Hull and mooring Execution and interface plan Develop. Overall test and inspection plan FPF Mooring Analysis FPF Mooring Configuration No. Of segments / inserts etc. Develop Geotechnical Scope of Work (Deep Core) for anchor design assume Suction Pile Evaluate / Select Off Hull Mooring Component (inc SMC) Suppliers for bid list.
Hull and mooring Execution and interface plan Develop. Overall test and inspection plan FPF Mooring Analysis FPF Mooring Configuration No. Of segments / inserts etc. Develop Geotechnical Scope of Work (Deep Core) for anchor design assume Suction Pile Evaluate / Select Off Hull Mooring Component (inc SMC) Suppliers for bid list.
Hull and mooring Execution and interface plan Develop. Overall test and inspection plan FPF Mooring Analysis FPF Mooring Configuration No. Of segments / inserts etc. Develop Geotechnical Scope of Work (Deep Core) for anchor design assume Suction Pile Evaluate / Select Off Hull Mooring Component (inc SMC) Suppliers for bid list.
FPF Mooring Evaluate / Evaluate / Develop Fab Installation
Contracting Geotechnical Transportation Scope of Develop Procedures Develop Analysis Select Off Hull Select On Hull Yard Scope of Spec / Develop Procedures Strategy Scope of Work Plan for Off Hull Work for Hull for Hull Mooring Hook Procedures for Hull Mooring mooring Work and RFQ Technical for Anchor installation (Deep Core) for Mooring Wet Tow and Up Wet Tow Component (inc Component for Anchor Fab Requirements Develop Doc Anchor design - Components to Mooring SMC) Suppliers Suppliers for bid and FPF Mooring assume Suction Marshalling Yard ( Installation for bid list list Approvals Configuration - Pile excluding anchors) and Hook Up Distribution No. of segments / Wet Tow Analysis inc Matrix Award Anchor Develop / inserts etc Hurricane bollard pull Develop Develop fabrication Evaluate and Issue Develop Hull Develop Develop Survey / Contingency plan Mooring Mooring Select Chain / SIMOPS Plan Develop & Mooring Develop Bid Doc Installation Positioning Scope for Geotechnical Component Bid Component Bid Rope Transport Marshalling Yard Execution FPF Mooring Bid Docs Selection Criteria of Work inc Define Wet Tow, Investigation Docs for Detail Docs for Detail Vessels USCG and interface Component and Evaluate seabed bathy for Mooring Hook up and Design and Design and Requirements plan Design Basis Develop / Yards array elevation Ballasting Installation Supply Supply Fab anchor aids Develop Hull Marine Issue Acoustic Evaluate Issue Hull & Mooring Warranty Frequency Potential Marine Ops Overall Test Surveyors Mobilize Develop Contractors Mobilize survey Manual for and Evaluate Bids surveys Management Anchor Wet Tow Plan inc Manufacturing Evaluate Evaluate Develop vessel Temporary Inspection and Award Plan Installation departure plan Specifications bids / Award bids /Award Deliver Marshalling Yard to site Condition Plan Contract -sole Vessel Shackles / Contracts Contracts Padeye Contract thimble/ rope and source ? Casting and Transport Issue Bid Develop docs Deliver Towing / Offshore Warranty reel /anchor /h- BFvalves and Chain to Install / USCG fab into Positioning Tugs Surveyor link /subsea Marshalling Calibrate Inspection / Detail design Detail Design Evaluate and Select Scope of connector / anchor yard by ship Transponder Quarters Carry Out of Chain Jack /F- Contract eddy Marshalling Yard / Work chain /fairlead / Evaluate Array Habitable Site Components lead / HPU watch vessl Award Contract Port closure chain jack /chain and Award Investigation Transport with ADCP Install notification Develop locker /casting / Mooring Develop Rope to Anchors Hull Wet Shipping HPU /controls Installation SIT plan Marshalling Prepare Install Anchor Tow preps Company Manufacture Manufacture Contract with ROV / yard by ship Yard position markers Scope of Mooring Mooring survey Hull custody Work Issue Componets Componets Mobe Develop Mooring As handover Geotech Company Component test Report Installed Transport Unload / Store reps, fit / DC Plan Survey Prepare Shackles , Components Comms Send chain Develop Outfit anchor Inshore Wet Tow Standard Connectors equip and for fit up to Integration plan for and SIT with (Manned) Specs for Select Anchor Thimbles etc to Mooring CJ / fairlead mooring ROV /Survey Application Develop Mooring Design 3rd Marshalling Recover Equipment supplier components on Component Bid Party yard by ship acoustic vendor reps Offshore Wet hull – piping / Load out chains / shackles and subsea Doc for Detail Consultant form array Tow (manned ) Develop Risk MCC / PLC / Design Grillage connectors for anchor fab yard delivery Load out Chains / Design and Supply manufacturer assessments containment and Rope /Shackles / of On and Off hull Connectors /SMC Mobe Mooring and Hazid Mooring Seafastening for Design for Installation Installation vessel Plan Components Anchor Deliver Demobe Mooring Develop Vessel to site barges / installn Develop System Transportation Position Fabricate Grill / Load out tugs to vessel Regulatory Anchor Plan for On Hull Obtain Anchor Hull Seafastening chains for Marshalling and Permits Develop List of Mooring Designer MSW sail Un Load Mooring integration yard Plan Approved Mooring Components to Approval of Contract away Components yard Component Check Hull Fabricator Grillage and S/ supply vessel inspection from Barges delivery Ballast Develop fabricated vs Suppliers for Bid fast Install Vessel Suitability Down List cast padeye Utilization Grillage Survey on option Tracking Equipment FAT - Tow Cargo Barges / Spreadsheet with chain sample Select Barge Paint Anti Twist on Chain Barges to Hook Up tugs for fit up test and tug Load out and Installation Site Mooring System Develop Demobe Develop Evaluate rental vs Seafasten Padeye Positioning Communicati purchased reels anchors Casting Bid Carry out tugs ons and Docs Suitability suitability Logistics Equipment SIT - As Installed Plan inc with training for Survey on survey Assemble Survey foreign and Client/Installn Barges /tugs MSW sail Tow anchors /chain / domestic Mooring Present Select casting Contractor away Barges(s) to Store Return Demobe connectors on personnel vs Preset Anchor supplier inspection Site Mooring barges to Installation barge training and only Study Spares MY vessel Installation immigration Contractor requirements Detail Design Deliver equipment Develops Mooring Develop spares Padeye to hull fabricator Unload Clean off Anchor Barge(s) Line HSE Audit philosophy inc Casting by Layout Spare / barges / off Plan Color Coding Stretching anchor spares casting scrap hire survey supplier Integration and QA Audit Plan Commissioning at Deliver Barge Marine Warranty Surveyor Hull Company Activity Flow Sheet for a Hull Yard with Designer Develop Develop Mooring Vendor Reps and Towing Floating Production System Hull and Mooring System line and insert Tug Mooring Component Installation Geotech Anchor Vendor Rep change out plan. Manufacture Installation and Associated Tasks Schedule Casting supplier Contractor Contractor Fabricator