SUMMARY OF PRICES
15% VAT
ADDIS MEBRATU
Consulting Architects and Engineers
PO.Box 43194 Addis Ababa Ethiopia
Tel -0115545383
-0115159652
Cell -0911229341
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
Design, supply and install support for the required depth of excavation
wherever required.Design is to be performed by a qualified engineer who
has ample experience in design of excavation support and whose design
has been installed with successful performance. The supply and
installation shall include, but not limited to, reinforced bored cast-in-situ m2 980
piles including concrete and reinforcement permanent grouted anchor
including all accessories, proof testing of working anchors to an
acceptable test load, and reinforced shotcrete membrane to be installed
between shoring piles.
Excavation work
Bulk Excavation of Ordinary Soil to a depth of 1500mm below existing
1.02 m3 975
ground surface.
Bulk Excavation of Ordinary Soil from a depth of 1500mm below existing
1.03 m3 975
ground surface to a depth of 3000mm.
Excavate in Soft Rock from a depth of 3000mm below existing ground
1.04 m3 975
surface to a depth of 4500mm.
Excavate in Soft Rock from a depth of 4500mm below existing ground
1.05 m3 975
surface to a depth of 6000mm.
Excavate in Soft Rock from a depth of 6000mm below existing ground
1.06 m3 358
surface to a depth of 6500mm.
Disposal
Cart away surplus excavated materials to a distance not exceeding 10km
1.07 m3 4,258
from site.
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
Fill
Fill over excavated ground up to the bottom level of the lean concrerte
with satisfactory soil (Selected Material) conforming to ASTM D 2487 soil
classification groups GW, GP, GM, SW, SP, and SM, or a combination of
1.08 m3 372
these group symbols; free of rock or gravel larger than 3 inches (75 mm)
in any dimension, debris, waste, frozen materials, vegetation, and other
deleterious matter and a swell potential of less than 3%.
1.09 Ditto as item 1.07 but under second basement slab m3 484
1.10 Ditto as item 1.07 but around retaning wall m3 681
Hard core
Hard basaltic or equivalent stone hard core under slab on grade, well
1.11 rolled consolidated and blinded with crushed stone to a finished m2 650
thickness of 25cm
Total Division 2 (Carried to Summary).
DIVISION 2 CONCRETE WORK
CONCRETE WORKS
SUBSTRUCTURE
5cms.thick lean concrete in class C-5 with minimum cement content of
2.01
150kg /m3
a Under Matt Foundation m2 651
b Under basement slab m2 651
b To Columns extending from Ground Floor to bottom of First Floor beams m2 205
Third Floor
Reinforced concrete in class C-25, with minimum cement content of
2.23 360kg/m3 filled into formwork and vibrated around steel reinforcement.
Steel and formwork measured separately:-
a In Columns extending from Third Floor to Fourth Floor beams m3 25
b In Third Floor Beams m3 40
c In Shear Walls extending from Third Floor to Fourth Floor beams m3 9
d In Stairs extending from Third Floor to Fourth Floor beams m3 3
2.24 Provide cut & fix in position formwork.
a To Third Floor Slabs m2 588
b To Columns extending from Third Floor to Fourth Floor beams m2 159
c To Third Floor Beams m2 134
d To Shear Walls extending from Third Floor to Fourth Floor beams m2 90
Steel reinforcement for use in First Floor concrete works with a minimum
yield strength Fyk of 400MPa. Reinforcement shall be according to
2.25
Structural Drawings and Technical Specifications. Price includes cutting
bending, placing in position and tying wires.
b f 8 mm. deformed bar Kg 2619
d f 12 mm. deformed bar Kg 408
e f 14 mm. deformed bar Kg 2064
f f 16 mm. deformed bar Kg 1208
g f 20 mm. deformed bar Kg 5760
h f 24 mm. deformed bar Kg 4813
Fourth Floor
Reinforced concrete in class C-25, with minimum cement content of
2.26 360kg/m3 filled into formwork and vibrated around steel reinforcement.
Steel and formwork measured separately:-
a In Columns extending from Fourth Floor to Fifth Floor beams m3 25
b In Fourth Floor Beams m3 40
c In Shear Walls extending from Fourth Floor to Fifth Floor beams m3 9
d In Stairs extending from Fourth Floor to Fifth Floor beams m3 3
2.27 Provide cut & fix in position formwork.
a To Fourth Floor Slabs m2 588
b To Columns extending from Fourth Floor to Fifth Floor beams m2 159
c To Fourth Floor Beams m2 134
d To Shear Walls extending from Fourth Floor to Fifth Floor beams m2 90
e To Stairs extending from Fourth Floor to Fifth Floor beams m2 14
Steel reinforcement for use in First Floor concrete works with a minimum
yield strength Fyk of 400MPa. Reinforcement shall be according to
2.28
Structural Drawings and Technical Specifications. Price includes cutting
bending, placing in position and tying wires.
a f 6 mm. deformed bar Kg 1295
b f 8 mm. deformed bar Kg 2619
c f 10 mm. deformed bar Kg -
d f 12 mm. deformed bar Kg 408
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
Steel reinforcement for use in First Floor concrete works with a minimum
yield strength Fyk of 400MPa. Reinforcement shall be according to
2.34
Structural Drawings and Technical Specifications. Price includes cutting
bending, placing in position and tying wires.
a f 6 mm. deformed bar Kg 1295
b f 8 mm. deformed bar Kg 2619
c f 10 mm. deformed bar Kg -
d f 12 mm. deformed bar Kg 408
e f 14 mm. deformed bar Kg 2064
f f 16 mm. deformed bar Kg 1208
g f 20 mm. deformed bar Kg 5760
h f 24 mm. deformed bar Kg 4375
Seventh Floor
Reinforced concrete in class C-25, with minimum cement content of
2.35 360kg/m3 filled into formwork and vibrated around steel reinforcement.
Steel and formwork measured separately:-
a In Columns extending from Seventh Floor to Top Roof beams m3 25
b In Seventh Floor Beams m3 40
c In Shear Walls extending from Seventh Floor to Top Roof beams m3 9
d In Stairs extending from Seventh Floor to Top Roof beams m3 3
2.36 Provide cut & fix in position formwork.
a To Seventh Floor Slabs m2 588
b To Columns extending from Seventh Floor to Top Roof beams m2 159
c To Seventh Floor Beams m2 134
d To Shear Walls extending from Seventh Floor to Top Roof beams m2 90
e To Stairs extending from Seventh Floor to Top Roof beams m2 14
Steel reinforcement for use in First Floor concrete works with a minimum
yield strength Fyk of 400MPa. Reinforcement shall be according to
2.37
Structural Drawings and Technical Specifications. Price includes cutting
bending, placing in position and tying wires.
a f 6 mm. deformed bar Kg 2034
b f 8 mm. deformed bar Kg 2595
c f 10 mm. deformed bar Kg -
d f 12 mm. deformed bar Kg 408
e f 14 mm. deformed bar Kg 2064
f f 16 mm. deformed bar Kg 1208
g f 20 mm. deformed bar Kg 5760
h f 24 mm. deformed bar Kg 4375
Top Roof
Reinforced concrete in class C-25, with minimum cement content of
2.38 360kg/m3 filled into formwork and vibrated around steel reinforcement.
Steel and formwork measured separately:-
a In Roof Slabs m3 66
b In Columns extending from Top Roof to Lift Room m3 4
c In Seventh Floor Beams m3 32
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
Double Assymetric Leaf Single Swing Tubular Framed Hollow Metal Fire
Rated Flush Door. Price shall include frames hard wood lippings and
8.02 edgings at sides ,top and bottom and 12cm high kick plate including the
necessary iron monger and cylindrical lock of ASSA or equivalent
certified European standard.
Curtain wall made of concealed aluminum frame , but single glazed 6mm
thick clear reflective tempered as shown on the drawings AR 158. The
spandrel panel will be in 6mm clear reflective glass externally alpolic or
8.10 m2 948
equivalent composite panel internally. Price shall include glazing and the
supply and fixing of the curtain wall which shall be subject to approval of
shop drawings from the manufacturers.
Supply and fix stainless steel kitchen sink with double bowl
as where shown on the drawing. Complete with the
11.1.8 necessary fixing and other accessories./Sinks shall be from No 2
pure stainless steel & quality shall be approved by submitting
manufacturer's technical specification & catalogues/
Cold Water Piping through ducts & cabinets, ceiling walls &
1.2.1
below
slabs
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
Size: 3m3 No 2
b - Accessories
i - Supply, install, test and commission, the followings
on domestic water tanks on the roof.
- Automatic level control switch, price include electric
wire
connection to basement centrifugal water pump. No 1
- dia65mm gate valve on drain pipe No 2
- dia.65mm G.S.Pipe drain pipe ml 2
- dia65mm G.S.Pipe over flow pipe ml 2
- dia.50mm gate valve after tank No 3
- dia.65mm gate valve before tanks No 2
11.4 Domestic & Fire Pumps
Supply,install,test and commission europe manufactured &
11.4.1 approved ,centrifugal cold water booster pumps(i.e one
stand by and one duty) on basement to roof
water tanks as shown in the drawing.Complete with check &
gate valves,piping,electrical control system and all required
accessories.
Capacity: Q= 4 liter/Second
H= 46meter No 2
All domestic waste, vent and storm water pipe lines shall be
PN4 uPVC pipes and shall be provided with a minimum
slope of 2% towards the outlet unless specified. All Upvc
pipes and necessary fittings shall be standard quality and be
free from damage during storage, transportation,construction
etc. Unit price shall include all the necessary assistance civil
works, such as excavation cartaway, fixing or hanging to
walls, beams or slabs.etc., necessary fittings such as bends,
Y, T, etc.Storm water uPVC pipes shall resist the external
temperature and the quality shall meet the purpose.
11.5.1 Supply and lay internal uPVC waste and vent pipes
according to where shown on the drawings, complete with
all the necessary fittings.
Dia. 50 mm ml 272
" 65 " ml 10
" 110 " ml 110
Dia. 110 mm No 1
Supply and fix floor drains made of polished steel of
11.5.3
approved quality, complete with P-smell trap and all other
necessary fittings and accessories. Type & model shall be
approved by the consultant prior to installation.
Size:- Dia. 110 mm No 21
Supply and fix approved quality screw type clean outs under
11.5.4 slab as where shown on the drawing. Price shall include all
the necessary connecting pieces.
Dia. 110 mm No 10
11.5.5
Supply and fix grated floor drains for basement area with
cleanable sand trap complete with all required works.
size
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
Dia. 100 mm No 4
Supply and lay approved quality storm water PN-6 uPVC
11.5.6 down pipes according to where shown on the drawings.
Price shall include all the necessary connecting pieces.
Dia. 110 mm ml 342
Supply and fix Roof drains made of polished steel of
11.5.7
approved quality, complete with all other necessary fittings
and accessories.Type & model shall be approved by the
consultant prior to installation.
Qmin= 4 liter/second
approximate size dia. 150mm (actual size to be determined
No 8
by manufacturer)
11.6 SUB SOIL DRAINAGE SYSTEM
11.6.1 PIPING & DAMP PROOFING
Supply and lay purpose made Upvc slotted plastic pipe for
the subsoil drainage system around the building according to
where shown on the basement basement floor plan & detail
drawing
Q =5 l/sec.
H = 8meters No 1
Supply & lay cleaning eye on each corner of the sub soil
11.6.4
drainage system as where shown on the drawings.Provide
plug or screw tube plastic cap on top to external ground
level.
Diameter 160mm No 4
11.7 Site Works
11.7.1 Site Water Works
Supply and install galvanized steel pipes to basement water
11.7.1.1 tanks as shown on the drawing. Complete with all the
necessary fittings and accessories.
Dia. 50 mm ml 45
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
Dia.110 mm ml 40
Dia.160 mm ml 35
Dia.200mm ml 10
1.7.3 Manholes
575x400 mmxmm ml 3
575x450 mmxmm ml 9
900x450 mmxmm ml 36
b) Multi purpose hall
Size: 300x300 mmxmm ml 10
400 x 400 mmxmm ml 5
675 x 400 mmxmm ml 5
c) Kitchen
Size: 425x400 mmxmm ml 17
d) Toilet
Dia.: 100mm ml 2
150mm ml 5
e) Strong room
Dia.: 225mm ml 6
12.3.1.2 Supply air duct
a) Basement car parking
Size: 350x200 mmxmm ml 15
475 x 350 mmxmm ml 3
475 x 425 mmxmm ml 50
b) Multi purpose hall
Size: 400x225 mmxmm ml 15
400 x 400 mmxmm ml 19
675 x 400 mmxmm ml 11
12.4 Dampers and accessories :
All dampers and accessories shall be manufactured as per
recognized codes,standards & technical specificationand full fill the
requirments specified in the technical specification & shall meet
the purpose.
12.4.1 Volume Dampers
400x225 mmxmm / VD No 2
12.4.2 Spliter Dampers
1 pc mcb of 3x40A
6 pcs mcb of 3x32A
all complete and ready for use No 1
Surface mounted lighting and power panel (LPP-GF) in sheet steel
13.5.2 housing with lockable door, bus bars, cover plates and PNE terminals
consisting of:
1 pc main switch of 3x63A
1 pc mcb of 3x32A
15 pcs mcb of 1x16A
1 pc power contactor of 3x20A
8 pcs tumbler switches of 1x16A
1 pc bypass switch of 3X16A No 1
Surface mounted motor control center (MCC-BF) in sheet steel housing
13.5.3 with lockable door, bus bars, cover plates and PNE terminals consisting
of:
1 pc main switch of 3x50A
3 pcs mcb of 1x16A
1 pc thermal magnetic circuit breaker of (3X(2.5….4)A
2 pcs ditto but breakers of 3X(6….10)A
1 pc ditto but breakers of 3X(6….10)A
2 pcs ditto but breakers of 3X(4…6.3)A
2 pcs mcb of 1x10A
4 pcs power contactors of 3X10A
1 pc power contactors of 3X40A
2 pcs adjustable pressure switches
1 pc time switch of 2 contacts main switch of 3X10A
all complete and ready for use No 1
Ditto as item 5.4 just above but lighting and power panel (LPP-1F)
13.5.4
consisting of:
1 pc main switch of 3x32A
14 pcs mcb of 1x16A No 1
13.5.5 Ditto but lighting and powr panel (LPP-MF) consisting of:
1 pc main switch of 3x32A
14 pcs mcb of 1x16A No 1
13.5.6 Ditto ditto but lighting and power panel (LPP-2F) modules consisting of:
1 pc main switch of 3x32A
13 pcs mcb of 1x16A No 1
13.5.7 Ditto ditto but lighting and power panel (LPP-3F) consisting of:
1 pc main switch of 3x32A
11 pcs mcb of 1x16A
Similar panels are: LPP-4F and LPP-5F No 3
13.5.8 Ditto ditto but lighting and power panel (LPP-6F) consisting of:
1 pc main switch of 3x60A
1 pc mcb of 3x40A
9 pc mcb of 1x16A No 1
13.5.9 Ditto ditto but lighting and power panel (LPP-7F) consisting of:
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
13.6.2 Flush mounted lighting switches type Legrand Suno type or equivalent :
- One - gang one - way (single) No 84
- Two - gang one - way( double) No 49
- Two - way No 26
- Intermediate No 5
- Triple switch No 3
- Dimmer No 4
- Llighting push-buttons No 10
13.7 Socket Outlets
Flush mounted socket outlets of 1x16A , 2P with earth lateral contacts,
complete with cover plates and frames (type Suno 7740 23 or
13.7.1 equivalent) fed through PVC insulated conductors of 3x2.5mm2 in No 49
thermoplastic conduits of 16mm diameter, complete with all wiring
accessories.
13.7.2 Ditto as item13. 7.1) just above but double socket outlets No 172
13.7.3 Ditto ditto but socket outlets with built-in on-off switches No 2
Hand drier outlets fed through PVC insulated conductors of 3x2.5mm2 in
13.7.4 thermoplastic conduits of 16 mm diameter , complete with all wiring No 18
accessories
Iindustrial 3 phase socket outlet fed through PVC insulated conductors
13.7.5 of 5x2.5mm2 in thermoplastic conduits of 16 mm diameter, complete with No 1
all wiring accessories
Type 3 - Surface mounted ceiling luminaire type Philips TCS 398 with
No 29
2xTL-D 36/830W lamps with IC gear and C6 reflector or equivalent
Type 4 - Surface mounted ceiling luminaire type Philips TCS 398 with
No 237
4xTL-D 36/830W lamps with IC gear and C6 reflector or equivalent
Type 5 - Wall luminaire type DISANO 408 Wing with FL 1X18 W lamp or
No 22
equivalent.
Type 6 - Ceiling luminaire type RZB art. 211006.002 with 75W
No 138
inacdescent lamp or equivalent
Type 7 - Wall luminaire with eyelid shield type RZB. 58125.002 with A60
No 10
75W lamp or equivalent.
Type 8 - Surface mounted downlight type 931043.002 with A60 W lamp
No 23
or equivalent.
Type 9 - Compact ceiling luminaire type DISANO 785 Compact with FL
No 20
2x26D lamps or equivalent.
Type 10 - Surface mounted down light type RZB art. 921384.774 with
No 5
HIT-CE-of 150 W lamp or equivalent.
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
Allow a provisional sum for the intake ETC's primary telephone cable of
13.10.3 P.S
100 pairs, internal wiring and provision of telephone apparatuses
N.B.2) Regarding CCTV system, only PVC conduits have been indicated
on the electrical drawings. The CCTV system shall be undertaken as part
and parcel of the data system referrred to under item 1 just above
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Commercial Bank of Ethiopia
Paulos Branch Office Building Project
Supply and fix crystal glass mirrors for toilets hand wash
basins with copper back protection, size 500/400 mm
including chrome plated brass mirror clips with chrome
plated screws. Price shall also include approved quality
1.1.4 shelves. No 44
b - Accessories
i - Supply, install, test and commision the following
on fire fighting water storage tanks
- 50mm dia. float valve No 2
b - Accessories
i - Supply, install, test and commission, the followings
on domestic water tanks on the roof.
- Automatic level control switch, price include
electric wire
connection to basement centrifugal water pump. No 1
- dia65mm gate valve on drain pipe No 2
- dia.65mm G.S.Pipe drain pipe ml 2
- dia65mm G.S.Pipe over flow pipe ml 2
- dia.50mm gate valve after tank No 3
- dia.65mm gate valve before tanks No 2
Capacity: Q= 4 liter/Second
H= 46meter No 2
1.5.1 Supply and lay internal uPVC waste and vent pipes
according to where shown on the drawings, complete with
all the necessary fittings.
Dia. 50 mm ml 272
" 65 " ml 10
" 110 " ml 110
1.5.4 Supply and fix approved quality screw type clean outs
under slab as where shown on the drawing. Price shall
include all the necessary connecting pieces.
Dia. 110 " No 10
Supply and fix grated floor drains for basement
1.5.5 area with cleanable sand trap complete with all
required works.
size No 4
Dia. 100 "
1.6.4 Supply & lay cleaning eye on each corner of the sub
soil drainage system as where shown on the drawings.
Provide plug or screw tube plastic cap on top to external
ground level. No 4
Diameter 160mm
1.7.3 Manholes
Capacity 40m3 No 1
2 MECHANICAL WORKS
2.1 VENTILLATION /SUPPLY & EXTRACTING FANS
b) D-EF-2
i)Fan Capacity
Type = DYN AIR or equivalent
Model ………
Capacity: 30 liter/second
Total static head ... 15mmH2O
Fan Capacity
Type = DYN AIR or equivalent
Model ………
Capacity: 3304 liter/second
Total static head ... 22mmH2O Set 1
Fan Capacity
Type = DYN AIR or equivalent
Model ………
Capacity: 1800 liter/second
Total static head ... 15mmH2O Set 1
2.1.5
Supply,install,test and commission backward blade centrifugal
air supply fans as where shown on the drawing and
manufacturers' instruction. Price shall include all the necessary
accessories.
• Centrifugal,supply fan/Europe manufactured,with a capacity
mentioned below
• Main structure in galvanized steel sheet ,inside lined with
acoustic insulation (thickness 50mm)
• Back ward bladed impller with high efficency
• Collars for fixing to the duct
• Support brackets
• Protection guard
0.0
2.2 Exhaust and supply air inlets and accessories 0.0
0.0
b) Multi purpose hall 0.0
Size: 300x300 mmxmm ml 10
400 x 400 mmxmm ml 5
675 x 400 mmxmm ml 5
c) Kitchen
Size: 425x400 mmxmm ml 17
d) Toilet
Dia.: 100mm ml 2
150mm ml 5
e) Strong room
Dia.: 225mm ml 6
SPEC UNIT
REF ITEM UNIT
DESCRIPTION QTY. PRICE
5 Distribution Boards
5.5) Ditto as item 5.4 just above but lighting and power
panel (LPP-1F) consisting of:
6 Electric Lighting
7 Socket Outlets
7.1) Flush mounted socket outlets of 1x16A , 2P with earth
lateral contacts, complete with cover plates and frames
(type Suno 7740 23 or equivalent) fed through PVC
insulated conductors of 3x2.5mm2 in thermoplastic conduits of
16mm diameter, complete with all wiring accessories. No 49
7.2) Ditto as item 7.1) just above but double socket outlets No 172
switches No 2
11 Sound System
11.1) Speaker points fed through recessed thermoplastic
conduits of 13mm diameter running from sound console
points to column mounted speaker outlets. Cabling and
other audio equipments to be supplied by others No 8
12 TV Aerial System
12.1) Flush mounted TV aerial outlet box of 60mm
diameter and screwed-on cover and thermoplastic conduit
of 23mm diameter running from TV outlet points to vertical
cable riser shaft No 2
13.2) Taper pointed air rod in copper rod of 16mm diameter and 2
meter length, complete with fixing and connection accessories No 1
13.5) Earth rod in hard drawn copper rod of 16mm diameter and
2400mm length each, for direct driving in soft ground and same to
be provided with concrete inspection pit of 320x320x210mm
external dimensions. Price to include starnded copper wires
running in rigid thermoplastic conduit of 16mm diameter for
recesssed installation from the oblong test points to the earthing
electrodes, connection with the later to be with thermoweld No 8
14 Passenger Elevators
14.1) Supply and install interlocked twin passenger elevators for 10
persons, in stainless steel cabin and 2 leaf sliding doors and 12
landings, all complete and ready for use No 1
- Lift speed………………………….1.6m/sec
- Power…………………………..….19HP
- Rated load………………. ……….800 Kg
- Clear entrance ………………….900 mm
- Exterior car width ……………….1400mm
- Exterior car depth ……………….1350mm
- Exterior car height……………….2045mm
- pit depth.. ……………………….1300 mm
- Clear overhead…………………. 3800 mm
15 Miscellaneous
15.1) Recessed rigid thermoplastic conduits of 19mm
diameter running from LPP-7F located in cable riser shaft to
future neon light locations on roof tops. The conduits to be
provided with pull wires cords ml 10