You are on page 1of 4

SPDC NIGERIA LTD

WORK PROCEDURE - ELECTRICAL

WORK PROCEDURE

TITLE: PROCEDURE FOR SERVICING


A CONSOLIDATED
PNEUMATIC [CP] PUMP

Document History: This Work Procedure supersedes:


The PSE-MTC Procedure Guide

Commenting parties: EAST: EPG-PN-PMSWE

WEST: EPG-PN-PMSWW

Endorsed by Functional Discipline Head:

APPROVED FOR ISSUE By (Signature) NAME DATE

AMAPAKABO, T
Head, PMSWE

Head, PMS OMORUYI, M

SUMMARY OF SIGNIFICANT CHANGES NAME REF. IND. DATE

THIS DOCUMENT WILL BE REVIEWED THREE YEARS FROM THE DATE OF APPROVAL

Revised: January 2008 Next Revision: January 2011

1
PROCEDURE INDEX PAGE

1.EQUIPMENT/MANUFACTURER 3

2. PROCEDURE 3

3. TOOLS 3

4. WASTE MANAGMENTS 3

5. PERSONAL PROTECTIVE EQUIPMENT 4

6. HAZARDS 4

7. CONTROLS 4

8. RECOVERY 4

9. MATERIALS/SPARES 4

REFERENCE DOCUMENTS:

1. FLOW CHART NO………..


2. CHECK SHEET NO………..

2
1. EQUIPMENT /MANUFACTURER

Consolidated Pneumatic [CP] PUMP > smith meter

2. PROCEDURE FOR C.P PUMP


(a) Visual inspection
(b) Strip down
(c) Check if defective parts
(d) Wash with shellsol
(e) Re-assemble
(f) Take it to test bay fox test
(g) Hook-up

3. TOOLS
(a) ½ x 9/16 flat & ring
(b) Allen key
(c) Screw drive
(d) Hammer
(e) 27” x 30” ring 2pcs
(f) Adjustable big size

4. WASTE MANAGEMENT
i. Ensure that waste generated are properly segregated into the
colour and coded bins and disposed accordingly.
ii. Engines, pumpsets, gen. set, etc. should only be tested at the
test bay.
iii. The wash area around the workshops must be flushed with
water and kept tidy at all times.
iv. Oil /chemical spills or droplets must be cleaned immediately
v. All related waste e.g. scrapped metals, used oil, water,
electrolytes, Ashing chemicals, office waste etc. should be
evacuated as per schedule. See PMSWE waste evacuation
schedule.
vi. Ensure that the workshop floor and the environment are not
littered.
vii. Ensure that spills and other environment incidents are
reported.

3
Ensure that all waste streams in our operation are managed
in accordance with the waste management procedure.
viii. Always refers to SHOC cards when you are handling
/disposing of chemical waste and solvent etc.
ix. Report any potential threat to the environment to the HSE
adviser and act on instructions in accordance with HSE-MS
policy.

5. HEALTH, SAFETY AND ENVIRONMENT

PERSONNEL PROTECTIVE EQUIPMENT


1. Coverall
2. Safety shoes
3. Ear muff
4. Hand gloves
5. Helmet
6. Apron etc

6. HAZARDS
1. Oil spill
2. Pressure
3. Weight
4. Chemical

7. CONTROLS
All PPES in place, follow job procedure manufactures manual and
general carefulness

8. RECOVERY
1. First aids
Medical attention

9. MATERIAL / PARTS
1. Float arm support
2. Check value bushing
3. Check value plate
4. Check value disc
5. Rubber butter & gaskets.