PIPE Repair:
CFRP to the rescue
Treatment
Optimize spent-filter
backwash water

Online Tools
database delivers
contaminant resources

Taste and Odor Control


reservoir circulation
reduces geosmin

volume 34, no. 11 N ove m b e r 2008


Distribution Shah Rahman is vice president,
Pipelines Division, Fibrwrap Construction
(www.fibrwrapconstruction.com), Ontario, Calif.

Technology is helping utilities locate water main breaks, estimate damage, and
repair specific sections quickly and cost-effectively. BY SHAH RAHMAN

DON’T STRESS OVER


PRESTRESSED CONCRETE CYLINDER

PIPE FAILURES
C
ARBON FIBER-REINFORCED poly- 201 in. (about 17 ft). Pipe retrofits can also be
mers (CFRPs) have been used to performed externally.
structurally rehabilitate steel and CFRP composites used in strengthening applica-
concrete structures in North America tions are additional tension members that bond to
for more than two decades. Using these advanced and supplement the strength of an existing rein-
composite systems, engineers routinely strengthen forced concrete structure. CFRPs consist of fibers
bridges, buildings, waterfront piers, industrial of high-tensile strength combined with a resin
facilities, and many other civil works structures matrix. Several thousand carbon fiber filaments
that have been in service for many years. Struc- are twisted together to form a yarn that can be
tural renewal of large-diameter pressure pipe- woven or stitched into a fabric (Figure 1). CFRPs
lines also has been performed with CFRPs in are held together by a resin matrix—the “poly-
PHOTOGRAPHS: FIBRWRAP CONSTRUCTION

municipal and industrial facilities for more than mer” component of the CFRP (Figure 2). CFRPs
a decade. The method is typically trenchless and are high-strength-to-weight ratio materials that are
performed completely inside pipes with diame- ideal for high-tensile strength, low-weight, and
ters of 30-in. and larger—even pipes as large as low-thermal-expansion applications.

10 Opflow November 2008 www.awwa.org/communications/opflow


CFRP repair requires the host pipe to be placed out
of service and dewatered for entry by repair personnel
and manual application of the composite layers.
Distribution

affecting large populations. According to ADVANTAGES AND DISADVANTAGES


Figure 1. Dry Carbon
a recent Awwa Research Foundation study When a structurally deficient pipe section
Fiber Fabric on PCCP, Failure of Prestressed Concrete has been identified, it can be repaired
Carbon fiber filaments are twisted
Cylinder Pipe: with CFRP. Most pipes rehabilitated with
together to form a yarn that can be
O Almost 100 million ft (about 19,000 mi) CFRP have been PCCP, but large-diameter
woven or stitched into a fabric.
of PCCP was manufactured between steel pipes also have been repaired using
1940 and 2006. this technology.
O A database of PCCP failures contains CFRP repair provides several bene-
592 independent entries, representing fits. The CFRP repair method is trench-
three categories of failure in 35 states less, eliminating the need to dig around or
and the District of Columbia. through surface structures. All components
O Within 50 yr of installation, one rup- of the system—fiber, epoxies, tack coats,
ture and 66 other failures occurred for primers, and top coats—must be NSF-61
every 264,000 ft (50 mi) of pipe. certified and ideal for potable water appli-
O A significant increased failure rate cations. The volatile organic compounds
occurred for pipe installed between in all CFRP epoxies should be well below
1971 and 1979 because of the type US Environmental Protection Agency
The resin matrix serves as a load of prestressing wire used during this limits and environmentally friendly.
path between each fiber filament, mak- period. The segmental repair system allows
ing the composite pliable and protecting O Half of the recorded catastrophic leaks personnel to repair only a specific pipe
the fiber. Epoxy is the most commonly and breaks involved pipe manufac- section. Significant time savings result. For
used resin in strengthening applica- tured or installed between 1971 and example, 20-ft pipe sections with diame-
tions. Each epoxy has unique properties 1979. ters larger than 66-in. can be rehabilitated
and contributes to a composite’s unique In the last decade, electromagnetic in as little as 72 hr, which is often less time
strength, stiffness, and other physical/ and acoustic technologies have been than is required to remove and replace a
mechanical properties for engineered developed that can help municipalities pipe section or for other repair options.
applications. locate and accurately estimate the num- Because one layer of CFRP is only 0.04-in.
ber of wire breaks in pipe sections. Fur- thick, pipeline flow losses are negligible.
AWWARF RESEARCH ON PCCP ther analysis of the electromagnetic and A typical high-pressure application usually
Most water transmission mains in North acoustic data helps pipeline owners pri- renders only a ¼- to ½-in.-thick compos-
America are large-diameter prestressed oritize rehabilitation initiatives. The abil- ite liner. In addition, the CFRP system pro-
concrete cylinder pipe (PCCP) and steel ity to precisely isolate and repair specific vides a significantly smoother flow surface
pipe. Because these pipes are so large, deficient pipe sections results in tremen- than the host pipe. However, CFRP repair
their failures can be catastrophic, usually dous cost and time savings. requires the host pipe to be placed out of
service and dewatered for entry by repair
Figure 2. Cross-Sectional View of Carbon Fiber-Reinforced personnel and manual application of the
composite layers.
Polymer Composite
CFRPs are held together by a resin matrix—the “polymer” component of the CFRP.
SYSTEM DESIGN
CFRP composite systems are linearly
Carbon Fiber elastic to failure, whereas steel yields
and plastically deforms to failure. When
designing a structural strengthening sys-
tem, it’s important to consider stiffness,
strength, and strain. In CFRP liners, elas-
tic modulus and strain limitations control
the system’s performance. Inside a PCCP
Single Carbon
line, the CFRP liner acts as a barrier that
Resin Matrix Fiber Filament
controls the level of strain experienced
by the steel cylinder in the host pipe. The

12 Opflow November 2008 www.awwa.org/communications/opflow


In CFRP liners, elastic modulus
and strain limitations control
the system’s performance.

composite liner enables the steel cylin- AWWA-recommended strain limita- stresses, providing a factor of safety
der to perform within its elastic range— tions are 50 percent and 75 percent greater than 5 for the CFRP liner. So when
at or below industry-recommended of the steel yield point for operating and a composite liner is used, the retrofitted
levels—to ensure the pipeline’s long- surge conditions, respectively. Conse- pipeline will have the ability to address
term performance is maintained. quently, these limits result in low CFRP standard operating and surge pressures

STEP BY STEP 4. After the surface is properly prepared


INSIDE A CFRP REHABILITATION PROJECT and the walls have dried, additional repairs
to the concrete surface can be conducted if
The wet lay-up carbon fiber-reinforced poly- 1/16-in.of concrete from the inner core sur- necessary. Next, the surface is primed for
mer (CFRP) process is a method by which the face. In steel lines (2b), the cement–mortar application of composite layers.
dry CFRP fabric is saturated in the field with lining or any other type of internal lining 5. The saturated rolls of composite are
epoxy resin, then applied internally to full sec- should be removed first, followed by a further applied to the pipe wall. When the composite
tions/pieces of structurally deficient pipe. abrasive treatment of the pipe to white steel. is applied in the circumferential direction, the
1. Before commencing repairs, assess 3. In preparation for the fiber saturation pipe is strengthened for hoop stress (5a).
the host pipe’s condition, set up emergency process, epoxy resins are mixed on-site (3a). When the composite is applied in the longi-
plans, check for hazardous gases, and set A specially designed saturator is used to sat- tudinal direction, some level of resistance to
up ventilation and dehumidification systems. urate measured lengths of 2-ft-wide dry fiber bending moments is accomplished (5b).
2. In PCCP lines (2a), use a high-pressure fabric (3b). When saturation is complete, the 6. A final topcoat further protects the
hydroblasting unit to remove a minimum composites must be applied within three hr. composite layers.

1 2a 2b

3a 3b 4

5a 5b 6

www.awwa.org/communications/opflow November 2008 Opflow 13


Distribution

per industry recommendations, but will based on strain compatibility between the ONGOING AWWARF RESEARCH
also have the ability to control short- liner and host pipeline. Controlling strain AWWARF and USEPA are funding research
term pressures common to unforeseen significantly increases long-term durability being performed by the US Bureau of
rapid valve closures that result in transient by ensuring the CFRP and host materi- Reclamation on the use of CFRP for the
pressures up to five times operating con- als don’t exceed limits for stress, crack- structural renewal of PCCP. AWWA RF
ditions. Therefore, CFRP-liner designs are ing, and creep. Project No. 4114, Fiber Rehabilitation of

CASE STUDIES Conduit 94, Denver. In February 2008, Superior Pipeline, Phoenix. The 60-in.
Denver Water experienced a catastrophic PCCP Superior Pipeline conveys surface
CFRP TO THE RESCUE failure in a 66-in.-diameter section of steel water from the Val Vista Water Treatment
Case studies demonstrate that carbon fiber- pipe in Conduit 94 because of a pump fail- Plant to customers in southern Phoenix. It
reinforced polymer (CFRP) repair saves time ure. The failed section, located near an was designed for 175 psi, a working pres-
and money, eliminating the need for large elbow where the steel pipe transitioned to sure of 125 psi and 50 psi surge pressure.
open-trench repair projects. PCCP, was replaced on an emergency basis In October 2006, a 24-ft section catastroph-
Southwest Transmission Main, Mary- with 40 ft of new cement–mortar-lined steel ically failed. The failure was later attributed
land. Following a 2006 condition assess- pipe that was procured from the inventory to corrosion of prestressing wire due to
ment of Maryland’s Southwest Transmission of a local steel pipe manufacturer. The two hydrogen embrittlement and possible pipe
Main—a PCCP line that serves the city of new sections were 0.307-in. and 0.375-in. damage during installation.
Baltimore and Baltimore, Howard, and Anne thick, which didn’t meet the Denver Water Before placing the pipeline back into ser-
Arundel counties—it was determined that Board’s specified factor of safety of 2 for vice, inspection revealed that 22 sections of
repairs were necessary to avoid future cata- the design working pressure of 225 psi the 60-in. line needed immediate structural
strophic failures. Deficiencies identified pre- and surge pressure of 90 psi. Due to the repair, which was performed using CFRP. Due
stressing wire breaks, longitudinal cracking, location of the line 15 ft directly under- to high demand on the water main and the
and delamination of the concrete core. neath the highway, CFRP repair was the short time allowed for completing the work,
Fully structural CFRP renewal was carried only available option to upgrade the pipe. repair schedules were tight. On all occa-
out on 68 sections of 54-in. and 36-in. pipe, CFRP design considered safety factors sions, the projects were completed on time
with internal pressures ranging from 75 psi to for long-term load, short-term load, core or ahead of schedule.
150 psi. Another 19 sections of pipe in Anne crushing, and radial tensile strength. The Author’s Note: The case studies on the
Arundel County with minor circumferential parameters were met by using eight layers Southwest Transmission Main and the Supe-
cracking were “stitched” with CFRP to prevent of carbon-fiber composites. The cement– rior Pipeline were adapted from technical
groundwater infiltration through the cracks. mortar lining was removed, and one lon- papers presented at the American Society of
Howard County’s 33 sections of 36-in. pipe gitudinal layer of glass fiber served as a Civil Engineers Pipelines International Con-
were completed in 23 days. Feasibility stud- dielectric barrier. The project was com- ference 2008, Atlanta, authored by Frank
ies had shown that traditional repair methods pleted in a week during a scheduled main- Donaldson et al. and Aimee Conroy et al.,
would have taken four to six mo. tenance shutdown. respectively.

The Southwest Transmission Main Denver Water’s John Bambei (left) On the Superior Pipeline project,
called for internal visual and sounding investigated the failed pipe section crews performed repairs farther from
inspections before surface preparation with Dr. Mehdi Zarghamee (right). the access point than they had ever
could begin. attempted.

14 Opflow November 2008 www.awwa.org/communications/opflow


New CFRP research and development
will continue to yield more efficient
systems and economical solutions.

Prestressed Concrete Pipe, is addressing CFRP repair can also be performed


CFRP material properties and installation externally when appropriate.
issues, as well as taking an in-depth look at
design issues and long-term material dura-
bility. At the conclusion of the three-year
study, an AWWARF report will be produced,
along with a USBR specification on CFRP
rehabilitation that can be used as a basis
for designing and installing CFRP systems
for PCCP repair and renewal. These efforts
will supplement current design methods
and may also serve to initiate what will
eventually result in the publication of an
AWWA Standard. In recent AWWA Con-
crete Pipe Committee discussions, it has
been suggested that the report may be a
good basis for the inclusion of a chapter
on the rehabilitation of PCCP in the AWWA
Manual of Water Supply Practice M9, Con-
crete Pressure Pipe.

ON THE HORIZON
Faced with the challenges of structur-
ally deficient large-diameter PCCPs, some various electromagnetic and acoustic to structurally rehabilitate the worst pipe
of which fail catastrophically, there is technologies, they are making worthwhile sections with CFRP technology. New CFRP
a conscious effort today on the part of investments in investigating and analyz- research and development will continue
many large infrastructure owners to be ing their large-diameter buried transmis- to yield more efficient systems and eco-
proactive rather than reactive. Using sion lines and taking immediate action nomical solutions.

CFRP INSTALLATION R ESO URCES


AWWA Manual of Water Supply Practices
QUALITY CONTROL IS KEY TO EFFECTIVE USE O

M9: Concrete Pressure Pipe, 1995.


The performance and long-term durability of carbon fiber-reinforced polymer (CFRP) sys- O ICC AC 125: Acceptance Criteria for Con-
tems inside pipelines can be ensured by crete and Reinforced and Unreinforced
O using experienced installers who have more than five years of underground infrastruc- Masonry Using Externally Bonded Fiber-
ture work experience and an equal amount of experience with CFRP applications. Reinforced Polymer.
O submitting structural and durability testing results by the materials manufacturer and O ICC ESR 2103: Concrete and Masonry
the applicator (examples include full-scale external load testing and internal pressure Strengthening Using the Tyfo Fibrwrap
testing of pipes, environmental durability testing, biological growth-support-potential Fiber-Reinforced Composite Systems.
testing, anticavitation testing, checking for volatile organic compounds in resins, and O Loera, R. 2006. PCCP Carbon-Fiber-Liner
ultraviolet testing for external applications). Repair Standard Specifications. In: Atalah,
O material approvals from independent agencies such as International Code Council. A., Tremblay, A., editors. Service to the
O ensuring that all components of the CFRP system, including the fiber, epoxies, tack Owner. Proceedings of the American Soci-
coats, primers, and top coats are all certified to NSF 61 requirements for potable water ety of Civil Engineers Pipelines Interna-
applications. tional Conference, Chicago. Reston, Va.
O confirming in-field sample tensile strength for all applications per ASTM D3039, Stan- O Romer, A.E., Bell, G.E.C. 2008. Failure
dard Test Method for Tensile Properties of Polymer Matrix Composite Materials and of Prestressed Concrete Cylinder Pipe.
adhesion testing on bond-critical projects per ASTM D4541, Standard Test Method for AWWA Research Foundation. Report
Pull-off Strength of Coatings Using Portable Adhesion Testers. No. 91214, Denver.

www.awwa.org/communications/opflow November 2008 Opflow 15