You are on page 1of 86

Alcatel BSS

Outdoor Evolution A9100 BTS


Installation Manual

BTS Document
Installation & Dismantling Manual

3BK 17137 0009 RJZZA Ed.08


BLANK PAGE BREAK

Status RELEASED

Short title INS


All rights reserved. Passing on and copying of this document, use
and communication of its contents not permitted without written
authorization from Alcatel/Evolium.

2 / 86 3BK 17137 0009 RJZZA Ed.08


Contents

Contents
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1 General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1.1 Hardware Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
1.1.1 Racks Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
1.1.2 Weight and Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.2 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.3 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1.4 Initial State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1.5 Final State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.6 Operating Principle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
1.7 Time Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
1.8 Information equired . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
2 Preliminary Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
2.1 Before Leaving for the Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
2.2 Before Starting (On Arrival at the Site) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
3 Rack Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
3.1 Rack Unpacking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
3.2 Racks Dismantling (If Necessary for Transport) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
3.2.1 Cables Disconnecting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
3.2.2 Mechanical Dismantling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
3.2.3 Batteries Dismantling (If Necessary for Transport) . . . . . . . . . . . . . . . . . . . . . . . . . 25
3.3 Rack Transportation on Final Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
3.3.1 Manual Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
3.3.2 Crane Transportation With Pallet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
3.3.3 Crane Transportation With Craning Bar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
3.4 Rack Positioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
3.4.1 Case of Steel Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
3.4.2 Case of Concrete Foundation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
3.4.3 Case of Space Constraint at Right of BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
3.4.4 Finishing Assembly (If Rack Dismantled) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
4 Power Supply and Earth Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
4.1 Cables Installation in the Cable Way . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
4.2 Cables Entry in BTS Plinth Cover Plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
4.3 Protective Earth Cable Connection (GND) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
4.4 AC 230 V Mains Power Supply Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
4.5 Batteries Installation (If Dismantled On Site) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
4.6 AC Power Supply Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
5 PCM Cables Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
5.1 Cable Installation in the Cable Way . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
5.2 Cables Passing at BTS Side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
5.3 Cables Connection at BTS Side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
5.4 Case of L907/ 4 - 120 Ohm Cable (Alcatel Kits) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
5.5 PCM Cables Other as L907 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
5.6 Case of FLEX3 75 Ohm Cables (Alcatel Kits) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
6 Antenna Jumpers Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
6.1 Antenna Connection General Scheme . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
6.2 Jumper Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
6.3 Connection to the Head of Feeders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
6.4 Connect to the BTS Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
7 Alarm Cables Installation (Option) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
7.1 Cable Installation in the Cable Way (Option) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66

3BK 17137 0009 RJZZA Ed.08 3 / 86


Contents

7.2 Installing Alarm Cables at BTS Side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67


7.3 L907/4 Alcatel Cable Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70
8 Synchronization Clock Installation (Option) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
8.1 Configuration of Cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
8.1.1 A9100 / G2 BTS Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
8.1.2 A9100 / A9100 Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
8.2 Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76
9 Finishing Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
Appendix A : Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
Appendix B : List of Kits and Consumable Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
Appendix C : List of Documents and Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85

4 / 86 3BK 17137 0009 RJZZA Ed.08


Preface

Preface
Purpose This document describes how to install an outdoor Evolution A9100 BTS
of ALCATEL BSS.

What’s New In Edition 08


Update for document type, category and mnemonic.

In Edition 07
DDF label reference change.

In Edition 06
Updating for platform naming.

In Edition 05
Editorial correction.

In Edition 04
Removing of Compact BTS CPT1.

In Edition 03
Modification of AC power cables wires color.

In Edition 02
Adding Compact BTS (CPT1 & CPT2).

In Edition 01
Creation.

Audience This document is intended for:


Installers

Site administrators

Supervisors

3BK 17137 0009 RJZZA Ed.08 5 / 86


Preface

Project managers
Field service technicians

Occasional users.

Assumed Knowledge You must have a basic understanding of the following:

Basic knowledge of Alcatel BSS equipment


Experience of electrical installation and cabling.

6 / 86 3BK 17137 0009 RJZZA Ed.08


1 General Information

1 General Information

This chapter provides general information about the principle of the operation
and requirements for the procedure:

Hardware description
Restrictions

Prerequisite

Initial state

Final state

Operating principle
Time schedule

Information required.

3BK 17137 0009 RJZZA Ed.08 7 / 86


1 General Information

1.1 Hardware Description


1.1.1 Racks Configuration
roof roof

AC Switch unit
radio subrack
ADAM
radio
subrack

radio subrack

radio subrack

radio subrack
Battery unit

AC Connection

OUTC Plinth Plinth

Figure 1: CPT 2

Side compartment BTS

top roof top roof

AC Switch unit
radio subrack
ADAM

Options

radio subrack

Battery unit
Battery
switchs
radio subrack
Battery unit

COAR
AC Connection

Plinth Plinth

Figure 2: MINI

8 / 86 3BK 17137 0009 RJZZA Ed.08


1 General Information

Side compartment BTS 1 BTS 2

top roof top roof top roof

AC Switch unit
radio subrack radio subrack
ADAM

Options

radio subrack radio subrack

Battery unit
Battery
switchs
radio subrack radio subrack

Battery unit

COAR
AC Connection

Plinth Plinth Plinth

Figure 3: MEDI

1.1.2 Weight and Dimensions

Dimensions (mm) Average Weight (kg)

CPT 2 without option/without battery H = 1500 380


W = 1200
D = 700

MINI without option/without battery H = 1500 300


W = 1200
D = 700

MEDI without option/without battery H = 1500 500


W = 1800
D = 700

BTS2 Extension rack for MINI BTS H = 1500 200


W = 600
D = 700

Battery BU 41 (4 batteries) - 50

Battery BU 100 (4 batteries) - 120

1.2 Restrictions
None.

3BK 17137 0009 RJZZA Ed.08 9 / 86


1 General Information

1.3 Prerequisites
The site conforms to the “Safety rules” of General Wiring Handbook

The site is ready to receive the rack, according to the SPP42

The equipment is delivered packed on site with associated kits

The following equipment are not mandatory installed before starting:


Antenna feeders

1.4 Initial State


The rack and installation kits are packed and delivered on site.

Figure 4: Concrete Foundation

10 / 86 3BK 17137 0009 RJZZA Ed.08


1 General Information

Figure 5: Street Construction

1.5 Final State


The rack is ready for commissioning

The rack is not powered up.

Figure 6: Field Installation on Concrete Foundation (Example MINI or CPT2)

3BK 17137 0009 RJZZA Ed.08 11 / 86


1 General Information

Figure 7: Building Installation on Steel Construction (Example MEDI)

12 / 86 3BK 17137 0009 RJZZA Ed.08


1 General Information

1.6 Operating Principle


LEGEND

... ... ... To be done by Alcatel


installation team

Can be done by the customer.


... ... ... If not, it is be acomplished by
Preparation before leaving for the site the installation team

Preparation on arrival at the site OPTION:According to customer


demands,can be provided or not

Rack installation

Option: Rack dismantling for transport

Install the power supply and earth cables

Install PCM cables

Install antenna jumpers

Option: Install alarm cables

Option: Install synchronizatoin cables

Finish installation

3BK 17137 0009 RJZZA Ed.08 13 / 86


1 General Information

1.7 Time Schedule

Task Duration (mn) Duration (mn)


1st person 2nd person

Before going on site (at base) 60 -

Preliminary tasks on site 20 20


- Packages unwrapping not included not included
- General checking
- Rack transportation on final location (1)

Installation with rack disassembling (2) 30 30

Installation without rack disassembling (2) 15 15

Battery removal and installation (option) 30 30

Installation of earth and power supply cables 30 30

Installation of PCM cables 15 -

Installation of antenna jumpers 30 30

Installation of alarm cables (option) 15 -

Installation of synchronization cables (option) - 15

Finishing installation 15 15

Total 260 185

(1) : Transportation time to final location depending of the site


(2) : Tasks where two persons are mandatory for execution

Mandatory 4 persons for manual transport of disassembled equipment


The given duration is based on :

Basic installation without options (alarm, synchronization, ...)

Technical constraint, not taking into account the safety parameter

14 / 86 3BK 17137 0009 RJZZA Ed.08


1 General Information

1.8 Information equired


Site

Address and access to the site (key holder)

Grounding plate location (GND)

Customer power supply cabinet location


Fuse breakers location in customer power supply cabinet

Antenna feeders connection and information (AZIMUTH, Sectors,...)

Rack precise location

Number of alarms to be connected (if the case)

Alarm terminal block location (if the case)

Rack

Type of BTS rack to be installed


Type of batteries (BU41, BU100)

Rack fixing (steel construction, concrete foundation)

Kits

PCM connection type

PCM cables impedance (120 ohm, 75 ohm)

Synchronization configuration (if the case)

3BK 17137 0009 RJZZA Ed.08 15 / 86


1 General Information

16 / 86 3BK 17137 0009 RJZZA Ed.08


2 Preliminary Checks

2 Preliminary Checks

This chapter describes the preparation of the operation in two steps:

At base

On arrival at the site.

3BK 17137 0009 RJZZA Ed.08 17 / 86


2 Preliminary Checks

2.1 Before Leaving for the Site

Check prerequisites fulfillment See Prerequisites (Section 1.3).

Check availability of information See Information equired (Section 1.8) .


required

Check availability of documentation See List of Necessary Documents (in section C).

Check availability of tools See Installation Kits (in section B), refer to the ” Tools
catalogue ” for content checking.

Check availability of supplies See Consumable Supplies (in section B).

2.2 Before Starting (On Arrival at the Site)

Check applicable notification list and Refer to ITL “Applicable notifications list” for checking if
Operation Instructions notifications have to applied during the operation.
Refer to IO “Applicable operation instructions list” for checking
if operation instructions have to applied.

Check that safety instructions are Refer to “ General Wiring Handbook “ for checking that safety
applied precautions have been taken into accordance with safety
instructions.

Read instructions to be applied in case Refer to “ General Wiring Handbook “ for instructions.
of anomaly

Fulfill premises inspection form and Refer to CEL “ Premises inspection form “.
completion check list

Fulfill completion check list Complete header field of the CCL


The CCL is completed as each installation instruction is
carried out.

Check availability of Alcatel kits See Installation Kits (in section B).

18 / 86 3BK 17137 0009 RJZZA Ed.08


3 Rack Installation

3 Rack Installation

This chapter describes how to:

Unpack the BTS rack

Dismantle the BTS rack (if necessary for transport)

Transport the rack

Position the BTS rack.

3BK 17137 0009 RJZZA Ed.08 19 / 86


3 Rack Installation

3.1 Rack Unpacking

1. Unpack the equipment


2. Check the delivery and report any damage to the carrier delivery note
3. Verify the type of rack and serial number
4. Locate the final location.

20 / 86 3BK 17137 0009 RJZZA Ed.08


3 Rack Installation

3.2 Racks Dismantling (If Necessary for Transport)


3.2.1 Cables Disconnecting
If case CPT2 : cables must be disconnected in rack 1 and rack 2

If case MINI : cables must be disconnected in BTS 1


If case MEDI : cables must be disconnected in BTS 1 and in BTS2

BTS1 Disconnecting for 1. Disconnect Heating 230V (See Figure 8)


MINI or MEDI 2. Disconnect 230V Service + light
3. Disconnect Alarms
4. Disconnect COAR power supply
5. Disconnect -48V Busbar power supply
6. Disconnect 0V Busbar power supply
7. Disconnect Earth (in side compartment)
8. Disconnect Abis to SUMP
9. Disconnect SUMP flat cable

B
I

C COAR

D
H

F
E

Figure 8: MINI or MEDI Connection Between SIDE COMPARTMENT and


BTS 1 (View From BTS 1)

3BK 17137 0009 RJZZA Ed.08 21 / 86


3 Rack Installation

BTS2 disconnecting for 1. Disconnect Subrack 6 power supply (See Figure 9)


MEDI only 2. Disconnect Subrack 5 power supply
3. Disconnect Subrack 4 power supply
4. Disconnect Heating 220V
5. Disconnect Door alarm
6. Disconnect Logic flat cable
7. Disconnect HEX2 (BTS2)

BTS1 BTS2
A

F
C

D E

Figure 9: MEDI Connection Between BTS 1 and BTS 2 (Front View)

Rack 2 Disconnecting 1. Disconnect Heating 230V (See Figure 10)


for CPT 2 Only 2. Disconnect 230V Service + light
3. Disconnect -48V blue wires
4. Disconnect 0V black wires
5. Disconnect internal alarm cable (15 pin male connector) (See Figure 11)
6. Disconnect Logic flat cable

22 / 86 3BK 17137 0009 RJZZA Ed.08


3 Rack Installation

Figure 10: CPT 2 Connection Between Rack 1 and Rack 2 (View From Rack 2)

OUTC

Figure 11: CPT 2


Connection Between Rack 1 and Rack 2 on
OUTC Board (View From Rack 1)

3BK 17137 0009 RJZZA Ed.08 23 / 86


3 Rack Installation

3.2.2 Mechanical Dismantling

Nr Materials Reference Kit

1 Dismantling tool 3BK 08898 AA Installation kit

1 2

3
4

5 6

1. Remove the 3 vandalismproof caps with screwdriver and the 3 screws with
supplied special tool (in document holder)
2. Remove the side panel by removing the 4 internal screws with spanner of 13
3. Roof removing of BTS2 (MEDI) or BTS1 (MINI)
4. Unscrew the BTS1 roof and remove it (MEDI)
5. Using specific tool, unscrew the racks (top view)
6. Disassemble the rack.

24 / 86 3BK 17137 0009 RJZZA Ed.08


3 Rack Installation

3.2.3 Batteries Dismantling (If Necessary for Transport)

F2
BAT BAT BAT BAT !
F1
BAT BAT BAT BAT
WARNING 2
1


TEMPERATURE
+

Sensor

TEMPERATURE

4
3

3BK 17137 0009 RJZZA Ed.08 25 / 86


3 Rack Installation

1. Switch off F1 (and F2)


2. Take precaution against short circuit current when handling charged batteries
3. Disconnect cables
4. Sensor connection details
5. Dismantle exhausting hoses
6. Unfit the batteries.

26 / 86 3BK 17137 0009 RJZZA Ed.08


3 Rack Installation

3.3 Rack Transportation on Final Location


3.3.1 Manual Transportation

1 2

1. Manual transportation for a very short distance (see general safety


instructions)
2. Rack transportation with pallet handling
3. MINI or CPT2 transportation with pallet handling.

3.3.2 Crane Transportation With Pallet

1 2

1. Handle by crane with straps. Leave the pallet to avoid doors damages
2. Handle by crane with straps (MEDI).

3BK 17137 0009 RJZZA Ed.08 27 / 86


3 Rack Installation

3.3.3 Crane Transportation With Craning Bar

Insert belts or slings before inserting rods bar into eyebolts - belts with 4 point
fastening should be used as a loading harness
Check that max. tensile load per eyebolt is not exceeded: direction of pull a =
45 to the screw axis 240 kg/eyebolt
Respect transport regulations:

single cabinet: fasten transport belts to all 4 eyebolts

MINI or MEDI cabinet: insert rods through eyebolts and attach to crane
hook at minimum of 4 points
The bar and the fixing points are specified by Alcatel.
The choice of straps (slings), hooks and crane are under responsibility of
craning subcontractor.

1 2

1234567
12345671234567
1234567 1234567
1234567
1234567 1234567
1234567
1234567
4 5

1. Roof removing of BTS2 (MEDI) or BTS1 (MINI)

28 / 86 3BK 17137 0009 RJZZA Ed.08


3 Rack Installation

2. Unscrew the BTS1 roof and remove it (MEDI)


3. Bar and split pin 3BK 08804 AA
4. Crane connection and fixing points (MINI or CPT2)
5. Crane connection and fixing points (MEDI).

3.4 Rack Positioning


3.4.1 Case of Steel Construction

Nr Materials Reference Kit

3 Bolt M12x80 1AD 00050 0123 Basic kit


(BKG3O)
5 Washer 12.4x24x1.6 1AD 00236 0006

6 Nut M12 1AD 00197 0008

3
1
1234
1234
2
1234 5
12
12
1234
12341234
1234
6
123456789
123456789

Figure 12: Leveling and Fixing on Steel Construction

Procedure 1. Assemble the racks using same principle of dismantling


2. Position the BTS
3. Level the racks using spanner of 19 (1 of figure 12)
4. Block the leveling feet nuts using spanner of 19 (2 of figure 12)
5. Fix the racks to the concrete foundation (3- 4 - 5 - 6 of figure 12)

3BK 17137 0009 RJZZA Ed.08 29 / 86


3 Rack Installation

3.4.2 Case of Concrete Foundation

Nr Materials Reference Kit

3 Wall plug 1AD 01847 0003 Basic kit


(BKG3O)
4 Bolt M12x80 1AD 00050 0123

5 Washer 12.4x24x1.6 1AD 00236 0006

123451234
3

Figure 13: Leveling Feet and Concrete Foundation Fixing

Procedure 1. Assemble the racks using same principle of dismantling


2. Mark the position of fixing points on the foundation (See Figure 14)
3. Drill fixing holes (4 holes)
4. Insert wall plugs with screws into the holes (See Figure 13)
5. Tighten a little and remove the screws
6. Position the BTS
7. Level the racks using spanner of 19 (1 of Figure 13)
8. Block the leveling feet wit nuts with spanner of 19 (2 of Figure 13)
9. Fix the racks to the concrete foundation (3 - 4 - 5 of Figure 13)

30 / 86 3BK 17137 0009 RJZZA Ed.08


3 Rack Installation

22.5 mm

72.5mm
22.5 mm
500 mm
72.5 mm

500 mm
1150 mm 625 mm

1150 mm

500 mm CPT 2

1750 mm

MINI or MEDI

20 mm

85 mm

Figure 14: Mark Position on Foundation

3.4.3 Case of Space Constraint at Right of BTS


If there is no place between right BTS compartment and the wall, it is necessary
to use specific tools :

ratchet + short tool : 3BK 08899 AA

long extension + socket : 3BK 08898 AA (can be left in the BTS cabinet)

3BK 17137 0009 RJZZA Ed.08 31 / 86


3 Rack Installation

Clearance
123456789012345678901234567
123456789012345678901234567
constraint
100 mm

123456789012345678901234567
BTS

123456789012345678901234567
123456789012345678901234567
123456789012345678901234567
12341234567890123456
123456789012345678901234567
12341234567890123456
123456789012345678901234567
1234
12341234567890123456
123456789012345678901234567
1234567890123456
123456789012345678901234567
12
1211
123456789012345678901234567
12
123456789012345678901234567
12
12 1
1 12
123456789012345678901234567
12
123456789012345678901234567
Guide
12
12 1
1 12
123456789012345678901234567
12
123456789012345678901234567
12
12 1
1 12
123456789012345678901234567
12
123456789012345678901234567
12
12 1
1 12
123456789012345678901234567
12
123456789012345678901234567
12
12 1
1 12
123456789012345678901234567
12
123456789012345678901234567
12
12 1
1 12
123456789012345678901234567
12
123456789012345678901234567
12
12 1
1 12
123456789012345678901234567
12
123456789012345678901234567
12
12 1
1 12
123456789012345678901234567
12
123456789012345678901234567
12
12 1
1 12
123456789012345678901234567
12
123456789012345678901234567
121
123456789012345678901234567
1234 1234567890123456
123456789012345678901234567
1234
1234 1234567890123456
123456789012345678901234567
1234567890123456
123456789012345678901234567
1234
12341234567890123456
123456789012345678901234567
Guide

1234567890123456
123456789012345678901234567
123456789012345678901234567
123456789012345678901234567
123456789012345678901234567
123456789012345678901234567
Figure 15: Specific Rack Assembling Tools

3.4.4 Finishing Assembly (If Rack Dismantled)


To finish the assembly:
1. Connect all cables as reverse method of disconnecting
2. Assemble batteries (if dismantled).

32 / 86 3BK 17137 0009 RJZZA Ed.08


4 Power Supply and Earth Installation

4 Power Supply and Earth Installation

This chapter describes the procedure to:

Install power cables in the cable tray

Connect protective earth cable (GND)


Connect the 230 V mains power supply cables

Install the batteries

Test the power supply installation.

Before making any electrical connections to the rack, ensure that the safety
instructions are applied.
It is essential that:

the electrical power supply is disconnected. Ensure that all switches or fuses
devoted to the new RACK into the site connection box are switched OFF

due to the high leakage current, the protective EARTH must be connected
to the equipment before AC or DC power cable connection.

3BK 17137 0009 RJZZA Ed.08 33 / 86


4 Power Supply and Earth Installation

4.1 Cables Installation in the Cable Way

Nr Materials Reference Kit

1 Tie wraps 1AD 00698 0001 Consumable supplies

2 GND cable Y/G 1 x 16 mm2 3BK 08957 xx Installation kit

3 AC 230V power cable: -


2
- 2 x 4 mm (1 phase system) 3BK 08943 xx
2
- 5 x 6 mm (3 phase system) 3BK 08944 xx

1 2

1m

3 4

1. Install yellow / green cable in power compartment of cable tray


2. Install AC power cable in power compartment of cable tray
3. Attach cable with plastic tie wraps
4. Cut the cables at good length.

34 / 86 3BK 17137 0009 RJZZA Ed.08


4 Power Supply and Earth Installation

4.2 Cables Entry in BTS Plinth Cover Plate

Nr Materials Reference Kit

1 Tie wraps 1AD 00689 0001 Consumable supplies

2 Shrink sleeves 1AC00057 0102

1 2

AC GND
4

1. Install cover plate (with holes) in front of cable tray


2. Insert 20 cm of 40/13 shrink sleeve on cables
3. Pass cables through cover plate
4. Heat the shrink sleeve.

3BK 17137 0009 RJZZA Ed.08 35 / 86


4 Power Supply and Earth Installation

4.3 Protective Earth Cable Connection (GND)

Nr Materials Reference Kit

1 Lug ring crimp ∅8 /50 mm2 1AB 03205 0071 Consumable supplies

2 Tie wraps 1AD 00698 0001

3 GND cable Y/G 1x50 mm2 3BK 08961 xx Installation kit

1 2


+

123456789012345678
123456789012345678
123456789012345678
123456789012345678
123456789012345678
123456789012345678
123456789012345678
123456789012345678
123456789012345678
GND

123456789012345678
123456789012345678
3 123456789012345678
123456789012345678
4

1. Crimp a ∅8 terminal lug at BTS side and crimp an adapted lug at site
extremity of GND cable
2. Connect the GND cable to the site earth plate
3. Connect earth cable to the stud in the plinth (8mm)
4. Detail of GND cable connection.

36 / 86 3BK 17137 0009 RJZZA Ed.08


4 Power Supply and Earth Installation

4.4 AC 230 V Mains Power Supply Connection

Nr Materials Reference Kit

1 Set of wire terminal 1AB 05067 0004 Basic kit

2 Tie wraps 1AD 00698 0001 Consumable supplies


+

AC filter BOX

Figure 16: AC Filter Box Position

Procedure 1. Cut the cable at good length and prepare head of cable
2. Cut 3 cm of external insulation at cable gland passage
3. Pass cable trough cable gland
4. Put a shrink sleeve on cable at end of external insulation
5. Fit a wire terminal on each wire
6. Connect cables to clamp bridge in the AC filter box
7. Close the cover of AC filter box

3BK 17137 0009 RJZZA Ed.08 37 / 86


4 Power Supply and Earth Installation

Figure 17: Fit Wire Terminal

Earth (GND) Yellow / Green

Neutral (N) (L1) Blue

Phase 1 Black

Phase 2 (L2) Brown

Phase 3 (L3) Red

12
12
PE
N

12
L1
L2
L3
L1

LIGHTNING PROTECTION
L2
L3
N

AC 230V
FILTERS

Figure 18: MINI / MEDI / CPT 2 : 3 Phase System – Remove Bridge ( If Present )

38 / 86 3BK 17137 0009 RJZZA Ed.08


4 Power Supply and Earth Installation

BRIDGE

12
PE
N

12
12
L1
L2
L3

L1

LIGHTNING PROTECTION
L2
L3
N
AC 230V
FILTERS

Figure 19: MINI / MEDI / CPT 2 : 1 Phase System


– connect bridge between L1, L2, and L3
– insulate the unused wires ( do not cut them off )

4.5 Batteries Installation (If Dismantled On Site)


The BTS can be equipped by factory either with BU41 or BU100 batteries. This
procedure is only applied after site dismantling (because transportation).

The weight of each element of battery BU100 is 30 kg. Apply safety rules
to carry it

Use insulated tools when connecting


Batteries are delivered in fully charged status.

Procedure 1. Put the batteries in the compartment at bottom of rack (See Figure 16)
2. Put spacers between batteries
3. Fix the batteries to the rack with strap (See Figure 20)
4. Connect the cables between the elements of batteries (See Figure 21
or Figure 22)
5. Connect positive and negative cables to the battery pack
6. Connect the temperature sensor to the positive of battery pack
7. Use protective covers to insulate terminals.

3BK 17137 0009 RJZZA Ed.08 39 / 86


4 Power Supply and Earth Installation

Buckle
Strap

121
12
121
12
112
12 112
12 12
1112112
Batteries

Figure 20: Strap Installing

Sensor

Figure 21: BU41 Cabling

40 / 86 3BK 17137 0009 RJZZA Ed.08


4 Power Supply and Earth Installation

6 spacers

Fixing straps

Sensor

123456789012345678901234567
123456789012345678901234567
123456789012345678901234567 Nut M6

Spring
washer M6

RED

12
Washer M6

12 M8−M6
terminal stud

M6 terminal stud M6 terminal stud


Hex screw
M8 x 15

Spring washer M8 4 x cap

Washer M8
3 x battery connector 4 x cap
Battery connector

Figure 22: BU100 Cabling

3BK 17137 0009 RJZZA Ed.08 41 / 86


4 Power Supply and Earth Installation

4.6 AC Power Supply Testing

AC
230V
N P
2
1

N P 3 4

V V

N P 5 N P 6

1. At site power cabinet: check if 230 V fuse breakers are switched off
2. At rack side: using an ohmmeter, check that there is no short circuit between
phase and neutral
3. At rack side: do the same test between protective earth (green / yellow
wire) and each 230 V wire

42 / 86 3BK 17137 0009 RJZZA Ed.08


4 Power Supply and Earth Installation

4. At site power cabinet: switch on the 230 V fuse breakers


5. At rack side: check that the 230 V voltage between phase and neutral
is present
6. At rack side: using phase tester, check that the phase wire is connected
at good connection point
7. At site power cabinet: switch off the fuse breakers.

3BK 17137 0009 RJZZA Ed.08 43 / 86


4 Power Supply and Earth Installation

44 / 86 3BK 17137 0009 RJZZA Ed.08


5 PCM Cables Installation

5 PCM Cables Installation

This chapter describes the procedure to:

Install PCM cables in the site cable tray

Connect PCM cables to the connection area of the rack.

3BK 17137 0009 RJZZA Ed.08 45 / 86


5 PCM Cables Installation

5.1 Cable Installation in the Cable Way

Nr Materials Reference Kit

1 Label 3BK 08062 ABAA Basic kit

2 Tie wraps 1AD 00698 0001 Consumable supplies

3 PCM cable: - Installation kit


- either L907/ 8 (120 - ohm) 3BK 08942 xx
- or FLEX3/ 8 (75 - ohm) 3BK 25240 xx

1m

1
2

2
is
Ab

is 1
Ab

4
3

1. Install cables in PCM compartment


2. Attach cables with plastic cable ties
3. Mark cables with a marker
4. Label cable with supplied labels.

46 / 86 3BK 17137 0009 RJZZA Ed.08


5 PCM Cables Installation

5.2 Cables Passing at BTS Side

Nr Materials Reference Kit

1 Shrink sleeve 40 / 13 1AC 00057 0102 Consumable supplies

2 Shrink sleeve 16 / 5 8BC180023528

3 Reduction 32 / 13 8BC180027133 Basic kit

3BK 17137 0009 RJZZA Ed.08 47 / 86


5 PCM Cables Installation

6 7

1. Pass 20 cm of 40 / 13 and 16 / 5 shrink sleeves then the plastic reduction


on the cables
2. Pass cables through plinth cover plate
3. Strip the cable at cable gland level
4. Pass the cable trough the cable gland
5. Pass PCM cables trough cable gland on BTS bottom plate
6. Fit plastic reduction then 40 / 13 shrink sleeve then heat the shrink sleeve
7. Fit and heat the 16 / 5 shrink sleeve.

48 / 86 3BK 17137 0009 RJZZA Ed.08


5 PCM Cables Installation

5.3 Cables Connection at BTS Side

Abis KRONE Abis


(inserting) (screwing)
Figure 23: MEDI or MINI COAR Board

3BK 17137 0009 RJZZA Ed.08 49 / 86


5 PCM Cables Installation

Abis KRONE Abis


(inserting) (screwing)
Figure 24: CPT 2 OUTC Board

50 / 86 3BK 17137 0009 RJZZA Ed.08


5 PCM Cables Installation

5.4 Case of L907/ 4 - 120 Ohm Cable (Alcatel Kits)


Only one cable is used to carry Abis1 & Abis2 signals.

Color KRONE Signal


inserting connector

Quad 1 white 8 Abis 1 / TX

(output high grey 8 Abis 1 / TX

level signal) blue 6 Abis 2 / TX

violet 6 Abis 2 / TX

Quad 2 yellow 7 Abis 1 / RX

(input low level grey 7 Abis 1 / RX

signal going brown 5 Abis 2 / RX

toward BSC) violet 5 Abis 2 / RX

M
B L

123
123 10 mm
L9 07
D 1 AC 0 1 3 2 8 0 0 0 4

100 mm
E
1
F

A : String
B : Cable drain (GND)
D : Cable
E : Cable braid
F : Transparent film
G : Aluminium foil

3BK 17137 0009 RJZZA Ed.08 51 / 86


5 PCM Cables Installation

4
RX 1

5
TX 8

6
RX

7
TX

8
1
2 3

Figure 25: Connection Detail

1. Prepare head of cable


2. Remove the lightning protection before cabling. Insert it after wires
connection
3. Using inserting tool connect to the KRONE connector:

Braid must be squeezed in the bridge

3 jumpers must be removed from Abis 1 and Abis 2 green connectors


(they are used only in 75-ohm connection)

5.5 PCM Cables Other as L907


If cables are not Alcatel L907/4, then the wires must have right specifications
for inserting in the KRONE connector. If not, the wires have to be connected to
the screwing connectors of board.

52 / 86 3BK 17137 0009 RJZZA Ed.08


5 PCM Cables Installation

8
RX
ABIS2
TX
1
8
RX
ABIS1
TX
1

Figure 26: Example : connection to screwing connectors of COAR or OUTC


board. The 3 jumpers must be removed from the connectors (they are used
only in 75-ohm connection)

1 GND braid earthing clamp

2 TX BTS output signal


going toward BSC
3 TX

4 GND drain wires

5 RX BTS input signal


coming from BSC
6 RX

7 R200 (not used)

8 GND braid earthing clamp

Table 1: Screwing Connector Pin Assignment

3BK 17137 0009 RJZZA Ed.08 53 / 86


5 PCM Cables Installation

5.6 Case of FLEX3 75 Ohm Cables (Alcatel Kits)


B
G

123
F

A
123 10 mm
J
D
I 50 mm
H
C
K 1

A : Transparency film
B : DRAIN of cable
C : Braid of coaxial
D : Multi-coaxial cable
E : Braid of cable
F : DRAIN of coaxial
G : Aluminium
H : Core of coaxial
I : Skin of coaxial
J : Core insulation
K : Number of coaxial

7
6

1234567
1234567 123
3
4
5

12345678 123
2
1

1. Prepare head of FLEX 3 cable


2. Mount the earthing clamp.

54 / 86 3BK 17137 0009 RJZZA Ed.08


5 PCM Cables Installation

Coaxial Connector Pin Remarks

1 Abis 1 (TX) 2 braid For each connector:


3 inner conductor - wire bridge from pin 1 to pin 2
- wire bridge from pin 4 to pin 5
2 Abis 1 (RX) 5 braid
- wire bridge from pin 6 to pin 7
6 inner conductor

3 Abis 2 (TX) 2 braid


3 inner conductor

4 Abis 2 (RX) 5 braid


6 inner conductor

3BK 17137 0009 RJZZA Ed.08 55 / 86


5 PCM Cables Installation

56 / 86 3BK 17137 0009 RJZZA Ed.08


6 Antenna Jumpers Installation

6 Antenna Jumpers Installation

This chapter describes how to connect the antenna jumpers between feeders
and BTS rack.

3BK 17137 0009 RJZZA Ed.08 57 / 86


6 Antenna Jumpers Installation

6.1 Antenna Connection General Scheme


NORTH 45

Ant A
Ant B

Ant A 90

Ant B

Ant B
Ant A

230
A B A B A B

Label:
ANT B
AZIMUTH
125
Label:
SECT: N B A B A B
ANT A
A

A AB A B
B
N P Q
ANX ANX ANX

MBS

Figure 27: Example of Antenna Cabling and Labeling (3 Sectors)

58 / 86 3BK 17137 0009 RJZZA Ed.08


6 Antenna Jumpers Installation

6.2 Jumper Installation

Nr Materials Reference Kit

1 Labels 3BK 08062 ABAA Basic kit

2 Tie wraps 1AD 00698 0001 Consumable supplies

3 Shrink sleeve 40/13 1AC 00057 0102

4 Shrink sleeve 63/19 1AC 00057 0103

5 Plastic reduction 55/32 8BC 18002 7134 Basic kit

6 Antenna jumper cable 3BK 05360 xx Installation kit

Figure 28: General View of Jumper Mounting

3BK 17137 0009 RJZZA Ed.08 59 / 86


6 Antenna Jumpers Installation

N P Q
Feeder label Jumper label

Azimut 30°
Ant 1

N
Ant A
B

2
1

Jumpers

3 4

63 19
40 13

Jumper

5
6
55/32

1. Label the jumpers


2. Plinth cover with cable bushes
3. Put 20 cm of 63 / 19 and 40 / 13 shrink sleeves and the reduction on
each jumper
4. Fit and heat the 40 / 13 shrink sleeve on the jumper
5. Fit and heat 63 / 19 shrink sleeve
6. Passing detail.

60 / 86 3BK 17137 0009 RJZZA Ed.08


6 Antenna Jumpers Installation

6.3 Connection to the Head of Feeders

If the feeders are not labeled:

Inform the customer


Don’t connect the jumpers

Fulfill the CCL.

Nr Materials Reference Kit

1 Vinyl electrical tape 1AC 01556 0001 Basic kit


(BKGO)
2 Tie wrap 1AB 00414 0006

3 Tape “auto-vulcanisant” 1AC 01595 0001

Feeder 1 3 2 Jumper

112345
123456
2345
1212
1234
123456
123
1234
1234 12
1123
1234
223
123456
123456
123
123
12
12 123
12
1234
1234
12345
12
12345
11234
123
234
123
12
12
123
1234
1234123
1234
1234
1234123
1234
12
1234
123456
12
123
1123
1234
12
1234
21234
12
23
Figure 29: Water Proof the Connections

Procedure 1. Connect the antenna jumpers to the feeders, start by the most difficult
connector to access (See Figure 28)
2. Verify the connectors
3. Screw connector male with connector female
4. Tighten the screw manually then shake cables a little
5. Using Alcatel tightening tool tighten with firmness
6. Fit the “Auto-vulcanisant” rubber tape (3) (See Figure 29)
7. Fit the vinyl electrical tape over the “auto-vulcanisant” tape (1)
8. Secure with tie wraps to avoid tape removing (2)

3BK 17137 0009 RJZZA Ed.08 61 / 86


6 Antenna Jumpers Installation

6.4 Connect to the BTS Rack

Nr Materials Reference Kit

1 Tie wraps with braid 1AD 00698 0001 Consumable supplies

BTS1 / BTS2

P N
ant A ant A
P N
ant B ant B
Q Q
ant A ant B

Figure 30: MINI or MEDI Bottom of BTS Cabinet

Back of rack

Batteries

Antennas

AC Filter
and
connection box

Figure 31: CPT 2 Bottom of Rack 1

Procedure 1. Ensure that the radius of each cable is at least 3 cm


2. Refer to Information equired (Section 1.8) for cable connections (See
Figure 30)
3. Fit connector male with connector female

62 / 86 3BK 17137 0009 RJZZA Ed.08


6 Antenna Jumpers Installation

4. Tighten the screw manually then shake cables a little


5. Using tightening tool, tighten with firmness
6. Use tie wraps to bundle the jumpers together

3BK 17137 0009 RJZZA Ed.08 63 / 86


6 Antenna Jumpers Installation

64 / 86 3BK 17137 0009 RJZZA Ed.08


7 Alarm Cables Installation (Option)

7 Alarm Cables Installation (Option)

This chapter describes how to:

Install alarm cables in the cable way

Connect alarm cables to the rack.

3BK 17137 0009 RJZZA Ed.08 65 / 86


7 Alarm Cables Installation (Option)

7.1 Cable Installation in the Cable Way (Option)

Nr Materials Reference Kit

1 Tie wraps 1AD 00698 0001 Consumable supplies

2 Labels 3BK08062ABAA Basic kit

3 PCM cable L907 / 4 3BK 08942xx Installation kit

1m

1 2

rm
Ala
1

3 4

1. Install cables in special compartment of cable tray


2. Attach cables with plastic tie wraps
3. Mark cables with a marker
4. Label cable with supplied labels.

66 / 86 3BK 17137 0009 RJZZA Ed.08


7 Alarm Cables Installation (Option)

7.2 Installing Alarm Cables at BTS Side

Nr Materials Reference Kit

1 Shrink sleeve 40 / 13 1AC 00057 0102 Consumable supplies

2 Shrink sleeve 16 / 5 8BC 18002 3528

3 Reduction 32 / 13 8BC 18002 7133 Basic kit

3BK 17137 0009 RJZZA Ed.08 67 / 86


7 Alarm Cables Installation (Option)

EXT − ALARMS
8 1

Alarms

ABIS 2
ABIS 1

7
Alarm n°14
Alarm n°13
8 Alarm n°10
7
6
5
4

2
1

1 : GND (braid earthing clamp)


2 : ALM1 GND
3 : ALM 1 (external alarm nr 10)
4 : ALM 2 GND
5 : ALM 2 (external alarm nr 13)
6 : ALM 3 GND

68 / 86 3BK 17137 0009 RJZZA Ed.08


7 Alarm Cables Installation (Option)

7 : ALM 3 (external alarm nr 14)


8 : GND (braid earthing clamp)
Figure 32: Connector Pin Assignment

8 9

10 11

1. Pass 20 cm of 40 / 13 and 16 / 5 shrink sleeves then the plastic reduction


on the cables
2. Pass cables through plinth cover plate
3. Strip the cable at cable gland level
4. Pass the cable trough the cable gland
5. Pass cable trough cable gland on BTS bottom plate
6. Prepare head of cable
7. Connect cable on COAR board
8. Example with 3 cables for 3 alarms
9. Example with 1 cable for 3 alarms
10. Fit reduction 32 / 13 and the 40 / 13 shrink sleeve then heat shrink sleeve
11. Fit and heat the 16 / 5 shrink sleeve.

3BK 17137 0009 RJZZA Ed.08 69 / 86


7 Alarm Cables Installation (Option)

Reduction
32/13 40 13 16 5

Cable

Figure 33: Cross Section

7.3 L907/4 Alcatel Cable Description


A

B M
L

brown
Pair 2
violet Quad
I 2
Pair 1 yellow
L907 grey
D 1 AC 01 32 8 0 00 4

blue
Pair 2
violet Quad
H 1
Pair 1 white
E grey

G
A : String
B : Cable DRAIN (earth)
D : Cable
E : Braid of cable
F : Transparency film
G : Aluminium
H : Quad of wires Number 1
I : Quad of wires Number 2
Figure 34: Prepare Head of Cable

70 / 86 3BK 17137 0009 RJZZA Ed.08


7 Alarm Cables Installation (Option)

Pair Alarm No Color

Quad 1 1 Alarm 1 white


grey

2 Alarm 2 blue
violet

Quad 2 3 Alarm 3 yellow


grey

4 not used brown


violet

3BK 17137 0009 RJZZA Ed.08 71 / 86


7 Alarm Cables Installation (Option)

72 / 86 3BK 17137 0009 RJZZA Ed.08


8 Synchronization Clock Installation (Option)

8 Synchronization Clock Installation (Option)

This chapter describes how to install and connect the synchronization cables
between the new rack and the other BTS on site (option).

3BK 17137 0009 RJZZA Ed.08 73 / 86


8 Synchronization Clock Installation (Option)

8.1 Configuration of Cabling


8.1.1 A9100 / G2 BTS Connection

G3/G4 CLK in G2
COAR
XCLC 1 out STSE
via
COB2
Master Slave

G2 CLK out
COAR G3/G4
MBSR
XCLC 1 in
via
COB2
Master Slave

74 / 86 3BK 17137 0009 RJZZA Ed.08


8 Synchronization Clock Installation (Option)

COAR COB2
screen
screen
white
5 5
brown
9 9
green
4 4
yellow
8 8
grey
3 3
pink
7 7
blue
2 2
red
6 6

P1 P2
OCC23 3BK 08303 AA
Figure 35: Synchronization Cables for A9100 Evolution / G2 BTS Connection

8.1.2 A9100 / A9100 Connection

G3/G4 G3/G4
COAR COAR
XCLC 1 out XCLK 1 in

Master Slave

3BK 17137 0009 RJZZA Ed.08 75 / 86


8 Synchronization Clock Installation (Option)

COAR 1 COAR 2
screen
screen
white
5 5
brown
9 9
green
4 4
yellow
8 8
grey
3 3
pink
7 7
blue
2 2
red
6 6

P1 P2
OCC33 3BK 08304 AA
Figure 36: Synchronization Cables for A9100 / A9100 BTS Connection

8.2 Installation

Nr Materials Reference Kit

1 Labels 3BK08062AB Basic kit

2 Cable for clock synchronization: - Installation kit


∇ A9100/G2-BTS (10 m) 3BK 08303 AA
∇ A9100/A9100 (10 m) 3BK 08304 AA

Procedure 1. Choose the good configuration


2. Pass the synchronization cables in the site cable way
3. Label the cables with supplied labels
4. Dismantle SubD 9 connectors (write down the wire colors)
5. Pass the cables through the BTS bottom plate
6. Put back the SubD 9 connectors
7. Connect cables to the coreponding sockets of connection area (See
Figure 37)
8. Fasten the connectors with knurled screws

76 / 86 3BK 17137 0009 RJZZA Ed.08


8 Synchronization Clock Installation (Option)

8
1 8
Synchro

1 8
ABIS 2

1 8
ABIS 1

Figure 37: Example : Synchronization Cables Connection to COAR

3BK 17137 0009 RJZZA Ed.08 77 / 86


8 Synchronization Clock Installation (Option)

78 / 86 3BK 17137 0009 RJZZA Ed.08


9 Finishing Installation

9 Finishing Installation

This chapter describes:

The labeling of the rack

Cleaning up

3BK 17137 0009 RJZZA Ed.08 79 / 86


9 Finishing Installation

BT S S T A TI O N 4

BTS STATION 4

3
4

1. Fit the "BTS STATION" and "N" labels at head of the BTS
2. Close unused ducts of plinth cover by using supplied caps
3. Clean the site
4. Give the key to the site responsible.

80 / 86 3BK 17137 0009 RJZZA Ed.08


Appendix A : Abbreviations

Appendix A: Abbreviations
Abis Link between BTS and BSC

AC Alternating Current

BATS Battery Small unit

BSC Base Station Controller

BSS Base Station Subsystem

BTS Base Transceiver Station

BU41 40 Amps battery unit

BU100 100 Amps battery unit

CCL Completion Check List

CEL Premises inspection form

DC Direct Current

EMS Cable clamp earthing and support assembly

FRD Failure report

GND Ground (earth)

GSM Global System for Mobile communication

ITL-PRO Procedure Technical and support information

IO Instruction Operation

MODEM MODulator - DEModulator

PCM Pulse Code Modulation

3BK 17137 0009 RJZZA Ed.08 81 / 86


Appendix A : Abbreviations

82 / 86 3BK 17137 0009 RJZZA Ed.08


Appendix B : List of Kits and Consumable Supplies

Appendix B: List of Kits and Consumable Supplies


Installation Kits The following table is used to check, on site, the mandatory or optional delivery
item kits.
The used symbols are:

• mandatory kit
∇ technical choice kit

◊ customer option kit

Mandatory kits Mnemo Reference Qty

• Basic installation kit BKG3O 3BK 08107 AC 1

• Antenna jumpers cables BLF3 3BK 05360 DA 2/s

◊ 2 Mbits cables: - - roll


∇ 120 ohm - 4 pairs - L907/ 4 (roll 100 m) CA120S4 3BK 08942 xx
∇ 75 ohm - 4 coax FLEX3/ 4 (roll 100 m) CACOAX4 3BK 08940 xx

◊ GND cable Y/ G 1 x 16 mm2 PC50YG1D 3BK08961 xx roll

◊ AC 230 Volts power cable - - -


2
∇ 3 x 2.5 mm 100 meters PC03G25 3BK25561 xx roll
2
∇ 5 x 6 mm 250 meters PC05B5 3BK08944 xx roll

◊ Cable for clock synchronization - - -


∇ A9100 / A9100 (10 m) OCC33 3BK 08304 AA 1
∇ A9100 / G2-BTS (10 m) OCC23 3BK 08303 AA 2

◊ Alarm cable 4 pairs - L907/ 4 CA120S4 3BK 08942 xx roll

◊ Dismantling tool - short part (left in cabinet) DISMSP 3BK 08898 AA 2

◊ Mechanical part for 24 terminal blocks MP24 1AD 02843 0001 1

◊ Label for 24 terminal blocks LAB 1AD 02853 0001 1

◊ CAD Alcatel terminal blocks JS10 1AD 06634 0011 4

◊ DDF fixing kit for wall FKW 1AD 02844 0001 1

◊ Jumpers for DDF - - -


∇ 120 ohm 1 pair CA120S 3BK 08941xx 4m
∇ 75 ohm 1 coax FLEX3 (roll 100 m) CACOAX1 3BK 08939 xx 4m

3BK 17137 0009 RJZZA Ed.08 83 / 86


Appendix B : List of Kits and Consumable Supplies

Consumable Supplies The following table is used to check, at base, the availability of the installer’s
consumable supplies (not included in Alcatel kits).

Item Qty

Indelible markers 1

Set of rubber sleeves for all cables 1

Ruber tape 1/ jumper

Electrical scotch 2

Set of Shrink sleeves 1

Tie wraps 5 mm x 300 mm 100

84 / 86 3BK 17137 0009 RJZZA Ed.08


Appendix C : List of Documents and Tools

Appendix C: List of Documents and Tools


List of Necessary The following table is used to check, at base, the availability of the necessary
Documents documents.

Applicable notification list (ITL-PRO) 3DF 00462 0004 AAAGA

Applicable operation instructions (IO) 3DF 00300 0004 UAZZA

General wiring handbook 3BK 17160 0001 RJZZA

Tools catalogue for field activity 3BK 20458 0001 RJZZA

Site premises inspection form (CEL) 8BL 00704 0015 DRBRA

Completion Check List (generic) (CCL) 3BK 17200 0002 QZZZA

Specification for site preparation (SPP42) 8BL 00704 0059 DRBRA

BSS site premises inspection, post handover 8BL 00704 0016 DRBRA

List of Necessary Tools The following table is used to check, at base, the availability of the necessary
tools (See ” Tools catalogue ” for content checking).

Kit name Reference Calibration

Basic kit OUT 001 no

BTS specific tools OUT 003 no

A9100 outdoor FVBA / Evolution BTS specific OUT 007 no