SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - Dec 2005) REV 2 31-Dec-05

SATR NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO TEST REPORT
Testing, Adjusting and Balancing of HVAC System SATR-K-4006 29-Jul-06 HVAC
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

A. TEST PROCEDURE AND CHECKLIST

A1 Test procedures shall be in accordance with SAIC-K-4042 N/A


Record all the data in accordance with detailed Information of either SAES-K-001
A2
AABC or NEEB Para 6.4
SAES-K-001
A3 Record data for air distribution system
Para 6.1.3 b
SAES-K-001
A4 Record data for chilled water system
Para 6.1.3 d
SAES-K-001
A5 Check operation of all controls
Para 6.1.3 e

Check all control element for proper "normally open" or proper "normally SAES-K-001
A6
closed" positions upon loss of power or instrument air Para 6.1.3 e

B. TEST EQUIPMENT AND MATERIALS CRITERIA

Instrument Manufacturer Model Serial Number Calibration Date


1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

Page 1 of 2
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - Dec 2005) REV 2 31-Dec-05
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Testing, Adjusting and Balancing of HVAC System SATR-K-4006 29-Jul-06 HVAC
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

C. TEST RESULTS

See item A2 in this Saudi Aramco Inspection Checklist (SAIC)

D. CONCLUSIONS

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Recorded data for air distribution is within +/-10% of air quantities shown SAES-K-001
D1
on project drawings Para 6.1.3 b
Recorded data for Chilled water system is within +/- 5% of values shown SAES-K-001
D2
on project drawings Para 6.1.3 d

All actuators cycle in accordance with the designed action of the


controlling device and the sequence of operation have been checked and SAES-K-001
D3
are in accordance with Saudi Aramco Engineering Standards and Para 6.1.3 e
contractual requirements

All control element for proper "normally open" or proper "normally closed"
SAES-K-001
D4 positions upon loss of power or instrument air have been checked and
Para 6.1.3 e
are in accordance with design requirements

Test results are acceptable and in accordance with Saudi Aramco


D5 N/A
Engineering Standards and contractual requirements.

REMARKS:

REFERENCE DOCUMENTS:
1-AABC "National Standards for Field Measurement and Instrumentation, Total System Balance", Volume 1 (Latest Edition)
2-NEBB "Procedural Standards for Testing, Balancing and Adjusting of Environmental Systems." (Latest Edition)

3-SAES-K-001 -- Heating, Ventilating, and Air Conditioning (HVAC) 31 May, 2004

Contractor / Third-Party Saudi Aramco


Technician Performing Test* PMT Representative
Name, Title, Department, Test Performed Successfully and Results are Acceptable: T&I Witnessed QC Record Reviewed Work Verified
Company, Initials and Name, Initials and Date:
Date:
QC Inspector PID Representative
Witnessed Test Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED

Page 2 of 2