops on one
side and steep inclines on the other where they are carved into mountain sides –
see Photos No 4 & 5 in Attachment No.1 to Consolidated report.

In these situations there would be no alternative but to install link pits together
with joint bays and pits for optic fibre cables (if fibres were to be part of the cable
installation) in road ways.
Appendix 6

Current rating and electrical losses of high


voltage power cable systems

1. Cable Rating Influencing Factors

The current rating of high voltage (HV) underground (U/G) power cable circuits is,
primarily, influenced by the environmental factors and cable losses.

Both factors are fully considered for determination of cable type and installation
particulars by taking into consideration the economic aspects related to the cost of
materials, installation of cable and accessories, running cost (whole life cost),
capitalised cost of losses and ancillary equipment such as bonding, condition
monitoring systems and compensating equipment.

a. Environmental Factors

The most specific factors which have a greater impact on cable current rating or
loading capacity are as follows:

• Air and soil maximum ambient temperature

• Soil thermal resistivity (TR) under the most severe climatic conditions in
respect to water (humidity) content

b. Installation Particulars

Extra high voltage (EHV) power cable circuits (including 220kV) are
manufactured in form of single-core cables which could be installed in trefoil or
flat formations.
The installation option is selected to correlate the cable type /conductor size with
the environmental parameters to get the required cable carrying capacity.

Fig1: Typical installation configuration of single-core power cables in trefoil


formation

This type of cable configuration has the advantage of minimising the sheath
circulating currents induced by the magnetic flux linking the cable conductors and
metallic sheath or copper wire screens. This configuration is generally used for
cables of lower voltages (33 to 132kV) and of smaller conductor sizes

However, for EHV cable systems the trefoil formation is not appropriate for heat
dissipation because there is an appreciable mutual heating effect of the three
cables.

The cumulated heat in cables and cable trench has the effect of reducing the cable
rating and accelerating the cable ageing

In order to improve the natural heat dissipation from around the cable circuits the
three single-core cables could be installed in flat formation (Fig2). This
configuration allows for a significant increase of current rating of EHV cable circuits.
Fig. 2: Typical installation configuration of single-core power cables in flat
formation

In Fig. 2 are shown the CMS (condition monitoring system) and


communication cables installed between the 220kV single-core power
cables.

In addition, to the centre power cable is attached the DTS (distributed


temperature sensing) optical fibre cable. Both the DTS and CMS are
designed to continuously monitor the cable and environment temperatures
and to perform other supervisory functions as well

The installation of cables in flat formation requires special bonding solutions


of cable metallic sheaths to reduce/eliminate the circulating currents.

Nevertheless, in case of unfavourable environmental conditions related to


soil thermal characteristics or of ambient temperature the sole application of
flat configured cables and of special bonding system may not provide the
expect result and as a consequence the following techniques should be
employed to achieve the required current rating:
• Replace a certain amount of soil adjacent to the excavated cable
trench with aggregates or imported soils of suitable thermal resistivity.
• Use of specialised bedding and backfilling materials such as:
 Sand/cement mix of 14: 1, 20:1 or of other proportions
 Fluidised backfill
 Blended sands or crushed rock of variable gain sizes
• All ducts and micro tunnels be filled with bentonite and respectively
light concrete
• Artificial cooling
• Particular installation configurations of single-core cables or of cable
circuits within a given cable corridor
• Special bonding system of cable metallic sheaths designed to reduce
the electric losses
• Install double cable circuits in a single or adjacent trenches or other
applicable site conditions

2. Electrical Losses

Under service conditions, regardless of magnitude of transported the power


cables are subjected to electrical losses manifested as heat in insulation and
metallic components.

Based on the location were they are generated and the generation cause the
electrical losses could be qualified as current and voltage-dependent losses.

The current-depending losses are generated in cable conductors, metallic sheath


or/and metallic wires designed to carry fault currents

For a simplified cable system (land cable circuit) the three main cable
component responsible for electrical losses are the conductor(s), the insulation
and the metallic sheaths or/and the metallic wire screens.
2.1 Conductor Losses

Conductors losses are ohmic losses, i.e. heat (Watt/meter) generated by the
current flowing in the cable conductor(s) and are calculated with the following
formula:

Wc = I2 Ra.c

I = current flowing in the conductor (A)

Ra.c = A.C. electrical resistance (Ω) of conductor at given temperature (°C)

The A.C. electrical resistance (Ω) is dependent, in addition to the D.C resistance
(Rd.c) on skin (ys) and the proximity (yp) effects which are responsible for the
uneven distribution of load current across the conductor cross sectional area, so
the Ra.c resistance could be defined as:

Ra.c = Rd.c (1 + ys + yp)

Rd.c = Ro [1 + α20 (Θ – 20)]

Ro = D.C electrical resistance at 20°C

α20 = Constant mass temperature coefficient at 20°C per Kelvin

Θ = maximum operating temperature (°C)

Skin effect (ys ) is attributed to the variation of conductor self-inductance which


is greater to the centre of the conductor than to its periphery and as a
consequence the current flow is maximum at the conductor surface and minimum
at the conductor core This phenomenon is one cause of increased A.C.
resistance of conductors.

Proximity effect (yp) is generated by the magnetic field produced by the currents
flowing in parallel cable conductors of another cable circuit or other parallel
current carrying conductors. The associated magnetic field embraces that
conductor and at the same time it encircles the parallel conductors in close
proximity.
The effect is explained by the fact that when two conductors carrying alternating
current are parallel and in close proximity, the current densities on the inner area
(side facing each other) are smaller than the current density flowing in the outer
area (remote side) of the conductors due to the difference in magnetic flux
densities cutting the conductor’s cross area.

So, the A.C. conductor resistance is defined by the D.C resistance and the skin
and proximity factors as indicated by the following formula:

Ra.c = Rd.c (1 + ys + yp)

The calculation of skin (ys) and proximity (yp) effect factors is based on the
empirical formula given in the IEC 60287 Standard

The proximity effect factor (yp) is determined by the cable D.C. resistance,
system frequency, cable spacing and cable diameter while the ys is influenced
only by conductor d.c resistance and system frequency:

ys = ƒ (R’ , f)

yp = ƒ (dc , R’, s , f)

The skin and proximity effects could be ignored for small conductors carrying low
currents, however for high rating cables requiring large conductors these effects
are significant and it is essential to include design feature to compensate their
effect.
The “Milliken” or “Segmental” conductors, which consist of several individually or
alternated insulated sector shaped strands, provide the desired solution (Fig. 3).

Cable Cable
conductor Insulation
(Milliken)

Fig. 3: Milliken Cable Conductor (Fluid–filled Cable System)

The modern technologies apply a layer of enamel or Cu oxide on individual wires


forming the sector shaped strands.

The economic justification of this type of conductor is validated when using


cables of minimum 800mm2

2.2 Dielectric and Charging Current Losses

A power cable is a large capacitor of certain capacitance characterised by


dielectric constant (ε) and electrical resistance. The two parameters and the
magnitude and frequency of applied voltage determine the magnitude of charging
current and dielectric losses.

Both, the charging current and dielectric losses are voltage-dependent and they
are generated in cable insulation at any time the cable is connected to the grid.

The charging currents are generated by the cable itself and produce a certain
amount of losses which, in combination with the system reactive power generate
losses reducing the flow of active/real power (MW).
The charging current charges and discharges the cable (capacitor) 50 times per
second. While the charging current is a reactive current the dielectric losses are
determined by real power currents.

The reactive power transported by the cable is independent of cable system; it is


a parameter determined by the system configuration and the elements designed
to compensate the reactive power flow

The charging (IC) and resistive (IR) currents flowing through the cable insulation
are calculated with the following equations:

IC= ω C Uo (charging current)


IR = Uo/R (leakage current),

While the dielectric losses are calculate from the equation:


Wd = Uo Ic tanδ, or
Wd = ωCUo2 tanδ Where:
ε −9

10
c=

18 ln Di 
 
 dc 
C = cable capacitance
ω = 2πƒ
ƒ = system frequency
Uo = phase voltage
tanδ = dielectric power factor
R = insulation resistance
ε = dielectric constant
Di = insulation diameter
dc = conductor diameter

For high and extra-high voltage cables the dielectric losses (Wd) could be
relatively high and may have significant contribution to in determination of cable
ratings

The cable dimensions and the insulation dielectric constant are the basic factors
responsible for the size of capacitance.

[C = ε /18ln (D insulation /d conductor)] while the tanδ is dependent on frequency,


temperature and the applied voltage and is being influenced by the following
factors:
• Leakage current flowing across the resistive component of cable
(capacitor) insulation is very much influenced by the quality-cleanliness of
insulating materials. The leakage current is an “ionic” conduction due to
the presence of free electrons flowing in the direction of electric field.
• Dielectric hysteresis losses caused by the interaction of alternating
electrical field with the molecular structure of cable insulation; a sort of
mechanical work aiming to orientate the bipolar microscopic molecules of
insulation, or of contaminants, in the direction of electrical field. As the
field direction changes 50 times/sec, the cumulative impact of hysteresis
effect could be significant and, in fact, it is the major contributor to
dielectric losses.
• Ionisation and low energy discharges inside the insulation.

2.3 Sheath Losses

Sheath losses are current-dependent losses and are generated by the induced
currents when load current flows in cable conductors.

The sheath currents in single-core cables are induced by “transformer” effect; i.e.
by the magnetic field of alternating current flowing in cable conductor which
induces voltages in cable sheath or other parallel conductors.

The sheath induced electromotive forces (emf) generate two types of losses:
circulating current losses (λ1’) and eddy current losses (λ1’’), so the total losses in
cable metallic sheath are: λ1 = λ1’ + λ1’’

The eddy currents circulating radially and longitudinally of cable sheaths are
generated on similar principles of skin and proximity effects mentioned in relation
to the conductor Rac resistance; i.e. they are induced by the conductor currents,
sheath circulating currents and by currents circulating in close proximity current
carrying conductors.

Cable
sheath

Eddy currents
in cable sheath

Fig. 4: Magnetic field of a three-phase single-core cable circuit

They are generated in cable sheath irrespective of bonding system of single core
cables or of three-core cables

The eddy currents are generally of smaller magnitude when comparing with
circuit (circulating) currents of solidly bonded cable sheaths and may be neglects
except in the case of large segmental conductors and are calculated in
accordance with formulae given in the IEC60287, which for simplification of this
document is not presented.

Circulating currents are generated in cable sheath if the sheaths form a closed
loop when bonded together at the remote ends or intermediate points along the
cable route.

These losses are named sheath circulating current losses and they are
determined by the magnitude of current in cable conductor, frequency, mean
diameter, the resistance of cable sheath and the distance between single-core
cables; i.e. the mutual inductance, calculated with the following equation:
Is = Es / (Rs2+ Xm2)1/2
Es = I Xm
Xm = ωM x10-3
M = 0.2 ln (2S/dm)
Where,
I = conductor current
Xm = inductive reactance per phase including the self inductance of the conductor
and the mutual inductance with other conductors.
M = mutual inductance between conductor and sheath
s = Cable spacing
dm = sheath mean diameter (m)
Is = circulating current
Rs = Sheath resistance

The actual calculation of circulating currents need to take into consideration the
magnetic influence of the conductor currents in all three single core cables
(conductors and sheaths), the mutual impedance between cable and sheath and
between all three cables.

In addition, for multiple cable circuits the aspect is further complicated by the
magnetic interference of circuits in close proximity. As a consequence the
calculation magnitude of induced voltages and circulating currents is done by
using specialised computer routines as indicated in the IEC60287. The cable
system and the interconnecting network represented by distributed parameters
(Impedances) and the hypothetical electrical occurrences (power frequency or
fast transients). The general model is quite complicated and requires some
computer programming and use of specialised software.

The impact of circulating currents is included in the cable rating equations as a


proportional quantity of sheath currents and sheath resistance to the conductor
current and conductor resistance in form of:
2

λ =I R
1
R S
2
S
(Eddy currents not included), quantity which is defined as
I C C

[“Sheath Loss factor” = λ1] and is expressed as a proportional quantity of


the total conductor losses.

The general equation for calculation of current rating (100% load factor) is:
By computing this equation it can be defined ∆Θ, the cable conductor maximum
permissible temperature rise above the ambient in the following form:

∆Θ = (I2R + ½ Wd) T1 + [I2R (1 + λ1) + Wd] nT2 + [I2R (1+ λ1 + λ2) + Wd) n (T3 +
T4)

However in the case of a simplified cable circuit consisting of three single-core


cables provided with metallic sheath and no metallic armour (λ2 = 0 and T3 =0)
and ignoring the environmental thermal resistance (T4) the temperature rise
between conductor and cable outer surface is given with the following equation:

∆Θ = I2R [T1+ T2 (1 + λ1)] + Wd (T1/2 +T2)

Where: ∆Θ = temperature rise above ambient temperature


I = conductor current
R = A.C conductor resistance
Wd = dielectric losses
T1, T2 = thermal resistances of cable insulation and anticorrosion jacket of cable.

It is seen that the “Loss Factor or power loss factor – λ1” as generated by the
circulating currents in cable metallic sheath is impacting on the heat crossing the
anticorrosion jacket and soil thermal resistance before being dissipated in air.

2.4 Special Bonding Systems

Single core distribution power cables are normally installed with cable metallic
sheaths or metallic copper screens solidly bonded to earth at both ends.

However, in cases of high and extra high voltage single-core cables installed in
flat formation the circulating currents could be as high as the current in cable
conductors, i.e. several hundred Amps especially if the cable sheaths would be
solidly bonded to earth at both ends.

In order to minimise the sheath circulating currents the single-core cables are
very often laid in close touching trefoil formation. However, as the three cables
have a considerable heating effect upon one another the heat dissipation is very
poor.

In order to increase the rate of heat dissipation the obvious solution would be to
increase the spacing between cables, regardless if installed in trefoil or flat
formations, aspect which in return would have a direct effect of an increased
magnitude of circulating currents. A proper balance of cable spacing must be
identified to optimise the two effects; circulating currents and heat dissipation.

The solid bonding system does not have a limitation impact on cable systems of
MV of up to 33kV but with larger conductor sizes and higher voltages the impact
is significant and alternative sheath bondedind systems need to be used.

For particular cases of short HV cable circuits (few hundred metres) the
technique of sheath special bonding systems involves earthing the single-core
cable sheaths at one point only and insulating all other points of the sheath from
earth, so that the circulating sheath losses are eliminated and the single-core
cables can be spaced apart to reduce their mutual heating effect without
increasing sheath losses.

Some of the most common “Single-point Bonding” arrangements are as shown in


Fig. 5

V V V

0 0 0
1 1 1
(m) (m) (m)

a) Sheaths earthed at b) Sheaths earthed at the c) Sheaths earthed at both ends


one end only immediate point and sectionalised at the
(midLEG immediate point

Fig. 5: Diagrammatic representation of single-point bonding systems of


cable metallic sheaths or screens and of induced voltages
For long cable connections, where the cable circuits consist of a series of
individual cable sections sequentially jointed, the cable sheaths are connected in
different configurations including the so called cross bonding system (Fig.6)

In this system the corresponding route length is divided in multiples of three


length of ca Each major transposition section is formed of three individual
sections of equal length and installed at equal and uniform spacing.

This solution is expected to provide balanced induced voltages at a vectorial


angle of 120°of no resultant circulating current when phasorial summation was
applied.

A C B

B A C

C B A

Fig. 6: Cross-bonding system without cable transposition at each joint bay

However, this is not the case, because when single-core cables are installed in
flat formation the voltages induced in the cable sheaths of outer cables are
higher than the induced voltage in the middle cable and the vectorial (phasor)
summation is not zero. As a consequence it is not possible to eliminate the
circulating currents in a cable circuit where only the cable sheaths are cross-
bonded. The imbalanced phasorial voltage (Fig.7) is generating a residual
voltage which, in return would generate circulating currents.
Smaller induced voltage
than in the 1st or 3rd
minor section

Imbalanced
difference

Fig. 7: Imbalanced induced voltages in a major transposition section with


un-transposed minor cable sections

When the cable sheaths of transposed cables occupying the same position in
circuit configuration are straight connected the vectorial summation of induced
voltage would be zero if the system would be of balanced parameters: currents,
spacing and length (Fig.8).

So, it is obvious that in order to significantly reduce or to eliminate the circulating


current losses the cable and cable sheaths must be transposed at every joint bay
position and the sheaths cross-connected with phase rotation in opposition to
that of cable transposition (Fig.8). This would facilitate a direct serial connection
of the cable sheaths of the three cable sections occupying the same position in
cable trench along a major transposition section.
A B C
R R

Y Y

B B

Fig. 8: Typical diagram of cross-bonding system with cable transposition

By connecting in series the cable sheath of the three phases (120° phasor
displacement) the circulating currents could be eliminated; the phasor sum of
induced voltages could be zero if the geometrical data of cable circuit is uniform
along the three cable sections.

UB A U AB B
A B

U OA U BC

UA UC

O=C O C

Fig. 9: Balanced induced voltage along three consecutive


cable sheaths occupying the same position in cable trench

However, it is evident that in practice the circulating currents can not be totally
eliminated. There would be all sorts of site limiting conditions to install the cable
sections at equal spacing and equal length and as consequence a loss factor - λ1
– in range of 3% for direct buried cable circuits and 5% for cable in ducts are
considered realistic figures (IEC 60287). Even larger losses may be tolerated
based on client acceptance of higher losses balanced against capital expenditure.
The sheath currents and the induced voltages vary as a function of bonding
system, as follows:

i. Solid-bonded cable sheaths (earthing at both ends)


The circulating currents consume the induced voltages and as a
consequence the entire cable sheath is at ground potential. The generated
heat reduces the cable rating
ii. Single-point bonding
The cable sheaths are subjected to a standing voltage varying between
earth potential at grounding point and maximum induced magnitude at
isolated (remote or mid-point) end of cable section
iii. Cross-bonding
The maximum induced voltage in respect to earth depends on the position
of each minor transposition section within the major transposition section.
At the ends of major transposition sections the cable sheaths are at earth
potential while at all other points along the cable the voltage is
proportional to cable length in respect to earthing points or, for the median
(2nd) minor section, of measuring point in respect to the other two minor
sections.
The maximum induced voltage amplitude is generally accepted as 150V.
In special circumstances it could be as high as 250V provided that the
bonding system of cable circuit is properly designed to satisfy the
insulation coordination and safety requirements. Nevertheless there are
examples of cable installations where the induced standing voltage could
be as high as 400V.

The special bonding system requires that the metallic sheaths and cable
accessories (joints, terminations and connections to CMS – condition monitoring
system) are electrically insulated with respect to earth (radial direction) and
between two adjacent cable sections (longitudinal direction).
The cross-bonding of cable sheaths is made in specially designed boxes,
generically denominated “Link Boxes” where the incoming bonding leads (single-
core or concentric conductor cables) are cross-connected.

Concentric bonding leads between link boxes and power cable joints are
designed to minimise the surge impedance between cable sheaths and SVL
protecting the bonding system.

The link boxes are equipped with sheath voltage limiters (SVL) designed to
protect the cable outer sheath (anticorrosion jacket), insulating flanges and
barriers in cable accessories and all other insulating components of bonding
system, against transient voltages propagated along the cable system.

The effect of specially bonding systems is visible when comparing the cable
rating of cables installed in solid and cross-bonded systems.

The current rating of cable system of 132kV and above could be up to 50%
higher for specially bonded cable circuits. The rating is influenced by the
following three factors:
• Reduction of circulation currents
• Increased spacing between single-core cables with direct response of
improved heat dissipation
• Reduction of eddy current losses with the increase of cable spacing

However it is recognised that the specially bonding system increases the capital
and running (maintenance) costs of the cable system. The cost of the bonding
system for an average 220kV cable system could be in range of 1 to 1.5% of
material cost for cable and accessories.

Nevertheless these costs are compensated by savings in cable size and the
number of accessories dependent of the length of cable sections (bigger cable =
shorter length) installed in the system and the maintenance costs could be
reduced by acquisition of reliable cable bonding system including cable outer
jacket, joints (insulating barriers), bonding leads, link boxes and sheath voltage
limiters (SVL).
Sheath
Voltage
Limiters
(SVL)

Post
insulators

Fig.10: Cross Bonding Link Box (LB)

The periodical maintenance of a reliable bonding system may be performed on a


three-year basis and even longer periods, depending on local environment and
statistical evaluation of accumulated maintenance data.

3 Conclusions and Observations

The basic factors influencing the current rating capacity of underground (U/G)
power cable systems is govern by three major factors:

a) Cable construction: conductor size, physical dimensions and quality of


materials
b) Installation particulars: single-core cable configuration and spacing,
bonding of cable metallic sheaths, proximity to other utilities, thermal
influencing factors and burial depth
c) Environmental parameters: air and soil temperature and thermal
characteristics of soil and of bedding and backfilling materials
Note:
The a) and b) factors are responsible for the magnitude of electrical losses
which, in return, are impacting on current rating of cable system

The calculation of losses and current carrying capacity are based on well
established international standards (IEC 60287 and IEC 60853) or national
standards.
However, as the fine details of cable construction are very specific to each cable
type produced by each manufacturer, an accurate calculation of losses and of
current rating are performed exclusively by cable suppliers using personalised
computer programs and softwares
In order to verify the accuracy of cable rating and magnitude of losses the cable
manufacturers carry out full scale trial experiments simulating hypothetical
installation and loading conditions.

4 Bibliograpfy
i. Rating of Electric Power Cables – Ampacity Computation for Transmission,
Distribution and Industrial Applications. IEEE Press Power Engineering by
GEORGE J. ANDERS
ii. Electric Cables Handbook – BICC Cables, by G.F. MOORE
iii. Underground Transmission Systems – Power Technologies Inc. (J.A.
Williams) & EPRI (RW Samm).
iv. IEC 60287 – Electric cables – Calculation – Part 1: Continuous rating
equations (100% load factor)and calculation of losses
APPENDIX 7

Reactive power compensation - Critical


Length of Cable Circuit

An underground (U/G) power cable has the capability to store and release
electrical energy with the voltage variation; it works as a shunt capacitance
generating a capacitive current which is in quadrature with the resistive or
load current

The capacitive or charging current has a limiting effect on cable rating


capacity (MW).

This effect is quantified by the fact that when intended to supply energy to a
resistive receptor (active load consumer) in a radial network, via a power
cable circuit, it is needed to inject a higher current at the source to
compensate for cable capacitance.

The charging current is calculated with the following equation:

I ω CU 10
_ 6
=
C

where:
• Ic = charging current (A/km)
• = 2 f ; f = System frequency
• C = capacitance per unit length (µF/km)
• U = Applied voltage (V)

The charging current generates heat losses in cable which are of a


significant magnitude in very long high and extra high A.C. underground
power cable connections.

As the capacitance and the charging current increase linearly with the
length of the cable circuits the generated heat losses by the charging
current could be as high as its entire thermal rating capacity. In other words,
it could be said that for long and uncompensated cable circuits the entire
cable rating capacity could be consumed by the circulation of charging
current; i.e. no real power transmitted without overheating the cable.

The length of a cable at which its thermal capacity was consumed by the
charging current is called “critical length” and it is calculated with the
following formula:

I 3
L 10 (km)
3
=
C ωC U

where:
• C = capacitance per unit length (µF/km)
• = 2 f ; f = System frequency
• U = Line (phase to phase) voltage (kV)
• I = phase current (A)
(CIGRE WGB1-19/2004)

The maximum transmitting power of a radial cable circuit is given by:

P L
= S
2

G
_ (ω. C. L. U . 10 2 _3
)
2
[MW]

Where
• PL = Active power at load receptor (MW)
• SG = Apparent power at injecting point (MVA)
• C = capacitance per unit length (µF/km)
• = 2 f ; f = System frequency
• U = Line (phase to phase) voltage (kV)
• L = Length of cable (km)
(CIGRE WGB1-19/2004)

It could be seen that the critical length “LC” is determined by the system
voltage and frequency and by cable rating which is determined by the
conductor size, environmental and installation conditions and cable
capacitance.

The larger active current transmitted on cable the longer the critical length;
i.e. the charging current is of a lesser importance.
The calculated values of critical length and the loss of transmitted power, of
a 40km 220kV cable system, by using the above equations, are of some
significance for smaller cable sizes ( 300MVA rating) but for larger cables (
600MVA carrying capacity) the impact is small.

In Fig 1 is shown the typical critical length and the length at which the
current rating is reduced by 20% for major high voltage cables (138 to
500kV voltage steps) based on North American experience.

In addition to the heating effect of charging current the cable capacitance


may have an impact on steady-state voltages across the power system to
which the cable is connected.

The voltage may rise, especially at low loads, due to charging current
flowing through cable series inductances (material polarisation) and through
system inductances (transmission lines and transformers); phenomenon
known as Ferranti effect.

The Ferranti effect is significant with long cables energised from one end.

In this kind of situations the network voltage stabilisation is carried out by


adjusting the voltage magnitude at generator by reducing the field excitation
or by lowering the voltage taps on transformers.

Figure 1 Critical length of 1000mm2 U/G power cables (Power


Technologies, Inc)
However in case of long cable circuits, the compensation of charging
current requires installation of shunt reactors connected at one end or both
end of cable circuits which are selected based on specialised system
studies by taking into consideration cable specific data and system
parameters.

In case of overhead transmission lines (O/H TL) the rating capacity is


influenced by the line inductance which is compensated by installation of
series capacitors. Power cable, which is a capacitor, improves the O/H TL
transmission capacity but, it presents the disadvantage of being of constant
capacitance at constant voltage while the system requires variable
adjustments
Appendix 8
Curriculum Vitae

NAME: Henry Kent

NATIONALITY: Australian (born in Switzerland)

ADDRESS: 22 Avoca Street


GLENBROOK, NSW 2773, AUSTRALIA
Tel. + 61 (2) 47 393352
Mobile (Preferred) + 61 418 652 860
Email: henrykent@energyaction.com.au

QUALIFICATIONS:
• Diploma in Electrical Engineering, NSW University of Technology
• Post Graduate Studies in Protection Engineering.
• Management and business training in various Institutions including
Australian Graduate School of Management.
• Extensive experience in planning, design, asset management,
construction and maintenance of transmission and distribution voltage
underground cables and other network infrastructure.

MEMBERSHIP OF PROFESSIONAL SOCIETIES


• Accepted to Institution of Engineers, Australia
• Convener of Australian Panel & member of CIGRE international Study
Committee SC 21 “HV Insulated Cables” - 1984 to 1990
• Current member of CIGRE Australian Panel B1 “Insulated Cables”
• Former member ESAA Technical Advisory Committee “Electro-magnetic
Fields”
• Current Secretary, ENA “Power Poles & Crossarms Forum”.

LANGUAGES:
• English
• German – some capacity

EMPLOYMENT HISTORY

1963 –1990: Electricity Commission of NSW [Generation &Transmission]

1990 – 2000: Prospect Electricity / Integral Energy [Distribution]


2000 – Present: Consulting services to Utilities & Industry [Cable Design;
Condition Assessment & Monitoring; Project Management
and Training]

COUNTRIES OF WORK EXPERIENCE:


Australia, New Zealand, Singapore, Indonesia and United Arab Emirates

CAREER HIGHLIGHTS:

During some 40 years in the electricity supply industry responsibilities included:

• Design, construction, maintenance & refurbishment of transmission and


distribution assets – specialising in high voltage underground power
cables.
• Development of specifications for cable infrastructure projects
[some under Joint Venture] and tender evaluation.
• Implementation of network asset life extension strategies.
• Management of a “stand alone” Contracting Services Business within
Integral Energy with an annual turn-over exceeding $A150 million [⅓
derived from external business].
• Community consultation prior to construction of controversial overhead
powerlines and underground cables.
• Development of industry guidelines for example, Electricity Supply
Association of Australia document D(b)26 -1995 “Work On Cables Under
Induced Voltages and Transferred Earth Potential”
• Six year term, 1984 – 1990, as Convenor of CIGRE Australian Panel 21 &
member of CIGRE international Study Committee SC-21 “HV Insulated
Cables” [representing the Australian & New Zealand cable industry
internationally]
• Staff training and accreditation

Specific highlights:

• Responsibility for the construction, maintenance & refurbishment of the


extra high voltage cable network in the Sydney CBD and inner suburbs
(comprising 500 kilometres of 132kV & 330kV oil-filled, gas-filled &
polymeric cables) – including project management of cable tunnel
construction and cable installation.
• Introduction to Australia of innovative optical fibre technology “Distributed
Temperature Sensing” and contribution (together with Tyree Optec &
University of Sydney) in the commercial development of an application
package.
• Engagement by the Inquiry into the “Auckland CBD Power Supply Failure”
as chief technical consultant to determine the cause of failure of the 110kV
oil filled & gas filled power cables in 1998.
• Engagement by Rail Services Australia [now RailCorp NSW] to investigate
condition of 33kV gas-filled cables
• Engagement by United Energy [now Alinta Vic] to report on in-house
management practices related to underground cables
• Engagement as technical investigator to determine the cause of failure of
Java-Madura 150kV submarine cable
• Project manager for the installation of 220kV XLPE cables, Taranki, NZ,
being one of a number of cable projects won competitively by Integral
Energy Contracting.
• Introduction of diagnostic methodologies associated with oil filled cables
• Presentation of technical papers at CIGRE, Paris Sessions; CIGRE
symposium on diagnostics, Zermatt, Switzerland; CEPSI conference, New
Zealand and to a number of Supply Industry forums in Australia
• Regular lecturer on cable technology at ESAA summer schools for
engineers
• Co-ordinator of four international cable technology seminars in Sydney
• Establishment of apprentice training school & cable jointer training facility
• Change management of an organisation transitioning from a monopoly to
a commercially competitive construction business
• Overseeing Corporation’s performance to customer service level
obligations, monitoring customer complaints and liaison with the industry
ombudsman

CONSULTING SERVICES TO UTILITIES & INDUSTRY, SINCE AUGUST 2000

• 2000/01: Consult to Electricity Supply Companies across Australia on


supply chain management strategies - including e-procurement of
equipment and services via live internet based auctions.
• 2001/02: Snowy Mountains Hydro Electric Authority, ACT, Australia:-
Develop options for the installation of a spare 330kV cable at Tumut No.2
Power Station
• 2002: HMAS “Success”, Garden Island Sydney: Investigate damaged
power & control cables on board while vessel under re-fit.
• 20002: TransGrid, NSW, Australia:- Assist TransGrid in tender
assessment for the 330kV Sydney CBD cable reinforcement project
• 2002: TransGrid, NSW, Australia:- Assist TransGrid [and JPS] in a field
trial to establish electro- magnetic field (EMF) mitigating measures
• 2002: Ergon Energy, Queensland, Australia:- Assess condition of 66Kv
gas-filled cables in Townsville and recommend maintenance &
replacement strategies
• 2002: Abu Dhabi Distribution Company, UAE:- Provide lectures (over a 5
month period) to professional staff & field operatives on life cycle issues
related to power cables
• 2003: “Promis – Group”, Dubai, UAE:- Present training course “Power
Cables – Operation, Maintenance, Location & Fault Detection”
• 2003: Mallesons Stephen Jaques, National Environment & Planning
Group, Sydney, NSW, Australia:- Provide design & estimate for
undergrounding 132kV overhead transmission line (to release land for
development purposes)
• 2003: TransGrid, NSW, Australia:- Appointed Project Manager to retrofit a
dynamic rating system to 330kV oil-filled cable [incl. assistance to
Parsons Brinckerhoff in preparation of REF].
• 2003: Blue Circle Southern Cement, Berrima, NSW: Investigate condition
of recently installed, suspect, 33kV XLPE cables
• 2004: RailCorp NSW: Review and update in-house cable standards and
procurement specifications – advise on cable installation on railway bridge
• 2005: RailCorp, NSW: Assist in technical evaluation of tenders for cable
supply
• 2006: TransGrid, NSW: Appointed Project Manager “Replacement of
330kV Cable Joints” – involvement in preparation of estimates, REF &
community consultation; co-ordination of many parties incl. JPS (Japan};
Energy Australia, Civil Works Contractor, Traffic Management, Cable
Freezing Service.
• 2007: Engaged by Snowy Hydro to assist in preparation of Business Case
to replace 330kV cables at T1 & T2 power stations
• 2007: Engaged by ElectraNet SA as Team Leader/Cables to assist in
route selection & procurement of 275kV cable installation, Adelaide.
• 2000-2006: Electricity Supply Association of Australia - in
conjunction with various Universities:- Present “Professional Development
Course” lectures on power cables & overhead line supports.
• 2000 to present: Secretary ESAA [now ENA] Power Poles & Crossarms
Forum
Name George Bucea
Education
Diploma in Electrical Engineering, Bucharest Polytechnic Institute
(1967).
Other Training
Special Training:
Specialist training in extra high voltage polymeric and oil filled
cable systems and high voltage apparatus.
A total of over 24 months were spent working at cable and
apparatus manufacturers in England, Italy, Germany, Japan
and Finland during the years of 1973 to 2003. Training and
specialising courses were attended at BICC, Pirelli, F&G
Cables, Siemens, Alfa Cavi, CEAT, Nokia and Sumitomo.
Membership of
Member CIGRE AP-B1 “High Voltage Cables”
Professional
Societies: Member CIGRE WG-B9 “Life Expectancy and Diagnostics”

Member Institution of Engineers, Australia (1986 to 2006)


Countries of
Australia, Romania, Thailand, Singapore, Japan and New
Work Zealand
Experience
Experience
Principal Engineer/HV Underground Power Cable Projects,
1994 – Present TransGrid, Sydney - Australia
(06/07/2007)
TransGrid became the registered business name of the Electricity
Transmission Authority of NSW/Australia as from
30 May 1995.
Responsible for the design, route selection, specification and
contract administration of High Voltage cable installations up to
and including 330 kV, throughout TransGrid’s transmission
system.

Responsible for material inspection and testing carried out by


cable manufacturers and contractors during manufacture,
installation and commissioning to ensure that all is in compliance
with the contract.

Responsible for the investigation and development of new


technologies in relation to high voltage cable systems and cable
accessories in conjunction with cable manufacturers to achieve
more reliable and cost effective products.

Responsible for the investigation, testing and evaluation of the


condition of TransGrid HV power cable systems and provide
consultancy assistance to HV and EHV cable users from
Australia and overseas.
Experience
Some of the most significant cable projects and investigations
(cont’d) were as follows:

1. Since 1999 to 1995 I was responsible for design activity in


relation to a 330 kV – 750MVA –28km U/G power cable
system for Sydney Central Business District. The work
included:

• Route investigations and feasibility studies


• Evaluation of cable technology and setting a strategy
for best tendering processes and technology selection
• Preparation of pre-qualification documentation for pre-
selection of most reliable and cost-effective cable
technology and of most competitive cable
manufacturers. The investigated technology
alternatives included XLPE, SCFF-paper and SCFF-
PPL insulated cable types and GIL (gas insulated
lines).
• Preparation of tendering documentation
• Evaluation of tenders

The design for this cable circuit includes provision for on-line

SCADA and condition monitoring system (CMS) in relation to the

supervision of oil pressure, temperature/rating limitations and

other supervisory systems.

2. Investigate the cable failure and specify/design remedial


works of a 330 kV cable circuit as a result of cable-core
movement (Sydney /1992 - 1996).

3. Investigations of cable network failure in Auckland, New


Zealand (1998). Assist in preparation of the “Report of the
Ministerial Enquiry into the Auckland Power Supply Failure”.

4. Member of the expert investigation teams employed to


investigate and assess the performance of cable insulation of
aged or faulty 132kV to 400 kV of cable systems in Sydney
Australia, New Zealand and Singapore.

5. Organiser of the “Cable Technology Seminars in Sydney,


Australia” in 1993, 1995, 1997 and 1998 (session dedicated
to Auckland Power Failure). Presentation of technical papers.

6. Investigations of cable network failure in Singapore (2000 to


2006) and the on going diagnostic and technical advise to
Singapore Power. Assist in preparation of technical
documentation related to U/G Cable System Failure (66 to
400kV).

1986 - 1994 Principal Engineer/HV Underground Power Cable Projects,


Pacific Power – Transmission Engineering Group, Sydney,
Australia

• Same as above.
Experience Head of Extra High Voltage Cable Department,
(cont’d) Electricity Ministry of Romania, Romania

1974 – 1985 • Responsible for design, procurement, installation, commissioning


and maintenance testing of cable systems up to 400 kV. During
this time I implemented development and training programmes to
reduce the dependence of the Romanian Ministry on overseas
technical assistance related range of works associated with HV &
EHV cable systems.
• Within that period the total volume of HV underground cable
network in Romania increased 10 fold, i.e. from about 45 km to
more than 500 km by 1985.
• SCOF (Self-contained Oil-filled), XLPE (cross-linked
polyethylene) and EPR (ethylene propylene rubber) were the
most common cable systems used.
• The installation methods included all possible site conditions such
as direct buried, tunnels, ducts, bridges, troughs, submarine
(River Danube crossing) and buildings.
Professional Engineer/High Voltage Network and
1967 – 1974 Substations,
Minister of Electricity Romania, Romania

Responsible for maintenance and operation of distribution cable


network and substations.
Publications
1. "110 kV Oil-filled Cable Handbook" Bucea, G, Editura Technica Bucharest,
1979.

2. "Jointing Systems of H.V. Oil-filled Cable Systems" Constructii - Montaj, 1980.

3. “High Voltage Cables: Present and Future" - Electroenergetica 1982.

4. "Techniques to Increasing the Current Carrying Capacity of H.V. Cables" Editura


Technica MEE 1983 (Training Manual), 1983.

5. "Management of High Voltage Cable Networks" Editura


Technica MEE 1983 (Training Manual) 1984.

6. "New Types of Insulations for HV Power Cables: PE, XLPE,


EPR" Editura Technica MEE 1983 (Training Manual) 1984.

7. "Repair the Damaged Submarine H.V. Cables Circuits at


Danube Crossing /Romania", Bucea, G Energetica 1985.

8. "Distributed Temperature Sensing of High Voltage Cables -


Case Study from Sydney, Australia" H Kent and G Bucea, CIGRE 21-304/1992
Session.

9. Presentation of technical papers at “Cable Technology


Seminars Sydney, Australia 1993, 1995, 1997 and 1998

10. “Shielding Techniques to Reduce Magnetic Fields Associated


with Underground Power Cables - Case Study from Sydney,Australia G. Bucea
and H. Kent. CIGRE 21-201/1998 Session

11. “Preselection of cable type and cable manufacturers for the MetroGrid project in
Sydney Australia”. 2003 Jicable, Conference/Paper A.1.3.
12. “330 kV Cable System for the MetroGrid Project in Sydney ,Australia” - 2004
CIGRE Conference/Paper 302
14. “Condition Monitoring Systems for 330kV Cables Supplying, Sydney CBD” -
TechCon 2004 Conference Sydney

15. “Condition Monitoring System for TransGrid 330kV Cable” - Powercon 2004 –
Singapore

16. Selection and Design of Cable System for HV & EHV


Underground Networks” – ESAA Summer School, 2005

17 Electrical Losses in Power cables – Current dependent and voltage dependent


losses. – Cable Technology Seminar, Sydney 2006

18 Performance of XLPE-insulated HV & EHV Cable Systems. Comparative evaluation


of IEC and North American related standards
HAUĀURU MĀ RAKI

WAIKATO WIND FARM


Connection to 220kV Main Grid

Overhead Transmission Line


Evaluation

ATTACHMENT No.2 OF THE CONSOLIDATED REPORT

Prepared for

Contact Energy Ltd

Name Date
Written by Jeff Carew 13/03/08
Reviewed by Michael Prance 13/03/08
Reviewed by Vanessa Ranjith 13/03/08
Approved By Joe Warren 13/03/08

Document Name Revision


Waikato Wind Farm Underground Study Rev 5
Waikato Wind Farm Project Overhead Transmission Line Evaluation

CONTENTS

1. EXECUTIVE SUMMARY ..........................................................................................4

2. SCOPE OF THE STUDY ..........................................................................................6

3. INTRODUCTION .....................................................................................................5

4. OVERHEAD TRANSMISSION LINE PROPOSAL ...................................................5

5. EVALUATION OF COSTS (LIFE CYCLE COSTS) ..................................................6

5.1 OVERHEAD TRANSMISSION LINE OPTION

6. PERFORMANCE DATA RELATED TO OVERHEAD LINES ..................................9

6.1 RELIABILITY
6.2 EFFICIENCY
6.3 MAINTENANCE
6.4 ENVIRONMENTAL IMPACT
6.5 TIMING AND CONSTRUCTABILITY
6.6 FUTURE PLANNING - UPGRADING THE TRANSMISSION CAPACITY

7. APPENDICES ........................................................................................................12

Page 3 of 23 13 March 2008


Rev 5
Waikato Wind Farm Project Overhead Transmission Line Evaluation

1. EXECUTIVE SUMMARY

Electrix has formed a relationship with Energy Action Pty Ltd for the purposes of
undertaking consulting work for the Contact Energy Waikato Windfarm. In this
relationship, Electrix has undertaken specific consulting services in relation to the
proposed overhead transmission line(s) which forms part of the overall consulting report to
be submitted by Energy Action Pty Ltd.

This report covers the section of works comprising the 220kV external transmission line
running between the substations located at Limestone Downs and Orton (Appendix A).
The transmission line will connect into the Transpower grid via a substation located at
Orton.

The most relevant aspects related to the design of overhead transmission lines include:

• Design Criteria (inter alia, number of circuits, route length, line rating, maximum
operating temp, nominal voltage, conductor type, earthwire system, structure
types, maximum electric field strength, maximum magnetic flux density, audible
noise level, radio frequency interference and easement width etc
• Line security status
• Reliability
• Terrain conditions through which the line passes
• Environmental impact of construction and final solution
• Rural nature of the project, aesthetic and visual impact
• Life cycle costs which include capital costs, cost of losses and maintenance costs
• Constructability and timing, including impact on local community during
construction
• Current technology and future upgrading

A comparison between overhead & underground alternatives is provided in the


consolidated report together with a comparative discussion as well as a life cycle cost, net
present value (NPV) and break even cost analysis. Factors such as calculations of
expected losses and cost thereof are also included.

2.0 SCOPE OF STUDY

The scope of this study is to evaluate the construction options and cost of a proposed
double circuit overhead line along a proposed corridor

Page 4 of 23 13 March 2008


Rev 5
Waikato Wind Farm Project Overhead Transmission Line Evaluation

3. INTRODUCTION

Contact Energy (CEN) plans to construct a purpose-built transmission line to transport


electricity output from a new wind farm on the west coast of the Waikato region to the
main grid connection. The detail of this project is contained in the final Project Description
document prepared for the purposes of applying for Resource Consents under the
Resource Management Act.

The main transmission link to the Grid is proposed to be 220 kV. Current plans are for the
link to be a double circuit overhead line on lattice tower construction.

CEN has engaged Energy Action Pty Ltd to provide expert advice on the practicability of
undergrounding and together with Electrix to provide comparisons (including advantages
and disadvantages) between overhead lines and underground cables.

4.0 OVERHEAD TRANSMISSION LINE PROPOSAL

The overhead line proposal comprises a line length of approximately 25 km and 84 towers
carrying a dual circuit configuration. The route has been selected with the following criteria
in mind:

• To follow the most direct route and to minimise the visual impact by utilising the
terrain. For example towers are located in valleys and below ridge lines where
possible.
• To minimise the impact on areas of environmental, ecological or archaeological
significance
• To consider property boundaries, access routes and dwellings.
• To consider the constructability of the line and to minimise the impact on the local
community during construction.

In order to evaluate the possibility of undergrounding the overhead transmission line it is


important the design criteria are understood.

The design criteria for this particular line are as follows

Number of circuits 2
Route Length 25km
Line Rating approx 518MVA
Maximum Operating Temp 75 deg
Nominal System Voltage 220kV
Conductors Twin Goat ACSR @ 460mm spacing (initial design
basis)
Earthwire System Single overhead earthwire (probably SC/AC Skunk)
Possible OPGW
Structure Types Double circuit lattice steel tower, Standard
Suspension, Light Strain, Angle/Heavy Suspension,
Heavy Strain/Deadend
Maximum Electric Field Strength As per ICNIRP Guidelines
Maximum Magnetic Flux As per ICNIRP Guidelines

Page 5 of 23 13 March 2008


Rev 5
Waikato Wind Farm Project Overhead Transmission Line Evaluation

Audible Noise Level 35dBA Franklin district Plan (may require


dispensation to 45dBA in rural areas)
Radio Frequency Interference Compliance with NZS 6869:2004
Easement Width Based upon criteria of conductor swing, audible
noise EMF, RFI – Average width 42 m

The route chosen at this stage of the analysis appears to meet all the criteria listed above.
A desktop analysis combined with site visits did not highlight any significant alignment
issues and therefore at this stage, the proposed alignment is the most effective. There
may be some lower level improvements to be made once final design commences.

5. EVALUATION OF COSTS (LIFE CYCLE COSTS)

The life cycle cost analysis for this study includes the following:
• Design costs
• Planning and consent costs
• Initial capital cost of project
• Operational costs including maintenance, and energy losses
• Fault costs

The Net Present Value is calculated over a 40 year period as this is the typical life cycle of
an underground cable. This cost analysis is relative (i.e. costs that are expected to be
similar for each option are not included in the study).

5.1 TRANSMISSION LINE LIFE CYCLE COST

Design Costs

It is anticipated that the design costs of the overhead line will be similar to the design cost
of the underground cable and are thus not examined.

Planning and Consent Costs

The planning and consent costs of the overhead line option will obviously have the
additional involvement of negotiations with stakeholders, in particular landowners with
towers on their properties. Public forums and notifications are expected to be more time
consuming, with more objections being raised. It is expected that an additional 2 people
for a period of 4 months will be required as compared to the underground option. This
equates to an additional 1300 man hours and a cost of $ 200K. This does not include the
opportunity cost of the lost time.

Additional Planning and consent costs $ 200k

Initial Capital Cost

Page 6 of 23 13 March 2008


Rev 5
Waikato Wind Farm Project Overhead Transmission Line Evaluation

A comprehensive costing of the proposed overhead line has been performed. Based
upon Electrix’s experience in the construction of transmission lines, the following cost
breakdown will apply. Appendix B shows a more detailed breakdown of the costs.
These costs have been developed from actual construction cost as experienced by
Electrix over the past 5 years. Please note these prices are based upon a preliminary
design, typical foundation types and typical tower types as shown in Appendix E.
Detailed design and geotechnical information may have a significant effect on the final
pricing. All costs are at current prices and subject to final design.

Preliminary and General Items $ 187k


Tower Foundations – suspension towers $ 5,565k
Tower Foundations – strain towers $ 1,412k
Tower Fabrication $ 8,646k
Tower Erection $ 8,143k
Hardware & insulators $ 1,438k
Conductor and Earthwire $ 3,225k
Conductor Stringing $ 3,515k
Commissioning and testing $ 357k

Total Initial Capital cost $31,961k

Future Capital Costs

Foundation interface refurbishment @30 years $ 830k


Tower Painting @30 years $ 2,500k
Insulator Replacement @30 years $ 2,500K
Reconductoring at 40 Years incl materials $ 7,000k

Total future capital costs $12,800k (2008 dollars)

Maintenance costs

An overhead transmission line requires a certain amount of maintenance throughout its


life. Electrix has been involved in the construction and maintenance of overhead
transmission lines since 1988. Based upon this experience an expected maintenance
regime can be developed for the transmission line in question. The costs shown are for
annual maintenance which includes patrols, vegetation control, minor steel replacements,
climbing deterrents and access work. These figures are conservative since depending on
the environment, corrosion zone, pollution, prevailing winds and temperature ranges, the
life span may vary significantly.

Annual unscheduled maintenance costs per annum $ 50k

Cost due to Losses

Appendix D shows the calculation of losses for the transmission line based upon the
design criteria. If we assume the average generation will be 300MVA then the following
losses apply

Page 7 of 23 13 March 2008


Rev 5
Waikato Wind Farm Project Overhead Transmission Line Evaluation

Total losses for transmission line 4,154 kW


Cost /kWh $ 0.03 per kWh
Total cost of losses per hour $125 per hr
Total cost per annum $ 1,095 k per annum

Cost due to Outages and Faults

Overhead transmission lines are subject to planned and forced outages. It is reasonable
to assume that a new transmission line should operate better than the current existing
lines in the grid which are nearly all 40 to 50 years old. The failures rates over the past 10
years are shown below

Actual sustained recorded forced outage rate for all Transpower 220kV lines1

Forced outage rate 0.34 per 100km/annum taking 1.808 hrs to repair
Planned outage rate 0.92 per 100km/annum taking 17.45 hrs to repair

By assuming that the rate for this particular case is similar to that of the aging Transpower
grid, then the costs would not be any worse.

Assuming each outage requires a 10 man team to repair, the costs associated with
outages are:

Forced outages 0.34 /4 x 1.808 hrs x 10 men x $100/hr = $154 /annum


Planned Outages .92 /4 x 17.45 hrs x 10 men X 100/hr = $ 4014/annum
Total outage costs per annum = $ 4168/annum

Net Present Value

The net present value is based upon the planning costs, the initial capital cost, the annual
maintenance costs and the fault costs. A capitalisation index of 5% is used with a term of
40 years. Appendix C has the detailed calculations

As can be seen from the above the overhead transmission line has a Net Present Value
of:
Net Present Value for Overhead Line

n  1 
j
NPVoh := Ci.oh + Cfut.oh + ∑ (Co.oh + Cf.oh ) ⋅  
  1 + i
j=1
6
NPVoh = 65.990 × 10
6
Ci.oh := 31.961 ⋅10 Initial Investment for overhead line ($ NZ)

6
Cfut.oh := 12.8 ⋅10 Future capital replacement costs ($ NZ)

1
Transpower-Asset Development group-“Comparison of the reliability of a 400kV Underground
Cable with an overhead line for a 200km Circuit”.-2005
Page 8 of 23 13 March 2008
Rev 5
Waikato Wind Farm Project Overhead Transmission Line Evaluation

6 Operational costs for overhead line including losses and


Co.oh := 1.233 ⋅10
Maintenance per annum ($ NZ)

3 Fault costs for overhead line per annum ($ NZ)


Cf.oh := 4.171 ⋅10

i := 5 % Capitalisation Index

n := 40 Evaluation period 40 years - effective life of the system

NPV for overhead transmission line option = $65,990,000.00

6. PERFORMANCE DATA RELATED TO OVERHEAD LINES

6.1 Reliability

A measure of underground and overhead transmission line reliability is the rate at which
they fail or are subjected to outages. Outages can be forced (due to a problem on the
network), or planned. Overhead transmission lines are often subjected to transient faults
which are normally cleared via an auto reclose. These faults are not considered in this
analysis as they are normally cleared within a few seconds.

Outage rates are measured by considering the number of outages per 100 circuit
kilometres. Transpower prepared a report which highlighted the outage rates for forced
and planned outages2.
Since these figures are a record of the 10 year period between July 1992 and June 2004,
they are considered appropriate for this analysis. The results are as follows:

Forced Outage Rate 0.34 per 100km per annum


Planned outage rate 0.92 per 100km per annum

Due to the lack of data for New Zealand, figures from the report Commission of European
communities - Background Paper- Undergrounding of Electricity Lines in Europe Brussels
10 December 2005 are used for this analysis and, indicate the following:

Average Failure Rate 0.072 per 100km per annum


Planned Failure Rate 2.5 per 100km per annum

This figure was confirmed by a DISCAB Group on figures over the past 12 years and was
presented at the ICF Congress in Barcelona. Other reports including CIGRE and various
American studies show varying rates from 1.4 to 4.1 faults per circuit kilometre.

2
Transpower-Asset Development group-“Comparison of the reliability of a 400kV Underground
Cable with an overhead line for a 200km Circuit”.-2005
Page 9 of 23 13 March 2008
Rev 5
Waikato Wind Farm Project Overhead Transmission Line Evaluation

For this analysis the rate of .072 has been used which equates to the following expected
outages for a 25 km long overhead line and a 38 km long underground cable.

Overhead Line Underground Cable Ratio


Outage Rate-forced 0.34 /100km 0.072/100km -4.7
No. expected outages/annum 0.085 per annum 0.027 per annum -3.1
Total no. outages 40 years 3.4 outages 1.08 -3.1

Overhead Line Underground Cable Ratio


Outage Rate-Planned 0.92 /100km 2.5/100km 2.6
No. expected outages/annum 0.23 per annum 0.95 per annum 4.1
Total no. outages 40 years 9.2 outages 38 outages 4.1

From the above it is evident that underground cables have a better reliability rate based
upon forced outages (European figures), but require more planned outages. In addition
there are reports which indicate the reverse, depending on the sample size, type of cable
analysed etc. However for the purposes of this report and based upon recent
developments in cable technology, the figures used are believed to be representative.

Repair Times

Repair time is another factor to be considered under reliability. The repair of overhead
lines is significantly shorter than that of underground cables. In addition, “live-line”
maintenance can be performed on overhead lines, thus reducing the duration of the
outages.

Results for the last 10 years from Transpower’s records for overhead lines show the
following

Average repair time for forced outages 1.808 hrs


Planned maintenance average 17.45 hrs

Studies conducted by consultants Meritec show the following repair times for underground
cables.3 This is indicative for New Zealand conditions.

Average Underground (XLPE) Cable repair time 200hrs to 300 hrs

Based upon the failure rate and the repair times, availability per unit can be calculated.
This is based upon the outage rate and the total number of hours per year. Using the
figures above, the following availability per unit is expected.

Overhead Line Underground Cable Ratio


Availability per unit 0.9962 p.u. 0.9802 p.u. 1.01

3
Meritec Report, Repair Scenarios for 220kV and 110kV Cable Installations” November 2001
Page 10 of 23 13 March 2008
Rev 5
Waikato Wind Farm Project Overhead Transmission Line Evaluation

6.2 Efficiency

The efficiency of a transmission system is dependent upon the losses. For overhead
transmission lines, aluminium conductors are used mainly for weight purposes. Using a
dual transmission system greatly reduces the impedance of the circuit and hence the
losses.

In underground cables copper conductor is often used which has a lower electrical
resistance than aluminium. However, due to the fact that cables are buried, the heat
generated needs to pass through the soil to reach the surface where heat is dissipated.
Soil thermal resistivity plays an important part in heat dissipation and cable rating.

Appendix D shows the calculations of the losses associated with the overhead
transmission line.

Overhead Line (25km) Underground Cable (38km)


Ratio

Losses kW 4154 kW 4125 kW (600MVA) 1:1

6.3 Maintenance

As discussed above, repair time for overhead lines is measured in hours whereas repair
times for underground cables is measured in days. Overhead lines require a significant
amount of long term routine maintenance as well as ongoing unscheduled maintenance
which includes vegetation management, patrols, access maintenance, fault patrols,
climbing deterrent maintenance, minor steel replacement etc. The maintenance schedule
for an overhead line is typically as follows:

• Routine patrols every six months


• Vegetation management monthly
• Access maintenance six monthly
• Minor steel replacements annually
• Climbing deterrent maintenance after each patrol

The total cost of the above work is estimated at $50k per annum

6.4 Environmental Impact

Overhead transmission lines are large structures and create a visual impact. This is
known as “visual” pollution and may form the basis of discontent for landowners and the
public. However, in this particular design every measure has been taken to minimise the
visual impact by keeping structures below ridgelines and out of sight where possible. The
route has been selected to minimise the impact on any natural bush, areas of
environmental, ecological or archaeological significance.

Page 11 of 23 13 March 2008


Rev 5
Waikato Wind Farm Project Overhead Transmission Line Evaluation

6.5 Timing and Constructability

The terrain in the region is fairly remote, undulating and rural. Construction of a
transmission line through this terrain is constricted by access to the tower sites. In some
cases access will be only by helicopter due to the restrictions resulting from native bush
and the terrain.

The construction of the overhead transmission line is dependent on the quantum of


resources allocated. With 4 foundation crews, 4 tower erection crews and 2 large
conductoring crews, the line could be constructed within 12 months. However due to the
nature of the terrain, winter work would be significantly more difficult and hazardous,
particularly in the Limestone Downs area. It is therefore proposed that an 18 month
construction period be allowed to ensure that optimum productivity is achieved during the
summer months.

6.6 Future planning - Upgrading the Transmission Capacity

The wind farm has the potential to increase generation capacity by 110MW from the initial
540MW. If this generation capacity is achieved, the transmission circuits will need to be
upgraded or catered for at the initial design stage.

The thermal ratings of existing overhead transmission lines can be increased (provided
that the static components of the line are appropriately rated) by re-tensioning the line to
allow a higher operating temperature.

Underground cables do not offer the same flexibility and any increase in thermal capacity
will have to be catered for during the initial design stage.

7. APPENDICES

Page 12 of 23 13 March 2008


Rev 5
Waikato Wind Farm Project Overhead Transmission Line Evaluation

Appendix A

Map showing Overhead Transmission Line Route

Page 13 of 23 13 March 2008


Rev 5
Waikato Wind Farm Project Overhead Transmission Line Evaluation

Page 14 of 23 13 March 2008


Rev 5
Waikato Wind Farm Project Overhead Transmission Line Evaluation

Page 15 of 23 13 March 2008


Rev 5
Appendix B

Initial Capital Cost Breakdown


Of Overhead Line

Page 16 of 23 13 March 2008


Rev 5
Page 17 of 23 13 March 2008
Rev 5
Appendix C

Net Present Value Calculations


and Break Even Cost Calculations
for Overhead and Underground Options

Page 18 of 23 13 March 2008


Rev 5
Breakeven investment cost Underground Cable vs. Overhead line

6
Ci.oh := 31.961 ⋅10 Initial Investment for overhead line ($ NZ)

6
Cfut.oh := 12.8 ⋅ 10 Future capital replacement costs ($ NZ)

6
Co.oh := 1.233 ⋅10 Operational costs for overhead line including losses and
Maintenance per annum ($ NZ)

3
Cf.oh := 4.171 ⋅10 Fault costs for overhead line per annum ($ NZ)

6
Ci.ug := 367 ⋅ 10 Initial Investment for Underground Cable ($ NZ)

6
Co.ug := 1.137 ⋅10 Operational costs for underground Cable including losses and maintenance per
annum ($ NZ)

3
Cf.ug := 20 ⋅ 10 Fault costs for underground Cable per annum ($ NZ)

i := 5% Capitalisation Index

n := 40 Evaluation period 40 years -effective life of the system

n  1 
j
Cbe := Ci.oh + Cfut.oh + ∑ ( Co.oh + Cf.oh − Co.ug − Cf.ug ) ⋅ 
  1 + i
j=1

6
Cbe = 46.137 × 10

Net Present Value for Overhead Line

n  1 
j
NPVoh := Ci.oh + Cfut.oh + ∑ (Co.oh + Cf.oh ) ⋅  
  1 + i
j=1
6
NPVoh = 65.990 × 10

Net Present Value for Underground Cable

n  1 
j
NPVug := Ci.ug + ∑ ( Co.ug + Cf.ug ) ⋅ 
  1 + i
j=1
6
NPVug = 386.853 × 10

Page 19 of 23 13 March 2008


Rev 5
Appendix D

Calculations of Losses for Overhead Transmission


lines

Page 20 of 23 13 March 2008


Rev 5
Calculation of Losses for Transmission Line

Power := 518 MVA

Voltage := 220 kV
Power
CircuitCurrent :=
Voltage⋅ 3

CircuitCurrent = 1.359 kA

3
CircuitCurrent ⋅ 10
PhaseCurrent :=
2

Amps
PhaseCurrent = 679.699

PhaseCurrent
SubconductorCurrent :=
2

SubconductorCurrent = 339.849 Amps

ACResistanceGoat := 0.109 Ohms per km per Phase


2
PowerLoss := ACResistanceGoat ⋅ SubconductorCurrent ⋅ 2 ⋅ 3
3
PowerLoss = 75.535 × 10 KW /km /circuit

1.1
TotalLoss := ( PowerLoss ⋅ 25 ⋅ 2) ⋅ + 10% For corona losses and conductor length
1000

TotalLoss = 4154.548 Kw

Page 21 of 23 13 March 2008


Rev 5
Appendix E

Typical Tower Configuration


And Foundation Configuration

Page 22 of 23 13 March 2008


Rev 5
Page 23 of 23 13 March 2008
Rev 5
Page 24 of 23 13 March 2008
Rev 5