Preparation and Professional Practice
Project Title
Project Stakeholders.................................................................................................................................................................................9
Measurement Criteria.................................................................................................................................................................................10
Deliverables/ Scope of the Project.............................................................................................................................................................11
In-Scope.................................................................................................................................................................................................11
Out-of Scope..........................................................................................................................................................................................13
Project Resources.......................................................................................................................................................................................14
Client Resources....................................................................................................................................................................................14
Project Team Resources.........................................................................................................................................................................15
WORK Breakdown Structure (WBS)........................................................................................................................................................16
Network Diagram:.....................................................................................................................................................................................18
The Technical Environment.......................................................................................................................................................................19
Hotel Anna’s Existing Corporate Environment.....................................................................................................................................19
Existing applications..............................................................................................................................................................................19
Existing physical layout.........................................................................................................................................................................20
Technical details of the existing environment.......................................................................................................................................21
New Recommendation:......................................................................................................................................................................22
Requirements Specification.......................................................................................................................................................................25
Site requirements...................................................................................................................................................................................26
User and Application Requirements......................................................................................................................................................26
Project Charter and Management Plan
Team Members:
Comments:
Note this charter and PMP is subject to changes in the following stakeholder’s meeting
Change History
All changes to the Project Charter must be recorded in the Change History, and the new version of the charter must be approved by the
client.
Authorized by:
However, Hotel Anna’s current corporate network infrastructure is incapable of effectively communicating because of various non-
centralized and non-standard technologies being used at various locations. Each network site is independent entity and has very little
connectivity based on the DSL internet technology installed. Each network has its own Business, Organizational, Technical and
Cultural infrastructure. The decisions are made at each site independent of the other. Following are some of the major issues
hampering business operations for Hotel Anna’s Management.
Currently, the applications and hardware used at each site is also independent and has very little or no standardization due to this the
reporting formats differ within the organization. This is due to the non-central nature of the corporation’s organization. This is causing
a lot of extra expenditure in maintaining various technologies. The current operational cost has made the business less competitive and
in order to stay competitive the Hotel Anna’s Management decided to take an initiative to reduce the business operational cost by
standardization of the technology across the board and integration of the currently separated networks into a single hierarchical
network. For instance, at the time of this documentation the country managers at each site makes decisions about what technologies
should be used to achieve a business goal. This will be changed after the implementation of standardized and integrated network
technology providing greater control over the network infrastructure and information while reducing business operational costs.
Furthermore, the running network has very little or no security features that can help protect the business in today’s virtual hostility
either by well-organized groups, script kiddies or competitors. By securely connecting each site to the head quarter the business will
achieve security and peace of mind. Because of the security concerns, the hotels communicate with each other by means of telephone
calls and due to geographical issues (e.g. different time zones) often the communication fails. The hotel chain is surviving only by
telephone bookings and running a web server to accept bookings online.
Furthermore, for the customers to access internet inside the hotel, they need to go to the Internet café room where computers are
provided in order connect. At the moment, a personal portable computer of every client has no means of access of the internet inside
the hotel, except if they have their own internet provider.
Purpose of the Charter
The main intention of this document is to discuss thoroughly the agreement between Hotel Anna’s sponsors, shareholders, higher
management and ITC306 Company about the changes and additional installation of network infrastructure across all branches of Hotel
Anna worldwide. This paper will discuss the scope and boundaries of the project. Furthermore, this document discusses broadly the
time allocated to begin the development and the time to conclude the project. Additionally, the charter also includes the estimated
budget for the project. These parts of the charter will be discussed individually further in the report.
The aim of the project is to connect the headquarters in every country using VPN over WAN, having the New York office as the
center of operations. Also, the project will build servers in every country located in the headquarters. Every main office will also have
a LAN connection using switches and routers to join computers located in different departments. The team will use Microsoft
Windows Server 2003 with the use of Active Directory to perform the network services. Moreover, inside each headquarter will have
an installation of wireless network. Every Hotel Anna will have an installation of wireless access point. Lastly, permissions and layers
of security protocols will be installed in the overall network design. All of these phases will be discussed further in the Requirements
specification document.
As discussed in the purpose of the project, the need of this development is vital and significant for the future of the business. Most of
successful worldwide businesses, not just in the hotel industry, implement a strong and robust installation of computer networking to
facilitate and organize their reports and transactions. The need to be organized, standardized precise in reporting important data across
different branches located in different countries saves a lot of cost, time, and scope of work in a business.
Deficiencies
The current system has problems standardizing communication to each of the branches. For example, every branch produces its own
format of reports. The databases used in hotels in Australia uses Microsoft products, while the main branch in New York uses Oracle.
Also, important documents such as reports, marketing strategies, holiday deals, are only available from head departments. Therefore,
if the department heads are unavailable, which usually happens because of vacation leaves, the documents needs to wait to be
available.
Project Stakeholders
Role Name Availability
Project Sponsor Sanjay Jha Thursday
CIO John Harris Appointment
VP, Human Resources Robert Smith Wednesday, Thursday
Director of Purchasing Tracey Dodd Wednesday
IT Representative David Black Monday, Tuesday, Wednesday
Country Operation Michelle Brown Friday (9am-5pm)
Managers Sharon Williams
David Jones
Margaret Brown
Project Manager Atif Dost Full Time (Mon-Fri), Weekends if
necessary for updates and upgrades
Business Analyst Sushil Aryal Full Time (Mon-Fri)
IT Network Analyst Rod Valencia Full Time (Mon-Fri)
Network Designer Rajenda Roka Full Time (Mon-Fri)
Users Susan Chang Full Time (Mon-Fri)
Sue Janjic Full Time (Mon-Fri)
Josh Kofman Full Time (Mon-Fri)
Measurement Criteria
The project’s success depends on the following factors:
• First phase of the project must be finished in twelve weeks. The first phase will specifically deal with the concrete concept
definition and the development of the project (aka Project Feasibility). This will include completing the draft of this document
(Project Charter and Management Plan) and successfully getting approved by the Project Sponsor Mr. Sanjay Jha.
• The second phase of the project must start in the 13th week and will be finished in the 24th week.
• The project must integrate Hotel Anna’s three network sites namely; New York (HQ), Australia, and Europe in order to
facilitate the Business and IT management greater control over the infrastructure and the information.
• The underlying network infrastructure must help facilitate the information to be centralized and then dispatched to
corresponding hotel sites, for instance, hotel room bookings and cancellation. The integrated network infrastructure should also
provide basis for corporate application to gather real-time statistics for policy makers to introduce new and last minute deals in
order to be more competitive and communicate these deals to its remote sales team via vpn.
• The project must be completed within the budgeted cost of $999,999.00 and/or 10% of its variance. See Cost Management
Plan for itemized details.
• The project implementation must not interrupt current daily operations at the hotel premises during upgrades.
• The IT staff must be trained during the life of the project.
Project Resources
Client Resources
Role Name Availability
Client Manager Nicole Wilson Tuesday for first two weeks
And rest by Appointment
Project Sponsor Maui Taylor Appointment
CIO John Harris Appointment
VP, Human Resources Robert Smith Wednesday, Thursday
Director of Purchasing Tracey Morgan Wednesday
IT Representative David Nguyen Monday, Tuesday, Wednesday
Country Managers Michelle Brown Friday (9am-5pm)
Sharon Williams
David Jones
Margaret Brown
The applications and hardware used at each site is also independent and has very little or no standardization due to this the reporting
formats differ within the organization. This is causing a lot of extra expenditure in maintenance of various technologies at different
sites and the management at the head quarter has taken an initiative to reduce the operational cost by standardization and integration of
the three network sites into a single hierarchical network.
Existing applications
As mentioned above, the network is a mixture of various technologies. This is due to the non-central nature of the corporation’s
organization. For instance, the country manager at each site makes decisions about what technologies should be used to achieve a
goal. Therefore in New York the network is based on Windows technology however, in Australia the network is a mix of Linux and
some windows technology to keep the initial installation and operation cost to a minimum.
Existing physical layout
Technical details of the existing environment
Hotel Anna Group Headquarter New York has been running with the following system:
Servers:
1. File Server 2
2. Database Server 2
3. Windows server (DHCP/DNS/WEB) 2
4. Exchange Server 2
5. Router/Firewall 1
________________________________________
Total 9
Higher Management: 10
Human Resource: 30
Information Technology 12
Finance 24
Research and Development 4
Legal 10
Call Center/Customer Support/Public Relation 10
______________________________________________
Total 100
Switches
24 Port Switches 7
New Recommendation:
Servers:
License Server 2
Application 3
File Server 3
Database Server 3
Web Server 3
Active Directory 2
Firewall 2
DHCP 2
DNS 2
VPN 2
Exchange Server 2
________________________________________
Total 26
Higher Management: 50
Human Resource: 150
Information Technology 60
Finance 120
Research and Development 20
Legal 50
Project Management 20
Call Center/Customer Support/Public Relation 50
______________________________________________
Total 520
Switches
24 ports switches 6
48 Ports Switches 10
_____________________________________________
Total 16
Routers
2 Cisco routers
4 wireless access routers
Where as the office is running with 100 desktop computers for the current users which is not of course enough for the users since the
number of users in the headquarter is going to be 520 including all the departments. So the new 420 desktop computers going to be
added to fulfil the demands of the users. The new desktop computer is purposed from the vendor Dell is Vostro™ 220s Slim Tower
which has the excellent features.
In the new network wireless network access facility will be provided in top level of the building only so that the higher management
will be benefitted. The network will use the 4 Cisco Aironet 1131AG - wireless access point (AIR-LAP1131AG-A-K9) wireless
access point. And the new network will use 2 Cisco routers integrating the security bundle named
Cisco Security Bundle, Cisco3825-HSEC/K9 which is the latest and the secure one in the market.
The network also will use 10 48 port switches of Cisco named 48-PORT 10/100/1000 MANAGED SWITCH WITH WEBVIEW
which is the fastest switch in the market. The entire network will also use the fibre optics cable as a backbone where as CAT 6 cable
for connecting the devices.
The server operating system will be Windows Server 2003 Enterprise Edition with 520 CALS which will be managed by the terminal
server where as the desktop computer will use the Microsoft office package 2007. Since the Hotel Anna Group has contact with
another company to provide the software the new application server will be integrated with the software and the web based application
will be installed to the web server to serve the customers throughout the world.
Site requirements
In our client’s scenario three sites needs to be connected via leased lines. This will require network service providers at New York,
Europe and Australian sites to physically inspect and install the E1/T1 lines for central connectivity. The leased lines will also be used
for site internet connectivity and audio and video conferencing. The routers will be configured as Data Terminal Equipment (DTE) for
voip, QoS and firewall etc.
The LAN will use cisco switches for inter and intradepartmental connectivity and enhanced performance and security. The switches
will also provide VLAN capability.
New server deployment will also be required for better performance, load balancing and redundancy.
The networks in each continental head office will also be equipped with wireless connectivity for mobile users and higher
management.
Voip telephony will be configured with QoS for low latency. The T1/E1 lines ensure 99.97% uptime for online transaction processing
by the hotel management legacy application.
Table below shows the hardware and software needed for the project to be accomplished
Serial Number Item Name Vendor Quantity
1 HP ProLiant DL380 G6 Server HP 3
Method: Online
2. HP ProLiant ML150 G6 Server HP 12
3. Vostro™ 220s Slim Tower Dell 420
4. 48-PORT 10/100/1000 MANAGED SWITCH WITH WEBVIEW Cisco 10
5. Cisco Aironet 1131AG - wireless access point (AIR-LAP1131AG-A- Cisco 4
K9)