4 Bitumen 50 Km 459.00
5 Brick 27 Km 518.00
6 Laterite 14 Km 257.00
Sl. Amount
Quantity Description of works Unit Rate
No.
Without CP With CP
CLEARING SITE
4
Felling trees including cutting of trunks and
branches, removing the roots completely and
stacking serviceable materialds
groth 60 to120cms
0.3 No wood cuter each 300.00 90.00 99.00
0.5 No man each 240.00 120.00 132.00
sudries LS 3.75 3.75
213.75 234.75
Say Rs. 214.00 /Each Rs. 235.00
DISMANTLING
7
Dismantling clearing and carefully stacking reusable
materials for any thickness of dry rubble masnory
0.7 no man each 240.00 168.00 184.80
Say Rs. 168.00 /m3 Rs. 185.00
Page 8
9 Dismantling clearing and carefully stacking reusable
materials for any thickness walls of brick, laterite,
or rubble in cement morter
1.6 no man each 240.00 384.00 422.40
Say Rs. 384.00 /m3 Rs. 422
13
Lifting and removing tiles set in mortar in floors
including clearing and stacking materials and
removing the debries within a distance of 150m
0.25 no mason each 325.00 81.25
0.25 no man each 240.00 60.00
141.25 155.38
Say Rs. 141 /m3 Rs. 155
15
Dismantling removing and stacking pan or pot
tiles over roof
1.0 no man each 240.00 240.00 264.00
Say Rs. 240.00 /m3 Rs. 264.00
17
Dismantling removing and stacking doors with or
without ventilators including remoel of shutters,
hinges,hold fast and other fittings
0.2 no mason each 325.00 65.00
0.18 no carpenter each 325.00 58.50
0.3 no man each 240.00 72.00
195.50 215.05
Say Rs. 196.00 /m3 Rs. 215
Page 9
0.15 no mason each 325.00 48.75
0.1 no carpenter each 325.00 32.50
0.2 no man each 240.00 48.00
129.25 142.175
Say Rs. 129 /Each Rs. 142
21
Taking down and stacking shutters of doors with
or without ventilaorsincluding removel of all fittings
0.1 no carpenter each 325.00 32.50
0.1 no man each 240.00 24.00
56.50 62.15
Say Rs. 57.00 /m2 Rs. 62
Page 10
31 Domolishing and removing old cement mortar
plaster
0.5 no man each 240.00 120.00 132.00
Say Rs. 120 /10m2 132.00
EARTH WORK
51
Earth work excavation in ordinary soil and
depositing on the bank with initial leads and lift for
foundation
1.10 no. man each 240.00 264.00
3.00 no. boy each 180.00 540.00
Total 10m3 804.00 884.4
Say Rs. 804.00 /10m3 Rs. 884
52
Earth work excavation in hard soil and depositing
on the bank with initial leads and lift for foundation
4.00 no. man each 240.00 960.00
3.00 no. boy each 180.00 540.00
Total 10m3 1500.00 1650
Say Rs. 1,500 /10m3 Rs. 1,650
53
Earth work excavation in ordinary rock and
depositing on the bank with initial leads and lift for
foundation
10.00 no. man each 240.00 2400.00
2.30 no. boy each 180.00 414.00
Total 10m3 2814.00 3095.4
Say Rs. 2,814 /10m3 Rs. 3,095
Page 11
56
Earth work excavation in ordinary soil and
depositing with leads upto 50m and lift upto1.5m for
cutting and filling
0.90 no. man each 240.00 216.00
2.75 no. boy each 180.00 495.00
Total 10m3 711.00 782.10
Say Rs. 711 /10m3 Rs. 782
Page 12
67a
Earth filling with ordinary soil including
consolidation by ramming in 150mm layers
including watering
10 m3 excavation of ordinary soil (vide item
no.56) 10m3 711.00 711.00
10 m3 conveyance m3 257.00 2570.00
Total 10m3 3281.00 3609.10
Say Rs. 3,281 /10m3 3610.00
67b Deduct extra one lead and lift over item No.67a 3281.00
2.1 no women each 240.00 504.00
2777.00 3054.70
Say Rs. 2,777 /10m3 3055.00
67d Deduct extra one lead and lift over item No.67c 3389.85
2.1 no women each 240.00 504.00
2885.85 3174.44
Say Rs. 2,886 /10m3 3174
67e
Earth filling with hard soil including consolidation
by ramming in 150mm layers including watering
10 m3 excavation of ordinary soil (vide item
no.57) 10m3 1314.00 1314.00
10 m3 conveyance m3 257.00 2570.00
Total 10m3 3884.00 4272.4
Say Rs. 3,884 /10m3 4272
67f Deduct extra one lead and lift over item No.67c 3884.00
2.1 no women each 240.00 504.00
3380.00 3718.00
Say Rs. 3,380 /10m3 3718
67g
Bailing out water with 5 HP engine and pump set
1.000 Hire of 5 Hp engine and pump set day 70.00 70.00 70.00
10.000 diesel lit 36.00 360.00 396
LS lubricrating oil 5.00 5.00
1.000 driver 270.00 270.00 297
1.000 cleaner 225.00 225.00 247.5
LS installation charge 6.25 6.25
Page 13
Total 936.25 1021.75
Hence per hour =701.25/8 117.03 127.72
Say Rs. 117 /10m3 128
A 67i
Putting up ring bunds of top width 2.5m and
bottom width 3.5m and height 2.5m using 1/2 split
coconut post and driving down 60cm c/c and 1.0m
below the ground level and 1/3 split coconut cross
ties 2.0m apart and wailing piceses 5 rows on either
side and screening double coconut cadgan madals
plated and 1/6 split aracanut reepers 50cm c/c
laying etc complete and including dismantling after
use
Sub data
Page 14
Hence rate for 1.0m, used for 2 times (25.56+25.20/2 25.38 /m
c) Clay soil
10 m3 cutting charge (vide Sl. No.56) 10m3 711.00 711.00
0.2 20% extra for liquid 142.20
853.20
d)
Driving down the coconut post(vide Sl. No.712) ,
Details for 8 m and used for two times
3 no heavy load mazdoor each 270.00 810.00 891
3 no pile driver each 300.00 900.00 990
0.12 no carpenter each 325.00 39.00 42.9
plat form LS 62.5 62.50
rope , chain LS 62.5 62.50
wooden scffolding LS 25.00 25.00
1899.00 2073.90
Hence for 1.0m used for 2 times 1899/8/2 118.69 129.62
Main Data
Page 15
Putting up ring bunds of top width 1m and
bottom width 1.5m and height 1.0m using 1/3 split
coconut post and driving down 60cm c/c and 1.0m
below the ground level and 1/3 split coconut cross
ties 2.0m apart and wailing piceses at 50cm c to c
B
and tide with coir yarn cross ties to all vertical posts
with 1/3 split coconut wood , screening double
coconut cadgan leaves, filling the inside with stiff
clay &consolidated includingmaintaining the bund fill
the work is over and dismantling thesame of for use.
a
b
Driving down the coconut post(vide Sl. No.712) ,
Details for 8 m and used for two times
3 no heavy load mazdoor each 270.00 810.00
3 no pile driver each 300.00 900.00
0.12 no carpenter each 325.00 39.00
1749.00
Hence for 1.0m length 1/3 split
1215.36/8/3 72.88 /m
Page 16
Add 20% for under water 160.80
964.80 /m3
b
Driving down 1/3 split the coconut post(vide Sl.
No.712) , Details for 8 m and used for two times
2x9x1.00 18 m
c
screening with double new coconut
cadjas and tying with coiryarn to
horizontal and vertical posts
h
Driving down 1/3 split the coconut post(vide Sl.
No.712) , Details for 9 m and used for two times 327.94
@Rs.36.44/m
Page 17
Say Rs. 1,635 /m Say 1799.00
CONCRETE
110
Cement concrete 1:3:6 using 40mm broken stone
including cost& conveyance of all materials labour
charges etc. complete
0.95 m3 40mm broken stones m3 490.00 465.50
0.48 m3 sand m3 1750.00 840.00
228 kg cement t 4700.00 1071.60
0.1 no mason each 325.00 32.50
1 no man each 240.00 240.00
1.4 no women c 240.00 336.00
0.95 m3 conveyance for 40mm broken stones m3 499.00 474.05
0.48 m3 do sand m 3
400.00 192.00
228 kg do cement t 234.00 53.35
Total m 3
3705.00
Say Rs. 3,705 /m3
111
Cement concrete 1:4:8 using 40mm broken stone
including cost& conveyance of all materials labour
charges etc. complete
0.95 m3 40mm broken stones m3 490.00 465.50
Page 18
0.48 m3 sand m3 1750.00 840.00
171 kg cement t 4700.00 803.70
0.1 no mason each 325.00 32.50
1 no man each 240.00 240.00
1.4 no women each 240.00 336.00
0.95 m3 conveyance for 40mm broken stones m3 499.00 474.05
0.48 m3 do sand m3 400.00 192.00
171 kg do cement t 234.00 40.01
Total m3 3423.76
Say Rs. 3,424 /m3
122
Cement concrete 1:2:4 using 20mm broken stone
including cost& conveyance of all materials labour
charges etc. complete
0.009 m3 20mm broken stones m3 700.00 6.30
0.0045 m3 sand m3 1750.00 7.88
3.3 kg cement t 4700.00 15.51
0.002 no mason each 325.00 0.65
0.01 no man each 240.00 2.40
0.035 no women each 240.00 8.40
0.009 m3 conveyance for 20mm broken stones m3 499.00 4.49
0.0045 m3 do sand m3 400.00 1.80
3.3 kg do cement t 234.00 0.77
Total 10dm3 48.20
Say Rs. 48 /10dm3
122
a Cement concrete 1:(1.5):3 using 20mm broken
stone including cost& conveyance of all materials
labour charges etc. complete
0.009 m3 20mm broken stones m3 700.00 6.30
0.0045 m3 sand m3 1750.00 7.88
4.32 kg cement t 4700.00 20.30
0.002 no mason each 325.00 0.65
0.01 no man each 240.00 2.40
0.035 no women each 240.00 8.40
0.009 m3 conveyance for 20mm broken stones m3 499.00 4.49
0.0045 m3 do sand m3 400.00 1.80
4.32 kg do cement t 234.00 1.01
Total 10dm3 53.23
Say Rs. 53 /10dm3
123
Cement concrete 1:3:6 using 20mm broken stone
0.009 m3 20mm broken stones m3 700.00 6.30
0.0045 m3 sand m3 1750.00 7.88
2.16 kg cement t 4700.00 10.15
0.002 no mason each 325.00 0.65
0.01 no man each 240.00 2.40
0.035 no women each 240.00 8.40
0.009 m3 conveyance for 20mm broken stones m3 499.00 4.49
0.0045 m3 do sand m3 400.00 1.80
2.16 kg do cement t 234.00 0.51
Page 19
Total 10dm3 42.57
Say Rs. 42.50 /10dm3
drain
123
Cement concrete 1:3:6 using graded matel in the
b
ratio of 50% 40mm and 50%,20mm including the
cost and conveyance of all materials labour charges
curing etc, complete
0.475 m3 40mm broken stone m3 490.00 232.75
0.45 m3 20mm broken stone m3 700.00 315.00
0.465 m3 sand m3 1750.00 813.75
222.0 kg Cement t 4700.00 1043.40
0.14 no mason each 325.00 45.50
1.0 no man each 240.00 240.00
2.45 no women each 240.00 588.00
0.925 m3 conveyance of broken stone m3 499.00 461.58
0.465 m3 do for sand m3 400.00 186.00
222.0 kg do for cement t 234.00 51.95
3977.92 4375.72
Say Rs. 3,978 /m3 Rs. 4,376
Page 20
Say 5413 /Qtl Rs. 5,954
FORM WORK
132
a Form work for RCC works in ,beam
1.1 add 10% over the rate of slab 10m2 3605.28 3965.81 4362.39
Say 3966 /10m2 4362
RCC WORKS
133
Reinforced cement concrete 1:2:4 using 20mm b.s
for slabs including form work, watering curring
etc.complete.butexcluding reinforcement.
10 cement concrete 1:2:4 using 20mm
dm3 metal (vide item no.122) 10dm3 48.20 48.20
0.1 m2 form work 10m2 3605.28 36.05
Total 10dm3 84.25 92.68
Say Rs. 84.50 /10dm3 Rs. 92.50
133
a Reinforcemed Cement concrete 1:(1.5):3 using
20mm broken stone for slab including form work,
watering , curing etc, complete,but excluding the
cost of reinforcement
10 dm3 cement concrete 1:1.5:3 using 20mm
metal (vide item no.122.a) 10dm3 53.23 53.23
0.1 m2 form work 10m2 3605.28 36.05
Total 10dm3 89.28 98.21
Page 21
Say Rs. 89.50 /10dm3 Rs. 98.00
134
b
Reinforced cement concrete 1:2:4 using 20mm b.s
for lintel (23x15cm) including form work, watering
curring etc.complete.but excluding reinforcement.
10 dm3 cement concrete 1:2:4 using 20mm
metal (vide item no.122) 10dm3 48.20 48.20
0.086 m2 form work 10m2 3015.93 25.94
74.14 81.55
Say Rs. 74.00 /10dm3 Rs. 81.50
134
b Reinforced cement concrete 1:11/2:3 using 20mm
b.s for lintel (23x15cm) including form work,
watering curring etc.complete.but excluding
reinforcement.
10 dm3 cement concrete 1:2:4 using 20mm
metal (vide item no.122) 10dm3 53.23 53.23
0.086 m2 form work 10m2 3015.93 25.94
79.17 87.08
Say Rs. 79 /10dm3 Rs. 87
134
Reinforced cement concrete 1:2:4 using 20mm b.s
c
for sun shade(60x7.5cm) including form work,
watering curring etc.complete .but excluding
reinforcement.
10 dm3 cement concrete 1:2:4 using 20mm
metal (vide item no.122) 10dm3 48.20 48.20
0.144 m2 form work 10m2 3015.93 43.43
Total 10dm3 91.63 100.79
Say Rs. 91.50 /10dm3 Rs. 101
134
d Cement concrete 1:2:4 using 20mm b.s for belt
(45x10),on top of ruble masonry including form
work, watering curring etc.complete.
10 dm3
cement concrete 1:2:4 using 20mm
metal (vide item no.122) 10dm3 48.20 48.20
form work 10m2 1.00
Total 10dm3 49.20 54.12
Say Rs. 49 /10dm3 Rs. 54
Page 22
134
Cement concrete 1:2:4 using 20mm b.s for
e
precast slab including form work, watering
curring etc.complete.
10 dm3 cement concrete 1:2:4 using 20mm
metal (vide item no.122) 10dm3 48.20 48.20
form work 10m2 1.00
Total 10dm3 49.20 54.12
Say Rs. 49 /10dm3 Rs. 54
134
Reinforced cement concrete 1:2:4 using 20mm b.s
h
for beam (20x30cm), including form work,
watering curring etc.complete.but excluding
reinforcement.
10 dm3 cement concrete 1:2:4 using 20mm
metal (vide item no.122) 10dm3 48.20 48.20
0.133 m2 form work 10m2 3965.81 52.75
Total 10dm3 100.94 111.04
Say 101 /10dm3 Rs. 111
Page 23
134
h Reinforced cement concrete 1:11/2:3 using 20mm
b.s for beam (20x30cm), including form work,
watering curring etc.complete.but excluding
reinforcement.
10 dm3
cement concrete 1:11/2:3 using
20mm metal (vide item no.122) 10dm3 53.23 53.23
0.133 m2 form work 10m2 3015.93 40.11
Total 10dm3 93.34 102.68
Say 93.50 /10dm3 Rs. 102.50
134
i Reinforced cement concrete 1:11/2:3 using 20mm
b.s for beam (20x40cm), including form work,
watering curring etc.complete.but excluding
reinforcement.
10 dm3 cement concrete 1:11/2:3 using
20mm metal (vide item no.122.a) 10dm3 53.23 53.23
0.125 m2 form work 10m2 3015.93 37.70
Total 10dm3 90.93 100.02
Say Rs. 91 /10dm3 Rs. 100
135
Reinforced cement concrete 1:2:4 using 20mm b.s
for column(20x20cm) including form work,
watering curring etc.complete.butexcluding
reinforcement.
10 dm3 cement concrete 1:2:4 using 20mm
metal (vide item no.122) 10dm3 48.20 48.20
0.20 m2 form work 10m2 3290.10 65.80
Total 10dm3 114.00 125.40
Say Rs. 114.00 /10dm3 Rs. 125.50
135
Reinforced cement concrete 1:11/2:3 using 20mm
b.s for column(20x20cm) including form work,
watering curring etc.complete.butexcluding
reinforcement.
10 dm3 cement concrete 1:11/2:3 using
20mm metal (vide item no.122) 10dm3 53.23 53.23
0.20 m2 form work 10m2 3290.10 65.80
Page 24
Total 10dm3 119.03 130.94
Say Rs. 119 /10dm3 Rs. 131
135
a Reinforced cement concrete 1:2:4 using 20mm b.s
for column(30x20cm) including form work,
watering curring etc.complete.butexcluding
reinforcement.
10 dm3 cement concrete 1:2:4 using 20mm
metal (vide item no.122) 10dm3 48.20 48.20
0.167 m2 form work 10m2 3290.10 54.94
Total 10dm3 103.14 113.46
Say Rs. 103 /10dm3 Rs. 113.50
135
Reinforced cement concrete 1:2:4 using 20mm b.s
b
for column(40x20cm) including form work,
watering curring etc.complete.butexcluding
reinforcement.
1 dm3 cement concrete 1:1.5:3 using 20mm
metal (vide item no.122.a) 10dm3 48.20 48.20
0.15 m2 form work 10m2 3290.10 49.35
Total 10dm3 97.55 107.30
Say Rs. 97.50 /10dm3 Rs. 107.50
BRICK WORK
Page 25
158
Brick work in cement mortar 1:5 with country burned
bricks19x9x9cm for foundatioin and basement
500 no. brick 1000n 2500.00 1250.00
0.24 m3 sand m3 1750.00 420.00
69 kg cement t 4700.00 324.30
0.7 no. mason each 325.00 227.50
0.35 no. man each 240.00 84.00
0.7 no. women each 240.00 168.00
500 no. conveyance for bricks 1000 518.00 259.00
0.24 m3 do sand m3 400.00 96.00
69 kg do cement t 234.00 16.15
Total m3 2844.95 3129.44
Say Rs. 2,845 /m3 Rs. 3,129
158
a Brick work in cement mortar 1:5 with country burned
bricks 22.9x11.2x7cm for foundatioin and
basement
460 no. brick 1000n 2800.00 1288.00
0.24 m3 sand m3 1750.00 420.00
69 kg cement t 4700.00 324.30
0.7 no. mason each 325.00 227.50
0.35 no. man each 240.00 84.00
0.7 no. women each 240.00 168.00
460 no. conveyance for bricks 1000 518.00 238.28
0.24 m3 do sand m3 400.00 96.00
69 kg do cement t 234.00 16.15
Total m3 2862.23 3148.45
Say Rs. 2,862 /m3 Rs. 3,148
Page 26
159
Brick work in cement mortar 1:6 with country burned
bricks19x9x9cm for foundatioin and basement
500 no. brick 1000n 2500.00 1250.00
0.24 m3 sand m3 1750.00 420.00
58 kg cement t 4700.00 272.60
0.7 no. mason each 325.00 227.50
0.35 no. man each 240.00 84.00
0.7 no. women each 240.00 168.00
500 no. conveyance for bricks 1000 518.00 259.00
0.24 m3 do sand m3 400.00 96.00
58 kg do cement t 234.00 13.57
Total m3 2790.67 3069.74
Say Rs. 2,791 /m3 Rs. 3,070
163
Brick work in cement mortar 1:6 with country burned
b
bricks19x9x9cm for superstructure in Gfloor upto
5m ht.
1 m3 Brick work (vide item No.159) m3 2790.67 2790.67
0.07 no. mason each 325.00 22.75
0.035 no. man each 240.00 8.40
0.07 no. women each 240.00 16.80
LS hire for scaffolding LS 6.25
Total m3 2844.87 3129.36
Say Rs. 2,845 /m3 Rs. 3,129
163
Brick work in cement mortar 1:6 with country burned
c
bricks 22.9x11.2x7cm for superstructure in Gfloor
upto 5m ht.
1 m3 Brick work (vide item No.159a) m3 2807.95 2807.95
0.07 no. mason each 325.00 22.75
0.035 no. man each 240.00 8.40
0.07 no. women each 240.00 16.80
LS hire for scaffolding LS 6.25
Total m3 2862.15 3148.37
Say Rs. 2,862 /m3 Rs. 3,148
Page 27
163
d Hollow brick stone masonry of brick 40x20x20cm
in cement mortar 1:5 for foundation and basement
55 no Hollow brick stone 100No 1500.00 825.00
0.16 m3 sand m3 1750.00 280.00
46 kgs cement t 4700.00 216.20
1.5 no mason each 325.00 487.50
0.35 no man each 240.00 84.00
0.5 no women each 240.00 120.00
0.84 m3 conveyance of stone m3 257.00 215.88
0.16 m3 do sand m3 400.00 64.00
46 kgs cement t 234.00 10.76
2303.34 2533.68
Say Rs. 2,303 /m3 Rs. 2,534
Page 28
0.16 m3 sand m3 1750.00 280.00
38 kg cement t 4700.00 178.60
0.70 no. mason each 325.00 227.50
0.35 no. man each 240.00 84.00
0.70 no. women each 240.00 168.00
0.84 no conveyance for brick m3 257.00 215.88
0.16 m3 do sand m3 400.00 64.00
38 kg do cement kg 234.00 8.89
Total m3 2696.87 2966.56
Say Rs. 2,697 /m3 Rs. 2,967
163
h Cement Solid brick masonry of brick 40x20x15cm
in cement mortar 1:6 for superstructure
1 m3 solid brick work for foundation m3 2696.87 2696.87 3263.22
add 10% of labour
0.07 no mason each 325.00 22.75 25.03
0.035 no. man each 240.00 8.40 9.24
0.07 no women each 240.00 16.80 18.48
LS hire for scaffolding LS 6.25 6.88
Total m3 2751.07 3322.84
Say Rs. 2,751 /m3 Rs. 3,323
LATERITE MASONRY
Page 29
1 m3 laterite work (vide item no.206a) m3 2259.15 2259.15 2485.07
0.15 no mason each 325.00 48.75 53.63
0.035 no man each 240.00 8.40 9.24
0.05 no women each 240.00 12.00 12.00
LS hire for scaffolding LS 6.25 6.88
Total m3 2334.55 2566.81
Say Rs. 2,335 /m3 Rs. 2,567
207
Laterite work in cement mortar 1:6 for
a
superstructure in Gfloor upto 5m ht.
1 m3 laterite work (vide item no.206a) m3 2574.15 2574.15 2831.57
0.15 no mason each 325.00 48.75 53.63
0.035 no man each 240.00 8.40 9.24
Page 30
0.05 no women each 240.00 12.00 13.20
LS hire for scaffolding LS 6.25 6.25
Total m3 2649.55 2913.88
Say Rs. 2,650 /m3 Rs. 2,914
RR MASONRY
275
Random rubble masonry in cement mortar 1:8 for
foundation and basement
1 m3 blasted rubble m3 270.00 270.00
0.3 m3 sand m3 1750.00 525.00
54 kg cement t 4700.00 253.80
0.7 no mason each 325.00 227.50
0.35 no man each 240.00 84.00
0.7 no women each 240.00 168.00
1 m3 conveyance for blasted rubble m3 499.00 499.00
0.3 m3 do sand m3 400.00 120.00
54 kg do cement kg 234.00 12.64
Total m3 2159.94 2375.93
Say Rs. 2,160 /m3 Rs. 2,376.00
275
a Random rubble masonry wih Departmental stone
in cement mortar 1:6 for foundation and basement
0.3 m3 sand m3 270.00 81.00
72 kg cement t 1750.00 126.00
0.7 no mason each 4700.00 3290.00
0.35 no man each 325.00 113.75
Page 31
0.7 no women each 240.00 168.00
0.3 m3 conveyance of sand m3 240.00 72.00
72 kg do cement kg 499.00 35.93
Total m3 3886.68 4275.35
Say Rs. 3,887 /m3 Rs. 4,275
277
a Dry stone masonry with Departmental stone for
retaining wall including the cost and conveyance of
all materials and labour etc, complete
0.8 no rubble mason each 325.00 260.00
0.7 no man each 240.00 168.00
Total m3 428.00 470.80
Say Rs. 428.00 /m3 Rs. 471.00
Page 32
1 m3 conveyance m3 499.00 499.00
spreading gravel SI 656
0.35 no man each 240.00 84.00
Total 718.00 789.80
Say Rs. 718.00 /m3 Rs. 790.00
WOOD WORK
301
a Anjily wood scantling 10dm3
14.4 dm3 Anjily wood log m3 ### 360.00
0.02 no man each 240.00 4.80
0.1419 no 0.33m2 sawing(4.3 sawer for10m2) each 300.00 42.57
407.37
3.8 dm3 Deduct cost of outer slab(25%) m3 6250.00 23.75
383.62
14.4 dm3 conveyance of Anjily wood log m3 360.90 5.20
Total 10dm3 388.82 427.70
Say Rs. 389 /10dm3 Rs. 428
Observed Data
9.87 m 2x1 plain section m 150.00 1480.50 1628.55
2 1.5 2x1.5 top and bottom channel m 300.00 900.00 990.00
2.55 m2 4mm glass m2 260.00 663.00 729.30
9.87 m rubber beading m 3.00 29.61 32.57
L.S conveyance 30.00 30.00
2 nos fitter each 210.00 420.00 462.00
2 nos man each 168.00 336.00 369.60
3859.11 4242.02
1.5 3687.21/(1.50x1.50) 1.5 3859.11 1715.16 1885.34
Say Rs. 1,715 /m2 Rs. 1,885
Page 33
313 Supplying and fixing Anjily wood planed and
framed work for frames of door window ventilator
etc
10.5 dm3 Anjily wood scanteling 10dm3 383.62 402.80
0.22 no carpenter each 325.00 71.50
0.1 no man each 240.00 24.00
10.5 dm3
conveyance of Anjily wood scanteling m3 495.00 5.20
Total 10dm3 503.50 553.85
Say Rs. 503 /10dm3 Rs. 554
Sub Data
(A) Fixing in position precast cement concrete Door /
Window
Labour charges
0.2 no mason each 325.00 65.00
0.3 no man each 240.00 72.00
LS conveyance and sundries 9.00
146.00 160.60
Hence fixing charge for door/ window Say Rs. 105 /Each Rs. 116
Door
Window
Ventilator
Page 34
304a Anjily wood ceiling planks 12mm
thick 10m2
183 dm3 Anjily wood log m3 ### 4575.00
0.55 no man each 240.00 132.00
4.644 no 10.8m2 sawing(4.3 sawer for10m2) each 300.00 1393.20
6100.20
45 dm3 Deduct cost of outer slab(25%) m3 6250.00 281.25
Total 5818.95
183 dm3 conveyance of Anjily wood planks m3 495.00 90.59
5909.54
Main Data
10.5 m2 ceiling with 12mm Anjily wood planks, 10m2 5909.54 6205.01 6825.51
0.25 kg wire nail kg 42.00 10.50 11.55
1.1 no carpenter for fitting each 325.00 357.50 393.25
2.15 no carpenter for planing each 325.00 698.75 768.63
1.1 no man each 240.00 264.00 290.40
Scaffolding LS 6.25 6.25
7542.01 8295.59
Say Rs. 7,542 /10m2 Rs. 8,296
351
Supplying and fixing Anjily wood fully panelled
shutters to suit the door frames already fixed in
position,inclusive of all labour charges of all iron
fittings,but excluding the cost of fittings
scanteling requires for 10dm2 is
(50.303/168.56)10=3.03dm3
3.03 dm3 Anjily wood scanteling 10dm3 383.62 116.24
3.03 dm3 conveyanve of scantling m3 495.00 1.50
0.386 no carpenter each 325.00 125.45
0.028 no man each 240.00 6.72
Total 10dm2 249.91 274.90
Say Rs. 250.00 /10dm2 Rs. 275.00
360
a Supplying and fixing fully glazed Anjily wood
shutters to suit the window frames already fixed,
including all labour charges for fixing iron fittings,
but excluding the cost of iron fittings
2.068 dm3
Anjily wood scanteling (37.78dm3 for
190.44dm2 ie,0.198dm3 for 10dm2) 10dm3 383.62 79.33 87.27
2.068 m3 conveyance of Anjily wood m3 495.00 1.02 1.13
0.086 m2 glass pan, 3mm thick m2 235.00 20.21 22.23
0.386 no carpenter each 325.00 125.45 138.00
0.028 no man each 240.00 6.72 7.39
LS nails, fillers, putty etc LS 1.25 1.38
Total 10dm2 233.99 257.38
Say Rs. 234 /10dm2 Rs. 257
Page 35
2 no carpenter each 325.00 650.00
1 qtl conveyance of MS rods t 234.00 23.40
Total qtl 4248.40 4673.24
Say Rs. 4,248 /Qtl Rs. 4,673
FLOORING
410
Flooring with cement concrete 1:4:8 75mmthick
using 40mm broken stone and plastyered over with
cement mortar 1:3,12mm thick floated hard and
trowelled smooth
0.75 m3 Cement concrete 1:4:8 using 40mm
broken stone (Sl.no.111) m3 3423.76 2567.82
10.0 m2
Plastering in cement mortar
1:3,12mm thick one coat(Sl.no.506) 10m2 1315.14 1315.14
Total 10m2 3882.97 4271.26
Say Rs 3883 /10m2 Rs. 4271
410
a Flooring with cement concrete 1:4:8 75mmthick
using 40mm broken stone and plastyered over with
cement mortar 1:3,12mm thick and neat cement
flushing coat
Page 36
0.75 m3 Cement concrete 1:4:8 using 40mm
broken stone(Sl.no.111) m3 3423.76 2567.82
10 m2
Plastering in cement mortar
1:3,12mm thick one coat(Sl.no.506) 10m2 1315.14 1315.14
10 m2
Cement flushing coat/second coat
over cement plaster items(Sl.no.514) 10m2 271.05 271.05
Total 10m2 4154.02 4569.42
Say Rs 4154 /10m2 Rs. 4569
409
a
Flooring with ISO/ Ist quality ceramic floor tiles
(30x30cm) laid in cement mortar 1:3,12mm thick in
line and level as per specifications and directions 10m2
10.5 m2 ceramic floor tiles(add 5% wastage) m2 320.00 3360.00 3696.00
0.01 m3 sand m3 1750.00 17.50 19.25
23 kg cement t 4700.00 108.10 118.91
0.01 conveyance of sand m3 400.00 4.00 4.40
23 conveyance of cement t 234.00 5.38 5.92
10 m2 cement plaster 1:3,12mm thick
(Sl.506) 10m2 1315.14 1315.14 1446.66
1.5 no mason each 325.00 487.50 536.25
0.9 no man each 240.00 216.00 237.60
117 no conveyance of tiles 1000no 518.00 60.43 66.48
LS sundries for colour, cutting machine
etc LS 31.00 31.00
5605.06 6162.47
Say Rs 5605 /10m2 Rs. 6162
409
b Flooring with ISO/best quality rectified tiles (joint
free of size 45x45cm) laid in cement mortar
1:3,12mm thick in line and level as per
specifications and directions 10m2
10.5 m2 rectified joint free tiles(add 5%
wastage) m2 350.00 3675.00 4042.50
10 m2 cement plaster 1:3,12mm thick
(Sl.506) 10m2 1315.14 1315.14 1446.66
1 no mason each 325.00 325.00 357.50
0.5 no man each 240.00 120.00 132.00
0.5 no boy each 180.00 90.00 99.00
52 no conveyance of tiles 1000no 518.00 26.94 29.63
LS sundries for cutting machine etc LS 6.25 6.25
5558.33 6113.54
Say Rs 5558 /10m2 Rs. 6114
Page 37
10 m2 cement plaster 1:3,12mm thick
(Sl.506) 10m2 1315.14 1315.14 1446.66
1 no mason each 325.00 325.00 357.50
0.5 no man each 240.00 120.00 132.00
0.5 no boy each 180.00 90.00 99.00
30 no conveyance of tiles 1000no 518.00 15.54 17.09
LS sundries for cutting machine etc LS 6.25 6.25
7856.93 8642.00
Say Rs 7857 /10m2 Rs. 8642
413
a Flooring with gray marble slab over a bed of
cement mortar 1:4,12mm thick including the cost of
polishing and all laour charges etc. complete
10.5 m2 gray marble slab m2 520.00 5460.00 6006.00
10 m2 cement mortar 1:4,12mm thick
(Sl.No,507) 10m2 1277.44 1277.44 1405.18
1 no carborandom stone each 120.00 120.00 132.00
2 no mason each 325.00 650.00 715.00
2 no man each 240.00 480.00 528.00
0.5 no boy each 180.00 90.00 99.00
4 no polisher each 198.00 792.00 871.20
2 no man each 240.00 480.00 528.00
1 day hire of cutting mechine day 50.00 50.00 50.00
2 day hire of polishing mechine day 50.00 100.00 100.00
sundries for wax,current charge etc LS 25.00 25.00
9524.44 10459.38
Say Rs 9524 /10m2 Rs. 10459
536
Dadoing the walls with coloured glazed tiles of
size 20x20cm, 7.5mm thick,in 12mm cement mortar
1:3 and pointed with coloured cement
25nos/
Page 38
5% wastage 15.63 17.19
1 m2 Plastering CM 1:3,12mm
thick(Sl.506) 10m2 1315.14 131.51 144.67
0.001 m3 sand m3 1750.00 1.75 1.93
0.48 kg cement tonne 4700.00 2.26 2.48
0.001 m3 conveyance of sand m3 400.00 0.40 0.44
0.48 kg conveyance of cement tonne 234.00 0.11 0.12
0.90 no mason each 325.00 292.50 321.75
0.50 no man each 240.00 120.00 132.00
LS colour LS 3.10 3.10
25 nos conveyance of tiles 3000nos 518.00 4.32 4.75
Total m2 884.07 972.17
Say Rs 884 /m2 Rs. 972
ROOFING
305
Supplying and fixing Anjily wood reepers
50mmx25mm to 38mmx16mm 10dm2
15.00 dm3 Anjily wood log(33% log value) m3 8250.00 123.75
1.6426 m2 3.82m2 sawing(4.3 sawer for10m2) each 300.00 492.78
616.53 678.18
Say Rs 617 /10dm2 Rs. 678
Page 39
145 no conceyance of tiles 1000no 518.00 75.11
1287.86 1416.65
Say Rs 1288 /10m2 Rs. 1417
458
Suplying and fixing MP hip and ridge tiles Ist class
set in cement mortar 1:3 including finishing edges
27 nos MP hip and ridge tiles 1000nos ### 432.00
0.1 m3 cement mortar 1:3 m3 1094.16 109.42
0.75 nos mason each 325.00 243.75
0.3 nos man each 240.00 72.00
0.3 nos boy each 180.00 54.00
27 nos conveyance of MP tiles 340mm size 1000nos 518.00 13.99
925.15 1017.67
Say Rs 925 /10m Rs. 1018
458
Fixing with Depatmental MP hip and ridge tiles
a
set in cement mortar 1:3 including finishing the
edges 10m
0.1 m3 cement mortar 1:3 m3 1094.16 109.42
0.75 nos mason each 325.00 243.75
0.3 nos man each 240.00 72.00
0.3 nos boy each 180.00 54.00
0.2 nos women for cleaning each 240.00 48.00
527.17 579.88
Say Rs 527 /10m Rs. 580
460
Valleying with GI sheet 0.8mm thick 900mm width
with over laps of 150mm at joints including nails etc.
Details for 30m
174 kg 1mm thick GI plainsheet Tonne 42000 7308.00
0.25 kg wire nails kg 42.00 10.50
1.5 no carpenter each 325.00 487.50
1.5 no man each 240.00 360.00
174 kg conveyance of GI sheet T 234.00 40.72
8206.72
Hence for 10m 2735.57 3009.13
Say Rs 2736 /10m Rs. 3009
453
Roofing with AC corrugated sheets with GI bolts
and nuts and bitumenus washers including
necessary ocer laps of 150 mm at ends etc
complete
11.5 m2 AC corrugated sheets m2 150.00 1725.00
Page 40
1.05 kg GI hooks and crank bolts and nuts
including GI plain washers, bitumen
washers
etc(14x0.15x0.62kg/m=1.30kg) kg 50.00 52.50
11.5 m2 conveyance of 11.50m2 AC
sheet(15kg/m2) Tonne 234.00 40.37
1.60 no carpenter each 325.00 520.00
1.60 no man each 240.00 384.00
Total 10m2 2721.87 2994.05
Say Rs 2722 /10m2 Rs. 2994
455
Roofing with galvanised iron corugatede sheets
1mm thick with overlape of 150mm at ends and GI
hooks or crank bolts and nuts including plain
washers and bitumen washers etc. complete
86 kg GI corrugated sheet 1mm thick t ### 3698.00
2.05 kg
Page 41
1.35 no man each 240.00 324.00
99.9 kg conveyance of plain GI ridge t 234.00 23.38
Total 5553.93
Hence 10m 1851.31 2036.44
Say Rs 1851 /10m Rs. 2036
455
,b Roofing with fiber corugatede sheets 28gauge
with overlape of 150mm at ends and GI hooks or
crank bolts and nuts including plain washers and
bitumen washers etc. complete
10 m2 fiber corrugated sheet 1mm thick m2 1100.00 11000.00 12100.00
2.05 kg
GI hooks or crank bolts and nuts
including plain washers and bitumen
washers(22x0.15x0.62kg/m=2.05kg) kg 50.00 102.50 112.75
1.35 no fitter each 300.00 405.00 445.50
1.35 no man each 240.00 324.00 356.40
10 m2
conveyance of fiber corrugated sheet LS 30.00 30.00
11861.50 13044.65
Say Rs 11862 /10m2 Rs. 13045
455
,b
Roofing with alluminium corugatede sheets
26gauge 0.46mm thick with overlape of 150mm at
ends and GI hooks or crank bolts and nuts including
plain washers and bitumen washers etc. complete
11.5 m2
alluminium corrugated sheet 0.38mm
thick@1.47Kg/m2@Rs.230/Kg
GI hooks and crank bolts and nuts m2 230.00 3888.15 3888.15
1.65 kg including GI plain washers, bitumen
washers
etc(14x0.15x0.62kg/m=1.30kg) kg 50.00 82.50 90.75
1.35 no carpenter each 325.00 438.75 482.63
1.35 no man each 240.00 324.00 356.40
16.91 Kg Conveyance of Alluminium sheet tonne 234.00 3.96 4.35
Total 10m2 4737.36 4822.28
Say Rs 4737 /10m2 Rs. 4822
Page 42
c)
Supplying and fixing 160mm dia PVC rain water
gutter semicircular section including fifing with
32x5mm MS flat supporters at 1m intervals
data for 6m
6 m PVC pipe,160mm dia (MR) m 130.00 780.00 858.00
7.8 kg 6x1m MS flat @1.3kg/m qtl 3800.00 296.40 326.04
sundries for conveyance,solvent etc LS 10.00 10.00
0.25 no plumber each 325.00 81.25 89.38
0.15 no man each 240.00 36.00 39.60
1203.65 1323.02
Hence for 1m 200.61 220.50
Say Rs 201 /m Rs. 221
d)
Supplying and laying 110mm dia PVC down water
pipe with fittings such as tees, elbows, bends,
checknuts, etc. complete
PLASTERING
Page 43
Say Rs 1094 /10m2 Rs. 1204
PAINTING
Page 44
Say Rs 64 /10m2 Rs. 70
555
b White washing with white cement two coat to walls
2.48 kg whiteCement kg 15.00 37.20
sundries LS 0.60
0.2 n o special man each 255.00 51.00
0.2 boy each 180.00 36.00
2.48 kg conveyance of cement t 234.00 0.58
125.38 137.92
Say Rs 125 /10m2 Rs. 138
560
Painting with water proof cement paint two coats
to the new walls
3.2 kg water proof cement paint kg 24.00 76.80
LS sundries LS 3.10
0.5 no painter each 270.00 135.00
0.7 no woman each 240.00 168.00
Total 10m2 382.90 421.19
Say Rs 383.00 /10m2 Rs. 421
Page 45
0.25 no woman each 240.00 60.00
Total 10m2 162.95 179.25
Say Rs 163.00 /10m2 Rs. 179
PAINTING
603
Painting priming coat on new wood work after
rubbing with sand paper and cleaning the surface
0.85 ltr wood primer ltr 85.00 72.25 79.48
LS sundries-bresh,sand paper,soap,putty etc LS 1.85 1.85
0.4 no painter each 270.00 108.00 118.80
Total 10m2 182.10 200.13
Say Rs 183.00 /10m2 Rs. 201.00
604
Painting priming coat on new iron work after
rubbing with emery paper and cleaning the surface
0.75 ltr iron primer ltr 85.00 63.75 70.13
LS sundries-bresh,sand paper,soap,putty etc LS 2.50 2.50
0.4 no painter each 270.00 108.00 118.80
Total 10m2 174.25 191.43
Say Rs 175.00 /10m2 Rs. 191
607
Painting with ready mixed paint of approved colour
a
and quality as specified, two coat including a
priming coat to new wood work
10 m2 priming coat (603) 10m2 182.10 182.10
10 m2 Painting,two coat(607) 10m2 330.65 330.65
Total 10m2 512.75 564.03
Say Rs 513 /10m2 Rs. 564
Page 46
0.25 no painter each 270.00 67.50 74.25
Total 10m2 163.85 180.05
Say Rs 164.00 /10m2 Rs. 181.00
612
$61
Painting with synthetic enamal paint of approved
3
colour and quality as specified, two coat(over
apriming coat already done) to new wood work
1.15 ltr synthetic enamal paint ltr 162.00 186.30 204.93
LS sundries-bresh,sand paper,soap,putty etc LS 3.35 3.35
1.1 no painter each 270.00 297.00 326.70
Total 10m2 486.65 534.98
Say Rs 487 /10m2 Rs. 535
612
a Painting with synthetic enamal paint of approved
colour and quality as specified, two coat including
a priming coat to new wood work
10 m2 priming coat (603) 10m2 182.10 182.10
10 m2 Painting,two coat(612) 10m2 486.65 486.65
Total 10m2 668.75 735.63
Say Rs 669.00 /10m2 Rs. 736
Page 47
612b
Painting with synthetic enamal paint of approved
colour and quality as specified, two coat(over
apriming coat already done) to new iron work
1.75 ltr synthetic enamal paint ltr 162.00 283.50 311.85
LS sundries-bresh,sand paper,soap,putty etc LS 1.85 1.85
0.45 no painter each 270.00 121.50 133.65
Total 10m2 406.85 447.35
Say Rs 407 /10m2 Rs. 448.00
612
d Painting with synthetic enamal paint of approved
colour and quality as specified, two coat including
a priming coat to new iron work
10 m2 priming coat (604) 10m2 174.25 174.25
10 m2 Painting,two coat(612b) 10m2 406.85 406.85
Total 10m2 581.10 639.21
Say Rs 581 /10m2 Rs. 639.21
615
Painting with plastic emulsion paint of approved
colour and quality as specified, two coat including
a priming coat to new plastered surface
1.15 ltr plastic emulsion paint including primin ltr 180.00 207.00 227.70
LS sundries-bresh,sand paper,soap,putty etc LS 3.10 3.10
1.15 no painter each 270.00 310.50 341.55
Total 10m2 520.60 572.35
Say Rs 521 /10m2 Rs. 572
Page 48
Total 10m2 355.85 391.25
Say Rs 356 /10m2 Rs. 392.00
628
Painting letters or figures 6.5, 8, 10cms height with
any kind of paints. Detailsof cost of 100 letters
0.45 ltr synthetic enamel paint of approved qualtr 162.00 72.9
Breshers LS 3.1
scaffolding LS 18.75
4.5 no painter each 270.00 1215
1.5 no man each 240.00 360
1669.75 1836.73
for average cost of each letters 16.6975 18.37
Say Rs 17 /each Rs. 18
629
Painting letters or figures 13, 15, 18cms height
with any kind of paints. Detailsof cost of 100 letters
0.6 ltr synthetic enamel paint of approved qualtr 162.00 97.2
Breshers LS 3.1
scaffolding LS 18.75
7 no painter each 270.00 1890
2 no man each 240.00 480
2489.05 2737.96
for average cost of each letters 24.8905 27.38
Say Rs 25 /each Rs. 27
630
Painting letters or figures 23, 25, 30cms height
with any kind of paints. Detailsof cost of 100 letters
synthetic enamel paint of approved
0.9 ltr quality ltr 162.00 145.8
Breshers LS 3.1
scaffolding LS 18.75
10 no painter each 270.00 2700
2 no man each 240.00 480
3347.65 3682.42
Page 49
for average cost of each letters 33.4765 36.82
Say Rs 33 /each Rs. 37
STEEL WORK
754
Steel work revetted or bolted in built up sections
trusses and framed work with MS angles, iron
plates, tees, etc. straightening, cutting, fabricating,
and hoisting including applying a coat of iron
priming
1.05 qtl cost of MS angles, plates, tees, channqtl 3800.00 3990.00
2 kg revets, nuts and bolts of sutable size
and length kg 60.00 120.00
3 m2 applying iron primer one coat 10m2 174.25 52.28
0.5 no blacksmith each 325.00 162.50
0.2 no heavy load mazdoor each 270.00 54.00
0.3 no fitter each 300.00 90.00
0.1 no heavy load mazdoor for cuttiung each 270.00 27.00
1.25 no blacksmith each 325.00 406.25
1.5 no heavy load mazdoor for punching holeeach 270.00 405.00
0.5 no blacksmith each 325.00 162.50
0.5 no heavy load mazdoor for revitting each 270.00 135.00
0.5 no blacksmith each 325.00 162.50
0.5 no heavy load mazdoor for revitting each 270.00 135.00
LS charcoal and hire for other appliances LS 5.00 15.00
LS hoisting and errecting in position LS 37.50 37.50
1.05 qtl conveyance of MS steel T 234.00 24.57
Total T 5979.10 6577.00
Say Rs 5979 /Qtl 6578.00
754
a Providing tubular truss with 65mm GI pipe (B
class) including cost and conveyance of all
materials , labour charges, scaffolding, errection
charges, hire of tools and plants etc complete,
including one coat of iron primer
63mm dia GI pipe for truss B class 1m
1 m 63mmGI pipe for truss m 230.00 230.00
L.S Labour for fabrication and errection L.S 40.00
L.s Hire of machinery & current charges L.S 20.00
0.2 m2 Iron primer 10m2 85.00 1.70
L.s Scaffolding & welding roads etc LS 10.00
301.70 331.87
Say Rs 302 /m Rs. 332
754
b 50mm dia. GI pipe for purline B class 1m
1 m 50mm dia.GI pipe for truss m 185.00 185.00
L.S Labour for fabrication and errection L.S 30.00
L.s Hire of machinery & current charges L.S 15.00
0.157 m2 Iron primer 10m2 85.00 1.33
L.s Scaffolding & welding roads etc L.S 6.00
237.33 261.07
Page 50
Say Rs 237 /m Rs. 261
754
c 40 mm dia. GI pipe B class 1m
1 m 40 mm dia.GI pipe for truss m 154.00 154.00
L.S Labour for fabrication and errection L.S 25.00
L.s Hire of machinery & current charges L.S 12.00
0.125 m2 Iron primer 10m2 85.00 1.06
L.s Scaffolding & welding roads etc L.S 5.00
197.06 216.77
Say Rs 197 /m Rs. 217
754
d 25 mm dia. GI pipe B class 1m
1 m 25 mm dia.GI pipe for truss m 110.00 110.00
L.S Labour for fabrication and errection L.S 22.00
L.s Hire of machinery & current charges L.S 10.00
0.1 m2 Iron primer 10m2 85.00 0.85
L.s Scaffolding & welding roads etc L.S 4.00
146.85 161.54
Say Rs 147 /m Rs. 162
755
Providing MS grills for window and compound
gates including all labour, hire charges for
fabricating and cost of all materials and applying a
coat of iron primer
1.05 qtl cost of MS square or round, qtl 3250.00 3412.50
100 no welding rods,8g 100no 420.00 420.00
5 m2 applying iron primer one coat 10m2 174.25 87.13
2.5 no blacksmith for leveling each 325.00 812.50
1.25 no blacksmith for cutting each 325.00 406.25
1.0 no heavy load man mazdoor for helping each 270.00 270.00
1.0 no welder each 325.00 325.00
1.0 no heavy load man mazdoor for welding each 270.00 270.00
2.5 no blacksmith for grinding each 325.00 812.50
1.05 qtl conveyance of steel t 234.00 24.57
currient charge, hire for welding plant LS 37.50
sundries LS 50.00
grinding stones LS 25.00
6952.95 7648.24
Say Rs 6953 /m Rs. 7648
763
Page 51
Total 10dm2 165.95 182.55
Say Rs. 166 /10dm2 Rs. 183.00
763
a Supplying and fixing top cover to rolling shutter
1 m top cover m 450.00 450.00
LS for conveyance and fitting LS 10.00
Total m 460.00 506.00
Say 460.00 /m 506.00
763
b Supplying and fixing steel collapsible grill of
appoved make and painted with a priming coat of
iron primer, interlocking together through their
entire length and jointed together at the end by end
locks with brackets, side guides and arrangements
for inside and outside locking with push and pull
operation etc complete.
10 dm2 collapsible grill m2 1400.00 140.00
0.03 no fitter each 300.00 9.00
0.03 no man each 240.00 7.20
0.03 no mason each 325.00 9.75
Total 10dm2 165.95 182.55
Say Rs. 166 /10dm2 Rs. 183.00
SANITARY
Page 52
855
a
855
b Supplying and fixing Stainless steel sink (1mm
thick sheet) of over all size 510x432x165mm with
cuppling and stainer
1 no Stainless steel sink (1mm thick
sheet) of over all size
510x432x165mm each 1606.00 1606.00
1.5 kg cement t 4700.00 7.05
0.25 no. plumber each 325.00 81.25
0.25 no. mason each 325.00 81.25
1775.55 1953.11
Say Rs. 1776 /Each Rs 1953
860
Supplying and fixing Indian type white glazed
earthernware WC 580x400 mm or nearest siuze
with P ro S trap, embedding in brick jelly concrete,
with a pair of porcelane foot rest and forming
squattiung platform 900x700mm plastered with
cement mortar 1:3 with neat cement flushing coat ,
including cutting and making good the wall, floors,
etc complete
1 no. wihite glazed IWC with trap each 484.00 484.00
1 pair foot rest pair 96.00 96.00
LS birick jelly concrete, and other
sundries LS 30.00
7 kg cement T 4700.00 32.90
Page 53
0.6 no. mason each 325.00 195.00
0.6 no. man each 240.00 144.00
Total each 981.90 1080.09
Say Rs. 982 /Each Rs 1080
860
a
Supplying and fixing Indian type white glazed
earthernware WC orissa pan 530x400mm or
nearest siuze with P ro S trap, embedding in brick
jelly concrete and forming squattiung platform
900x700mm plastered with cement mortar 1:3 with
neat cement flushing coat , including cutting and
making good the wall, floors, etc complete
1 no. wihite glazed orissa pan IWC with trap each 600.00 600.00
LS birick jelly concrete, and other
sundries LS 30.00
7 kg cement T 4700.00 32.90
0.6 no. mason each 325.00 195.00
0.6 no. man each 240.00 144.00
Total each 1001.90 1102.09
Say Rs. 1002 /Each Rs 1102
861
Supplying and fixing European type white glazed
earthernware WC with P ro S trap, and plastic
seatcover with hinges and rubber bufer ,including
cutting and making good the wall, floors, etc
complete
1 no glazed EWC with trap each 634.00 634.00
1 no seat cover each 232.00 232.00
sundries for plug, screws etc, LS 7.50
2 kg cement kg 4.70 9.40
0.3 no mason each 325.00 97.50
0.3 no man each 240.00 72.00
1052.40 1157.64
Say Rs. 1052 /Each Rs 1158
Page 54
854
Supplying and fixing white glazed earthernware flat
back, lipped front, urinal of size 430x260x350mm ,
15mm GM wheel valve with 15mm PVC connection
and 32mm PVC wastage pipe with brass union,
including cutting and making good the wall
1 no flat back, lipped front urinal each 368.00 368.00
1 no 15mm GM wheel valve each 171.00 171.00
1 no 15mmPVC connection each 44.00 44.00
1 no 32mm PVC waste pipe each 58.00 58.00
sundries for conveyance,screws ,plugs etc. LS 7.50
2 kg cement kg 4.70 9.40
0.5 no mason each 228.00 114.00
0.5 no man each 168.00 84.00
855.90 941.49
Say Rs. 856.00 /Each Rs 941
WATER SUPPLY
883
Supplying threading and jointing 20mm dia PVC
pipe and specials such as tees, bends, elbows,
checknuts etc, with clamps including cutting and
making good the walls, painting with suitable paint
two coat, etc complete.(Internal)
Details for 30m.
30 m 20mm PVC threaded pipe (10kgf/cm2)m 11.00 330.00 363.00
add 15%for specials 49.50 54.45
LS clamp, cement ,paint etc LS 15.00 15.00
2 no. fitter each 210.00 420.00 462.00
2 no. man each 168.00 336.00 369.60
Total 1150.50 1264.05
Hence m 38.35 42.14
Say Rs. 38.50 /m Rs. 42.00
883
Supplying threading and jointing 25mm dia PVC
a
pipe and specials such as tees, bends, elbows,
checknuts etc, with clamps including cutting and
making good the walls, painting with sutable paint
two coat, etc complete.(Internal)
Details for 30m.
30 m 25mm PVC threaded pipe (10kgf/cm2)m 15.00 450.00 495.00
add 15%for specials 67.50 74.25
LS clamp, cement ,paint etc LS 15.00 15.00
2 no. fitter each 210.00 420.00 462.00
2 no. man each 168.00 336.00 369.60
Total 1288.50 1415.85
Hence m 42.95 47.20
Say Rs. 43 /m Rs. 47.00
884 30 m
Supplying and laying 40mm dia PVC pipe with
fittings such as tees, elbows, bends, checknuts,
etc.including trenching to a minimum depth of 0.5m.
And refilling etc, complete(External)
Page 55
30 m 40mm PVCpipe (8kgf/cm2) m 28.00 840.00 924.00
add 5% specials 42.00 46.20
0.5 no. fitter each 210.00 105.00 115.50
0.5 no. man each 168.00 84.00 92.40
3 no. man for tnching each 168.00 504.00 554.40
L.S 3.75 3.75
Total 1578.75 1736.25
hence for 1m m 52.63 57.88
Say Rs. 52.50 /m Rs. 58.00
884 30 m
a
Supplying and laying 110mm dia PVC pipe with
fittings such as tees, elbows, bends, checknuts,
etc.including trenching to a minimum depth of 0.5m.
And refilling etc, complete(External)
30 m 110mm PVCpipe (8kgf/cm2) m 204.00 6120.00
add 5% specials 306.00
0.5 no. fitter each 210.00 105.00
0.5 no. man each 168.00 84.00
3 no. man for tnching each 168.00 504.00
Total 7119.00
hence for 1m m 237.30 261.03
Say Rs. 237 /m Rs. 261
Page 56
Supplying and fixing best quality 110mm steel
grating to toilet floor
1 no. 110mm steel grating to toilet floor each 16.15 16.15 17.77
fitting charges, gum etc LS 3.00 3.00
19.15 20.77
Say Rs.19 /Each Rs.21
884 30 m
.c Supplying and fixing 40mm dia PVC pipe with
specials for septic tank ventilator(External)
1 m 40mm PVCpipe (8kgf/cm2) m 28.00 28.00 30.80
add 5% specials 1.40 1.54
fitting charges, gum etc LS 2.00 2.00
Total 31.40 34.34
Say Rs.31.50 /m Rs.34.50
Earth work
1.2 IRC Forming Embankment
Extra charges for compaction with Power Roller
10m3
0.027 Day Hire charges of roller day 2080.00 56.16
0.5 Liter Diesel oil lit 36.00 18
74.16 81.58
Say Rs 75.00 /10m2 Rs. 82
Page 57
0.027 Day Hire charges of roller day 2080.00 56.16
0.5 Liter Diesel oil lit 36.00 18
74.16 81.58
Say Rs 75.00 /10m2 Rs. 82
a
Supplying and stacking 60mm( 70% of 60mm and
30%of 36mm) graded metal for measurements
0.7 m3 60mm broken stone m3 410.00 287.00
0.3 m3 36mm broken stone m3 510.00 153.00
1.0 m3 conveyance of metal m3 499.00 499.00
939.00 1032.90
Say Rs 939.00 /10m2 Rs. 1033
2.1.2
Sub base work:- Metalling the road way 100mm
spreaded thickness compacted to 75mm using
deptl. broken stones (graded in the ratio of 7:3 of
60mm and 36mm size)
0.67 no. man for spreading each 240.00 160.80 176.88
0.67 no. women for spreading each 240.00 160.80 176.88
0.67 no. boy for spreading each 180.00 120.60 132.66
0.012 day hire of roller day 2080.00 24.96 24.96
0.22 ltr diesel ltr 36.00 7.92 8.71
sundries LS 1.85 1.85
476.93 521.94
Say Rs 477 /10m2 Rs. 522
Page 58
2.2.2 Base course work:- Metalling the road way
100mm spreaded thickness compacted to 75mm
using 36mm deptl. broken stones
0.67 no. man for spreading each 240.00 160.80 176.88
0.67 no. women for spreading each 240.00 160.80 176.88
0.67 no. boy for spreading each 180.00 120.60 132.66
0.012 day hire of roller day 2080.00 24.96 24.96
0.22 ltr diesel ltr 36.00 7.92 8.71
sundries LS 1.85 1.85
476.93 521.94
Say Rs 477 /10m2 Rs. 522
Page 59
2.7 ltr kerosene for heating aggregate ltr 26.00 70.20 77.22
2 ltr kerosene for heating bitumen ltr 26.00 52.00 57.20
sundries LS 1.35 1.35
1.8 no spical man each 255.00 459.00 504.90
0.75 no women each 240.00 180.00 198.00
sundries LS 1.35 1.35
828.12 907.84
Say Rs 828 /m3 Rs. 908
3.1.3.2
459.74 500.76
Say Rs 460 /m3 Rs. 501
Page 60
3.2.2 Providing 20mm premixed chipping carpet over
WBM surfacewith deptal. broken stone (Total usage
of bitumen is 29.1kg/10m2)
Data for 100m2
0.12 day hire of boiler and sprayer day 100.00 12.00 12.00
0.12 day hire of roller day 2080.00 249.60 249.60
0.12 day hire of hot mix plant day 830.00 99.60 99.60
0.36 day Hire for wheel barrows day 3.50 1.26 1.26
2.2 ltr diesel for roller ltr 36.00 79.20 87.12
4 ltr diesel for HM plant ltr 36.00 144.00 158.40
10.8 ltr kerosene for heating aggregate ltr 26.00 280.80 308.88
11.6 ltr kerosene for heating bitumen ltr 26.00 301.60 331.76
291 kg bitumen kg 35.927 10454.76 10454.76
291 kg conveyance of bitumen T 459.00 133.57 146.93
7.5 no spical man each 255.00 1912.50 2103.75
3 no women each 240.00 720.00 792.00
sundries LS 5.00 5.00
14393.89 14751.05
for 10m2 1439.39 1475.11
Say Rs 1440.00 /10m2 Rs. 1476.00
Page 61
10.8 ltr kerosene for heating aggregate ltr 26.00 280.80 308.88
10.6 ltr kerosene for heating bitumen ltr 26.00 275.60 303.16
266 kg bitumen kg 35.927 9556.58 9556.58
266 kg conveyance of bitumen T 459.00 122.09 134.30
7.5 no spical man each 255.00 1912.50 2103.75
3 no women each 240.00 720.00 792.00
sundries LS 5.00 5.00
13458.24 13811.66
for 10m2 1345.82 1381.17
Say Rs 1346 /10m2 Rs. 1381
3.6.1.2
Filling up pot holes (cut and formed to regular
shapes And all loose and defective materials
removed) after applying a priming coat of hot
bitumen using 36mm deptl broken stone and
com,pacting with power roller to get a compact
surface and applying hot bitumen by sprayer
including cost, hire and conveyance of all materials,
hire of tools and plants (total usage of bitumen is
27.5kg/m3)
0.03 day hire of boiler and sprayer day 100.00 3.00 3.00
0.03 day hire of roller day 2080.00 62.40 62.40
0.09 day Hire for wheel barrows day 3.50 0.32 0.32
0.5 ltr diesel for roller ltr 36.00 18.00 19.80
27.5 kg bitumen kg 35.927 987.99 987.99
11 kg fire wood T 3400.00 37.40 41.14
27.5 kg conveyance of bitumen T 459.00 12.62 13.88
1.75 no special man each 255.00 446.25 490.88
0.75 no man each 240.00 180.00 198.00
0.75 no women each 240.00 180.00 198.00
sundries LS 0.40 0.40
1928.38 2015.81
Page 62
Say Rs 1928 /m3 Rs. 2016
3.6.1.2
Filling up pot holes (cut and formed to regular
shapes And all loose and defective materials
removed) after applying a priming coat of hot
bitumen using 36mm deptl broken stone and
com,pacting with power roller to get a compact
surface and applying hot bitumen by sprayer
including cost, hire and conveyance of all materials,
hire of tools and plants (total usage of bitumen is
27.5kg/m3)
0.03 day hire of boiler and sprayer day 100.00 3.00 3.00
0.03 day hire of roller day 2080.00 62.40 62.40
0.09 day Hire for wheel barrows day 3.50 0.32 0.32
0.5 ltr diesel for roller ltr 36.00 18.00 19.80
11 kg fire wood T 3400.00 37.40 41.14
1.75 no special man each 255.00 446.25 490.88
0.75 no man each 240.00 180.00 198.00
0.75 no women each 240.00 180.00 198.00
sundries LS 0.40 0.40
927.77 1013.93
Say Rs 928.00 /m3 Rs. 1014
3.6.2.2
Page 63
3.6.2.2
Deepening of well
63
Page 64
f 6th depth of 9m-10.5 add 10% to the
1.1 m3 rate of previus depth 10m3 1717.53 1889.28 2078.21
Say Rs. 1890.00 /10m3 Rs. 2079.00
b
Providing and errceting in well RCC ring of 1.35m
dia, 0.05 thick and 0.3 height with 1:2:4 using
20mm broken stone
c
Providing and errceting in well RCC ring of 1.5m
dia, 0.05 thick and 0.3 height with 1:2:4 using
20mm broken stone
0.068 m3 concrete 10dm3 38.88 264.38
2.73 m2 form work-@50% of slab 10m2 1370.88 374.25
0.5 no man for errecting each 168.00 84.00
Total 722.63 794.90
Say Rs. 723.00 /each 795.00
Page 65
0.5 no man for errecting each 168.00 84.00
Total 1177.17 1294.88
Say Rs. 1177 /each 1295.00
Page 66
/100m2
/100m2
/100m2
/Each
/m3
/m3
/m3
Page 67
/m3
/m3
/m3
/10m2
/m3
/10dm3
/m3
Page 68
/Each
/Each
/m3
/m2
/m2
/m2
/m3
/10m2
Page 69
/10m2
/10m3
/10m3
/10m3
/10m3
/10nos
Page 70
/10m3
/10m3
/10m3
/10m3
/10m3
/10m3
/10m3
Page 71
/10m3
/10m3
/10m3
/10m3
/10m3
Page 72
/10m3
/m3
/10m3
Page 73
/m
Page 74
/m
/10m
Page 75
/m3
/m3
/m3
Page 76
/Qtl
/10m2
/10m2
/10m2
/10dm3
Page 77
/10dm3
/10dm3
/10dm3
/10dm3
/10dm3
/10dm3
Page 78
/10dm3
/10dm3
/10dm3
/10dm3
/10dm3
Page 79
/10dm3
/10dm3
/10dm3
/10dm3
Page 80
/10dm3
/10dm3
/10dm3
/10dm3
/10dm3
Page 81
/m3
/m3
/m3
/m3
Page 82
/m3
/m3
/m3
/m3
Page 83
/m3
/m3
/m3
/m3
Page 84
/m3
/m3
/m3
/m3
Page 85
/m3
/m3
/m3
/m3
Page 86
/m3
/m3
/m3
/m3
Page 87
/m3
/m3
/m3
/m3
/m3
Page 88
/m3
/10dm3
/10dm3
/m2
Page 89
/10dm3
/Each
/Each
/m2
/m2
/10m2
Page 90
/10m2
/10dm2
/10dm2
Page 91
/Qtl
/Qtl
/10nos
/10nos
/10nos
/10nos
/10nos
/10nos
/10nos
/10nos
/10nos
/10nos
/10nos
/10nos
/each
/each
/10m2
Page 92
/10m2
/10m2
941
225
#VALUE!
/10m2
Page 93
/10m2
/10m2
/10m2
Page 94
/m2
/10dm2
/10dm3
2541
/10m2
Page 95
/10m2
/10m2
/10m
/10m
/10m
Page 96
/10m2
/10m
/10m2
Page 97
/10m
/10m2
/10m2
/10m
Page 98
/m
/m
/10m2
Page 99
/10m2
/10m2
/10m2
/10m2
/10m2
Page 100
/10m2
/10m2
/10m2
/10m2
/10m2
/10m2
Page 101
/10m2
/10m2
/10m2
/10m2
/10m2
/10m2
Page 102
/10m2
/10m2
/10m2
/10m2
/10m2
/10m2
Page 103
/10m2
/10m2
/10m2
/10m2
/10m2
Page 104
/10m2
/10m2
/10m2
/each
/each
Page 105
/each
/Qtl
/m
Page 106
/m
/m
/m
/m
Page 107
/10dm2
/m
/10dm2
/each
Page 108
/Each
/Each
Page 109
/Each
/Each
/Each
/Each
Page 110
/Each
/m
/m
Page 111
/m
/m
/Each
/Each
/Each
/Each
Page 112
/Each
/m
/10m2
/10m2
/10m2
/10m
/10m2
Page 113
/10m2
/10m2
/10m2
/10m2
/10m2
/10m2
/10m2
Page 114
/10m2
/10m2
/m3
Page 115
/m3
100
5.75
/m3
Page 116
/10m2
/10m2
Page 117
/10m2
/10m2
Page 118
/m3
/m3
/m3
Page 119
/m3
/10m3
/10m3
/10m3
/10m3
/10m3
/10m3
Page 120
/10m3
/each
/each
/each
/each
Page 121
/each
/each
Page 122
Page 123
Page 124
Page 125
Page 126
0.00 /10m
Page 127
Page 128
Page 129
Conveyance of materials by lorry - Average lead (Paravoor
Taluk)
Alangad Block
4 Bitumen 50 km 377.90
5 Brick 27 km 420.90
6 Laterite 14 km 201.95
8 Timber(scantling) 46 km 407.90
Certified that the distance noted in the data for conveyance of materials
except cement/steel and earth are the average Taluk wise conveyance
approved by the Exe. Engineer, Building Division, Ernakulam and for cement /
steel and earth are the minimum lead required
Sl.
No. Description of works Rate with out C.P Rate with C.P
CLEARING SITE
1 Clearing grass and other growth of vegitations 120.00 /100m2 132.00 /100m2
3 Clearing tick and throny jungles and small trees 480.00 /100m2 528.00 /100m2
DESMANTLING
16 Do wrought and framed timber from roof 7.91 /10dm3 8.70 /10dm3
Page 132
31 Do cement mortar 120.00 /10m2 132.00 /10m2
EARTH WORK
51 Earth work excavation in ordinary soil for foundati Rs. 804 /10m3 884 /10m3
56 Do - in ordinary soil for cutting and f Rs. 711 /10m3 782 /10m3
57 Do - in hard soil for cutting and fil Rs. 1,314 /10m3 1445 /10m3
65 Granite rock blasting in wells for initial deapth 5375.8 /10m3 5913 /10m3
65(a) Granite rock blasting in wells for additional deapth Rs. 265 /10m3 291 /10m3
67b Earth filling with ordinary soil,consolidation by ra Rs. 2,777 /10m3 3055 /10m3
67f Earth filling with hard soil,consolidation by rammin 3380 /10m3 3718 /10m3
67h Sand filling with sea sand Rs. 875 /m3 963 /m3
Packing with mutty stone in slushly portion of the
road Rs 556 /m3 0 /m3
67j Putting bunds with sand bags 6643 /10m 7308 /10m
CONCRETE
110 Cement Concrete 1:3:6,using 40mm matel Rs. 3,705 /m3 0 /m3
Page 133
122 Do 1:2:4,using 20mm matel 48 /10dm3 0 /10dm3
FORM WORK
RCC WORK
133 Cement Concrete 1:2:4 for slab including form wor 84.50 /10dm3 92.50 /10dm3
133a Do 1:(1.5):3, for slab including form work 89.50 /10dm3 98.00 /10dm3
134b Do 1:2:4 for lintel including form work 74.00 /10dm3 81.50 /10dm3
134c Do for sun shade including form work 91.50 /10dm3 100.79 /10dm3
134e Do for pre cast slab including form wor 49 /10dm3 54 /10dm3
134g Do for beam (20x20) including form wo 107.50 /10dm3 118.50 /10dm3
134i Do 1:2:4 for beam (20x40) including form wor 98 /10dm3 107.50 /10dm3
135 Do 1:2:4 for column(20x20) including form 114.00 /10dm3 125.50 /10dm3
135a Do 1:2:4 for column(30x20) including form 103 /10dm3 113.50 /10dm3
Page 134
BRICK WORK
158 Brick work in 1:5 using 19x9x9cm for foundation Rs. 2,845 /m3 3129 /m3
158a Do using 22.9x11.2x7cm for foundati Rs. 2,862 /m3 3148 /m3
159 Brick work in 1:6 using 19x9x9cm for foundation Rs. 2,791 /m3 3070 /m3
159a Do using 22.9x11.2x7cm for foundati Rs. 2,808 /m3 3089 /m3
163d Hollow brick(40x20x20) work in 1:5 for foundation Rs. 2,303 /m3 2534 /m3
163f Do (40x20x10) work in 1:5 for superstructu Rs. 3,051 /m3 3356 /m3
163g Solid brick(40x20x15) work in 1:6 for foundation Rs. 2,697 /m3 2967 /m3
LATERITE WORK
206a Laterite work 1:6 for foundation (44x24x14cm) Rs. 2,259 /m3 2485 /m3
206 Laterite work in 1:5 for foundation(29x24x14cm) Rs. 2,614 /m3 2875 /m3
STONE MASONRY
274 RR masonry in 1:6 Rs. 2,249 /m3 2474 /m3
Page 135
274a RR masonry in 1:6 with Deptl. Stone Rs. 3,887 /m3 4275 /m3
277a DR masonry with Deptl, stone Rs. 428 /m3 471 /m3
278 Rough stone dry packing for Aprons and revetmen 1257 /m3 1383 /m3
278 Rough stone dry packing for road formation 1105 /m3 1216 /m3
WOOD WORK
312 Anjily wood wrought and put up Rs. 430 /10dm3 473 /10dm3
313 Do planed and framed work foir door/ wi Rs. 503 /10dm3 554 /10dm3
A Fixing in position pre cast cement concrete door/ Rs. 105 /each 116 /each
360 Anjily wood fully glazed shutters to windows Rs. 234 /10dm2 257 /10dm2
369 MS flat iron work for windows or hold fast Rs. 5,665 Qtl 6231 Qtl
Page 136
g 75mm iron hooks and eyes 20.00 /10nos 22.00 /10nos
FLOORING
410 CC 1:4:8-75mm thick, CM-1:3,12mm thick, one co 3883 /10m2 4271 /10m2
410a CC 1:4:8-75mm thick, CM-1:3,12mm thick, flushin 4154 /10m2 4569 /10m2
ROOFING
318 Supplying and fixing Anjily wood reepers 488 /10dm3 537 /10dm3
328 Ceiling with Anjily wood planks 5849 /10m2 6434 /10m2
Page 137
458 Supplying and fixing MP hip and ridge tiles 925 /10m 1018 /10m
458a Fixing with Deptl.MP hip and ridge tiles 527 /10m 580 /10m
455b Roofing with fiber corrugated sheet 11862 /10m2 13045 /10m2
506 Plastering with cement mortar 1:3, 12mm thick 1315 /10m2 1447 /10m2
514 Cement flushing coat/ second coat 271.05 /10m2 298 /10m2
536 Dadoing with glazed tiles20x30mm, CM-1:3, 12mm 884 /m2 972 /m2
PAINTING WALLS
558 Oil bond distember two coat to new wall 241 /10m2 265 /10m2
560 Water proof cement paint,2 coat,new wall 383.00 /10m2 421 /10m2
607 Ready mixed paint 2 coat, new wood 331.00 /10m2 364.00 /10m2
Page 138
608 Do 1 coat, old wood 164.00 /10m2 181.00 /10m2
607a Do 2 coat, new wood including primer 513 /10m2 564 /10m2
609 Aluminium paint 2 coat, new iron 386 /10m2 425.00 /10m2
612 Synthetic enamal paint-2 coat,to new wood 487 /10m2 535 /10m2
615 Plastic emulsion-two coat, to new wall 521 /10m2 572 /10m2
625 Black Japan coat to rubble surface 216 /10m2 238 /10m2
STEEL WORKS
755 MS grill for windows and gate 6953 /Qtl 7648 /Qtl
Page 139
763 Rolling shutters 166 /10dm2 183 /10dm2
855b Stainless steel sink of size 510x432c165mm, 1mm 1776 /Each 1953 /Each
860 Indian type WC with foot rest 982 /Each 1080 /Each
862a PVC low level flush tank 1136.00 /Each 1249 /Each
WATER SUPPLY
883 Laying 20mm PVC pipe(10kgf/cm2) for internal wo Rs. 38.50 /m 42 /m
d supplying and fixing 25mm PVC ball valve Rs.41.50 /Each Rs.45 /Each
g Do - brass and gun matel 20mm stop cock Rs.261 /Each Rs.287 /Each
i Do - 40mm PVC ventilation pipe for septic tank Rs.31.50 /Each Rs.34.50 /Each
ROAD WORK
651 Sectioning new road 120.00 /10m2 132 /10m2
Page 140
652 Do old road 60.00 /10m2 66 /10m2
653 Picking up 50 to 100mm old matelled surface and 120.00 /10m2 132 /10m2
6 Matelling Ist layer with 60mm graded matel 477 /10m2 522 /10m2
9 Filling pot holes with 12mm matel(bitumen-60kg/m 4308.00 /m3 4725 /m3