ABSTRACT:
between two recorded energy data, an error
Power line communication (PLC) signal is generated and transmitted via PLC
presents an interesting and economical solution network. The detector and control system is
for automatic meter reading (AMR). If an AMR proposed. The architecture of the system and
system via PLC is set in a power delivery their critical components are given. The
system, a detection system for illegal electricity measurement results obtained from turkey’s
usage may be easily added in the existing PLC power lines are given. This paper describes a
network. In the detection system, the second prototype of the detector system for illegal
digitally energy meter chip is used and the value electricity usage using the power lines. The
of energy is stored. The recorded energy is target of this study is to discover new and
compared with the value at the main possible solutions for the lack of literature
kilowatthour meter. In the case of the difference concerning this problem.

INTRODUCTION:
The automatic meter reading (AMR) system power network, every user connected each other
has become a necessity for most energy suppliers via modems using power lines. AMR is a
as deregulation, free customer choice and open technique to facilite remote readings energy
market competition occur in the energy supply consumption. Another important problem may
sector. Power line communications has many be described as illegal electricity usage for
new service possibilities on the data transferring energy suppliers. There is no study in the field to
via power lines without use extra cables. AMR is determine the illegal usage in the literature. In
a very important application in these possibilities order to portray the dimensions of this problem,
due to every user connected each other via power the following explanations are very interesting.
lines. If an AMR system may be established in a
2

Illegal electricity may be a serious etc. These methods could not give the optimum
problem in many countries. In our country solutions due to their impartialities, Meter
30%-40% of total electricity consumption is reading has been applied humans and some
illegal; adding that prevention of its illegal use is electronic solutions such as optical reading
of great importance in overcoming this problem. Methods, creditable utilization of electrical
Increasing electricity production and building energy, etc. There does not exist a study about
complexes is not sufficient to meet demand, electronic detection of illegal usage of electricity.
because of the illegal image of electricity. This This may be related to technological innovations
illegal electricity causes loss of million dollars to so far. Today, we have many chips which can be
electricity board. using electricity illegally may used for digital energy metering and PLC
indirectly affect the economic state of a country modems. At this point of technological
negatively. On the other hand, the planning of development, the problem of illegal usage of
national energy may be difficulty in the case of electricity must be solved electronically, without
unrecorded usage. any human control. The main aim of this paper is
This illegal usage of electricity problem to start a discussion on this problem and find
can be attempted to be resolved by special skills solutions similar to this which has occurred.
of humans, such as the police, special security,

DETECTION OF ILLEGAL ELECTRICITY USAGE :


METHODS OF ILLEGAL ELECTRICITY USAGE :

In this study, the methods of illegal  Using the external phase before meter
electricity usage are first determined. In illegal terminals: This method gives
usage, a subscriber illegally uses electricity in subscribers free energy without any
followings ways. record.
 Using the mechanical objects: A  Switch the energy cables at the meter
subscriber can use some mechanical connector box: In this way, the current
objects to prevent the revolution of a does not pass through the current coil of
meter, so that disk speed is reduced and the meter, so the meter does not record
the recorded energy is also reduced. the energy consumption.
 Using a fixed magnet: A subscriber can Although all of the methods explained above
use a fixed magnet to change the may be valid for electromechnical meters, only
electromagnetic field of the current the last two methods are valid for digital meters.
coils. As is well known, the recorded Therefore, this problem should be solved by
energy is proportional to electronics and control techniques.
electromagnetic field.
3

DETECTION AND CONTROL SYSTEMS :

The proposed control system for the should applied to every low-voltage distribution
detection of illegal electricity usage is shown in network.
Fig. 1. PLC signaling is only valid over the low
voltage-220 VAC power lines. The system

Subscriber 1 Subscriber 2

220 VAC
Distribution
Transformer

To Central Station Subscriber N


4

kWh kWh

PLC PLC
1A 2A

PLC energy
1B meter

PLC energy
1B meter

PLC energy
NB meter
Host PLC
Unit
kWh

PLC
NA
5

Fig .1 Schematically illustration of detection system of illegal electricity usage.


The system given in Fig. 1 belongs only main lines and subscriber’s line. Since this
one distribution transformer network and should connection point is usually in the or at the
be repeated for every distribution network. ground, it is not suitable for anyone to access,
Although the proposed system can be used such that its control is easy. The main procedure
uniquely, it is better to use it with automatic of the proposed system can be summarized as
meter reading system. If the AMR will be used follows.
in any network, the host PLC unit and a PLC PLC signaling must be in CENELEC
modem for every subscriber should be contained standards. In Europe CENELEC has formed the
in this system. In Fig.1, the host PLC unit and standard EN-50 065-1, in which frequency
the other PLC modems are named PLC1A, bands, signaling levels, and procedures are
PLCNA and used for AMR. These units provide specific 3-95 kHz are restricted for use by
communication with each other and send the electricity suppliers, a 95-148.5 kHz are
recorded data in kilowatt hour meter to PLC unit. restricted to consumer use. The signal level for
In order to detect illegal usage of electrical the band 95-148.5 kHz is limited as follows. For
energy a PLC modem and an energy meter chip general use the signaling level is limited to
for every subscriber are added to an AMR 116dB µV (Class 116 equipment), and for
system. As given in Fig. 1 PLC1B, PLCNB and particular applications, e.g., industrial areas, the
energy meter chips belong to the detector. The signaling level is limited to 134 dB µV (Class
detector PLCs and energy meters must be placed 134 equipment). The recorded data in kilowatt
at the connection point between distribution hour meters for every subscriber are sent to host
6

PLC modem via PLC modems which placed in subscriber address and error signal combined and
subscriber’s locations. On the other hand, energy sent to the central control unit. If it is requested,
meter chips are located at the connection points a contactor may be included to the system at
and read the energy in kilowatt hours and also subscriber locations to turn off the energy
send data to host PLC unit. This proposed automatically, as in the case of illegal usage.
detector system has two recorded energy data in The main elements of the PLC modem
host PLC unit, one which comes from the AMR- are ST7537HS1 and the 707VX-T1002 the
PLC, and the other which comes from the PLC ADE7755 is an accurate electrical energy
modem at the connection points. These two measurement IC intended for use in single phase
recorded data area compared in the host PLC; if distribution systems, produced by Analog
there is any difference between two readings, an Device. The main circuits of one detector system
error signal is generated. This means that there is are carried out in the conditions of the
an illegal usage in the network. After that the laboratory.
7

Main power line


220 VAC

Connector box for k subscriber

PLC Modem Energy meter


k1 address chip

Power line of
k subscriber k subscriber

PLC exist
Modem kWh
k. address meter

Host PLC unit

Main microprocessor logic


PLC
modem

To information center
Fig . 2 illegal detector system for one subscriber

The tests of the proposed detector detection system of illegal electricity usage is
system are carried out in the laboratory. Because shown in Fig.2. In the laboratory, a host PLC
the AMR system has not established a power modem, an energy meter chips and PLC modem,
grid in many places yet, the detector system is an electromechanical kilowatt hour meter and its
checked using the model of the overall system. PLC modem, and an optical reflecting sensor
The system model and simulation of the system are loaded at the same phase of the power
8

grid. The energy value at the electromechanical received two different records from the same
kilowatt-hour meter is converted to digital data subscriber. This is the detection of the illegal
using by optical reflector sensor. Disk speed of usage for interested users. In these tests, the
the kilowatt-hour meter is counted and obtained carrier frequency is selected at 132khz, which is
data is sent to PLC modem as energy value of permitted in the CENELEC frequency band. In
the kilowatt-hour meter. At the system model, an real applications, the AMR system may be
illegal load may be connected to the power line designed in all CENELEC bands. The data rate
before the kilowatt-hour meter via an S switch. between the host and other PLC modems is
While only a legal load is in the system, two 2400b/s. Data signaling between PLC modems
meters are accorded each other to compensate has a protocol which includes a header, address,
for any error readings. The host PLC units read energy value data, error detection bits, and other
two recorded data coming from metering PLC serial communication bits such as parity and stop
units. If the S switch is closed, the illegal load is bits. The protocol may also be changed
connected to the system, and therefore two according to the properties of the required
recorded energy values are different from each system and national power grid architecture.
other. The host PLC unit is generated when it

Energy meter PLC KWhmeter


chip modem modem

power line

S disk
Legal

load

Host PLC modem Illegal load


PLC modem optical reflector system
Fig . 3 system simulation and modeling of the detection system of illegal electricity usage for
electromechanical kilowatthour meters.

Fig3 shows the detection system for an Therefore, there is no need for an optical
electromechanical kilowatt-hour meter system. reflector system in digital meters.
In the digital energy meter system, the recorded The results of the tests show that this system
energy may be received in the digital in the may solve this problem economically because
digital form directly using the port of the meter. the budget of the proposed system is
9

approximately U.S. $20-25 per subscriber. It is it is compared with the economic loss caused by
very economical and is a reliable solution when illegal usage.

OVERVIEW OF THE PROPOSED DIRECTOR SYSTEM:

The proposed detector system is the configuration of the addressing format


equipment and procedure for controlling more of PLC signaling must be designed
remote stations from a master control station. It carefully.
includes PLC modems, energy meters, control  The host PLC modem and its controller
logics, and the system software. The PLC must include two addresses per every
modems are host and target modems for two- user: one is the AMR and the other for
way communications to and from the host station the energy meter. These two addresses
and the remotely controlled targets. The energy must be selected sequentially.
meters include metering chips and some circuit  Operating software must be designed
elements; the control and logic units compare for the information of every subscriber
and generate the error signal in the illegal usage. in every sub power network: subscriber
The system software has two parts: assembler identification number, billing address,
program for the micro controller and the etc.
operating software for the management of the  The system has two values of the
overall system. Operated software may be energy consumption for every user, so if
downloaded from a PC and should be placed in there is a difference between them, an
the main center of the system. An AMR system error signal is generated for the illegal
including an illegal detector performs the user.
following functions.  The proposed equipment is the only one
 Every user has two PLC modems; one distributed in the power network. So
is for AMR and the other is used to send this system should be repeated for all
the data from second energy meter chip distributed power networks. All host
to host PLC modem. units in each distribution transformer
 An energy meter must be installed in may be connected to only one main
the connection box between a home line center station via phone lines, fiber-
and main power lines. optics cables, or RF links.
 The host PLC unit must be placed in the
distribution transformer and the
10

Fig 4: Effects of distance of the source receiver Fig 5: Bit error probability with frequency
on the loss for various frequency load combinations and load impedance for 1000 meter line.

Fig 6: Effects of line length (m) on


the bit error probability.

Some works are carried out for the applications are done. Obtained results are
proposed system in the project supported hopeful in order to achieve the detection
Turkish government. PLC modems and illegality in the real system. Some results of
second energy meter are realized in the the measurements are shown in Fig.4-6. The
conditions of the laboratory. Signal relations between frequency, length, and bit-
measurements for remote and indoor home order probability are given in these figures.
11

CONCLUSIONS:
A detector system to determine illegal due to nonexistent AMR system in our
electricity usage via power line country. In the near future, combined AMR
communications is designed and proposed. and detector systems will be tried in our
The proposed system is examined in country as explained above. One of the main
laboratory conditions. Obtained results from aims of this study is to start new discussions
this study show that if the AMR and detector and propose solutions in this field, because
system are used together, illegal usage of illegal usage is a serious problem in our
electricity may be detected. The proposed country. and may also be in other parts of
system has not been tried in real power lines the world.

REFERENCES:

IEEE Trans. power delivery, vol.16,2001


IEEE Trans. power delivery, vol.17,2002
www.google.com
www.electrotek.com
IEEE Trans. power delivery, vol.13,1998