What is Folded Pipe (FP)
z A factory manufactured
pipe that is folded for
easy delivery in coils
then reheated and
installed into an existing
pipeline
WITHOUT
EXCACATION
Where Can CIPP or Folded Pipe Be
Used?
z Municipal sewers, laterals,
water mains and drainage
pipes, outfall pipes, force
mains, etc
z Industrial, sewer ,water,
drainage, gas mains,
process pipes,
downspouts, air vents
z Highway & railroad
culverts
z Other piping systems
Pipeline Solutions With CIPP
z Structural renewal
z Structural reinforcement
z Infiltration reduction
z Inflow reduction
of……..
{ M.H. – M.H. Lining
{ Lateral pipe lining
{ Sectional Lining
Sizes 4”-120”
Pipeline Solutions With Folded Pipe
z Structural renewal
z Structural reinforcement
z Infiltration reduction
z Inflow reduction
of……..
{ M.H. – M.H. Lining
Sizes 4”-24”
Typical CIPP Liner Materials
Materials
Resins
Polyester
Vinyl Ester
Epoxy
Liner Fabric
Fiberglass
Carbon Fiber
Kevlar
Coatings
Urethane
Polyethylene
Installation PVC
The Cured CIPP Product
z Typically manufactured
in a “U” shape 4” to 24”
and in some cases larger
z Coiled on large vertical
drums
z References ASTM F-
1533, ASTM F-1606
Folded Pipe (PVC) Type #1
z Quantity to be reinstated
z Locations to be documented
z Abandoned services
identified
Pre-Installation Considerations
z Equipment staging area is
required at or near access
manhole
z The existing pipe must be pre-
televised and surveyed to
determine its condition
z Some excavation may be
required for larger diameter
liners or for point repairs
z All existing flows in the pipe
must be plugged or by-passed
z The existing pipe must be
cleaned to remove ALL debris,
silt, roots, sand, etc
Heat Cured CIPP Liner Installation
Boiler Truck
CIPP Curing With Steam
z Once in place and properly inflated the liner is cured
using steam heat. Cure temperatures are monitored
at access points and at each end of the installation
U V Light Cured Liner Installation
A fiberglass liner is pulled into the host pipe. A light
train & CCTV is inserted in one end and pulled to the
opposite end recording the pre-cure condition of the
liner. The light train is then pulled back through the
inside of the liner, at a regulated speed, with the
CCTV camera recording the actual curing of the
liner.
CIPP Curing With Ultra-Violet Light
A seal can be
Existing
Pipe installed between the
newly installed liner
and the existing pipe
to prevent
groundwater
Pipe Seal migration into the
manhole.
Seals can be either
hydrophilic or grout
New CIPP
Pipe
Installed CIPP or Folded Pipe
Irv Gemora
Executive Director
NASSCO
410 486-3500
Email director@nassco.org
Web www.nassco.org
Credits & Disclaimer
zMaterial contained in this Presentation has been obtained and
compiled from various related industry manufacturers,
contractors, engineers, installers and end users. All parties
involved acknowledge the need to disseminate relevant
information to promote (trenchless technology) product
advantages and rehabilitation techniques for the benefit of all
concerned.