Variations of green:
Different ways for your building to
achieve green credentials

Official magazine of the Facility Management Association of Australia


Print Post Approved 340742 00155  $9.95 inc GST
A new kind of
superpower has
emerged in China.

When China’s largest oil and gas producer looked for a lighting control system for their new
headquarters that could redefine office building performance, they looked to Philips Dynalite.

From individual configurable settings for each floor that allow tailored lighting zones and flexible dimming
options, to daylight harvesting sensors that automatically adjust internal levels according to natural light
availability as it changes throughout the day. Philips Dynalite’s intelligent integration of total flexibility,
intuitive functionality and simplicity of use has not only powered significant energy savings for PetroChina
HQ, it has helped them set the new benchmark for ‘green’ building performance and efficiency in China.

To find out how Philips Dynalite can power your creativity and efficiency,
visit www.dynalite-online.com or call 1300 554 178.
From the Chairman 1

Chairman’s Message

W
elcome to the first edition of Facility Perspectives for 33 Provide a platform to promote products and services to the wider
2011. community;
As many of you would know, FMA Australia is part 33 Develop its global voice and influence to ensure that governments
of the Global Facility Management Association. This Association is a around the world recognise the importance of FM;
worldwide federation of member-centred organisations committed 33 Offer access to information sharing to enable best practice to be
to providing leadership in the facility management profession. available anywhere in the world; and
Founded in 2006 upon the success of the ‘Partners in Excellence 33 Network the FM community to further develop our industry
Agreement’, it created a constitution and structure to develop wider through international workshops, steering groups etc.
global recognition of FM. The Partners in Excellence Agreement was To date, GFM has a membership base of over 40,000. This is made
a tri-party agreement involving the International Facility Management up of full members from France, Brazil, the UK, Hungary, USA, South
Association (IFMA), British Institute of Facility Management (BIFM) Africa and Australia. Other affiliate members include those previously
and ourselves. mentioned in this article.
In 2007, Global FM (GFM) developed a Balanced Scorecard to In October 2010, GFM appointed Teena Shouse as the new
drive forward several initiatives. Some of the outcomes achieved over Chairman taking over from Steve Gladwin. Many of you would know
the three years include: Steve from being National Chairman of FMA Australia, and being
33 The success of World FM Day. 23 June 2011 will be our third instrumental with Stephen Ballesty in driving the FM Industry Action
successive celebration of FM across the world. It gives each Agenda back in 2004/05. Teena was the Past Chair of IFMA and
professional body the opportunity to celebrate their successes is passionate about the future of GFM. With the initial three-year
with their members and peers; period involving a great deal of setup and recognition of GFM, Teena
33 The launch of the annual Global FM Awards for Excellence in envisages an opportunity to take the association to the next step in
Facility Management in 2010. To be held again in 2011 with its growth phase. FMA Australia will be working closely with our
specific category winners of the FMA Australia Awards for international colleagues and contributing to the evolution of GFM at
Excellence being nominated; future International Workshops and other forums in 2011. I will keep
33 Establishing a resource centre to provide access to FM related you updated of any future developments.
material. This can be found on GFM website; and Enjoy the magazine, and I look forward to a prosperous year ahead
33 A gradual increase in GFM membership base. Recent for the FM industry.
membership by Euro FM, the International Facility Management
Steve Taylor
Institute India (IFMI India) and FM Arena (Switzerland) illustrates
Chairman
further interest from like-minded professional bodies.
FMA Australia
The benefit that FMA Australia will gain from GFM will be
predicated on our active involvement and engagement. The global
association was created in 2007 to:

Facility Perspectives
VOLUME 5 NUMBER 1
2 Contents

Level 6, 313 La Trobe Street


Melbourne VIC 3000
Tel: (03) 8641 6666
Fax: (03) 9640 0374
Email: info@fma.com.au
Web: www.fma.com.au

Published by

ABN 30 007 224 204


430 William Street
Melbourne VIC 3000
Tel: (03) 9274 4200
Fax: (03) 9329 5295

01 08 14
Email: media@executivemedia.com.au
Web: www.executivemedia.com.au
Offices also in Adelaide, Brisbane &
Sydney

Edited by: Gemma Peckham


Chairman’s FMA Australia Green
Editorial enquiries: Message Events Building
Tel: (03) 9274 4200 FMA Australia chairman Steve Green building is an ever-
Last November’s Awards for
Email:
gemma.peckham@executivemedia.com.au
Taylor discusses the benefits of Excellence was a fantastic night evolving facet of the building
FMA Australia’s involvement for FMA Australia, and the sector, and there are a growing
Advertising enquiries: with the Global Facility number of ways to achieve
upcoming ideaction11 will again
Tel: (03) 9274 4200 Management Association, and green credentials and implement
Email: media@executivemedia.com.au
looks towards the FM industry bring together ideas from across cost-saving initiatives.
in 2011. the industry.
Editorial contributors
Ross Bagnall, Robin Mellon, Tom
Cantwell, Marianne Baker, Phillip Roös,
Jeff Robinson, Adam O’Brien, Carly
Fordred, Terry Roche, Michael Green,
Chou Lien, Bryan Douglas, Annie Gales,
Peter Johnson.
04 Case study:
Engineering House 08 FMA Australian
Awards for
Excellence 2010
14 Stockland wins
inaugural award
for office energy
Take a look inside the efficiency
Engineers Australia Committee November 2010 saw the best
Layouts CitySwitch has awarded the
Belinda Crawford headquarters, which have and brightest of Australia’s
facility management first ever national award
received an overhaul of existing
industry recognised for their for improving office energy
Printed by building services with the help
Geon Impact Printing achievements. We provide a efficiency to property developer
of Norman Disney & Young.
full wrap-up of the winners, Stockland.
the highlights, and the
entertainment. 16 Cool runnings

46 ideaction 2011 Robin Mellon from the Green


Building Council of Australia
discusses the drawbacks and
We look towards this year’s
opportunities presented by
ideaction conference, and
air conditioning, and looks at
provide information about the
greener methods of cooling your
themes and presenters.
building.
Coming up in the
The editor, publisher, printer and their staff and
agents are not responsible for the accuracy or
June edition of
Facility Perspectives
20 Tax breaks for green
buildings
correctness of the text of contributions contained in Client Features Going green can be costly,
this publication or for the consequences of any use
made of the products, and the information referred to
Industry focus: IT RUD Chains but there may be good news
in this publication. The editor, publisher, printer and meets FM Brookfield Multiplex for property managers. Tom
their staff and agents expressly disclaim all liability of
Wiffen Products Pty Ltd Cantwell provides insight into
whatsoever nature for any consequences arising from Plus
any errors or omissions contained in this publication AE Smith & Son the government’s proposed
whether caused to a purchaser of this publication or + Green workspaces Express Glass Tax Breaks for Green Buildings
otherwise. The views expressed in the articles and
other material published herein do not necessarily + A full wrap-up of Armstrong World Industries program.
reflect the views of the editor and publisher or their
ideaction11 Haden
22 Are your buildings
staff or agents. The responsibility for the accuracy
of information is that of the individual contributors
+ An FM’s guide to Dorma Australia healthy?
and neither the publisher or editors can accept
responsibility for the accuracy of information which is reducing building waste Dyson Appliances Sick Building Syndrome can
supplied by others. It is impossible for the publisher
Judd Farris Recruitment be responsible for loss of
and editors to ensure that the advertisements + Spotlight on flooring GLG Greenlife Group
and other material herein comply with the Trade productivity, the poor health
Practices Act 1974 (Cth). Readers should make their + A look at social media Perpetual Property Care of workers, and can cost
own inquiries in making any decisions, and where
necessary, seek professional advice.© 2010 Executive for facility managers GGI Office Systems organisations greatly. Marianne
Media Pty Ltd. All rights reserved. Reproduction in
whole or part, without written permission is strictly + Education and training Australian Exhibition and Baker describes how building
prohibited. feature Conferences biology can help.

Facility Perspectives
VOLUME 5 NUMBER 1
Contents 3

26 52 64 68
Retrofitting for Maintenance and Spotlight on Water and Security
green buildings essential services lighting Insight into Australia’s water
Retrofitting provides not only a Changes to HCFC imports and Lighting is an area that can industry is invaluable in order
new lease on life for a building, global lease accounting present provide energy efficiency and to optimise water use within
but environmental, health and new challenges for facility cost savings. Two experts from a facility – find out how we
cost benefits as well – and managers, and we take a look the field share their insights into measure against other nations.
some properties are leading by at what this means for the the lighting revolution. The Australian Security Industry
example. industry. Association (ASIAL) also gives
us a run-down on vital security
considerations.

26 Sustainable retrofits
to existing buildings
make a big impact
52 Phasing out: the
departure of HCFC
refrigerants
64 Low carbon trend is
lighting the way 68 Water, water
everywhere
Lighting can make or break the In the wake of the Canadian
Ensuring that new buildings are Facility managers need to aesthetic of a building, but as CCPPP National Conference
environmentally considerate be abreast of changes to international lighting designer on public private partnerships,
is very important, but it’s our requirements involving HCFC Chou Lien points out, it can also Annie Gale compares the
existing buildings that hold the refrigerants. Carly Fordred assist in lowering a building’s Canadian and Australian water
potential to dramatically lower analyses how the phase-out will carbon footprint. industries.
our carbon output. Phillip Roös affect you.
looks at retrofitting to make a
difference. 56 Effective space 66 The
LEDs
pros and cons of Security
management
LEDs have the building 70 Think security
32 Finding new value in
old assets
The consideration of building
space is essential in the success
industry abuzz, as they promise
substantially lower energy The facility manager faces a lot
Jeff Robinson provides advice of any organisation, and Terry output. But there are some of security considerations for
to facility managers, building Roche provides insight into how obstacles to widespread uptake keeping building occupants and
owners and tenants to assist in best to use the space around of this advancement in lighting, contents safe. Peter Johnson
achieving green credentials. you. and Bryan Douglas examines outlines the important security
how to approach these. concerns for every facility
42 Going green 58 The impact of global
lease accounting
changes in Australia
manager.

An old railway building has been


given a dramatic new lease on New international accounting
life – InterfaceFLOR’s Sydney standards for operating leases
Facility Perspectives embraces
office sets the standard for may place an enormous
Green Printing Initiatives
sustainable refurbishment. administrative burden on
companies leasing real estate
and equipment. Michael Green
looks at the potential impact.

This publication has been printed


using ECO-CLEAN print processes.
Vegetable based inks and recyclable
materials are used where possible.

Facility Perspectives
VOLUME 5 NUMBER 1
4 Case Study: Engineering House

Engineering House facilities


get an upgrade
When the Engineers Australia Committee decided that an upgrade of the existing building services
within Engineering House Brisbane was required, they called on the expertise of Norman
Disney & Young (NDY) to act as the building services engineering consultants and project managers.

T
he mechanical upgrade works included replacement
of the existing packaged air-conditioning plant serving
the John Keys Room and the Hawken Room foyer
with chilled water air handlers to improve energy efficiency
and control accuracy.
The primary airside upgrade, however, was the conversion
of the existing 50-year-old air handling plant from direct
expansion coils to chilled water. This conversion would allow
the entire plant to be converted to variable air volume control
with variable speed drives fitted to the fans to improve
efficiency.
A key component of the brief for NDY was that the
equipment and fit-out demonstrated a commitment to energy
efficiency and building lifecycle.
To achieve this, a Climaveneta air-cooled chiller replaced
the existing York reciprocation compressors and air-cooled
condenser. The old plant was ostensibly from original
construction.
The key feature of the new Climaveneta chiller was the
highly efficient TurboCor compressor, which is a high-speed
semi-hermetic compressor using oil-free bearing technology
and infinitely variable speed control. The coefficient of
performance actually increases as the cooling demand
increases, making the combination of the converted air
handling plant and the chiller very efficient.
According to NDY Project Engineer and Project Manager on
this job, Ross Bagnall, timing was a key factor.
‘The changeover and downtime period of any mechanical
plant in Queensland is of high importance on any job, so the
timing of the upgrade was paramount. Luckily the conditions
were in our favour for the downtime period and we were able
to meet tenant demands,’ Mr Bagnall said.
Engineering House Queensland facade
The electrical upgrade in the building included the

Facility Perspectives
VOLUME 5 NUMBER 1
Case Study: Engineering House 5

Top Left: Existing plinth used to support chilled water pipework to new Climaveneta Air-Cooled Chiller. Top Right: Existing York DX Compressors. Bottom Left: New Chilled water pump incl.
VSD. Bottom Centre: Main air handling unit Variable Speed Drive (VSD). Bottom Right: Hawken Auditorium Foyer T5 lighting Upgrade.

conversion of all existing luminaires to their T5/T16 energy efficient chiller lift. Council approval was granted to lift the chiller into
equivalent. These lights were controlled using motion control passive place by crane between the hours of 1:30am and 4:30am on a
infrared (PIR) detectors, and override switching, which gives each Wednesday morning. The lift itself went as planned, with very few
tenant the opportunity to reduce the energy consumption within traffic disruptions, yet according to Mr Bagnall, ‘the 90-tonne crane
their particular tenancy. Class 1 type energy meters were installed required to lift the chiller into place at the opposing end of the
on each floor to monitor electricity usage and graph energy demand building involved some creative manoeuvring to minimise disruption
changes throughout the building. to adjoining tenants.’
‘A building management system (BMS) was installed to provide Despite a lack of existing building services information, NDY’s
full function control of the building to Engineers Australia. This extensive experience in such works allowed for a survey of the
system allows individual control of each zone in the building, while entire building to formulate a workable design. While this was
monitoring the equipment and allowing off-site monitoring and a rather challenging task that involved creative ways of reaching
control of the building’s mechanical systems,’ Mr Bagnall said. areas previously thought to be inaccessible, careful planning and
‘Airmaster Australia were the nominated mechanical contractors investigation by the engineers allowed it to be achieved without
who completed the mechanical upgrade. Their understanding of cost major disruption.
restraints and design initiatives allowed the project to reach practical About the author
completion under budget and within a reasonable time frame. Ross Bagnall
‘Whilst the budget did not allow for the removal of existing plant Ross Bagnall is Project Engineer and project co-ordinator within the MPlus
division for Norman Disney & Young Consulting Engineers in Brisbane. He
room equipment, Airmaster Australia dismantled and removed started working in the consulting building services industry in Ireland after
compressors, motors and the air cooled condenser, without charge, completing his honours degree in engineering and has been working with
Norman Disney & Young in Australia for the past three years. This work has
to demonstrate their commitment to not-for-profit organisations that included many types of multifaceted projects including mechanical plant
modifications such as chiller upgrades and building modernisations.
strive for modern energy efficiencies,’ added Mr Bagnall.
Web: www.ndy.com
One of the more challenging aspects of the project was the

Facility Perspectives
VOLUME 5 NUMBER 1
6 CLIENT feature
client FEATURE

DEMAND FOR PUBLIC PLACE RECYCLING


ON THE RISE
While good recycling rates are being achieved through kerbside collections, there is still much to
be done in collecting recyclable materials in public places.

P
ublic place recycling has become a focus for the Federal Since it began in January 2008, Public Place Recycling has installed
Government as it strives to meet our greenhouse gas 3,500 recycling bins in 90 public venues in Queensland alone.
reduction targets and the growing public demand for access Companies such as Queensland Rail and Virgin Blue have
to recycling facilities wherever they go. successfully implemented PPR programs, each estimating a diversion
A staggering 50% of a household’s recyclable material is generated of 50 tonnes of recyclable material from landfill per month. With
in public places1, and under 1/4 of this is recycled compared to more audits showing less than 5% contamination and the volume of
than triple the amount at home2. With public surveys all saying that recycling increasing since implementation, it is clear that these well
people want to recycle when they are out and about, the message is planned PPR programs are working.
clear - provide more public recycling bins.
The National Packaging Covenant (NPC) provides a framework for To enquire about the RUD C-Thru bins and other recycling systems,
private sector companies and government agencies to roll out the call Mark Williams on (07) 3712 8000.
Public Place Recycling (PPR) program. The goal of this program is
to increase the level of recycling in public places through installing 1 SOURCE: ABS 2007 REPORT ON SOCIAL TRENDS.

recycling bins at key retail, recreational, sporting, tourist and transport 2 SOURCE: HYDER CONSULTING AUSTRALIAN BEVERAGE PACKAGING CONSUMPTION,

sites. Currently, through industry bodies such as the Packaging RECOVERY AND RECYCLING QUANTIFICATION STUDY.

Stewardship Forum (PSF), ), the NPC co-funds


co funds over 38 projects with a
total value of approximatelyely $38 million.
RUD is one company that hat is working with the PSF on Public
Place Recycling projects. They nationally distribute
distribbututee an
extensive range of indoorr and outdoor recycling
recycliningg
bins that encourage efficient
ent waste collection
colleccti
tioon
and are designed specificallyally to help prevent
preevent
pr
cross-contamination of recyclable
ecyclable materials.
matterials.
ma
And because they are created ated for public
public
place use, RUD also offerss anti-vandalism
anti-va
vandalism m
and fire-resistance options.
ns.
RUD Product Specialistt Mark
Marark
Williams explains that “foror publicly
pu y
placed bins to be effectivee in
encouraging recycling with thh no-cross-
no-crross-
contamination, you need to tailortailo
or
waste bin options to the needs
of each particular site
and make it visually
obvious which materials
are to go into which bin.
You also need to design
the bin lid so that it not
only prevents the dumping ngg
of general waste, but also o
encourages the sorting off
recyclables.” Options such ch ass
RUD’s C-Thru range, which ch have ve
a clear body to allow an instant
nstant
visual cue on the appropriate
riate contents,
conten
ents,
can be combined with signage
gnage and shaped
sha
hape
p d
lids - round holes for cans,s, wide slits forr
paper – to help public usersers recycle responsibly.
responsnsibly.

Facility Perspectives
VOLUME 5 NUMBER 1
C-THRU Bin is a large stylish 180ltr capacity container with a clear body to enable viewing
of contents to ensure that there is no contamination of waste. The C-THRU Bin encourages
responsible recycling by providing a choice of hood apertures, specificially designed to suit
an array of different recycling/waste groups. Other key features include:
• Robust see through body;
• Choice of four hood apertures/colours;
• Keyed locking mechanism;
• Can be flat-packed for ease of storage;
• RecycleNow graphics and text sticker sets (optional extra).

For further information please call our product specialist Mark Williams on (07) 3712 8000.

8 West Link Place, Richlands Brisbane QLD 4077


• P: 07 3712 8000 • F: 07 3712 8001
• E: info@rud.com.au • W: www.bins4recycling.com.au
8 Awards for Excellence 2010

FMA Australia
Awards for Excellence 2010

O
n Thursday 25 November 2010, FMA Australia announced 2010 FMA Australia and UGL Services Young Achiever of
the winners of the 2010 Awards for Excellence at Sydney’s the Year Award
iconic Doltone House. Winner – Victoria Rose, UGL Services
Opened by the Hon. Anthony Kelly MLC on behalf of the
Premier of New South Wales, Kristina Keneally, and hosted by About the winner
Paul McDermott of Good News Week, this massive event included Victoria has a passion for driving business value through the
performances by legendary Aussie rocker Ross Wilson from Daddy development of sustainable strategy with a solutions focus. She is
Cool, the outstanding new talent of Justice Crew, the all-male hip- currently working for UGL Services overseeing the sustainability
hop dance and musical group of Australia’s Got Talent fame, and management of several key client portfolios. Her background
Darryl and Harmony Lovegrove. within Australia’s national stevedoring industry saw her move
There were an outstanding number of entries across all categories from operational efficiency toward a more environmental and
for the 2010 awards, all of a very high standard, and FMA Australia resource focus. She has been involved in NGERS and EEO reporting,
would like to congratulate all the finalists and winners. national project management, behavioural awareness campaigns,
strategy development/execution and large-scale global business
case developments. Victoria has recently been a key driver in the
development of an emerging leader’s network within UGL Services
to engage, lead, inspire and empower employees, support the
reduction of attrition and promote employer of choice status.
Currently Victoria chairs an Advisory Committee for a Sydney-
based sustainable equity management firm where she holds a
directorship. Additionally, she is working on developing a young
professional association which aims to position and prepare young
leaders and organisations for future success and growth. Her passion
and vision is to see organisations embrace sustainability as being
‘just good business’, whilst improving bottom lines, competitive
positioning and organisational culture.

This award was sponsored by UGL Services:


www.ugllimited.com/services.

Facility Perspectives
VOLUME 5 NUMBER 1
Awards for Excellence 2010 9

About the winner


Geyer undertook research to better understand the role of space in
supporting the management of knowledge in organisations. Findings
suggest that despite its passive nature, space plays an active role in
the creation, storage and transfer of knowledge. This could imply that
the best tool that organisations have to manage knowledge may be
their buildings.
This research suggests that the relationship between space and
knowledge demands consideration as part of the operational and
strategic management of the facility. Facility managers thus have
a privileged role as custodians of the organisation’s competitive
advantage. The research was led by Laurie Aznavoorian and Dr
Agustin Chevez from Geyer, with over 25 years in the profession.

This award was sponsored by Spotless: www.spotless.com/fm


2010 FMA Australia and Programmed Facility
Management State and Federal Government Excellence in
FM Award
Winner – Integrated Facilities Management Business Line, Jones
Lang LaSalle (ACT)

About the winner


Jones Lang LaSalle has been providing excellence in service
delivery to federal government departments since 1996. From
2009, the Integrated Facilities Management (IFM) team at Jones
Lang LaSalle has delivered a number of positive changes to federal
government departments in the management of their facilities. These
include a more strategic approach to property management, cost
savings through more efficient portfolio management, improved
transparency and management of data, enhanced procurement
capability, and refined maintenance processes. The IFM team has 2010 FMA Australia and ISS Product Excellence Award
also implemented innovations that have achieved tangible financial Winner – Airblade™ Hand Dryer, Dyson Appliances
outcomes for its clients. Examples of these are a lease buy-out option
methodology, lease classification rating system, technology systems, About the winner
and energy recovery program. The Dyson Airblade™ hand dryer is the world’s fastest and most
The IFM team has positively impacted the perception of the FM hygienic hand dryer.
industry by generating significant real estate savings for federal Dyson Airblade™ hand dryers deliver significant cost and energy
government departments (and in turn the Australian taxpayer), savings, providing a hand drying solution that dries hands hygienically
implementing transparent service delivery models, assisting in in just ten seconds. Using a hospital-grade HEPA filter, the Dyson
improving sustainability credentials, getting staff involved in industry Airblade™ hand dryer eliminates 99.9 per cent of bacteria to ensure
associations, and implementing thought leadership, as well as that hands are hygienically dried. A safety and hygiene benefit to all
building robust career paths for employees. facilities, especially when considering that cross contamination of
bacteria between people is 1,000 times more likely to occur when
This award was sponsored by Programmed Facility hands are damp.
Management: www.programmed.com.au Hand drying provisions are a core requirement of all facilities,
regardless of the size of the building, purpose of the facilities or end
users of the amenities. A hand drying device that can offer significant
savings, both environmentally, as it provides a solution to the gross
waste of paper towels, and from an operational point of view, as
it reduces the maintenance required to constantly refill dispensers,
as well as being a standout in its uniqueness, speed and appeal,
prompts good hand hygiene, and in the end delivers to facilities and
facility managers a healthier and more sustainable environment.

This award was sponsored by ISS Facility Services:


www.au.issworld.com

2010 FMA Australia and Spotless Most Significant


Research Initiative Excellence Award
Winner – Space as a Knowledge Management Tool, Geyer Pty
Ltd

Facility Perspectives
VOLUME 5 NUMBER 1
10 Awards for Excellence 2010

About the winner


Commonwealth Bank Group Property manages a complex property
portfolio for Commonwealth Bank and Bankwest, encompassing
retail branches and commercial offices across Australia and abroad,
for a workforce of around 45,000 people.
In 2007, the group reviewed its property strategy, and in particular
the support model available to manage the national portfolio of
sites, consisting of over 1,320 branches and 65 commercial office
buildings.
The fundamental premise of the group’s vision is that the
customer is at the centre of everything it does. To support this vision,
Group Property embarked upon a workplace renewal program to
2010 FMA Australia and Integrated Initiative in Customer not only provide state-of-the-art workplace facilities, but also to lead
Service Excellence Award a major change management initiative for greater collaboration and
Winner – Glen Eira City Council more flexible work practices across business units.
Group Property’s approach involved consolidation of office space
About the winner in key locations, by vacating old buildings and moving into new
Glen Eira City Council is the local government authority for the City purpose-built premises, and insourcing its entire facilities team
of Glen Eira, which covers 38.7 square kilometres of Melbourne’s to support the initiative. This was an opportunity for the team to
inner south-east. It was created in 1994 following a merger of introduce a comprehensive client services model with locally-based
the former City of Caulfield and the nearby suburbs of Bentleigh, facilities management (FM) resources, which are integrated with the
Bentleigh East, McKinnon and parts of Ormond. The area is home to business to support its retail and commercial priorities. Accordingly,
129,000 people across 56,000 households, representing more than new workplaces were commissioned and designed to:
160 different cultural backgrounds, and is the centre of Melbourne’s 33 Facilitate collaborative team-based work styles without ‘silos’;
Jewish community. 33 Foster innovation for competitive advantage; and
Council works to develop a tolerant and caring community where 33 Support faster, smoother workflows across the business.
everyone can feel that they belong and participate in the decision- The new workplaces are complemented by innovative technology
making that leads to achieving the best possible health, safety and to support smarter ways of working.
lifestyle options within the city.
Council is proud of the services it provides to the community, This award was sponsored by Jones Lang LaSalle:
and also of its occupational health and safety record. In order to www.joneslanglasalle.com.au
provide a first-class responsive service to the community it serves,
Council utilises a customer tracking system. It also uses an asset
management database.
This initiative involved the integration of other databases into
the customer request and asset management processes to further
enhance the service that Council provides to the community. In
this example, Council’s hazardous material database has been
successfully integrated into its customer request tracking system and
asset management database to enable it to provide an enhanced
service to the community and a safer working environment for staff
and contractors.

This award was sponsored by Integrated:


www.integrated.com.au

2010 FMA Australia and GJK Facility Services


Sustainability and Environmental Impact Excellence
Award
Winner – Forster Shopping Centre, Stockland (Shane Monro)

About the winner


Forster Shopping Centre, on the mid-north coast of NSW, is
Stockland’s first naturally ventilated mall. It relies on the natural
sea breezes to cool the centre, which means a huge reduction in
energy consumption. In addition, the centre is designed to rely
heavily on natural daylight rather than artificial light. As a result of
2010 FMA Australia and Jones Lang LaSalle Impact on these initiatives, Forster has recently been awarded Australia’s first
Organisation and Workplace Excellence Award 5 star retail NABERS energy rating. In addition, it achieved a 3.5 star
Winner – Commonwealth Bank Group Property NABERS water rating.

Facility Perspectives
VOLUME 5 NUMBER 1
Awards for Excellence 2010 11

The driving force behind these operational changes is the


centre’s facility manager, Shane Monro. Shane, in conjunction
with the Forster centre management team, initiated a number of
comprehensive sustainability programs and trials which have led to
reductions in energy and water consumption, and reduced waste
to landfill. Shane, who has been at Stockland since 2007, is at the
forefront of Stockland’s grass-root trials, and plays a fundamental
role in ensuring that Stockland’s shopping centres are responding
to the sustainability challenge. In addition, as a result his great work
at Forster, Shane has been utilised at other Stockland buildings for
providing ‘one-on-one’ coaching as a result of his capabilities and
expertise.

This award was sponsored by GJK Facility Services:


www.gjkfacilityservices.com.au 2010 FMA Australia and Rider Levett Bucknall Industry
Innovation Excellence Award
Winner – Airblade™ Hand Dryer, Dyson Appliances

About the winner


Dyson Airblade™ hand dryers are the world’s fastest, most energy
efficient and hygienic hand dryers, drying hands in just ten seconds.
These new technology hand dryers offer facilities an efficient,
sustainable and healthy alternative to the wastage of paper towels
and other drying devices.

Airblade™ technology
Dyson Airblade™ technology is different. Instead of painfully
slow evaporation, the Dyson Airblade™ hand dryer uses patented
technology to wipe hands dry with high velocity blades of air.
Unheated air is channelled through a 0.3 millimetre gap, no thicker
2010 FMA Australia and Atlantis Service Provider than an eyelash, and acts like an invisible windscreen wiper to wipe
Excellence in FM Award moisture from hands; leaving them completely dry.
Winner – Spotless / Department of Education and Training, The Dyson Airblade™ hand dryer was the first product to be
NSW awarded the Carbon Reduction Label from the Carbon Trust, a UK
environmental organisation dedicated to lowering carbon emissions,
About the winner which is strongly supported by the UK government. Represented
Spotless has over 30 years experience in large-scale facilities in Australia by Planet Ark, the Carbon Reduction Label program
management and maintenance contracts throughout Australia. One was only recently launched in Australia to inform consumers about
of the top 15 employers in Australia, Spotless has over 37,000 staff the carbon footprint of their everyday products. Locally, Dyson
internationally who work in facilities management, cleaning, catering Airblade™ was the second product to be recognised by Planet Ark
and laundry services. Australia for its positive impact on Australians’ carbon footprint.
From July 2005, Spotless has worked with the NSW Department Compared to conventional warm air hand dryers, the Airblade uses
of Education and Training to deliver facilities maintenance for 485 80 per cent less energy, so along with reducing energy consumption,
public schools across Sydney. Over this time, they have developed this also reduces the electricity bill. With certain facilities running
a strong collaborative partnership with the Department, based on hundreds of hand dryers at a time, these costs can add up, and the
exceptional service delivery and a strong focus on safety. This year reduction outlined above with one Airblade™ unit, once extrapolated
Spotless achieved a record zero injuries in the contract, and delivered across all hand dryers, results in significantly reduced running costs
all project works on time and on budget. for a facility.
Spotless’ service excellence is evidenced in their annual review
and audit results. They achieved 99 per cent in the most recent This award was sponsored by Rider Levett Bucknall:
annual review and received over 90 per cent in weighted scores for www.rlb.com
all assessments in the last three years. Spotless has also achieved
100 per cent compliance over the last three years in the delivery of
programmed, statutory maintenance, according to Australian FM
Standards.
The Department strongly supports Spotless as an expert FM
provider, and has praised Spotless for their dedication to Department
projects.

This award was sponsored by Atlantis: www.atlantis.net.au

Facility Perspectives
VOLUME 5 NUMBER 1
12 Awards for Excellence 2010

Awards for Excellence


2010 Finalists
Brisbane City Council, Neil Wood

Clean Space Solutions, Sani Seat

Commonwealth Bank Group Property

Dyson Appliances, Airblade™ Hand Dryer

Express Glass, 24 Hour Service

2010 FMA Australia and Airmaster Facilities Manager of Foster’s Group


the Year Award Geyer Pty Ltd, Space as a Knowledge Management Tool
Winner – John Burgess, Jones Lang LaSalle
GJK Facility Services
About the winner
Glen Eira City Council
John Burgess, General Manager Transition – ANZ Centre, recently led
a team of property and facilities specialists in planning and executing Jones Lang LaSalle (ACT), Integrated Facilities Management
‘operational readiness’ for ANZ Centre – the Southern Hemisphere’s business line
largest single occupancy office building, accommodating over 6,500
people. Jones Lang LaSalle, John Burgess
On behalf of Jones Lang LaSalle’s major client, ANZ, John and his Jones Lang LaSalle, The MLC Centre
team delivered all operations contracts, site commissioning, testing
and mobilisation on time and with no business interruption. Knight Frank, Jon-Paul Mather
The success of this work has been acknowledged by ANZ who
Port of Brisbane, Roger Waalder
requested that John take on a broader role to close out the ANZ
Centre project and transition of all project functions to business as Spotless Facilities Services, Nathan Volke
usual operations – a role that would normally be filled in-house.
John Burgess is a director with Jones Lang LaSalle’s Integrated Spotless/ACT Defence
Facilities Management (IFM) business. Working with one of Jones Spotless/Department of Education and Training, NSW
Lang LaSalle’s largest clients in the Asia Pacific, John currently fills
the role of general manager, ANZ Centre. John has contributed Stockland, Forster Shopping Centre (Shane Monro)
significantly to the environmental outcomes that the building has
Sustainable Living Fabrics, Green Living Collection
achieved, including its 6 Star Green Star ‘Office Design’ rating and
registration for another two Green Star ratings. He also ensured that UGL Services in Partnership with Australia Post
the building services were delivered to the highest standard, befitting
an iconic building such as ANZ Centre. He has helped to set the UGL Services, Victoria Rose
benchmark in facilities management; many of the practices from ANZ University of Melbourne, ESD Operations Guide
Centre are being rolled out across ANZ’s global portfolio.
University of Woolongong
This award was sponsored by Airmaster:
Woolworths Ltd, Rod Glover
www.airmaster.com.au

The 2011 FMA


Australia Awards for
excellence will be
held on 10 November
2011 at the grand
hyatt Melbourne

Facility Perspectives
VOLUME 5 NUMBER 1
90,000 ASSETS, 10,000 FACILITIES,
121 BASES AND A CONTINUING COMMITMENT
TO EXCELLENCE

Brookfield Multiplex Services has been providing DMM REBRANDS TO BROOKFIELD MULTIPLEX
comprehensive maintenance services to the SERVICES
Department of Defence for more than 10 years.
In 2011 DMM is rebranding to Brookfield Multiplex
The market-leading property and facilities Services, bringing the benefits of the market-leading
management company won its first contract for the Brookfield Multiplex Services brand to the Department
Department of Defence’s Sydney region in 2000, at of Defence portfolio. This rebranding coincides with
that time as part as a joint venture with John Holland the Department of Defences’ own Strategic Reform
and under the brand of Defence Maintenance Program.
Management (DMM). A year later DMM acquired the
The expansion of Brookfield Multiplex Services’
Shoalhaven portfolio. The contracts were merged to
service delivery into the Central Northern NSW
form the new Northern NSW region, one of five of the
region, as well as its centrally based Property Service
larger national regions.
Centre, enables it to capitalise on these
In 2007, DMM won the Department of Defence’s arrangements. Commensurate with Defence’s new
Southern Victoria contract and has subsequently been priorities, the company is in the process of
successful in maintaining these contracts. Combined, establishing a Relationship Hub. This will simplify and
the three portfolios comprise 121 bases, more than standardise processes, ensure consistency of
10,000 individual structures and facilities and approach, promote synergies and eliminate inefficient
approximately 90,000 items of fixed plant and variances between the regions.
equipment.
Services provided include hard facilities management, BROOKFIELD MULTIPLEX SERVICES MANAGES A
project management, Help Desk services, fixed plant DIVERSE RANGE OF PROPERTY ASSETS FOR THE
and equipment maintenance and Engineering DEPARTMENT OF DEFENCE INCLUDING:
Operations. Specialist considerations include:
- Heritage regulations for facilities such as the office buildings, workshop facilities, live-in
historic Victoria Barracks in Paddington and accommodation, messes, warehousing, carparks,
Victoria Barracks in Melbourne teaching and conference facilities, childcare
- Issues surrounding OH&S, asbestos and facilities, hospitals, wharf/docking facilities,
environmental management, including airfields, fuel farms, recreational fields and
Environmentally Sustainable Design equipment, gymnasiums and swimming pools, firing
- Compliance with statutory regulations such as ranges, vast areas of bushland and fencing,
Civil Aviation Safety Authority specialist training facilities, chapels, research and
requirements and the Defence Aviation Safety test facilities, armouries, fire stations, museums,
Manual libraries, cinemas, sewage and water treatment
- The need for 24/7 site availability plants, substations and high-voltage
infrastructure,and
- The requirement for Plant Special Licences and
data/communications/transmission facilities.
Defence security clearance levels
for subcontractors.

PH: 02 9322 2000 WEB: www.au.brookfield.com


14 green Building

appliances, replacement of all energy-intensive CRT monitors with

Stockland flat screen LCDs, timed air-conditioning switches in all meeting


rooms, and extensive staff engagement.

wins inaugural The rating was achieved without the use of GreenPower, where
customers pay a premium for electricity produced from renewable

national sources such as wind. The NABERS rating, from 1 to 5, is an


industry-recognised tool to help tenants benchmark their greenhouse

award for gas reduction performance.


‘Stockland has placed a strong emphasis on both leading building

office energy
management practices as well as trialling emerging technology
towards reducing their carbon emissions by 800 tonnes, and saving

efficiency
over $90,000 on energy bills during 2010,’ said MsToohill.
Energetics in Melbourne, and Cameron Chisholm Nicol in Perth,
were both runners-up of the 2010 CitySwitch Signatory of the Year
award, having achieved considerable savings through innovative
energy efficiency initiatives and extensive staff engagement.
The CitySwitch program, which began in 2006 in Sydney and was
launched nationally in June 2008, assists organisations to improve
the energy efficiency of their offices. Organisations that become
CitySwitch Signatories commit to achieving an accredited 4 stars or
higher NABERS Energy rating for their tenancy or whole building.
The current Australian market average is 2.5 stars.
An estimated 60 per cent of total energy demand in the central
business districts of Australia’s capital cities is attributed to stationary
energy use including office equipment, lighting and computers, with
tenants accounting for almost half the electricity consumed.
If all of Australia’s commercial office tenants were to achieve
a NABERS Energy tenancy rating of 4 stars or higher, a saving of
960,000 tonnes of CO2 could be made each year, which is the
equivalent of taking 200,000 cars off the road.
The national CitySwitch Signatory of the Year was selected from
the state winners as judged by representatives from the Green
Building Council of Australia, the Property Council of Australia and

P
CitySwitch.
roperty developer Stockland, who reduced carbon emissions
This year’s CitySwitch National Awards acknowledged leading
by 800 tonnes a year and saved $90,000 in energy bills, has
signatories from each state who have demonstrated an exemplary
won the first ever national award for improving office energy
commitment to reducing greenhouse gas emissions and a high level
efficiency as part of a national partnership program led by the City of
of environmental leadership and action.
Sydney Council.
Monica Barone, CEO of the City of Sydney, presented Siobhan The CitySwitch state award winners are as follows:
Toohill, Stockland’s general manager for corporate responsibility and New South Wales
sustainability, with the inaugural CitySwitch signatory of the year 33 Jones Lang LaSalle – CitySwitch Signatory of the Year under
award at its Sydney office in Castlereagh Street. 2000m2
CitySwitch assists companies leasing office space to improve their 33 Stockland – CitySwitch Signatory of the Year over 2000m2
energy efficiency. The program is run in partnership between the Australian Capital Territory
cities of Sydney, North Sydney, Parramatta, Willoughby, Brisbane, 33 Exergy – CitySwitch Signatory of the Year under 2000m2
Adelaide, Melbourne, Perth, Port Phillip, the ACT Government, the Queensland
NSW Department of Environment, Climate Change and Water, and 33 Queensland Nurses’ Union – CitySwitch Signatory of the Year
Sustainability Victoria. under 2000m2
The judges said that Stockland is undoubtedly a green market
33 Parsons Brinckerhoff – CitySwitch Signatory of the Year over
leader who demonstrated innovation, a dedicated commitment to
2000m2
the pursuit of office energy efficiency, and an ability to find creative
South Australia
solutions.
33 Zero Waste SA – CitySwitch Signatory of the Year under 2000m2
‘Energy efficiency is becoming a key competitive driver in the
33 Department for Families and Communities – CitySwitch
commercial office market as electricity prices continue to rise and the
Signatory of the Year over 2000m2
government prepares to put a price on carbon pollution,’ said Ms
Victoria
Barone.
‘CitySwitch is now Australia’s leading energy efficiency program, 33 Energetics – CitySwitch Signatory of the Year under 2000m2
representing 1.46 million square metres of office space and over 305 33 EPA Victoria – CitySwitch Signatory of the Year over 2000m2
tenancies – a 72 per cent increase on last year and approximately 6.5 Western Australia
per cent of the total office space in Australia’. 33 Cameron Chisholm Nicol – CitySwitch Signatory of the Year
Stockland achieved a top 5 star NABERS Energy tenancy rating for under 2000m2
their Sydney head office through inititatives such as sub-metering 33 Wood and Grieve Engineers – CitySwitch Signatory of the Year
to monitor energy use, motion sensors for lighting, energy efficient over 2000m2

Facility Perspectives
VOLUME 5 NUMBER 1
“Choosing Formula Interiors as the key partner for your
project gives you confidence in both the project’s outcome
and in the process through which it is delivered”

AdelaideBrisbaneCanberraMelbournePerthSydney

P 1300 004 004 | F 1300 404 404 | E info@formulainteriors.com.au | W www.formulainteriors.com.au

I&D 13764
POSITIVE RELATIONSHIPS ARE KEY

Mills Oakley Lawyers of level 6, 530 the quality of the materials and
Collins Street, Melbourne are ready workmanship is outstanding.
to tell anyone who wants to listen Throughout the process you and
about how delighted they are with the team were courteous and
the work carried out by Formula happy to answer any of our queries
Interiors. They were particularly while working with us to oversee
impressed that the project came in the project and ensure all our
on time and on budget without any needs were met. The ability of you
compromise on quality. and the Formula Interiors team
to meet our needs while working
“The ability of you and within a tight timeframe and strict
the Formula Interiors budget was critical and you did an
team to meet our needs exceptional job.
while working within a It was such a pleasure to work
tight timeframe and strict with the team at Formula Interiors,
budget was critical” I would highly recommend you to
anyone looking to refurbish or fit out
The following is an extract from office space.”
an unsolicited letter written by
Formula Interiors know the
The Information Technology
relationships established with their
Manager of Mills Oakley Lawyers,
clients, and how they manage their
Mr Josh Piper.
expectations are critical elements to
“We are delighted with the fit out their success.
at our new premises, the design
and layout suit us perfectly and
16 green Building

Cool Runnings
By Robin Mellon, Executive Director –
Advocacy and International – Green Building Council of Australia

The break-out staff area at Norman Disney & Young’s Green Star office.

W
hile the Chinese can lay the temperature of a building, without the use of any mechanical
claim to devising the systems, should form the basis of building design and retrofit work.
rotary fan for cooling in Reductions in energy needs can be achieved through site orientation,
the second century AD, it was not until window glazing and shading, good thermal mass and insulation
1902 that the first modern electrical air appropriate to the climatic conditions. Features such as these can
conditioning unit was invented. enable mechanical HVAC systems to be downsized. In essence, the
When American Willis Haviland better the building façade, the less energy required inside.
Carrier conceived of a machine that While traditionally most of the focus on HVAC has been on
could control not only temperature minimising its energy consumption, the Green Star rating system for
Robin Mellon
but humidity too, he could never have buildings takes an holistic approach to HVAC, assessing the amount
foreseen that his invention would irrevocably change our buildings of fresh air delivered into a space, the mix and circulation of the air,
and the lives of the people within them. With less need for openable the quality of the air being circulated, and the capacity of the building
windows, buildings could be constructed with larger floor plates. At to deliver the air effectively, all of which can affect the wellbeing of
the same time, air conditioning led to productivity increases as office occupants.
workers could work through long, hot summers without raising a The design and construction of an HVAC system is also considered
sweat. within a number of Green Star tools. In Green Star – Healthcare
But while air conditioning technology solved many problems, v1, for instance, access to the ducting for maintenance purposes is
it brought with it some new ones. In his book, Losing our cool: assessed, as is the construction of the system. In Green Star – Office
Uncomfortable truths about our air-conditioned world, Stan Cox Interiors v1.1, projects are required to clean the existing ductwork
argues that society is paying a steep price for our air conditioning. prior to use in order to reduce the amount of mould in the system
We stay inside longer, exercise less and get sick more often – and, itself.
of course, the electricity required to keep our buildings icy-cold is All Green Star rating tools measure the proportionally large
contributing to global warming. environmental impact of a refrigerant’s ozone depletion potential
As air conditioning has made the leap from a luxury to a necessity, (ODP) and global warming potential (GWP) – as a refrigerant
its use is ensuring its future use. The more we use air conditioning molecule might contribute 1,000 times more to climate change than
now, the more it contributes to climate change, hotter summers and a molecule of carbon dioxide, for example. Furthermore, the water
even greater demand in the future. use of an HVAC system is considered if the system uses a cooling
However, recent innovations in heating, ventilation and air tower, as well as the risks that such systems pose with regards to
conditioning (HVAC) technology are looking at ways of improving Legionella.
energy efficiency, and in turn delivering significant financial Innova21, the University of Adelaide’s new building for the
advantages and environmental benefits. Faculty of Engineering, Computer and Mathematical Sciences,
Smart, sustainable cooling concepts should be considered in boasts an array of HVAC innovations which will not only reduce the
conjunction with other good, green design principles. Simple environmental impact of the building, but help improve learning
passive design techniques that assist in controlling ventilation and outcomes for students.

Facility Perspectives
VOLUME 5 NUMBER 1
green Building 17

The eight-storey building was awarded a 6 Star Green Star – hours, when the tri-generation plant is turned off. Cooling the
Education v1 rating in May 2010, representing ‘world leadership’ in building in this manner is more efficient as it allows most cooling
environmentally sustainable design. potential to be produced using the tri-generation plant’s absorption
Innova21 features a natural gas-fired tri-generation plant chiller, which uses waste heat to produce chilled water, rather than
that supplies all of the building’s electricity, heating and cooling less efficient electric chillers. The use of geothermal energy storage is
requirements and will reduce peak electrical demand by around 60 an Australian first and is calculated to reduce the building’s cooling-
per cent compared to ‘business as usual’. Due to local planning laws, related CO2 emissions by 58 per cent.
the plant has been designed to run in ‘island’ mode, which means it Innovative cooling systems aren’t just the preserve of new
is isolated from the grid. This posed a number of design challenges buildings. Norman Disney & Young’s Melbourne office at 115
but was deemed worthwhile due to the significant operational, Batman Street is the first refurbished building to achieve certification
environmental and life-cycle savings offered by the plant. under all three Green Star Office rating tools. The project, which
Tri-generation installations typically convert around 75 to 85 per has transformed a derelict factory into a state-of-the-art multi-storey
cent of the energy source into electrical power and useful heat. This office block, achieved a 5 Star Green Star rating under the Office
compares favourably with conventional power generation, which has Design and As Built v2 rating tools, as well as a 5 Star Green Star
a typical delivered energy efficiency of only around 30 to 35 per cent. Office Interiors v1.1 rating. The building now accommodates the
This is particularly important in South Australia where the majority of entire Melbourne team of consulting engineers, and is a strong
power is generated by coal-fired power plants. symbol of NDY’s commitment to a sustainable future.
Costs for the plant were further offset by reducing the need for Within the building, a passive chilled beam system is used
traditional plant infrastructure such as back-up generators and for ground, first and second floor air conditioning. Chilled beam
separate boilers and chilling units. Innova21 also gained a ‘green tick’ technology works via convective cooling, where warm air rises and
for the 500,000-litre water tank that harvests water from around the is cooled by the chilled beam pipework in the ceiling panels and
campus for use in the building’s cooling towers and toilets. then falls back to the floor. The process is more efficient than air-
Another stand-out feature of Innova21 is the innovative use of based cooling in drier climates and also eliminates the effects of
the building’s foundation piles for geothermal energy storage. This draughts that may occur with conventional air conditioning systems.
system uses the thermal mass of the earth beneath the building to NDY’s system ensures the space is comfortable and operates well in
provide an efficient source of cooling for the building after hours. extreme conditions.
The system involves reticulating chilled water, produced by the The bottom line for facility managers is this: the efficiency of HVAC
building’s tri-generation plant, through pipework embedded within systems has improved significantly over recent years. Replacing an
the foundations. This cools the ground, and in effect enables the existing HVAC system with a newer model may help you to deliver
building to ‘store’ energy to cool areas, such as data rooms, after significant energy savings. However, if capital costs are an issue,

WHY WOULD YOU? WHY WOULDN’T YOU?

BEFORE AFTER

Using a cooling tower like this is yesterday’s thinking. Choosing a 3C Cooler is a decision for now,
They consume over 5000 litres of drinking water per day. and for the future. They consume up to 80% less water.
They carry the risk of the deadly Legionnaires’ disease. They eliminate the risk of Legionnaires’ disease.

LET MULLER
FIND THE BEST 03 8761 6155
SOLUTION mullerindustries.com.au
FOR YOU
COMPANY MEMBER

Facility Perspectives
VOLUME 5 NUMBER 1
18 CLIENT Building
green FEATURE

CLEANSCENE - THE ONLY NATIONAL


CLEANING EXHIBITION WITH FULL
INDUSTRY SUPPORT
The passive chilled beam system at 115 Batman Street was purposefully left exposed and is an active display of Norman Disney & Young’s commitment to Green Star efficiency.

C
considerLEANSCENE:
how you mayThe National
improve Cleaning
existing & Hygiene
equipment Expotuning
through will throughout the week (down to 14 per cent of all complaints on
be held
and installing 5 – 7 April
advanced at the
control Melbourne Exhibition Centre.
systems. Fridays).
CLEANSCENE
Air conditioning enjoys
should not association
be considered support across
a ‘bad’ a plethora
practice. It can of In some buildings, the air conditioning system may be switched
sectors and at asolution
be an effective level unprecedented
for cooling and forventilation
an Australian cleaning
needs, show
provided off over the weekend, reducing energy costs and emissions.
(NCSA, NUCCRA,
it is considered ACCA
as one and BSCCA
element are allofsupporters
in a range of the than
solutions, rather event However, this means that the air and the materials in the building
and betweenpoint
the starting themforrepresent
building over
design 90% of the cleaning
or operation. Smartindustry).
passive heat up over a summer weekend and cool down during winter. At
Training
design companies
features should (Joined
be at the Forces),
forefront educational
of designinstitutions
considerations, the same time, people have been in their homes all weekend and
(Gordon TAFE) as well
not an afterthought. as companies
From time to time, andeven
organisations offering
with the right aspect have become accustomed to being either in a space set to their
the
and latest in ventilation,
natural cleaning and hygiene
some products
artificial and services
assistance may bewill be on
required. own personal comfort level or able to dress in accordance with their
hand to inform and challenge
In cleverly-designed your current
green buildings, the airpractices and processes.
conditioning and surroundings. So, when they arrive at work on Monday, it’s easy
Wash
heatingroom
won’t products
need to(Pink
workHygiene),
as hard – large
whichmachinery
means less and sweepers
energy and to blame their lack of motivation on the air conditioning; by Friday
(Tennant),
greenhousecleaning consultation
gas emissions, and hygiene
and more dollars in supplies
the bank.are just a few the building may be more in balance and the people within it are
examples of note
One final whatabout
exhibitors have on offer.
air conditioning and the important role principal source of
looking towards theexpert knowledge
weekend for OHS
once more. professionals,
Facility thus
managers have
Association
facility managers members
can playand facilities andindoor
in maintaining building professionals
environment alike
quality providing facilities
an important and
role in building
making professionals
sure with
that buildings cananbeopportunity
not only to
will
and benefit
occupant from numerous
comfort. In anfeatures
analysisatoftheover cleaning show workers’
6,000 office including source hygienebut
cost-effective, andproductive
safety products
spacessimultaneously.
throughout the week – and
acomplaints
free seminar
in 34 series, workshops,
Australian a live
buildings demonstration
over stage and the
two years, researchers To registerthe
throughout to year.
visit CLEANSCENE: The National
Visit Investa’s Green BuildingsCleaning & Hygiene
Alive website
Clean
at the & GreenSustainability
Investa product areaInstitute
featuringhave companies
found thatwhogripes
have about
gained Expo in Melbourne in April go to www.cleansceneshow.com.au.
(www.greenbuildingsalive.com.au) to find out how you can diagnose
green certification
being too from GECA
hot, too cold, or aorEuropean
too stuffy too draughtyor American
are mostequivalent.
frequent Monday-itis in your office.
onCLEANSCENE
Mondays (25 per will cent
be co-located alongsideand
of all complaints) Safety In Action, a
fall dramatically

5 -7 April 2011
Melbourne
Exhibition
Centre

Major Sponsor Accredited by Supported by

Register now at cleansceneshow.com.au

Facility Perspectives
VOLUME 5 NUMBER 1
QFM Software
e w
ic

o
serv

rks
Controlling the FM Climate g
l o b al

QFM software from Service Works Global is an award


winning, web enabled CAFM solution which:

• Improves efficiency of FM assets and services


• Supports sustainability strategies
• Delivers typical cost savings
of up to 15% across FM operations
• Transforms data into meaningful information
to support financial decision making

For more information call 03 8676 0380

To receive a complimentary white paper,


‘Best Practices for Successful CAFM Implementation,’ please email info@swg.com
A donation will be made to Premier’s Disaster Relief Appeal for each enquiry
to help Queenslanders affected by recent floods

309789A_Grace Removals | 1685.indd 1 3/11/10 2:58:58 PM


20 green Building

Tax breaks for green buildings


By Tom Cantwell, head of real estate, DLA Phillips Fox
Fresh from the implementation of the Commercial Building Disclosure (CBD) laws in November 2010,
the Commonwealth Government is pressing ahead with its drive to green Australia’s building stock.

Facility Perspectives
VOLUME 5 NUMBER 1
green Building 21

T
he CBD program requires improvements to the façade or building fabric.
owners of commercial Where many parts of the retrofit work together to deliver the
office buildings of greater energy efficiency improvement, it is not clear how the amount
than 2000m2 to disclose the energy eligible for the tax break will be calculated. For instance, the
efficiency of the buildings during consultation paper contemplates that non-capital expenditure on a
a sale and for major leases. This post-installation NABERS assessment, development or installation of
compulsory regime has increased improved software for building automation and costs associated with
the focus within the property commissioning of the building may be examples of non-construction
Tom Cantwell industry on the energy efficiency of costs to which the tax break applies. However, it is unclear how
the existing building stock and is a fees payable to consultants such as architects and engineers, ESD
move away from the former voluntary rating processes. advisors or NABERS assessors for pre-submission evaluations would
However, the cost of retrofitting existing buildings to make them be handled.
more energy efficient has remained the major stumbling block for the
industry and has delayed the widescale take-up of energy efficient Key requirements
retrofits. Assistant Treasurer, Bill Shorten, and Parliamentary The scheme does not apply ‘as of right’ or as a self-assessment
Secretary for Climate Change & Energy Efficiency, Mark Dreyfus, regime. To obtain the tax bonus, a building owner must complete
have now jointly released the government’s consultation paper on three stages with significant approvals and reporting obligations:
their proposed Tax Breaks for Green Buildings scheme, which aims 33 Stage 1: The submission of the initial retrofit proposal, which
to increase the payback from green retrofits and overcome this has to be accepted and registered by the Department of Climate
hurdle. Change & Energy Efficiency (DCCEE).
33 Stage 2: The implementation of the retrofit. The current
Scheme overview proposal is that any contracts entered into prior to the retrofit
The scheme proposes a one-off bonus tax deduction of 50 per being registered would not result in eligible expenditure, even if
cent of the cost of eligible improvements. This tax deduction is in the works took place later. This may lead to significant delays in
addition to the normal capital allowance deduction, enabling 150 per the timing of works and be difficult to manage from a practical
cent of their total value to be deducted over their life and providing perspective. Biannual reports must be submitted to DCCEE
significant cash flow benefits to owners upgrading their properties. throughout this stage.
The scheme is open to existing commercial office buildings, 33 Stage 3: Upon completion of the works, a new four star-plus
shopping centres and hotels, provided they are currently covered NABERS rating must be obtained. Various compliance materials
by the National Australian Building Environment Rating System must be compiled and submitted to DCCEE for approval and
(NABERS) and have below average energy performance. NABERS for DCCEE to issue a certificate confirming eligibility of the
is managed by the NSW Department of Energy, Climate Change project for the tax bonus. As a NABERS rating requires 12
& Water on behalf of all Australian states and territories and is months of operational data after the building is commissioned
becoming the de facto energy efficiency standard, having also been and optimised, two years have been allowed for the issue of the
adopted by the mandatory CBD program. NABERS rating, with the ability to request extensions if building
Being limited to buildings with a NABERS rating of two stars or performance has not achieved the required level.
less, the scheme will deliver the most benefit by improving the worst It is only after DCCEE has issued a certificate that the bonus tax
performing buildings. In order to qualify, the energy efficiency of the deduction could be claimed. There would therefore be no certainty
building must lift by at least two stars and achieve a minimum four- at the commencement of the project whether or not the tax break
star rating. could ultimately be achieved, or the timing of the deduction. This
The scheme is due to commence from 1 July 2011 and run until will make budgeting for the impact of the tax break difficult for
30 June 2015, with $1 billion allocated for the life of the scheme. building owners.
With this budget likely to be rationed, one of the questions to be A number of completed projects have struggled to perform at the
resolved is whether the deductions will be granted on a ‘first come, level of energy efficiency predicted by the design modelling. It will be
first served’ basis, or whether only the best-performing projects will critical to ensure that all assumptions made in the modelling process
be chosen. are appropriate so that the building will achieve the required rating
upon the retrofit being completed.
A global approach As for the CBD program, the proposal is for much of the
The consultation paper proposes that a global approach be applied information in applications to be accessible through an online
to the costing of the energy efficient elements. This is appropriate register. This should prove a useful tool for the future planning of
as most retrofits seeking to achieve significant energy efficiency retrofits, with much greater transparency of costs and benefits.
improvements include many different elements, such as improving The scheme is undergoing consultation with the public and the
lighting, heating, ventilation, air conditioning systems, upgrading property industry, prior to its details being finalised. Submissions can
building management and control systems, and, more rarely, be made online to DCCEE.

Facility Perspectives
VOLUME 5 NUMBER 1
22 green Building

Are your buildings healthy?


Headache, fatigue, poor concentration… If the occupants of your building were frequently complaining
of these health issues, would you stop to consider the possibility of a sick work environment?

W
ith the current emphasis on energy efficiency, buildings What makes buildings sick?
are often constructed to be airtight, which can lead to Each room in a building may contain hazards that can make people
insufficient air exchange. Hence, chemicals that enter the sick. It is particularly important to consider the contaminants present
indoor environment either from the outside or from internal sources in areas where people spend the most time. Common indoor
stay trapped inside, where they may make us sick. In addition, the contaminants and their sources include:
use of electronic equipment and wireless communications is now 33 Dust and dust mites. Sources:
commonplace. 33 air conditioning systems;
33 ineffective cleaning practices.
What is Sick Building Syndrome? 33 Mould. Sources:
Sick Building Syndrome is a condition in which people experience 33 Air conditioning systems;
ill health only when inside a particular building. They are free of 33 Surfaces subjected to condensation;
symptoms outside of that building. While symptoms vary from 33 Areas kept damp by flooding or leaking water pipes.
person to person, they may include headache, fatigue, poor 33 Chemicals. Sources:
concentration, eye/nose/throat irritation and asthma. 33 Cleaning products, pesticides;
This condition is different to building-related illness, which refers 33 Chemicals released from paints, adhesives, building
to ill health caused by a particular building contaminant. These materials, furnishings;
symptoms are felt even when occupants are away from the source 33 Fumes from photocopiers, fax machines, printers;
of exposure. Examples include Legionnaire’s disease and asbestos- 33 Automobile exhaust.
related diseases. 33 Electromagnetic radiation. Sources:
33 Computers, printers, photocopiers and other electronic
equipment;

Facility Perspectives
VOLUME 5 NUMBER 1
green Building 23

equipment.
33 To reduce exposure to moisture and mould:
33 ensure good ventilation to reduce humidity in all indoor
areas;
33 completely dry all wet materials within 48 hours of them
becoming wet;
33 fix all water leaks, broken pipes, etc., as soon as they are
identified.
33 To improve indoor air quality:
33 place photocopiers, faxes and printers in an area that is
away from desks and is vented to the outside;
33 use cleaning agents such as microfibre cloths, white vinegar
and water;
33 have air conditioning systems serviced, ducts cleaned and
filters cleaned/replaced regularly;
33 ensure that intake air for air conditioning systems does not
come from damp, mouldy or polluted areas;
33 vacuum regularly with either a HEPA vacuum cleaner or a
33 Wireless internet, cordless phones and other wireless ducted vacuum system exhausted to the exterior;
devices; 33 avoid using pressed woods, particle boards and plywood;
33 Electrical switch boxes and building wiring; 33 use only paints, varnishes, wood oils and adhesives which
33 Street power lines; are made from natural, non-toxic products.
33 Electrical substations;
33 Rooftop mobile phone masts, radio repeaters and other How indoor air quality testing identified another potential
telecommunications antennae. workplace health hazard at client Richard’s workplace
33 Other sources: Several of Richard’s team members were concerned that the eye
33 Temperature and relative humidity either too high or too soreness and headaches that they often experienced at work may
low. have been associated with dust entering the office through the air
conditioning vents.
How building biology can help Although previous investigation by HVAC professionals had found
Building biology is the study of the relationship between buildings the air conditioning ducts to be clean, Richard asked me to conduct
and life. It is concerned with the impact of the built environment an assessment of the airborne particulate levels in the workplace to
on human health and the use of this knowledge to create healthier determine whether or not they were within safety guidelines.
buildings. It considers the connection between people and buildings
and between buildings and the environment. Test results
The application of building biology principles can result in an Testing found that respirable particulate (PM10) levels in all
energy-efficient building with minimum exposure to environmental sections of the workplace were well within the Australian Air
sources of illness. These principles can be applied either when Quality Standard. While there is no standard for ultrafine particulate
designing a new dwelling or when planning or executing changes to exposure, levels in all sections of the workplace were well within the
an existing structure. range normally found in indoor environments and were significantly
less than the outdoor levels.
Reducing exposure to environmental causes of illness
indoors Outcome
Ideally, the best way to reduce exposure to adverse factors is to The finding that respirable and ultrafine particulate exposures in
eliminate their sources from the work environment. If necessary, the workplace were acceptable provided some peace of mind for
less toxic alternatives can be substituted for more toxic products. If Richard and his staff.
it is not possible to either eliminate or substitute a source of illness, In addition, I noted during the assessment that the staff members
then either isolate it or increase your distance from it. Improved who had been experiencing headaches and eye soreness occupied
housekeeping practices may be beneficial if sources cannot be workstations beside the windows on one side of the building, where
eliminated. glare was greater than it was elsewhere in the workplace. I therefore
While a professional assessment, such as an electromagnetic field, recommended that steps be taken to reduce the glare to which these
radio frequency or indoor air quality assessment, of your property is team members were being exposed.
the only way of ascertaining your exposure to indoor health hazards,
there are many simple things that you can do to make your interior About the author
spaces healthier. Marianne Baker
33 To reduce exposure to electromagnetic radiation:
Marianne Baker is director of Building Wellness Pty Ltd. She holds a Diploma
33 locate spaces where people spend the most time as of Building Biology and is President of the Australasian Society of Building
far away as possible from power lines, substations and Biologists. Further information about indoor environment assessments can be
electrical switch boxes; obtained at www.buildingwellness.com.au or by emailing
33 use corded appliances rather than mobile or wireless marianne@buildingwellness.com.au.

Facility Perspectives
VOLUME 5 NUMBER 1
24 CLIENT feature
client FEATURE

BOILING BILLY

F
rom the campfire Billy to today’s will shut itself off automatically to provide peace of mind1.
original Boiling Billy, concepts Our filter system allows any maintenance crew, plumber or
haven’t changed much. electrician to change them, no need for a costly call out fee to
The simple things in life are often the the manufacturer to come out and our unit doesn’t turn itself
best, that’s why we at Boiling Billy have off when filters are due to be changed so no interrupted tea
come up with a new, energy efficient range times due to filter breakdown!
of Boiling Billy Green T. Our chiller unit requires minimum ventilation to operate
Wiffen Products Pty Ltd has been and doesn’t need an electronic pump to get rid of unwanted
providing Australians and many others of hot air and it certainly doesn’t waste our most precious
our great world with their daily doses of resource water on cooling itself unlike some competitors
caffeine for over 17 years, the difference who waste up to 16 litres of water over a 24 hour period and
today is that we have made things easier, that’s on standby mode!!
more efficient and more productive for Boiling Billy Green T is affordable, cheap to run, makes
today’s consumer. minimum impact on the environment and leaves almost no
The Boiling Billy Green T range has 9 carbon footprint.
different options for you to choose, unlike Boiling Billy Green T complies with all relevant Australian
other units available on the market, Boiling Standards, C Tick, CE Mark and BCA.
Billy work on water pressure alone. So we All Boiling Billy units are 99% recyclable and are all 100%
don’t need power consuming devices such repairable. All units are also available in stainless steel and/or
as pumps, sensors, electronic taps or complex other Kw capacities for all your needs.
electronic control boards. This makes us the most energy Remember you don’t have to be the biggest to be the
efficient unit on the market. best!!
We pride ourselves on simplicity! Come grab yourselves the Original Boiling Billy Green T,
The new range of units come with extra thick pure new 100% Australian owned and made in Australia.
wool blend insulation straight from the sheep’s back to
minimise energy loss and ensure that water temperature
remains at its upmost. They are also fitted with a 24 hour
7 day timer which allows the consumer to decide on what
times they need the unit to be running at its full potential
and when it needs to be in sleep mode. We don’t believe in
having a time out period as who wants to wait 10 minutes
while there instant boiling water unit decides to wake up!!
The units come with all the usual components solid brass
Australian made tap, twin filter system and a pressure limiting
valve to allow your unit to work at its optimum and conserve
water flow into your unit. Also if a water leak occurs the unit
1 Optional extra

Facility Perspectives
VOLUME 5 NUMBER 1
It’s finally here!
A boiling water unit that is effecient and 99% recycable.
Not only does it work on water pressure alone, it doesn’t need power
zapping water pumps, solenoid valves or electronic taps.
Simple Design
It Eliminates costly parts, and has easy maintenance.
No Electronic Waste
The unit has no toxic components that is hazardous to people,
as well as the environment.

Saves Power
All units fitted with a 24 hour timer to stop power wastage when not in use.

Come grab yourself the most green unit on the market,


get the original Boiling Billy by going into your
nearest plumbing outlet or Boiling Billy Distributor.

WIFFEN PRODUCTS Pty Ltd


1/33 Cedar Parade,
Moolap, 3221 Victoria
ABN 95 073 810 616

Ph 61 3 5248 7072
Fax 61 3 5248 7272
Email bbilly@pipeline.com.au
www.boiling-billy.com
26 Retrofitting for green Buildings

Sustainable retrofits to existing


buildings make a big impact
By Phillip Roös, Sustainable Design Practice Leader,
Sinclair Knight Merz

I
t is a popular belief that vehicles, industry and fossil fuel burning
power plants are the principal culprits contributing to climate
change. However, the global buildings and property sector
actually generates about 40 per cent of the world’s greenhouse gas
emissions, meaning that existing buildings are an essential element in
the global assault on kicking the carbon habit.
Few new sustainable buildings are constructed so they lack the
ability to impact global warming in a significant way. This is where
existing buildings provide so much opportunity as they typically
undergo periodic upgrading and refurbishments.
Such refurbishments can be a combination of ‘hard’ engineering
solutions as well as smart, informed choices in fit-out design and
specification.
At the fit-out stage, the application of sustainable design principles
can deliver significant energy savings that produce less carbon
emissions for the equivalent cost of a standard commercial fit-out.
And sustainable building design and commercial office fit-out
is not just limited to achieving reduced energy consumption.
Considering many of us spend a considerable portion of our lives
inside an office environment, applying smart design is a protection
from hazards such as poor indoor air quality and eyestrain from
insufficient or inappropriate lighting.
The considered nature of sustainable design typically creates office
working environments with thoughtful layouts that respond to an
organisation’s purpose and culture. Such environments contribute
strongly to productivity, staff interaction and collaboration, and
respond to critical issues of staff engagement and retention.
From a commercial property owner and manager’s perspective,
desirable facilities translate to improved occupancy and return on
investment.

The measures of a sustainable building


A wide range of sustainable building measures can be incorporated
into the fit-out of existing commercial buildings including:
33 Energy efficiency through energy management;
33 Energy saving lighting systems;
33 Energy efficient supplementary air conditioning systems;
33 Low energy computer servers and IT solutions;
33 Water efficient fixtures, fittings and appliances;
33 Materials and furniture with low environmental impact;
33 Internal planting;
33 Waste management;
Sustainability Victoria Offices 33 Sustainable transport.

Facility Perspectives
VOLUME 5 NUMBER 1
Retrofitting for green Buildings 27

A key to success is good project management consumer of energy. Careful server room design and technology
One hurdle to overcome is the common perception and anxiety selection achieved large reductions in energy consumption. IBM
around incorporating environmentally sustainable design (ESD) into blade servers were implemented, with the number of servers
the retrofitting of existing buildings: that it is not easy being ‘green’. reduced through consolidation and virtualisation. Blade servers
Developers and clients alike believe that it is more expensive to consume approximately 30 per cent less power than standard rack
achieve than regular construction; that it works at odds with the servers and utilise monitoring tools that can further reduce the
capital budget, and that additional features and consultants increase power consumption of non-critical servers during the night and on
costs. weekends. And energy efficient laptops (which use approximately
The reality is that any additional capital cost will result in one-fifth of the energy of desktops) replaced desktop computers.
decreased operational costs and add value for the client. If
sustainable principles are incorporated into the project from the
outset, great efficiencies can be achieved. This is because the
efficient use of natural resources and reduced wastage translates into
better building performance and savings in whole-of-life costs.
Successful development of green buildings begins with an
integrated project team who are committed to achieving a
sustainable building and taking a holistic approach to construction.
Then comes environmentally sustainable and energy efficient design,
through to construction and operation.
At the beginning of a project all stakeholders should collaborate
in a workshop environment, including ESD consultants, client and
design team. They should work to identify the project’s vision,
individual’s values, client needs, potential outcomes, project risks,
constraints, goals, milestones and tasks.
These workshops are key to a project’s success because if ESD
principles are not incorporated into the design from the outset, it is
difficult and costly to make changes once the construction phase has
been reached.
To illustrate the potential of this kind of approach, Sinclair Knight Sinclair Knight Merz’ Rooftop Garden

Merz’ (SKM) ESD team recently assisted Sustainability Victoria


(SV) to achieve a certified 5 Star Green Star Office Interiors Version Much of the fit-out furniture is modular, which contributes to
1.1 rating for the fit-out of their Melbourne office. It also achieved materials’ efficiency. Items can be easily moved around the office
outstanding results in energy efficiency and greenhouse gas and reused in new locations. Plus the inclusion of an internal
emissions reductions, and in addition to the Green Star achievement, environmental management system for the recycling of waste
with SKM’s assistance, it was awarded a 5 Star NABERS tenancy resulted in an incredible 94 per cent of operational waste being
energy rating 12 months after occupancy. diverted from landfill.
Being the government agency charged with championing the Implementing these principles resulted in the achievement of
efficient use of natural resources and reduced environmental the certified Green Star rating. However, to achieve longer-term
impacts, SV was keen to demonstrate what could be achieved. environmental sustainability the tenant needed to know how to run
the building to maximise energy and water efficiency whilst reducing
Innovation through design elicits the best results waste generation. This meant creating a ‘Building Users Guide’,
Through the design process, an abundance of innovative ideas were setting out recommendations for maintenance and instructions on
manifested and duly implemented into SV’s tenancy. These included the use of all building systems.
‘plant walls’ of climbing plants on a wire screen with integrated The achievements of this project are very good news for
lighting. This met security requirements and assisted in filtering air Sustainability Victoria and its staff. The performance of the ESD
pollutants from the indoor environment. initiatives exceeded expectations and achieved superior occupant
Paints, carpets, adhesives and finishes with low VOC (volatile comfort and workplace health compared to conventional office fit-
organic compounds) content were selected to minimise toxic off- outs.
gassing. One study conducted post-occupation revealed increased
To encourage a reduction in motor vehicle use, best practice productivity levels and a reduction in sick leave of 30 per cent
cycling facilities were installed in the basement of the building compared with Sustainability Victoria’s previous tenancy.
including a dedicated secure bicycle parking area, lockers, showers In addition to this, the following improvements were evident:
and change rooms. In addition, car parking spaces dedicated to SV 33 Concentration in meetings increased by 34 per cent;
were reduced to 25 per cent less than the maximum allowed by the 33 Meeting participation increased by 41 per cent;
local planning scheme. 33 Staff perception of better air quality and office ambience
Naturally, a key target was a reduction in energy use. Passive improved by 19 per cent.
design features included positioning work stations adjacent to Sustainability Victoria’s offices now consume 40 per cent less
natural daylight sources and individual light fittings were retrofitted energy, produce less carbon emissions and provide improved indoor
with daylight dimming and occupancy sensors to minimise hours of environment quality, yet were completed for equivalent cost of a
operation and maximise use of natural daylight. standard commercial fit-out. Careful waste management during fit-
Information and communication technology is another major out construction and office relocation also saw many items reused or
continued on page 30

Facility Perspectives
VOLUME 5 NUMBER 1
28 CLIENT feature
client FEATURE

HELPING AN OLD DECO DAME GO


GREEN – INSIDE AND OUT
1920s Melbourne city building gets a green makeover.
Installation by AE Smith of the new air handling unit for 131 Queen Street, Melbourne – crane-lifted into place onto the building rooftop.

A
n iconic Melbourne art deco building has just won a grant to are far more environmentally friendly, the 131-141 Queen Street icon
transform their 90 year old heating and cooling systems to has recently won another Green award through the Committee for
21st century energy efficient standards. Melbourne.
Working with AE Smith’s Emerald Sustainable Performance In a unique program designed to beautify Melbourne’s city building
(ESP), the owners of the iconic 131-141 Queen Street building have rooftops that are dominated by air conditioning units, “Growing Up”
been awarded a $500,000 grant via the “Green Building Fund” – a brought together green roof industry partners with award winning
government initiative to improve energy ratings and efficiencies of design and CBD buildings to create an environmentally vibrant, green
older buildings. space to the city skyline.
Built in a time when a building’s design was not focused on saving 131Q’s rooftop is now an award winning living sanctuary, with
energy, reducing carbon emissions or achieving Green Star Ratings, landscaping, tiered gardens, BBQ facilities and various sculptural
the building’s HVAC systems are receiving a complete overhaul. screens - giving the building an external green makeover.
As part of applying for the Green Buildings Grant, AE Smith’s ESP “It’s great to work with building owners such as these who
completed NABERS assessments of the property as well as looked at really embrace preserving the heritage of their property with green
ways to replace the inefficient old systems. initiatives,” adds Doug.
“131-141 Queen Street will be going from a zero NABERS Rating Owners Corporation Manager and part owner Amanda Black
to a 31/2 Star Rating with this retrofit project,” says Doug Binns, commented “the need to upgrade the HVAC systems was undeniable
General Manager of AE Smith’s ESP business unit – established by AE however the enormity of the task and the limited financial resources
Smith to help customers find ways to turn their commitment to being of the ten owners proved to be a stumbling block in taking the very
efficient with energy and water management of their property assets first step.
into reality. “With the help of AE Smith, the owners were able to break the
Now collaborating with Lincoln Scott Engineers, AE Smith ESP project into achievable goals which gave us the confidence to finally
are facing some challenges designing and reinstalling systems for a face the challenge head on. It was a significant step in ensuring
property built in the 1920s. The work on the HVAC system includes a the building retained its position in the ever changing Melbourne
new chiller; new air handling unit and new heating hot water system CBD property market which is fast becoming environmentally
throughout the building to replace the old electric duct heaters. The focused. At the same time, we were mindful that the project met the
work has been undertaken primarily after hours so that the disruption performance expectations of the building occupants, the majority of
to the occupants has been minimised. which are owner occupiers”.
“These older buildings can throw up a few challenges – but we’re
mindful of keeping costs down as much as possible while achieving
the environmental outcomes,” adds Doug.
In addition to the Green Building Grant to ensure HVAC systems

Facility Perspectives
VOLUME 5 NUMBER 1
30 Retrofitting for green Buildings

continued from page 27

recycled, with waste to landfill reduced to less than five per cent by procure, manufacture, transport and recycle materials and provides
volume and 87 per cent of construction waste being recycled. a complete understanding of the comparative impact of material
choices.
Size is not important In the case of SV’s fit-out, workstations were designed for
These outcomes are within the reach of every business and disassembly and return to the manufacturer for recycling
organisation regardless of size. Modifying existing buildings does not and/or reuse when no longer required. This also contributed to the
necessarily require a complete overhaul. Changes can be small and fit-out achieving maximum points in the Green Star Office Interiors
incremental. For instance, lighting and other forms of energy usage Workstation calculator.

provide significant opportunities. Light and movement sensors avoid Exceptional sustainable outcomes occur where building designers
excess energy use and applying insulating film to exterior façades and constructors can respond strongly with an integrated design
also reduces the load. approach that ensures the right outcome without a dramatic change
In the Sustainability Victoria project, further annual energy in overall design or capital cost. And anticipating new technologies,
reductions are being achieved with an automatic master switch that even when they are not applied in the initial capital works, should be
controls all non-essential equipment (e.g. computers, desk lamps and provided for.
printers) during out of office hours. A zoned manual override switch From the perspective of legislation, building owners and operators
is also provided to accommodate occasional out-of-office hour use. also need to be aware that governments are signaling the imposition
Newer and more powerful blade computer servers reduce the of broad-scale sustainable building legislation and regulation, e.g.
need for large air conditioning systems and therefore deliver energy the Australian Government has accepted a recommendation from
and cost savings. This mitigates a major hurdle for existing buildings, its 2020 Strategic Summit for all buildings to be carbon neutral after
which is the ability to upgrade ventilation and air conditioning 2020.
systems due to constraints of building structures and space. Already, the Australian Government’s Energy Efficiency in
Traditional notions that natural materials are more environmentally Government Operations (EEGO) has nominated 2011 as the target to
friendly than man-made products have become redundant. The reduce the energy intensity for tenant light and power by 25 per cent
science of life cycle analysis measures all the energy used to and for central services by 20 per cent.

Facility Perspectives
VOLUME 5 NUMBER 1
CLIENT FEATURE client feature 31

THE GLASS IS GREENER...

T
he Council of Australian Governments (COAG) met in 2009 to
outline the “National Strategy on Energy Efficiency”.
Some of the outcomes from this meet included; increasing the
energy efficiency requirements for new residential buildings to target a
minimum of six stars or equivalent, to be implemented by May 2011. Also
a major change being the phasing in of mandatory disclosure of residential
building energy, greenhouse and water performance at the time of sale
and lease, commencing with energy efficiency by May 2011.
A separate 18-month independent study has concluded that in many
areas of Australia, typical Australian homes can achieve an increase of
up to 2-2.5 stars of energy efficiency simply by changing from the worst-
performing windows to the best-performing windows.
Key findings from the study
3 Moving from the worst-performing windows to the best performing
windows can increase the star rating of typical houses in many parts
of Australia by up to 2-2.5 stars
3 Applying passive solar design principles in glass can provide further
improvement by up to 1 star
3 Different locations within Australia require different glazing solutions,
and within that, even different orientations of the building benefit
from different window solutions

Speak to an expert at Express Glass on 1300 666 234 or visit


www.theglassisgreener.com.au

Speak to an expert at Express Glass


to find out more....1300 666 234
www.expressglass.com.au
Are your existing
Choosing to have your existing glass changed to
windows costing you energy efficient glass is one of the most simple and
MONEY? cost effective ways to cut power consumption, improve
your energy rating and ensure a comfortable building
Did you know that in summer 87% environment all year round.
of heat gain in a building is via
windows? Energy ef ficient windows -
s Help the environment
s Add market value to your building
How about the fact that in winter
s )mprove the star rating of your
those same windows allow 49%
building
of your building’s heat loss.
s Decrease the use of
electricity
By using the right glass and/or
s 2educe the noise coming
film solutions we can prevent up through your window
to 70% of heat transfer, reducing s Never stop working
your air conditioning costs and s )mprove your re-sale position.
save you money.

www.theglassisgreener.com.au

Facility Perspectives
VOLUME 5 NUMBER 1
32 Retrofitting for green Buildings

Finding new value in old assets


By Jeff Robinson, Sustainable Buildings Manager, Aurecon

T
he sustainable refurbishment of existing
buildings is topical in the commercial Australian Commercial Sector – CO2
property industry at the moment, with
much discussion about the imperative for emissions by application
owners of buildings to improve the energy
performance of their buildings in order to retain
tenants and the value of their assets. There
are compelling reasons for the sustainable
refurbishment of existing buildings, and the
many opportunities to reduce energy and water
usage or to improve the indoor environment
quality for building occupants. These
range from building tune-ups to large-scale
refurbishments.
To illustrate the critical roles of the facilities
management provider, the building owner, and
the tenant in helping to achieve and maintain
the environmental targets that have been set
for the building, we can review some case
studies where our clients have realised new value from their existing increased in importance since their 2008 survey.
buildings by strategic reinvestment in their services and the people 53 per cent of organisations surveyed thought that there was
who operate and maintain these. We will also discuss some of the strategic benefit in occupying a green building and said they
opportunities for building owners to obtain financial assistance with would be prepared to pay more rent for it, with tenants citing
funding their sustainable refurbishments. operational cost savings and corporate responsibility as the
most common driving factors. Major corporates in the survey
Compelling reasons for the sustainable refurbishment of said that green buildings not only offered cost savings and
existing buildings reduced energy consumption, but benefits such as increased
33 There is increasing evidence from property valuers that green productivity, decreased employee turnover, less sick leave and
buildings will achieve higher valuations than non-green buildings. better morale.
The potential upsides for Green Star buildings are: 33 Governments are using their power as prospective tenants to
33 increased renewal probability; drive energy efficiency improvements in the commercial building
33 improved occupancy rates; stock. The federal government requires a 4.5 NABERS Energy
33 decreased down times; rating for both base build and tenancies, and the Victorian
33 lower operating costs. Government has a requirement for a 4.5 Star NABERS star
Large institutional property investors are having to report rating and 5 Star Green Star rating for the base building and 5
on the Corporate Social Responsibility of their operations and Star Green Star and 5 Star NABERS rating for the tenancies it
their portfolio, and many are actively working to improve the occupies.
environmental performance of their assets or to divest assets 33 The other important piece of legislation brought in by the
which they deem to be non-strategic, or where the cost of government last year, which came into force at the beginning
upgrading the asset to improve its environmental performance of November 2010, is the mandatory requirement for building
is deemed to not be commercially viable. owners and lessors of commercial property space of 2000m2 or
33 Tenants are demanding green buildings. According to the latest more to disclose energy efficiency information to prospective
Colliers International ‘Office Tenant Survey’, sustainability has buyers or tenants during sales, leasing or subleasing negotiations.

Facility Perspectives
VOLUME 5 NUMBER 1
Retrofitting for green Buildings 33

Those who fail to comply face a $110,000 fine on the first day, pump power allowances and requirements for metering and
and $11,000 per day thereafter. This legislation will create much commissioning.
greater transparency in the market and benefit those building 33 Other recent studies have shown that green buildings outperform
owners who have invested in improving the energy performance non-green buildings in terms of comfort and productivity.
of their portfolios for some time. We are currently seeing many 33 500 Collins Street in Melbourne found a nine per cent
of the large property owners investing in measures that will increase in typing speeds of secretaries and a seven per
substantially improve and maintain the energy performance of cent increase in lawyers bill rates.
their assets. 33 At the City of Melbourne’s CH2, productivity has risen by
33 Government incentives such as the AusIndustry Green Building 10.9 per cent since staff moved into their green office,
Fund aim to reduce the impact of Australia’s built environment resulting in annual savings of $2 million.
on greenhouse emissions from commercial office buildings. The 33 40 Albert Road, Melbourne, noted a 13 per cent increase
program will provide $90 million in grants for five years, 2008– in staff productivity in their 6 Star Green building.
2013. Many recent sustainable refurbishment projects have
availed themselves of the matching funding from this program to Realising new value from old assets
undertake energy improvement projects. While there are many compelling reasons for the sustainable
33 From 1 July 2011, the Tax Breaks for Green Buildings scheme refurbishment of existing buildings, what are the best opportunities
will offer businesses that invest in eligible assets or capital works to find new value in the old assets?
to improve the energy efficiency of their existing buildings – from The answer will be different for every building, and will depend
two stars or lower to four stars or higher – the ability to apply for on factors such as the age of the building, the quality of the original
a one-off bonus tax deduction of 50 per cent of the cost of these design, specification, construction and commissioning, how the
improvements. According to assistant treasurer Bill Shorten, ‘The building has been maintained, and what refurbishment works have
Tax Breaks for Green Buildings scheme is expected to provide been carried out.
a boost of around $1 billion over the life of the scheme to help Some of the key upgrade opportunities that will add value to the
“green up” existing buildings across Australia.’ building include:
33 The City of Melbourne has developed another creative way of 33 Updating the aesthetics and image of the building;
providing funding for sustainable refurbishments. The City of 33 Improving the spatial functionality and increasing space efficiency
Melbourne can now help building owners obtain finance for (NLA/GFA);
retrofit works that will reduce energy use, save water and lower 33 Providing additional services to tenants, adding a coffee shop in
carbon emissions through the city’s 1200 Buildings Program. An the foyer, a gym and child care in the building;
amendment to Victorian legislation means financial institutions 33 Upgrading technology; and
will be able to advance funds to commercial building owners for 33 Providing a better working environment with better indoor
environmental retrofitting works. These funds will be recovered environmental quality.
by the City of Melbourne through a charge linked to rates
collection. Opportunities to reduce energy and water usage whilst
The City of Melbourne has developed the financial improving indoor environmental quality include:
mechanism with banks to build incentive for environmental 33 Reducing lighting and small power loads by:
retrofits and overcome the difficulty that many building owners 33 Installing energy efficient lighting – T5 lights with automatic
had accessing capital to finance their environmental projects. lighting controls designed with optimised layouts to avoid
33 Buildings offer one of the lowest cost opportunities for Australia under- or over-lighting;
to reduce its greenhouse gas emissions. According to Climate 33 Reducing the level of background lighting whilst providing
Works Australia in their ‘Low Carbon Growth Plan for Australia’ task lights for occupants;
(published March 2010), Australia can reduce its greenhouse 33 Replacing incandescent lamps with compact fluorescent or
gas emissions to 25 per cent below 2000 levels by 2020 at an LEDs;
average annual cost of A$185 per household, using technologies 33 Replacing low-voltage lighting with compact metal halide
that are readily available today. The building sector has the lamps; and
potential to contribute 11 per cent of the lowest cost emissions 33 Upgrading to energy-efficient equipment such as:
reduction opportunities – 77 per cent of the opportunity is 33 Multi-function devices
within the commercial sector (including 16 MtCO2e for existing 33 Computers and IT equipment.
buildings retrofits and 4 MtCO2e for new builds). 33 Reducing infiltration into and out of buildings by sealing gaps at
33 The government has recognised that improving the energy junctions in building elements; roofs, walls, floors, roof lights,
efficiency of buildings will make a significant contribution windows, doors, chimneys and vents (something that is rarely
to reducing Australia’s greenhouse emissions and water done in Australia but is a mandatory requirement in the UK is the
shortages, and they have recently introduced legislation through pressure testing of the building by the contractor to ensure that
the Building Code of Australia that has required substantial the building meets the specified air leakage criteria);
improvements in the energy and water efficiency of new 33 Improving the indoor air quality for the building occupants by a
buildings and large-scale refurbishments. BCA 2010 saw combination of the following:
energy efficiency requirements increase by 25 per cent overall, 33 improving the quality of the air filtration and cleaning the
with increases in ductwork and pipe insulation requirements, existing ductwork systems;
additional requirements for sealing doors and window frames, 33 increasing the amount of outside air supplied to occupants
and an increase in the energy performance of façades of (whilst providing heat recovery to maintain energy
approximately 20 per cent. There were also reduced fan and efficiency);
continued on page 36

Facility Perspectives
VOLUME 5 NUMBER 1
34 client feature

Armstrong provides sustAinAble solution


For noise in commerciAl spAces
Unwanted noise can be distracting and stressful! Studies identify noise as the No.1 issue affecting
worker productivity, comfort and satisfaction. Armstrong’s range of “SOUNDSCAPES Shapes” provide
an excellent acoustic solution for a wide variety of commercial applications and can be quickly and
simply installed with minimal disruption to the workspace.

S
OUNDSCAPES Shapes – Acoustical
Clouds, are designer acoustic
panels, pre-formed into a convex,
concave, square, circle, hexagon, trapezoid,
or parallelogram shape. SOUNDSCAPES
Shapes improves the overall comfort of the
working environment, offering excellent
sound absorption and light reflectance.
SOUNDSCAPES Shapes can be used to
provide a striking design for a new space or
be used to refresh or renovate an existing
area. SOUNDSCAPES Shapes can retrofit to
most exposed structures or existing ceiling
systems in minutes and are the ideal solution
for an area that suffers from background
noise and reverberation.
SOUNDSCAPES Shapes are flat,
22 mm thick, panels, available in 10
different shapes and three different sizes,
including 1200x1200, 1200x1800 and
1200x2400mm. The face and edges are
finished with an abrasion resistant paint on
a glasswool scrim, providing a bright white
and durable surface. A variety of custom
shapes and also colours are also available on
request. environment and using resources intelligently, with SOUNDSCAPES
Shapes panels being produced from 75% recycled raw ingredients
Enhanced Acoustical Benefits: and at the end of life, the panels are fully recyclable.
The primary benefit of SOUNDSCAPES is enhanced room acoustics:
lower ambient noise and reverberation. This translates to improved Hassle Free Installation & Designer Configurations
comfort, speech intelligibility, productivity and occupant satisfaction. SOUNDSCAPES Shapes can be integrated into a new design or
The improved acoustical outcome is achieved due to the excellent simply retrofitted to nearly any existing commercial space. The
sound absorbing properties of the SOUNDSCAPES Shapes panel: Shapes panels are extremely versatile and can be positioned
Sound is literally absorbed from both the front and back surfaces, individually or in a group. Thanks to the flexibility of the product and
which means that SOUNDSCAPES Shapes panels are approximately installation it is possible to create your own personal designs and
twice as efficient as a traditional wall to wall standard acoustic ceiling. layouts. SOUNDSCAPES Shapes are very quick and easy to install,
requiring no special tools and can easily be adapted to a variety of
Sustainable Outcomes heights and angles. Grouping frames allow perfect alignment of
IEQ is the big winner with SOUNDSCAPES Shapes. In addition to the multiple Canopies close to each other. Shapes can be grouped in
acoustical benefit, the Shapes panels have a light reflectance of 90% unlimited combinations, with grouping layout ideas available on
(white panels only), which enables natural light to be reflected further the Armstrong website or in the SOUNDSCAPES Shapes technical
into the building interior and aid in the reduction of artificial lighting brochure.
and energy demand.
Armstrong also demonstrates its commitment to protecting the www.sustainableceilings.com.au or www.armstrongceilings.com.au

Facility Perspectives
VOLUME 5 NUMBER 1
CEILING SYSTEMS
Between us, ideas become reality®

Create Silence
:6<5+:*(7,: :OHWLZ
A visually more stunning form has never existed to control undesired noise. With
SOUNDSCAPES Shapes, it is possible to really appreciate both beauty and silence,
with the creation of acoustic clouds and canopies. SOUNDSCAPES Shapes come
in a variety of sizes, shapes and colours. They can be installed individually or in
innovative group configurations to help to define a space and create silence. Use
your creativity, because with SOUNDSCAPES Shapes, you have no limit.
^^^HYTZ[YVUNJLPSPUNZJVTH\

Telephone: 1800 179 279


email: aureply@armstrong.com
36 Retrofitting for green Buildings

continued from page 33

33 improving the air change effectiveness of the air carbon intensive fuel sources, such as coal, building owners are
conditioning supply and extract systems; seeing the potential to achieve up to a 50 per cent reduction
33 providing tenants contaminant exhaust system to enable in the building’s carbon footprint by installing gas fired co-
tenants to be able to extract air over photocopier areas etc.; generation and tri-generation systems, which simultaneously
33 avoiding specifying materials and finishes that give off produce heating and cooling energy from a single fuel source.
harmful VOCs; This can appear to be a simple way of quickly improving the
33 designing the controls of the air-conditioning systems to greenhouse performance of the building; however, these systems
avoid mould; and are expensive to install and maintain, and issues relating to the
33 Improving the effectiveness of the building cleaning building’s heating and cooling load profile, excess heat, noise and
systems, using ‘green’ cleaning products and HEPA exhaust emissions must be carefully considered.
filtered vacuum cleaners (improves the effectiveness of the 33 The vertical transportation systems in commercial buildings are
cleaning of carpets whilst improving IEQ). often overlooked when it comes to reducing energy usage. There
33 There are many ways to improve the efficiency of the existing air are many energy-saving opportunities that can be incorporated
conditioning systems, and key opportunities include: as part of a major VT refurbishment, including the installation
33 installing metering and data collection for major energy of regenerative drives, locating lift controllers in separately
users (you can’t control what you can’t measure); air-conditioned rooms, installation of LED lighting, and setting
33 recommissioning existing air conditioning systems (many air up the lighting controls to turn off when the car is not in use.
conditioning systems were never properly commissioned Other things that can be done to improve the energy efficiency
and have not been recommissioned to reflect changes in in operation include setting up lifts and controllers to enter
use and layout); standby mode during periods of reduced demand, and setting
33 The replacement of old and inefficient equipment provides reduced acceleration rates. Also scheduling where lift cars ‘park’
a great opportunity to improve the efficiency of the systems throughout the building to minimise travel on a floor button call.
when equipment reaches the end of its economic life and 33 The installation of renewable energy technologies as part of
needs to be replaced. Changes in technology and controls the sustainable refurbishment of commercial buildings is being
in recent years have greatly improved the efficiency of more commonly adopted. Buildings like 40 Albert Road in South
major plant such as chillers and boilers and the building Melbourne have installed photovoltaic panels to generate power,
control systems; while also shading windows and evacuated tube solar collectors
33 Selecting more efficient fans and pumps with high to heat hot water for showers and hand basins. The retrofitting of
efficiency motors and variable speed drives; wind generators is also being planned as part of the sustainable
33 Removing heating and cooling loads from systems that refurbishment of some buildings (Colonial First State Global
have different load characteristics or different operating Asset Management were successful in obtaining funding under
hours from the main building systems, such as reception the Green Building Fund to install vertical axis wind turbines on
areas, data centres that operate 24/7, and retail units. the roof of 385 Bourke Street in Melbourne).
These areas can be served by separate dedicated energy 33 Upgrading the façades of buildings to improve thermal and
efficient air conditioning systems such as VRF systems; daylight performance is often a concern for building owners
33 Improving the air and water distribution systems to remove because of the perceived cost of these works. Having a poorly-
ductwork and pipe work elements which cause excessive performing façade can limit the ability of the building owner
pressure drops and result in greater energy use by fans and to achieve good Green Star and NABERS ratings as the façade
pumps; and performance can put a limit on the energy savings that can
33 Improving the zoning of air conditioning systems and the be achieved by more efficient plant and reticulation systems.
design and operation of the control systems to avoid the Some of the more cost-effective strategies that could be used to
Guide to refurbishment level required
need for simultaneous heating and cooling. improve façade performance may include:
33 Sometimes, rather than persisting with a poorly performing air- 33 sealing up cracks and gaps in the façade that allow air
conditioning system that will require a large
investment to improve its performance,
it may be more cost efficient to change
the existing system to a low-energy high-
performance air conditioning system
utilising underfloor air conditioning
or radiant cooling systems, including
chilled ceilings and chilled beams –
both systems have been used on major
refurbishment projects. Recently, chilled
beams were installed in the 5 Star Green
Star refurbishment of 500 Collins Street,
Melbourne, and underfloor air supply
was installed in the refurbishment of 200
Victoria Street in Melbourne.
33 The predominant energy source for
commercial buildings is electricity, and
where this power is generated using

Facility Perspectives
VOLUME 5 NUMBER 1
Retrofitting for green Buildings 37

leakage between inside and outside; improvements in the performance of existing commercial buildings
33 installing solar control firm on the inside of glass; can be achieved on a commercial budget.
33 insulating spandrel panels;
33 installing an external shading system or external blinds to Upgrade Methodology
shade the existing glass; Unlike new building projects, where leading edge technologies
33 the thermal and acoustic performance can be improved if can be implemented, this redevelopment required superior energy
secondary glazing systems are installed on the inside of the outcomes within the framework of an existing poorly-zoned variable
façade; this can, however, cut down the amount of light air volume air conditioning system and a fully tenanted building.
that enters the tenancies. Following a design review and site inspection, predictive
thermal modelling of a number of proposed system upgrades was
Don’t forget to upgrade the staff! undertaken to help assess their likely performance, and which were
The research carried out by the Warren Centre in The Low Energy the most cost-effective options to implement. The upgrades that
High Rise project found that buildings work better when: were assessed included a combination of works to both the main
33 The staff and contractors care about performance; building plant and to individual floors.
33 The management chain all work positively with efficiency issues; The energy efficiency initiatives that were finally agreed upon for
33 Energy efficiency training is provided; installation included:
33 The NABERS rating is declared to tenants. 33 Change all VAV control strategies to improve energy efficiency
It is at least as important to invest in training and motivating the 33 New high efficiency electric motors and belt drivers to main fans.
people who are going to optimise the operation of the building
systems as it is to invest in the physical infrastructure. Summary
The building services project budget for the redevelopment of this
A recent case study of sustainable refurbishment projects 14,200m2 office building was equivalent to approximately six months
414 La Trobe Street, Melbourne rent, and has reaped typical savings of 40 per cent for electricity and
The refurbishment of the building services in this 18-year-old, 70 per cent for gas.
nineteen-storey office building demonstrates how poor design no
longer needs to mean poor performance. The building was designed
and built for a government tenant at a time when cost was king and
sustainability was an unknown concept. The upgrades undertaken
in the building provide an excellent example of how sustainable

310148A_Active Air Rentals | 1665.indd 1 27/10/10 8:54:51 AM

Facility Perspectives
VOLUME 5 NUMBER 1
38 CLIENT feature
client FEATURE

HOW GREEN IS YOUR BUILDING?


Making a building environmentally sustainable involves looking at the big picture—
picture—not just
installing a new whiz-bang energy-saving device, writes Paul Winfindale, Divisiona
Divisional Technology
Manager, Haden.

I
f you are thinking about ‘greening’ an existing building, obviously environmental or economic benefit) is unlikely to be attractive to a
reducing energy consumption will be at the forefront of your grant provider or savvy tenant.
mind. Following a goal-setting approach to achieve an improved Greening a building is about finding synergies between its different
NABERS (National Australian Built Environment Rating System) rating elements. Often these won’t be apparent at first sight. Start by
is a commendable way to do this. You may well decide to start with looking for passive measures to reduce energy consumption. There
heating, ventilation and air conditioning (HVAC) systems—after all, are many positive changes that can be made on an existing building
they are a major source of energy consumption for all facilities. before a wrench is turned. For example you might put solar film on
Truly green buildings merge the building envelope (its outer shell) your windows or install fabric insulation before raising considerable
with its services systems to ensure they are fully integrated and money on an entire building upgrade. By spending time on a holistic
work seamlessly together. They maximise daylight, reduce waste, approach, modifications to HVAC systems are likely to produce
and promote a general feeling of well-being through the quality and outstanding results at less cost.
performance of the internal environment. Merely installing an energy- A key factor in the success of any green master plan will be a
saving device in a poorly performing building will not always make it comprehensive study of the interaction of the building with its
green or increase the building’s attractiveness. surrounding physical and climatic conditions. Computer simulation
Green buildings are at the forefront of a transforming and is a great way to help optimise the sustainability of the design in a
transitional property market. An extra push is coming from scientific manner and it will assist in reducing time between draft
government and NGO initiatives. One example is the Green Building iterations.
Fund, which provides grants to assist in developing solutions in Following this workflow will help you get a really effective
commercial office buildings according to particular merit criteria. outcome:

Install and optimize Monitor and


Audit Fix the basics Iterate additional through increased seek continuous
solutions level of control and improvement after
automation installation

Green buildings workflow

Typically the criteria will include: By using this systematic approach, you will ensure that the most
3 Reduction in greenhouse gas emissions; basic elements are addressed first, and that nothing is omitted.
3 Demonstration potential; and
3 Excellent project design and management. For more information about how Haden can help you to make
The reduction in greenhouse gas emissions will be subject to your buildings more sustainable, contact:
an analysis, by an accredited assessor, of baseline emissions for a
building under NABERS. Given that the merits of one project will be Paul Winfindale
weighed against another, it is not only essential that your project gets Divisional Technology Manager, Haden
across the baseline, but that it does so by a considerable distance. E: pwinfindale@haden.com.au
‘Demonstration potential’ means that the funder will be looking for T: 02 9947 7673
projects that can foster knowledge sharing and education, as well as
exemplary efforts that break new ground, so don’t be afraid to push Howard Nguyen
some boundaries. National Engineering Manager, Haden
The project management and design of any solution will need to be E: hnguyen@haden.com.au
cost-effective and carried out by an experienced team of consultants T +61 2 9947 7917
and contractors. In other words, pick a team with a track record.
For instance, a poorly thought through solution (without real

Facility Perspectives
VOLUME 5 NUMBER 1
Haden specialise in the design, construction and
maintenance of mechanical and air conditioning
Haden, your systems. We take a ‘Whole of Life Value’ approach
partners in to the retrofit and refurbishment of reliable, energy
efficient systems using the latest technology and
sustainable delivery methodologies.
mechanical Our Green Star and NABERS accredited engineers offer advice and
expertise that extends beyond the mechanical services to the entire
solutions range of building systems. This includes BMS, efficient lighting and
co/tri-generation as an integrated Building Design Approach to
minimise carbon emissions.

Haden help you make the right choice for your business and
the environment:
• Meet mandatory disclosure, legislative and certification requirements
• Increase energy efficiency to reduce your energy costs
• Increase tenancy attraction with improved facilities and
environmental credentials

Choosing the right partner for your air conditioning and mechanical
services has never been more critical.

1300 4 HADEN
www.haden.com.au

NSW AU 16007
Head Office
40 CLIENT feature
client FEATURE

IMPROVED SAFETY AND


PERFORMANCE WITH NEW
AUTOMATIC DOOR STANDARD

A
ustralian Standards ensure the consistent performance of Door signage requirements
products as they are intended for use and that adequate have also been improved
safety criteria minimise risk and protect consumers from under the new Standard. All
potential harm. Automatic pedestrian doors are no exception and automatic doors will now be
the automatic door industry, through its representative body AADIF accompanied by one of four,
(Australian Automatic Door Industry Forum) and Standards Australia distinctive types of door labels
have developed a platform to ensure the safe and reliable operation (dependent on the door type).
of all pedestrian automatic doors. The labels will be 150mm
In September 2007, Standards Australia released a new automatic wide and 75mm high and
door standard, entitled AS5007 “Powered doors for pedestrian have a blue background with
access & egress.” Replacing the 1992 Standard AS4085, the new white arrows and text. The new designs ensure that all automatic
Standard focuses on standardising the “design, installation, test and doors and their direction of travel will be easily identifiable by all
safety requirements of all automatic pedestrian door assemblies.” pedestrians as they approach the door.
These assemblies including automatic sliding, swinging, folding As technology has improved in the design and manufacturing of
and revolving doors in all types of buildings as classified in the automatic door operators, so too have the levels of performance
BCA and the changes to AS5007 reflect the extensive technological and safety as expected by Australian society. AS5007 reflects these
improvements that have been made to all forms of automatic doors changes and has established checks and balances for monitoring the
over the last decade. developments of the industry. Furthermore, the industry body will
Like many Australian Standards and Codes of Practice, AS5007 is ensure that the Standard is continuously reviewed and modified as
not legally binding; however, it is often used by courts to determine ongoing product and safety changes are implemented within the
whether ‘reasonable steps have been taken to mitigate risk.’ The industry.
Standard also serves as a benchmark for the industry and sets
minimum performance and safety criteria for manufacturers and Nicholas Flinos
service providers. Sales and Product Marketing Manager
The focus on reliability and safety of the Standard and the design, DORMA Automatics
installation and service directives within AS5007, has implications Nicholas.flinos@dorma.com.au
not only for automatic door manufacturers but also for architects,
builders, fabricators and other stakeholders involved in the design
and installation of the door system. Consequently, architects and
designers will be creating entrances and doorways that consider the
safety distance requirements to avoid head, body and finger trap
danger points during the opening cycle of the door.
The maintenance and ongoing safety of a pedestrian door
also features prominently in AS5007. The Standard provides
requirements for the testing, marking and regular servicing of
the complete powered pedestrian door installation. One such
directive requires automatic doors to be serviced at a minimum of
every four months and outlines a requirement for regular service
inspections and maintenance to be undertaken, in accordance with
the manufacturer’s instructions. It is the responsibility of a building
owner / facility manager to ensure this requirement of the Standard
is adhered to.

Facility Perspectives
VOLUME 5 NUMBER 1
In relationships,
first impressions
are important.
In buildings, it’s the
door that counts.

Glass Fittings and


Door Control Automatic Doors Movable Walls Service
Accessories

DORMA Service – opening a door to the future.


automatic doors · door closers · movable walls

When you choose DORMA, you are supported by a nationwide network of accredited and fully trained
technicians and agents, 24 hours a day, 7 days a week. This level of service applies not only to DORMA
automatic door operators, but also extends to all types of automatic doors, door control products and
movable walls.
When you call DORMA Service you will speak to a DORMA staff member who knows the products and
who can offer expert advice. Public safety and security are our paramount concern and reflected in our
prompt response times - making DORMA the unrivalled industry leader in service support.

DORMA Australia
Tel.1800 675 411 · infoautomatics@dorma.com.au · www.dorma.com.au
42 Retrofitting for green Buildings

Going Green
As the first heritage-listed building in New South Wales, and the second Australia-wide, to achieve a
5 Star Green Star – Office interiors v1.1 rating, InterfaceFLOR’s Sydney headquarters are setting the
standard for sustainable refurbishment.

I
n the words of Bob Dylan, ‘The times they are a-changin’’ – as The Green Star is a comprehensive, national, voluntary
true a statement now as it was in 1964. Dylan was addressing environmental rating system that evaluates the environmental design
the futility of not embracing change – but that’s not to say that and construction of buildings. It was developed for the purposes
we shouldn’t remember the past. InterfaceFLOR’s green retrofitting of: establishing a common language and standard of measurement
of the heritage-listed NSW Railway Institute Building is a leading for green buildings; recognising environmental leadership; raising
example of a successful marriage of old and new. awareness of the benefits of green building; promoting integrated,
The NSW Railway Institute Building was opened in 1891 for the whole-building design; and identifying building life-cycle impacts.
purposes of providing a higher standard of education, recreation The Green Building Council of Australia (GBCA) has 12 Green
and welfare to all staff members of the Department of Railway, Star categories overall, with four relating to office buildings. The
and their families. It offered a variety of classes for staff to further Office Interiors v1.1 Green Star, specifically, is designed for building
their employment within the department, as well as classes such owners, tenants and interior designers to assess the environmental
as dressmaking, millinery, painting and cooking for their wives and impact of interior fit-outs. Environmental criteria to be met for the
daughters. Railway Institute fit-out to ensure the 5 Star Green Star included:
Due to its strong Federation Anglo-Dutch architectural influence, 33 access to natural light and office ventilation – meaning that all
in 1980 the Rail Institute was registered as a heritage building. The windows are able to be opened;
building was vacated in 1998 and auctioned off in May 1999 by 33 available external views of the city skyline and nearby Albert
the State Rail Corporation. In May of 2008, InterfaceFLOR became Park;
the first permanent tenants since the building was vacated in 1998. 33 waste management – including wastage, recycling, and specific
Before occupying the building, InterfaceFLOR set out to restore the cleaning products;
dilapidated Institute and make its interior certifiably sustainable. 33 low emission paints;
In September 2010, it was awarded a 5 Star Green Star – 33 timbers from sustainable forests, with low formaldehyde
Office Interiors v1.1 rating, due to the interiors upgrade driven by emissions; low emissions of volatile organic compounds from
InterfaceFLOR, who lease 80 per cent of the building. The current carpets, adhesives and sealants;
owners of the building, W Property, contributed $120,000 towards 33 removal of all asbestos, above and beyond legal requirement;
restorations of the building to match the green expectations of their provision of bike racks and change rooms, and proximity to
tenants. public transport for staff;

Facility Perspectives
VOLUME 5 NUMBER 1
Retrofitting for green Buildings 43

33 water efficient fixtures; neutral and are held in place with ‘TacTiles’ adhesive stickers,
33 ceiling insulation (not typically present in heritage listed which use no carpet glue and have a low volatile organic compound
buildings); content. The carpets are also eligible for InterfaceFLOR’s re-entry
33 mechanical air conditioning – not water cooled, to ensure low scheme, which is a take-back program that recycles carpet tiles.
emissions and high efficiency; From the outset of the project’s design phase, a Green Star
33 mechanically ventilated computer rooms; accredited professional, along with an independent commissioning
33 environmentally sound refrigeration and refrigerant leak agent, were engaged to oversee the project and ensure the
detection; criteria for the 5 Star Green Star rating were well defined and
33 energy efficient light fittings; being met. Other managerial provisions included a comprehensive
33 as well as electric metering to allow sub-metering to monitor building user’s guide to enable tenants to achieve the desired
usage in areas of the building. environmental performance; a 12-month building-tuning program
The GBCA has developed seven materials calculators to assess to ensure optimum performance and maintenance within the
the environmental impacts of fit-out items during their manufacture, tenancy; an environmental management plan which conformed
use, and post-use phases. The items are assessed for eco-preferred with NSW government EPA guidelines during fit-out works; and
content, durability, the product manufacturer’s environmental a comprehensive waste management and recycling plan during
management system, commitment to product stewardship, and building refurbishment and fit-out that ensured no construction and
whether the product is modular and/or designed for disassembly deconstruction waste went to landfill.
(very important when dealing with heritage-listed buildings). Like any investment, dividends from building green take time, but
InterfaceFLOR wanted to maintain the heritage structure of the the benefits are clear. Higher utility efficiency equates to savings
building in the process of ensuring its 5 Star Green Star rating. of at least 20-30 per cent on operating costs, while increasing a
InterfaceFLOR worked closely with the developer and architect in property’s value. The increased natural light and ventilation in green
consultation with the National Trust of Australia and the Central buildings has been proven to result in healthier, therefore more
Sydney and NSW heritage bodies to restore the building from its productive workplaces. A post-refurbishment study of 500 Collins
run-down state – leaking roofs, rising damp and general neglect had Street in Melbourne found a nine per cent increase in typing speeds
compromised much of the interior – to its natural grandeur. of secretaries and a seven per cent increase in lawyers’ billings ratio,
Working with architecture firm Rice Daubney, who have spent a despite a 12 per cent decline in the average monthly hours worked.
decade working on new building sites with Green Star ratings but The enhanced marketability and demonstration of social
were undertaking their first heritage project, lnterfaceFLOR ensured responsibility that a green company displays immeasurably aids a
that all new additions to the base building were visually separate company’s prosperity in the marketplace, thanks to client attraction
from the existing building. This allowed the building to maintain and free publicity from certification and awards. This differentiates
its distinct heritage look and provided the option for the additions a company from the competition, giving them a clear competitive
to be removed in the future without affecting the base structure. edge.
For example, the new boardroom sits atop the Institute’s theatre The shift to a green operation can be costly at its inception,
balcony. but with changes in legislature in the business and regulatory
InterfaceFLOR, a sustainable flooring company who aim to be environment sure to multiply, along with increased customer
carbon neutral by 2020, are at the forefront of green initiatives awareness, it shouldn’t take long to reflect in the bottom line – but
in their own right. The building’s carpet flooring was fitted using most of all, those concerned can rest easy that they’re behaving
InterfaceFLOR’s own carpet tiles, which are 100 per cent climate ethically and responsibly.

Facility Perspectives
VOLUME 5 NUMBER 1
44 CLIENT feature
client FEATURE

DYSON AIRBLADE™

L
ast year’s FMA Australia ‘Awards for Excellence’ helped to hand dryers.
acknowledge some of the significant outcomes achieved in
Facility Management. Interestingly, one of the big winners Accreditations
on the night was the Dyson Airblade™ hand dryer, which took out The Dyson A01 and A03 Airblade™ hand dryer range are the only
two of the industry’s ten coveted awards with the FMA Australia & hand dryers to date approved by NSF International Protocol P335 for
ISS ‘Product Excellence Award’ and FMA Australia & Rider Levett hygienic hand dryers, while the A01 Airblade™ remains the only hand
Bucknall ‘Industry Innovation Excellence Award’. dryer endorsed by HACCP Australia and HACCP International for
“For a relative newcomer to the facility management sector to food safety excellence and use in food handling areas.
win these two awards is a testament to the Australian industry’s
enthusiasm for new technology solutions,” states Ross Cameron, Industry impact
Managing Director of Dyson South East Asia. The fast, hygienic and energy efficient features of this appliance
“Our 700 plus research and development team are focused on means facility managers now have the option of purchasing a hand
engineering products that work significantly better. In the case of the drying device that will not only perform significantly better than
Airblade™ hand dryer, it was about delivering to the industry a hand conventional warm air hand dryers, but will also be more sensitive to
dryer that will work properly; drying hands quickly, hygienically and the environment than a paper towel dispenser. In fact, using just one
with minimal impact to the environment. So it was exciting to see Dyson Airblade™ 200 times a day for five years saves 730,000 paper
Australia’s response to this commitment reflected so strongly at the towels from being produced, transported and disposed of.*
Facility Management industry awards night.” Mr Cameron concludes.
Earlier last year the Dyson Airblade™ hand dryer became the
first commercial product to be awarded the Planet Ark Australia “I’ve done calculations in terms of consumables only, essentially
and Carbon Trust’s Carbon Reduction Label for its ability to help in the purchase of paper towels. I haven’t calculated waste or
minimising the nation’s carbon footprint. electrical savings yet, but even without this, the total cost of
Airblades purchased is recoverable in just over a year.”
About the Dyson Airblade™ hand dryer Melbourne Airport Facilities Manager, Joe Cremona
The Dyson Airblade™ hand dryer is the world’s fastest and most
hygienic hand dryer. Delivering significant cost and energy savings,
this appliance provides a hand drying solution that dries hands in just Since 2008, Dyson Airblade™ hand dryers have been installed
ten seconds. in over 500 facilities across Australia, including major sporting and
A hospital grade HEPA filter, contained within the unit, filters entertainment stadiums, retail centres, airports, casinos, universities,
99.9% of bacteria from the air stream before blowing it onto hands, hospitals, councils and many other corporate and government
ensuring hands are hygienically dried. With a total input power properties.
consumption of 1600w and a 1W standby, the Dyson Airblade™
hand dyer uses up to 80% less energy than conventional warm air * calculation based on an average of two paper towels per hand dry

Facility Perspectives
VOLUME 5 NUMBER 1
www.dysonairblade.com.au

Costs $1,460.00 Costs $50.62


per year to run. per year to run.
Based on 100 people visiting a washroom For the same use, the Dyson Airblade™ hand
twice a day, a paper towel dispenser will dryer costs just $50.62 to run. It works in
get through 146,000 towels a year. only 10 seconds and its HEPA filter cleans
the air before it reaches hands.
That’s a cost of $1,460.00.
It’s fast, hygienic and a fraction of the cost
of paper towels.

FMA Australia & ISS ‘Product Excellence Award’


FMA Australia & Rider Levett Bucknall
‘Industry Innovation Excellence Award’

Usage based on 2 towels per dry (data from Dyson internal research – Sept 2008). 1600W machine shown. Calculations include standby power. Cost based on 1 cent
per paper towel (data from Dyson internal research – 2010) and $0.152 per kWh (data from Energy Australia small and medium business customer – published 2009).
Paper towel dispenser and Dyson Airblade™ hand dryer purchase costs are excluded from comparison. 10 second dry time based on NSF protocol P335.
46 ideaction 2011

Brisbane | 11-13 May 2011 FMA Australia’s national conference

Platinum sponsor of ideaction11

T
his year’s ideaction conference will be held in Brisbane, a Premier’s Flood Relief Appeal, so you can rest assured that by
city that we are all aware has recently endured terrible floods attending ideaction11 you will be supporting this very worthy cause.
and will be in recovery for many years to come. Despite this, We are proud to be holding our conference in Brisbane and hope
we are confident that Queensland’s resilience and determination you will join us for what is sure to be an outstanding event covering
will prevail, and that we will deliver a first-class FM learning and up-to-the-minute FM topics and offering excellent social events.
networking event. The program for ideaction11 has now been confirmed and
In light of these recent tragic events, FMA Australia will be registrations are open. Make sure you book by 31 March to take
donating a percentage of each registration fee received to the advantage of the earlybird discount.

Program in depth

Session 1: Panel discussion – will outline how systems and resources were used for emergency
Walking the tightrope: balancing cost efficiency response (make safe), the temporary repairs to get facilities
and innovation operational, and, finally, working with all stakeholders (owners,
tenants, insurers and service providers) to determine the best way to
Chris Hunt, Jones Lang LaSalle rebuild/restore facilities in the long term. Many learnings have been
Facility managers are constantly being asked to walk the tightrope derived from the real-time test of the company’s BCP, and these
between creating cost efficiency and delivering innovation to improve learnings will have universal application to facility managers around
service quality. How can facility managers implement innovation that the world.
doesn’t cost the earth? How should they balance driving innovation
that results in incremental change versus step-change? In this Session 4: Oral presentation –
session, our panel will explore examples of innovation that have Superheroes of the workplace of the future
been implemented across large and small portfolios, that have not
required significant investment but have shown an attractive return Mark Kelly, Woods Bagot
on investment. Who will be the superheroes of the workplace of the future,
what skills will they have, and what technology will they use to
Session 2: Oral presentation – communicate and deliver? This presentation will consider present
Environmental ratings and the facilities manager day scenarios and evaluate an exponentially different and better
future. Basic bricks and mortar will be predictable to an extent, but
Phillip Carruthers, Norman Disney & Young how will we understand the changes in the world of commerce
We have lived for a number of years with environmental rating tools and communications that will mean that a new generation of smart
such as NABERS and Green Star; however, evidence is emerging collaborators will lead from within a complex organic ecosystem?
that predicted results are not being achieved, giving rise to landlords How will we define and control the workplace of the future?
being in default of lease conditions and the legal fraternity gearing
up. Ultimately, the buck may stop with the facility manager, and Session 5: Panel discussion –
that could be costly. This presentation explores the responsibility of Open house: challenges and solutions for facilities
the facility management team in meeting strict performance goals managers as buildings go public
set by others without their input. Living with and maintaining an
environmental rating will become the most important facilities role in Paul Akhurst, QLD Performing Arts
the coming years. Will you be ready? Buildings that would once have been the exclusive domain of
residents and workers now open their foyers and viewing galleries to
Session 3: Oral presentation – all, and burst at their seams with cafes and niche retail opportunities.
Christchurch earthquake – facilities management These significant changes in building use present a new set of
response challenges for facility managers, from access, to wear and tear;
challenges that are heightened when an existing building seeks to
Onno Mulder, City Care Limited remodel itself to engage with today’s society. An expert panel of
This presentation will provide an insight into City Care’s response, facilities managers will discuss challenges and solutions to designing
as one of the largest maintenance providers in Christchurch, to the and operating an ‘open house’.
magnitude 7.1 earthquake on 4 September 2010. The presentation

Facility Perspectives
VOLUME 5 NUMBER 1
ideaction 2011 47

Session 6: Oral presentation – context, ‘Towards Zero’ has derived definitions, processes,
Five steps to implementing a successful FM technologies, strategies and an exemplary design in this pursuit.
program The panel will give delegates an insight into ‘Project Zero’ and the
processes used to achieve ‘zero emissions’, a target which, although
Ennio Bianchi – Noel Arnold & Associates elusive, is infinitely achievable.
An essential requirement of every Facility Management (FM)
program is the delivery of an effective, reliable, practicable and viable Session 10: Oral presentation –
FM service. The five key steps to the design and implementation of The FM challenge of sustainability precincts
an effective FM program are:
33 Step 1: Evaluating your market sector’s service delivery Jeff Robinson, Aurecon
requirements; By 2050, 70 per cent of the world’s 6.4 billion population will live in
33 Step 2: Consolidating and formalising your systems; cities. Australian cities are predicted to nearly double in population
33 Step 3: Implementing the program; in the next 40 years. How can we re-tool our cities to make them
33 Step 4: Doing a health check of your FM program; more sustainable, liveable and economically viable? Jeff will discuss
33 Step 5: Being prepared for when things do go wrong. the imperatives to move beyond individual sustainable buildings to
ideaction conference delegates will be provided with sustainable precincts and sustainable cities, with shared low energy,
key principles and practicable strategies for the design and water and waste infrastructure. What are the opportunities and the
implementation of an effective FM program. barriers to building and operating sustainable precincts? What new
technologies can be used? What are the FM challenges of running
Session 7: Oral presentation – the sustainable infrastructure that serves sustainable precincts?
Sit on the fence or lead? The evolving role of facility
managers in business continuity Session 11: Case study –
Productivity and indoor environment assessment
Geoff Olsen – MC2 Pacific before and after base building energy reduction
Facilities managers are in a tough position when considering business works
disruptions, having to balance the sometimes conflicting needs of
asset owners, tenants and other stakeholders. We are noticing a Dr Vyt Garnys, Cetec Pty Ltd, Roger Walker & Brian Churchill,
shift in how FM organisations are approaching the challenge of how Local Government Super
they prevent emergencies becoming a crisis, and how they respond Several significant base building upgrade initiatives have been
and recover if something does happen. Interestingly, the needs undertaken at four buildings owned by Local Government Super to
and expectations of tenants are typically not included in even basic reduce the greenhouse gas emissions of the existing commercial
services that many FMs offer today. The FM role is evolving, but office buildings. These works are aimed at reducing energy
should they follow the leader, or can they add value to their clients consumption and also improving indoor environment quality. The
by leading? results of an indoor environment quality (IEQ) and productivity study
of four multi-tenant, multi commercial office buildings that have
Session 8: Oral presentation – undergone extensive energy saving works will be presented, showing
The seven sins of greenwashing substantial and rapid commercial returns.

Robin Mellon, Green Building Council of Australia Session 12: Oral presentation –
As sustainability moves from ‘voluntary’ to ‘vital’ for buildings, The difference between an emergency and a
products and services, many organisations have applied a green tragedy
sheen to their marketing, branding and communications to show
that they are trying to adopt sustainable business practices. But how Michael Rabbidge, First 5 Minutes
can we know which companies are really green and which have just Time, knowledge and practice, or lack thereof, are key factors that
applied a generous coat of greenwash? The term ‘greenwash’ usually determine whether an emergency in a built environment escalates
indicates that more has been spent on promoting a product’s green into a tragedy. In the event of an emergency the ability of the
credentials than has been invested in true, environmentally-sound occupants of a building to react rapidly to a threat is significantly
practices. This session will detail ‘the seven sins of greenwashing’, reliant on effective procedures and training being in place. Ultimately
following in the footsteps of the now-famous 2007 study by your ability to deal with an event in a manner that provides optimum
Canadian firm Terrachoice, and use Australian building industry case protection against a potential tragedy is experience. This presentation
studies to show you what to look for and what outcomes you might will provide participants with an appreciation of the legislative and
expect. standards framework that governs obligations of building managers,
owners and tenants/occupants.
Session 9: Panel discussion –
Project Zero Session 13: Case study –
Foreseeing the building future through property
Ros Magee & Nigel Fitton, Spowers strategic planning
The ultimate sustainability goal for an office building is ‘net balance
carbon neutral’, not only in operation but over its whole life cycle. Steve Jones, Australian Sports Commission
Internationally there are a number of projects, legal frameworks, As facility managers, gut feelings and emotions are not enough to
rating systems and projects pursuing this target. In the Australian ensure that sufficient funding will be available to maintain buildings

Facility Perspectives
VOLUME 5 NUMBER 1
48 ideaction 2011

and infrastructure, in the short and long term. To compete with Session 16: Case study –
other business priorities, we facility managers need to apply a Metropolitan Fire Brigade
level of science to support our claim. In order to assess the future
requirements of the ASC Campus at Bruce ACT, the Australian Ros Magee, Robert Pahor & Andrew Rutt, Spowers
Sports Commission has recently undertaken a property strategic plan The MFB Burnley Complex is the new Community Safety and
(PSP). In this session the roles played by both client and consultant Training Facility of the Metropolitan Fire Brigade in Richmond. 5 Star
in the preparation of a PSP and supporting business programming Green Star accredited, the main incentives throughout the project
documents will be presented. were the development of integrated and holistic design solutions
and the implementation of low- and high-tech environmental
Session 14: Oral presentation – strategies. Spowers will give you an insight into the MFB Project,
Space as a knowledge management tool covering topics including: the business case for investing in
sustainable facilities; competitive advantage through facilities; green
Dr Agustin Chevez, Geyer Pty Ltd procurement – sourcing and selecting green products and services;
Geyer undertakes research to better understand the role of space and energy ratings – how to realistically achieve a 6 Star rating.
in an organisation’s ability to address the pressing issues and
imperatives that impact companies today. Findings suggest that Session 17: Oral presentation –
despite its passive nature, space supporting the management plays The impact of the energy performance contract on
an active role in a company’s ability to address business objectives, facility management
communicate brand and influence human behaviour. This could
imply that an important tool that organisations have to sustain Laurie Reeves, Melt FM
their businesses may be the buildings and workplaces they inhabit. With increased government focus on the reduction of carbon
Facility managers thus have a privileged role as custodians of the emissions in commercial buildings, the introduction of legislation for
organisation’s competitive advantage. The research was led by Laurie mandatory disclosure and the forecast significant increase of energy
Aznavoorian and Dr Agustin Chevez from Geyer. This presentation is prices have seen the re-emergence of the energy performance
a summary of their findings. contract (EPC). This presentation will look at the process of the
EPC, the information required to provide to service providers, the
Session 15: Case study – impact on buildings operations, and the role of the facility manager
Delivering on a Green Star project – in providing information and supporting the overall activity. What is
EnergyAustralia’s new Learning Centre the impact of the EPC process as an enabling tool for the energy and
emissions reduction process from a client side project management
Kate Gunton & Paul Ryan, EnergyAustralia perspective?
This presentation will cover the EnergyAustralia Learning Centre
project from inception to completion and occupation: getting the Session 18: Oral presentation –
brief right, working with key stakeholders, developing the project 215 Adelaide Street NABERS refurbishment
team, commissioning the building and managing the relocation. It
specifically focuses on the environmentally sustainable design (ESD) Connan Brown, Norman Disney & Young
aspects. The Learning Centre will be a centre of excellence providing 215 Adelaide Street is a significant refurbishment project in the
high-quality training for staff, particularly its apprentices. The building Brisbane CBD. The project is a $5M NABERS refurbishment from 2.5
has achieved a 6 Star Green Star Education Design v1 rating and is to 4.5 stars in an occupied building. This presentation briefly covers
due for completion in February 2011. the design and the construction, with a major focus on how the
FM, designer and controls company worked together to deliver the
targeted rating.

For more information


on speakers,
venues, program,
accommodation and
social activities, visit
www.fma.com.au

Facility Perspectives
VOLUME 5 NUMBER 1
ideaction 2011 49

ideaction 2011 Program

Wednesday 11 May 2011


8.30am - 5.00pm Site visits
9.00am - 12.00pm Option 1/Full day: Port of Brisbane
12.30pm - 2.30pm Lunch
Option 1/Full day: Combined Emergency Services Training Centre
2.30pm - 4.00pm
Option 2/Half day: Ecosciences building
4.30pm - 6.00pm Option 2/Half day: GOMA
6.30pm - 8.30pm Chairman’s Welcome Reception at GOMA

Thursday 12 May 2011


8.00am - 5.00pm Registration open
9.00am - 10.25am Official opening and keynote speaker
10.30am - 11.00am Morning tea
Session 1: Panel discussion - Walking the Tightrope: Balancing Cost Efficiency and Innovation Chris Hunt, Jones
Lang LaSalle (Room 1)
Session 2: Oral presentation - Environmental Ratings and the Facilities Manager Phillip Carruthers, Norman Disney
11.05am - 12.00pm
Young (Room 2)
Session 3: Oral presentation - Christchurch Earthquake - Facilities Management Response Onno Mulder, City Care
Limited (Room 3)
12.05pm - 2.00pm Lunch with keynote address
Session 4: Oral presentation - Superheroes of the Workplace of the Future Mark Kelly, Woods Bagot (Room 1)
Session 5: Panel discussion - Open House: Challenges and Solutions for Facilities Managers as Buildings go Public
2.15pm - 3.15pm Paul Akhurst, QLD Performing Arts (Room 2)
Session 6: Oral presentation - 5 Steps to Implementing a Successful FM Program Ennio Bianchi - Noel Arnold &
Associates (Room 3)
3.20pm - 4.05pm Afternoon tea & poster session
Session 7: Oral presentation - Sit on the Fence or Lead? The Evolving Role of Facility Managers in Business
Continuity Geoff Olsen - MC2 Pacific (Room 1)
4.10pm - 4.50pm Session 8: Oral presentation - The Seven Sins of Greenwashing Robin Mellon, Green Building Council of Australia
(Room 2)
Session 9: Panel discussion - Project Zero Ros Magee & Nigel Fitton Spowers (Room 3)
7.00pm - 12.00 midnight Gala dinner, Victoria Park

Friday 13 May 2011


8.00am - 3.00pm Registration open
8.30am - 2.30pm Exhibition open
8.45am - 9.15am Poster session
Session 10: Oral presentation - The FM Challenge of Sustainability Precincts Jeff Robinson, Aurecon (Room 1)
Session 11: Case study - Productivity and Indoor Environment Assessment Before and After Base Building Energy
9.15am - 10.00am Reduction Works Dr Vyt Garnys, Cetec Pty Ltd, Roger Walker & Brian Churchill, Local Government Super (Room 2)
Session 12: Oral presentation - The Difference Between an Emergency and a Tragedy MIchael Rabbidge, First 5
Minutes (Room 3)
10.05am - 10.35am Morning tea
Session 13: Case study - Forseeing the Building Future Through Property Strategic Planning Steve Jones, Australian
Sports Commission (Room 1)
10.45am - 11.30pm Session 14: Oral presentation - Space as a Knowledge Management Tool Dr Agustin Chevez, Geyer Pty Ltd (Room 2)
Session 15: Case study - Delivering on a Green Star Project - Energy Australia’s New Learning Centre Kate Gunton &
Paul Ryan, Energy Australia (Room 3)
Session 16: Case study - Metropolitan Fire Brigade Ros Magee, Robert Pahor & Andrew Rutt, Spowers (Room 1)
Session 17: Oral presentation - The Impact of the Energy Performance Contract on Facility Management Laurie
11.40pm - 12.25pm Reeves, Melt FM (Room 2)
Session 18: Oral presentation - 215 Adelaide Street NABERS Refurbishment Connan Brown, Norman Disney Young
(Room 3)
12.30pm - 2.30pm Lunch with keynote address and close of conference

Facility Perspectives
VOLUME 5 NUMBER 1
50 CLIENT feature
client FEATURE

JUDD FARRIS RECRUITMENT


T
he facilities management industry is continually evolving recruitment experience, the Facilities Management division in
to incorporate new legislation pertaining to health, safety, Australia has a proven track record in aligning business
environment and risk management. Facilities Managers requirements with individual’s expertise and career aspirations.
are now responsible for developing, implementing and promoting Throughout the recruitment process, our extensive industry
strategic initiatives to ensure a happy, healthy and more productive knowledge enables us to provide advice to employers and job seekers
working environment. Consequentially, we have seen an increase in with regards to career growth, employee sentiment, education, brand
the demand for technically qualified and accredited professionals, and perception and individual profile improvement.
the rise of specialist roles within organisations. These include, but are
not limited to, Sustainability Managers, Project Directors, Workplace For a more informative discussion in relation to your career or
Managers, OHS&E Managers, Risk and Compliance etc across all business requirements, please call:
sectors. As a result of the current trends affecting our industry:
3 Facility Managers are now responsible for developing initiatives Candice Egan
to improve the performance of buildings Permanent solutions - NSW, ACT and WA
3 Businesses are aiming to create “zero harm” cultures throughout candice.egan@juddfarris.com.au
the workplace. This calls for all Facility Managers to have either 02 9321 5500
a strong understanding and/or qualification in risk, compliance
and building safety Matthew Dwyer
3 Relocation Managers or Project Directors are becoming more Temporary solutions - NSW, ACT and WA
prominent as organisations seek to consolidate their office matthew.dwyer@juddfarris.com.au
space. These projects often require extensive relocation with a 02 9321 5500
resultant demand in professionals to manage and promote these
changes on behalf of landlords and tenants Matthew Smith
3 Workplaces are becoming more stringent on achieving green Permanent and temporary solutions - VIC, SA, TAS
star and NABERS ratings. matthew.smith@juddfarris.com.au
3 Work environments are becoming more efficient with 03 9620 2717
modern initiatives in space planning; maximising comfort and
productivity Phil Seed
3 NABERS ratings are providing prospective tenants and buyers Permanent and temporary solutions - QLD
with the ability to better compare commercial buildings. This phil.seed@juddfarris.com.au
increases pressure on the Facility Managers to maintain or 07 3221 6799
achieve green star ratings, making them accountable for the
environment and not just the base building plant and fabric.
Judd Farris is a global organisation and specialist property
recruitment consultancy committed to providing comprehensive
permanent and temporary staffing solutions to many of the world’s
leading corporate groups, partnerships, government bodies and
institutions. With over thirty-five years of combined industry and

Facility Perspectives
VOLUME 5 NUMBER 1
No.1 in Facilities
Management

...not number 2
At Judd Farris Recruitment, we can identify the perfect fit for your organisation, offering you
the best available Facilities Management professionals in the industry.
Our long standing relationships with clients and candidates, our reputation, market
knowledge and access to non-active candidates, takes the guess work out of hiring.
Whether it’s a permanent or temporary requirement, our national team of experts can help.

> MELBOURNE: 03 9620 2717


Matthew Smith - matthew.smith@juddfarris.com.au
> SYDNEY: 02 9321 5500
Candice Egan - candice.egan@juddfarris.com.au
Matthew Dwyer - matthew.dwyer@juddfarris.com.au
> BRISBANE: 07 3221 6799
Phil Seed - phil.seed@juddfarris.com.au
for all our latest vacancies log on to www.juddfarris.com.au
52 MaintenAnce & essential services

Phasing out:
The departure of HCFC refrigerants

The Australian hydrochlorofluorocarbon (HCFC) refrigerant market is now beginning to feel the
implications of 1987’s Montreal Protocol. How will the phase-out of HCFC’s affect you? Carly Fordred
finds out.

T
he Montreal Protocol is an international environmental 33 Total phase-out by 2020 (Up to 0.5 per cent of base level
agreement that established requirements to begin consumption can be used until 2030 for servicing existing
the worldwide phase-out of ozone-depleting CFCs equipment, subject to review in 2015).
(chlorofluorocarbons). Over the years, the phase-out timetable for ozone-depleting
The original protocol was signed in 1987. However, in 1992 substances has come under constant revision, with phase-out
an amendment was established to schedule the phase out of dates accelerated in accordance with scientific understanding and
hydrochlorofluorocarbons (HCFCs). technological advances.
These artificial refrigerants have long been identified for their
ozone depletion potential (ODP) and global warming potential
About the Montreal Protocol
(GWP).
CFCs are now virtually phased out, and refrigerant stockpiles are The Montreal Protocol on Substances That Deplete the Ozone Layer is an
international treaty designed to protect the ozone layer by phasing out the
nearly exhausted.
production of a number of substances believed to be responsible for ozone
HCFCs, which are widely used in air conditioning equipment, are depletion.
currently under phase-out conditions. The treaty was opened for signature on 16 September 1987 and entered
The current phase-out dates for HCFCs for developed countries, into force on 1 January 1989 followed by a first meeting in Helsinki, May
which include Australia, stand at: 1989. Since then, it has undergone seven revisions, in 1990 (London),
33 Freeze from beginning of 1996 (Based on 1989 HCFC 1991 (Nairobi), 1992 (Copenhagen), 1993 (Bangkok), 1995 (Vienna), 1997
(Montreal), and 1999 (Beijing).
consumption, with an extra allowance (ODP weighted) equal to
2.8 per cent of 1989 CFC consumption) Due to its widespread adoption and implementation it has been hailed as an
example of exceptional international co-operation, with former Secretary-
33 35 per cent reduction by 2004
General of the United Nations Kofi Annan quoted as saying that ‘perhaps
33 75 per cent reduction by 2010 the single most successful international agreement to date has been the
33 90 per cent reduction by 2015 Montreal Protocol’.

Facility Perspectives
VOLUME 5 NUMBER 1
MaintenAnce & essential services 53

begins to appear. Eventually the drop-ins and replaced HCFCs will


What is Ozone Depletion Potential (ODP)?
achieve parity in price as demand begins to exceed supply.’
The ozone layer is damaged by the catalytic action of chlorine and bromine De Jong adds, however, that retrofit drop-in refrigerants should not
in compounds, which reduce ozone to oxygen when exposed to UV light at be viewed as a long-term solution. ‘Drop-in refrigerants are designed
low temperatures. The Ozone Depletion Potential (ODP) of a compound is
to keep existing equipment running when R22 becomes unavailable
shown as an R11 equivalent (ODP of R11 = 1).
and equipment still has a useful lifetime.’
De Jong also advises that controls and oils should not require
Australia has met or exceeded all of its phase-out obligations under replacing if choosing to use a drop-in replacement.
the Montreal Protocol, which is implemented in Australia through the ‘In most, TX valves won’t require replacing either, but of course
Ozone Protection and Synthetic Greenhouse Gas Management Act best practice dictates that dryers should always be replaced when
1989 (the Act). charging refrigerant,’ he adds.
Australia will essentially phase out consumption of HCFC by 2016, So, where to from here? What is De Jong’s advice on managing the
four years ahead of the schedule required under the Protocol. In implications of the phase-out?
doing so, Australia will consume 61 per cent less HCFC in the period ‘Talk to customers now and begin to discuss drop-ins, retrofit
to 2020 than required under the Protocol, even after the Parties to options and equipment replacements,’ he says.
the Montreal Protocol agreed in 2007 to advance the HCFC phase- ‘Don’t panic,’ he reassures. ‘Now should be a period of education
out globally. and information flow from importer to distributor, to contractor and
The most prevalent of the HCFCs is known as R22. It is used most on to the end user.’
commonly in small and packaged air conditioning equipment, and
has been used in this way for many years. Thank you to Frank De Jong and A-Gas for their input in this article.
The HCFC phase-out primarily affects R22 but also R123. R123, This article first appeared in HVAC&R Nation. It is reproduced with
which was itself a replacement for R11, is predominantly found in permission.
older centrifugal chillers.
So what impact will the phase-out of HCFC’s have?
Frank De Jong of A-Gas answers some of the pertinent questions
relating to the phase-out of HCFC’s, and in particular R22.

How will R22-installed equipment be serviced, and will it


be costly? Will there be shortages of R22?
‘The HCFC phase-out will primarily affect the installed base of
equipment using R22 and its importation, as it will drop by 30 per
cent – which equates to 500–550 tonnes,’ De Jong says.
‘This will primarily affect the service bank out there, and the
implication is that it will become more expensive because of its
availability.’
‘R22 should still remain the first choice for the service market for
the next 12 months,’ he adds.

Should R22-installed equipment be retrofitted and


converted to alternative refrigerants? What should be
used in new equipment?
For existing R22 air conditioning equipment, De Jong suggests that
R407C be used. He cautions, however, that it requires hardware
replacements including the TX valve, drier, and POE oil. R407C also
has a large temperature glide (approx 7K). He recommends seeking OUR EXPERIENCED SERVICE
original equipment manufacturer (OEM) approval before seeking this YOUR PROTECTION
route.
RELIABLE AND GUARANTEED
He suggests that R410A be used for new equipment only and 65 YEARS OF SERVICE
that it should be not used as a retrofit refrigerant due to the high
discharge pressures involved.
This has led many manufacturers to begin offering various
solutions for R22 drop-in refrigerants.
‘Drop-ins are already available, although are currently a bit more
expensive. It is predicted that this gap will narrow as R22 scarcity SAFE AND EFFECTIVE PEST
CONTROL SOLUTIONS

What is global warming potential (GWP)? MELBOURNE 03 9645 2388


The greenhouse effect arises from the capacity of materials in the ADELAIDE 08 8297 8000
atmosphere to reflect the heat emitted by the Earth back onto the Earth.
The direct global warming potential (GWP) of a compound is shown as a
CO2 equivalent (GWP of a CO2 molecule = 1). www.adamspest.com.au

Facility Perspectives
VOLUME 5 NUMBER 1
54 CLIENT feature
client FEATURE

GREENER GROUNDS MAINTENANCE –


MAKES COMMERCIAL SENSE

G
LG GreenLife Group is one of Australia’s leading open space all turf areas, along with fertilising, gardening, landscaping, plant
specialists, providing integrated landscape construction, selection and replacement, irrigation maintenance, weed and
maintenance and project management services to a wide litter control
variety of clients across Australia. No job is too big for GLG GreenLife Group. It has an extensive
The organisation recently changed its name from Grounds & range of resources and an experienced team of trained
Gardens to GLG GreenLife Group to reflect the company’s evolution horticulturalists to provide superior native environments through to
over the past 15 years, its extensive range of services and renewed finely manicured landscapes. Most importantly, all of GLG GreenLife
focus on environmental sustainability. Group’s professional services are delivered on time and at market
Despite the rebrand, GLG GreenLife Group’s commitment to competitive prices.
deliver exceptional results to a variety of nationwide corporate and GLG GreenLife Group treats all large, open space landscapes as
government clients remains unchanged – these include Sanctuary valuable assets and with the respect they deserve. The organisation
Cove, Telstra, Hansen Yunken, Theiss and Transfield Services. always goes that extra step to employ credible and sound
GLG GreenLife Group also has a wealth of experience maintaining environmental principles so that the landscapes they manage and
some of Australia’s most significant, prestigious and remote facilities. create last for generations to come.
The company has earned a reputation for being a market leader in No stone is left unturned to ensure GLG GreenLife’s innovative
the management and maintenance of commercial landscape and wetland developments, revegetation and landscaping initiatives are
open space infrastructure. Some of GLG GreenLife Group’s current delivered using the latest technologies and products, and exemplify
contracts include: world’s best practice.
3 Grounds maintenance to 5000 Telstra facilities throughout Furthermore, GLG GreenLife Group not only ensures that
the entire country including both urban, regional and remote sustainability is at the core of its projects but is incorporated into
locations the company’s everyday practices. GLG GreenLife Group minimise
3 Grounds maintenance services including grass cutting, the water required to sustain healthy plant growth, limits the use
gardening, pest control, arboricultural works and graffiti removal of chemicals in all areas of its work, continually monitors its energy
at over 300 of Yarra Valley Water’s sites in Melbourne efficiency and always looks for new ways to reduce its carbon
3 All aspects of landscape maintenance along the Jemena eastern footprint.
gas pipeline from Newcastle to Wollongong in NSW; such as GLG GreenLife Group is genuinely excited to be embarking on a
mowing, brush cutting, slashing and arboriculture through to the new era of sustainable landscape creation and maintenance, and will
replacement and repairs to gas network infrastructure continue to apply its philosophy of ‘build, maintain and sustain’ to all
3 Grounds maintenance for Western Power’s 119 zone substations of its urban and commercial open space projects.
and five terminals covering over 300,000 square kilometres in
mid and lower Western Australia For more information go to www.glgcorp.com
3 Maintaining Adelaide Airport’s prestigious grounds by mowing

Facility Perspectives
VOLUME 5 NUMBER 1
Grounds
Maintenance
Specialists
GLG GreenLife Group is devoted to the
maintenance and care of commercial and
institutional facility grounds, ensuring their
ongoing functionality with our large range of
landscape services.

Encompassing a wide range of landscaping


principles and disciplines all with a strong
environmental focus, GLG can maintain and
improve the effectiveness of any facility’s
environment.

GLG are the specialists in developing routine


and sustainable maintenance programs,
providing tailored, long-term solutions in the
operation and care of facility grounds, creating
optimal, safe and cost effective environments
for people to work, live and play in.

- Hospitals & Aged Care - Defence


- Schools & Universities - Telecommunications
- Power & Water Utilities - Local Government
- Development Estates - Industrial & Commercial
- Hotels & Resorts Properties
- Transport: Road, - Sporting & Recreation
Rail, Airports - Housing Authorities

To find out more visit:


www.glgcorp.com

AUSTRALIA WIDE

BUILD | MAINTAIN | SUSTAIN


56 MaintenAnce & essential services

Effective space management


Terry Roche, Manager, Space Management, Victoria University

E
ffective space management can be distilled to one overriding
principle: understand the way in which space supports the
strategic directions of the organisation, and quantify the
equation to balance space demand and space supply. All flows from
this; know what it is that your organisation wants to do strategically,
and make sure that your space is best positioned to deliver on this
strategy. At best, your space should facilitate strategic delivery; at
worst, it should not hinder.
One of the many challenges facing those responsible for the
effective management of space is understanding the nexus between
business operations and the space that best supports this delivery.
Often, corporate strategies focus on market opportunities: of
minimising potential or actual threats, and of ensuring alignment
between corporate strategy, financial strategy, HR strategy and IT
strategy.
Often overlooked is the Space Management Strategy. An effective
organisation would not embark on a major expansion strategy
without planning its workforce to make sure it has the right staff to
service that growth. No efficient organisation plans an acquisition
strategy without first understanding its capacity to finance such
acquisitions. However, a significant number of organisations continue
to go about their business, planning for tomorrow, without aligning
their space. Not enough focus is placed on the key role that space
plays in a successful organisation. This reflects a mindset that sees
space as static – here yesterday, here today and will be here again
tomorrow.
Space impacts on management vision usually when an office
has to be found for a new member of staff; or a new team has
to be established and there is no spare space. Reactive planning
is often the norm in space management, at a significant financial The strategic context – tomorrow’s vision
and opportunity cost. The organisational capital that is embedded The challenge is to relate strategic objectives to space requirements.
in facilities, and the cost of operating and maintaining space, are Not an easy challenge, but manageable if you engage the right tools.
both significant elements of the budget bottom line. For most Space projection techniques exist across a number of professional
organisations, space represents the second largest budget item after and service areas, including health, education, and travel. By way
staff. Failure to plan and manage space effectively therefore impacts of an example, universities have been employing space projection
on all aspects of the organisation. models that translate their teaching and research activities into space
So, effective space management is all about asking the right requirements. The ability to model changes to business delivery, and
questions. their impact on space, is crucial to ensuring that universities plan
33 How does existing space support the organisation’s strategic effectively. The space drivers are catalogued and quantified. These
objectives? include student numbers, the various pedagogies used to deliver
33 If it doesn’t, what space is required and in what timeframe? teaching and learning, frequency and occupancy rates (the number
33 How is space meeting the current needs of the organisation? of times a room is in use and, when in use, the number of people in
33 Is there too much, too little, is it the right type of space, is it the room relative to its capacity), and the space per student station
costing too much? required to deliver the pedagogy. By developing and applying these
33 Is it flexible enough to support change? tools, the Space Manager can run multiple what-if scenarios on the
33 How well is it being used at the moment? Who has responsibility impact of change – of a strategy that seeks to grow activity in one
for space management? area, reduce in another, or break into completely new markets.
33 Are they equipped with the right information to make sound Models are representations of tomorrow based on an extrapolation
decisions? of today. The more successful models are continually updated from
Starting to ask the right questions is one powerful step along the a feedback loop – it is not a sign of a bad model to change the
path to effective space management. outcomes through better data; instead it is a reflection of a mature

Facility Perspectives
VOLUME 5 NUMBER 1
MaintenAnce & essential services 57

planning process. of space is easily produced, reports generated and action plans put in
Whatever the industry, the principle remains the same – place. What is often missing, however, from these space reports, is
understand what it is that your organisation does and how that the organisational use of this space. Office accommodation databases
translates into space requirements. will record, with varying degrees of accuracy, the organisational unit
A good space manager is able to clearly articulate the strategic allocated to that space, and even the name of the staff member(s).
directions by intimately understanding the business. It is often a Space managers removed from the organisational unit will not know
positive outcome of managing space allocations that the Space how efficiently that space is being used. Engaging resources to collect
Manager is able to regularly tour operational areas and gain an quality data on the actual use of space is a vital component of fully
understanding of their business activities. The challenge is to utilise understanding the demand on current space. Trend data can be vital
in projecting future requirements and enable enlightened reallocation
of space to better support both current levels of activity and future
programs.
The resources required to maintain accurate space data systems
should also not be trivialised. The amount of change that occurs
within an organisation’s physical resources in one year is quite
considerable. Space systems that are not maintained lose their
corporate credibility very quickly, and critical investment decisions
can be made using faulty or misleading data. Ensuring systems are
in place to capture churn is vital, coordinating the allocation and
reallocation of space – ensuring a direct link between the physical
relocation process and updating the space database, coordinating
HR, voice and data systems with the space system. Even with such
system coordination it is still necessary to physically audit all space
on a regular basis.
Emerging strategies in improving space management include
techniques for conveying to occupants the true cost of space they
occupy, and incorporating this data into their strategic decision-
making process. Organisations where space is treated as a free good
have a tendency to be wasteful of space or, worse, to see space
as a currency of success. Clinging on to space that is no longer
required in the anticipation that one day it may be is extremely
damaging to any organisation’s effectiveness, responsiveness and
flexibility. Tools for internal space charging or activity-based costing
enable the organisation to effectively price the
cost of space into activity delivery. Where the
costs of providing and maintaining space are
met centrally, organisational units have little
or no incentive to ameliorate space use. The
redistribution of the operational cost of space
to the area occupying the space sends effective
this information signals on the cost of holding space that is
in a formal and beyond requirements or in seeking space for
structured way growth. Without these price signals, space use
that populates is often sub-optimal. Non-asset solutions should
the understanding always be preferable to provision of new space
of business operations. Reviewing operational areas and placing when there is a request for additional physical resources. Systems
oneself in the shoes of the practitioner enables an effective Space that convey this message to the occupiers of space are an investment
Manager to anticipate operational areas’ requirements. Of equal worth making.
importance, however, is the use of data collection templates that So a shorthand summary of good space management would
enable organisational units to transmit data into a meaningful format include:
for Space Managers. The Space Manager has to take responsibility 1. Know the strategic context of space management;
to ensure that they are provided with up-to-date, meaningful data on 2. Know the current characteristics of your space;
how space is currently being used. 3. Employ the right tools to help plan and manage space;
4. Be ahead of the game – anticipate longer-term requirements by
The operational context – today’s wisdom ensuring you build flexibility into your current space; and
The development of sophisticated computer space management 5. Avoid the temptation to treat space as an investment to
applications over the past decade has made the job of the space meet tomorrow’s challenges. Carefully consider the cost of
manager equally easier, and more challenging. Systems such as holding space that doesn’t contribute to today’s organisational
Archibus, BEIMS, Aperture etc., enable the user to have a fingertip performance.
(mouse click) grasp of space management data. Information on the
allocation, amount, type, condition, cost, and regulatory compliance

Facility Perspectives
VOLUME 5 NUMBER 1
58 MaintenAnce & essential services

The impact of global lease


accounting changes in Australia
Companies leasing assets in Australia, such as real estate, computers, copiers and transportation
equipment, will face an overwhelming administrative burden if new international accounting standards
for operating leases are finalised in 2011.

N
ew lease accounting reviewed quarterly, and changes to the assumptions accounted for.
standards will Every lease that you are responsible for, from the photocopier and
dramatically impact the cars in the company fleet, to the corporate headquarters, will
every organisation that require detailed and ongoing analysis for the term of the initial lease
holds a lease, and will have and beyond, and no doubt the finance department will look to you,
important ramifications the facilities manager, for much of the new information required.
across all corporate Though the new lease accounting rules are expected to go into
functions, from corporate effect no sooner than 1 January 2013, given the need to report two
Michael Green
real estate and finance to prior years’ comparative information, Jones Lang LaSalle is urging
technology and human resources. companies to begin to prepare immediately, particularly businesses
In January, global real estate services firm Jones Lang LaSalle that draw heavily on lease arrangements.
launched an industry website (www.LeaseAccountingChanges.com) Companies will need to re-evaluate their approach to leasing
to provide information to help corporations navigate the upcoming decisions. In order to decide whether to renew, move, expand,
changes in global lease accounting treatment. consolidate, or own space or equipment, companies will require
much more detailed information about their leases. The proposed
Who will be impacted? standard requires a company to make a number of decisions at the
The changes will affect any company that is reporting under either start of the commitment based on the balance of probabilities as to
the International Financial Reporting Standards (IFRS) or US GAAP. what will happen in the future. Some examples:
This includes Australia, all US-based companies and most European 33 Will an option be exercised?
Union-based companies. The standards would also be adopted by 33 What will the rent be at exercise of option?
any company that wants access to European or US capital markets. 33 What will the rent be if there are any market reviews during the
The changes will touch virtually every organisation, as most term of the lease?
businesses lease some type of asset, be it real estate, computers, 33 If there are expansion, contraction, handback or upgrade options
copiers or transportation equipment. The exposure draft is expected in the lease will they be invoked?
to be released in July of this year, and the continued on page 60
changes are likely to be effective in 2013.
If adopted, the accounting for leases of
real estate and equipment will be changed
Proposed accounting treatment
dramatically, as companies will be required Straight-lined rent P&L (current rules) Cash rent P&L (proposed rules)
to capitalise all lease obligations on their $2.80 M
balance sheets. This means recognising $2.75 M
their right to use leased property as an $2.70 M
asset, and their obligation to pay rent and $2.65 M
other amounts as a liability. $2.60 M
The changes will affect every lease
$2.55 M
for real estate and equipment located
$2.50 M
anywhere in the world. It will impact
$2.45 M
those signed in the future, as well as those
$2.40 M
already in place today.
$2.35 M
$2.30 M
How do these changes impact the
$2.25 M
facilities management industry?
$2.20 M
Where once any lease was essentially Year 1 Year 2 Year 3 Year 4 Year 5
set and forget, now every lease must be

1
Facility Perspectives
VOLUME 5 NUMBER 1
client feature client feature 59

PERPETUAL PROPERTYCARE ENHANCES


IT’S GREEN CLEANING CREDENTIALS AND
ANNOUNCES NEW ALLIANCE

H
aving commenced important in all decisions taken by management in the development
it’s Green Cleaning of the green cleaning program.
Program in 2009 In late 2010 a group of Perpetual managers and supervisors
Perpetual PropertyCare has attended a greenRclean training course further developing their
continued to successfully commitment to the green cleaning concept.
develop the program. A recent “Perpetual PropertyCare has been prepared to invest in staff
external audit highlighted the development, new equipment, and trialling new methods. This has
success of the company’s opened up a number of new opportunities for company growth”
implementation and it’s founder, David Butcher said in announcing an alliance with the
development of green cleaning Berkeley Group in February. “The alliance now gives Perpetual
on the University of NSW PropertyCare the infrastructure support nationally, and financial
campus. strength to take advantage of these opportunities. All Perpetual
The green cleaning program PropertyCare staff are excited by this development and the career
has also provided additional opportunities the Berkeley Group alliance will bring. Customers
benefits to the company’s will retain a service provider that is responsive to their needs and
managers, supervisors and staff in enhanced job satisfaction, new innovative in it’s approach to changing circumstances.”
challenges, and sense of achievement. Staff enthusiastically take part
in trialling new equipment and methods and know that their input is

Innovative
Solutions

Your Choice is Clear


for the best sustainable solutions in
> Offices
Reliable
Service > Educational Facilities
> Event Venues
> Industrial Sites

Contact Perpetual PropertyCare


Quality p 02 9281 1149
Care f 02 9281 1134
info@perpetualpropertycare.com.au
www.perpetualpropertycare.com.au

The Right Choice

Facility Perspectives
VOLUME 5 NUMBER 1
page2.pdf 1 3/1/11 3:33 PM

60 MaintenAnce & essential services

What should companies be doing now?


Calculate/anticipate impact of changes

Lease Portfolio (real estate and equipment)

Identify data/resource gaps


Lease Information Information Systems
Organization Human Resources

Score Card
Measures business
results Establish cross-functional teams/processes
Operational
Dashboard

Staffing levels Change Management


Joint Global How our portfolio is

Governance performing

Team Financial Analysis

Portfolio Status
Real estate, Accounting Communications, Training
Reports

Property profile: Saint-Louis Park, MN

Facilitate strategic/tactical decision support


Governance Framework Information Systems
Business Assumptions, Data Collection/Management,
Work Routines Financial Reporting

continued from page 58

Increasingly companies will turn to their facilities managers and and feasible to own office equipment and cars, for example,
2
corporate real estate team to make calls on these issues that are paid rather than lease them and account for them under the new
little attention today and for decisions that would not be expected standard.
to be made for several years. These now become critical under the 33 Outgoings – As outgoings will still be accounted for on a yearly
proposed standard. basis in the profit and loss statement, a lower rent and higher
You will not only need to know your current leases in detail, but outgoings will lessen the first year impact for tenants. Will
you will also need to have information at hand to make robust future landlords offer lower rent and higher operating expenses in
projections. Future options will need to be reflected on the balance order to secure tenants, and how does this affect the income and
sheet at the time of reporting if the business thinks that they will distribution policies of AREIT’s?
take that option. No longer will you sign a lease, evaluate it and then
put it on the shelf. In the future, you will need to re-evaluate all of What can you do now?
the estimates you have made every reporting cycle, and changes will Some of the steps that can be taken to prepare for the new rules
need to be made to adjust asset and liability. include:
The overwhelming administrative burden to track all of their leases 33 Review your leases;
– no matter how small or short – will be borne by large and small 33 Review your portfolio/current space needs and future
businesses alike. The increased complexity of reporting, data and projections;
information being managed will necessitate investment in enhanced 33 Review the market to understand what options are out there and
information systems. It will also require the involvement of more when;
people across the organisation, placing greater importance on the 33 Understand how the standards will apply to your business;
conversations that CRE executives have with people throughout the 33 Review your information systems and research what other
business around their use of property – what type of space they need options are available;
and for how long. 33 Engage with your finance team and business units;
33 Begin a dialogue with your suppliers and landlords.
Considerations For those that are on the front foot, the administrative burden of
The new standard poses a number of questions on how to structure complying with the new lease accounting rules will be reduced, and
leases moving forward: adapting to the impact of the changes on leasing decisions will be a
33 Lease vs. own – If an asset is going on the balance sheet, why much more manageable task.
not just own it? If a company’s underlying cash position does not
change, nor should the underlying reasons why the organisation Michael Green
would lease rather than own property. Given the level of Corporate Solutions
admistrative burden, though, it may now be more economical Jones Lang LaSalle Australia

Facility Perspectives
VOLUME 5 NUMBER 1
Need help planning and tracking your maintenance?
Prolong the life cycles of your equipment by
implementing preventative maintenance
systems and procedures.
The ARCHIBUS Building Operations Management application allows you
to cost effectively manage on demand and preventative maintenance,
improve internal and outsourced service providers performance and
simplify forecasting and budgeting.

ARCHIBUS has specialist modules that include:


Building Operations Management
Space Management
Condition Assessment
Furniture and Equipment Management
Service Desk / On Demand Work
Real Property and Lease Management
Environmental Sustainability Assessment
Overlay for AutoCAD and Revit
Room Reservations
Move Management
Project Management
Capital Budgeting

Sydney Office Melbourne Office Brisbane Office The # 1 Solution for Total
t +61 2 9267 8215 t +61 3 9008 5444 t +61 7 3503 9270
Infrastructure and Facilities
f +61 2 8915 1322 f +61 3 9445 9227 f +61 7 3503 9269
Management in the World...

Over 3 Million users managing


1.6 Billion square meters
archibus@asc-a.com | www.asc-a.com | +61 2 9267 8215 prove it daily!

A new evolution in Facility Management


Monitor, manage and control FM anywhere
with Concept Evolution™, the web-enabled,
complete Facility Management software
solution, from FSI APAC.
Concept Evolution™ is:
■ a fully web-enabled, functionality
rich, complete Facility and Maintenance
Management software solution
■ deployable regardless of borders
■ accessible from anywhere
■ easy and cost-effective to deploy
and sustain

Isn’t it time for your organisation to evolve?

Let us help change your world.


T: +61 (0) 449234446
E: info@fsifm.com.au W: www.fsifm.com.au
62 CLIENT feature
client FEATURE

FINESEAT
MANUFACTURERS

F
ineseat was established in the Australian market in 1986. The
company manufactures a wide range of commercial office
seating and trades through independent office furniture
dealers across Austr
Australia. The company when formed employed four
people and
an manufactured from a small facility in Alexandria
NSW. Product
P manufactured at this time was approx.
2000 chairs
ch per annum. Fineseat identified and targeted
a definite
definit lack of service in this market and was quickly
recognized
recogniz for supplying a superior service and product.
Fineseat nown operates in a combined space of over 15000
square meters
me and employs 60 people. We produce and
distribute across
ac Australia over 50,000 chairs each year.
Our companies
comp combined manufacturing experience is
over 60 years.
years A direct benefit of that experience flows into the
following four areas:
3 Product d design
3 Research aand Development
3 Manufacturing processes
Manufactu
3 Warehousing and Distribution
Warehous
Adding to this Fineseat has also established key manufacture
and supply agreements
agree with international seating and furniture
companies such as the Fursys Group from Korea incorporating
the Sidiz range of seating and Senator who is the largest designer
and manufactu
manufacturer of seating and systems furniture from the UK.
Both companies
compa add an exceptional level of experience and
product options
optio to The Fineseat Australian operation.
Fineseat is an
a active member of AFRDI and has accreditation
for ISO9001 and ISO14001
IS in both the manufacturing administrative
sides of the business.
busine
At Fineseat we alsoa believe it is our responsibility to protect the
environment for future
fut generations. Fineseat embrace sustainability
as a fundamental practice
pr and we continue to implement sustainable
solutions. Sustainable
Sustainab development provides the opportunity to
achieve significant results
r in the key areas of environment, society
and business.
To compliment all al of this we have a dedicated team of Sales and
Support staff around Australia who are direct employees of Fineseat
with a commitment to service and efficiency.
Fineseat is an Australian
Aus owned and operated manufacturer. We
are proud to be supporting
sup Australian industry and Australian jobs.

Facility Perspectives
VOLUME 5 NUMBER 1
64 Spotlight on Lighting

Low carbon
trend is lighting
the way
By Chou Lien, lighting designer, President of Brandston Partnership
Inc., and keynote speaker at Sydney’s SPARC International Lighting
event in June 2011.
Better lighting choices for our commercial, residential and public spaces increasingly equate to
leadership in energy and environmental design. Chou Lien, an internationally recognised lighting
designer visiting Sydney in June for the SPARC International Lighting event, reveals upcoming lighting
trends and how industry professionals involved in designing and managing lighting solutions can
position themselves in the world of the ‘low carbon’ concept.

L
iving in a visual culture, lighting design and management product selections. Factors that are quantified and rated include
significantly influences us physically, psychologically and material product inputs, the system’s energy consumption over its
sociologically. Clever lighting choices improve our lives, expected lifespan, as well as the final recycling potential for the
transform the way we feel about a space, and enhance our system. It can be expected that regulation will play a greater role in
interactions within that space. Clever lighting choices cannot be the use of LCAs.
separated from pursuing improved energy efficiency and lighting Already very important overseas, and something that Australians
longevity. More than just switching off the lights when they’re can also expect to see here in the coming years, is the Leadership
not needed, the ‘low carbon’ trend gathering pace will soon be in Energy & Environmental Design (LEED) certification system
dominating decision-making on all new buildings, private and public encouraging building designers to use strategies to improve energy
spaces alike. savings, reduce CO2 emissions, improve indoor environment
The low carbon trend is driven in part to decrease energy bills, quality, and improve stewardship of resources and sensitivity to their
contribute on behalf of corporate social responsibility, and also impacts. LCAs contribute to this rating system.
meet increasingly stringent legislative demands. It relates to making With stricter regulations comes the necessity for industrial
lighting decisions based on the entire carbon footprint of the lighting engineers and lighting designers to be more sophisticated. We have
system throughout its lifespan. It also considers the lighting system in to change the way we think about the size of light fixtures and the
the context of the lighting environment and how to manipulate other need to use lighting materials which are and can be proven to be
aspects of the space to rely less on artificial lighting. more sustainable. Smaller sized lighting fixtures (capitalising on
Currently in Australia, life cycle assessments (LCAs) are used as today’s smaller sources) means less material of every kind in each
ways to promote an organisation’s responsible building choices and fixture. More thoughtful fixture design and selection also means

Facility Perspectives
VOLUME 5 NUMBER 1
Spotlight on Lighting 65

consideration of the manufacturing processes, transportation of


components and finished fittings, as well as the eventual disposal
issues. Also, many lighting fixtures are disposed of not because they
have reached the end of their useful life, but because the space they
are illuminating is renovated. Perhaps thought needs to be given to a
systematic recycling of used lighting fixtures, rather than disposal as
the first option.
Also acknowledged in this rating system is the importance of an
integrated, whole-of-building design system of practice. This works
to limit power use to a bare minimum by considering more than
the lights alone. Increasingly, lighting consultants, electricians and
designers are expanding their scope of consideration. Affecting
lighting choices should be things such as the colour of the walls, the
building orientation and the source of the electricity. Many designers
and space planners forget that walls absorb a great deal of light.
Chou Lien
Lighting designers often promote lighter coloured walls, but also
lower walls or open plans whenever possible. This way of thinking lighting systems as a whole is calculating lighting power allowances
needs to find its way into space planners’ considerations as well. for building spaces and whole buildings within the context of the
Early consideration of the orientation and configuration of the way the lights are used. In Australia, building rules regulate on the
building in the early stages, with the thought of maximising daylight wattage that can be used per square metre, with differences based
use in the interiors, needs to become more common. In the early on particular building types. Little respect is given to how the lights
days of electric lighting, even high-rise buildings in large cities were are used, and that not all lights are used at the same time. It can be
planned so as to illuminate as much of the interiors as possible with expected there will be more sophisticated measurement around how
the windows, and the electric lighting was considered supplemental. lighting systems will be used.
There is, of course, a tightrope we walk finding the balance With different measurement, I expect a trend toward more
between quality lighting solutions and energy efficiency. All too automated lighting systems that can sense how a space is being
often we overestimate the level of lighting necessary to enhance used. Take, for example, a lecture hall that traditionally seats over
the pleasure of the space, leading to waste and unnecessary energy 100 people, but on many occasions is only half-filled. Wouldn’t it be
consumption. Significant change will come from those who make fantastic if the lighting system was able to tell that less than half of
light fitting/control systems as well as lighting designers who are the hall needed lighting, and responded by only lighting up the front
working to improve the design of architectural elements in lighting rows of the hall? With little personal incentive for individuals in public
systems. Lighting designers have for years preached the value of and commercial spaces to control the light systems themselves,
vertical luminance (i.e. lighted walls), rather than concentrating automation will be a necessity and a sure trend in the building
exclusively on horizontal illuminance. Especially in this day and age of industry.
computer use in almost every business and home, the over-lighting I believe these technological advancements, improvements in
of desktops is all too common. Demonstrations, mockups and measurement, and legislative changes will light the way to enhancing
general education of clients are required to make them comfortable the personal and the broader built environment.
in using the low end of lighting recommendations rather than the For more information, consider visiting the SPARC International
high end. Lighting Event, which is open to builders and project managers,
These changes will help make it easier to find that necessary architects, lighting designers, industrial designers, engineers, interior
balance. A good analogy is that low-calorie food won’t be eaten designers, and landscape designers.
unless it tastes good, and the same goes for energy efficient options
that do little to improve the pleasure of the environment. Register your interest in this event at info@sparcevent.org and visit
One perspective changing the way that designers are looking at www.sparcevent.org for more information.

Facility Perspectives
VOLUME 5 NUMBER 1
66 Spotlight on Lighting

The pros and cons of LEDs


Bryan Douglas, Chief Executive Officer, Lighting Council Australia

F
rom traffic lights to exit signs, heat sinks. Degradation in LED material
torches to street lighting, kitchens and phosphors in white LEDs can lead
to lounge rooms, stadium displays to colour shift; a potential issue for side-
to architectural and decorative lighting – by-side applications. As a point source of
the use of LEDs as a light source is on the light, LEDs are well suited to uses such as
rise. Light-emitting diodes, or LEDs, are traffic lights, but this makes LED use for
an important development in the lighting general illumination more challenging. And
industry and they are here to stay. initial costs for LEDs remain higher than
alternatives.
What are LEDs?
LEDs are a type of solid-state lighting (SSL). Expectations and standards
They consist of a chip of semiconducting Numerous new LED products are now
material treated to create a positive- entering the Australian market. While
negative junction. When switched on, some are excellent, many are poor quality
charge carriers flow into the junction and and do not live up to suppliers’ claims.
combine to release energy in the form of Lighting Art and Science December 2009
photons. The colour emitted depends on edition reported that LED testing at the
the materials used to make the diode. LEDs Queensland University of Technology found
can be red, yellow, blue, green or ‘white’ ‘Many [LEDs] perform poorly or have
(created by combining other colours). failed to meet the specifications for the
LEDs were introduced as a practical application that they were designed for’.
electronic component in the 1960s. Such performance issues threaten to
Significant technical developments in more Lighting Council Australia’s SSL Quality Scheme label with sample
values. For a description of the label see www.lightingcouncil.com.au
undermine user confidence, discourage
recent years have seen them used widely as uptake, and delay or otherwise compromise
indicator devices and, increasingly, for special and general-purpose the substantial energy savings potential of LEDs. Lighting Council
lighting. is keen to promote this technology. However, we want to avoid a
repeat of the early days of compact fluorescent lamp technology
Benefits when consumers were put off by poor quality, premature failures
LEDs are highly energy efficient, comparable to fluorescent and light output issues. While new LED standards are being prepared
technology. They have a long life – lasting last up to 50 times longer at an international level, the technology is yet to be properly
than incandescent lamps and 5–10 times longer than fluorescent standardised globally or within Australia.
lamps. This makes them ideal for hard-to-access locations. LEDs
are durable and can withstand vibration and shocks. They are not SSL Quality Scheme
affected by regular on/off switching, which is good for areas such as Standardisation remains an issue. Until we have robust, mature
bathrooms. Another advantage is that LEDs do not contain the toxic standards, we can’t address the quality and performance problems.
substance mercury. In addition, they are at full brightness as soon as In response, Lighting Council Australia recently launched an industry-
they are switched on and are fully dimmable. led voluntary quality certification scheme for LEDs. The SSL Quality
Scheme provides confidence to the market that a luminaire carrying
Quality comparison the scheme’s label matches the supplier’s performance claims.
Some types of LEDs, however, still have a way to go to match the Lighting Council Australia verifies performance claims based on test
quality of other technology. For example, recent testing of LED T8 reports or other evidence provided and then authorises the use of
fluorescent replacements by the US Department of Energy found the SSL Quality Scheme label. Labels include details such as light
bare lamp output of the LED T8 was about one-third the average for output, efficiency, power required, light colour and colour accuracy.
fluorescent T8s. Performance was also significantly below fluorescent Registered products appear on a searchable database on Lighting
T8s in luminaire efficacy (efficiency in terms of light output versus Council Australia’s website.
energy consumed) and colour rendering index (colour accuracy). LEDs have enormous potential. This is a highly flexible technology
However, average fixture efficiency was higher with LED T8s because that will lead to a re-think of lighting applications. We haven’t even
LEDs are directional, so less light is lost inside the fixture. imagined all the possible uses yet.

Other issues More information about LEDs and the SSL Quality Scheme is at
Heat management of LEDs is an issue, requiring elements such as www.lightingcouncil.com.au.

Facility Perspectives
VOLUME 5 NUMBER 1
CLIENT FEATURE client feature 67

CLEANSCENE - THE ONLY NATIONAL


CLEANING EXHIBITION WITH FULL
INDUSTRY SUPPORT

C
LEANSCENE: The National Cleaning & Hygiene Expo will
be held 5 – 7 April at the Melbourne Exhibition Centre.
CLEANSCENE enjoys association support across a plethora of
sectors and at a level unprecedented for an Australian cleaning show
(NCSA, NUCCRA, ACCA and BSCCA are all supporters of the event
and between them represent over 90% of the cleaning industry).
Training companies (Joined Forces), educational institutions
(Gordon TAFE) as well as companies and organisations offering
the latest in cleaning and hygiene products and services will be on
hand to inform and challenge your current practices and processes.
Wash room products (Pink Hygiene), large machinery and sweepers
(Tennant), cleaning consultation and hygiene supplies are just a few
examples of what exhibitors have on offer. principal source of expert knowledge for OHS professionals, thus
Association members and facilities and building professionals alike providing facilities and building professionals with an opportunity to
will benefit from numerous features at the cleaning show including source hygiene and safety products simultaneously.
a free seminar series, workshops, a live demonstration stage and the To register to visit CLEANSCENE: The National Cleaning & Hygiene
Clean & Green product area featuring companies who have gained Expo in Melbourne in April go to www.cleansceneshow.com.au.
green certification from GECA or a European or American equivalent.
CLEANSCENE will be co-located alongside Safety In Action, a

5 -7 April 2011
Melbourne
Exhibition
Centre

Major Sponsor Accredited by Supported by

Register now at cleansceneshow.com.au

Facility Perspectives
VOLUME 5 NUMBER 1
68 Water

Water, Water Everywhere


Canada is Embracing PPPs. Annie Gales, Director of Service Works Global, reports on the Canadian
CCPPP National Conference on public private partnerships, and compares the Australian and
Canadian water industries.

W
ater is always topical in Australia – most recently The Britannia Mine Water Treatment Plant in British Columbia
because of the flood devastation across several states, is one such (smaller scale) PPP project, which is part of a larger
but more typically because of the water shortage that remediation scheme being managed by the Ministry of Sustainable
impacts the country. Similar water concerns are experienced by Resource Management (MSRM). The project was to clean up the
many countries across the world; either because they are water rich water flowing from a contaminated mine site which, if left untreated,
or water scarce – in any event, fresh water supplies are dwindling. would continue to deposit on average 600 kilograms of metals in
Water is also an issue in less obvious countries such as Canada. the area on a daily basis. By implementing a new acid rock drainage
At the Canadian CCPPP National Conference on public private treatment plant funded through a PPP project, up to 500,000 cubic
partnerships just prior to Christmas, water was high on the agenda. metres of water is now treated per year. The plant has received
Similar to Australia, they too are looking towards the PPP model to several awards for innovation and project excellence for its water
alleviate the issue of years of under-investment in different types treatment process, plant operation and water quality monitoring.
of infrastructure; from water through to hospitals, schools and Using the PPP model, the British Columbia province has successfully
healthcare. Over the last 12 years, Canada has developed some protected taxpayers from the risks involved with developing and
innovative PPPs with particularly notable success in recent years. implementing ways to effectively treat the mine water, and the
project has delivered excellent value for money (with a projected
Water in Canada lifecycle cost of $10m less than the estimated cost of completing the
Historically, both municipal water and wastewater industries have plant through traditional methods). The Canadians are also working
been performing badly across Canada. They have experienced issues on a number of international infrastructure projects, including a new
with water quality violations, inspection problems and high leakage desalinisation plant in Adelaide, which is projected to deliver 100
rates (between 12 per cent and 40 per cent depending upon which billion litres of clear water to the city of Adelaide each year and is
statistics you read) because the infrastructure is aging faster than it’s due for completion in 2012.
being repaired, and municipalities have been finding it very difficult
to turn the situation around. Australia’s ambitious water projects
In Australia, there has been consistent private sector involvement
PPPs – the ideal solution to the water problem in desalination plants based on several different models including
The estimated capital investment required for water and waste- PPP. A recent impressive example is the Victorian Desalination
water in Canada over the next 20 years is between C$79 billion and Project, which is the largest seawater desalination plant currently
C$90 billion, and PPPs are the ideal solution to the problem. Much being developed in Australia and one of the largest PPP projects
to its credit, Canada has taken the opportunity to really embrace undertaken globally in the last few years. When complete, it will
the maturing PPP model, demonstrating considerable expertise and supply up to 150 gigalitres of water a year to Melbourne and
innovation, both domestically and internationally, with over 150 the surrounding areas. This production capacity is equivalent
projects completed or in procurement. to approximately one third of Melbourne’s annual water usage.

Facility Perspectives
VOLUME 5 NUMBER 1
Water 69

However, it is only in the last few years that Australia has started to originally specified may no longer be valid when the infrastructure
embrace the private sector in general water infrastructure in order to is built. When the specification is written, the public sector should
secure its supply for domestic, industrial and agricultural use, where look to the private sector for innovation (especially with regards to
up until recently it had typically used the traditional procurement technology in water infrastructure) to ensure that it’s not functionally
model. obsolete before it’s physically obsolete.
Future-proofing contracts was very topical at the conference,
The success of PPPs in water with an emphasis on ensuring the PPP specification isn’t written
As demonstrated, the PPP model can generally be successfully so tightly that flexibility is stripped out. There is always a balance
applied to the water infrastructure market, although the sector between flexibility and durability and taking into account future
has some unique characteristics. Firstly, market competition is needs. Agreements must be flexible enough to accommodate change
smaller than in other sectors and this can result in a debate as to (i.e. change of use of a building, physical scope as well as service
whether best public outcome and value for money can be achieved. changes) otherwise long-term PPPs can be an encumbrance rather
Most importantly, the technology is developing so rapidly that than a source of innovation. Canadian PPPs have come a long way,
procurement costs are high and input from the private sector is to a situation where lifecycle expectations are incorporated into the
crucial in order to leverage the technology and innovation benefits. In contract, often including commercial incentives to balance short- and
striking contrast to the speed of technological change, the nature of long-term needs from the project.
the market is very long-term and this is evident in the return, which is
typically low but constant. The general public are also very sensitive
about allowing the private sector to take responsibility for something
as critical as water, with the concern that it isn’t going to be
regulated as efficiently as if the public sector retained responsibility.
Although in some countries, such as the UK, private sector retaining
ownership of the model is widely accepted, in many countries lease
or operating contracts tend to be used, with the private sector
partner focusing on improving operational efficiency and the public
sector remaining solidly in charge of the investment. In these cases,
the public sector is still very important to the success of the project.

Managing service delivery and performance in PPPs


Particularly in these instances, Service Works’ performance
management software, QFM, is often used by both the private and
public sectors to manage the operational efficiency, service delivery Canadian attitudes to PPPs
and performance of PPP contracts, and is currently in use by in It is no surprise that public opinion in Canada is extremely supportive
excess of 140 PPPs in this capacity. Many of these contracts use of the PPP model. Regular surveys have been commissioned
QFM’s integrated payment mechanism, so that deductions and gain since 2004 (using the same questions to ensure accurate
share/pain share incentives can be automatically derived. benchmarking) and positive opinion is at an all-time high with two
thirds of Canadians supporting the use of PPPs to deliver critical
Best practice infrastructure. The youth are the strongest supporters of the model,
In both Canada and Australia, significant work is being carried out with 74 per cent of respondents providing positive support. It is
around PPP design, research, innovation and best practice and the therefore anticipated that there will be a growing level of support
focus is to go beyond the needs of today in order to meet the needs over years to come.
of future users. These two markets have much in common based on
their systems of government, small population versus geographical A successful PPP
size and infrastructure deficit (although the difference in size of the In conclusion, the Canadians have developed considerable
latter is debatable). expertise in the PPP field in recent years, both domestically and
internationally. They have learned from the mistakes made in the UK
Lessons learned by incorporating flexibility into contracts, with the ability to finetune
At the Canadian PPP Conference, delegates were happy to share and incorporate change. In addition, all contracts include a protection
the lessons learned from recent projects. Although Canada is clause to accommodate political change (in case, for example,
newer to PPPs than Australia, it has fully embraced the model and a decision is taken by a new government to discontinue PPPs).
demonstrated great success in recent years. It was widely agreed that Whereas Australia has reached a crossroad in PPP with the pipeline
because the life of a PPP project is long, there may be influences that of future projects looking surprisingly thin despite the infrastructure
change expectations along the way (i.e. environmental groups) and it deficit, Canada has truly embraced the PPP model and recognised
is important not to be pulled off course from the original specification that the private sector is better equipped to deliver infrastructure on
in order to accommodate new requirements. It is therefore vital time and within budget.
that a ‘vehicle’ responsible for the delivery of the project acts as A successful PPP is where a healthy asset is created and
an effective steward in the interest of the project, actively resisting maintained and aligned to the users’ needs. The message at the
change where necessary in order to keep the project on course. conference was clear. To secure the best PPP model, public interest
However, it is also important that some of the initial design elements is paramount, value for money must be demonstrable, accountability
are indicative only, because technology (especially in water) can must be maintained, and similar to the goals in Australia, innovation
change in a short space of time and what was state-of-the-art when and transparency are critical to the success of a project.

Facility Perspectives
VOLUME 5 NUMBER 1
70 security

‘Think Security’.
By Peter Johnson, Manager-Compliance,
Australian Security Industry Association Limited (ASIAL)

S
ecurity for the facility manager is not just a tick and flick audit should be conducted; facility managers will be provided with a matrix
process, it is an underpinning mindset required to enable of risks rated according to the potential impact upon the facility if
the facility tenants to undertake their daily activities in a safe an incident or event were to occur. Provided with such information
manner and to ensure the security of the premises after hours. facility managers will be positioned to apply appropriate security
Unfortunately, security for the facility manager does not always measures and spend the facility security dollar wisely.
mean convenience for tenants. Convenience, security and safety A skilled security design professional is capable of solving a
is a balancing act which requires management to be informed of security problem without detracting from the environment. Excessive
a vast array of security measures including access control, CCTV, visual security measures may be inappropriate or give the wrong
security hardware, guarding and patrol services, and the multitude of message in that ‘crime does occur here’. Such an impression
variations of electronic security measures and the available options. may not attract tenants or provide a degree of comfort for tenant
No one expects the facilities manager to have a complete employees or visitors. On the other hand, security options including
understanding of detailed security applications and leading edge electronic access control, CCTV and managed reception/security
technology; however, we do expect the facility manager to have the control point can present security options that deliver the message
ability to grasp what security measures are suitable for the facility that ‘we care’ and that the facility provides a safe feeling and a
having regard to tenant and building requirements. pleasure to be there. Suitable lighting, space management and a
Facility managers are encouraged to seek advice from a security facility culture of compliance and acceptance of procedures naturally
expert; although, care should be exercised in the selection of the support this.
source and the advice. The Australian Security Industry Association Whatever your security initiative, security is an investment; the
Limited (ASIAL) encourages the selection of suitably qualified and return on investment may at times be difficult to measure. This
licensed security advisers. Although not a national requirement, returns us to the appropriate security risk assessment of the facility
many jurisdictions licence security advisers, security sales people that guides us in our decision process.
and technicians responsible for installation of electronic security Many buildings are ‘open buildings’ during normal business
equipment. ASIAL provides a public search database for providers hours. This is particularly so for shopping centres, which create other
of security services. The corporate member database can search security challenges for facility manager including behavioural issues.
by services offered, state/territory and region. The search service is The risk assessment and risk ratings would identify those issues and
found at http://www.asial.com.au/FindASecurityProvider. guide facility management towards appropriate options.
The application of security measures can take many forms Building security and access control systems are capable of
although all options can be assisted by the consideration of Crime controlling interior and exterior door control and alarm point
Prevention through environmental Design (CPTED – pronounced monitoring and are scalable for the requirements of the facility.
Sep-Ted). CPTED is a proven crime prevention approach, which System options may include:
has been shown to reduce the opportunities for crime and incivility. 33 biometric readers
To understand the facility environment, a security risk assessment 33 door scheduling

Facility Perspectives
VOLUME 5 NUMBER 1
security 71

measures, although tenants should be guided on the selection of


quality equipment and installation. Engaging appropriately licensed
and qualified security organisations and individuals for the installation
of security equipment is an important criteria and responsibility of
facility managers.
Modern access control systems are relatively simple to monitor
and maintain. When installed by qualified people, they are difficult
to tamper with and override, creating peace of mind for building
managers and tenants.
Whatever security measures are provided within the facility, the
performance of the system is only enhanced by the management
system that supports it.
The selected security measures should also be supported by
quality operating procedures for the facility supported by training
for the facility staff and contractors and, where required, tenants,
especially with regards to evacuation training. Good procedures
provide direction, and advice for the daily function of the facility
33 employee database information and the requirements and procedures to follow in the event of an
33 detailed real-time reporting incident or emergency.
33 visitor management Procedures should include (as a minimum):
33 photo identification 33 facility description & plan
33 video surveillance 33 24 hour emergency contact list
33 car park entry/exit and fee management. 33 facility communication
The selection of the security measures must take into account 33 general security instructions including patrol requirements
the requirements of the facility and that of all stakeholders. In 33 emergency procedures including:
multi-tenanted buildings we recognise the need for systems that 33 fire alarms
meet the basic needs of all whilst providing the additional security 33 building evacuation
measures required by some. Depending upon the facility, tenants 33 medical emergencies
may be permitted to source and provide their own internal security 33 bomb threats
Continued on page 72

The Australian Local


1640_A
LGYE
Government Environment
_cvr_IM
P 25/06/
10 2:1
9 PM

Yearbook® 2011
Page 1

Available from

Phone 03 9329 5295

ALGEY
THE AU
STRA
N LOCA LIA

T
LOCA HE AUSTR
L GOVE

L GO
VERN ALIAN
AUSTRALIA MENT
RNME

W ’S BEST
NT EN

ASTE TRUC environ


VIRON

K ment
MENT

Designed
and eng
FE Du
al Contro ineered in Au
l is Austra stralia
YEAR
YEAR

Cle an est to suit


BOOK
lia’s bes local wo
t waste rking con
The onl truck. ditions

2011
y waste , the Vol ®
BOOK ®

The onl truck tha vo


y side-lo t is
(Euro 5) ader ava built in a CO
tod ilable 2
Qu iet est ay. that can neutral factor
deliver y.
2011 em
2011

The onl issions


y side-lo standa
compre ader in rds
ssion bra Austra
Sa fest king sys lia tha
tem, ide t featur

2011
al for sen es a uni
The onl sitive res que, noi
y sid identia se red
instantan e-loader tha l and city ucing
eous bra t offe areas.
The onl ke respon rs an Electro
y waste se. nic Bra
For a tes truck tha king Sys
t drive t offers tem (EB
contac all wheel S) for nea
t your disc bra r
local dea kes as
volvo truc ler on
1800
803 42
standa
rd.
01

ks. drivin 7.
VOL02

www.v g progre
olvotruc
ks.com.
au
ss

ISBN 978
1 921345
15 9

ALGY Enviro Filler Ad Half page.indd 1 2/25/11 8:49 AM

Facility Perspectives
VOLUME 5 NUMBER 1
72 security

continued from page 71

33 criminal activity (including local police contact points) issues surrounding the use of CCTV:
33 engineering requirements including: 33 The Western Australian Police CCTV Guidelines
33 mechanical problems and emergencies 33 The Victorian Law Reform Commission – Surveillance in Public
33 electrical problems and emergencies Places
33 administration requirements including: 33 Northern Territory CCTV Code of Practice
33 key control 33 New South Wales CCTV in Public Places Guidelines
33 complaint handling 33 Commonwealth Organisation of Australian Governments (COAG)
33 lost and found procedures National Approach to CCTV.
The monitoring of a facility’s electronic security system is an Despite concerns over the use of CCTV, its use in Australia is now
option, although many insurance companies require system widespread with significant public support when the value of CCTV is
monitoring as a condition of coverage. In many jurisdictions fire demonstrated as a means of crime prevention and proactive security
system monitoring is a legislative requirement falling under the measures. Operators must ensure their compliance with use,
building regulations. recording, distribution and archiving of images recorded via CCTV.
When selecting an alarm monitoring company, facility managers The changing environment of security and the plethora of security
should ensure that the monitoring company is appropriately licensed equipment available will continue to challenge the facility manager.
and the monitoring centre is certified to the Australian Standards Security organisations offering services from the provision of guards
2201.2-2004 (Intruder Alarm Systems – Central Stations). ASIAL to elaborate electronic security systems involving access control
provides a public list of monitoring centres that have been certified and CCTV will need to offer the facility manager confidence of
through the Association’s process. View the current list at compliance in all aspects of the delivery and provision of the security
http://www.asial.com.au/AlarmMonitoringCentreCertification. service and products. It is the responsibility of facility managers to
With the monitoring of electronic security equipment, CCTV demand evidence of compliance from security providers.
presents another challenge for organisation not only in the selection When you think security, think ASIAL and utilise the services of
of quality equipment and its operation but also the legislative appropriately licensed security professionals.
requirements and privacy issues. As with security, there is no
About ASIAL
uniform national legislation covering CCTV and the associated privacy
issues. The uncertainty of operational accountability and level of ASIAL is the recognised peak national body for the private security industry in
Australia. Established in 1969, ASIAL’s members represent approximately 85
public intrusiveness exercised by private organisations operating
per cent of the security sector. ASIAL has played a key role in driving Australian
CCTV continues to attract public and government interest. The standards, developing codes of conduct and raising the level of professionalism
following publications provide further information regarding the within the industry. Visit www.asial.com.au for further information.

ADT SECURITY

A
DT Security provides intrusion, smoke detection and life safety
solutions, as well as products such as closed circuit television
(CCTV), access control, electronic article surveillance (EAS),
radio frequency identification (RFID) and wireless networks. We are
experts at integrating systems to meet your needs. When it comes to
security, we know that one size does not fit all.
ADT Security’s alarm solutions are designed to detect unauthorised
entry and help maintain your business’ integrity. Our services can be
extended to arrange the monitoring of fire systems and other critical
alarms such as temperature fluctuations in environments where none
can be tolerated. Monitor who comes into your workplace or safeguard
sensitive areas within your business. Swipe cards, key-pad access and
badging enable you to keep track of visitor and employee movements.
Our electronic access control solutions also provide practical ways to
account for employees gathered at muster points during evacuations.
Our range of video surveillance and digital recording devices helps About ADT Security
you manage visual information. We also offer a remote monitoring With more than a century’s worth of experience and providing
service should you not have the time or resources to undertake electronic security solutions to more than seven million residential,
surveillance on site. Either way, security cameras are proven deterrents commercial and retail customers worldwide, ADT Security is the
to theft, fraud and EH&S issues. world’s largest electronic security company. ADT Security’s total
With rapid advances in technology, ADT Security is constantly security solutions include intrusion, closed circuit television, access
working with the very latest technology, drawing from a wide range of control, fire protection, smoke, fire and critical condition monitoring,
products and services, to provide the best protection for every office electronic article surveillance, source tagging, radio frequency
environment. identification (RFID) and integrated systems.
For more information, call ADT Security on 131 238 or visit www.
adtsecurity.com.au. www.adtsecurity.com.au

315616E_ADT Security | 1685.indd è:–ø2 2/2/11 8:46:52 AM

Facility Perspectives
VOLUME 5 NUMBER 1
INTRUDER ALARMS MONITORING | LOSS PREVENTION | ELECTRONIC ARTICLE SURVEILANCE | CCTV | ACCESS CONTROL | MONITORED SMOKE ALARM | SECURED WIRELESS NETWORK TOTAL SECURITY SOLUTIONS

Manage your facility more effectively


with ADT Security
ADT Security’s facilities management solutions are designed to detect unauthorised entry and help maintain your business’
integrity, providing intrusion alarms and monitoring, CCTV, visual surveillance and access control. Swipe cards, key-pad access
and badging enable you to keep track of visitor and employee movements.

ADT Security ’s team will help address your needs, providing a uniquely designed solution that complies with industry
standards. ADT Security will plan, install, integrate and maintain your security system to help protect your key assets.

With over 130 years experience globally, ADT is the world’s largest provider of electronic security solutions.

For more information or enquiries, please contact 131 ADT or visit our website at www.adtsecurity.com.au

Master Licences:
VIC No. 65201491P | WA No. SA37852 | SA No. ISL152299
NSW No. 405187443 | ACT No. 17501009 | QLD No. 3258669
INSPIRATIONOVERNIGHT

Refurbish your office without disruption.


Revitalise your building assets with Renovisions® from InterfaceFLOR and create workplaces that inspire.
Choose from Australia’s largest range of stylish modular carpet designs which are durable, stain resistant,
recyclable and achieve 100% Green Star points.

Less downtime. Less hassle.


InterfaceFLOR’s revolutionary installation system, Renovisions®, enables old flooring to be replaced quickly
and efficiently. There’s no need to move out, move furniture, or even disconnect power and data.

Less cost.
With rapid installation overnight and on weekends, your carpet replacement costs can be cut by up to 50%.

Find out how you can save with InterfaceFLOR’s Renovisions® Calculator at www.renovisions.com.au
or call 1800 008 101.

Renovisions® from InterfaceFLOR - inspiration not interruption.

Why design when you can create www.interfaceflor.com.au