Professional Documents
Culture Documents
Description:This project aims to established forestry and agroforestry production systems over 2,160 hectares, recovering degraded areas and deve-
loping sustainable economic activities in Perené district, Chanchamayo province. The proposed species are: coffe (Coffea Arabica), bolaina (Guazu-
ma crinita), tornillo (Cedrelinga catenaeformis), Capirona (Calycophyllum spruceanum), cedro (Cedrela odorata) and caoba (Swietenia microphylla).
Current Status: Projects Benefits:
Earliest project start date: The project is expected to start on the rainy Sustainable development contribution:
season of 2010. This project mainly will contribute to the increment of forest coverage,
Project lifetime: The project aims to maintain the forest perpetually. conservation of biodiversity, enhancement of the ecosystem capacity
Current Status: Land identification and site selection completed, Pro- to produce environmental services and the increment of the employ-
ject Idea Note in process. ment rate and life conditions. Additionally, it should be considered the
particular vulnerability of the area to landslides and floods so that the
Estimated Emission Reductions: project will also lead to a reduction of this vulnerability.
Net anthropogenic GHG removals by sinks:
1,326,610.18 tCO2e in 20 years. CER´s negotiation:
1,767,095.45 tCO2e in 30 years.
Open.
Description: This project activity aims to achieve the reforestation of at least 2,000 ha, enriched with tree valuable species and managing for the
collection of non-timber products. The project is located in private land units located in the provinces of Chanchamayo, Oxapampa and Puerto Inca.
The species to be used are: pines (Pinus sp), eucalyptus (Eucalyptus globulus), Cypress (Cupresus sp), Ulcumano (Podocarpus sp.), Capirona (Calyco-
phyllum spruceanum), Tornilo (Cedrelinga cateanformis), among others.
Current Status: Projects Benefits:
Earliest project start date: Sustainable development contribution:
The project will start on the beginning of the rainy season. At the end of the project lifetime at least 2000 ha of degraded areas,
Project lifetime: 30 years. mostly grassland and old impoverished soils will be reforested and ma-
Current Status: naged. It is estimated that the Project will require 1,500 direct jobs, a
Land identification and site selection in process. positive impact on the region.
www.fonamperu.org