FOR THE YEAR 2008-2009
INDEX

Sl No Name of the Zone Page No.

1 Bytarayanapura 1 - 22
2 Mahadevapura 23 - 33
3 Bommanahalli 34 - 43
4 Rajarajeshwari Nagar 44 - 55
5 Dasarahalli 56 - 65
6 Bangalore West 66 - 107
7 Bangalore South 108 - 139
8 Bangalore East 140 - 166
9 Major Roads 167 - 176
10 CE Projects-1 176 - 183
11 Enhanced Allocation 183
Abstract of Programme of Works for BBMP
Amount (in Lakhs)

Civil Works Electrical Works 18% Total

Sl No Name of the Zone Capital Maintenance Capital Maintenance

No of Works Amount No of Works Amount No of Works Amount No of Works Amount No of Works Amount No of Works Amount

1 Rajarajeshwari Nagar 156 2391 83 874 23 500 13 300 30 720 305 4785.00

2 Bytarayanapura 171 2250.5 111 1039.5 23 105.5 36 304.5 61 810 402 4510.00

3 Bommanahalli 117 2984 84 296 33 350 7 150 36 720 277 4500.00

4 Mahadevapura 140 2459.9 75 807.6 34 325 11 189.5 55 718 315 4500.00

5 Dasarahalli 100 3188 10 111 15 283 7 160 31 756 163 4498.00

6 Bangalore West 332 2880 227 800 66 233.4 95 672.49 82 612 802 5197.89

7 Bangalore South 132 1545.5 387 1698.25 26 100 90 900 78 720 713 4963.75

8 Bangalore East 164 2319.2 114 985.72 2 16 463 984 56 692.58 799 4997.50

9 Major Roads 147 18200 18200.00

10 CE Projects-1 96 10799 29 2627.4 13 800 14226.40

11 Enhanced Allocation 400 400.00

12 Approach Roads to Villages 2000 2000.00

Total 1555 51017.1 1120 9239.47 222 1912.9 722 3660.49 442 6948.58 3776 72778.54
Byatarayanapura Division
Virupakshapura Sub-Division
Sl. Estimated Cost
Name of Works
No. (Rs. In Lakhs)
I. (Original Works)
A) Buildings
1 Construction of 2 Nos. of Garbage Transit Plant in Amruthahalli Circle Limit 3.00
Construction of Samparka Bandhu Building and Providing Furnitures in
2 10.00
Amruthahalli Circle Limit
B) Roads & Drains
Improvements and Asphalting to Roads and Construction of Drains in
1 20.00
Kempapura, Amruthahalli Circle Limit
Improvements and Construction of Drains to Coffee Board Layout in
2 20.00
Amruthahalli Circle Limit
Improvements and Asphalting to Roads and Construction of Drains to Cross
3 20.00
Roads at Amruthahanagar in Amruthahallli Circle Area
Improvements and Asphalting to Roads and Construction of Drains from
4 30.00
Amruthahalli Circle to Dasarahalli Main Road Via Tank Bund
Improvements and Asphalting to Roads and Construction of Drains from
5 30.00
Amruthahalli Circle to Dasarahalli Main Road Via Arkavathi Layout
Improvements and Asphalting to Roads and Construction of Drains in
6 20.00
Byatarayanapura
C) Bridges & Culverts
1 Construction of Bridge at Amruthahalli Tank Bund Road 11.00
D) Side Walks & Ducts
1 Construction of Side Walks from NH-7 to Amruthahalli Circle Main Road 20.00
E) Concrete Road
Nil
F) Water Supply
Nil
G) Playground & Protection of BBMP Properties
Nil
II. (Maintenance Works)
A) Buildings
1 Maintenance of BBMP, Byatarayanapura Zonal Office 10.00
2 Providing Furnitures and Fixtures to BBMP, Byatarayanapura Zonal Office 5.00

B) Roads & Drains


1 Asphalting to Main Roads in Coffee Board Layout of Amruthahalli Circle Limit 40.00

2 Asphalting to Cross Roads in Coffee Board Layout of Amruthahalli Circle Limit 20.00
3 Asphalting to Main Roads in Tala Cauvery Layout of Amruthahalli Circle Limit 24.00
Engaging Tractor & Road Gang for Emergency Repair for Maintenance of Roads
4 8.00
in Amruthahalli Circle
5 Maintenance of Roads in Amruthahalli Circle 10.00
C) Water Supply
Nil
D) Maintenance of Under Ground Drainage
Nil
E) Flyover, Underpass & Grade Separators
Nil

1
IV. (Other Works)
B) Other Works
1 Maintenance of Byatarayanapura Zone Control Room Office 25.00
2 Providing Street Signage Boards in Amruthahalli Circle Limit 1.00
Improvements and Geometrical corrections to Circles at Amruthahalli and
3 15.00
Hebbal Kempapura in Amruthahalli Circle limit
Providing Grant-in-Aid to Schools During National & State Festivals in
4 1.00
Amruthahalli Circle Limit
Total 343.00

Sl. Estimated Cost


Name of Works
No. (Rs. In Lakhs)
1 2 3
I. (Original Works)
A) Buildings
1 Construction of Sub Division Office of Byatarayanapura Zone at Sahakaranagar 30.00

2 Construction of 2 Nos. of Garbage Transit Plant in Sahakaranagar Circle Limit 3.00


Construction of Samparka Bandhu Building and Providing Furnitures at Thindlu
3 10.00
in Sahakaranagar Circle Limit
B) Roads & Drains
1 Improvements to Roads in Kodigehalli Village at Sahakaranagar Circle Limit 30.00
Improvements and Asphalting to Roads and Construction of Drains from
2 20.00
Kodigehalli Railway Station to Canara Bank Layout Connecting Road
Improvements and Asphalting to Roads and Construction of Drains to Main
3 20.00
Roads and Cross Roads of Devinagar Layout
Improvements to Roads and Construction of Drains in Hanumaiah Layout of
4 26.00
Thindlu Village in Sahakaranagar Circle Limits
C) Bridges & Culverts
1 Construction of Bridge at Gurudarshan Layout in Thindlu Village 10.00
2 Construction of Culverts in Sahakaranagar Circle Limits 8.00
D) Side Walks & Ducts
Nil
E) Concrete Road
Nil
F) Water Supply
Nil
G) Playground & Protection of BBMP Properties
1 Protection to BBMP Property Near Thindlu Village 7.50
II. (Maintenance Works)
A) Buildings
1 Repairs and Maintenance to Panchayat Office at Kodigehalli Village 2.00
2 Maintenance of Nirmala Souchalaya at Kodigehalli Village 1.50
B) Roads & Drains
Improvements and Asphalting to Roads and Construction of Drains to Main
1 25.00
Roads and Cross Road at Sahakaranagar Layout - CQAL & Defence Colony
Improvements and Asphalting to Roads and Construction of Drains to Main
2 25.00
Roads and Cross Road at Sahakaranagar Layout - A & B Block

2
Improvements and Asphalting to Roads and Construction of Drains to Main
3 25.00
Roads and Cross Road at Sahakaranagar Layout - C & D Block
Improvements and Asphalting to Roads and Construction of Drains to Main
4 25.00
Roads and Cross Road at Sahakaranagar Layout - E, F & G Block
5 Improvements and Asphalting to Roads and Construction of Drains at Tatanagar 25.00
6 Providing Pot Hole Filling to Roads in Sahakaranagar Circle Limits 10.00
Engaging Tractor & Road Gang for Emergency Repair for Maintenance of Roads
7 8.00
in Sahakaranagar Circle
C) Water Supply
Nil
D) Maintenance of Under Ground Drainage
Nil
E) Flyover, Underpass & Grade Separators
Nil
IV. (Other Works)
A) Other Works
1 Providing Street Signage Boards in Sahakarangar Circle Limit 1.00
Improvements and Geometrical corrections to Circle at Kodigehalli in
2 5.00
Sahakaranagar Circle limit
Providing Grant-in-Aid to Schools During National & State Festivals in
3 1.00
Sahakaranagar Circle Limit
Total 318.00

PROGRAMME OF WORKS FOR THE YEAR 2008-09


Byatarayanapura Division
Thanisandra Sub Division
Circle : Dasarahalli
Sl. Estimated Cost
Name of Works
No. (Rs. In Lakhs)
1 2 3
I. (Original Works)
A) Buildings
1 Construction of Public Library Building at Jakkur (Balance Work) 8.00
Construction of Additional Building and Improvements to Satyam Shivam
2 7.00
Sundaram Orphanage School at Jakkur
3 Construction of 2 Nos. of Garbage Transit Plant in Dasarahalli Circle Limit 3.00
Construction of Samparka Bandhu Building and Providing Furnitures at
4 10.00
Hegdenagar in Dasarahalli Circle Limit

B) Roads & Drains


Improvements to Road and Construction of Drains from NH-7 to Dasarahalli Via
1 30.00
Bhuvaneshwarinagar
Improvements and Asphalting to Road from JNRC to Srirampura - Mestripalya
2 25.00
Road
Improvements to Road and Construction of Drains to Nagawara - Thanisandra
3 25.00
Road (Ch: 0.90 Km to 1.60 Km)
Balance Work of Asphalting to Road from 5th Cross to 9th Cross of
4 20.00
Bhuvaneshwarinagar
Improvements to Road and Construction of Drains from 10th Cross to 18th
5 20.00
Cross of Bhuvaneshwarinagar

3
Improvements and Construction of Drains, Asphalting to 2nd Cross of
6 3.00
Cauverynagar Near Sai Baba Temple Road in Dasarahalli Circle Limit
Improvements and Asphalting to 2nd Main Road of Hegdenagar and Ramaiah
7 20.00
Road to Arkavathi Layout
Improvements to Road and Construction of Drains to Cross Roads of
8 10.00
Navyanagar & BGS Layout Near Jakkur
Improvements and Asphalting to Main Road of Ashwathanagar and Anam
9 10.00
Enclave Layout in Thanisandra
10 Improvements and Asphalting to Main Road of Vidyasagar in Thanisandra 10.00
Improvements to Road and Construction of Drains to Cross Roads of
11 5.00
Rachenahalli Village
Improvements to Road and Construction of Drains to Cross Roads of
12 10.00
Sampigehalli & Srirampura Village
Improvements to Road and Construction of Drains to Cross Roads of Jakkur
13 10.00
Village
14 Improvements and Asphalting to Roads from MCEH Layout to Arkavathi Layout 8.00
C) Bridges & Culverts
Construction of Culvert Across Local Halla Near Ashwathnagar in Thanisandra
1 8.00
Main Road
Construction of Culvert Across Local Halla Near Bharathnagar in Thanisandra
2 8.00
Main Road
Construction of Culvert Across Local Halla Near Nagenahalli Cross in
3 5.00
Hegdenagar - Nagenahalli Road at Dasarahalli Circle Limit
D) Side Walks & Ducts
Nil
E) Concrete Road
Nil
F) Water Supply
Nil
G) Playground & Protection of BBMP Properties
1 Protection to BBMP Property in Dasarahalli Circle 5.00
II. (Maintenance Works)
A) Buildings
1 Repairs and Maintenance of BBMP Sub Division Office at Thanisandra 1.00
2 Repairs and Maintenance of Ward Office at Dasarahalli 2.00
B) Roads & Drains
1 Maintenance and Emergency Repairs to Roads in Dasarahalli Cirlce 10.00
Improvements and Asphalting to Balance Length of Thanisandra - Rachenahalli
2 25.00
Road
Engaging Tractor & Road Gang for Emergency Repairs and Maintenance of
3 8.00
Roads in Dasarahalli Circle
C) Water Supply
Nil
D) Maintenance of Under Ground Drainage
Nil
E) Flyover, Underpass & Grade Separators
Nil
IV. (Other Works)
A) Other Works
1 Providing Street Signage Boards in Dasarahalli Circle Limit 1.00

4
Improvements and Geometrical corrections to Circle at Thanisandra in
2 10.00
Dasarahalli Circle limit
Providing Grant-in-Aid to Schools During National & State Festivals in
3 1.00
Dasarahalli Circle Limit
Total 318.00

PROGRAMME OF WORKS FOR THE YEAR 2008-09


Byatarayanapura Division
Thanisandra Sub Division
Sl. Estimated Cost
Name of Works
No. (Rs. In Lakhs)
1 2 3
I. (Original Works)
A) Buildings
1 Construction of 2 Nos. of Garbage Transit Plant in Nagawara Circle Limit 3.00
Construction of Samparka Bandhu Building and Providing Furnitures at HBR
2 10.00
Layout in Nagawara Circle Limit
B) Roads & Drains
1 Improvements and Asphalting to Roads at Illalnagar Roads 25.00
Construction of Drains at Arabic College, Rashadnagar, Omarnagar and
2 25.00
Byranakunte
3 Improvements and Asphalting to Govindapura Roads 15.00
Improvements to Drains and Footpath at 80 Feet Road Nagawara Main Road to
4 20.00
Kacharakanahalli Main Road in Thanisandra Sub Division
Improvements to Drains and Footpath to Kacharakanahalli Main Road in
5 20.00
Thanisandra Sub Division
Construction of SWD of 1 mt. vent on 9th main, 2nd block, HBR 1st stage from
6 10.00
house no. 727 to join 80 ft road, Kacharakanahalli
C) Bridges & Culverts
Nil
D) Side Walks & Ducts
Nil
E) Concrete Road
Nil
F) Water Supply
Nil
G) Playground & Protection of BBMP Properties
Nil
II. (Maintenance Works)
A) Buildings
Repairs and Maintenance of Nirmala Souchalaya Toilet Block at Nagawara
1 3.00
Circle
2 Repairs and Maintenance of Nagawara Ward Office 4.00
B) Roads & Drains
1 Repairs and Maintenance of Roads at Nagawara Circle 5.00
2 Improvements and Asphalting to Subashnagar Main Road (Balance Work) 10.00
Improvements and Asphalting to Roads at HBR 5th Block, 15th, 16th and 17th
3 30.00
Main Road
Improvements and Asphalting to Roads at HBR 5th Block, 15th, 16th, 17th,
4 24.00
Service Road and Parallel Road
5 Improvements and Asphalting to Roads at HBR 4th Block, 4th Cross 20.00

5
Improvements and Asphalting to Roads at Cross Roads of HBR 3rd Block Near
6 20.00
Ganesh Temple
Improvements and Asphalting to Roads Beside BDA Complex at HBR 2nd Stage
7 30.00
and Cross Roads
8 Improvements and Asphalting to Roads at HBR 2nd Stage Near Narendra Tent 20.00
Engaging Tractor and Road Gang for Emergency Repairs and Maintenance of
9 8.00
Roads in Nagawara Circle
Improvements to Roads and Drains at Ambedkar Colony at Veeranapalya in
10 9.00
Nagawara Circle Limit
Improvements to Roads and Drains at Fathima Layout, Umarnagar in Nagawara
11 25.00
Circle Limit
C) Water Supply
Nil
D) Maintenance of Under Ground Drainage
Nil
E) Flyover, Underpass & Grade Separators
Nil
IV. (Other Works)
A) Other Works
1 Providing Street Signage Boards in Nagawara Circle Limit 1.00
Improvements and Geometrical corrections to Circles at Nagawara Ward Office
2 15.00
& Opp. To HBR B.D.A Complex in Nagawara Circle limit
Providing Grant-in-Aid to Schools During National & State Festivals in
3 1.00
Nagawara Circle Limit
Total 353.00
PROGRAMME OF WORKS FOR THE YEAR 2008-09
Byatarayanapura Division
Thanisandra Sub Division
Circle : Kothanur Circle
Sl. Estimated Cost
Name of Works
No. (Rs. In Lakhs)
1 2 3
I. (Original Works)
A) Buildings
1 Construction of 2 Nos. of Garbage Transit Plant in Kothanur Circle Limit 3.00
Construction of Samparka Bandhu Building and Providing Furnitures at Hennur
2 10.00
in Kothanur Circle Limit

B) Roads & Drains


IMPROVEMENTS TO CROSS ROADS AND DRAINS OF HENNUR
1 20.00
GOWDARA COLONY AND VILLAGE IN THANISANDRA SUB DIVISION
IMPROVEMENTS TO ROADS AND DRAINS AND PROVIDING
2 CONCRETE TO NARROW ROADS OF CHELKERE AND 15.00
MEGHANAPALYA IN THANISANDRA SUB DIVISION
IMPROVEMENTS AND ASPHALTING TO MAIN ROAD FROM RING
3 20.00
ROAD TO CHELAKERE IN THANISANDRA SUB DIVISION
IMPROVEMENTS AND ASPHALTING TO ROAD FROM HENNUR ROAD
4 TO CHELAKERE BEHIND INDIAN ACADEMY IN THANISANDRA SUB 10.00
DIVISION

6
PROVIDING AND LAYING R.C.C COVERING SLAB TO RAIN WATER
5 DRAIN IN HENNUR NEAR GOVERNAMENT SCHOOL IN 5.00
THANISANDRA SUB DIVISION
ASPHALTING AND IMPROVEMENTS TO MAIN ROAD FROM KRISTHU
6 JAYANTHI COLLEGE TO K. NARAYANPURA CROSS IN 10.00
THANISANDRA SUB DIVISION
ASPHALTING AND IMPROVEMENTS TO MAIN ROAD FROM K.
7 NARAYANPURA CROSS TO NAGARESHWAR NAGENAHALLI IN 15.00
THANISANDRA SUB DIVISION
IMPROVEMENTS TO MAIN ROAD, CROSS ROADS AND DRAINS OF
8 10.00
BYRATHI VILLAGE IN THANISANDRA SUB DIVISION
IMPROVEMENTS TO MAIN ROAD, CROSS ROADS AND DRAINS OF
9 10.00
BILISHIVALE IN THANISANDRA SUB DIVISION
PROVIDING AND ASPHALTING TO MAIN ROAD FROM
10 40.00
KYLASANAHALLI TO BILISHIVALE IN THANISANDRA SUB DIVISION
IMPROVEMENTS TO MAIN ROAD, CROSS ROADS AND DRAINS OF
11 BABUSABPALYA NEAR LOGUS CHURCH IN THANISANDRA SUB 20.00
DIVISION
IMPROVEMENTS TO CROSS ROADS AND DRAINS OF THIRUMALA
12 20.00
LAYOUT IN THANISANDRA SUB DIVISION
IMPROVEMENTS TO HORAMAVUAGARA MAIN ROAD FROM
13 RAILWAY GATE TO HORAMAVU AGARA IN THANISANDRA SUB 8.00
DIVISION
IMPROVEMENTS TO ROADS FROM VADARAPALYA MAIN ROAD
14 8.00
TOWARD SAIBABA TEMPLE IN THANISANDRA SUB DIVISION
IMPROVEMENTS TO ROADS AND DRAINS IN HORAMAVU AGARA
15 7.00
VILLAGE IN THANISANDRA SUB DIVISION
PROVIDING AND LAYING R.C.C COVERING SLAB TO RAIN WATER
16 DRAIN IN SUSHILAMMA LAYOUT HENNUR IN THANISANDRA SUB 10.00
DIVISION
C) Bridges & Culverts
1 Construction of Bridges at Kothanur halla 25.00
D) Side Walks & Ducts
Nil
E) Concrete Road
Nil
F) Water Supply
Nil
G) Playground & Protection of BBMP Properties
1 Protection to Govt. property in Kothanur in Thanisandra Sub Division 5.00
2 Protection to Govt. property in Chalkere village in Thanisandra Sub Division 5.00
II. (Maintenance Works)
A) Buildings
IMPROVEMENTS AND PROVIDING PARTITION WORK TO WARD
1 5.00
OFFICE IN KOTHANUR IN THANISANDRA SUB DIVISION
IMPROVEMENTS AND MAINTENANCE TO THE EXISTING SULABH
2 2.00
SOUCHALAYA IN KOTHANUR CIRCLE LIMIT

7
B) Roads & Drains
ENGAGING TRACTOR AND ROAD GANG FOR EMERGENCY REPAIRS
1 AND MAINTENANCE OF ROADS IN KOTHANUR CIRCLE OF 8.00
THANISANDRA SUB DIVISION
MANITANANCE OF ROADS AND DRAINS IN KOTHANUR CIRCLE IN
2 10.00
THANISANDRA SUB DIVISION
C) Water Supply
Nil
D) Maintenance of Under Ground Drainage
Nil
E) Flyover, Underpass & Grade Separators
Nil

IV. (Other Works)


A) Other Works
1 Providing Street Signage Boards in Kothanur Circle Limit 1.00
Improvements and Geometrical corrections to Circles at Hennur Village
2 Junction, Kothanur Cross Junction and Byrathi Cross Junction in Kothanur 15.00
Circle limit
Providing Grant-in-Aid to Schools During National & State Festivals in
3 1.00
Kothanur Circle Limit
Total 318.00
PROGRAMME OF WORKS FOR THE YEAR 2008-09
Yelahanka Division
Yelahanka Upanagara Sub Division
Sl. Estimated Cost
Name of Works
No. (Rs. In Lakhs)
1 2 3
I. (Original Works)
A) Buildings
1 Constrruction of Help Point building in chikkabommasandra circle 5.00
B) Roads & Drains
Improvements to Roads and Drains in Chikkabommasandra Village Cross and
1 25.00
Main Roads
Improvements to Roads and Drains in Sharadanagara Village in Yelahanka New
2 15.00
Town
3 Improvements to Roads and Drains in Mathru Layout in Yelahanka New Town 20.00
4 Improvements to Roads and Drains in P.M Layout in Yelahanka New Town 10.00
5 Improvements to Roads From puttenahalli to BBMP Border 28.00
C) Bridges & Culverts
1 Construction of Culverts in 10 to 15th cross main roads in B sector 10.00
2 Construction of Culverts in cross main roads 407 sector 10.00
D) Side Walks & Ducts
Nil
E) Concrete Road
1 Formation of concrete road in B secter sanitery core (interior roads) 8.00
2 Formation of concrete road in 707, 407 secter 3rd phase (interior roads) 18.00
F) Water Supply
Nil
G) Playground & Protection of BBMP Properties
Nil

8
II. (Maintenance Works)
A) Buildings
Nil
B) Roads & Drains
1 Improvements to drain and asphalting 5th phase Yelahanka New Town 16.00
Improvements to drain and asphalting in 10, 14, 15th and 16th A sector Balance
2 15.00
portion cross roads Yelahanka New Town
Improvements to drain and foot path to 12nd main 11 main,14 main in A sector
3 10.00
Yelahanka New Town
Improvements to drain and foot path to 13nd main 1st to 3rd main in A sector
4 20.00
Yelahanka New Town
Improvements to drain and footpath to 5nd main 6 main,7,8,9,10 main in A
5 9.00
sector Yelahanka New Town
6 Improvements to drain and footpath in 407 SFS Yelahanka New Town 10.00
Improvements to drain and footpath in 10, 14, 15th and 16th A sector Balance
7 10.00
portion cross roads Yelahanka New Town
Engaging Tractor & Road Gang for Emergency Repair for Maintenance of Roads
8 8.00
in Chikkabommasandra Circle
Improvements to asphalting to cross roads from 13 A Main to 15th A Main in A
9 17.00
Sector Yelahanka New Town
10 Patch repairs in Chikkabommasandra circle 8.00
C) Water Supply
Nil
D) Maintenance of Under Ground Drainage
Nil
E) Flyover, Underpass & Grade Separators
Nil
IV. (Other Works)
A) Other Works
1 Providing street sinage boards in Chikkabommasandra Circle 1.00
2 Providing garbage transit place in Chikkabommasandra Circle 2.00

Total 275.00

PROGRAMME OF WORKS FOR THE YEAR 2008-09


Yelahanka Division
Yelahanka Upanagara Sub Division
Sl. Estimated Cost
Name of Works
No. (Rs. In Lakhs)
1 2 3
I. (Original Works)
A) Buildings
1 Constrruction of Help Point building in Attur circle 5.00
2 Construction of ward office in Attur circle 10.00
B) Roads & Drains
1 Improvements and Construction of roads & drain in Mathru Layout 10.00
2 Improvements and Construction of road & drain in P.M.Layout 10.00
3 Improvements and Construction of roads& drain in Doddabettahalli village 10.00
4 Improvements and Construction of roads & drain in Chikkabettahalli village 10.00
5 Improvements and Construction of roads & drain in Adithya nagar 1st stage 14.00
6 Improvements and Construction of roads & drain in Attur village chikkadinne 15.00

9
Engaging Tractor & Road Gang for Emergency Repair for Maintenance of Roads
7 8.00
in Attur Circle
8 Maintenance of Roads in Attur Circle 7.00
9 Improvements to Roads in Doddabettahalli Village 20.00
10 Improvements to Roads in Chikkabettahalli Village 15.00
11 Asphalting in AMS layout to cross and Main roads 25.00
12 Asphalting in Vinayaka layout and puttenahalli village to cross and Main roads 10.00
13 Improvements to Roads in Sushelamma Layout 10.00
C) Bridges & Culverts
1 Construction of culverts in Mathru Layout 10.00
2 Construction of culverts in P.M.Layout 10.00
3 Construction of culverts in Thirumalanagar 10.00
4 Construction of culverts in Doddabettahalli village 10.00
5 Construction of culverts in Adithya nagar 1st stage 10.00
D) Side Walks & Ducts
E) Concrete Road
Nil
F) Water Supply
Nil
G) Playground & Protection of BBMP Properties
Nil
II. (Maintenance Works)
A) Buildings
1 Renovation of Grama Panchayat Building at Doddabettahalli 20.00
B) Roads & Drains
Nil
C) Water Supply
Nil
D) Maintenance of Under Ground Drainage
Nil

IV. (Other Works)


A) Other Works
1 Providing Street Signage boards, Ornamental boards in Attur circle 6.00
2 Providing garbage transit place in Attur Circle 2.00
Providing Grant-in-Aid to Schools during national & state festivals in Attru
3 1.00
circle
Improvements and Geometrical corrections to Circles at Thirumala Dhaba and
4 14.00
Dairy Circle in Attur Circle limit
Total 272.00
PROGRAMME OF WORKS FOR THE YEAR 2008-09
Yelahanka Division
Maruthi Nagara Sub Division
Circle : Gandhinagara
Sl. Estimated Cost
Name of Works
No. (Rs. In Lakhs)
1 2 3
I. (Original Works)
A) Buildings
1 Beautification of Kempegowda platform at Yelahanka old town bus stop 5.00
2 Construction of Office Building in Yelahanka 46.00
3 Construction of Help point Building in Gandhi nagara circle 5.00

10
B) Roads & Drains
1 Construction of drain and formation of roads in Maheshwari Layout. 8.00
Asphalting Balance portion road from Yelahanka police station circle to Kogilu
2 30.00
Circle.
3 Widening of road from Police station circle to Kogilu circle. 25.00
4 Construction of drain from both sides NES circle to Police station circle. 20.00
construction of drain and Formation of Road at Ayyappa temple at yalahanka Old
5 5.00
town.
Providing covering to drain from Janapriya apartments to Muneshwara temple at
6 5.00
Allalasandra .
7 Construcation of Drain from Allalasandra road to Judicial Layout. 5.00
8 Asphalting 21st Main road in Judicial Layout. 13.00
C) Bridges & Culverts
Construction of footpath and decks from Police station circle to NES circle at
1 10.00
Yelahanka
D) Side Walks & Ducts
Nil
E) Concrete Road
1 Construction of C.C payment in yelahanka iedga behind railwheel factory 5.00
Formation of concrete road in Hosbeedi to Deshad pete Road, Old Post Office
2 11.00
road and Left Side Govt.Primary School,balanceVokkaligara Beedi Roads.
Formation of concrete road and improvemets to drain in chowdeshwari layout
3 8.00
main and cross roads
Providing concrete roads to 18th cross upto 22nd cross and 1st to 6th cross of
4 5.00
Kondappa layout
F) Water Supply
Nil
G) Playground & Protection of BBMP Properties
1 Protection to BBMP property at Gandi nagara circle. 5.00
II. (Maintenance Works)
A) Buildings
1 Improvements to RudraBhoomi at yalahanka Old Town 5.00
2 Demolition of Unauthorsied buildings/clearance in Maruthi nagara Subdivision 6.00
B) Roads & Drains
Improvements to drain and Roads at 2nd main to 3rd main and 1st cross to 4th
1 cross at Gandhi nagara ,1st main and Three cross roads in Neharu nagara at 10.00
Yelahanka.
Engaging Laboureres and tractors for daily maitainance of emergency works in
2 8.00
the jurisdiction of Gandhi nagara circle.
3 Depot Collection in Gandhinagar Circle 2.00
C) Water Supply
Nil
D) Maintenance of Under Ground Drainage
Nil
E) Flyover, Underpass & Grade Separators
Nil
IV. (Other Works)
A) Other Works
1 Providing street sinage boards in Gandhinagar Circle 6.00
2 construction of garbage transit plant in Gandhinagar Circle 2.00
3 Construction of immersion tank for Lord Ganesh in Yelahanka Amani kere 10.00

11
Improvements and Geometrical corrections at junction of Old town bus stop
4 6.00
circle in Gandhi Nagar
5 Maintenance of Byatarayanapura Zone Control Room Office 25.00
6 Providing Fencing and Drain Parrallel to Railway line in Gadhinagara Circle 8.00
Total 299.00

PROGRAMME OF WORKS FOR THE YEAR 2008-09


Yelahanka Division
Maruthi Nagara Sub Division
Circle: Kogilu
Sl. Estimated Cost
Name of Works
No. (Rs. In Lakhs)
1 2 3
I. (Original Works)
A) Buildings -
B) Roads & Drains
Extending 1st main road of Maruthinagara by providing drain and formation of
1 25.00
road from km 1.00 to 2.60
Construction of drains and formation of cross roads at Chokkanahalli noor
2 5.00
nagara village.
Construction of drain and formation of link road from Thirumenahalli to
3 20.00
Agrahara village
Construction of drain and formation of main road and cross roads at
4 5.00
Kattigenahalli extension.
Construction of drain and formation of road at Bhadranna layout near
5 10.00
Maruthinagara
6 Improvements and Asphalting to Roads in Agrahara Layout 25.00
7 Improvements and Asphalting to Roads in Agrahara Village 9.00
8 Improvements and Asphalting to Roads in Kogilu Layout 30.00
9 Providing Concrete Roads in Chokkannahalli Village 6.00
10 Asphlting in Kattigenahalli Village 5.00
C) Bridges & Culverts
1 Construction of culvert at Kogilu circle towards Kogilu Kannur road 10.00
D) Side Walks & Ducts
Nil
E) Concrete Road
1 Providing and laying concrete roads at Aggrahara Layout 5.00
2 Providing and laying concrete roads at Kogilu Layout. 5.00
3 Providing and laying concrete roads at Venkatala village. 5.50
F) Water Supply
Nil
G) Playground & Protection of BBMP Properties
1 Protection to BBMP property at Dwaraka Nagar near storm water drain 10.00
II. (Maintenance Works)
A) Buildings
1 Repairs and improvements to Kattigenahalli Panchayath offifce 1.50
2 Celebretion of National festivals/State festivals in Maruthi nagara sub division 3.00
B) Roads & Drains
Engaging Laboureres and tractors for daily mantenance of emergency works in
1 12.00
the jurisdiction of Kogilu circle.
Improvements drain and Asphalting at Maruthinagara 2nd and 3rd main roads
2 12.00
and cross roads of 7th to 15 at maruthi nagara.

12
Improvements drain and Asphalting at Maruthinagara From 16thcross to 25th
3 10.00
cross roads at maruthi nagara.
4 Improvements to road and Asphalting to Bande Road at Kogilu layout. 13.00
Improvemants drain and Asphalting to Vinayakanaga 2nd main road at
5 5.00
kattigenahalli panchayat..
6 Improvements drain and asphalting to Roads in papanna layout. 7.00
Re-Construction of culverts at Aggrahara layout. 6.00
8 Improvements to Concrete road at palanahalli village. 3.00
9 Depot Collection in Kogilu circle 2.00
C) Water Supply
Nil
D) Maintenance of Under Ground Drainage
Nil
E) Flyover, Underpass & Grade Separators
Nil
IV. (Other Works)
A) Other Works
Improvements and Geometrical corrections to Bagalur Circle in Kogilu Circle
1 10.00
limit
2 Providing street sinage boards in Maruthi Nagar and Kogilu Circle 6.00
3 Providing garbage transit plant in Kogilu Circle 2.00
Providing Grant-in-Aid to Schools During National & State Festivals in kogilu
4 1.00
Circle Limit
Total 269.00
PROGRAMME OF WORKS FOR THE YEAR 2008-09
Yelahanka Division
Vidyaranyapura Sub Division
Sl. Estimated Cost
Name of Works
No. (Rs. In Lakhs)
1 2 3
I. (Original Works)
A) Buildings
Nil
B) Roads & Drains
Improvements to cross rodas in Raghavendra Layout, Chikkavenkatappa Layout
1 10.00
of D.B. sandra.
Improvements to cross roads in Byrappa layout, Muneshwara Layout, D.B.
2 10.00
sandra.
Improvements of Ramaiah Layout, Ayyanna Layout of Ramachandrapura
3 10.00
Vidyaranyapura Sub Division
Improvements of roads cross roads and main roads Bloom field garden, Pillappa
4 10.00
Garden in Ramachandrapura layout Vidyaranyapura Sub Division
Improvements of roads cross roads and main roads Kempanna layout, Hanuman
5 10.00
Layout of Ramachandrapura Vidyaranyapura Sub Division
Improvement to roads Velangani Layout, Mathru koti layout in Vidyaranyapura
6 10.00
Sub Division
7 Improvement to roads in Gangamma gudi circle of Vidyaranyapura Sub Division 10.00
Asphalting to cross roads in Chikkavenkatappa main road from
8 10.00
Doddabommasandra arch to Jurisdiction of Vidyaranyapura Sub Division
Asphalting to for Ramachandrapura main road to Gangammagudi circle in
9 10.00
Vidyaranyapura Sub Division

13
Asphalting to cross roads and main roads of Gangamma gudi circle Velangani
10 10.00
layout and Mathukutti layout V.Pura Sub Division
Asphalting to cross roads and main roads of Devappa layout and Kempanna
11 15.00
layout V.Pura Sub Division
Asphalting to cross roads and main roads of Nanjappa circle V.Pura Sub
12 18.00
Division
Asphalting to cross roads and main roads of Bloom field garden and pillappa
13 20.00
layout of V.Pura Sub Division
Asphalting to cross roads and main roads of Subbanna layout Nethaji layout and
14 10.00
Muneshwara Layout in DB Sandra of V.Pura Sub Division
15 Asphalting to DBsandra main road from Nanjappa circle to BEL arch 10.00
Improvements to roads Doddabommasandra arch to Vidyaranyapura Sub
16 10.00
Division Jurisidiction.
C) Bridges & Culverts
formation of foot path V.Pura main road to bloom field garden onf
1 6.00
Ramachandrapura main road in V.Pura Sub Division
formation of from Nanjappa layout to Ramachandrapura cross V.Pura main road
2 12.00
in V.Pura Sub Division
D) Side Walks & Ducts
Nil
E) Concrete Road
concrete roads near St.Philomina school D.B.Sandra Vidyaranyapura Sub
1 8.00
Division
2 concrete road in AK colony of DB sandra of Vidyaranyapura Sub Division 8.00
improvements roads to old village of Ramachandrapura Vidyaranyapura Sub
3 8.00
Division
Improvements roads to old village of Doddabommasandra Vidyaranyapura Sub
4 8.00
Division
F) Water Supply
Nil
G) Playground & Protection of BBMP Properties
Construction of compound wall of Sy.No:12 of Ramachandrapura in
1 9.00
Vidyaranyapura Sub Division
II. (Maintenance Works)
A) Buildings
Nil
B) Roads & Drains
1 Repairs to roads and Culverts in Doddabommasandra Village 5.00
C) Water Supply
Nil
E) Flyover, Underpass & Grade Separators
Nil
IV. (Other Works)
A) Other Works
1 Providing Garbage transit plant in Doddabommasandra Circle 2.00
Improvements and Geometrical Corrections of Junction at Nanjappa circle, in
2 5.00
Doddabommasandra Circle
3 Providing Street Signage boards, Ornamental boards in Attur Circle 8.50
4 Celebretion of National festivals/State festivals in Vidyaranyapura sub division 0.50
Total 263.00

14
PROGRAMME OF WORKS FOR THE YEAR 2008-09
Yelahanka Division
Vidyaranyapura Sub Division
Circle: Kuvempunagara
Sl. Estimated Cost
Name of Works
No. (Rs. In Lakhs)
1 2 3
I. (Original Works)
A) Buildings
Construction of Ward office/Subdivision office building in Defence layout at
1 40.00
Vidyaranyapura Sub Division
B) Roads & Drains
Asphalting to cross roads and main roads of HMT 1st block to 6th block V.Pura
1 32.50
Sub Division
Asphalting to cross roads and main roads of BEL layout 1st and 5th block
2 24.00
V.Pura Sub Division
Estimate for Improvements asphalting to Main road and cross roads in
3 15.00
Narasipura 1st stage V.Pura Sub Division
Estimate for Improvements asphalting to Main road and cross roads in
4 15.00
Narasipura 2nd stage V.Pura Sub Division
Estimate for Improvements asphalting to Main road and cross roads in Balaji
5 15.00
Layout 1st and 2nd stage V.Pura Sub Division
Estimate for Improvements asphalting to Main road and cross roads in Vishnavi
6 10.00
Layout 1st and 2nd stage V.Pura Sub Division
Estimate for Improvements asphalting to Main road and cross roads in Srinidhi
7 10.00
Layout 1st and 2nd stage V.Pura Sub Division
Estimate for Improvements asphalting to Main road and cross roads in Techers
8 10.00
Layout V.Pura Sub Division
Estimate for Improvements asphalting to Main road and cross roads in
9 10.00
Ragavendra Layout V.Pura Sub Division
Estimate for Improvements asphalting to Main road and cross roads in M.S.Palya
10 10.00
1st and 2nd stage V.Pura Sub Division
Estimate for Improvements asphalting to Main road and cross roads in
11 10.00
Varadaraja Nagara 1st and 2nd stage V.Pura Sub Division
Estimate for Improvements asphalting to Main road and cross roads in
12 10.00
VinayakaNagara Bharath Nagara 1st and 2nd stage V.Pura Sub Division
Estimate for Improvements asphalting to Main road and cross roads in Singapura
13 10.00
1st and 2nd stage V.Pura Sub Division
Estimate for Improvements asphalting to Main road and cross roads in N.T.I
14 10.00
layout to M.S palya
C) Bridges & Culverts
Nil
D) Side Walks & Ducts
Nil
E) Concrete Road
Nil
F) Water Supply
G) Playground & Protection of BBMP Properties
Nil
II. (Maintenance Works)

15
A) Buildings
Nil
B) Roads & Drains
1 Demolition of Unauthorsied buildings/clearance in Vidyaranyapura Subdivision 2.00
Engaging Laboureres and tractors for daily maitainance of emergency works in
2 10.00
the jurisdiction of Vidyaranyapura Subdivision.
3 Repairs to Drains in Kuvempunagara Cross Roads 3.00
4 Repairs to Culverts in Diffence Layout 2.00
5 Patch repairs in Vidyaranyapura Subdivision 5.00
C) Water Supply
Nil
D) Maintenance of Under Ground Drainage
Nil
E) Flyover, Underpass & Grade Separators
Nil
IV. (Other Works)
A) Other Works
1 Providing garbage transit plant in Doddabommasandra Circle 1.50
2 Providing street sinage boards in Kuvempunagar Circle 3.00
Improvements and Geometrical Corrections of Junction at Vidyaranyapura
3 3.00
circle, in Kuvempunagara Circle
4 Celebretion of National festivals/State festivals in Vidyaranyapura sub division 1.00
Total 262.00
Zone Total 3290.00
BYTARAYANAPURA ZONE
PROVISIONAL BUDGETARY PROPOSAL PERTAINING TO 18%(CIVIL) WORKS FOR THE YEAR
A) 18% Programme
Construction of Low Cost Houses to SC / ST Beneficiaries in Amruthahalli
1 18.00
Circle Limit (6 Nos.) @ Rs. 3.00 Lakhs Per Unit
Construction of Toilets at Janatha Colony, Bangarappa Colony, Byatarayanapura
2 7.00
& Amruthahalli in Amruthahalli Circle Area
Improvements and Construction of Anganawadi Centres at Amruthahalli Circle
3 5.00
Area
Improvements and Construction of Class Rooms at Bangarappa Colony in
4 10.00
Amruthahalli Circle Area
Improvements and Construction of Community Centres in Amruthahalli Circle
5 7.00
Area
Improvements to Roads in Byatarayanapura, Janatha Colony, Bangarappa
6 25.00
Colony and Amruthahalli in Amruthahalli Circle Area
A) 18% Programme
Construction of Toilets at Thindlu A.K. Colony, Kodigehalli A.K. Colony
1 20.00
Maruthinagar, Saneevivinagar & B.B. Nagar in Sahakaranagar Circle Area
2 Improvements to the Existing Anganawadi Centre in Sahakaranagar Circle Area 7.00

Improvements to Schools and Construction of Compound Walls to Government


3 20.00
School in Kodigehalli & Kothi Hosahalli in Sahakaranagar Circle Area
Improvements to Roads in Thindlu A.K. Colony, Kodigehalli & B.B. Nagar in
4 25.00
Sahakaranagar Circle Area
A) 18% Programme
Construction of Low Cost Houses to SC / ST Beneficiaries in Dasarahallli Circle
1 30.00
Limit (10 Nos.) @ Rs. 3.00 Lakhs Per Unit

16
Construction of 2 Nos. of Community Toilets Each in Jakkur Layout &
2 7.00
Dasarahalli Colony in Dasarahalli Circle Limits
3 Construction of Anganawadi Centre in Hegdenagar, Dasarahalli Circle Limits 5.00
4 Construction of Class Room in Dasarahalli Circle Limits 5.00
Improvements and Construction of Community Centres in Dasarahalli Circle
5 10.00
Limits
Improvements to Roads in Jakkur Layout A.K. Colony of Dasarahalli Circle
6 15.00
Limit
A) 18% Programme
1 Balance Work of Basavalingappa Bhavan Nagawara in Nagawara Circle Limits 30.00
2 Construction of Toilets in Nagawara Circle Area 7.00
3 Improvements to the Existing Anganawadi Centres in Nagawara Circle Area 10.00
Construction of Community Centre at Basavalingappanagar in Nagawara Circle
4 20.00
Area
5 Improvements to Harijan Burial Ground at Nagawara in Nagawara Circle Area 5.00
A) 18% Programme
Construction of Low Cost Houses to SC / ST Beneficiaries in Kothanur Circle
1 21.00
Limit (7 Nos.) @ Rs. 3.00 Lakhs Per Unit
Construction of 2 Nos. of Community Toilets Each in Babusabpalya Colony,
2 7.00
Horamavu Janatha Colony in Kothanur Circle Limits
Improvements to the Existing Anganawadi Centres in Kothanur Circle Limits
3 and Construction of Anganawadi Centres in Chellkere & Kothanur in Kothanur 11.00
Circle Limits
4 Improvements and Construction of Class Rooms in Kothanur Circle Limits 10.00
Improvements and Construction of Community Centres at Chellkere, Horamavu
5 15.00
Agara & Nagareshwara Nagenahalli in Kothanur Circle Limits
6 Improvements to Roads in Babusabpalya Colony of Kothanur Circle Limit 8.00
A) 18% Programme
Acquring land for landless people in A - sector(Approximatly Rs 3.00 lakhs per
1 30.00
beneficiery)
Improvements to Roads and Drains in Slum Clearance Board Area in
2 21.00
Chikkabommasandra
3 Construction of Public Toilet block in Ambedkarnagar 9.00
A) 18% Programme
Construction of Houses For SC/ST In J P Nagara, AK,Colony, Puttanahalli,
30.00
1 Kenchenahalli for 10 beneficiers
Construction of Houses For SC/ST In MS Pallaya, Chikkabettahalli,
20.00
2 Dodabettahalli
3 Construction of concrete roads in SC/ST Colony kenchenahalli, Nagenahalli 10.00
A) 18% Programme
1 Construction of Samudaya bhavana in JP colony at Yelahanka 8.00
2 Construction of concrete roads in JP colony at Yelahanka 15.00
3 Construction of Community centre in AK colony at Yelahanka old town 7.00
Construction of houses beneficiaries at AK colony, AD colony, JP colony at
4 30.00
Yelahanka old town
III. (18% Programme )
Construction of new houses/Additions/Alterations etc for 10 beneficiers in
1 30.00
Agrahara, Kogilu, Katigenahalli
Providing concrete roads in SC/ST colony at Agrahara village, Srinivasapura
2 20.00
village

17
Construction of Community hall in Kogilu village, Ambedkar nagara in
3 10.00
Katigenahalli
A) 18% Programme
1 Construction of concrete roads in Doddabommasandra. 14.00
2 Construction of individval toilets/Common toilets 5.00
3 Construction of houses in SC /ST Coliony of Doddabommasandra circle 24.00
4 Construction of community centre/Anganavadi in Doddabommasandra 10.00
5 Construction of class rooms to the governament school in Doddabommasandra 7.00
A) 18% Programme
1 Construction of Community Hall/Anganavadi in Kuvempu nagara 5.00
2 Construction of concrete roads in Gangamma gudi area 15.00
3 Construction of houses in ST/SC colony in Kuvempu nagara 30.00
4 Construction of concrete roads in Singapura village 10.00
Total 720.00
PROGRAMME OF WORKS FOR THE YEAR 2008-09
EXECUTIVE ENGINEER (PROJECT )
ELECTRICAL
DIVISION: BYATARAYANAPURA
Sl. ESTIMATED COST
NAME OF WORK
NO (IN LAKHS)
1 4 5
I

A PROVIDING TUBULAR POLES & LINES TO PRAKRITI MEDOWS LANE. 2.00


Total 2.00

B INSTALLATIONS OF 12 MTR HI-MAST LIGHTS IN THINDLU CIRCLE,


BHADRAPPA LAYOUT ENTRANCE FROM RING ROAD CIRCLE 8.00
Total 8.00

NIL 0.00
C Total 0.00
II

OPERATION AND MAINTENANCE OF STREET LIGHTS UNDER


VIRUPAKSHAPURA SUB DIVISION AREAS - PACKAGE NO -1 22.00
A
OPERATION AND MAINTENANCE OF STREET LIGHTS UNDER
VIRUPAKSHAPURA SUB DIVISION AREAS- PACKAGE NO.II 22.00
Total 44.00

IMPROVEMENTS OF STREET LIGHTS IN COFFYBOARD LAY OUT 1 TO


4.00
8 MAIN
IMPROVEMENTS OF STREET LIGHTS IN SAHAKAR NAGAR ALL
4.00
BLOCK JUNCTIONS & CANARA BANK MAIN ROAD & CROSSES
IMPROVEMENTS OF STREET LIGHTS IN TATA NAGAR AREA 3.00
IMPROVEMENTS TO STREET LIGHTS IN VIRUPAKSHAPURA & MV
5.00
B LAYOUT 1 TO 11 MAINS & CROSSES
ELECTRICAL MAINTENANCE OF SCHOOLS, HOSPITALS & HOSTEL
4.00
BUILDINGS UNDER VIRUPAKSHPURA SUBDIVISION

18
ELECTRICAL MAINTENANCE OF PARKS COMING UNDER
4.00
BYATARAYANAPURA DIVISION
LIGHTING ARRANGEMENT FOR IMMERSION OF GANESHA IDOL IN
1.50
DIVISION LAKES
Total 25.50

IMPROVEMENTS OF STREET LIGHTS IN AMRATALLI & JANATA


COLONY 6.00
IMPROVEMENTS OF STREET LIGHTS IN KG NAGAR, BB NAGAR, KOTI
HOSAHALLI 6.00
C
IMPROVEMENTS OF STREET LIGHTS IN JAKKURU VILLAGE& AK
COLONY 7.00
PROVIDING STREET & LINES TO THE KEMPAPURA & JANATA
COLONY 6.00
Total 25.00
Sub Total 104.50
I

INSTALLATIONS OF NEW LINES AND STREET LIGHTS TO THE


HORAMAVU AGARA CIRCLE TO HENNURU MAIN ROAD 4.00
INSTALLATIONS OF NEW LINES AND STREET LIGHTS TO THE
KOTTANURU NARAYANPURA CIRCLE HEGDE NAGAR RASTROTHAN
A CIRCLE 4.00
INSTALLATIONS OF NEW LINES AND POLES FROM GEDDALHALLI
TO BAIRATI BANDE 20.00
PROVIDING TUBULAR POLES & LINES TO I STAGE 3RD BLOCK HBR
CREMETERY ROAD 2.00
Total 30.00

12 MTR HI-MAST INSTALLATIONS IN BDA COMPLEX HBR, SHIVAM


B
HOSPITAL CIRCLE 2ND BLOCK HBR, 8.00
Total 8.00

UPGRADATION OF STREET LIGHTS IN MEGHANAPALYA ROAD


FROM RING ROAD 2.50
UPGRADATION OF STREET LIGHTS IN CHELEKERE ROAD FROM
RING ROAD 2.50
UPGRADATION OF STREET LIGHTS IN BABUSA PALYA ROAD FROM
RING ROAD 2.50
UPGRADATION OF STREET LIGHTS IN HENNURU ROAD FROM RING
ROAD 2.00
UPGRADATION OF STREET LIGHTS IN BABUSA PLAYA NANJAPPA
GARDEN ROAD 3.00
UPGRADATION OF STREET LIGHTS FROM DASARAHALLI CIRCLE TO
BUVANESHWARI NAGAR MAIN ROAD 3.00
C Total 15.50

19
II

OPERATION AND MAINTENANCE OF STREET LIGHTS UNDER


THANISANDRA SUB DIVISION AREA PACKAGE - I 22.00
A
OPERATION AND MAINTENANCE OF STREET LIGHTS UNDER
THANISANDRA SUB DIVISION AREA PACKAGE - II 22.00
Total 44.00

IMPROVEMENTS OF STREET LIGHTS IN HBR STREETS & LANES 3.00


IMPROVEMENTS OF STREET LIGHTS IN DASARAHALLI I MAIN &
CROSSES 3.00
B IMPROVEMENTS OF STREET LIGHTS IN GEDDALA HALLI MAIN
ROAD & CROSS ROADS 4.00
IMPROVEMENTS OF STREET LIGHTS FROM 80 FEET ROAD TO
NAGARESHWAR NAGENALLI TO K.NARAYANPURA CIRCLE 2.4 KM
LENGTH 4.00
PROVIDING STREET & LINES TO THE HENNUR MAIN ROAD FROM
HORAMAVU AGAR CROSS TO THE GEDDALHALLI(SRINIVAS
TRADERS) 4.00
B IMPROVEMENTS OF STREET LIGHTS IN AMERJYOTI
L/O,ASHWATHNAGAR & SARAYI PLAYA LAY OUTS 4.00
ELECTRICAL MAINTENANCE OF SCHOOLS, HOSPITALS & HOSTEL
BUILDINGS UNDER THANISANDRA SUBDIVISION 4.00
Total 26.00

IMPROVEMENTS OF STREET LIGHTS IN HEGDE NAGARA STREET &


LANES 8.00
IMPROVEMENTS OF STREET LIGHTS IN BILISHIVALE & BAIRATI
MAINS & CROSS ROADS 10.00
C
IMPROVEMENTS OF STREET LIGHTS IN VADDAR PALYA,AK
COLONY ETC 4.00
Total 22.00
Sub Total 145.50
Grand Total (A) 250.00
DIVISION: YELAHANKA
Sl. ESTIMATED COST
NAME OF WORK
NO (IN LAKHS)
I

A INSTALLATIONS OF NEW LINES & LIGHTS TO ATTUR LAY OUT 6.00


Total 6.00

B NIL
Total

PROVIDING STREET LIGHTS & LINES IN NEW TOWN INDUSTRIAL


AREA 4.00
UPGRADATION OF STREET LIGHTS IN 'A'SECTOR YELAHANKA
NEWTOWN 4.00
UPGRADATION OF STREET LIGHTS IN 'B'SECTOR YELAHANKA
NEWTOWN 4.00
C Total 12.00

20
II

OPERATION & MAINTENANCE OF STREET LIGHTS IN YELAHANKA


UPANAGARA AREA PACKAGE – I 16.00
A
OPERATION & MAINTENANCE OF STREET LIGHTS IN YELAHANKA
UPANAGARA AREA PACKAGE - II 16.00
Total 32.00

ELECTRICAL MAINTENANCE OF PARKS COMING UNDER


YELAHANKA SUBDIVISION 3.00

B ELECTRICAL MAINTENANCE OF SCHOOLS, HOSPITALS & HOSTEL


BUILDINGS UNDER YELAHANKA NEWTOWN SUBDIVISION 5.00
LIGHTING ARRANGEMENT FOR IMMERSION OF GANESHA IDOL IN
YELAHANKA DIVISION LAKE 2.00
Total 10.00

C IMPROVEMENTS OF STREET LIGHTS IN ATTURU VILLAGE 5.00


Total 0.00
Sub Total 65.00
I

PROVIDING TUBULAR ELECTRICAL POLES & STREET LIGHTS FROM


8.00
KEMPEGOWDA CIRCLE TO YELAHANKA BUS STOP.
INSTALLATIONS OF NEW POLES & STREET LIGHTS FROM 8.00
A KATTIGENALLI CROSS TO RING ROAD SIGNAL OF KOGILU ROAD
INSTALLATION OF NEW CONTROL LINES & SWITCHES IN
KATTIGENALLI VILLAGE AREAS LIKE CHAKKANALLI,VINAYAK 8.00
NAGAR DWARAKANAGAR,THIRUMENALLI
Total 16.00

B NIL -
Total -

PROVIDING STREET LIGHTS IN YELAHANKA OLD TOWN AREA 6.00


C Total 6.00
II

OPERATION & MAINTENANCE OF STREET LIGHTS IN MARUTHI


A NAGARA SUB DIVISION AREA PACKAGE – I 25.00
Total 25.00

IMPROVEMENTS OF STREET LIGHTS IN MARUTINAGAR 1 TO 3


8.00
MAINS & CROSSES
IMPROVEMENTS OF STREET LIGHTS IN JUDICIAL LAY OUTS &
8.00
ALLALSANDRA AREA
B
IMPROVEMENTS OF STREET LIGHTS IN GANTIGANALLI MAIN ROAD
7.00
& ALL CROSSES
ELECTRICAL MAINTENANCE OF SCHOOLS, HOSPITALS & HOSTEL
5.00
BUILDINGS UNDER MARUTINAGARA SUBDIVISION
Total 28.00

21
PROVIDING STREET LIGHTS, ELECTRIFICATION NEAR KOGILU
C
LAYOUT NEAR COLONY 8.00
Total 8.00
Sub Total 83.00

INSTALLATION OF NEW CONTROL LINES IN KUVEMPU NAGAR


A
AREA 3.00
Total 3.00

12 MTR HI-MAST INSTALLATIONS IN SINGAPURA CIRCLE,NANJAPPA


B
CIRCLE 8.00
Total 8.00

NIL -
C Total -
II

OPERATION & MAINTENANCE OF STREET LIGHTS IN


A
VIDYARANYAPURA SUB DIVISION AREA PACKAGE – I 25.00
Total 25.00

IMPROVEMENTS OF STREET LIGHTS IN CHAMUNDESHWARI L/O 1 TO


5.00
10 CROSSES & MAINS
IMPROVEMENTS OF STREET LIGHTS IN HMT LAY OUTS 1 TO 6
6.00
BLOCK MAIN & CROSSES
IMPROVEMENTS OF STREET LIGHTS IN AMS LAYOUT 1 TO 4 MAINS
4.00
& CROSSES
IMPROVEMENTS OF STREET LIGHTS IN LAKSHMIPURA &
5.00
B DODDABETTALLI MAIN ROAD
PROVIDING AND FIXING OF SODIUM VAPOUR LIGHTS AT SINGAPUR
MAIN ROAD FROM AIRFORCE OFFICE GATE TO SINGAPUR CIRCLE 7
TO MS PALYA CIRCLE
ELECTRICAL MAINTENANCE OF SCHOOLS, HOSPITALS & HOSTEL
5
BUILDINGS UNDER VIDYARANYAPURA SUBDIVISION
IMPROVEMENTS OF STREET LIGHTS IN BEL 1 TO 6 BLOCK MAIN
4.00
ROADS & CROSSES
Total 36.00

IMPROVEMENTS OF STREET LIGHTS IN SINGAPURA OLD VILLAGE


11.00
VARADARAJANAGARA, VINAYAKA NAGAR
IMPROVEMENTS OF STREET LIGHTS IN MS PALYA & SRINIDHI
8.00
C LAYOUT CROSS ROADS & GRAM THANA AREA.
IMPROVEMENTS OF STREET LIGHTS IN RAMACHANDRAPURA L/O &
11.00
MAINS & AK COLONY
Total 30.00
Sub Total 102.00
Grand Total (B) 250.00

Grand Zone Total 4510.00

22
MAHADEVAPURA ZONE
PROGRAMME OF WORKS (POW) 2008-09 Marathhalli division
( WORK PROPOSED FOR 2008-09)
Sl No Name of Work Estimate Cost
1 Development and asphalting to main road, Devarabisanahalli 58.00
2 Development of road from Yamalur tank waste wier to Kareyammana Agrahara 25.00

3 Improvements of Belendur tank bund road 6.00


4 Development of Tulasi Theater road at Marathahalli 10.00
5 Improvements to road from ring road to Munekolala village via S.J.R. College 50.00

6 Improvements to road from HAL compound to Belendur Kere kodi 25.00


7 Improvements to road from Samudaya Bhavana to Basava Nagara main road 50.00
(Vibhuthipura main road)
8 Improvements to road from Varthur road to Eshwara Temple at Marathahalli 20.00
(Chowdeshwari Temple road)
9 Improvements to road from Vignanagara main road from Kaggadasapura main 65.00
road to Basavanagara Bus stand
10 Improvements to Ramesh Nagara main road 10.00
11 Developments to Jagadish Nagara main road 25.00
12 Improvements to Abbayya reddy layout main road 15.00
13 Improvements to roads and drains at Vinayaka Nagara 17.00
14 Improvements to roads and drains at Veerabhadra Nagar and Thalakaveri 15.00
Nagara)
15 Improvements to roads and drains at Annasandrapalya 10.00
16 Development of Marathahalli, Sanjaya Nagara loop road 15.00
17 Development of Jagadish Nagara to Jyothi Nagara loop 10.00
18 Improvements to Ashwath Nagara cross roads 10.00
19 Construction of RCC rain water drain lead up to SWD in Kalappa layout main 10.65
road
20 Providing and laying Asphalting of Yamalur to Kempapura road 20.00
21 Providing RCC drain at Kere kodi S.T.P. to Railway track at Panathur 15.00
22 Providing and Construction of road divider and footpath walk –way at Kundala 10.00
halli Gate Circle (Marathahalli Varthur main road )
23 Improvements to roads and drains at Islampura 10.00

24 Improvements to roads and drains at L.B.Shastri Nagara 10.00


25 Improvements to roads and drains at Shivananda Nagara 8.00
26 Construction of RCC drain at Near Sree Rama Temple at Panathur main road 4.00
27 Construction of Star motor drain from BWSSB treatment plan to K.C. valve 20.00
28 Construction of RCC culverts and drain at Boganahalli road 6.00
29 Improvements to roads and drains at P.R. Layout 10.00

1 Providing side walks to Yamalur main road 15.00


1 Providing Barbad wire fencing to Yamalur Burrial ground 5.00
2 Providing Barbad wire fencing to Challagatta Burrial ground 3.00
3 Providing Barbad wire fencing to Ashwath Nagar Burrial ground 3.00
4 Providing Barbad wire fencing to Panathur Burrial ground 5.00

23
Sl. No. Maintainance Works

1 Repairs and maintance to Samudhaya Bhavana at Yamalur 1.00


2 Repairs and maintance to Samudhaya Bhavana at B.Nagasandra 1.00
3 Repairs and maintance to Aganawadi Building at Devarabisanahalli 0.60

4 Repairs and maintance to Govt Higher Primary School at Marathahalli 1.00


5 Repairs and maintance to Govt Higher Primary School at Challaghatta 1.00
6 Repairs and maintance to Govt Higher Primary School at Annasandrapalya 1.00
7 Repairs and maintance to Govt Higher Primary School at Vibhuthipura 1.00

8 Repairs and maintance to Govt Higher Primary School at Islampura 1.00


9 Repairs and maintance to Govt Higher Primary School at Devarabisanahalli 1.00
10 Repairs and maintance to Govt Primary School at Balagere 1.00
1 Desilting of Tresery drains at HAL Area 5.00
2 Desilting of Tesery drains at Marathahalli Area 5.00
3 Desilting of Tesery drains at Panathur Area 3.00
4 Engaging road Gang and Tractor at HAL Area 2.00
5 Engaging road Gang and Tractor at Marthahalli Area 2.00
6 Engaging road Gang and Tractor at Panathur Area 2.00
7 Depo Collection of metal and gravel for pot hole filling at Marathahalli Sub- 5.00
division
8 Prahari maintanece in emergency 6.00
9 For unuthorised building demolition 4.00
1 Providing Sighn boards for BBMP works progress and divertion of roads at 6.00
Marathahalli sub-division
2 Providing and fixing sighn boards at Street/roads at Marathahalli sub-division 10.00
Area
Sub Total 650.25
Mahadevapura Sub-division,
I. Original Works
Sl No Name of the Work Est.Cost
A.Building works - Nil
B. Construction of Roads and drains
1 Construction Main roads and cross roads in Pai layout 30.00
2 Construction of drain beside of Selam railway track upto Rajakaluve in Pai 29.00
layout.
3 Construction of road from Anugraha layout main road to Ring road (via 15.00
Swarnadhama layout)
4 Construction of road from Doddanekundhi Railway track to Marathally main 20.00
road
5 Construction of road and drains in Hemanthanagara and Anandanagara of 20.00
Chinnappanahally
6 Construction of the RCC drain in Doddanekundhi Village 15.00
7 Construction of RCC drain and road in Ramanjaneya layout of Chinnappanahally 20.00

8 Construction of RCC drain and road in Chinnappanahally Village 15.00

9 Construction of the road from Garudacharpalya to RHB Colony 10.00


10 Construction of the road in Ramakka layout 10.00
11 Construction of the RCC drain in main road of Mahadevapura village 15.00
12 Widenting and Construction of the Hoody main road from ITPL main road to 30.00
Hoody railway gate

24
13 Construction of cross roads and drains in Hoddy village 10.00
14 Construction of the RCC drain and road in Nagappa layout and Sitaramapalya in 20.00
Basavannanagara
15 Construction of roads and drains of Singaianapalya main roads 20.00
16 Construction of main roads and cross roads in Industrial area Singainapalya 20.00
17 Construction of road and drain in SRR layout and KGF Munireddy layout 20.00
18 Construction of road and drain in Baddi Krishnappa layout 20.00
339.00
Sl No Name of the Work Est.Cost
C. Culverts and Bridges
1 Construction of RCC culverts in Garudacharpalya and RHB Colony 5.00
2 Construction of RCC culverts in Mahadevapura village and Layout. 3.00
3 Construction of RCC culverts in cross road of Hoody village and Thigarapalya 3.00
4 Construction of RCC culverts in cross road of Kaverinagara 3.00

5 Construction of RCC culverts in cross road of Udayanagara 2.00


6 Construction of RCC culverts in cross road of A.Narayanapura 2.00
18.00
D. Side walks and Ducts - Nil -
E. Cement Concrete Roads – Nil -
F. Water Supply Nil -
G. Fencing of Play ground and BBMP Assets
1 Fencing of Burrial ground in Singaiana palaya 2.00
2 Fencing of Burrial ground in B.Narayanapura 2.00
4.00
II. Maintenance Works
Sl No Name of the Work Est.Cost
A. Buildings
1 Repairs and maintenance of Samudaya Bhavana inA.Narayanapura 1.00
2 Repairs and maintenance of Anganavadi Building in Kundalahallly 1.00
3 Repairs and maintenance of Anganavadi B uilding in Chinnappanahally 1.00
4 Repairs and Annual maintenance of Anganavadi Building in Garudacharpalya 1.00
5 Repairs and Annual maintenance of Samudaya Bhavana and Anganavadi in 2.00
Kaverinagara
6 Annual Maintenance of the Mahadevapura Range office and sub-division office 10.00

7 Repairs and maintenance of Anganavadi Building in Andhra colony 1.00


17.00
B. Maintenance of Roads and drains
1 Asphalting of main road from A.Narayanapura main road from New light to 75.00
DRDO Compound.
2 Asphalting of main road of AECS layout and ABC Block of Kundalahally 50.00
3 Engaging of road gange labours and hireing of tractor for maintenance of roads 15.00
and drains in Mahadevapura sub-division
4 Asphalting of main and cross roads in Mahadevapura Village 35.00
5 Asphalting of main and cross roads in Hoody Village 30.00
6 Improvements of roads and drains in Baddi Krishnappa layout and Gangamma 10.00
Layout
215.00

25
C. Side walk and ducts - Nil
D. Water supply and Underground drainage
1 Maintenance of UGD line in MEG layout 2.00
2 Maintenance of UGD line in AECS layout Kundalahally 5.00
3 Maintenance of UGD line in Singaina playa and Industrical area 8.00
15.00
E. Subways, Fly overs, and drains under pass - Nil
F. Other works
1 Construction of Welcome arch at Entrance of Mahadevapura Zonal office 4.00
2 Desilting of drains in Mahadevapura Sub-division area 10.00
3 Construction of Vehicles Shed in Mahadevapura Zonal Office 10.00
4 Providing and fixing of Sign boards in Mahadevapura Sub-division area 8.00
32.00
Sub Total 425.00
MAHADEVAPURA ZONE, WHITEFIELD SUB-DIVISION
I. Original Works
Sl.No Name of the Work Est. Cost
A. Build
Works Nil Nill

1 Construction of roads and drains of Edga road, Chowdeshwari road and 30.00
Vinayaka layout and Halasahally road
2 Construction of roads and drains in Madhuranagara Village 26.00
3 Construction of roads and drains Vinayaka layout, Bairappa layout of Whitefield 10.00

4 Construction of roads and drains in Ward No. 19 Kadugodi 20.00


5 Construction of roads and drains in Kodigehalli Village 30.00
6 Construction of main road and cross roads in Vijayanagara 25.00
7 Construction of main road and cross roads in Immadhihalli 15.00
8 Construction of main road and cross roads in Hagaduru 15.00

9 Construction of main road and cross roads &Tubarahalli playa main road, 25.00
Tubarahalli Village
10 Construction of main road and cross roads in Siddapura 40.00
11 Construction of main road and cross roads in Ramgondanahalli 20.00
12 Construction of roads and drains from Siddapura gate to Nellurahalli 40.00
13 Construction of Burrial ground Compound wall in Vijaynagar 15.00
14 Construction of Compound wall to BBMP land at Amedkar gutta 10.00
15 Construction of main road and cross roads and drains at Karumariyamma temple 10.00
road
16 Construction of RCC Covering slab and drain improvement at Inner circle and 6.00
other circle
337.00

1 Construction of RCC culverts in Madhuranagara 5.00


2 Construction of RCC culverts and cross roads in Kadugodi Village 5.00
3 Construction of RCC culverts in Gandhipura cross roads 5.00
4 Construction of RCC culverts between Ramgondanahalli main road to 5.00
Narayanapura road
5 Construction of RCC culverts and drain improvement in Post office road 3.00
Whitefield
23.00

26
Nil ----

1 Construction cement concrete road in Bairappa layout 5.00


2 Construction cement concrete road in Gandhipura 5.00
3 Construction cement concrete road in Ramgondanahalli village 20.00
4 Construction cement concrete road in Gunjur playa (Jogi colony) 20.00
50.00
F. Water Supply Nil

1 Fencing of vacant land in Siddapura Gate 1.50


2 Fencing of vacant land in Hosahalli 1.50
3 Fencing of government land in Ambedkar gutta 2.00
5.00
II. Maintenance Works

Sl.No Name of the Work Est. Cost


A. Buildings
1 Repairs and Annual Maintenance of Anganavadi Buildings in Beltur and Beltur 2.00
Colony
2 Repairs and Annual Maintenance of Anganavadi Buildings in Varthur village 2.00
3 Repairs and Annual Maintenance of Anganavadi Buildings in Pattanduru 1.00
agrahara
5.00
B. Maintenance of Roads and drains
1 Asphalting of main road and cross road Prashanth Layout 30.00
2 Asphalting of cross roads in Inner Circle and Outer 30.00
3 Asphalting of main roads & cross road in BEML Layout and Tubarahalli 50.00
4 Asphalting of main and cross roads in Kumbena Agrahara and Sadaramangala 30.00
Village
5 Asphalting of main and cross roads in IInd main and IIIrd main of Gandhipura 25.00
6 Asphalting of main and cross roads Maithry layout 29.00
7 Engaging of road gange labours and hireing of tractor for maintenance of roads 10.00
and drains in Whitefield Sub-Division
204.00
C. Side walk and ducts
Nil ----
D. Water supply and Underground drainage
Nil --

Nil ----
F. Other works
1 Providing and fixing of Sign boards in Whitefield Sub-Division 10.00
2 Desilting of drains in Whitefield Sub-Division area 10.00
3 Engaging Prahari equpments and mechanaries and labours 6.00
4 Enforcement charges for demolistion of unauthorised constructions in BBMP 5.00
lands
31.00
MAHADEVAPURA ZONE, KR PURAM SUB-DIVISION
656.00
1 Samparka Kendra at K.R.Puram
Construction of temporary garbage handling plat form at near BWSSB
2 Treatment plant K.R.Puam 10.00

27
Pipe Line
Providing pipe line for ducting NH-4 Bhattarahalli to Anandapura via
3 T.C.Palya 25.00

4 Providing pipe line for ducting NH-4 to Hoodi Railway gate ( Shanthi Nagar ) 25.00
5 Providing pipe line for ducting NH-4 to Bhattarahalli G.C.C. College 19.00
Providing pipe line for ducting NH-4 Ayyappa Nagar Circle via Chikka
6 Basavanapura 19.00
7 Traffic development works 10.00
8 Providing of signage Boards at K.R.Puram Sub-Division Area 6.00
9 Protection of BBMP Property with Barbed wire / Chain link fencing 15.00
Providing of Tractor & Gangmen for Help centre in K.R Puram Sub-Division
10 Limits 20.00
11 Demolition of unauthorised & Enchroached structures 5.00
12 Toilet blocks & removal of night soil in soak pits in Govt office 1.00
Prahari arrangement in emergency 6.00
Demolition of unauthorised & Enchroached structures 6.00
Roads
Providing Metalling & Construction of Culverts at Thippaiah Layout Krishna
13 Nagar 7.00
14 Metalling & Asphalting to Masjid road in Devasandra 20.00
Construction of SSM drains to the road from Hoodi Burrial Ground to
15 Ayyappa Nagar 22.00
Providing SSM Drain & Metalling and Construction of Culvert
16 Shanimahathama Temple road in Devasandra 18.00
Metalling and Construction of Culvert in Vijaya Bank Colony & Krishna
17 Nagar 20.00
Providing SSM Drain at down Streem side at waste weir Chikka Basavanapura
18 Over Head Tank 5.00
19 Metalling and Construction of Culvert in Gayathri Layout 2nd Stage 15.00
20 Metalling and Construction of Culvert in Ekthanagar 5th Cross Road 10.00
Providing Metalling and Construction of Culvert in Lakshmipura Layout in
21 Devasandra 5.00
Providing Metalling and Construction of Culvert in Manjunatha ayout in
22 Devasandra 15.00

23 Providing Metalling and Construction of Culvert in R.R.Temple Area road 20.00


Providing Metalling and Construction of Culvert in R.R.Layout &
24 Muneshwara Layout 12.00
25 Providing Metalling and Construction of Culvert in Priyadarshini Layout 10.00
26 Widening of T.C.Palya Main road ( Balance length ) 60.00

27 Providing roads & drains From K.R.Puram to T.C.Palya ( Balance length ) 30.00
Providing roads & drains From Manjunath Layout Sunshine Layout of
28 Anandapura 15.00
29 Providing roads & drains of Venkateshwara Tent Road ( Balance length ) 15.00
30 Providing roads & drains of ITI Compound to Anandapura Road 25.00
Providing Drainages formation of road metalling & Asphalting at
31 Shanthinikethan & Adjecent Layout 35.00
32 Providing Asphalting to road from NH4 to Medahalli Border ( ) 15.00
33 Providing Metalling & Asphalting to road and drain in Vinayaka Nagar 20.00

28
34 Providing Metalling & Asphalting to Nrupathunga road in Bhattarahalli 25.00
35 Providing Asphalting to roads at Banashankri Layout 25.00
36 Providing Metalling & Asphalting to roads at Bhattarahalli Village limits 25.00
37 Providing Metalling to roads at Medahalli Village limits 20.00
Sub Total 656.00

MAHADEVAPURA ZONE, RAMAMURTHYNAGAR SUB-DIVISION


S.No Name of Work Amt in lakhs
(a) Building Works
1 Construction of Library Building at kalkere 3.00
Total Rs 3.00
(b)Roads and Drains
Improvements and Asphalting to vivekananda road From R.M.Nagara main road
1 to Shanthilayout road in Ramamurthynagara 25.00
Improvements and Asphalting to Khrishthaking school road,Kamadenu road in
2 Ramamurthynagara 20.00
Improvements to roads at Sir M.V.Nagar 1st block and 2nd blockin
3 Ramamurthynagara 35.00
Improvements and Asphalting to Ghandiji road and Lakshmi theater road and
4 upto Balaji street road and cross roads in Ramamurthynagara 40.00

Improvements and Asphalting to Muninanjappa layout and yerraiahnapalya main


5 road and garden street and Piramid Show room road in Ramamurthynagara 30.00
Improvements to Roads and drains from Shanthi layout to Yoginarayana
6 Ashrama in R.M.Nagara. 30.00
Construction of drains, culverts and Improvements to roads at Kotthur main road
7 and cross roads in Vijinapura 15.00
Improvements and Asphalting to roads and drains at I.T.I Layout main road and
8 cross roads in Vijinapura 10.00

9 Improvements to roads and drains at O.H.T.Area and A.& B.blocks in Vijinapura 15.00
Improvements to roads and drains at chinnappa layout and sheshappa colony
10 roads and opp-F.C.I.main road in Vijinapura 14.00

11 Improvements to roads and drains at S.P.Naidu layout cross roads in Vijinapura 20.00
Improvements and Asphalting to roads and drains at kuvempunagara and
12 R.R.Layout roads in Vijinapura 10.00
Improvements and Asphalting to roads and drains at Chandrashekara Layout
13 roads in Vijinapura 10.00
Improvements and Asphalting to roads at Brundavanlayout and old kotthur area
14 in Vijinapura 20.00
Construction of culverts,drains and Improvements to mother Theresa school
15 main road of varanasi. 15.00
16 Improvements to roads and drains from kanakanagara to k.channasandra 10.00
Improvements and Asphalting to Horamavu main road from outer ring road to
17 horamavu border 98.00
Improvements and Asphalting to Kalkere main road via N.R.I Layout in
18 Horamavu 30.00
Providing drains and culverts and Improvements to Shakthi nagara main road
19 and cross roads in Horamavu. 10.00

29
Providing Hume pipe culverts and Improvements and Asphalting to roads ,drains
at babusabpalya main road (V.V.Choultry road) and cross roads at
20 Kalyananagara H.R.B.R.layout 35.00
Total Rs 492.00
(c) Protection of B.B.M.P.Property (Capital works )
Providing B.S. slab Compound wall to Existing Govt land near Horamavu
1 Jayanthigrama. 9.00
Providing B.S. slab Compound wall to Existing burial ground near Horamavu
2 lake in Jayanthi grama 6.00
Total Rs 15.00
(d) Building Works ( Maintenance Works )
1 Annual Maintenance and Repairs of Community halls(4nos) at R.M.Nagara 0.50
Annual Maintenance and Repairs,Painting of Horamavu office buiding &
2 kalkere commercials shops buiding 0.50
Total Rs 1.00
(e) Capital works (Other Works )
1 Construction of Garbage center and Handling of Garbage 10.00
Providing Pipe Line to ducting main roads and cross roads in R.M.Nagar sub
2 division 93.00
3 Providing Sign Boards, Banners and Flex boards, Caution boards, 6.00
Dismantling of Buildings and Compounds,Sheds, Enchroachment of footpaths
4 R,M,Nagara sub-Division 6.00
5 Providing Gangmens and tractor in R,M,Nagara Area 5.00
6 Providing Gangmens and tractor in Vijinapura Area 5.00
7 Providing Gangmens and tractor in Horamavu Area 5.00
Hiring of J.C.B/Troctor/Gangmans/ machenories For flood Damage works and
8 Emergency works 2.00
9 Traffic Develovpemental works for Barricading,shoulders, medians. 10.00
10 IIIumination on special occasion in R.M.Nagara sub division 1.00
Prahari arrangement in emergency 6.00
Total Rs 149.00
Total 3046.25
MAHADEVAPURA ZONE
PROVISIONAL BUDGETARY PROPOSAL PERTAINING TO 18%(CIVIL) WORKS FOR THE YEAR

Estimated
Name of work Cost in (Lakhs)
1 Rehabiliatation works 72.00
2 Construction of Anganawadi Centre at Seegehalli in K.R Puram 12.00
3 Construction of Anganawadi Centre at Bhattarahalli in K.R Puram 12.00
4 Construction of Class rooms at Seegehalli in K.R Puram 7.00
5 Construction of Class rooms at Bhattarahalli in K.R Puram 7.00
6 Construction of cement concrete road at Jyothi Nagar in K.R.Puram 8.00
7 Construction of cement concrete road at Parvathi Nagar in K.R.Puram 8.00

8 Construction of cement concrete road at Chikka Basavanapura in K.R.Puram 4.00


9 Construction Community Hall at Priyanka nagar 14.00
10 Construction of Community Center in Kaverinagara 5.00
11 Construction of School building at Kaverinagara 20.00
12 Purchasing of land for rehabitation of SC & STs 72.00
13 Construction individual Toilet for SC, STs 14.00
14 Construction of the Cement Concrete road in A.Narayanapura old village 8.00

30
15 Construction of the Cement Concrete road in Kaverinagara 5.00
Construction of the Cement Concrete road and drain in A.K.Colony of 8.00
16 Doddanekundhi
Construction of the Cement Concrete road and drain in A.K.Colony of 4.00
17 Singainapalya
18 Developments of road in A.K.Colony of Hoody Village. 9.00
19 Reserved for purchase of land Rehabilition of S.C., S.T Houses 72.00
20 Upgradation of Sulab Sowchalaya at Ambedkar Nagara (Jagadish Nagara) 5.00
21 Construction of Sulab Sowchalaya at Devarabisanahalli 8.00
22 Repairs to Aganwadi Centres at Balagere Village 1.00
23 Construction of Aganwadi Centres at Vibhuthipura 4.00
24 Construction of Aganwadi Centres at Kadubisanahalli 4.00
25 Construction of Aganwadi Centres at B.Nagasandra 4.00
Major repairs to Nallurpura Govt. School Building (Jagadesh Nagar) main road 5.00
26
27 Repairs & maintance of Govt. School 1.50
28 Repairs & maintance of Govt. School building at Devarabisanahalli 1.00
29 Repairs & maintance of Govt. School building at Kadubisanahalli 1.00
30 Repairs & maintance of Govt. School building at Sanjay Nagar 1.50
31 Repairs & maintance of Samudhaya Bhavana at Devarabisanahalli 1.00
32 Repairs & maintance of Samudhaya Bhavana at Vibhuthipura 1.50
33 Repairs & maintance of Samudhaya Bhavana at B.Nagasandra 2.00
34 Repairs & maintance of Samudhaya Bhavana at Munekolalu 2.00
Construction and Improvements to Samudhaya Bhavana at Manjunatha Nagara 6.00
35
36 Repairs & maintance of Samudhaya Bhavana at Kadubisanahalli 1.50
Providing Concrete roads at Kadubisanahalli S.C. Colony ( 1st and 2nd Cross
37 roads)
st nd 8.00
38 Providing Concrete roads at Kadubisanahalli S.C. Colony ( 1 and 2 Cross road
39 Providing Concrete roads at Vibhuthipura S.C. Colony 7.00
40 Providing Concrete roads at Manjunatha Nagara Cross roads 7.00
Construction of Additional class rooms to Existing Primary and higer Primery
41 School building at Ambedkarnagar in R.M.Nagara. 12.50
42 Repairs to Primery scholl building at Jayanthigrama of Horamavu 1.50
43 Purchase of land for Rehabitations 72.00
44 Construction and repairs of Anganawadi centers 10.00
Construction of Community halls in Horamavu Jayanthigrama of R.M.Nagara
45 Sub-Division 14.00

46 Providing cement concrete road to Ambedkarnagar cross roads in R.M.Nagara 14.00


47 Providing cement concrete road to Ambedkarnagar cross roads in vijinapura 10.00
Providing cement concrete road to kalkere & Horamavu S.C/S.T. colony cross
48 roads in R.M.Nagara 6.00
49 Purchasing of land for rehabitation of SC & ST peoples 72.00
50 Construction of individual toilets for SC & ST 14.00
51 Construction of School building at Ambedkar Gutta 14.00
52 Construction of Aganawadi building at Tubarahalli Colony 5.00
53 Construction of Aganawadi building at Gandhipura 5.00
54 Construction of the drains in Harijana Colony in Gunjur Palya 10.00
55 Construction of the road & drain in Pattandur Agrahara colony 10.00
56 Construction of the Cement concrete road in Tubarahally Colony 15.00
Total 718.00

31
ELECTRICAL
MAHADEVAPURA
Sl. Name of Work Estimate Cost
No

1 Providing New street light fittings in HAL Area 15.00


2 Providing New street light fittings in Marathahalli Area 15.00
3 Providing New street light fittings in Panathur & Bellendur Panchayat Area 15.00
4 Shifiting of Electric poles at existing lines in Marathahalli Area 5.00
5 Replacement of U.G Cable and New poles at New lines in Marathahalli Area 10.00
6 Instalation of Himast street light 10.00
1 Operation and Maintances of street light fittings in Marathahalli Sub-division 30.00
Area
Mahadevapura Sub-division,
1. Original works
a. New lines Street lights (Extension of street lights and Providing of new Electric 6.00
poles and new fittings)
b. Replacement of UG Cable and repair of Street light of MS Pole from 10.00
Doddanekundhi road to Marathahally road
c. Providing and laying UG Cable and Street light from KAIDB main road to 25.00
Rayan School
d. Repairs and replacing of UG cables and street light of MS Poles of 10.00
Chinnappanahally main road
51.00
e. Providing and fixing Highmast light (10 to 16 mtr)
1. Garudacharpalya Circle 1 no 4.00
2. Mahadevapura 1 no 4.00
3. Chinnappanahally 1 no 4.00
12.00
f. Up gradation -
2. Operation and Maintenance
a. Operations and Maintenance of street light fittings 40.00
b. Providing street light fittings - Sodium fittings 10.00
c. Building electrical Management 0.50
d. Illumination on special occasion 1.00
51.50
MAHADEVAPURA ZONE, WHITEFIELD SUB-DIVISION
Sl.No Name of the Work Est. Cost
1. Original Works
a. Supply and fixing of Street ligths in Whitefield Sub-Division area 30.00
b. Replacement of UG Cable and related works for MS pole streetligths in Sai 20.00
Asharama to Sadaramangala, GE road, Borewell road, Nallurahalli, Ambedkar
Gutta, Hagaduru, ECC road, Vijaynagara, Immdhihalli & Kadugodi
c. Installation Of Himasts In whitefield subdivision 10.00
d. Shifting of poles and BESCOM deposit in Whitefield Sub-Division 5.00
e Emergency works in whitefield Subdivision 2.00
67.00
2. Operation and Maintenance
a. Operations and Maintenance of Street light fittings 32.00
b. Maintenance of building and other electrical installations in Whitefield sub 1.00
division
33.00

32
K.R.Puram Sub-Division Mahadevapura Zone Bangalore
Electrical Work
pital WorSupply and fixing of streetlights in K R Pura sub division. 20.00
Supply and replacement of streetlight fittings in K R Pura sub division. 5.00
Building electrification improvement works in K R Pura sub division. 1.00
Pole Shifting and Bescom Deposits in K.R Puram sub division 5.00
Installation of hi-masts in K R Pura Sub-division 12.00
Cable replacement works for MS Pole streetlights in Seegehalli to Bhattarahalli 8.00
and Seegehalli to Kodige halli main road
Cable replacement works for MS Pole streetlights in Ayappa Nagara to Bhattara 7.00
halli and Ayappa Nagara to Devasandra Main road
Emergency works in K.R Puram sub division 2.00
aintainan Operation and Maintenance of Street lights in K R Pura Sub-division 38.00
Maintenance of building and other electrical installations in K.R Puram sub 2.00
division
Sub-Total 100.00
Ramamurthynagara Subdivision
Capital works
1 Supply and fixing of streetlights in Rammurthi Nagara sub division. 30.00
2 Supply and replacement of streetlight fittings 5.00
3 Building electrification improvement works 1.00
4 Pole Shifting and Bescom Deposits in Rammurthi Nagara sub division 5.00
5 Installation of hi-masts in Rammurthi Nagara Sub-division 12.00
6 Cable replacement works for MS Pole streetlights in Akshya Nagar to Koshi 5.00
Hospital Road.
7 Cable replacement works for MS Pole streetlights in Rammurthy Nagar Main 5.00
road and Naidu Layout roads.
8 Emergency works in Rammurthi Nagara sub division 2.00
Maintenance Works
9 Operation and Maintenance of Street lights in Rammurthi Nagara sub division. 33.00

10 Maintenance of building and other electrical installations in Rammurthi Nagara 2.00


sub division
Total 100.00
Sub Total 514.50
Grand Total 4500.00

33
Bruhath Bangalore Mahanagar Palike
BOMMANAHALLI ZONE
PROGRAMME OF WORKS (POW) 2008-09
( WORK PROPOSED FOR 2008-09)
Sl No Name of work Estimate cost (in lakhs)
CAPITAL WORKS
1 Construction of compound wall to Burial ground at Bellandur village 15.00
2 Construction of HSR Sub Division Bldg at HSR Layout 30.00
Construction of School Buildings at Arakere BDA Road Near Vyshya Bank
3 15.00
Circle
4 Construction of School Rooms at Weavers Calony Gottigere 15.00
5 Construction of Puttenahalli sub divisional Office 30.00
6 Construction of Ward Office in the place of Konanakunte Panchayathi Office. 30.00
Total 135.00
Providing 4 culverts , metaling the remaining 2 cross roads and asphalting to
1 60.00
roads of Green Glen Layout in Bellandur village.
Providing metaling, asphalting to road near Ramesh redy house, Yallamma and
2 30.00
Munireddy house, road in Bellandur village.
Providing side Drain , construction of culverts ,Metaling and Asphalting to road
3 from ring road to Munireddy house , sunrise villa road and Pearl apartment road 40.00
in Bellandur village.
Providing cement concrete to lane roads from Sweet well water road to Angala
4 10.00
Parameshwari temple in Bellandur village
Providing side drain, culvert, metaling and asphalting to road from Ring road to
5 20.00
Janaradhana Reddy house in Bellandur village
Providing side Drain , construction of culverts ,and metaling , Asphalting in
6 Ambalipura Janajiva apartment road and Bekary road and 2 cross road at 30.00
Amblipura village
Providing drain, culvert and foot path paving , kerb stones to the road from outer
7 80.00
ring road to shahi garments at Ambalipura.
Providing and refixing side Drains , construction of culverts ,Metaling ,
8 Asphalting to transformer factory road and two adjacent roads in Sarjapura road 25.00
at Ambalipura village.
Providing and widening side Drain , construction of culverts , Asphalting in
9 doddakanahalli main road from Gear college to Kadabissanahalli road at 73.00
Doddakanelli village .
Providing asphalting to 2 roads in front of Anjanadri School and left side road of
10 Government hostel and left side 3 roads of Doddakannelli main road near ward 10.00
office
Providing side Drain , construction of culverts , Asphalting from Sarjapura main
11 road to Narayana reddy house in Junnasandra village.( from 0 - 240 m chainage 45.00
and 590m-1500m chainage)
Providing side Drain , construction of culverts ,Metaling , Asphalting at Tulasi
12 25.00
Layout 1st & 2nd cross roads at Kasavanahalli village.
Providing side Drain , construction of culverts ,Metaling , Asphalting to 1st,
13 2nd, 3rd main and 1st, 2nd, 3rd, 4th Cross roads Velliyamma Layout at 45.00
Kasavanahalli village .
14 Providing asphalting to 5th main road in Ibbluru village 6.50
Providing to road infront of La Casa hotel 1st, 2nd and 3rd cross roads in
15 8.00
Kasavanahalli village

34
Providing drains construction of culverts, metalling and asphalting to roads at
16 30.00
1st, 2nd Cross, Isha Mazid Road at Mangammanapalya.
Providing drains construction of culverts, metalling and asphalting to roads at 1st
17 and 2nd Cross Roads at Yellukunte from patel Chennappa Circle to Govt School 30.00
& Nelakanteswara Layout.
18 20.00
Metalling and asphalting to the road from Somasandra palya leading to Haraluru
Providing drains and cement concrete to roads at kudlu village (Vinayaka layout
19 24.00
1st cross and Connecting Lines)
20 Providing CC to Agara village main road 30.00
Providing asphalting to 11th Cross, 13th Cross, 20th Main Road from BES COM
21 25.00
to 7th Cross, Police station Road from 27th to 17th Main road
Remodling of 1st 'B' Main road at MHBC Colony in HSR Layout from 15th
22 30.00
Cross to Service Road
23 Providing asphalting to 20th, 21st, 23rd & 24th Cross Roads in HSR Layout 20.00
Asphalting to road from hosur main road to Channakeshavanagar Main Road @
24 15.00
1st Main Road
Providing metalling and asphalting to roads at GK Layout @ Parappana
25 20.00
Agrahara and Baratena Agrahara (Western side)
Providing metalling to road from Naganathpura Main Road to Doctors Layout
26 18.00
and Bangalore English School
27 32.00
Asphalting to 15th Cross Road and 16th B Cross road in HSR Layout 6th Sector
Metalling and chip carpeting to 1st Main road and Cross roads in Rajiv
28 26.00
Gandhinagar HSR Layout 6th Sector
Providing drains, metalling and asphalting to Main road Alsur Munivenkatappa
29 20.00
Road & Muneswara Road Hospalya
Providing drains, metalling and asphalting to 1st Cross to 5th Cross at Kudlu
30 23.00
village

31 Formation of roads and Drains, Matalling and chip carpeting the road from 20.00
Hosur Main Road to wards Krishna Reddy Indl. Area behind Toyota Showroom
Construction of culverts at 10th Cross, 25th A Main, 1st Sector and 3rd Sector of
32 10.00
HSR Layout
33 Construction of Side walks at 27th Main in HSR Layout from Ring Road, Ch 0.00 44.00
Construction of drains and metaling to roads at Kaja Masidi 2nd Cross to
34 21.00
Secondary drain of Rajakaluve Madeenanagara
Metaling & asphalting to the balance reach in Hosur Road to Country club road
35 25.00
in Singasandra (0.00 to 220.00 M)
Metaling and asphalting the road from Begur Main road to Devarachikkanahalli
36 40.00
main road (via 11th Main), Hongasandra (0.00 to 1.20 KM)
37 Metaling and asphalting the main roads in Singasandra 18.00
Providing BS Slab drain, Culverts and Metaling to Subashnagara main road in
38 25.00
Subashnagara
Providing BS Slab drains, Metaling and Asphalting the main road in Muniyappa
39 35.00
Layout (Near Gajalappa house) at Hongasandra
Providing Metaling and Asphalting the 11th Main road to Mandi road in
40 30.00
Bommanahalli
41 Providing drains, Metaling and Asphalting to Bhagathsingh road at Hongasandra 20.00

35
Providing drains and Asphalting to Oni road balance reach at Garvebavipalya
42 30.00
(Begur main road to Hosur road)
Providing drains, Metaling and Asphalting Hosur road to Garvebavipalya (via
43 18.00
Munireddy layout)
44 Asphalting the main road in Narasimahareddy layout at Garvebavipalya 15.00
45 Metaling and Asphalting Kodichikkanahalli main road 22.00
Metaling and Asphalting main road of Sir M Vishweshwraya road (via Hosur
46 35.00
road joining to Roopena Agrahara)
Metaling and Asphalting main road and cross roads at Krishna layout in
47 40.00
Devarachikkanahalli
48 Metaling and Asphalting in Balaji layout via 4th main road in Hongasandra 30.00
Metaling and Asphalting the road from Begur road to Devarachikkanahalli (via
49 25.00
Deo heights layout)
Metaling and Asphalting Devarachikkanahalli main road to Devarachikkanahalli
50 35.00
Bus stand (via Royal shelter)
Metaling and Asphalting main roads and cross roads near Srinivasa Kalyana
51 23.00
Mantapa in Hongasandra
Re Metaling and Asphalting to road from 1st main to 11th Main in
52 30.00
Shanthinikethan layout
Re Metaling and Asphalting to road from A to N Cross in Shanthinikethan
53 30.00
layout
54 Metaling and Asphalting to Thayappa Garden cross roads (6 crosses) 25.00
Metaling and Asphalting to Panduranga Nagara colony roads (4 cross) and main
55 30.00
road
Metaling and Asphalting to Roads in Venkatadri Layout (3 cross and 1 main
56 30.00
road)
Asphalting to Roads in Doresanipallya behind Apolo Hospital road and Tempo
57 20.00
stand roads
58 Asphalting to Roads in Nidhi Layout 1 main road and 4 crosses in NS Palya area 25.00
59 Widening and Asphalting to Road from BG Road to Kothanuru Main road 40.00
Asphalting to roads and providing footpaths from Ayappa Swamy Temple to
60 60.00
Bilekahalli main road in Vijaya Bank Layout (1 Main road and 6 cross roads)
Asphalting to roads and providing footpaths from HSBC Bank to Namana Hotel
61 60.00
and 1 to 8 crosses in Vijaya Bank Layout
Metaling & Asphalting to Road from Chikkammanahalli village to Koppa main
62 20.00
road
Formation, Metaling and Asphalting to Road From B.G.Road to Kammanahalli
63 20.00
Main Road via Nobo Nagar
64 Metling & Asphalting to colony roads in Nobo Nagar (5 cross roads) 10.00
65 Asphalting to road from Hulimavu main Road to Someshwara Temple 25.00
Widening and Asphalting to Begur Main Road from Sriram Temple to BDA road
66 25.00
in Hulimavu
Metaling and Asphalting of road from Binnibande to Begur Road via Thejaswini
67 20.00
Nagara
Construction of culverts, providing metalling and Asphalting to road from
68 40.00
Harinagara to Chunchghatta circle via Srinidhi layout Ch 0.00 to 0.80 KM
Construction of culverts, providing metalling and Asphalting to road from
69 50.00
Kothanur to BDA road Ch 0.00 to 0.75 KM
Providing metalling and Asphalting to widen the existing road from Kuvempu
70 15.00
circle to Brigade Millenium from 7.00M to 10.00 M wide

36
Providing metalling & Asphalting of roads in Naidu layout, Jaraganahalli
71 25.00
village.
Providing metalling & Asphalting to cross roads of Ganapathipura, Ganapathi
72 20.00
Temple road
Providing metalling & Asphalting of roads in New bank colony 1st, 2nd and 3rd
73 25.00
Cross roads
Providing metalling & Asphalting of main roads of Srinidhi layout (1st main
74 30.00
road and 2nd cross road)
Providing metalling & Asphalting of roads in Beereshwara nagara 2nd, 3rd and
75 20.00
4th Cross roads and main road
Providing metalling & Asphalting of roads in Sharada layout 1st main, 1st and
76 20.00
2nd cross roads
77 Providing metalling & Asphalting of roads in Sreyas colony 3rd main road 20.00
Providing metalling & Asphalting of roads in Aradhana layout main and cross
78 20.00
roads
Providing metalling & Asphalting of roads in Navodaya nagara 6th and 7th
79 25.00
Main road
80 Providing CC Roads in Harinagara 1st main of Muneshwara layout 25.00
Providing metalling & Asphalting of roads in Jambo savari dinne 1st, 2nd and
81 25.00
3rd cross roads
82 Providing CC Roads in Basavana pura 1st and 2nd cross roads 20.00
Providing metalling & Asphalting of roads behind Siddeshwara theatre under
83 25.00
Sarakki thota 9th to 12th cross roads
84 Providing CC Roads in Pillaganahalli village 1st to 3rd cross roads 20.00
85 Providing metalling & Asphalting of roads to Narashimaiah garden 20.00
Providing CC Roads around the Pillaganamma Temple under Sarakki, Ramanna
86 20.00
layout to Masjid road
Providing metalling & Asphalting of roads in Chikkaswamy layout under
87 13.00
Jaraganahalli village ( 5 to 7 th cross )
Providing metaling to the Annayappa Layout Roads (C1, C2, C3) at Anjanapura
88 12.50
Village. (Approx. 350 x 5 mtr.)
Construction of SSM drain in Kidwai Layout at Anjanapura Village. (Approx.
89 12.00
200 mtr).
Providing asphalting to the road from Avalahalli Petrol Bunk to Gollahalli Bus
90 40.00
Stop. (Approx 600 x 700 mtrs.)
Providing asphalting to the road from Anjanapura Masjid to Subramanyapura
91 40.00
Temple & anjanapura village (Approx. 600 x 7m).
Providing metalling & Asphalting to the roads in Shetty Layout in Gollahalli
92 23.00
Village (C1, C2) (Approx. 600 x 6 mtrs.)
Providing asphalting to the road from Anjanapura main road to Shaneshwara
93 6.00
Temple at Avalahalli Village. (Approx. 100 x 8m & 200 x 7 m)
Construction of SSM drain from 5th Block to Fareeda House, Near Chikka
94 10.00
Masjid. (Approx. 400 mtrs.)
Construction of SSM drain from Haribabu's House to Moullas House (Approx.
95 10.00
400 mtr.).
Providing metalling & Asphalting to the road from Kothanoor Main Road to
96 16.00
BDA Road in Avalahalli Village (Approx. 500 x 5 mtr.).
Providing asphalting and construction of slab drain from Kanakapura Main Road
97 50.00
to Vajramuneshwara Temple at Thalaghattapura Village (Approx. 1400 x 4 mtr.).
Providing metalling & Asphalting to the Saraswathi Nagara Main Road at
98 6.00
Thalagattapura Village (Approx. 350 x 5 mtrs.).

37
Providing asphalting of the HM Colony Road upto BDA road and
99 50.00
thalaghattapura Village (Approx. 1150 x 6.75 mtr.).
Providing concrete to the Munramu Layout appraoch road, construction of L
100 6.00
drains at Raghuhalli Village (Approx. 120 x 3 m.)
Providing asphalting to the Raghuvanahalli Layout cross roads (C1, C2, C3, C4
101 15.00
& C5) at Raghuvanahalli Village (approx. 1300 x 6m).
Providing asphalting to the Manjunath Nagar Cross Roads in Raghuvanahalli
102 30.00
Village (1 to 6th Cross (approx. 1000 x 5.5 mtr.)
Providing asphalting to the road next to the Canara Bank road near Konanakunte
103 15.00
Cross (approx. 1000 x 5 mtrs.).
Providing asphalting to the Appaianna cross roads (C1 & C2) at Konanakunte
104 17.00
Village (Approx. 450 x 7 mtrs.).
Providing concrete to the cross roads (C1 to C5), construction of L drains
105 coming under Vasanthpura Main Road in Konanakunte Cross (Approx. 500 x 4 10.00
mrs.).
Providing metalling and Asphalting to the Vallabha Nagara Main Road (C1 to
106 30.00
C4) at Konanakunte Cross (Approx. 900 x 7 mtrs.)
Providing asphalting to the IPS Kemmapaiah Road in Kuvempu Nagar at
107 12.50
Doddakalasandra (Approx. 300 x 7 mtrs.)
Providing metalling and Asphalting to the roads of Anjanadri Layout (C1, C2,
108 11.50
C3) at Doddakalasandra Village (Approx. 300 x 5 mtrs.).
Providing asphalting to the road from the Doddakallasandra Village to Narayana
109 18.00
Nagara Block-I at Doddakalasandra Village (Approx. 1200 x 7 mtrs.).
Providing Asphalting and construction of slab drain to the cross roads at
110 17.00
Avalahalli village (C1, C2, C3 & C4)
Providing Asphalting to the road connecting Gokul nagara from Kanakpura main
111 12.00
road at Doddakallasandra village
Total 2849.00
Sub Total - 1 2984.00
MAINTENANCE WORKS
1 Annual maintenance and special repairs of sub division office at Bellandur 1.00
2 Annual maintenance and special repairs of ward office at Doddakanneli 0.50
3 Annual maintenance of Samudaya Bhavana and Annexure buildings at Ibbluru 0.50
4 Schools & other Buildings Maintenance in HSR Sub Division 5.00
5 Improvements and maintenance of Zonal Office Building 30.00
6 Special repairs to ward office at Bilekahalli 0.50
Special repairs and construction of compound wall to ward office at
7 1.50
Doresanipalya
8 Special repairs to ward office (Old GP Office) at Gottigere 0.50
9 Special repairs to School building at Gottigere 1.00
10 Construction of Compound wall to Veterinary Hospital at Gottigere 2.00
11 Ward Office 1.00
Total 43.50
1 Pothole filling at Bellandur Sub Division 2.00
2 Pot holes filling at HSR 1st, 2nd and 3rd Sector Roads 3.00
3 Pot holes filling at Village roads in HSR Sub Division 2.00
Improvements and Maintenance of drains and culverts at 27th Main &
4 2.00
Surrounding Area HSR 1st Sector
Improvements and Maintenance of drains and culverts at 24th Main, 15th Main
5 Road Surrounding Area in 2nd & 3rd Sector HSR Layout HSR 2nd and 3rd 2.00
Sector

38
Improvements and Maintenance of drains and culverts at near 17th Cross &
6 2.00
Surrounding area of HSR 4th, 6th and 7th Sector
7 Pot holes filling at HSR Layout 4th, 6th and 7th Sector 4.00
8 Pothole filling to Begur Main road 2.00
Improvements and maintanance of drains and culverts in Kodichikkanahalli and
9 2.00
Devarachikkanahalli
10 Improvements and maintanance of drains and culverts in Roopena Agrahara 1.50
11 Improvements and maintanance of drains and culverts in Hongasandra 2.00
Improvements and maintanance of drains and culverts in Garvebavipalya and
12 3.00
Lakshmi layout
13 Pothole filling to Bilekahalli main Road and colony roads in Bilekahalli 2.00
14 Pothole filling to Hulimavu main road and colony roads in Hulimavu 1.00
Pothole filling to Arakere main road, Mico Layout main road, colony roads in
15 2.00
Mico Layout, Brundhavan layout
16 Pothole filling to BDA BTM 6th Stage roads in Arakere Sub Division 2.00
Providing pot holes filing to existing asphalted roads under Puttenahalli sub
17 3.00
division
18 Pot hole filing in Konanakunte Sub Division roads 3.00
Total 40.50
1 Provision to meet Demolition charges (Buildings in Bellanduru sub divison) 2.00
Providing Signage board for road diversions and construction works of
2 1.00
Bellandur Sub Divisions
Providing Signage board to road and lane in layouts and main roads Bellandur
3 2.00
Sub Divisions
4 Providing fencing to BBMP recovered Properties 2.00
5 Construction of plastic & garbage collection points 1.00
6 Provision to meet Demolition charges in HSR Sub Division Jurisdiction 2.00
Providing signage board for road diversions and construction works of HSR Sub
7 1.00
Division
Providing signage board to road and lane in layouts and main roads HSR Sub
8 2.00
Division
9 2.00
Providing fencing of BBMP recovered properties HSR Sub Division Jurisdiction
Construction of plastic & grabage collection point HSR Sub Division
10 1.00
Jurisdiction
11 Provision for Demolition charges in Bommanahalli sub division Jurisdiction 2.00
Providing signage board for road diversions and construction works of
12 1.00
Bommlanahalli sub division
Providing signage board to road and lane inlayouts and main roads
13 2.00
Bommanahalli sub Divison
14 Providing fencing of BBMP recovered properties in Bommanahalli sub division 1.00
15 Construction of plastic & garbage collection point Bommanahalli sub division 1.00
16 Demolition of Buildings in Arakere Sub Division 2.00
Providing Sinage Board for Road Diversion and Construction works of Arakere
17 1.00
Sub Division
18 Providing Sinage Board for Roads & informatry boards in Arakere Sub Division 1.00
19 Providing fencing to BBMP recovered properties 2.00
20 Construction of Plastic & Garbage collection points 1.00
21 Provisions to meet Demolition charges 2.00

39
Providing signales board for road diversions and construction works in
22 1.00
Puttenahalli sub division
Providing signales board to road and lane in layouts and main roads in
23 1.00
Puttenahalli sub division
24 Providing fencing to BBMP recovered properties under Puttenahalli sub division 2.00
25 Construction of plastic & garbage collection points 1.00
26 Provision to meet Demolition charges pertaining to Konanakunte Sub Division. 2.00
Providing Signage board for road diversions for construction works at
27 1.00
Konanakunte Sub Division Jurisdiction.
Providing Signage board to roads and lanes in layouts and main roads coming at
28 1.00
Konanakunte Sub Division Jurisdiction.
Providing fencing to BBMP recovered properties coming under Konanakunte
29 2.00
Sub Division.
Construction of plastic & garbage collection points coming under Konanankunte
30 1.00
Sub Division Jurisdiction.
Total 44.00
1 Payment charges for Computer Operator and Security (Contact point 2 Nos.) 3.47
2 Providing Tata Sumo and tractor to Help points 2 Nos. 8.40
3 Providing Stationaries 2 Nos. 0.20
Payment charges for computer Operator and security (2 No of help points X 1.65
4 3.30
lakhs/year) in HSR Sub Division Jurisdiction
Providing Tata Sumo and tractor to help points (2 No of help points X 4.20
5 8.40
lakhs/year) in HSR Sub Division Jurisdiction
providing Stationaries (2 No of Help points 0.2 lakhs/year) in HSR Sub Division
6 0.20
Jurisdiction
Payment charges for computer operator and security (3 no of help points X 1.65
7 5.00
lakhs / year) inBommanahalli sub division
Providing Tata Sumo and tractor to help points (3 No. of help points X 4.20
8 12.60
lakhs / year) in Bommanahalli sub division
Providing stationaries (3 No of help points 0.20 lakhs / year) in bommanahalli
9 0.30
sub dition
10 Provision for deploying PRAHARI for Bommanahalli Zone 17.40
Payment charges for Computer Operator and Security (6 No of Help points X
11 10.00
1.65 lakhs / years)
Providing Tata Sumo and tractor to Help points (6 No of Help points X 4.32
12 26.00
lakhs / year)
13 Providing Stationaries (6 No of help points X 0.20 lakhs / year) 0.30
Payment charges for Computer Operator and Security (4 No of Help points X
14 6.60
1.65 lakhs / years)
Providing Tata Sumo and tractor to Help points (4 No of Help points X 4.32
15 17.33
lakhs / year)
16 Providing Stationaries (4 No of help points X 0.20 lakhs / year) 0.30
Provision for the payment charges for the computer operator and security (3 Nos.
17 5.40
of Help points x 1.80 lakhs / year)
Providing Tata Sumo and Tractor to Help points (3 Nos. of Help points x 4.20
18 12.60
lakhs / year)
19 Providing Stationaries (3 Nos. of Help point x 0.2 lakhs / year). 0.20
Total 138.00
1 Provision to meet emergency works in Bellandur Sub Division 5.00
2 Provision to meet emergency works in HSR Sub Division Jurisdiction 5.00
3 Provision to meet emergency works in Bommanahalli sub division 5.00

40
4 Provision to meet Emergency works in Arakere Sub Division 5.00
5 Provision to meet Emergency works in Puttenahalli Sub Division 5.00
6 Provision to meet emergency works in Konanakunte Sub Division 5.00
Total 30.00
Sub Total - 2 296.00
Zone Total 3280.00
BOMMANAHALLI ZONE
PROVISIONAL BUDGETARY PROPOSAL PERTAINING TO 18%(CIVIL) WORKS FOR THE YEAR

1 Provision for Purchase of land for rehabitation of slums / SC, ST Colony 60.00
2 Construction of Toilets (Individual) at Bellandur Sub Division 10.00
3 Construction of Anganawadi building in colony at Kasavanahalli village 10.00
Construction of Class rooms to Government Higher Primary School at
4 15.00
Junnasandra village
Construction of drains and WBM to Rajeevgandi in Ashraya Colony at
5 25.00
Doddakannelli village
6 Provision for Purchase of land for rehabitation of slums / SC, ST Colony 60.00
7 10.00
Construction of Toilets (Community / Individual) at Bandepalya & Parangi palya
8 Construction of Aganawadi Building at Bandepalya 10.00
9 Construction of Class rooms/Reading room at HSR Sub Division Jurisdiction 15.00
10 Construction of Community Hall at Jursdiction of HSR Sub Division 15.00
11 Construction of Cement concrete road in Colony at Ambedkar nagar 10.00
12 Provision for Purchase of land for rehabitation of slums / SC, ST Colony 60.00
13 Construction of Toilets (Community / Indivisdual) at Hongasandra AK Colony 10.00
14 Construction of Anganawadi School at NGR Layout 10.00
15 Construction of Class rooms / Reading room at Gulbarga slum 15.00
16 Construction of Community Hall at NGR Layout 15.00
17 Construction of Cement concrete road in Colony at Devarachikkanahalli 10.00
18 Provision for Purchase of land for rehabitation of slums / SC, ST Colony 60.00
Construction of Toilets at Doresanipallya slum and Nyanappanahalli Bhovi
19 10.00
colony
20 Construction of Anganawadi Schools at Nyanappanahalli Bhovi colony 10.00
Construction of Class rooms/Reading room at Doddakammanahalli &
21 15.00
Chikkammanahalli AK colonies
22 Construction of Community Hall at Nyanappanahalli Bandepalya 15.00
23 Construction of Cement concrete Road at Bilekahalli AK colony 10.00
24 Provision for Purchase of land for rehabitation of slums / SC, ST Colony 55.00
25 Construction of Community Toilet block at Pillaganahalli colony 5.00
26 Construction of Community Toilet block at Puttenahalli palya 5.00
27 Construction of Anganawadi School at Pillaganahalli colony 5.00
28 Construction of Anganawadi School at vaddarapalya 5.00
29 Construction of Class rooms at Puttenahalli Govt. school 20.00
30 Construction of Community hall at Jambo savaridinne 15.00
31 Construction of Cement concrete road at vaddarapalya 1st main 5.00
32 Construction of Cement concrete road at Puttenahalli colony 5.00
33 Provision for Purchase of land for rehabitation of slums / SC, ST Colony 60.00
Construction of Toilets (Community / Individual) at Konanakunte Sub Div.
34 10.00
Jurisdiction.
35 Construction of Anganawadi School at Konanakunte Sub Div. Jurisdiction. 10.00
Construction of Class Rooms / Reading Rooms at Konanakunte Sub Div.
36 15.00
Jursdiction.

41
37 Construction of Commuinty Hall at Konanakunte Sub Division Jursidiction. 15.00
Construction of cement concrete road at colonies coming under Konanakunte
38 10.00
Sub Division Jurisdiction.
Sub Total - 3 720.00
ELECTRICAL
BOMMANAHALLI
1 Supplying and fixing of Street lights in Bellandur and Ebbalur 12.00
2 Supplying and fixing of Street lights in Boganahalli and Kaikondanahalli 12.00
Supplying and fixing of Street lights in Kasavanahalli, Junnasandra and
3 11.00
Ambalipura
4 Supplying and fixing of Street lights in Doddakanahalli 12.00
Supplying and fixing of Street lights in Rupena Agrahara, Bommanahalli and
5 12.00
Hongasandra
Supplying and fixing of Street lights in Singasandra, Doddathoguru and
6 11.00
chikkathoguru
7 Supplying and fixing of Street lights in Beratena Agrahara and Begur 11.00
Supplying and fixing of Street lights in Devarachikkanahalli, Kodichikkanahalli
8 12.00
and Garvebhavipalya
9 Supplying and fixing of Street lights in Arekere and Nyanapanahalli 11.00
10 Supplying and fixing of Street lights in Billekahalli and Hulimavu 12.00
Supplying and fixing of Street lights in Yelenahalli, Chandrashekarapura and
11 11.00
Kammanahalli
12 Supplying and fixing of Street lights in Kallena Agrahara and Gorattigere 12.00
13 Supplying and fixing of Street lights in Konankunte 11.00
14 Supplying and fixing of Street lights in Jaraganahalli and Doddakallasandra 10.00
Supplying and fixing of Street lights in Raghuvanahalli, Thippasandra and
15 10.00
Vajarahalli
Supplying and fixing of Street lights in Avalahalli, Anjanapura, Gollahalli and
16 12.00
Talagatapura
17 Supplying and fixing of Street lights in Puttenahalli and Sarakki 11.00
Supplying and fixing of Street lights in Pillaganahalli, Basavanapura and
18 12.00
kembathalli
19 Supplying and fixing of Street lights in Kothanur 10.00
20 Supplying and fixing of Street lights in Chunchanagatta 12.00
21 Supplying and fixing of Street lights in Agara and Sommasundrapalya 11.00
22 Supplying and fixing of Street lights in Harallur and Kudlu 10.00
23 Supplying and fixing of Street lights in Parappana Agrahara and Nagnathpura 10.00
24 Supplying and fixing of Street lights in H.S.R Layouts 11.00
25 11.00
Supplying and fixing of Street lights in Harallukunte, Ellukunte and Parangipalya
Total - 1 280.00

Suppy and fixing of High mast light at Vijaya Bank Enclave Circle in
1 5.00
Bommanahalli Sub Division
Suppy and fixing of High mast light at Shanthinikethana Circle in Arakere Sub
2 5.00
Division
3 Suppy and fixing of High mast light at BK Circle in Puttenahalli Sub Division 5.00
Suppy and fixing of High mast light at Khode Glass facotyr circle in
4 5.00
Konanakunte Sub Division
Suppy and fixing of High mast light at Raghavanahalli circle in Konanakunte
5 5.00
Sub Division
6 16 Mtrs High Masts at Kembridge School Junction at HSR Layout 5.00

42
Total - 2 30.00

Supplying and fixing of MS Tubulara Poles in Arekere BTS layout to


1 20.00
Devarachikkanahalli
2 Supplying and fixing of MS Tubulara Poles in B.K circle to Gorattigere colony 20.00
Total - 3 40.00

1 O & M of Street Lights in Bellandur Sub Division 15.00


2 O & M of Street Lights in Bommanahalli Sub Division 25.00
3 O & M of Street Lights in Arekere Sub Division 25.00
4 O & M of Street Lights in Konankunt Sub Division 25.00
5 O & M of Street Lights in Puttenahalli Sub Division 20.00
6 O & M of Street Lights in HSR Sub Division 20.00
7 Provision for Emergency works 20.00
Total - 4 150.00
Grand Total 500.00
Grand Zone Total 4500.00

43
Bruhath Bangalore Mahanagar Palike
Rajarajeshwari Nagar Zone, Bangalore
Rajarajeshwari Nagar Division, Bangalore
PROPOSED BUDGET FOR THE YEAR 2008-09 PERTAINING TO RAJARAJESHWARINAGARA SUB-
DIVISION
Estimated amount in
Sl. No. Name of works
Lakhs
2 3
I- ORIGINAL WORKS
A-BUILDINGS
1 Providing Partition & AR, SR to RR Nagar Zonal office 20.00
Sub Total 20.00
B-NEW ROADS
1 Providing metalling to Main road and cross road for durga parameshwari layout 10.00

2 Providing metalling and drain from JSS Collage to Omkar hills 10.00
3 Providing metalling and drain at Shankarappa Layout and infront of Jnanakshi 15.00
Rajarajshwari Temple
Sub Total 35.00
C-DRAINS
1 Construction Of RCC box drains at Pattanagere village 20.00
Sub Total 20.00
D- CONSTRUCTION OF FOOTPATH
1 Construction of footpath from BBMP Complex to Ideal home circle 30.00
(nimishambha temple Circle)
2 Construction of footpath from Ideal home circle to Andhra Bank 25.00
Sub Total 55.00
E-CONCRETE ROADS
1 Providing Concrete road Lanes to Gankal Village 15.00
2 Providing Concrete road Lanes to Kenchenahalli Village 15.00
3 Providing Concrete road Lanes to Pattanagere Village 15.00
Sub Total 45.00
II-MAINTENANCE WORKS
ROADS AND DESILTING OF DRAINS
1 Providing Asphalting to 1st stage Ideal Homes and Balance Roads 35.00
2 Providing Asphalting Main and Cross road to Ideal Home 40.00
3 Providing Asphalting from Pattanagere to RR Temple and Adjoining 20.00
MainRoad, and Cross Roads of Kenchenehalli and Pattanagere
4 Providing Asphalting to Panchasheela Layout 12.00
5 Providing Asphalting to BEML 4th Stage and Adjoining Roads 25.00
6 Providing Asphalting to BEML 5th Stage and Adjoining Roads 25.00
7 Providing Asphalting to Main and Cross Roads of Kenchenahalli 15.00
8 Pot Hole Filling and Road Cutting Filling of MainRoads and cross Roads of RR 5.00
Nagar Sub Division.
9 Providing Asphalting Kenchenahalli Bridge to Mysore Road, 20.00
10 Providing Asphalting to BHEL, Pattanagere and Concord Layout 20.00
11 Providing Asphalting to Durgaparameshwari Layout and Adjoining Road of 25.00
Halagewaderahalli and Shivanna layout
12 Providing Asphalting to Adjoining cross Road of Reddy farm and Raghavendra 15.00
Temple
13 Providing Asphalting to Roads parallel to Fabmall and roads around it 25.00

44
14 Desilting of Drain at 1st and 2nd Stage of Ideal Homes 5.00
15 Desilting of Drain and Berm Cutting at BEML Layout and Other Layout 5.00
16 Providing Ornamental Sign Board for RR Nagar Sub Division 12.00
17 Providing Name Boards to Main and cross Road for RR Nagar Sub Divisions 12.00
18 Maintenance of Footpath Clearance 12.00
19 Emergency works 25.00
Sub Total 353.00
Total 528.00
PROPOSED BUDGET FOR THE YEAR 2008-09 PERTAINING TO UTTARAHALLI SUB-DIVISION
Estimated amount in
Sl. No. Name of works
Lakhs
I- ORIGINAL WORKS
A-BUILDINGS
Construction of Ward Offices 20.00
B- ROADS
1 Construction of drains, Mettalling and Asphalting of roads at Pramod layout 20.00
2 Mettalling and Asphalting of roads at Gurudatta layout 20.00
3 Construction of Drains, Improvements of roads at Bangarappanagar 10.00
Construction of Drains, Improvements and Asphalting of roads at Channasandra
4 10.00
Colony
Mettalling and Asphalting of Balance roads at Sai Lotus
5 Layout,Dwarakanagat,Raithakaarmikanagar and Asphalting of roads in front of 10.00
RNS College
Construction of Drains, Mettalling and Asphalting of roads at Gattigere
6 12.00
Siddananjappa layout
7 Construction of Drains, Mettalling of roads at Bagegowda layout near Ring road 10.00
Construction of Drains, Mettalling and Asphalting of roads at Doddakempaiah
8 20.00
layout and Marappa Layout
9 Construction of Drains, Improvements of roads at Kerekodi paalya 12.00
Construction of Drains, Mettalling and Asphalting of main roads and cross roads
10 27.00
at Javaraiahna Doddi
Construction of Drains and Culverts, Improvements of roads at Uttarahalli
11 20.00
Vaishnavi layout, appayya swamy layout
Construction of Drains and Culverts, Mettalling roads at Uttarahalli
12 15.00
NandaKumara layout
Construction of Drains, Improvements, Mettalling of roads at Uttarahalli Arjun
13 15.00
kaval, Muneshwara Block, Turahalli Village
Construction of Drains and Culverts, Improvements to roads in between
14 30.00
Ittamadu road and AGS Layout
Construction of Drains and Culverts, Improvements to roads Uttarahalli
15 10.00
Narasappa layout and near Anjaneya Swamy Temple and Netaji layout
Sub Total 241.00
D-FOOTPATH NIL
II-MAINTENANCE WORKS
A - BUILDINGS NIL
Sub Total 0.00
B-ROADS AND DRAINS
1 Asphalting to roads at Southern Poornapragna layout 15.00
2 Asphalting to roads at Northern Poornapragna layout 15.00
3 Improvements and Asphalting of roads at D'souzanagar, Muneshwaranagar 15.00

45
4 Asphalting of roads at Gattigere hanumayya layout 10.00
Asphalting to main road from Pantharapaalya petrol Bunk to Pramod layout and
5 20.00
Construction of Drains, Improvements of cross roads
6 Asphalting of roads at Gattigere Haridasa layout 15.00
7 Asphalting and Improvements of remianing roads at Gattigere Layout 15.00
Improvements of roads from Bangarappanagara Hosakerehalli cross to
8 30.00
Basaveshwara layout via Arunachalam Residence
9 Improvements and Asphalting of roads at Ajjappa layout 10.00
10 Improvements of roads at Arehalli Naydu Layout 20.00
11 Improvements and Asphalting of roads at Arehalli AGS Layout 15.00
12 Improvements and Asphalting of roads at Arehalli and Srinivasa Colony 15.00
Asphalting and Improvements of roads at Chikkallasandra Doctors layout,
13 10.00
Sapthagiri layout and Sarvabhoumanagara
14 Asphalting of Chikkallasandra Abbayya Naydu Studio road 10.00
Improvement and Asphalting of roads from Arehalli Ittamadu road to
15 15.00
Chikkallasandra Ramanjaneya Layout
Improvement and Asphalting of roads from Uttrahalli main road to Arehalli
16 15.00
Ittamadu road
Pot Hole Filling and Road Cutting Filling of MainRoads and cross Roads of 5.00
17
Uttrahalli Sub Division.
18 Maintenance of Footpath Clearance 12.00
19 Emergency works 25.00
Sub Total 287.00
IV-OTHER WORKS
1 Providing Ornamental Sign Board for Uttarahalli Sub Division 15.00
2 Providing Name Boards to Main and cross Road for Uttarahalli Sub Divisions 15.00
Sub Total 30.00
Total 578.00
PROPOSED BUDGET FOR THE YEAR 2008-09 PERTAINING TO SUBRAMANYAPURA SUB-
DIVISION
Estimated amount in
Sl. No. Name of works
Lakhs
1 2 3
I- ORIGINAL WORKS
A-BUILDINGS Nil
B-NEW ROADS
1 Improvements and Asphalting the roads at Iliyasnagar 20.00
2 Improvements and Asphalting the roads at Ramakrishnanagar 15.00
3 Improvements and Asphalting the roads at Rajyotsavanagar 15.00
4 Improvements and Asphalting the roads at J.C.Industrial Area 15.00
5 Improvements and Asphalting the roads at Yelachenahally 20.00
Improvements and Asphalting the roads at Bikasipura & Paul Chanappa Layout 20.00
6
7 Improvements and Asphalting the roads at Prashanthanagar 20.00
Improvements and Asphalting the roads at Behind Balamuri Ganapathi Temple
15.00
8 at Kumarswamy Layout
Improvements and Asphalting the roads at 2nd Phase (BDA) of Kumaraswamy
15.00
9 Layout
10 Improvements and Asphalting the roads at Chandranagar 15.00
11 Providing RCC drain at main road of Chandranagar 15.00
12 Improvements and Asphalting the roads at Sunrise & Nanjappa layouts 15.00

46
Improvements and Asphalting the roads at Kanakanagar & Faiyazabad layouts 16.00
13
14 Improvements and Asphalting the roads at Gubbalala-Ramanjaneyanagar 15.00
15 Improvements and Asphalting the roads at Turahali Village 18.00
16 Improvements and Asphalting the roads at Paramahamsanagar 18.00
17 Improvements and Asphalting the roads at Uttarahalli Bangarappanagara 15.00
18 Improvements and Asphalting the roads at Uttarahalli Vallabhanagar 10.00
Improvements roads from Uttarahalli main road to join Canara Bank Colony via
15.00
19 Burrial ground
20 Improvements to roads at Muniswamynaidu Layout 15.00
21 Improvements to roads & Providing drainage system at Sharadhanagar 15.00
22 Improvements and Asphalthing the roads at Desai Garden 15.00
23 Improvements and Asphalthing the roads at Reshmanagar in Ganigarapaalya 20.00
24 Improvements to roads at Vasanthapura Village 18.00
25 Improvements to roads from Bhuvaneshwarinagar toTurahalli Village 12.00
Sub Total 402.00
C-BRIDGES AND CULVERTS NIL
D-CONCRETE ROADS
Providing Concrete roads at Kashin agar, Yelachenahalli, Chandranagar,
15.00
1 kanakanagar, Faiyazabad and Ramakrishnaanagar
2 Providing Concrete roads at Yadalamnagar 15.00
Sub Total 30.00
II MAINTENANCE WORKS
B-MAINTENANCE OF ROADS AND DRAINAGES
Maintenance of roads and drainages at Yelachenahalli, Iliyzsnagar,
15.00
kanakanagara, Chandranagar, Fiayazabad, Ramakrishnanagar, Rajyotsavanagar
1
Maintenance of roads and drainages at Chikkallasandra, Canara Bank Colony,
Udayanagar, Manjunathanagar, Gowdayyanapaalya, Ankappa layout,
15.00
paramahamsa nagar, maruthinagar, Vallabhanagar, Sharadanagar, hosahalli and
2 Gubbalala Village
Pot Hole Filling and Road Cutting Filling of MainRoads and cross Roads of 5.00
3 Subramanyapura Sub Division.
4 Maintenance of Footpath Clearance 12.00
Sub Total 47.00
D-MAINTENANCE OF WATER SUPPLY AND UGD SYSTEMS NIL
IV-OTHER WORKS
1 Providing Ornamental Sign Board for Subramanyapura Sub Division 15.00
Providing Name Boards to Main and cross Road for Subramanyapura Sub
15.00
2 Divisions
3 Emergency Works 25.00
Sub Total 55.00
Total 534.00
PROPOSED WORKS LIST TO BE TAKEN IN KENGERI DIVISION FOR THE YEAR 2008-09
Kengeri Sub Division
1) ORGINAL WORKS
a) Buildings
Sl
Amount
No Name of work
b) New Roads
I WBM Two layers
1 Improvements to Babasahebarpalya cross roads 10.00

47
2 Improvements to balance roads of Ramjyoti nagar 10.00
Total 20.00
ii Asphalting
1 Improvements and ashphalting to road from B.M. Road to Doddabele 25.00
2 Improvement and Ashphalting to SriRam lay out roads 10.00
4 Improvements and ashphalting to railway 2 nd parallel and other roads of KST 20.00
5 Improvement and Ashphalting Valgerahally roads in KST 20.00
6 Re ashphalting to 2nd and 3rd main road and cross roads of KST 25.00
7 Re ashphalting to 4 th and 5th main road and cross roads of KST 25.00
8 Improvemnts and Re ashphalting to 6th main from komaghatta road 30.00
9 Improvements and asphalting to 7 th main and cross roads in KST 20.00
10 Ashphalting to MTS lay out roads 25.00
11 Improvements to roads of krishnappa layout and other roads in KST 20.00
12 Re ashphalting to road from hoysala circle to SWD of KST 20.00
13 Improvement and ashphalting to roads of K.H.B apartment balnace roads 15.00
14 Ashphalting to mylasandra BEML lay out roads 30.00
15 Ashphalting to mylasandra Mukambika lay out roads 10.00
16 Improvements and asphalting to Kodipalya kengeri road 25.00
Improvements and ashphalting to Auto stand and Gutte anjaney road in Kengeri
17 Town 15.00
18 Improvements to cross roads of vidyapeeth roads in kengeri town 10.00
19 Improvements ,construction of side drain and asphalting to Komaghatta road 35.00
Total 380.00
c) Bridges and Culverts
Improvements to bridge at balaji layout in kengeri town 20.00
d) Side walks and ducts (Foothpath)
Nil Nil
i) Concrete Nil
ii) B.S. Slabs Nil
e) Concrete Roads - Less than 4.00M width.
1 Improvements and consruction of concrete Roads to Beedi karmikara colony 30.00
2 Construction of Cement concrete roads in Gattigerepalya roads 7.00
3 Improvements to roads of Chikkegowdanapalya village roads 8.00
Improvements and consruction of concrete Roads to Muniyappana vatara&
4 adjecent Roads 10.00
5 Improvements to roads of Jattigarahally village 10.00
Total 85.00
f) Water Supply Nil
g) Play ground and protectiion of BBMP Properties
1 Providing chain link Fencing at BBMP Assets Parks at Kengeri 10.00
Total 10.00
II Maintenance Works:
b) Roads and Drains Remettling, Rechifcorpetting- Reconstruction of Drains
Providing JCB tractor and labours for maintenance of Roads and foothpaths&
1 Removel of Encroachments in Kengeri Sub Division 10.00
2 Providing Pot hole fillings at Kengeri sub divisions 5.00
Total 15.00
e) Fly overs and under Passes, Grade separaters and securites Nil
F) Other Works
1 Providing Street name boards in Juridiction of Kengeri sub division 5.00
2 Providing Ornamental name boards&street sign boards in Juridiction of Kengeri 5.00
Total 10.00

48
1 Emergency fund 5.00
Total 5.00
Grand Total Rs 525.00

Nagarabavi Sub Division


1) ORGINAL WORKS
a) Buildings
Amount
Name of work
Sl.No (in lakhs)
b) New Roads
I WBM Two layers
1 Improvements Road in BDA Layout Block No.1 & 3 12.00
Improvements of roads in BDA Layout 9th Block and sapthageri Layout At
2 Nagarabavi II stage 15.00
Providing and asphalting and improvements of road at chanadana layout in
3 nagarabavi 20.00
Providing asphalting & improvementswork mallathahalli Kengunte main road
4 Nagarabavi 10.00
Providing asphalting & improvements of Roads work at chandrashekara layout
5 Nagarabavi\ 20.00
Total 77.00
ii Asphalting
Improvements of road and Asphalting work in Ramakrishna Badavane Malagalu
1 Nagarabavi 18.00
2 Improvements Road Asphalting work block No. 4,5, nagarabavi II Stage 21.00
Providing asphalting & improvements of roads in byraveshwarnagar
3 Hanumantharayana palya at Nagarabavi 20.00
Providing asphalting & improvements of roads work at Eranapalya Roads at
4 Nagarabavi 20.00
Providing asphalting & improvements of roads work at D Group layout at
5 Nagarabavi 23.00
Providing asphalting & improvements of road at Rajajinagar housing society
6 layout I Stage at Nagarabavi 19.00
Providing asphalting & improvements of road work at M.P.M. Layout at
7 Nagarabavi 15.00
Providing asphalting & improvements of roads work at hanumathanagar at
8 Nagarabavi 10.00
Providing asphalting & improvements of roads work at muddiayanapala near
9 doddanna circle Nagarabavi 15.00
10 Providing asphalting & improvements work in Nuggali palya at Nagarabavi 10.00
Providing asphalting and improvements of roads at health layout at Nagarabavi
11 20.00
Providing asphalting & improvements of roads at Arradhya layout at Nagarabavi
12 10.00
Providing asphalting & improvements of roads at Jayalakshmi layout at
13 Nagarabavi 10.00
Improvements roads and providing asphalting roads at Rajajinagar housing
14 society layout II Stage at Nagarabavi 20.00
15 Providing asphalting & improvements of roads at I.T.I Layout at Nagarabavi 10.00
TOTALRs 241.00

49
iii Drains
Construction of Road side drain and improvements of roads in Block No.8 at
1 Nagarabavi II stage 20.00
Construction of Drain and Road at Nagarabavi II stage at BDA Layout Block No.
2 10 and 11 at Nagarabavi 22.00
Construction of road side drain and improvements Road and asphalting work At
3 vinayaka layout 4th Stage13th Block in Nagarabavi II Stage 18.00
Construction of road side drain and re asphalting work in NGEF Layout 12th &
4 14 Block at Nagarabvi II stage 18.00
Construction of Missing length of drain and R C C Deck at Kebbehalla, and
5 Sriganda kaval at Nagarabavi 9.00
Total 87.00
c) Bridges and Culverts Nil
d) Side walks and ducts (Foothpath)
i) Concrete
Providing and constructing foothpathas around the BDA Complex at Nagarabavi
1 15.00
Providing and constructing foothpathas in annapoorneshwari nagar and health
2 layout Nagarabavi 15.00
Total 30.00
ii) B.S. Slabs Nil
e) Concrete Roads - Less than 4.00M width.
Improvements of Road ( Concrete Road) in Kottige palya, Malagal, Saje palya,
1 and Old villages nagarabavi II stage 18.00
2 Providing and laying concrete roads at kebbehalla Cross roads at Nagarabavi 15.00
Total 33.00
f) Water Supply Nil
g) Play ground and protectiion of BBMP Properties
1 Providing chain link Fencing at BBMP Assets Parks at Nagarabavi area 15.00
Total 15.00
II Maintenance Works:
a)Buildings including Nirmal Toilets
Repair work works of office of BBMP Sub Division Nagarabavi and community
1 Centers 5.00
Total 5.00
b) Roads and Drains Remettling, Rechifcorpetting- Reconstruction of Drains
Desilting works of strom water drains and improvements of strom water drain
1 at nagarabavi II stage 5.00
Providing JCB Tractior and labours for maitatinence of Roads, and foothpaths
2 clearance&Removel of Encroachment in Nagarabavi sub division 10.00
3 Providing Pot hole fillings at nagarabavi sub divisions 4.00
Total 19.00
e) Fly overs and under Passes, Grade separaters and securites
F) Other Works
Providing Street sign boards and ornamental name Boards in nagarabavi
8.00
1 Sub Division
Total 8.00
1 Emergency fund 10.00
Total 10.00
Grand Total 525.00

50
Ullalu Sub- division
1) ORGINAL WORKS
a) Buildings
Amount
Sl.No. Name of Work
(In lakhs)
Construction of BBMP office Complex at C.A Site at Mallathalli in front of
1 Ambedkar college 50.00
Total 50.00
b) New Roads
Asphalting to Mallathalli Main Road from Outer Ring Road Up to Bus Stand
1 and Cross Rorads 25.00
2 Metallin g & Asphalting and other development work to Harinatha Layout 15.00
3 Construction of Culverts , Metalling & Asphalting to Jnanganga nagar 20.00
Providing metalling & Asphalting to Revenue Layout Near Mallathalli Bus Stop
20.00
4 on Western side of Outer Ring road
Construction of Culverts, Road side drian & improvements of road at Jagajyothi
20.00
nagar Around the Kengeri Division office. (Western Side of Ring road)
5
6 Construction of Road side drian & improvements of road at Upadhya nagar 20.00
Construction of Road side drian & improvements of road at Dubasi Palya N.K
15.00
7 Form & J.K. Form Remaining Works)
Formation Road & Metallin g to Revenue Layout. On southern side of NGEF
20.00
8 Layout Mallathalli
9
Construction of Road side drian , & Asphalting road at Nisarga Badavane
8.00
10 (balance roads)
Construction of Road side drian Mettalling and asphalting road at mariyappana
20.00
11 Palya
Providing Road side drains and constuction of Culverts and improvements of
10.00
12 Roads in RR Layout at Ulala sub - division
13 Improvements of Works Balanace roads in KHBCS Society 15.00
14 Improvements of Nagadevana halli Main road Asphalting 16.00
15 improvements & Asphalting works at Doddabasthi Main Road 25.00
16 Improvements of Maruthi nagar Sy No. 9 roads 20.00
17 Improvements Sonnenahlli Sy No.17 Roads 20.00
Construction Box type drain and improvements road in Buvaneshwari nagar III
15.00
18 stage
Improvements roads & construction road at Raju layout Around the Horizen
20.00
19 school
Construction of Culvert, Drain, mettalling, and asphalting At NGEF Layout
25.00
20 Roads
21 Construction of Culvert, Drain, mettalling, and to Byrigowda layout 20.00
22 Asphalting to road from Ullal main road to Matha Amruthmayi School 15.00
23 Construction of Culvert, Drain, mettalling, and to Byrigowda layout 20.00
24 Asphalting to Kengunte main road from SWD to Mallathalli tank 30.00
Total 434.00
c) Bridges and Culverts
Construction of Bridge Across SWD & Asphaltimg in Ullalu Road, Near
1 30.00
Vidynikethan School
2 Con structiion of Culvert and Drain & mettalling in Ullalu village Raods, 16.00

Total 46.00

51
d) Side walks and ducts (Foothpath)
i) Concrete
Total Nil
ii) B.S. Slabs
NIL
e) Concrete Roads - Less than 4.00M width.
1 Concreting to Narrow roads in Ullal village 15.00

Total 15.00
g) Play ground and protectiion of BBMP Properties

Total 0.00
II Maintenance Works:
a)Buildings including Nirmal Toilets
Providing JCB Tractior and labours for maitatinence of Roads, and foothpaths
1 10.00
clearance and Removel of encroachment in ullal sub division
2 Pot hole filling of roads in the judisdiction of ullal subdivision 5.00
Total 15.00
e) Fly overs and under Passes, Grade separaters and securites
F) Other Works
1 Providing metal Street name boards in the Juridiction of Ullal sub division 10.00
Total 10.00
1 Emergency fund 5.00
Total 5.00
Grand Total Rs. 575.00
Zone Total 3265.00
RAJARAJESHWARI NAGARA ZONE
PROVISIONAL BUDGETARY PROPOSAL PERTAINING TO 18%(CIVIL) WORKS FOR THE YEAR
Rs in Lakhs
I Capital Works
SL No. Name of Work Estimated Cost
1 Constuction of Nirmrala toilets in Rajarajeshwrinagar Range 20.00
2 Constuction of Nirmrala toilets in Subramanyapura Range 20.00
3 Constuction of Nirmrala toilets in Uttarahalli Range 20.00
4 Constuction of Nirmrala toilets in Kengeri Range 20.00
5 Constuction of Nirmrala toilets in Ullalu Range 20.00
6 Constuction of Nirmrala toilets in Nagarabhavi Range 20.00
7 Constuction of Anganavadi Buildings in Rajarajeshwrinagar Range 15.00
8 Constuction of Anganavadi Buildings in Subramanyapura Range 15.00
9 Constuction of Anganavadi Buildings in Uttarahalli Range 15.00
10 Constuction of Anganavadi Buildings in Kengeri Range 15.00
11 Constuction of Anganavadi Buildings in Ullalu Range 15.00
12 Constuction of Anganavadi Buildings in Nagarabhavi Range 15.00
13 Constuction of Classroom Buildings in Rajarajeshwrinagar Range 20.00
14 Constuction of Classroom Buildings in Subramanyapura Range 20.00
15 Constuction of Classroom Buildings in Uttarahalli Range 20.00
16 Constuction of Classroom Buildings in Kengeri Range 20.00
17 Constuction of Classroom Buildings in Ullalu Range 20.00
18 Constuction of Classroom Buildings in Nagarabhavi Range 20.00
19 Providing & laying of Concrete Roads in slums of Rajarajeshwrinagar Range 50.00
20 Providing & laying of Concrete Roads in slums of Subramanyapura Range 50.00
21 Providing & laying of Concrete Roads in slums of Uttarahalli Range 50.00

52
22 Providing & laying of Concrete Roads in slums of Kengeri Range 50.00
23 Providing & laying of Concrete Roads in slums of Ullalu Range 50.00
24 Providing & laying of Concrete Roads in slums of Nagarabhavi Range 50.00
25 Construction of community centres /Repairs in Rajarajeshwrinagar Range 15.00
26 Construction of community centres /Repairs in Subramanyapura Range 15.00
27 Construction of community centres /Repairs in Uttarahalli Range 15.00
28 Construction of community centres /Repairs in Kengeri Range 15.00
29 Construction of community centres /Repairs in Ullalu Range 15.00
30 Construction of community centres /Repairs in Nagarabhavi Range 15.00
Total 720.00
Zone Total 3985.00
RAJARAJESHWARI NAGARA ZONE
ELECTRICAL DIVISION
PROVISIONAL BUDGETARY PROPOSAL PERTAINING TO ELECTRICAL WORKS FOR THE YEAR
Rs in Lakhs
I Capital Works
SL No. Name of Work Estimated Cost
1 Replacement of Damaged LTUG cables &street lights in Nagarabhavi range 22.00
2 Replacement of Damaged LTUG cables& street lights in , Kengeri range . 27.00
Replacement of Damaged LTUG cables & street lights in Rajarajeshwari nagar
3 8.00
range.
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
4 line,in roads / lay out of Malagalu,Kottigepalya,Sajjepalya & other area in 19.00
Nagarabhavi Range
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
5 line,in roads / lay out of BDA 1 to 13 blocks,nagarabhavi 2nd stage & other 24.00
area in Nagarabhavi Range
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
6 line,in roads / lay out of NGEF lay out,BDA 14th block & other area in 18.00
Nagarabhavi Range
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
7 line,in roads / lay out of Sunkadakatte,Kebbehalla,Annapoorneshwrinagar & 22.00
other area in Nagarabhavi Range
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
line,in roads / lay out of Srigandadakaval,Rajajinagar HBCS,Group D lay
8 20.00
out,ITI lay out,MPM layout,Kengunte,Gidadakonenahalli & other area in
Nagarabhavi Range
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
9 line,in roads / lay out of Ullalu,Railway lay out,Balaji lay out,NGEF 2nd 22.00
stage,Mallathahalli, & other area in Ullalu Range
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
10 line,in roads / lay out of Govt press lay out,Jnanajyothinagar,Jnanaganganagar 23.00
& other area in Ullalu Range
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
line,in roads / lay out of BDAlay
11 24.00
out,mariappanapala,Bhuvaneshwarinagar,maruthinagar & other area in Ullalu
Range
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
12 line,in roads / lay out of Nagadevanahalli,RR lay out,jagajyoti lay out,Kalyan 25.00
HBCS,Dubasipalya & other area in Ullalu Range

53
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
13 line,in roads / lay out of Kengeri satelite town,Shirke appartment,MTS lay 25.00
out,Bunde mutt,BDA lay out & other area in Kengeri Range
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
14 line,in roads / lay out of Mylasandra,kodipalya,Kengeri,Newly added villages & 24.00
other area in Kengeri Range
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
15 line,in roads / lay out of Ideal homes,BEML lay out & other area in 22.00
Rajarajeshwarinagar Range
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
16 line,in roads / lay out of Kenchenahalli,pattanagere,BHEL lay 25.00
out,Halagevaderahalli & other area in Rajarajeshwarinagar Range
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
17 line,in roads / lay out of Channasandra,Krishna Garden,Ganakal & other area 16.00
in Rajarajeshwarinagar Range
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
18 line,in roads / lay out of Pantarapalya,Pramod lay out,Kerekodipalya & other 22.00
area in Uttarahalli Range
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
19 line,in roads / lay out of Ags lay out,Poornaprajna lay out & other area in 24.00
Uttarahalli Range
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
20 line,in roads / lay out of Chikkalasandra,Naidu lay out,Uttarahalli & other area 20.00
in Uttarahalli Range
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
21 line,in roads / lay out of Canara bank colony,subramanyapura,vasanthapura & 26.00
other area in Subramanyapura Range
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
22 line,in roads / lay out of Yelachenahalli,Ilyasnagar,chandranagar & other area 22.00
in Subramanyapura Range
Supply & fixing of 150/250 watt HPSV Lamps, Control switches & control
23 line,in roads / lay out of Jayanagar HBCS,gubbalalu,Turahalli,Hosahalli & 20.00
other area in Subramanyapura Range
Sub total 1 500.00
II Maintenance Works
Street light Maintanance( in Packages for the year 2008-09 )Package A
1 27.00
Nagarabhavi Range
Street light maintenance (in Packages for the year 2008-09)-Package B
2 24.00
Nagarabhavi Range
Street light maintenance (in Packages for the year 2008-09)-Package C Ullalu
3 23.00
Range
Street light maintenance (in Packages for the year 2008-09)-Package D Ullalu
4 22.00
Range
Street light maintenance (in Packages for the year 2008-09)-Package E Kengeri
5 24.00
Range
Street light maintenance (in Packages for the year 2008-09)-Package F Kengeri
6 24.00
Range
Street light maintenance (in Packages for the year 2008-09)-Package G
7 22.00
Rajarajeshwarinagar Range
Street light maintenance (in Packages for the year 2008-09)-Package H
8 21.00
Rajarajeshwarinagar Range

54
Street light maintenance (in Packages for the year 2008-09)-Package I
9 21.00
Uttarahalli Range
Street light maintenance (in Packages for the year 2008-09)-Package J
10 21.00
Uttarahalli Range
Street light maintenance (in Packages for the year 2008-09)-Package K
11 24.00
Subramanyapura Range
Street light maintenance (in Packages for the year 2008-09)-Package L
12 21.00
Subramanyapura Range
Annual Maintenance of BBMP building electrification in Rajarajeshwarinagar
13 26.00
zone
Sub total 2 300.00
Grand Total 800.00
Grand Zone Total 4785.00

55
DASARAHALLI ZONE
Details of Programme of works for the year 2008-09
(Works proposed for 08-09)
DASARAHALLI ZONE
PROGRAMME OF WORKS FOR YEAR 2008-2009 IN DASARAHALLI SUB DIVISION

Approximate
Sl.no Name of work Estimaed cost in lakhs
1 Emergency grant 20.00
Total 20.00
Original works
a Buildings Nil
b Roads & Drains

1 Metaling of roads,drains& culverts in Bhuvaneshwarinagara ,Kalyananagara 20.00


Asphalting Mettling of roads,drains& culverts in Prashanthanagara,Officers
2 model colony,Krishnegowda layout 30.00
Metaling of roads,drains& culverts in,panchyath colony area,Patel sawmill back
3 side area 20.00
4 Metaling of roads,drains& culverts in Kammagondanahalli 25.00
5 Metaling of roads,drains& culverts in Vidyanagara 25.00
6 Metaling of roads,drains& culverts in Kempegowda nagara 25.00

7 Metaling of roads,drains& culverts in Kammagondanahalli Village 30.00


8 Metaling of roads,drains& culverts in Mallasndra Village 25.00
9 Metaling of roads,drains& culverts in Abbigere Village 30.00
Asphalting to WIMAC factory to BBMP border ,Abbigere pipe line road and
10 Abbigere village 40.00
11 Asphalting to Mallasandra 25.00
Asphalting to Lakshmivenkateshwara layout,Ragavendra colony and prakash
12 layout, 30.00
Total 325.00

C Culvert and Bridges Nil


d side walk & Duct Nil
e Concrete road
1 Providing concrete roads to Kalasti nagara and Prashathanagara 30.00
2 Providing concrete roads to Vidyanagara 30.00
Providing concrete roads to Kammagondanahalli,KG halli AK colony,KG halli
3 Muneshwara temple area 25.00
4 Providing concrete roads to Cross lane at Mallasandra 25.00
5 Providing Concerete Roads, drains & culverts in Officers model colony 25.00
6 Providing Concerete Roads, drains & culverts in Maheshwari nagara 25.00
7 Providing Concerete Roads, drains & culverts in Dasarahalli 35.00
Total 195.00
f Water supply Nil
g Play ground & protection of BBMP assets
Improvements to Drains and Providing covering slabs in Dasarahalli high
1 school play ground 10.00
Total 10.00

h Storm water drains Nil

56
2 Maintenance work
a Buildings
1 Special repairs to public toilet buildings at Kamagondanahalli slum area 10.00
Total 10.00
b Roads & Drains NIL
c side walk & Duct Nil
d Water supply & UGD Nil
e Fly over,under pass & pedestrian NIL
f Other Works
1 Fencing of BBMP properties 15.00
2 BBMP sighn boards 5.00
3 Street name boards 11.00
Total 31.00
DASARAHALLI ZONE
PROVISIONAL BUDGETARY PROPOSAL PERTAINING TO 18%(CIVIL) WORKS FOR THE YEAR

1 Metaling of roads,drains& culverts in Mallasandra and kalanagara 20.00


2 Asphalting to Kalasthinagara , and Maheshwarinagara 30.00
3 Asphalting to Ravindranagara,and Mini BHEL colony area 25.00
Total 75.00
Total 666.00

Programme of works for the year 2008-09


LAGGERE SUB -DIVISION
Sl. No. Name of Work Est. Amount (Lakhs)
I Orginal works
a) Buildings
1 Construction of Sub division Office Building in MEI Colony 65.00
Total 65.00
b) Roads and Drains
1 Asphalting the road from Laggere main road to outer ring road via IPP hospital 45.00
Asphalting the road from Laggere main road to Swatantra yodhara nagar (near
2 45.00
Kurbar halli bridge )
Asphalting the road from Rajagopal nagar main road to Laggere main road via
3
fiends circle 45.00
4 Asphlating balance length of Rajgopal nagar main road 45.00
Mettling and asphalting cross and main roads of Muneshwara
5
Badavane,Gunddapa Badavane and near IPP hospital 45.00
Asphalting cross and main road of LG Rammaiah Badavane Lavakusha nagar
6
and Byraveshwara nagar 40.00
7 Mettling the main roads of Kempegowda layout and Chowdeshwari nagar 35.00
8 Mettling the main roads and construction of slab drain at Rajgopal nagar 35.00
Total 335.00
C)Bridges & culverts
Construction of RCC deck slab at juunctions of main and cross roads at
1
Rajeshwaari nagar, Shambavi nagar and Kasturi Badavane 50.00
Construction of RCC Box Drain For Raja Kaluve in Chowdeshwari nagara from
2
Pushpa Bar Main Road to BWSSB Pipeline road 50.00

57
Construction of RCC Box Drain For Raja Kaluve in front of Kempegowda arch
3
in Hanumaiah Badavane 50.00
Total 150.00
D)Bridges & culverts
NILL
E) Concrete road
NILL
F) Water supply
NILL
G) Play Ground & protection of BBMP assets
NILL

II. Matainanace Work


a) Builings
NILL
b) Roads & Drains
NILL
c) Water supply
NILL
d) Maintainance of UGD
NILL
e) Fly over, Under pass & pedestrian subway
NILL

III. 18% Grants


Construction of Concrete roads for cross & main roads of Laggere Old Village &
Near Basappanakette and construction of RCC box type bridge at Basappana 80.00
1 katte
2 Construction of community hall in Laggere Old Village. 15.00
3 Junction improvement and winding of Laggere circle 25.00

IV) Other Works


a) Other Works
NILL
Total 120.00

Grand total 670.00


Programme of Works for the Year 2008-09 of Chokkasandra sub division
Sl. No. Name of Work Est. Amount (Lakhs)
Capital Works
a) Buildings
1 Construction of Sub-Division office Building @ H.M.T layout 50.00
construction Samudaya Bhavna at Sy No 64 of Doddabidarakallu village in
2 50.00
Thippenahalli

b) Roads and Drains


1 Improvement Asphalting to roads in HMT Layout . 45.00
2 45.00
Improvement and metalling to the roads at Venugopala nagara CN Palya Mysore
3
lamp Layout Bhavani nagara. 45.00
4 Improvement and Metalling to the roads at Byraveshwaranagara . 10.00

58
Formation of Road & Culverts from Thippenahalli to Thirumalapura BBMP
5
Boudary 10.00
6 Asphalting to road from PIA to NH 4 (Chokkasandra main road ) 15.00
Formation of Road , Drain and culverts in Muniswamappa Badavane in
7
chennanayakana palya 25.00
8 Formation of Road , Drain and culverts in Bhavani nagar & Colony 2nd Stage
20.00
9 Asphalting to road from ICML to Magadi main road via maruthi layout 25.00
Formation of Road , Drain and culverts in Sapthagiribadare in Doddabidarekallu
10
Villege 20.00
Improvement Formation of Road , Drain and culverts in Maruti Badavane
12
(Rajanna ) at in Doddabidarekallu Villege 30.00
Improvement and Formation of Roads in Layout Krishnappa Badavane
13
adjuscent to HMT layout 30.00
14 Formation of Road , Drain and culverts in Suvrna nagara 2 nd Stage 30.00
Construction of approching road to the solid waste management site at
15
Doddabidarakallu. 40.00
C) Bridges & Culverts
Nil
D)Side walks & Ducts
Nil
E)Concrete roads
Formation of concrete roads in Doddabidrakallu village and Chokkasandra
15.00
F) Water supply
Nil
G)Play ground & protection of BBMP properties
1 Construction of compound wall to govt properties in Chokkasandra sector 36.00

(II) Maintance works


A) Buildings
1 Maintanance of Sub-Division Office Building located at SGSJRY Building 4.00

B) Roads & Drains


Pot hole fillings of roads in Chokkasandra, Nagasandra and Dodddabidarakallu
1
sector. 5.00

C) water supply
Nil

D) Flyover , Under pass & Grade seperator


Nil

(III) 18% Programme


1 Construction of Concrete roads in Doddabidarakallu colony 30.00
2 Construction of Concrete roads in Nagamma Badavane. 35.00
3 Construction of Concrete roads in Nagasandra Colony and old Village 40.00
Rehebilitation and Reconstruction of collapsed CD works in Chokkasandra sub-
4
division. 15.00
Pot holes filling and repairs to the roads in Chokkasandra , Nagasandra and
5 Doddabidarakallu Sector. 10.00
665.00

59
Herohalli
POW (Works Proposed For 2008-09)
PROGRAMME OF WORKS FOR THE YEAR 2008-09

Sl.No. Name of Works Est Amt in Lakhs


1 2
I.(Original works )
A) Buildings
nil

B) Roads and drains


Asphalting of om shakti temple road from Hegganahalli cross to Nadakereppa
1 Indutrial main road 49.00
2 Asphalting of Shankaranti Dhaba main road 48.00
Asphalting of Sreenivasa Nagar Tent road From Magadi Road to Karim Sab
3 layout main road via K.T.G. College 40.00
Improvement & Asphalting of P & T Layout Main Road From magadi road to
4 Pipeline 49.00
Industrial Estate Main Road From Herohalli Main Road to Andrahalli Main
5 Road 49.00
Improvement & Asphalting of Kempegowda Main Road From Magadi Road
6 Police Quarters 35.00
7 Asphalting of cross & Main roads of B.E.L Layout 1st Stage, 25.00
8 Asphalting of Magadi Road From Janapriya Apartments 25.00
Providing B.S. Slab drains and Formation and Construction of Culverts At
9 Cross & Main Roads Of Hosahalli 25.00
Providing B.S. Slab drains and Formation and Construction of Culverts At
10 Annapoorneshwari Nagar, Hegganahalli 25.00
Providing B.S. Slab drains and Formation and Construction of Culverts At
11 Lakshmana Nagar 25.00
Providing B.S. Slab drains and Formation and Construction of Culverts At
12 Thyagaraja's house Road,and Crooss Roads, Anjana Nagara. 15.00
Providing B.S. Slab drains and Formation and Construction of Culverts At
13 Vasanathappa Badavane, Herohalli 20.00
Providing B.S. Slab drains and Formation and Construction of Culverts At
14 Cross & main Roads of Tunganagar,Herohalli. 21.50
Providing B.S. Slab drains and Formation and Construction of Culverts At
15 Anjaneya swamy Temple Roads & Cross Roads of anjeevininagar,Hegganahalli. 25.00
Providing B.S. Slab drains and Formation and Construction of Culverts At
16 Shanakarappa Industrial Estate, Sunkadakatte. 25.00
Providing B.S. Slab drains and Formation and Construction of Culverts At
17 Srigandakaval, Srinivasnagar. 25.00

Providing B.S. Slab drains and Formation and Construction of Culverts At


18 Byraveshwara Industrial Estate & Muneshwaranagar ,Hegganahalli 19.50
Nil

III. (18% Programme )


A) 18% Programme
1 Concreting and improvement works of cross roads of Colony of Hosahalli 25.00

60
Providing B.S. Slab drains and Construction of Culverts and formation of Roads
2 and Cosntruction of Culverts At Janatha colony, and Bilekallu. 20.50
3 Improvement & Asphalting of Hosahalli Main Road 49.50
At Electrician Kumar Hose Road ( Behind Chandragiri Bar), Mayura Nagar,
4 Hegganahalli 5.00
5 Construction of School rooms at Hosahalli 15.00
6 Construction of Angana vadi at Hegganahalli School Premises 5.00

IV. (Other Works )


Nil

Grand Total 666.00

programe of Work for the Year 2008-09 of Nelagadaranahalli Sub division


Sl No Name of Work Est. Amount (Lakhs)
Orginal works
a) Buildings
1 construction of School Building at Andrahalli Village in N G Halli Sub Div. 15.00
2 construction of School Building at Thigalarapalya in N G Halli Sub Div. 10.00
3 construction of School Building at Karihobanahalli in N G Halli Sub Div. 10.00
4 Corstruction of Nelagadaranahalli sub division office at Gruehalakshmi Layout. 50.00
b) Roads and Drains
Formatiion of road and construction of B.S slab drain &culverts at cross roads of
1 30.00
Tigrapalya Main road in N G Halli Sub Div.
Formation of Roads at Vidyamanyanagara East main Road & Cross Roads N G
2 30.00
Halli Sub Div.
Formation of Roads and construction of culverts at Vidyamanyanagara West
3 30.00
main Roads & Cross Roads N G Halli Sub Div.
Formation & constructions of Drains and construction of culverts at cross roads
4 25.00
between Thigalarapalya and Andrahalli main Road N G Halli Sub Div.
Construction of Storm water drain at Raja Caluve in between Andrahalli &
5 40.00
Thigalarapalya main Road N G Halli Sub Div.
6 Construction of SSM drain in Kalikanagara Area N G Halli Sub Div. 30.00
Formation of Roads & Construction of B S Slab drain & Culverts From
7 Siddagangamma Layout to Ragavendranagar main Road & Doddanna Layout in 20.00
N G Halli Sub Div.
Formation of Roads & Construction of B S Slab Drain & culverts at cross Roads
8 20.00
of Andrahalli main Road N G Halli Sub Div.
Formation of Roads & Construction of B S Slab & SSM Drains at
9 30.00
Karihobanahalli N G Halli Sub Div.
Construction of Culverts & construction of B.S slab drain at Shivapura &
10 30.00
Nelagadrahalli N G Halli Sub Div.
Construction of B.S.slab drains & culverts at N.G.Halli new layout adjecent to
11 15.00
HMT layout N G Halli Sub Div.
Formation of Roads and construction of B.S.slab drain at Siradisai nagar cross
13 25.00
roads in NG halli sub -division .
14 Asphalting to Guhalakshmi Layout in N G Halli Sub Div. 30.00
15 Asphalting to Nelagadaranahlli and Shivapura main roads in N G Halli Sub Div. 30.00

16 Providing name boards in Nelagadaranahalli Sub-Division in N G Halli Sub Div. 5.00

61
Construction if SSM Drain at Storm Water Drain near Shiva Temple at
17 21.00
Andrahalli in N G Halli Sub Div.
Cinstruction of RCC Drain @ Aralikatte road 6th cross 1st main Shivapura Ward
18 20.00
no 23 in N G Halli Sub Div.
C) Bridges and Culverts
Nill
D) Side Walks & Ducts
Nill
E) Concrete Roads
Proiding CC Paving to narrow lanes at N.G.Halli & Shivpura Village colony N G
1 30.00
Halli Sub Div.
F) Water Supply
Nill
II Maintenance
a) Buildings
Nill
b) Roads & Drains
Nill
c) Water Supply
Nill
d) Maintenance of UGD
Nill
e) Flyover, Underpass& Grade Separater
Nill
III 18% Programme
Formation of Road & Drains in old Andrahalli Village belind & beside Govt
1 20.00
Schoolin N G Halli Sub Div.
Formation of Road & Construction of Drains at old Thigalarapalya in N G Halli
2 20.00
Sub Div.
Formation of Roads Drains & Construction of Calverts Pilavanarapalya at
3 30.00
Thigalarapalyain N G Halli Sub Div.
Formation of Road & Construction of B S Slab drain at Shivapura Colony in N
4 26.00
G Halli Sub Div.
5 Providing CC road at Andrahalli Old Village in N G Halli Sub Div. 23.00
TOTAL AMOUNT IN LAKHS 665.00
POW (WORK PROPOSED FOR 2008-09) PERTAINING TO BAGALAGUNTE SUB DIVISION
( Rs.IN LAKHS)
SL NO Name of Work Estimated cost

I Original Works
Building Rs.In Lakhs
1 Constructiomn of offies bulbing in bagalanunte sub division 50.00
Road and Drain Works
1 Improvement and Asphalting of sidedahalli main road from KM 1.1to 1.5 50.00
2 improvements to rcross roads of GeleyaraBalaga Layout 40.00
3 improvements to cross rods of Shettyhalli 50.00
improvements road from Hesaragatta main road to maruthi service station
4 20.00
(Krishnamurthy layout)
Bridges and Roads
1 Formation of road drain and culverts in defance colony 35.00

62
Formation of roads drain and culverts in Vidyanagara and Vishweshwaraya
2 45.00
Colony
Side Walks and Decks
1 Formation of footpath and side walk in Sidedahalli main road 95.00
2 Formation of footpath and side walk MEI layout 95.00
480.00
ii Maintenance works
1 improvements and special repairs to schools 10.00
2 Improvements to Special repairs to Anganavadi Buildings 10.00
Maintenance of UGD
1 Maintenance of UGD in old CMC ward No.7 10.00
Maintenance of UGD in old CMC ward No.8 10.00
Maintenance of UGD inChikkasandra, Shettyhalli and Medarahalli Village 18.00
58.00
iii 18% Programme
1 improvements to Cross roads of Havnoor Badavane and Soundarya layout 50.00
2 Formation of road drain and Culvert in Chikkasandra Village 30.00
3 Formation of road drain and Culverts in Manjunathnagara 45.00
125.00
IV Other Works
1 Providing and fixing of side board, stret name board and boundry limit board 3.00
3.00
Grand Total (I+ii+iii+IV) 666.00

1. MAINTENANCE WORKS.

Rs in Lakhs
APPROX. ESTIMATE
S.L NO NAME OF THE WORK COST.
1 Annual operation and maintenance of street lights within the limits of dasarahalli 25.00
sub division , Bruhath Bangalore Mahanagar palike , Dasarahalli zone.

2 Annual operation and maintenance of street lights Within the limitsof 22.50
Bagalagunte sub division , Bruhath Bangalore Mahanagar palike , Dasarahalli
zone.
3 Annual operation and maintenance of street lights within the limits of 22.50
Chokkasandra sub division , Bruhath Bangalore Mahanagar palike ,
Dasarahalli zone.
4 Annual operation and maintenance of street lights within the limits of 25.00
Nelagadaranahalli sub division , Bruhath Bangalore Mahanagar palike ,
Dasarahalli zone.
5 Annual operation and maintenance of street lights within the limits of Laggere 25.00
sub division, Bruhath Bangalore Mahanagar palike , Dasarahalli zone.
6 Annual operation and maintenance of street lights under Herohalli sub division , 30.00
Bruhath Bangalore Mahanagar palike , Dasarahalli zone.
7 Electical Maintenace of Bruhath Bangalore Mahanagar palike Buildings, 10.00
schools, and IPP Centers within the limits of B.B.M.P, Dasarahalli Zone.
TOTAL 160.00

63
2 ORIGINAL WORKS

APPROX. ESTIMATE
COST.
S.L NO NAME OF THE WORK Rs in Lakhs
Providing tube light street light fittings and timer switches within the limits of
Dasarahalli Subdivision , Bruhath Bangalore Mahanagar palike , Dasarahalli
1 Zone. 20.00
Providing tube light street light fittings and timer switches within the limits of
Bagalagunte Subdivision , Bruhath Bangalore Mahanagar palike , Dasarahalli
2 Zone. 20.00
Providing tube light street light fittings and timer switches within the limits of
Chokkasandra Subdivision , Bruhath Bangalore Mahanagar palike , Dasarahalli
3 Zone. 20.00
Providing tube light street light fittings and timer switches within the limits of
Nelagadaranahalli Subdivision , Bruhath Bangalore Mahanagar palike ,
4 Dasarahalli Zone. 20.00
Providing tube light street light fittings and timer switches within the limits of
Leggere Subdivision , Bruhath Bangalore Mahanagar palike , Dasarahalli Zone.
5 20.00
Providing tube light street light fittings and timer switches within the limits of
Herohalli Subdivision , Bruhath Bangalore Mahanagar palike , Dasarahalli
6 Zone. 20.00
Providing Sodium Vapour street light fittings and timer switches within the
limits of Dasarahalli Subdivision , Bruhath Bangalore Mahanagar palike ,
7 Dasarahalli Zone. 20.00
Providing Sodium Vapour street light fittings and timer switches within the
limits of Bagalagunte Subdivision , Bruhath Bangalore Mahanagar palike ,
8 Dasarahalli zone. 20.00
Providing Sodium Vapour street light fittings and timer switches within the
limits of Chokkasandra Subdivision , Bruhath Bangalore Mahanagar palike ,
9 Dasarahalli Zone 20.00
Providing Sodium Vapour street light fittings and timer switches within the
limits of Nelagadaranahalli Subdivision , Bruhath Bangalore Mahanagar palike
10 , Dasarahalli Zone. 20.00
Providing Sodium Vapour street light fittings and timer switches within the
limits of Leggere Subdivision , Bruhath Bangalore Mahanagar palike ,
11 Dasarahalli Zone. 20.00
Providing Sodium Vapour street light fittings and timer switches within the
limits of Herohalli Subdivision , Bruhath Bangalore Mahanagar palike ,
12 Dasarahalli Zone. 20.00
Providing 12.5 Mtr High mast light at TVS Cross Junction, Leggere near Ring
13 Road Bridge, Hegganahalli , Magadi main road, Near BEL layout. 16.00
Providing Illumination to Hegganahalli Main Road from Peenya 2ND Stage to
Sunkadakatte Within the limits of Bruhath Bangalore Mahanagar palike ,
14 Dasarahalli Zone. 25.00
Shifting of Electrical poles and Lines obstructing Traffic flow in Roads.
15 2.00
TOTAL 283.00

64
III. ORIGINAL WORKS-18% PROGRAMME

APPROX. ESTIMATE
COST.
S.L NO NAME OF THE WORK Rs in Lakhs
Providing Tube Light, Sodium Vapour Street light fittings, Control wires &
Switches at Kammagondanahalli Colony, Abbigere Colony, Ravindra Nagar,
Mallasandra colony, kalasthi nagar, Under Dasarahalli subdivision, within the
1 limits of Bruhath Bangalore Mahanagar palike , Dasarahalli Zone. 15.00
Providing Tube Light, Sodium Vapour Street light fittings, Control wires &
Switches at Bagalagunte Colony, and Manjunath Nagr Colony Under
Bagalagunte Subdivision , within the limits of Bruhath Bangalore Mahanagar
2 palike , Dasarahalli Zone. 5.00
Providing Tube Light, Sodium Vapour Street light fittings, Control wires &
Switches at Narayanpura colony, nethaji nagar, Under Chokkasandra
Subdivision , within the limits of Bruhath Bangalore Mahanagar palike ,
3 Dasarahalli Zone. 7.50
Providing Tube Light, Sodium Vapour Street light fittings, Control wires &
Switches at Nelagadaranahalli colony, Shivpura Colony,Thigalarapalya Colony,
Channanayakanahalli colony, Doddabidarakallu Colony etc Under
Nelagadaranahalli Subdivision , within the limits of Bruhath Bangalore
4 Mahanagar palike , Dasarahalli Zone. 12.00
Providing Tube Light, Sodium Vapour Street light fittings, Control wires &
Switches at Lakshmidevi nagar colony, Rajgopal nagar colony, leggere colony
etc. Under Leggere Subdivision , within the limits of Bruhath Bangalore
5 Mahanagar palike , Dasarahalli Zone. 10.00
Providing Tube Light, Sodium Vapour Street light fittings, Control wires &
Switches at Heggenahalli colony. Maruthi nagar, Herohalli colony etc. Under
Herohalli Subdivision, within the limits of Bruhath Bangalore Mahanagar
6 palike , Dasarahalli Zone. 7.50
Total 57.00
Zone Total 4498.00

65
WEST ZONE
Details of Programme of works for the year 2008-09
(Works proposed for 08-09)
Pertaining to Yeshwantapura Sub Division-I
Sl No. Name of the work Est. cost
I. General Works
a. Capital Works
1 Providing Asphalting to HMT high school to ISRO in Ward No. 1 10.00
Providing Asphalting to Ayyappa Ngr, Udupa garden Jalahalli Village to missing
2
bits in ward no. 1 8.00
Providing Asphalting to Peenya, Saradambanagara in Jalahalli Village &
3
Saradambanagara (new layout) W-1 10.00
Providing CC to 1st, 1st Am 2nd & 5th Crs. of Sharadamba Ngr in Ward No. 1
4
10.00
Formation of Footpath, consruction drain & shoulder drain from ST plant
5
towards HMT high school in W-1 10.00
Construction of balance portion of SSM drain near Gruhalakshmi Apts. Upto
6
NH-4 in Ward No. 1 10.00
7 Imp. to drain & culverts in Jalahalli Village in Ward No. 1 5.00
Construction of SSM drain & RCC covering slab, park road, Jalahalli in Ward
8
No. 1 9.00
Construction of Compound wall to Protect Corporation property near Ward
9
Office in Ward No.1 3.00
Sub - Total = 75.00
b. Maintenance
10 Procurement of Bitumen Emulsion for filling potholes in W-1 1.00
11 Depot Collections for the year 2008-09 in Ward No. 1 1.00
Improvements & special repairs to Ward-1 Office, Tailoring Hall, Anganwadi
12
& Gymnasium building 4th cross at Jalahalli Village in W-1 3.00
13 Providing & Painting of street name boards in Ward No. 1 1.00
14 Supply of sign boards & baricades for execution of works in W-1 1.00
Sub - Total = 7.00
A. General Works Total = 82.00
II. Contact Points
15 Maintenance of Contact Point at Ward-1 Office, 4th Crs Jalahalli in ward no. 1
10.00
16 Emergency fund (JC/CE) 13.00
II. Contact Points Total = 23.00
Details of Programme of works for the year 2008-09
(Works proposed for 08-09)
Pertaining to Yeshwantapura Sub Division-II

a. Capital Works
1 Construction of Plastic Collection centre near Chowdeshwari bus stop in W-2 1.00
Providing Metalling, Culverts, deck slab & Asphalting to 12th A , F cross &
2
surroundings, in Mutyala Ngr W-2 23.00
Providing Metalling, Culverts, deck slab & Asphalting to 15th C, H, T &
3
sourrounding crosses, in Mutyala Ngr W-2 12.00
4 Improvements to Drains & Culverts in Brindavan Nagar Ward No. 2 6.00
5 Providing deck slab over SWD infront of J P Park in W-2 10.00
6 Improvements to Drains & culverts in M K Ngr W-2 5.00
7 Improvements to Drains & culverts in Chinnappa Gdn W-2 5.00

66
Improvements to Drain & providing covering slab along pipline road (northern
8
side) w-2 5.00
9 Providing Metalling & improvements to drain in Muthyala Ngr W-2 9.00
Sub - Total = 76.00
B. Maintenance
10 Procurement of Bitumen Emulsion for filling potholes in W-2 1.00
11 Providing & Painting of street name boards in Ward No. 2 1.00
12 Supply of sign boards & baricades for execution of works in W-2 1.00
Improvements & special repairs to Post Office, Veternary Hospital & Tailoring
13 Centre, 1st Mn Rd Jalahalli, Ward-2 Office building, near Chowdeshwari Bus W
2 3.00
Sub - Total = 6.00
I. General Works Total = 82.00
II. Contact Points
Maintenance of Contact Point - I at Ward-2 Office, Chowdeshwarai Bus stop in
14
ward no. 2 10.00
15 Emergency fund (JC/CE) 13.00
II. Contact Points Total = 23.00
Details of Programme of works for the year 2008-09
(Works proposed for 08-09)
Pertaining to Yeshwantapura Sub Division-III
a. Capital Works
1 Construction of Help Line centre @ Government High School premises Gokula
1st stg, 1st Ph. In W-3 9.50
2 Additions & special repairs to Ward-3 Office, Tailoring centre & Quarters at
Pipe line road, W-3 3.00
3 Providing Cement Concrete to Crs road from 2nd Mn towards SWD Gokula 1st
stage, 3rd Ph & Bandappa street & formation of L drain on northern side of
Bandappa street in Ward No.3 16.00
4 Providing Aspalting to balance roads in Gokula 1st stage 3rd phase, 12th cross.
2nd Mn Rd B K Ngr & surrounding crosses in Wrd No. 3 10.00
5 Construction of box dain & providing covering slabs along 2nd main road, B K
Ngr (Eastern side) from Bandappa Road in Ward No. 3 8.00
6 Reconstruction of drain & providing covering slabs over drain from
Shanimahatma Temple to IPP Hospital, 1st Mn Rd, B K Ngr W-3 7.00
7 Improvements to drains & junction in front of Rly Station in Ward No. 3 12.00
8 Improvements to drains & Providing Covering slabs to 15th cross B K Nagara in
Ward No. 3 6.00
9 Construction of Samudaya Bhavana (Balance Works), 1st Main Road, BK
Nagara in Ward No 3 60.00
Sub - Total = 131.50
b. Maintenance
9 Procurement of Bitumen Emulsion for filling potholes in W-3 1.00
10 Depot collection for the year 2008-09 W-3 1.00
11 Improvements & special repairs to Corporation High School, Junior College at
Gokula 1st stg, 1st Ph, Nursery School behind Metarnity Hospital at
Yeshwantpura & IPP Hospital at 1st Mn Rd, B K Ngr in W-3 6.00
12 Providing fencing to corporation property at 1st E Mn & Painting of name
boards in Ward No. 3 1.50
13 Supply of sign boards & baricades for execution of works in W-1 1.00
Sub - Total = 10.50
I. General Works Total = 142.00

67
II. Contact Points
14 Maintenance of Contact Point - I at Ward-3 Office, Pipeline road in ward no. 3
10.00
15 Emergency fund (JC/CE) 13.00
II. Contact Points Total = 23.00

List of Proposed POW Works for 2008-09 In Ward No 4 Pertaining to Sanjaynagar Sub-division

Sl. Est Cost


Name of the work
No. (In lakhs)
CAPITAL WORKS
Providing Cement concreting to narrow roads (6th, 6th ‘A’ cross &1st ‘A’ main
road) in K.N. Extenstion and Gokula 1st stage 2nd phase (lane joining 4th cross
1 16.00
road & 5th cross road) & 1 'B' road in M.K. Estn., & 3rd main road in
Chikkamaranahalli in Ward No.04.
Re-Asphalting of 3,4,5,6th Cross roads & 4,5,6th man roads AGS layout & 1st
2 Cross road & main road of Jaladarshini layout & roads of ITI layout & 15.00
Venkateshwara layout in Ward No.04.
Re-Asphalting to 1st ‘A’ to 1st ‘D’ Cross roads, 1st & 2nd main road in RMV 2nd
3 stage 3rd block & 1st to 6th cross roads, 1st to 3rd main roads in Chikkamaranahalli 15.00
in Ward No.04
4 Re-Asphalting to 1st to 4th cross roads in R.K.Garden in Ward No.04. 13.00

5 Re-Asphalting of Pipeline road from BEL road to Nethaji Circle in Ward No.04 17.00
Sub-Total -1 76.00
MAINTAINANCE WORKS
6 Supply of Emulsion Tar 1.00
7 Depot Collection 1.00
8 Construction Plastic Collection centre in ward No 1.00
9 Providing Work Name Baords 1.00
10 Painting to Name boards in ward No 4 2.00
Sub-Total -2 6.00
Total 82.00
HELP LINE CENTRE
13 Maintenance of Help line Centre in ward No 4 10.00
14 Reserves Grants 13.00
Sub-Total -4 23.00

List of Proposed POW Works for 2008-09 In Ward No 100 Pertaining to Sanjaynagar Sub-division

Sl.
Name of the work Est Cost (In laksh)
No.
CAPITAL WORKS
Providing drains, metalling & Asphalting to Seenappa layout road in ward 20.00
1
no.100
Re-Asphalting to cross roads from 1st to 6th cross roads & 2nd main road of 15.00
2
Jaladarshini Layout. in ward no.100
Re-Asphalting to cross roads from 1st to 6th cross roads & main roads 1st to 5th 16.00
3
main roads of NGEF Layout. in ward no.100
Re-Asphalting to 2nd main road & 11th cross roads of Dollars Colony RMV 2nd 10.00
4
stage & 2nd Block cross roads in ward no.100

68
Re-construction of culverts at Patellappa layout, Geddalahalli & KEB layout in 10.00
5
ward no.4.
5.00
6 Construction of Culverts across SWD near ISRO main Builiding in ward no.100
Sub-Total -1 76.00
MAINTAINANCE WORKS
7 Supply of Emulsion Tar 1.00
8 Depot Collection 1.00
9 Construction of Plastic collection centre in ward no.100 1.00
10 Providing Work Name Boards 1.00
11 Paiting to name boards in ward no.100 2.00
Sub-Total -2 6.00
HELP LINE CENTRE
14 Maintenace of Helpline Centre in ward No 100 10.00
15 Reserves Grants 13.00
Sub-Total -5 23.00
BRUHATH BANGALORE MAHANAGARA PALIKE

POW (Works Proposed for 2008-09) in ward no.5, Malleshwarm Sub division

Sl.No Name of the Work Est. cost in Lakhs


I. CAPITAL WORKS
Providing Cement Concrete to Conservancy Lane (Behind food world) & 10.00
1 Providing Covering slab infront of Sevasadana and Construction of Culverts
(T.Chowdeshaiah road ) in IDEL park Malleshwaram in ward no.5
2 Improvements to footpath C.V Raman in ward no.5 19.00
Improvements to Footpath & Drain, 11th Cross from 3rd Cross to toward 3rd 16.00
3 Main Road, Vyalikaval and 12th A cross, Kodhandaramapura,Malleshwaram in
ward no.5
Providing Asphalting and Footpath at 4th Cross Road in S.P.Extension in ward 5.00
4
no.5
construction of RCC drain & Covering Slab from Sankey tank to Maramma 15.00
5
Circle in ward no.5
Improvements to Public Toilet at 12th Cross, Kodandharampura & Ward office 3.00
6
in ward no.5
Improvements of Open Air Theatre, Gymnasium Building and Improvements to 50.00
7
Kabaddi Ground at 12 th Cross, Kodandaramapura in Ward No 5
Sub Total - 1 118.00
II. Maintenance Works
7 Annual Maintenance of Samudhaya Bhavana & I.P.P Building in ward no.5 4.00
8 Depot Collection for the year 2008-09 in ward no.5 1.00
9 Providing Painting to Kerb stone & Name Boards in ward no.5 1.50
10 Supplying Tools & Plants & Signed Boards in ward no.5 1.50
11 Supply of emuslion tar for Potholes filling in ward no.5 1.00
Barricading & Desilting for the Imerssion of Ganesh Idol at Sankey Tank in
12 5.00
ward no.5
Sub Total - 2 14.00
Total for General Grant 132.00

69
POW (Works Proposed for 2008-09) in ward no.6,Malleshwarm Sub division

Sl.No Name of the Work Est. cost in Lakhs


I.Capital Work
Improvements to Road side drain & Footpath from Dhattatreya Temple to 10.00
1
Sheshadripuram 1st cross, Malleshwaram in ward no.6
Providing Concrete to Conservancy lane, 1st street, Anjaneya Block Back side 15.00
2 and Providing RCC covering slab for concrete drain between 6th and 8th cross
left side CCA road in ward no.6
Asphalting to Nagappa Street Main Road from Vinayaka Circle to 10.00
3
Sheshadripuram, 1st Main Road , Malleshwaram in ward no.6
Improvements to Road side Drain and Footpath Resitting at Gutthalli Main Road, 15.00
4
Malleshwaram in ward no.6
Improvements to drain & Footpath at 10th Cross from sampige Road to 2nd 13.00
5 Temple Road & 5th cross Pipe line road to SWD Malleshwaram in ward no.6

Improvements to Railway paraller Road side drain & Foothpath from Sampige 13.00
6
theatre to Railway Bridge & 4th main, M.D. Block in ward no.6
7 Improvements to ward office in ward no.6 1.00
Sub Total - 1 77.00
II. Maintenance Works
8 Depot Collection for the year 2008-09 in ward no.6 1.00
9 Providing Painting to Kerb stone & Name Boards in ward no.6 1.50
10 Supplying Tools & Plants & Signed Boards in ward no.6 1.50
11 Supply of emuslion tar for Potholes filling in ward no.6 1.00
Sub Total - 2 5.00
Total for General Grant 82.00
POW (Works Proposed for 2008-09) in ward no.7, Malleshwarm Sub division
Sl.No Name of the Work Est. cost in Lakhs
I. Capital Works
1 Construction of Gymnasium Building at Pit Colony Play ground in ward no.7 6.00
Providing Asphalting to 1st to 4th Main, M.T.Layout , bad reaches of 9th &7th
2 10.00
Cross, Malleshwaram in ward no.7
Improvements to Drains & Footpath at 6th Cross, 7th Cross, (Between 4th Main
3 & 6th Main) & at 6th Main Road, Malleshwaram, and Improvements to Drain at 14.00
S.C.Road, Shariff Slum in in ward no.7
Improvements to footpath at Sir. C.V.Raman Road from Maramma Circle to 18.00
4
MSR Road (Southern side) in ward no.7
Providing Reconcreting to Conservancy lanes between 6th Cross & 11th Cross 9.00
5
Malleshwaram in ward no.7
Improvements to drains & Culverts at 10th Main & 12th cross, Malleshwaram in 20.00
6
ward no.7
Sub Total - 1 77.00
II. Maintenance
7 Depot Collection for the year 2008-09 in ward no.7 1.00
1.50
8 Providing Painting of Kerb Stones & Name boards in Malleshwarm in ward no.7
9 Supply of emuslion for patches of Potholes in ward no.7 1.00
10 Supply of Tools & Plants & Signed Boards to ward no.7 1.50
Sub Total 2 5.00
Total for General Grant 82.00

70
BUDGET GRANTS FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 25
MAHALAKSHMIPURAM SUB DIVISION
Est. Cost (Rs. In
Sl. No. Name of Work
Lakhs)
I. Capital Works
1 Providing and constructing SSM drain 9th Main, Srirampuram and Kalappa 10.00
Block surrounding areas in ward No.25.
2 Reconstruction of drain and providing deck slab at Nagendra Garden in Ward 8.00
No.25.
3 Providing cement concrete road and lanes at 5th, 6th and other surrounding area 7.00
of Gopalapuram in Ward No.25.
4 Providing cement concrete road and lanes at Modamoddhin block in 9.00
Ramachandrapura in Ward No.25.
5 Providing cement concrete road and lane at Pillamma Block, 1st Cross, 2nd 9.00
Cross and surrounding.
6 Providing cement concrete at Saibabanagar 1st, 2nd, 3rd and 4th Cross in Ward 8.00
No.25.
7 Providing cement concrete road 1st and 2nd Cross New Kalappa block in Ward 7.00
No.25.
8 Providing cement concrete road in Selva Nagar Main Road in Ward No.25. 7.00
9 Providing cement concrete road and drain at Aurandathi nagar In ward No.25. 5.00

10 Providing cement concrete roads and drain (Missing bits) in Gopalapuram and 7.00
surrounding areas in Ward No.25.
II. Maintenance Works
11 Procurement of Bitumen mulsion for filling pot holes in Ward No.25 1.00
12 Depot Collections for the year 2008-09 in Ward No.25. 1.00
13 Providing painting of street name boards in Ward No.25 1.00
14 Supply of Sign boards and barricades for execution of works in Ward No.25 1.00
15 Providing painting to kerb stones in ward no.25 1.00
Sub total 82.00
II. Contact Points (Help Line Centre)
20 Maintenance of Contact point at Ward No.25, Office 10.00
21 Emeregency Fund (JC / CE ) 13.00
Sub Total 23.00

BUDGET GRANTS FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 26


Est. Cost (Rs. In
Sl. No. Name of Work
Lakhs)
I. Capital Works
1 Providing drain & Cement concrete to roads & lanes in Shastrinagar in Ward 9.00
No.26.
2 Providing Cement Concrete to lanes in Papanna Block in Ward No.26. 9.00
3 Providing Cement Concrete to lanes in Swatantrapalya in Ward No.26 9.00
4 Providing Cement Concrete to lanes in Swatantrapalya 1st Main Road 9.00
5 Providing Cement Concrete to lanes in Hanumanthapura 1st & 2nd Main & 10.00
Cross Roads in Ward No.26.
II. Maintenance Works
6 Improvements to drain at Kasturinagar & Providing Cement Concrete to Cross 7.00
Roads in Ward No.26.
7 Reconstruction of primary SWD & Providing RCC Coveringin Papanna Block 14.00
in Ward No.26.

71
8 Special repairs to public toilet Behind church Vatal Nagaraj Road, Okalipuram 5.00
slum , Narayan Colony & Improvements to Surrounding area in Ward No.26.
9 Special repairs to public toilet Jai Bheem Nagar & VST Colony Slum & 5.00
Imrpvoements to Surrounding area in Ward No.26.
10 Procurement of Bitumen mulsion for filling pot holes in Ward No.26 1.00
11 Depot Collections for the year 2008-09 in Ward No.26 1.00
12 Providing painting of street name boards in Ward No.26 1.00
13 Supply of Sign boards and barricades for execution of works in Ward No.26 1.00
14 Providing painting to kerb stones in ward no.26 1.00
Sub total 82.00
II. Contact Points (Help Line Centre)
19 Maintenance of Contact point at Ward No.26, Office 10.00
20 Emeregency Fund (JC / CE ) 13.00
Sub Total 23.00

BUDGET GRANTS FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 27


Est. Cost (Rs. In
Sl. No. Name of Work
Lakhs)
I. Capial Works
1
Construction & formation of drains to cross roads in K.P. West in Ward No.27. 5.00
2
Providing and construction of drain in and around Nehrunagar in Ward No.27. 5.00
3 Construction of drain & providing RCC slab covering (N/Side) from palace road
to 1st Main road Gandhinagar, Kalidasa Marga in Ward No.27. 7.00
4 Construction of footpath in the surrounding area of Gandhinagar School in K.P.
West in Ward No.27. 5.00
5 Formation & Providing cement concrete to lanes & narrow lanes in the
surrounding areas of P.C. Road in Ward o.27. 5.00
6 Providing Cement Concrete to Hospital road at Balepet in Ward No.27. 5.00
7 Annual maintenance to Community Hall at Resildar Street in Ward No.27. 5.00
8 Special repairs to toilet block at Rilsdar, V.V. Giri Colony and Lakshmanpuri
and Himayala Slum in Ward No.27. 6.00
9 Improvements to drains of lanes and By-lanes in Laxmanpuri Colony in Ward
No.27. 5.00
III. Maintenance of Work
10 Improvements to drains in the surroundings of Sirurpark at Sheshadripuram in
Ward No.27. 5.00
11
Imprvoements to drains & Providing RCC slab covering to drains (W/Side) of
Sheshadripuram 1st Main from Kino Theatre to Sheshadri Circle in Ward No.27. 5.00
12
Improvements to drains & footpath in Balepet surrounding areas in Ward No.27. 5.00
13 Improvements, rejuvenation and beautification of footpaths at Dr. T.C.M.
Royan Circle in Ward No.27. 5.00
14 Annual maintenance of Sub Way at Railway Station in Ward No.27. 5.00
15 Procurement of Bitumen mulsion for filling pot holes in Ward No.27 2.00
16 Depot Collections for the year 2008-09 in Ward No.27 2.00
17 Providing painting of street name boards in Ward No.27 3.00
18 Supply of Sign boards and barricades for execution of works in Ward No.27 2.00
Sub Total 82.00

72
II. Contact Points (Help Line Centre)
22 Maintenance of Contact point at Ward No.27, Office 10.00
23 Emeregency Fund (JC / CE ) 13.00
Sub Total 23.00
BUDGET GRANTS FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 28
Est. Cost (Rs. In
Sl. No. Name of Work
Lakhs)
I. Original Works
a. Buildings
1 Construction of 2nd floor at 25th cross Cubbonpet 10.00
Concrete road
2 Providing Cement concrete road to 2nd cross Sowrastrpet 10.00
Providing Cement concrete road to OTC road B/w BVK Iyengar road to
3 Balepet road 60.00
4 Providing Cement concrete road to S.V. Lane Crosses 10.00
5 Providing Cement concrete road to D.K. Lane crosses 5.00
II. Maintenance
b. Roads drains
1 Desilting & Improvements to footpath Avenue road 25.00
2 Depot Collection for the year 2008-09 2.00
3 Desilting and Improvements to footpath at OT pet road 15.00
4 Desilting and Improvements to footpath at Balepet main road 15.00
5 Annual Maintenance to Help point in 10th cross S.P. Extension 1.00
6 Repairs to road cutting works in concrete roads 5.00
7 Improvements to Akkipet main road 25.00
8 Filling up of pot holes 5.00
Total 183.00

BUDGET GRANTS FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 29


Est. Cost (Rs. In
Sl. No. Name of Work
Lakhs)
I. Original Works
a. Buildings
1 Construction of gents public toilet at Nagammanagara main road 10.00
2 Construction of Gents toilet at Vinny colony magadi road 10.00
3 Construction of Urinals at DR.TCM Royan road 3 Nos 20.00
4 Construction of gents toilet at Nethajinagar Magadi road 10.00
5 Construction of Ladies toilet at Ist main road Magadi road Vinny colony 10.00
II. Maintenance
a. Buildings
1 Repairs to Urinal & toilet 15.00
b. Road and drains
Providing Cement concrete road Balance portion from ETA apartment to
1 Eshwara Temple road 20.00
Providing Cement concrete road and box drain and L shape drain at Ist cross
2 road 18.00
Construction of box drain and desilting of L shape draina nd Providing culverts
3 at Magadi road 6th cross 18.00
Providing Cement concrete road from cottonpet main road to Akkipet main road
4 including desilting of drain & impts to drains 15.00
Providing cement concrete road and desilting and iMpts to drain at K.V. Lane
5 cross roads 10.00

73
Providing Cement concrete road from Dr. TCM Royan road to cottonpet main
6 road ( Mill road) 15.00
Providing Cement concrete road and desilting and Impts to footpath & drain at
7 Kurubarpet cross road 25.00
8 Providing CC road at Agrahara 6th cross road 15.00
Desilting & construction of box drain & L shape drain at Magadi road Ist cross
9 to Keshavanagara 20.00
Desilting and construction of drain at 13th main road at Agrahara sub cross (
10 near Nataraj work shop) 10.00
11 Repairs to road cutting works 10.00
12 Desilting and reconstruction of drain at 10th cross Ashwathnagar 15.00
Deislting and construction of drain and culverts at 14th main near ( sureka shop)
13 magadi road 15.00
14 Desilting & construction of drain 8th , 9th & 9th A B C cross road 10.00
15 Filling of pot holes 6.00
Side Walk Duct
Providing Cment concrete road and footpath concrete and desilting and Impts to
1 drain fromm Belimutt road to Binny mill road 50.00
2 IMpts to footpath from Mill road cross road to K.V. lane near Vandrana Hotel 10.00
Desiting and iMpts to drain and Providing footpath concrete from leprosy
3 hospital to railway cross 20.00
Deislting & Construction of drain and footpath concrete from Eshawara temple
4 to mill road 15.00
5 Impts to footpath from railway crossing to Eshwara temple road at Agrahara 10.00
18% grants
a Original works
1 Construction ogf Samundayabhavan at Vinny colony 10.00
Total 412.00
BUDGET GRANTS FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 30
Est. Cost (Rs. In
Sl. No. Name of Work
Lakhs)
I. Original Works
a. Buildings
Construction of addition room adjacent to gymnasium building at bhakshi
1 garden 25.00
2 Construction of office complex building at Dr. TCM Royan road 20.00
II. Maintenance
a. Buildings
1 Repairs to urinal & otilet 10.00
2 Improvements to K.R market building 40.00
3 Repairs to nursery building & health office at Ranasingpet 10.00
4 Impts to Nursery School at Beeradevaragudi 6.00
5 Impts to Nursery School at Ranasingpet 6.00
6 Providing Civic aminities verternary hospital at Dr. TCM Royan road 20.00
b. Road & drains
1 Providing Cement concrete road and culverts and desilting in P.V.R. ropad 25.00
2 Providing Cment concrete toad at cart stand road 30.00
3 Providing Cement concrete road atA.S> char street 25.00
4 Providing Cement concrete to cross road at Anjanappa garden 15.00
5 Repairs to road cutting 10.00
6 Construction of box drain at siddarthanagara 9.00
7 Filling up of holes 5.00

74
F. sidewalk &duct
Providing Cement concrete footpath desilting od drain & construction of drain
1 at Dr. T.C.M. Royan road 40.00
Providing Cement concrete footpath, deislting of drain and Construction of drain
2 from Veterinary hospital to Vinataka talkies 20.00
3 Providing footpath and desilting of drain at tank bund road 25.00
4 Providing cement concrete footpath & desilting of drain at police road 10.00
5 Providing Cment concrete footpath from CCB office to A.S. char street 20.00

6 Providing Cement concrete footpath from cottonpet P.S. station to CCB office 20.00
Flyover & sub way
1 Repairs to footpath & repairs to expansion joints & asphalting fly over 50.00
18% grants
1 Construction of first floor school building in bhaski garden 30.00
Total 471.00

DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09


PERTAINING TO RAJAJINAGAR SUB DIVISION
WARD NO.15, RAJAJINAGAR

Est. Cost (Rs. In


Sl. No. Name of Work
Lakhs)
I. GENERAL WORKS
a) Capital Works
Providing asphalting to cross roads of 1st Phase, Manjunathnagar in Ward
1 9.00
No.15.
Providing asphalting to cross roads of 2nd Phase, Manjunathnagar in Ward
2 9.00
No.15.
Providing cement concrete to footpath, Northern Side of Thimmaiah Road from
3 9.00
Dr. Modi Road to 1st Main, Manjunathnagar.
Providing cement concrete to footpath, Southern Side of Thimmaiah Road from
4 9.00
Dr. Modi Road to Border Road.
5 Construction of Urinals at Navarang Play Ground in Ward No.15. 4.00
6 Construction of Plastic collection point in Ward No.15. 2.00
Sub Total 42.00
b) Maintenance Works
7 Supply of Sign Board and Barricades for execution of works in Ward No.15. 2.00
8 Improvements of office chamber to MOH Office at Rajajinagar. 2.00
9 Special Repairs to Gymnasium at 4th Main, 1st Phase, Manjunathnagar. 2.00
10 Providing painting to existing Name boards. 2.00
11 Maintenance of Dr. Rajkumar Kalakshethra 10.00
12 Departmental Collection for Maintenance of Roads in Ward No.15. 2.00
13 Improvements to drains and culverts in 1st Phase, Manjunathnagar. 6.00
14 Improvements to drains and culverts in 2nd Phase, Manjunathnagar. 6.00
15 Improvements to footpath at Thimmaiah road. 7.00
16 Procurement of Bitumen Emulsion for Filling of potholes in Ward No.15. 1.00
Sub Total 40.00
I. General Works Total 82.00
III. CONTACT POINT
19 Maintenance of Contact Point (1 No.) 10.00
20 Emergency Works [JC(W)/CE(W)] 13.00
III. Contact Point Total 23.00

75
DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09
PERTAINING TO RAJAJINAGAR SUB DIVISION
WARD NO.16, KAMALANAGAR
Est. Cost (Rs. In
Sl. No. Name of Work
Lakhs)
I. GENERAL WORKS
a) Capital Works
1 Providing SSM drain, Northern side of Kurubarahalli Main Road in Ward No.16.
10.00
2 Providing SSM drain, Southern side of Kurubarahalli Main Road in Ward No.16.
10.00
Construction of footpath from Netaji arch to Kamalanagar Market Right side in
3
Ward No.16. 10.00
Providing SSM drain, RCC culverts at Shakthi Ganapathinagar Main Road on
4
both side in Ward No.16. 8.00
Providing Ornamental Street Name Boards for Main Roads and Cross Roads of
5
KEC Colony. 5.00
6 Construction of Culverts at Kirloskar 1st and 2nd Stage in Ward No.16. 10.00
7 Construction of Plastic collection point in Ward No.16. 2.00
Asphalting to Cross Roads of Kasturi Badavane at 1st, 2nd and 3rd Cross Roads,
8
Kamalanagar. 5.00
9 Asphalting to Cross Roads of Kirloskar L at 1st Cross, 2nd Cross and 3rd Cross
6.00
Sub Total 66.00
b) Maintenance Works
10 Departmental collection for the year 2008-09 of Ward No.16. 3.00
11 Maintenance of Ward Office, Tailoring Centres, Health Centers of Ward No.16.
2.00
12 Procurement of Bitumen emulsion for filling potholes in Ward No.16. 1.00
Regrading of drain and providing flagging course to Ward Office Road in Ward
13
No.16. 5.00
14 Providing painting to existing name boards in Ward No.16. 1.00
15 Supply of Sign Board and Barricades for execution of works in Ward No.16. 4.00
Sub Total 16.00
I. General Works Total 82.00
III. CONTACT POINT
Maintenace of Helpline Centers (2 Nos.) at Ward Office, 15th Main, Water Tank
20 Road, Kirloskar Colony and Primary Health Center, Near Shankarnag Bus Stop,
Kamalanagar. 20.00
21 Reserve Grants for the Emergency Works (JC(W) / CE (W) 3.00
III. Contact Point Total 23.00

76
DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09
PERTAINING TO SREERAMAMANDIRA SUB DIVISION
WARD NO.17, VRUSHABHAVATHINAGAR
Est. Cost (Rs. In
Sl. No. Name of Work
Lakhs)
I. GENERAL WORKS
a) Capital Works
1 Construction of Helpline Center building in the premises of Ward Office. 10.00
Construction of drain and covering slabs in Magadi Main Road to
2 10.00
Kamakshipalya 5th Main Road in Ward No.17.
Construction of Size Stone Masonry Drain and providing a covering slab in 2nd
3 10.00
Main Road of Vrushabhavathinagar in Ward No.17.
Providing SSM Drain and RCC Covering slab both sides in 14th Main Road and
4 10.00
Cross Roads in Nanjappa Layout in Ward No.17.
Providing SSM Drain and RCC Covering slab both sides in 11th Main Road and
5 10.00
Cross Roads in Nanjappa Layout in Ward No.17.
Providing SSM Drain and RCC Covering slab both sides in 12th Main Road and
6 10.00
Cross Roads in Maruthinagar in Ward No.17.
7 Construction of Plastic collection point in Ward No.17. 2.00
Sub Total 62.00
b) Maintenance Works
8 Supply of sign boards and barricades for execution of works in ward No.17. 2.00
9 Providing and painting street name boards in Ward No.17. 2.00
10 Maintenance of Ward Office, Tailoring Centres in ward No.17. 2.00
11 Depot collection for the year 2008-09 in Ward No.17. 3.00
12 Procurement of Bitumen Emulsion for filling potholes in Ward No.17. 2.00
Improvements to drain and providing a covering slab both sides in Harali Mara
13 9.00
Main Road in Maruthinagar in Ward No.17.
Sub Total 20.00
I. General Works Total 82.00
III. CONTACT POINTS
17 Maintenace of Contact Point at Ward No.17 Office, BEML Layout. 10.00
18 Emergency fund (JC/CE) 13.00
III. Contact Point Total 23.00
DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09
PERTAINING TO SREERAMAMANDIRA SUB DIVISION
WARD NO.18, KAMAKSHIPALYA
Est. Cost (Rs. In
Sl. No. Name of Work
Lakhs)
I. GENERAL WORKS
a) Capital Works
Providing BS Slab footpath at 60 Feet Road from Havanoor Circle to BMTC Bus
1 15.00
Stand.
Providing Ornamental Street Name Boards for Main Roads and Cross Roads of
2 5.00
KHB Colony.
Providing SSM Drain and RCC covering slab for 3rd Main Road (Eastern Side
3 5.00
of BBMP Property) at KHB Colony.
Asphalting to Roads at 7th Main and Surrounding Cross Roads at
4 7.50
Kamakshipalya.
Asphalting to Roads at 6th Main, 8th Main, 9th Main, 10th Main and Cross
5 6.00
Roads at Kamakshipalya.

77
Asphalting to Roads at 3rd Main, 4th Main, P&T Road, Ashtagrama 2nd Stage,
6 7.00
Kamakshipalya.
7 Asphalting to Roads at 4th, 5th Main, 6th Main and 3rd B Cross of KHB Colony. 6.00
8 Construction of Plastic collection point in Ward No.18. 1.00
9 Construction of Tax payment building near Auto Stand, Sharada Colony. 7.00
Sub Total 59.50
b) Maintenance Works
Maintenance of Ward Office, Tailoring Centres, Health Centers, Horticulture
10 3.00
Buildings of Ward No.18.
Improvements to culverts and drains at 1st Main Road, 2nd Cross, 2nd A Cross,
11 5.00
3rd B Main, 4th Main, 5th Main of KHB Colony.
Improvements to culverts and drains at 4th Main, 7th Main, 8th Main & 9th Main
12 5.00
of Kamakshipalya.
Improvements to culverts and drains at Eastern side of Aladamara Park of
13 5.00
Sharada Colony.
14 Depot collection for the Maintenance of road in Ward No.18. 1.50
15 Procurement of Bitumen Emulsion for filling potholes in Ward No.18. 1.00
16 Supply of sign boards and barricades for execution of works in ward No.18. 2.00
Sub Total 22.50
I. General Works Total 82.00
III. CONTACT POINTS
20 Maintenace of Helpline Centers (1 No.) 10.00
21 Reserve Grants for the Emergency Works 13.00
III. Contact Points Total 23.00
DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09
PERTAINING TO RAJAJINAGAR SUB DIVISION
Ward No.19, Basaveshwaranagar
Est. Cost (Rs. In
Sl. No. Name of Work
Lakhs)
I. GENERAL WORKS
a) Capital Works
Providing asphalting to badly damaged roads at 1st and 3rd Block, 3rd Stage,
1 10.00
Basaveshwaranagar.
Improvements to drain and culverts at 9th and 10th Crosses, Manjunathnagar in
2 10.00
Ward No.19.
Improvements to drain and culverts at 10th A and 11th Crosses, Manjunathnagar
3 10.00
in Ward No.19.
Providing Ornamental Street Name Boards for Main Roads and Cross Roads of
4 5.00
Bhovi Colony, Saneguruvanahalli.
5 Providing Cement concrete to Cross Roads in Saneguruvanahally (Old Village). 10.00
Improvements to footpath and side drains at Thimmaiah Road, Near KEB Office
6 10.00
in Ward No.19.
7 Improvements to drain and culverts at University Layout in Ward No.19. 10.00
Improvements to drain and culverts at 14th A Main at 1st Block,
8 10.00
Basaveshwaranagar in Ward No.19.
9 Construction of Plastic Collection Point in Ward No.19. 2.00
Sub Total 77.00

78
b) Maintenance Works
10 Providing painting to existing Name Boards. 2.00
11 Supply of Sign Board and Barricades for execution of works in Ward No.19. 2.00
12 Procurement of bitumen emulsion for filling of potholes in Ward No.19. 1.00
Sub Total 5.00
I. General Works Total 82.00
III. CONTACT POINT
16 Maintenance of Contact Point at Ward Office in Ward No.19. 10.00
17 Reserve Grants for the Emergency Works 13.00
II. Contact Point III) Contact Point Total 23.00

DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09


PERTAINING TO RAJAJINAGAR SUB DIVISION
WARD NO.20, SHIVANAGAR
Est. Cost (Rs. In
Sl. No. Name of Work
Lakhs)
I. GENERAL WORKS
a) Capital Works
1 Construction of contact point building at Sy. No.25, Shivanahalli 10.00
Providing Asphalting to Main and Cross Road to 5th Phase,
2 10.00
Mahaganapathinagar.
Providing Asphalting to Main and Cross Road to 6th Phase,
3 10.00
Mahaganapathinagar.
Providing cement concrete to footpath at Thimmaiah Main from 1st Main to
4 10.00
Pushpanjali Theater.
5 Construction of plastic collection point in Ward No.20. 2.00
Sub Total 42.00
b) Maintenance Works
6 Supply of Sign Board and Barricades for execution of works in Ward No.20. 2.00
7 Providing painting to existing Name boards. 2.00
8 Departmental Collection for the year 2008-09 in Ward No.20. 2.00
Improvements to drain and culverts of main and cross roads, 5th Phase,
9 9.00
Mahaganapathinagar.
Improvements to drain and culverts of main and cross roads, 6th Phase,
10 9.00
Mahaganapathinagar.
Improvements to Footpath of Thimmaiah Road and 1st Main,
11 10.00
Basaveshwaranagar.
12 Procurement of Bitumen Emulsion for filling up of potholes in Ward No.20. 1.00
13 Improvements to drain and culverts to Main and Crosses of Shivanahlly. 5.00
Sub Total 40.00
I. General Works Total 82.00
III. CONTACT POINT
14 Maintenance of contact point (1 No.) 10.00
15 Emergency grants (JC(W) & CE(W)) 13.00
III. Contact Point Total 23.00
GRAND TOTAL (I+II+III) 105.00

79
DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09
PERTAINING TO SREERAMAMANDIRA SUB DIVISION
WARD NO.21, INDUSTRIAL TOWN
Est. Cost (Rs. In
Sl. No. Name of Work
Lakhs)
I. GENERAL WORKS
a) Capital Works
Providing and constructing drain and RCC covering slabs in both sides of
1 12.00
Industrial Estate 1st Main Road and Cross Roads in Ward No.21.
Providing SSM drain and RCC covering slabs in Andalamma Mutt at Industrial
2 12.00
Town in Ward No.21.
Construction of drains and culverts at Dasarahalli in 4th Main road and its Cross
3 10.00
Roads in Ward No.21.
Providing RCC deck covering slabs at Industrial Town in Ward No.21, near
4 10.00
Raheja Park of Agrahara Dasarahalli.
5 Construction of Plastic collection point in Ward No.21. 2.00
Sub Total 46.00
b) Maintenance Works
6 Supply of sign boards and barricades for execution of works in ward No.21. 2.00
7 Providing and painting street name boards in Ward No.21 2.00
8 Maintenance of Ward Office, Tailoring Centres in ward No.21. 2.00
9 Depot collection for the year 2008-09 in Ward No.21. 3.00
10 Procurement of Bitumen Emulsion for filling potholes in Ward No.21. 2.00
Improvements to drain and providing a covering slab both sides in Agrahara
11 8.00
Dasarahalli in 8th Main Road in Ward No.21.
Maintenance of Ward Office, Tailoring Centres, Health Centers, Buildings of
12 5.00
Ward No.21.
Maintenance and Providing painting to Sub Division Office, Communitee Hall,
13 Computer Center, Hospital Building and Ward Office in Agrahara Dasarahalli in 6.00
Ward No.21.
Maintenance of Higher Primary school and High School building near Jai Muni
14 6.00
Rao Circle in Agrahara Dasara Halli in Ward No.21.
Sub Total 36.00
I. General Works Total 82.00
Providing and constructing Size stone masonry drain and covering slab to
16 9.00
existing drain in Kanteerava Colony in ward No.21.
Sub Total 9.00
b) Maintenance Works Nil
II. 18% Grants Total 18.00
III. CONTACT POINTS
Maintenace of Contact Point A50at Ambedkar Stadium and Agrahara
17 20.00
Dasarahalli in Ward No.21.
18 Reserve Grants for the Emergency Works 3.00
III. Contact Points Total 23.00
GRAND TOTAL (I+II+III) 123.00

80
DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09
PERTAINING TO SREERAMAMANDIRA SUB DIVISION
WARD NO.22, SREERAMAMANDIRA
Est. Cost (Rs. In
Sl. No. Name of Work
Lakhs)
I. GENERAL WORKS
a) Capital Works
1 Providing BS Slab footpath from Bhashyam Circle to 72nd Cross both sides. 15.00
Providing Ornamental Street Name Boards for Main Roads and Cross Roads of
2 5.00
Ward No.22.
3 Providing cement concrete road to KB Temple Street. 15.00
4 Providing concrete road to Cross Road at Jedarahalli, 5th Block, Rajajinagar. 5.00
5 Construction of Plastic collection point in Ward No.22. 1.00
6 Construction of Roll Call Shulter in Ward No.22. 7.00
Sub Total 48.00
b) Maintenance Works
7 Supply of sign boards and barricades for execution of works in ward No.22. 2.00
Improvements to footpath at 2nd Main Road, Balance Portion, 4th Block,
8 7.00
Rajajinagar, Bangalore.
9 Depot collection for the year 2008-09 in Ward No.22. 2.00
10 Procurement of Bitumen Emulsion for filling potholes in Ward No.22. 1.00
Improvements to footpath from Bhashyam Circle to Malle Gowda Road Back
11 5.00
side.
Improvements to footpath from 6th Block Circle to Entrance in Dr. Rajkumar
12 6.00
Road in Ward No.22.
Improvements to culverts and drain at 6th Main Road, 58th Cross, Rajajinagar in
13 6.00
Ward No.22.
14 Maintenance of grating and footpath in underpass near entrance. 2.00
15 Depot collection for the Maintenance of road in Ward No.22. 2.00
16 Procurement of Bitumen Emulsion for filling potholes in Ward No.22. 1.00
Sub Total 34.00
I. General Works Total 82.00
III. CONTACT POINT
Maintenace of Helpline Centers at Ward Office and Tailoring Center, 11th
20 20.00
Main, Near Ramamandira Ground, Rajajinagar in Ward No.22.
21 Reserve Grants for the Emergency Works 3.00
III. Contact Points Total 23.00
BUDGET PROPOSAL FOR THE YEAR 2008-09 PERTAINING TO WARD NO.08, GAYATHRINAGARA SUB
Sl.No. Name of work
I General Grants
(a) Captial works
(b) MAINTENANCE WORK
1 Maintanence of toilets/Urinals in ward no.08 1.50
2 Maintenance of corporation building in ward no.08 10.00
3 Maintenace of water supply systems in ward no.08 0.50
Providing electrical repairs to corporation market building @ Gayathrinagara in
4 4.00
ward no.08
5 Providing electrical repairs to LN Pura market building in ward no.08 4.00
Providing electrical repairs to Corporation shopping complex near devaiah park
6 4.00
in ward no.08
7 Maintenance of asphalted roads in ward no.08 3.00
8 Pot hole fillings in ward no.08 2.00

81
9 Asphalting to cross roads in Nagapappa block, in ward no.08 5.00
10 Restoration of road cut portion in ward no.08 2.00
11 Maintenace of drains in ward no.08 5.00
12 Reconstruction of bridge across SWD in L.N.Pura in ward no. 15.00
13 Maintenace of footpath, MKK road in ward no.08 3.00
14 Maintenace of footpath, for puttaswamiah road in ward no.08 2.00
15 Maintenace of footpath, for Railway parallel road in ward no.08 2.00
16 Maintenace of footpath, for Dr. Rajkumar Road. 2.00
17 Construction of retaining wall near SWD @ LN Pura in ward no.08 5.00
18 Maintenance of chain link fencing & grills in ward no.08 1.00
Maintenance of street name boards & providing sign boards, Barricading & tools
19 3.00
& palnts in ward no.08
Reconstruction of secondary drain & concreting to conservency lanes @ A.D
20 10.00
block in ward no.08
21 Depot collection in ward no.08 2.00
22 Maintenance & improvements to drains @ D block in ward no.08 4.00
23 Maintenance & improvements to drains @ C block in ward no.08 4.00
24 Maintenance & improvements to drains @ Maruthi extension in ward no.08 2.00
25 Purchase of bitumen barrels in ward no. 08 2.00
26 Reserved for Emergency works 20.00
Total 82.00
II Help Line Center Maintenance
27 Help line center @ Gayathrinagara shopping complex in ward no.08 10.00
28 Help line center @ Market building, L.N.Pura in ward no.08 10.00
29 Emergency grants for help line work in ward no.08 3.00
Total 23.00
BUDGET PROPOSAL FOR THE YEAR 2008-09 PERTAINING TO WARD NO.09 MAHALAKSHMIPURAM
Sl.No. Name of work
I General Grants
(a) Capital Works
Providing CC to 7th cross and 2nd cross (old 8th cross) B block, Subramanya
1 10.00
nagara in ward no.09
Providing RCC deck slab to SWD near 8th A cross, Gandhi grama B block,
2 10.00
Rajajinagara in ward no.09
Asphalting to 2nd to 5th main road and 2nd to 5th cross roads, Milk colony, A
3 10.00
block in ward no.09
Asphalting to Gayathrinagara main road, Subramanya nagara main road, 5th
4 10.00
cross (E-block) & 17th cross, Subramanya nagara in ward no.09
(b) Maintenance
Improvements to drain & culverts at A,B and E block at Subramanya nagara in
5 10.00
ward no.09
Maintenance of ward office, community hall, high school building &
6 5.00
Gymansium buildings in ward no.09
Improvements to drains & culverts @ E & B block 2nd stage, Rajajinagara in
7 10.00
ward no.09
Maintenance of street name boards & providing sign boards, Barricading & tools
8 3.00
& palnts in ward no.09
9 Maintenance of roads and potholes filling in ward no.09 3.00
10 Purchase of bitumen barrels in ward no. 09 2.00
11 Depot collection in ward no.09 2.00
12 Reserved for Emergency works 7.00
Total 82.00

82
II Help Line Center Maintenance
13 Help line center @ Dr.Raj Kumar road near ESI hospital in ward no.09 10.00
14 Help line center @ 8th A cross, Gandhi grama in ward no.09 10.00
15 Emergency grants for help line work in ward no.09 3.00
Total 23.00
BUDGET PROPOSAL FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 10 MAHALAKSHMIPURAM
Sl.No. Name of work
I General Grants
(a) Capital works
1 Construction of health ward office in ward no.10 8.00
2 Constructionof tax collection centre in ward no.10 8.00
3 Construction of drain and culverts @ Industrial suburb in ward no.10 10.00
(b) Maintenance
Maintenance of community hall, Sub division office, corporation school,
4 4.00
tailoring centre in ward no.10
Improvements and providing RCC deck slab at MLP further extension slum in
5 10.00
ward no.10
6 Maintenance of roads and pot holes filling in ward no.10 3.00
7 Depot collection in ward no.10 2.00
8 providing sign boards, Barricading & tools & palnts in ward no.09 2.00
Maintenace of street name boards & providing new street name boards in ward
9 3.00
no.10
10 Purchase of bitumen barrels in ward no. 09 2.00
Improvements to storm water drain, retaining wall repairs, bed treatment &
11 10.00
covering deck slab at Mahalakshmi layout and shankara nagara in ward no.10
12 Plastic collection points in ward no.10 2.00
Providing bus shelter and libray building near mahalakshmi layout bus stand in
13 10.00
ward no.10
14 Reserved for Emergency works 8.00
Total 82.00
II Help Line Center Maintenance
15 Help line center @ Sub division office in ward no.10 10.00
Help line center @ Shanimahathma temple road , Shankara nagara in ward
16
no.10 10.00
17 Emergency grants for help line work in ward no.10 3.00
Total 23.00
BUDGET PROPOSAL FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 11

Sl.No. Name of work

I Original Works
(a) Capital Works
1 Providing drains in peenya new extention in ward no.11 5.00
Improvements to roads in Muneshwara Industrial estate 1st stage peenya, PIA in
2 10.00
ward no.11
Improvements to roads 6th main (Raj kamal transport road) & 7th main by
3 providing SSM drain and embakment, metalling @ 2nd phase, PIA in ward 30.00
no.11
Providing SSM drain & deck slab culvert to cross roads of 4th block of
4 5.00
G.G.Palya in ward no.11
Providing CC & SSM drains to cross roads (Near NH4 petrol bunk ) peenya
5 5.00
village in ward no.11

83
(b) Maintenance
Maintenance of ward office, tailoring centre, School building and health ward
6 3.00
office in ward no 11
7 Maintenance of roads and potholes filling in ward no.11 5.00
8 Plastic collection in ward no.11 1.00
Maintenance of street name boards & providing sign boards, Barricading & tools
9 3.00
& palnts in ward no.11
10 Depot collection in ward no.11 2.00
11 Purchase of bitumen barrels in ward no. 11 2.00
12 Reserved for Emergency works 11.00
Total 82.00
II Help Line Center Maintenance
13 Help line center @ G.G.Palya in ward no.11 10.00
14 Help line center @ Peenya in ward no.11 10.00
15 Emergency grants for help line work in ward no.11 3.00
Total 23.00
BUDGET PROPOSAL FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 12
Sl.No. Name of work
I General Grants
(a) Capital Works
Construction of Anganawadi building & Rangamandira at Jai maruthi nagara in
1 10.00
ward no.12
Improvements & re-modeling of drain at 2nd and 3rd and 4th main road at
2 5.00
parimalanagara in ward no.12
3 Improvements to drains and culverts at Rajiv gandhi layout in ward no.12 10.00
4 Providing CC to Narrow roads at 7th and 8th main 4th block in ward no.12 8.00
Proviidng CC to narrow roads b/w 1st and 2nd main of Jai maruthi nagara in
5 5.00
ward no.12
Providing chain link fencing to BBMP Property at Rajiv Gandhi layout in ward
6 10.00
no.12
(b) MAINTENANCE
Maintenance ward office tailoring hall, Library building, Anganawadi building
7 4.00
and help line centers in ward no.12
8 Road cuttings and pot holes filling in ward no.12 4.00
9 Depot collection for maintenance of road in ward no.12 2.00
10 Painting kerbs, chain link fencing and Name boards in ward no.12 3.00
11 Providing plastic collection center in ward no.12 2.00
Maintenance of street name boards & providing sign boards, Barricading & tools
12 3.00
& palnts in ward no.12
13 Purchase of bitumen barrels in ward no. 12 2.00
14 Maintenance of footpath in Ward No.12. 3.00
15 Reserved for Emergency works 11.00
Total 82.00
II Help Line Center Maintenance
16 Help line center @ Kanteerava nagara in ward no.12 10.00
17 Help line center @ ward office in ward no.12 10.00
18 Emergency grants for help line work in ward no.12 3.00
Total 23.00

84
BUDGET PROPOSAL FOR THE YEAR 2008-09 PERTAINING TO WARD NO.13 GAYATHRINAGARA
SUB DIVISION
Sl.No. Name of work
I General Grants
(a) Captial works
(b) Maintenance
1 Maintenace of road & pot hole filling in ward no.14 5.00
2 Improvements to Drains & culverts in 8th B cross @ J.S.Nagara in ward no.13 5.00
3 Improvements to Drains & culverts in 1st B main @ J.S.Nagara in ward no.13 5.00
Improvements to Drains & culverts in 14th C cross, 60 feet road 1st B main road
4 10.00
@ J.S.Nagara in ward no.13
Improvements to Drains & culverts in 1st B,2nd main road @ J.S.Nagara in
5 10.00
ward no.13
Improvements to Drains & culverts in 2nd main road to 3rd main road @
6 10.00
J.S.Nagara in ward no.13
Improvements to Drains & culverts in 3rd main road to J.S.Nagara in ward
7 10.00
no 13
Improvements to Drains & culverts in 3rd cross, College of pharmacy, D Cross,
8 5.00
pipeline road @ J S Nagara in ward no 13
Improvements to Drains & culverts in D cross pipeline road Ch 0.00 to 150.00
9 5.00
Mtrs@ J.S.Nagara in ward no.13
Maintenance of street name boards & providing sign boards, Barricading & tools
10 3.00
& palnts in ward no.12
11 Purchase of bitumen barrels in ward no. 12 2.00
12 Reserved for Emergency works 12.00
Total 82.00
II Help Line Center Maintenance
13 Help line center @ in ward no.13 10.00
14 Emergency grants for help line work in ward no.13 13.00
Total 23.00
BUDGET PROPOSAL FOR THE YEAR 2008-09 PERTAINING TO WARDNO.14 GAYATHRINAGARA
SUB DIVISION

Sl.No. Name of work

I General grants
(a) Capital works
Providing chain link fencing around scating rink in Dr. Rajkumar Play Ground in
1 9.00
Ward No.14.
Providing and constructing RCC retaining wall, near existing skating rink at Dr.
2 10.00
Rajkumar Play Ground in Ward No.14.
Providing and constructing RCC retaining wall, near existing at Dr. Rajkumar
3 8.00
Play Ground in Ward No.14.
4 Construction of store room and office room at Dr. Rajkumar play ground. 8.00
(b) Maintenance
Providing water supply & sanitary connection to the computer center building @
5 5.00
1st N block Rajajinagara in ward no.14
6 Reparis & improvements to engineering & health ward office @ ward no.14 1.00
Providing asphalting to bad roads @ west of chord road 2nd stage area in ward
7 10.00
no.14
8 Depot collection in ward no.14 3.00
Maintenance of street name boards & providing sign boards, Barricading & tools
9 3.00
& palnts in ward no.14

85
10 Purchase of bitumen barrels in ward no. 14 2.00
Providing & improvements to footpath & drain @ Vidyavardaka Sangha road
11 13.00
(10th cross) in 1st block, Rajajinagara in ward no.14
12 Reserved for Emergency works 10.00
Total 82.00
II Help Line Center Maintenance
13 Help line center @ in ward no.14 10.00
14 Emergency grants for help line work in ward no.14 13.00
Total 23.00
BUDGET PROPOSAL FOR THE YEAR 2008-09 PERTAINING TO WARD NO.23, GAYATHRINAGARA
Sl.No. Name of work
I General Grants
(a) Capital Works
1 Construction of toilet block @ G.D.Park in ward no.23 5.00
(b) Maintenance Works
2 Maintanence of toilets/Urinals in ward no.23 0.50
Providing flagging cours & improvements around Gymnasium building @
3 3.00
G.D.Park in ward no.23
4 Providing electrical repairs works & annex building in ward no.23 2.00
5 Providing asphalting to 59th B cross in ward no.23 19.00
6 Providing asphalting to roads @ Prakash nagara in ward no.23 15.00
7 Restoration of road cut portion in ward no.23 2.00
8 Maintenace of footpath, MKK road in ward no.23 2.00
9 Maintenace of drains in ward no.23 2.50
10 Maintenace of drains in @ 4th N block in ward no.23 3.00
11 Maintenance of drains in ward no.23 3.00
12 Maintenace of footpath, @ Ayappa temple road in ward no.23 2.00
13 Maintenace of footpath, @ Dr.Raj Kumar road in ward no.23 2.00
14 Strengthening of retaining wall near SWD @ Mariyappana palya in ward no.23 5.00
15 Maintenance of chain link fencing & grills @ G.D.Park in ward no.23 1.50
16 Maintenance of chain link fencing @ Sai college play ground in ward no.23 1.50
17 Providing CC to Narrow roads, in ward no.23 4.00
18 Reserved for Emergency works 5.00
Maintenance of street name boards & providing sign boards, Barricading & tools
19 2.00
& palnts in ward no.23
20 Depot collection in ward no. 23 1.00
21 Purchase of bitumen barrels in ward no. 23 1.00
Total 82.00
II Help Line Center Maintenance
22 Help line center @ Prakash nagara Adjacent to ward office in ward no.23 10.00
23 Help line center @ 4th N block, Prakash nagara in ward no.23 10.00
24 Emergency grants for help line work in ward no.23 3.00
Total 23.00
BUDGET GRANTS FOR THE YEAR 2008-09 PERTAINING TO WARD NO. 24
Est. Cost (Rs. In
Sl. No. Name of Work
Lakhs)
I.Capital Works
1 Construction of electrical office at wards office premises in Ward No.24. 8.00
2 Providing cement concrte road and lane in between 7th and 8th main 7.00
Srirampuram in Ward No.24.
3 Providing cement concrete missing bits at Ambedkarnagar and R.K.S. Nagar in 6.00
Ward No.24.

86
4 Providing cement concrete roads and improvements drains Pillamma Block in 7.00
Ward No.24.
5 Providing cement concrete road near ESI Hospital in Ward No.24. 5.00
II. Maintenance
6 Special repairs to Ambedkar Bhavan at 5th Cross Dayananda in Ward No.24 5.00
7 Special repairs to Nursery School 7th Cross, Anganawadi at 5th Main 5.00
Srirampuram in Ward No.24.
8 Special repairs toLibrary buildings & Anganawadi Kendra at 6th Cross, RJI 7.00
Colony in Ward No.24.
9 Improvements to BBMP Quarters in Ward No.24 5.00
10 Reconstruction of drain and providing cement concrete to Bhashyamnagar 1st, 7.00
2nd, 3rd, 4th cross road in Ward No.24.
11 Reconstruction of SSM and providing deck slb at Bandi reddy Circle in Ward 5.00
No.24.
12 Reconstruction of drain and providing deck slab and cement concrete roads and 7.00
lane at Gouthamnagar in Ward No.24.
13 Improvements to drain and footpath at 7th and 9th Main Srirampuram in Ward 8.00
No.24.
Sub Total 82.00
II. Contact Points (Help Line Centre)
20 Maintenance of Contact point at Ward No.24, Office 10.00
21 Emeregency Fund (JC / CE ) 13.00
Sub total 23.00
DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09
( WORKS PROPOSED FOR 08 - 09 )
PERTAINING TO CHAMARAJPET SUB DIVISION WARD NO.46

Est. Cost (Rs. In


Sl. No. Name of Work
Lakhs)
I. Genearl works
a. Capital Works
1 Construction of culverts at 8th cross from Sirsi road to 5th Main road 10.00
Chamarajpet in ward no.46
2 Providing cement concrete to footpath at 3rd, 4th, 5th Main road Chamarajpet 26.00
and from 7th cross to 8th cross in ward no.46
3 Providing cement concrete to lanes at Dasappa garden and Krishnna layout in 10.00
ward no.46
4 Providing cement concrete to lanes at Raghavendrea colony in ward no.46 10.00
5 Providing cement concrete to conservency lane between 5th main and 4th main 10.00
form 5th cross to 6th cross in ward no.46
6 Providing cement concrete to Appajappa Agrahara Main road in ward no.46 10.00
Sub total 76.00
b. Maintenance Works
7 Procurement of Bitumen emulsion for filling pot holes in ward no.46 1.00
8 Depot collection for the year 2008 - 09 in ward no.46 2.00
9 Special reparires to ward office and Shasakara Bhavan at 3rd Cross Chamarajpet 1.00
in ward no.46
10 Providing painting to street name boards in ward no.46 1.00
11 Supply of Sign boards and barricads for execution of works in ward no.46 1.00
Sub total 6.00
General Works TOTAL 82.00

87
II. Contact points
12 Maintenance of Contact point at 6th cross chamaraj pet in Ward No.46. 10.00
13 Emeregency Fund (JC / CE ) 13.00
Contact points TOTAL 23.00

DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09


( WORKS PROPOSED FOR 08 - 09 )
PERTAINING TO CHAMARAJPET SUB DIVISION WARD NO.47

Est. Cost (Rs. In


Sl. No. Name of Work
Lakhs)
I. Genearl works
a. Capital Works
1 Construction of first floor to stores building at Dasappa Hospital Premises in 20.00
ward no.47
2 Providing cement concrete and improvements to footpath at Siddanna lane 7.00
balance portion in ward no.47
3 Providing cement concrete to Govindappa lane in ward no.47 6.00
4 Providing cement concrete to DCM lane and balance portion of Ranoji rao lane 4.00
in ward no.47
5 Construction of Nirmala Bangalore Toilet at Bamboobazar Main road and 10.00
dispensary road Kalasipalya in ward No.47
6 Providing cement concrete to road cut portion at K.R.road in ward no.47 6.00
7 Providing drinking water borewells at Subansab lane and P.R.S lane in ward 7.00
no.47
8 Providing cement concrete to B.Oosman khan road from N.R.road 4th cross to 14.00
3rd cross in ward no.47
Sub total 74.00
b. Maintenance Works
9 Procurement of Bitumen emulsion for filling pot holes in ward no.47 1.00
10 Depot collection for the year 2008 - 09 in ward no.47 2.00
11 Special repairs to ward office and Buildings at Dasappa Hospital premises in 2.00
ward no.47
12 Providing and painting to street name boards in ward no.47 1.00
13 Supply of Sign boards and barricads for execution of works in ward no.47 1.00
14 Special repairs to P.K quarters at Kumbargundi and Mothinagar in ward no.47 1.00

Sub total 8.00


General Works TOTAL 82.00
II. Contact points
15 Maintenance of Contact point at Dasappa Hospital premises in Ward No.47. 10.00
16 Emeregency Fund (JC / CE ) 13.00
Contact points TOTAL 23.00
DETAILS OF PROGRAMME OF WORKS FOR THE YEAR 2008-09
( WORKS PROPOSED FOR 08 - 09 )
PERTAINING TO CHAMARAJPET SUB DIVISION WARD NO.48
Est. Cost (Rs. In
Sl. No. Name of Work
Lakhs)
I. Genearl works
a. Capital Works
1 Asphalting to Lalbagh road 4th cross and surrounding area in ward no.48 12.00
2 Asphalting to Mission road in ward no.48 8.00

88
3 Asphalting to roads in CSI compound area in ward no.48 10.00
4 Asphalting to 1st, 2nd & 3rd cross of Srinivasa colony in ward no.48 8.00
5 Construction of RCC culvert and drain across Siddaiah road near Urvashi theater 9.70
in ward no.48
6 Providing cement concrete to lanes at Badamakan slum behind al-ameen college 5.30
in ward no.48
Sub total 53.00
b. Maintenance Works
7 Procurement of Bitumen emulsion for filling pot holes in ward no.48 2.00
8 Depot collection for the year 2008 - 09 in ward no.48 2.00
9 Removal of over burden earth and debries in ward no.48 5.00
10 Special repairs to office complex building at J.C road in ward no.48 5.00
11 Special repairs to town hall building at J.C Road in ward no. 5.00
12 Improvements and providing R.C.C covering slabs to the drain at Srinivasa 9.00
colony in ward no.48
13 Providing and painting to Name boards and sign boards in ward no.48 1.00
Sub total 29.00
General Works TOTAL 82.00

II. Contact points


14 Maintenance of Contact point at J.C road office in Ward No.48. 10.00
15 Emeregency Fund (JC / CE ) 13.00
Contact points TOTAL 23.00
Sub total 2788.00
WEST ZONE
PROVISIONAL BUDGETARY PROPOSAL PERTAINING TO 18%(CIVIL) WORKS FOR THE YEAR
III. 18% Grant
a. Capital Works
2 Provision for purchase of land / construction of toilet /construction of House 18.00
Sub - Total = 18.00
B. 18% Maintenance Works
--- NIL --- 0.00
Sub - Total = 0.00
III. 18% Grant Total = 18.00
III. 18% Grant
a. Capital Works
3 Provision for purchase of land / construction of toilet /construction of House 14.00
Sub - Total = 14.00
b. Maintenance Works
3 Improvements to existing Anganwadi building at B K Nagara slum in Ward-3. 1.50
3 Improvements to existing toilets at B K Ngr slum in Ward-3 1.50
3 Improvements to existing toilet at sunnadagudu slum in Ward-3 1.00
Sub - Total = 4.00
III. 18% Grant Total = 18.00
4 Purhase of land and Construction of Toilet 9.00
Construction of Bridge and Improvements to road at Jayaram slum in ward No
4 9.00
4
Sub-Total -3 18.00
100 Purchase of Land and Construction of Toilet 9.00
100 Providing Cement Concreting to roads in Manjunath nagar in Ward No.100 9.00
Sub-Total -3 18.00

89
Providing Cement Concrete Road to Sankey Anjaneya Swamy Temple Road in 9.00
5
ward no.5
5 Construction of Individual Toilets & Purchase of Land in ward no.5 9.00
Sub Total - 3 18.00
Improvements to Drains and Concrete Roads at Karumariyamma Slum in ward 9.00
6
no.6
6 Construction of Individual Toilets and Purchase of Land in ward no.6 9.00
Sub Total - 3 18.00
7 Providing CC to Roads at Byrahanumaiah Slum in ward no.7 9.00
Construction of Individual Houses in Subedarapalya, New Harijan colony, 9.00
7
Byrahanumaiah Slum & Karimandi Slum & Purchase of Land in ward no.7
Sub Total 3 18.00
a) Capital Works
Purchase of Land 17.00
b) Maintenance Works
30 Maintenace of drains in Mariyapappana palya in ward no.08 1.00
Total 18.00
(a) Capital Works
16 Purchase of land & Construction of SC/ST houses in ward no.09 9.00
(b) Maintenance
Improvements to drains & providing covering slab @ A.K.Colony near
17 9.00
madduramamma temple in ward no.09
Total 18.00
(a) Capital Works
18 Purchase of Land & Construction of SC/ST houses in ward no.10 9.00
19 Providing RCC deck slab to SWD @ Vijayananda nagara slum in ward no.10 9.00
(b) Maintenace
Total 18.00
(a) Capital Works
16 Purchase of Land & Construction of SC/ST houses in ward no.11 9.00
Improvements to drains & roads of 1st, 2nd main in Jai Bhuvaneshwari nagara
17 9.00
& Kulee nagara slums in ward no.11
(b) Maintenance
Total 18.00
(a) Capital Works
19 Purchase of land & Construction of SC/ST houses in ward no.12 9.00
(b) MAINTENANCE
21 Provding covering slab over drain @ Kanteerava nagara slum in ward no.12 5.00
22 Providng A.C sheets to SC/ST houses in ward no.12 2.00
23 Improvements to open wells at Kanteeravanagar Slum in Ward No.12. 2.00
Total 18.00
(a) Capital works
15 Purchase of land & Construction of SC/ST houses in ward no.13 9.00
(b) MAINTENANCE
17 Improvements to CC & drains & culverts 25th F to H roads in ward no.13 5.00
18 Improvements to CC & drains & culverts @ Handhi jogarahatti in ward no.13 4.00
Total 18.00
(a) Capital Works
15 Construction of SC/ST houses in ward no.14 9.00

90
(b) MAINTENANCE
17 Improvements to CC, culverts & drains @ Bhovi palay in ward no.14 5.00
18 Providing covering slab to culverts & drains @ Bhovi palya in ward no.14 4.00
Total 18.00
a) Capital Works
25 Purchase of land 16.00
b) Maintenance Works
26 Maintenace of drains in Mariyapappana palya in ward no.23 2.00
Total 18.00
Capital Works
Construction of Individual houses / Purchase of Land / Construction of Urinals
9.00
in Ward No.15.
Sub Total 9.00
Maintenance Works
Construction of Anganavadi Building, Gayatrhi HBCS, Ward No.15. 9.00
Sub Total 9.00
II. 18% Grants 18.00
Caital Works
Construction of Individual Houses in Sy. No.46 of Chandranagar Slum. 9.00
Sub Total 9.00
Maintenance Works
Repairs of Anganavadi Building, 4th Main, 3rd Cross, Sy.No.46, Kamalanagar. 2.00
Providing flagging course to drain at Kaverynagar Slum. 3.00
Providing SSM Drain in Sanjaygandhinagar Slum. 4.00
Sub Total 9.00
II. 18% Grants Total 18.00
Capital Works
Provision for purchase of land / construction of toilet / construction of House. 9.00
Improvements to footpath and secondary drains at Sannakki Bylu in A.K.
8.00
Colony in Ward No.17.
Sub Total 17.00
Maintenance Works
Improvements to footpath to a approach road of A.K. Colony in Ward No.17. 1.00
II. 18% GRANTS Total 18.00
Capital Works
Construction of RCC Deck slab over drain at Sreeramanagara Slum. 5.00
Construction of Compound wall around Dr. Ambedkar Bhavan and providing
4.00
cement concrete to Roads at Karekallu, A.K. Colony.
Construction of Individual houses for the SC/ST beneficiaries at Sreeramanagar
9.00
Slum, Karekallu A.K. Colony and Harijana Slum
Sub Total 18.00
Maintenance Works Nil
II. 18% Grants Total 18.00
Capital Works
Construction of Individual houses / Purchase of Land / Construction of Urinals
18.00
in Ward No.19.
Sub Total 18.00

91
Maintenance Works
Providing CC to Main Road of Bhovi Colony and Improvements to footpath on
13.00
either side of the Road in Ward No.19.
Reconstruction of Collapsed Road adjacent to SWD and raising the deck slab of
5.00
SWD of Bhovi Colony in Ward No.9.
Sub Total 18.00
II. 18% Grand Total 36.00
Capital Works Nil
Maintenance Works Nil
II. 18% Grants Total Nil
18% GRANTS
Capital Works
Provision for purchase of land / construction of toilet / construction of House in
9.00
Ward No.21
Providing and constructing Size stone masonry drain and covering slab to
9.00
existing drain in Kanteerava Colony in ward No.21.
Sub Total 18.00
Maintenance Works Nil
II. 18% Grants Total 18.00
18% Grants
Capital Works
Construction of Anganavadi Building at Chamundi Slum in Ward No.22. 5.00
Providing flagging course and construction of culverts in Bhuvaneshwari Slum at
4.00
Rajajinagar in Ward No.22.
Providing Individual houses in Chamundi and Bhuvaneshwari Slum 9.00
Sub Total 18.00
Maintenance Works Nil
II. 18% Grants Total 18.00
III. 18% Grants
a. Original Works
Providing individual sanitary and water connections for SC/ST in Ambedkar 9.00
Nagar R.K.S. Nagar Gowtham Nagar ward No.24.
b. Maintenance Works
Procurement of Bitumen mulsion for filling pot holes in Ward No.24 2.00
Depot Collections for the year 2008-09 in Ward No.24. 2.00
Improvement to public toilet in Dayananda Nagar ,Ambedkar Nagar & Aundathi 3.00
Nagar in Ward No.24.
Providing painting of street name boards in Ward No.24 1.00
Supply of Sign boards and barricades for execution of works in Ward No.24. 1.00
Sub total 18.00
III. 18% Grants
a. Original Works
16 Providing individual sanitary facilities to SC/ST houses in Ward No.25. 9.00
b. Maintenance Works
17 Improvement to Sulab Showchalaya in Gopalapura Near Iyyappa Temple& 3.00
Jataka Stand in Magadi road in Ward No.25.
18 Special repairs to public toilet in Selva Nagar at Ward No.25. 3.00
19 Special repairs to public toilet & Improvements to Surrounding area at 3.00
Aurandathi Nagar In Ward No.25.
Sub total 18.00

92
III. 18% Grants _
a. Original Works _
15 Providing Cement Concrete to balance portion in Jakkarayanakere in Ward 9.00
No.26.
16 Providing individual sanitary facilities to SC/ST houses in Ward No.26. 5.00
b. Maintenance of Works
17 Special repairs to public toilet 1st main Road, Behind Tailoring Center & near 2.00
6th cross Swathanthrara Palya (Near Railway line) in Ward No.26.
18 Special repairs to Public toilet Hanumanthapura 2nd Main , Vivekananda colony 2.00
, Laxman Rao nagara and Narayan Rao Colony ( Opp Bharathinagara( &
Improvements surrounding area in Ward No.26.
Sub Total 18.00
III.18% grants
a. Original Works
19 Providing cement concrete to cross roads and lanes near old savar lane at Risldar
Street in Ward No.27. 5.00
20 Improvements to drain and reconstruction of Masonary drain in Laxmanpuri
Colony in Ward No.27 5.00
21 Providing cement concrete to lanes and bylanes in and around Risaldar Park in
ward No.27. 8.00
b. Maintenance
Sub Total 18.00

Purchasing of land. 18.00


Total Amount 18.00

Construction of Indiviual Toilet in Agrahara 4.00


Supplying A.C sheet for poor family 5.00
Providing C.C to Nagamma Nagara roads 5.00
Constructions drain and culverts and cc to Muneshwara temple Road 4.00
Total Amount 18.00

Construction of Indiviual Toilets in Bakshi Garden & Anganappa garden 5.00


Supplying A.C sheet for poor family 4.00
Construction of masonry drain & Covering Slabs opposite to balekayi mandi 5.00
Construction of drain & Disilting at Anganappa & Bakshi Garden 4.00
Total Amount 18.00
18% Grants
a. Capital Works
Provision for purchase of land / Construction of toilet / construction of House. 9.00
Sub total 9.00
b. Maintenance Works
Improvement to toilet at Ananda pura slum, Venkatarama nagara slum in ward 4.00
no.46
Providing cement concrete to lanes at Venakatarama nagara slum in ward no.46 5.00

Sub total 9.00


18% GRANTS TOTAL 18.00
18% Grants
a. Capital Works
Provision for purchase of land / Construction of toilet / construction of House 9.00
Sub total 9.00

93
b. Maintenance Works
Improvement to toilet and providing cement concrete to lanes at Kumbaragundi 9.00
slum in ward no.47.
Sub total 9.00
18% GRANTS TOTAL 18.00
18% Grants
a. Capital Works
Provision for purchase of land / Construction of toilet block in ward no.48 9.00
Sub total 9.00
b. Maintenance Works
Repairs to toilet blocks at sudhama nagara and Rajagopala garden in ward no.48 4.00
Providing cement concrete to lanes at K.S garden slum in ward no.48 5.00
Sub total 9.00
18% GRANTS TOTAL 18.00
18 % Works
1 Providing Electrification to the SC/ST Houses at
Siddarth Nagar and Jalahally Slum 2.00
2 Providing Electrification to the SC/ST Houses at
Jalahally Slum 2.00
3 Providing Electrification to the SC/ST Houses at
Yeswanthpura Slum 2.00
4 Providing Electrification to the SC/ST Houses at
Sanjeevappa Garden, AK colony, Mathikere 2.00
9 Providing Electrification to the SC/ST Houses at
AK Colony, Subramanya Nagar. 0.10
10 Providing Electrification to the SC/ST Houses at
Ashokpura and Gowtham nagar slum 2.00
10 Providing Electrification to the SC/ST Houses at
Kanteerava Nagar slum 2.00
30 Providing Electrification to the Gym Building at
Bakshi Garden 1.97
30 Providing Electrification to the community hall
at Bakshi Garden 0.72
Total 14.79
Sub total 612.00
ELECTRICAL
WEST
Capital Works
Sl Cost
No. Name of the Work Rs. in lakhs
1 Providing poles with fittings, Control Wire, Cable etc, to
Katha Nagar Main Road. 8.00
2 Re-errection of Released Tubular Poles from Bellary Road, the
Same is fixed to C.V. Raman road, and Sankey Raod. 5.00
3 Providing poles with fittings, Control Wire, Cable etc, to Bescom Road
Govt. Press Road, Volvo Road & S.M. Road and 1st Phase
Peenya Industrial Area. 10.00
4 Providing poles with fittings, Control Wire, Cable etc, from Tumkur Road to
Devraj Urs Truck Terminal Circle and Burial ground Road 10.00
5 Providing poles with fittings, ACSR Wire etc to the 3, 4, 5 & 6th Main and 3rd
and 5th Cross at 2nd Stage, Peenya Industrial Area 10.00

94
6 Providing poles with fittings, ACSR Wire etc to the 3rd A, B,
C, D, E, F Mains, 6th, 7th, 8th, 9th & 10th Cross Roads,
1st Stage Peenya Industrial Area. 10.00
7 Providing poles with fittings, Control Wire, Cable etc,
from Shiva Form Rudramma and Rugdre Gowda Conventional
Hall road, 9th Cross and other cross, in Kamakshipalay. 10.00
8 Providing poles with fittings, ACSR Wire etc to the 2nd, 3rd
4th Main and Industrial Estate Area at Industrial Town 5.00
9 Providing poles with fittings, Control Wire, Cable etc, from
Leprosay Hospital to APMC Yard Circle 5.00
10 Providing poles with fittings, Control Wire, Cable etc, from
Subbaiah Circle to Lalbagh Road Circle. 5.00
11 Providing poles with fittings, Control Wire, Cable etc, from KH Road Lalbagh
Circle to Flyover Bridge Via Mission Road Upto Siddaih Circle to Lalbagh 10.00
12 Providing poles with fittings, Control Wire, Cable etc, from
Railway line road, Lottegollahally, Sanjay nagar. 5.00
13 Providing Mini High Mast light at the Junction of
M.S.Ramaiah hospital Circle, HMT Road, Mathikere 4.00
14 Providing Mini High Mast light at the Junction of
TVS Cross Junction, Peenya KIDB Road. 4.00
15 Providing Mini High Mast light Near Petrol Bunk Circle
6th Main, Peenya KIDB Road, 4.00
16 Providing Mini High Mast light at the Junction of
Saraswathipura Main and Nandini Layout Bus stand Road, 4.00
17 Providing High Mast lights Opp. Shankarama Circle 4.00
18 Providing High Mast lights Opp. Nandini Layout Busstand 4.00
19 Providing High Mast lights at BWSSB Office Circle, 3rd Block, Rajaji Nagar 4.00
20 Providing High Mast lights at
Okalipura Railway Bridge Under pass( Near Weaver Building) 4.00
21 Providing High Mast lights at Kalidasa Circle, Gandhi Nagara 4.00
22 Providing High Mast lights at City Market Gate(Inside) SKR Market 6.00
23 Providing High Mast lights at Royan Circle, Chamarajpet 4.00
24 Providing High Mast lights at Subbaih Circle, Lalbagh Road 4.00
25 Providing High Mast lights at Opp. Town Hall 8.00
26 Providing High Mast lights at BEL Road & Club road jn, Sanjay Nagar 4.00
27 Upgradation of Street lights including cable Panel Box etc., at Tumkur Road
from Metro to GG Palya 20.00
28 Upgradation of Street lights including cable Panel Box etc., at KIDB Road
from Jalahally Circle to Ring Road 20.00
29 Upgradation of Street lights including cable Panel Box etc., Govt. Soap
Factory circle to Magadi Road 20.00
30 Upgradation of Street lights to Mysore deviation road
from Krishna floor Mill circle upto Magadi raod,Drainagae 20.00
31 Upgradation of Street lights at KH Road 10.00
32 Providing Street light fittings to the HMT Quarters MainRoad and Cross roads 5.00
33 Providing Street light fittings to the
RTO Office, 3rd Main, 1st phase, Peenya Industrial area 5.00
34 Providing Street light fittings to the 15th & 19th Cross,
8th Main etc., Bandappa Garden. 5.00
35 Providing SV/MH fittings to the LIG, MIG, HIG and 1 to
6th Main, Circular road, Singapura Layout. 10.00

95
36 Providing SV/MH fittings to the 1st to 15th Main
4th Block and Railway Layout and Ramakrishana nagar 10.00
37 Providing SV/MH fittings to the 16th Main to 33rd main
roads at Srinivasa nagar, BHEL and Sakamma layout. 10.00
38 Providing SV/MH fittings to the 1st Main to 8th Main,
Jaimaruthi Nagar and 1st Main to 5th Main, Ravi layout. 5.00
39 Providing SV/MH fittings to the 1st Main to 8th Main and 1st cross to 5th cross
in Parimala Nagar and 1st Main to 8th Main in Rajeev Gandhi Nagar 6.00
40 Providing SV/MH fittings to the Leprosay Hospital
Circle to Perumal drain bridge ( Magadi Road ). 8.00
41 Providing SV/MH fittings to the Leprosay Hospital Circle to Okalipuram under
pass railway bridge upto Binny Mill Circle 8.00
42 Providing SV/MH fittings to the Nagamma Nagar,
Nethaji nagar, from Sudha lodge to CCB Office. 5.00
43 Providing UG Cable/ ACSR Wire etc., to the Binny Mill road
from Binny Mill Circle to RMC Yard. 2.00
44 Providing SV/MH fittings to the Mutton Market,
Anjanappa Garden, Bakshi Garden, Chaluvadi palya. 8.00
45 Providing SV/MH fittings to the N.T. Pet and Sarrounding area, Anandapura Slum 5.00
46 Providing Street light fittings to S.P. lane, Kumbarpet Ganigarpet, SJP Raod
crosses, Dharmaraya swamy Temple Area 1.50
47 Providing Street light fittings to the 2nd Cross to 7th cross
and 1 to 6th Main at Postal Colony. 5.00
48 Providing Street light fittings to the 1st Main to 7th main
and 1st cross to 5th Cross, NGEF Layout. 5.00
49 Providing Street light fittings to the Judicial layout 1st main and Channamma
kalayana mantapa main road, and Sanjay nagar Main road 10.00
50 Providing Additional, Points, fixtures etc., to the Help center at
Ward Office at 4th Cross, Jalahalli Village. 0.10
51 Providing Fan and TL fittings to the Anganawadi and Gymnasium
building at HMT Area 0.10
52 Providing Electrification to the Newly Constructed Vetarnary
Hospital at Jalahally 0.50
53 Providing Additional, Points, fixtures etc., to the Help center at
Ward Office Adjacent to J.P. Park ( Near Chowdeswari Temple ) 0.10
54 Providing Additional, Points, fixtures etc., to the Help center at
Ward Office Model Street, Yeswanthpura. 0.10
55 Providing Fan and TL fittings to the Tailoring and Library
Building at Yeswanthpura 0.10
56 Providing Additional, Points, fixtures etc., to the Help center at
Ward Office, Nethaji Circle, Mathikere. 0.10
57 Providing Additional, Points, fixtures etc., to the Help center at Ward Office,
swimming pool extension, 10th Cross, Sudhindranagar 0.10
58 Providing Additional, Points, fixtures etc., to the Help center at
PHU Center, kodandarampura, 13th Cross, SP Extension, Malleswaram 0.10
59 Providing Additional, Points, fixtures etc., to the Help center at
ARO Office, 16th Cross, Malleswaram,( Next to IPP Building) 0.10
60 Providing Additional, Points, fixtures etc., to the Help center at
BBMP Office,( Next to to Ward Office) 5th Cross, Malleswaram 0.10
61 Providing Additional, Points, fixtures etc., to the Help center at
Office of AEE, Malleswram 2nd Temple Street. 0.10

96
62 Providing Additional lighting to the Malleswaram play ground 2.00
63 Supplying and commissioning of 30KVA 3R-1040 Water
cooling DG Set at Yeswanthpura Maternity Home 7.00
64 Providing Additional, Points, fixtures etc., to the Help center at
Ward Office, 5th Cross, 5th Main, Malleswaram. 0.10
65 Providing Additional, Points, fixtures etc., to the Help center at
BBMP Complex, Yeswarnthpura S.C. 0.10
66 Providing Standby Submersible Pumpset and Panel Board, GI pipe
etc., Yeswanthpura shopping complex. 0.75
67 Providing Additional, Points, fixtures etc., to the Help center at LN Pura Market 0.10
68 Providing Additional, Points, fixtures etc., to the Help center at
Dr. Raj Kumar Road, E' block, Subramanya nagar 0.10
69 Providing Additional, Points, fixtures etc., to the Help center at
Ward Office, 3rd Main, behind Vani School. 0.10
70 Providing Additional, Points, fixtures etc., to the Help center at
Subramanya nagar community hall. 0.10
71 Providing lighting system to the Sahakarnagar Park and Play ground 1.00
72 Providing Additional, Points, fixtures etc., to the Help center at
Sub-division Office, Vasavi temple Road. 0.10
73 Providing Additional, Points, fixtures etc., to the Help center at
Tailoring Center, Shankar nagar. 0.10
74 Providing Fan and TL fittings to the Gymnasium Building at
Srikanteshwara nagar. 0.10
75 Providing additional lighting to Hindu burial ground at GG Palya 3.00
76 Providing Additional, Points, fixtures etc., to the Help center at
Ward Office, near Burial Groun, Goragunte playa. 0.10
77 Providing Additional, Points, fixtures etc., to the Help center at
Ward Office, Peenya Village. 0.10
78 Providing Fan and TL fittings to the Ward Office at Peenya Village 0.10
79 Providing Additional, Points, fixtures etc., to the Help center at
Ward Office, Circular Park, Nandini Layout, 0.10
80 Providing Additional, Points, fixtures etc., to the Help center at
Veternary Hospital, Kanteerava nagar, near BWSSB Water Tank. 0.10
81 Providing Fan & TL fittings to the Newly constructed tailoring
Center at Nandini Layout. 0.10
82 Providing Fan & TL fittings to the Anganavadi Center, Nandini Layout 0.10
83 Providing Additional, Points, fixtures etc., to the Help center at
Ward Office, 2nd ‘A Main,MICO L/O. JC Nagar. 0.10
84 Providing Additional, Points, fixtures etc., to the Help center at
Ward Office compound 0.10
85 Providing Additional, Points, fixtures etc., to the Help center at
Reading room, Uday kumar park, Keethamarana hally village 0.10
86 Providing additional lighting to Dr. Raj Kumar Kala mandira
and BBMP Office at Rajaji nagar shopping complex. 2.00
87 Providing Additional, Points, fixtures etc., to the Help center at
th nd
Engineering Ward Office, Mustering center, 19 main, 2 Block, Rajaji nagar 0.10
88 Providing Additional, Points, fixtures etc., to the Help center at
Manjunatha Nagar Tailoring Center, 0.10
89 Providing Additional, Points, fixtures etc., to the Help center at
Ward Office, 1st Main, Kamala Nagar. 0.10
90 Providing Additional, Points, fixtures etc., to the Help center at
Health Center, Shankar nagar bus stand, Kamala Nagar 0.10

97
91 Providing Additional, Points, fixtures etc., to the Help center at
Engineering Ward Office, BEML Colony, 5th Main, Vrushabhavathinagar 0.10
92 Providing Additional, Points, fixtures etc., to the Help center at
Tailoring center, 8th Main, SBI Colony, Kamakshi Palya 0.10
93 Providing Electrification to the Newly constructed Anganawadi kendra
Kamakshipalya. 0.10
94 Providing Additional, Points, fixtures etc., to the Help center at Ground floor.
Ward Office, 7th Main, Basaveshwara nagar. (Tailoring Centre upstair) 0.10
95 Providing Additional, Points, fixtures etc., to the Help center at Site Office
Building, Manjunatha Nagare, 1st Main, Sy.No-25. Opp Shanimahatama Temple 0.10
96 Providing Additional, Points, fixtures etc., to the Help center at
Ambedkar stadium, 1st Main, Basaveshwara nagar 0.10
97 Providing Additional, Points, fixtures etc., to the Help center at
BBMP Health center, 4th Cross, Agrahara Dasarahalli, 0.10
98 Supplying and commissioning of 30KVA 3R-1040 Water
cooling DG Set at Sreeramamandira Maternity Home 7.00
99 Providing Additional, Points, fixtures etc., to the Help center at
Ward Office, 6th main, 4th Block, Rajaji nagar, (Opp. Spandana ) 0.10
100 Providing UG Cable etc to Srirama mandira play ground. 0.50
101 Providing Additional, Points, fixtures etc., to the Help center at
, Corporation community hall, Rajaji nagar 0.10
102 Providing Additional, Points, fixtures etc., to the Help center at
Ward Office building, Mariyappana palya. 0.10
103 Providing Additional, Points, fixtures etc., to the Help center at
Tailoring Center, 59th ‘B’ Cross, 4th N Block, Rajaji nagar. 0.10
104 Supplying and commissioning of 30KVA 3R-1040 Water
cooling DG Set at Sreerampuar Maternity Home 7.00
105 Providing Additional, Points, fixtures etc., to the Help center at
Ward Office, Dayananda nagar. 0.10
106 Providing Additional, Points, fixtures etc., to the Help center at
Ward Office, Gowtham Nagar, 7th Main, Sriranga, 0.10
107 Providing Additional, Points, fixtures etc., to the Help center at
Ward Office, Saibaba Nagar. 7th Main, 0.10
108 Providing Electrification to the Newly constructed
Anganawadi and computer center shastri nagar, Okalipura, 0.80
109 Providing Electrification to the Newly constructed
Anganawadi and computer center Bapuji Block, Srirampura. 0.45
110 Providing Electrification to the Newly constructed
Anganawadi Center at Lakshman rao road, Okalipura, 0.18
111 Providing Electrification to the Newly constructed Angawadi
and computer center Swathanthra palay, Srirampura. 0.49
112 Providing Additional, Points, fixtures etc., to the Help center at
5th Main, Ward Office, Okalipuram 0.10
113 Providing Additional, Points, fixtures etc., to the Help center at
Tailoring Center, Kasturi Nagar 0.10
114 Providing Battries to U.P.S at D.C West Office, Seshadripuram 0.10
115 Providing Electrificaiton to BBMP Toilet at VV Giri colony, Gandhi Nagar 0.10
116 Providing Additional Points, Grounding, fixtures etc. to the
BBMP advocate office at Chickalal bagh, 0.10

98
117 Providing Additional, Points, fixtures etc., to the Help center at
Zonal Office premises, Seshadripuram. 0.10
118 Providing Additional, Points, fixtures etc., to the Help center at
opp. To Medical Health Office, Upparpet police station, Gandhi nagar 0.10
119 Providing Perment illumination to the Kranthi veera sangoli Rayanna
Statue Opp. Railway Station, Gandhi Nagar. 0.10
120 Providing Standby Motor Pumpset at ARO Office Chickpet 0.10
121 Supplying and commissioning of 30KVA 3R-1040 Water
cooling DG Set at Cottonpet Maternity Home 7.00
122 Providing Additional, Points, fixtures etc., to the Help center at
Chickpet ARO Office, Chikka Lalbagh 0.10
123 Supplying and commissioning of 30KVA 3R-1040 Water
cooling DG Set at Manavarthpet Maternity Home 7.00
124 Providing Additional, Points, fixtures etc., to the Help center at
Ward Office, TCM Royan Road 0.10
125 Providing Additional, Points, fixtures etc., to the Help center at
IPP Health Center, Anjanappa Garden, near Binny Mill 0.10
126 Providing Additional, Points, fixtures etc., to the Help center at
R.O. Market Office 0.10
127 Supplying and commissioning of 30KVA 3R-1040 Water
cooling DG Set at Sirsi Road Maternity Home 7.00
128 Providing Additional, Points, fixtures etc., to the Help center at
BBMP School, 6th Cross, 2nd Main, Chamarajpet 0.10
129 Supplying and commissioning of 30KVA 3R-1040 Water
cooling DG Set at Dasappa Hospital Maternity Home 7.00
130 Providing Additional, Points, fixtures etc., to the Help center at
Ward Office, Dasappa Maternity Hospital extension, SJP Road 0.10
131 Supplying and commissioning of 30KVA 3R-1040 Water
cooling DG Set at Siddiah Road, Maternity Home 7.00
132 Providing Additional, Points, fixtures etc., to the Help center at
BBMP Office Building , behind sub-division Office, J.C. Road 0.10
Total 432.57
Maintenance Works
1 Providing Temprovary illumination in connection with Immersion
of Lord Ganesha Idols to the Sankey Tank. 1.50
2 Providing Temprovary illumination to West Zonal offce in connection
with Kempegowda day Cellebration. 0.10
3 Providing Temprovary illumination to SKR MARKET 0.10
4 Providing Temprovary illumination in connection with Karaga Festival 1.00
5 Providing Temprovary illumination in connection with Karaga
Kempegowda day Cellebration to the Town Hall Building. 0.1
6 Providing Additional, Points, fixtures etc., to the Help center at
Health Center, Sanjay Nagar Main Road( Near Water Tank ) 0.10
7 Operation and Maintenance of Street Lights under Yeshvanthpura sub-dvn 0.35
8 Operation and Maintenance of Street Lights under Sanjay Nagar Sub Division 40.00
9 Operation and Maintenance of Street Lights under Malleswaram Sub Division 35.00
10 Operation and Maintenance of Street Lights under Gayathrinagar Sub Division 50.00
Operation and Maintenance of Street Lights under Mahalakshmipuram Sub Dvn
11 52.00
12 Operation and Maintenance of Street Lights under Rajajinagar Sub Division 43.00
13 Operation and Maintenance of Street Lights under Srirammandir Sub Division 40.00
14 Operation and Maintenance of Street Lights under Gandhinagar Sub Division 41.00
15 Operation and Maintenance of Street Lights under Chickpet Sub Division 30.00

99
16 Operation and Maintenance of Street Lights under Chamarajpet Sub Division 47.00
17 Repairs to Park lights / Pumpset etc., to the Sharadamba Layout park,HMT area 0.10
18 A.M.C of Electrical Installation by engaging Electrician Wiremen, Helper,with
maintenance materials of theBBMP building complete in Malleswaram Const 2.00
19 Providing Fixtures to the Newly constructed community hall at HMT area 0.60
20 Repairs to Park lights / Pumpset etc., to the Sundar Nagar park Jalahalli 0.10
21 AMC of Electrical Crematorium by engaging required staff including periodically
repairs of furnaces, DG Sets cleaning of scrubber, chimney, repairs to motors etc
complete at Medi agrahara Electric Crematorium 10.00
22 AMC of Solar lights at JP park 10.00
23 A.M.C. of Park lights, Pumpsets Fountain etc., JP Park 3.00
24 Repairs to Park lights / Pumpset etc., to the LIC Colony Park, Yashvantpura 0.10
25 Repairs and Providing additional fixtures to the Yeshwantpur Maternity Home 0.10
26 Repairs and Providing additional fixtures to the IPP Building at BK Nagar 0.10
27 Repairs to Pumpset, Panel Board etc., to the Yeshwanthpur maternaty Home 0.10
28 Repairs to Pumpset, Panel Board etc., to the Veternary Hospital, Yeshwantpur 0.10
29 A.M.C of Electrical Installation by engaging the wiremen, Operator, DG Set, Lift
Pumpset & Building etc., Teshwantpur Shopping Complex 3.00
30 Repairs to Pumpset, Panel Board etc., to the range office at Nethjinagar, Mathi 0.10
31 Repairs and Providing Additional lighting system to Sankey Tank Park 5.00
32 Repairs to Park lights / Pumpset etc., to the AGS office layout park 0.10
33 Repairs to Park lights / Pumpset etc., to the Dathathreya temple park, KR pura 0.10
34 Repairs to Park lights / Pumpset etc., to the IDL Traingular Park 0.10
35 Repairs to Park lights / Pumpset etc., to the Sankey Tank Park, K R Pura 0.10
36 Repairs to Park lights / Pumpset etc., to the KRPura Park 0.10
37 Repairs and Providing additional fixtures to the Boys highschool at KR Pura 0.10
38 Repairs and Providing additional fixtures to the ARO Office, 16th cross, KR Pura 0.10
ARO Office, 16th Cross, KR Pura,.
39 Repairs to Pumpset, Panel Board etc., to the 0.10
ARO Office compound, KR Pura,.
40 Repairs to Pumpset, Panel Board etc., to the 0.10
Park at 3rd Cross, K R Pura.
41 Repairs to Pumpset, Panel Board etc., to the 0.10
Dhobhi Ghat, K R. Pura.
42 A.M.C of Electrical Installation by engaging the
wire men, Helper, Pumpset etc., at Sankey Tank Park. 2.00
43 A.M.C of Electrical Installation by engaging the
wire men, Operator, DG Set, A.C, Pumpset , Public
Address system at IPP Building, KR Pura. 3.00
44 Repairs to Pumpset, Panel Board etc., to the
K.C. General Hospital Park. 0.10
45 Repairs to Pumpset, Panel Board etc., to the
Boys School, Pit colony, Malleswaram. 0.10
46 Repairs to Pumpset, Panel Board etc., to the
Yeswanthpura Shopping complex ( Water Pump ). 0.10
47 Repairs to Pumpset, Panel Board etc., to the
Yeswanthpura Shopping complex ( Sump pit Motor ) 0.10
48 Repairs and Providing additional fixtures to the
Yeswanthpura Shopping complex 0.10
49 Repairs to Pumpset/ Street light at Burial Ground,
Subedarpalya. 0.10

100
50 AMC of Electrical Installation, Lift, Generator at yeswanth-
pura shopping complex for the year 2008-09. 1.00
51 Repairs to Park lights / Pumpset etc., to the
Ane Park, 9th Cross, Malleswaram. 0.10
52 Repairs to Park lights / Pumpset etc., to the
Bala Subramanya Nagar Park, 17th Cross, Malleswaram. 0.10
53 Repairs to Park lights / Pumpset etc., to the
between 11 & 12th Cross Park, Malleswaram. 0.10
54 Dismantling the existing M/s. Kone Elevator lift and commissiong
of New lift at yeswanthpura shopping complex. 12.00
55 Releasing of Tubular poles at Yeswanthpura Circle due to
construction of fly-over 0.60
56 Repairs to Electrical Installation and Providing Fixtures to 17th cross
Quarters, Malleswaram. 0.10
57 A.M.C of Electrical Installation by engaging the
wire men, Helper, BBMP Building etc., complete
in Rajaji angar Constituency. 2.00
58 Repairs and Providing additional fixtures to the
Harischandara Ghat, Srirampura, 0.10
59 AMC of Electrical Crematorium by engaging required staff
including periodically repairs of furnaces, DG Sets cleaning of
scrubber, chimmney, repairs to motors etc., complete at
Harischandara Ghat, Srirampura, 10.00
60 Repairs to Pumpset, Panel Board etc., to the
Community Hall, Subramanya Nagar. 0.10
61 Repairs to Park lights / Pumpset etc., to the
Ayyapa temple park, Subramanya nagar, 0.10
62 Repairs to Park lights / Pumpset etc., to the
Sangoli Rayanna park, 0.10
63 Repairs to Park lights / Pumpset etc., to the
Milk Colony Park. 0.10
64 Repairs to Park lights / Pumpset etc., to the
Anjanaiah Hillrock park, 0.10
65 Repairs to Park lights / Pumpset etc., to the
Vasavi park, in Mahalaxmipura, 0.10
66 Repairs to Park lights / Pumpset etc., to the
BNEL park, in Mahalaxmipura, 0.10
67 Repairs to Park lights / Pumpset etc., to the
Vasavi park, in Mahalaxmipura, 0.10
68 Repairs to Park lights / Pumpset etc., to the
Sharana Seva Samaja park, in Mahalaxmipura, 0.10
69 Repairs to Park lights / Pumpset etc., to the
Usha park, in Mahalaxmipura, 0.10
70 Repairs to Park lights / Pumpset etc., to the
Shankar Nagara park, in Mahalaxmipura, 0.10
71 Repairs to Park lights / Pumpset etc., to the
Hare Krishna Park, 0.10
72 Repairs to Park lights / Pumpset etc., to the
Indira priyadarshini park, in Mahalaxmipura, 0.10
73 Repairs to Park lights / Pumpset etc., to the
KSDL soap factory Circle Park, 0.10

101
74 Repairs to Pumpset, Panel Board etc., to the
Anjanaiah Hill rock Park, Mahalaxmipura 0.10
75 Repairs and Providing additional fixures to the High school and
middle, Marappana palya. 0.10
76 Repairs to Pumpset, Panel Board etc., to the
Community Hall, Ashokpura 0.10
77 Repairs to Electrical Installation to the I PP building at
Jaibhuvaneshwari Nagar, Nandini Layout. 0.10
78 Repairs to Park lights / Pumpset etc., to the
jark Bande Park, GG Palya. 0.10
79 Repairs to Park lights / Pumpset etc., to the
TVS Cross Park, Peenya. 0.10
80 Repairs to Park lights / Pumpset etc., to the
2nd Stage Park, Peenya Industrial Area. 0.10
81 Repairs to Park lights / Pumpset etc., to the
K.I.D.B. Park. Peenya. 0.10
82 AMC of Electrical Crematorium by engaging required staff
including periodically repairs of furnaces, DG Sets cleaning of
scrubber, chimmney, repairs to motors etc., complete at
Peenya Electric Crematorim. 10.00
83 Repairs to Park lights / Pumpset etc., to the
SFHS Park, Nandini Layout. 0.10
84 Repairs to Park lights / Pumpset etc., to the
Circular Park, Nandini Layout. 0.10
85 Repairs to Park lights / Pumpset etc., to the
SFHS Balamuri Ganapathi Park, Nandini Layout. 0.10
86 Repairs to park lights/ Pumpset at C.A.Site Park,
Geleyarabalaga 0.10
87 Repairs to park lights/ Pumpset at Pipe line park Part-1 & 2
Geleyarabalaga 0.10
88 Repairs to park lights/ Pumpset at Pipe line park Part- 3 & 4
Geleyarabalaga 0.10
89 Repairs to park lights/ Pumpset at Pipe line park Part-5 & 6
Geleyarabalaga 0.10
90 Repairs to Park lights / Pumpset etc., to the
Siddaruda Park, Nagapura. 0.10
91 Repairs to Park lights / Pumpset etc., to the
Viveshwaraiah Park, Nagapura. 0.10
92 Repairs to Park lights / Pumpset etc., to the
High Tension Park. 0.10
93 Repairs to Park lights / Pumpset etc., to the
Swamy Vivekananda Park, 0.10
94 Repairs to Park lights / Pumpset etc., to the
Karimariyamma temple park, Nagapura. 0.10
95 Repairs to Park lights / Pumpset etc., to the
Uday Kumar park. 0.10
96 Repairs to Park lights / Pumpset etc., to the
Pipe line Park, Nagapura. 0.10
97 Repairs to Park lights / Pumpset etc., to the
1st Block Bus stop Park, 0.10
98 Repairs to Park lights / Pumpset etc., to the
Usha Park, Mahalaxmipura. 0.10

102
99 Repairs to Park lights / Pumpset etc., to the
Viveshwaraiah Park, Nagapura. 0.10
100 Repairs to Park lights / Pumpset etc., to the
Shankar mata Park, 0.10
101 Repairs to Park lights / Pumpset etc., to the
Govt. Soap Factory Park. 0.10
102 Repairs and Providing additional fixtures to
Usha Park and Hare Krishna Park 1.00
103 Repairs to Pumpset/ Street light at Dhobhi Ghat,
Nagapura. 0.10
104 providing Fixtures to the Newly constructed BBMP Building
at Ward Office, 0.10
105 Repairs to Pumpset, Panel Board etc., to the
Rajaji nagar shopping complex. 0.10
106 Repairs to Park lights / Pumpset etc., to the
Navarang Park. 0.10
107 Repairs to Fountain at
Navarang Park, Rajaji nagar. 0.10
108 Repairs to Park lights / Pumpset etc., to the
Maruthi layout park, Rajaji nagar. 0.10
109 A.M.C of Electrical Installation by engaging the
wire men, Helper, Operator. DG Set, A C, Aditorium
pumpset & BBMP office etc., at Rajajinagar shopping complex. 4.00
110 Repairs to Park lights / Pumpset etc., to the
Kempe gowda Park, Kamala nagar. 0.10
111 Repairs to Park lights / Pumpset etc., to the
Kuvempu Park, Kamala nagar. 0.10
112 Repairs to Park lights / Pumpset etc., to the
KEC Colony Park, Kamala nagar. 0.10
113 Repairs to Park lights / Pumpset etc., to the
Kirloskar colony park, Kamala nagar. 0.10
114 Repairs to Park lights / Pumpset etc., to the
SBI Colony park, Kamala nagar. 0.10
115 Repairs to Park lights / Pumpset etc., to the
Shamba Murthy Park, 0.10
116 Repairs to Park lights / Pumpset etc., to the
Ward Office Park, Vrushabhavathi Nagar park, 0.10
117 Repairs to Park lights / Pumpset etc., to the
Vrushabhavathi Nagar park, 0.10
118 Repairs to Fountain at
Aladamara Park,Kamakshipalya. 0.10
119 Repairs to Park lights / Pumpset etc., to the
Aladamara Park,Kamakshipalya. 0.10
120 Repairs to Park lights / Pumpset etc., to the
SBI Colony Park, 0.10
121 Repairs and Providing additional fixtures to
IPP buidings at Kamakshipalya. 1.50
122 Repairs and Providing additional fixtures to
S.C. Bose Play ground at Basaveshwaranagar 2.00
123 Repairs to Park lights / Pumpset etc., to the
University Park, Basaveshwara Nagar. 0.10

103
124 Repairs to Park lights / Pumpset etc., to the
KHB Colony 2nd Stage, 5th Cross Park. 0.10
125 Repairs to Park lights / Pumpset etc., to the
Subash Chandra Bose park, KHB Colony. 0.10
126 Repairs to Park lights / Pumpset etc., to the
Nandava Vana Park, Industrial Town. 0.10
127 Repairs to Park lights / Pumpset etc., to the
Bule ward Park. 0.10
128 Repairs to Park lights / Pumpset etc., to the
Dr. B.R.Ambedkar Park, 0.10
129 Repairs to Park lights / Pumpset etc., to the
Basavana Park. 0.10
130 Repairs and Providing additional fixtures to
IPP buidings at KHB Colony, Industrial Town. 0.10
131 Repairs and Providing additional fixtures to
BBMP Community hall at 6th Block, Rajaji nagar. 0.10
133 Repairs to Pumpset to
BBMP Community hall at 6th Block, Rajaji nagar. 0.10
134 A.M.C of Electrical Installation by engaging the
wire men, Helper, Pumpset etc., at Dr. Ambedkar
Stadium. 1.00
135 Repairs to Pumpset, Providing additional fixtures to
Maternity Home at Sreerama mandira. 0.10
136 Repairs to Park lights / Pumpset etc., to the
64th Cross, Sreerama mandira 0.10
132 Repairs to Park lights / Pumpset etc., to the
Soundarya Park, 76th Cross, 6th Block, Rajaji nagar. 0.10
137 Repairs to Park lights / Pumpset etc., to the
Dhobhi Ghat Park, 5th Block, Rajaji nagar. 0.10
138 Repairs to Park lights / Pumpset etc., to the
Mahadev Banakar park, 0.10
139 Repairs to Park lights / Pumpset etc., to the
park, Opp. Madhu Hotel, West of chord road. 0.10
140 Repairs to Park lights / Pumpset etc., to the
G.D. Park, Prakash Nagar. 0.10
141 Repairs to Fountain at G.D. Park, Prakash Nagar. 0.10
142 Repairs and Providing Additional fittings cable etc. at
G.D. Park, Prakash Nagar. 1.00
143 Providing fixtures to the Newly constructed BBMP Building
at 4th N Block, Prakash Nagar. 0.10
144 Repairs to Pumpset, Panel Board etc., to the
Community hall, Dayananda nagar. 0.10
145 Repairs to Pumpset, Panel Board etc., to the
Sri rampura Maternity Home. 0.10
146 Repairs to Pumpset, Panel Board / Mono Block pump
etc., to the Sri rampura Maternity Home. 0.10
147 Providing Fixtures to the Newly constructed Building at
Srirampura Maternity Home 0.50
148 Repairs to Pumpset, Panel Board etc., IPP Center
at Gopala Pura, 0.10
149 A.M.C of Electrical Installation by engaging the
wire men, Helper, Operator. DG Set, AC etc, at JC West Zonal Office. 4.00

104
150 A.M.C of Electrical Installation by engaging the
wire men, Helper, Operator. DG Set, A C,etc., at
City Railway station and Sangam Sub-way, Gubbi
Veerana Drama Gandhi nagar 4.00
151 Repairs to A.C. at J.C. West Chamber, Seshadripuram 0.10
152 Repairs to A.C. Health Office, JC West Annexure building,
Seshadripuram 0.10
153 Repairs to Submersible pump/Panel Board at
J.C.west, zonal office, Seshadripuram 0.10
154 Repairs to Pump motor to
J.C.west, zonal office, Seshadripuram 0.10
155 Repairs to Electrical Installaiton / Pump motor to
Seshadripuram Park 0.10
156 Repairs to Electrical Installation to Gym building/community
hall/pumpset at Resildar street, Gandhi nagar 0.10
157 Repairs to Motor Pump to ARO/AEE ( Civil )Office
Good shed road, Gandhi nagar 0.10
158 Repairs to Submersible pump/Panel Board at BBMP
Girls High School, Gandhi nagar. 0.10
159 Repairs to Submersible pump/Panel Board at
Bashyam Park. 0.10
160 Repairs to Fountain Motor and Submersible motor to
Bashyam Park, Seshadripuram 0.10
161 Repairs to Fountain Motor and Submersible motor to
Thulasi Thota. 0.10
162 Repairs to Pump Motor and Panel at Railway
Station at Sub-way. 0.10
163 Repairs to Submersible pump/Panel Board at
Gubbi veerana Drama Theater, Gandhi nagar. 0.10
164 Repairs to Inter-com to J.C.West Zonal Office(West )
Seshadripuram 0.10
165 A.M.C of Electrical Installation by engaging the
wire men, Helper, Operator. DG Set, motors etc., at S.K.R.
Chickpet constituecny. 2.00
166 Repairs to Pump Motor at Chickpet Maternity Home. 0.10
167 Repairs to Pumpset at BBMP Girls High School
KV Temple Street, chickpet 0.10
168 Repairs and Providing MV fittings to the Bannapa Park,
Cubbonpet 3.00
169 Repairs to Elelctrical Installation
Cottonpet Maternity Home. 0.10
170 Repairs to Pumpset / Panel Board at
Manvarthpet Maternity Home. 0.10
171 Repairs to Pump Motor at
Muniyan park. 0.10
172 A.M.C of Electrical Installation by engaging the
wire men, Helper, Operator. DG Set, motors etc., at S.K.R.
Market, Market Sub-way, 8.00
173 Repairs to Pump Motor at
Mutton Market. 0.10
174 Repairs to Pumpset / Panel Board at
Mutton Market. 0.10

105
175 Repairs to Pumpset / Panel Board at
to SKR market Sub-way. 0.10
176 Repairs to 6Nos. Pumpset / Panel Board at
to SKR market, Basement floor 1.00
177 Repairs and Servicing 2Nos. Of DG sets
125KVA at SKR Market 0.60
178 Repairs to the Electrical Installation, Panel Board etc.,
complete at Mutton and Fish Matket. 3.00
179 A.M.C of Electrical Installation by engaging the
wire men, Helper, Operator. DG Set, , at
Set, Dasappa Hospital Annexure
building and other B.B.M.P. Buildings in
Chamarajpet constituency., 4.00
180 Repairs to Pump Motor at
B.B.M.P. Junior College Chamarajpet 0.10
181 Repairs to Pumpset / Panel Board at
Makkalakoota Park. 0.10
182 Repairs to Submersible Pump Motor at
Makkalakoota Park. 0.10
183 Repairs to Pumpset / Submersible Motor at Hindu
Burial Ground, Chamarajpet. 0.10
184 A.M.C of Electrical Installation by engaging the
wire men, Helper, etc. at Whole Sale Yard,
Kalasipalya. 3.00
185 Repairs to Pump Motor at
Whole Sale Yard. 0.10
186 Repairs to Submersible Pump Motor at
SJP park part-1 0.10
187 Repairs to Submersible Pump Motor at
SJP park part-11 0.10
188 Repairs to Submersible Pump Motor at
Dasappa Maternity Home. 0.10
189 Repairs to Submersible Pump Motor at
Dasappa Hospital Annexure Building. 0.10
190 Repairs to A.C. Unit at Dasappa Hospital
Annexure Building. 0.10
191 Repairs to Pumpset / Panel Board at
BBMP Car Shed. 0.10
192 Repairs to Pumpset / Panel Board at
Bannappa Park. 0.10
193 Repairs to Pumpset / Panel Board at
Janatha Colony, BBMP Park 0.10
194 Repairs to Pumpset / Panel Board at
CSI, BBMP Park. 0.10
195 A.M.C of Electrical Installation by engaging the
wire men, Helper, Operator. DG Set, , at Town hall,
Transformer Yard etc., 3.00
196 Repairs to Submersible Pumpset / Panel Board at
Town Hall. 0.10
197 Repairs to Submersible Pump Motor at
J.C. Raod Office Complex. 0.10
198 Repairs to Submersible Pump Motor at

106
J.C. Raod Car parking. 0.10
199 Repairs to 7.5KVA D.G.Set at Siddiah Road,
Maternity Home 0.10
200 Repairs to Submersible Pump Motor at
Siddiah Road Maternity Home 0.10
201 AMC of Nyaya Degula complex engaging with lift operator etc.,
at Siddaiah Road. 1.00
202 Repairs to Pumpset, Panel Board etc., to the
Judicial Layout park, Sanjay nagar., 0.10
203 Repairs to Pumpset, Panel Board etc., to the
AECS 2nd Stage, 7th main park, Sanjay nagar., 0.10
204 Repairs to Pumpset, Panel Board etc., to the
Amar jyothi Layout park, Sanjay nagar., 0.10
205 Repairs to Pumpset, Panel Board etc., to the
Central Excise Layout park, Sanjay nagar., 0.10
206 Repairs to Pumpset, Panel Board etc., to the
RMV 2nd Stage park, Sanjay nagar., 0.10
207 Repairs to Pumpset, Panel Board etc., to the
KEB Layout Park, Sanjay nagar. 0.10
208 Repairs to Pumpset, Panel Board etc., to the
RMV 3rd Stage, Soundarya park, Sanjay nagar., 0.10
209 Repairs to Pumpset, Panel Board etc., to the
RMV Hospital park, Sanjay nagar., 0.10
210 Released and refixing Tubular poles with fittings from Bellary
road the same is refixed to the BEL Road, Sanjay nagar. 3.00
Total 521.95
Sub Total 954.52
Grand Total 5197.89

107
SOUTH ZONE
Details of Programme of works for the year 2008-09
(Works proposed for 08-09)
Details of Programme of Works for the Year 2008-09 pertaining to Ward No.31, Binnypet Sub Division
Sl No. Name of the Work Estimated Cost
I (A) Capital Works
1 Providing CC to Lanes in new Binny Layout 45.00
Sub Total-1 45.00
II (B) Maintainence Works
1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.00
Maintainance of Street Name / ornamental Name Boards in the Ward Juridiction
2 1.00
3 Maintenance of Nirmala & Other BBMP toilets in the Ward Juridiction 2.00
4 Protection of recovered BBMP Properties in the Ward Juridiction 2.00
Providing new Street Name / ornamental Name Boards in the Ward Juridiction
5 1.00
Annual maintenance of Range office building in 4th Cross, ward office building
6 5.00
& School building in 2nd cross
7 Annual maintenance of Hospital & Nurse Quarters 2nd Cross, Magadi Road 4.00
House Keeping & maintenance of Range Office Building in 4th cross of Magadi
8 2.00
road
9 Annual maintenance of School building in 1st Cross of Magadi road 4.00
10 Patching of pot holes to the internal roads 3.00
11 Patching of pot holes to the Arterial and sub-arterial roads 5.00
Desilting of territiary drains in Bhuvaneshwarinagar from 1st cross to 8th cross
12 5.00
of Magadi road & 6th cross to 16th cross of Bhuvaneshwarinagar
13 Asphalting to 5th main of Bhuvaneshwarinagar 5.00
Sub Total-2 40.00
III BBMP Contact Point
Construction of BBMP contact point Building at CA site Vijayanagar 4th Main
1 9.00
road
Sub Total-3 9.00
IV Annual Maintenance of BBMP properties
1 Annual repairs to BBMP Properties in the ward juridiction 1.29
Sub Total-4 1.29
Grand Total 95.29
Details of Programme of Works for the Year 2008-09 pertaining to Ward No.32, Binnypet Sub Division

Sl No. Name of the Work Estimated Cost


1 2 3
I (A) Capital Works
Formation of Cement Conrete Roads in 2nd & 3rd main of Bhuvaneshwari
1 22.00
nagara
2 Formation of New roads in Ambedkar Layout next to 4th Cross 5.00
Construction of Genaral Toilet at 8th cross of Magadi road & 5th main of
3 3.00
B.Nagar
Sub Total-1 30.00
II (B) Maintainence Works
1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.00
2 Maintainance of Street Name / ornamental Name Boards in the Ward Juridiction 1.00
3 Protection of recovered BBMP Properties in the Ward Juridiction 2.00

108
4 Providing new Street Name / ornamental Name Boards in the Ward Juridiction 1.00
5 Patching of pot holes to the internal roads & Depot Collection 4.00
6 Patching of pot holes to the Arterial and sub-arterial roads 5.00
Desilting of territiary drain in Bhuvaneshwari nagar from 8th cross to 15th cross
7 5.00
& 1st main to 10th main
8 Desilting of territiary drain in Telecom Layout & Ambedkar Layout 3.00
9 Restoration of roads cut potion in 22nd cross of Bhuvaneshwarinagar 10.00
10 Asphalting roads in Bhuvaneshwari nagar from 16th to 22nd Cross 15.00
11 Restoration of Cement concrete road cut potion in Bhuvaneshwarinagar 8.00
Sub Total-2 55.00
III BBMP Contact Point
Construction of BBMP contact point Building at CA site Vijayanagar 4th Main
1 9.00
road
Sub Total-3 9.00
IV Annual Maintenance of BBMP properties
1 Annual repairs to BBMP Properties in the ward juridiction 1.29
Sub Total-4 1.29
Grand Total 95.29
Details of Programme of Works for the Year 2008-09 pertaining to Ward No.33, Binnypet Sub Division
Sl No. Name of the Work Estimated Cost
I (A) Capital Works
Construction of Library Building Computer Training Center Tailoring hall in4th
1 30.00
main Vijayanagara (Balance Portion)
2 Providing CC to Lanes along 1st Cross to 8th Cross, N.R. Garden 10.00
Sub Total-1 40.00
II (B) Maintainence Works
1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.00
2 Maintainance of Street Name / ornamental Name Boards in the Ward Juridiction 1.00
3 Maintenance of Nirmala & Other BBMP toilets in the Ward Juridiction 2.00
4 Protection of recovered BBMP Properties in the Ward Juridiction 2.00
5 Providing new Street Name / ornamental Name Boards in the Ward Juridiction 1.00
Annual maintenance of Pramila Bai Mane School & Library Building at
6 2.00
Manjunathanagara
Patching of pot holes to the 1st to 4th Main Road Vidyaranyanagara, 1st cross to
7 5.00
10th Cholurpalaya.
8 Patching of pot holes to the Arterial and sub-arterial roads in Ward - 33 5.00
Desilting of territiary drains in Cholurpalya from 1st cross to 13th Cross &
9 5.00
Manjunathanagara 1st cross to 10th cross & Vijayanagara
10 Asphalting to 1st Main to 9th Main, Vijayanagar 16.00
11 Foot path maintenance of West of Chord Road & Magadi main road 2.00
12 Foot path maintenance of roads 1st to 9th main Vijayanagar roads 3.00
Sub Total-2 45.00
III BBMP Contact Point
Construction of BBMP contact point Building at CA site Vijayanagar 4th Main
1 9.00
road
Sub Total-3 9.00
IV Annual Maintenance of BBMP properties
1 Annual repairs to BBMP Properties in the ward juridiction 1.29
Sub Total-4 1.29
Grand Total 95.29

109
Details of Programme of Works for the Year 2008-09 pertaining to Ward No.34, Binnypet Sub Division
Sl No. Name of the Work Estimated Cost
1 2 3
I (A) Capital Works
Construction of foot path at 5th road from 4th Cross to Rameshbabu Circle
1 35.00
(balance work)
2 Providing CC to Roads 8th A and 8th B roads of BNASO Layout 10.00
Sub Total-1 45.00
II (B) Maintainence Works
1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.00
Maintainance of Street Name / ornamental Name Boards in the Ward Juridiction
2 1.00
3 Maintenance of Nirmala & Other BBMP toilets in the Ward Juridiction 2.00
4 Protection of recovered BBMP Properties in the Ward Juridiction 2.00
Providing new Street Name / ornamental Name Boards in the Ward Juridiction
5 1.00
6 Annual maintenance of Old ward office at 9th main road RPC Layout 2.00
7 Desilting of territiary drains in ward no.34 3.00
8 Depot collection for the year 08-09 1.00
9 Patching of pot holes to the internal roads 2.00
10 Construction of Culvert at 9th main and Railway parallel road junction 3.00
11 Providing asphalting to 9th ABCD, 10th, 11th Main Road of RPC Layout 18.00
12 Providing RCC cover to SWD at 10th Cross RPC Layout 4.00
Sub Total-2 40.00
III BBMP Contact Point
Construction of BBMP contact point Building at CA site Vijayanagar 4th Main
1 9.00
road
Sub Total-3 9.00
IV Annual Maintenance of BBMP properties
1 Emergency repairs to BBMP Properties in the ward juridiction 1.29
Sub Total-6 1.29
Grand Total 126.29
PROGRAMME WORKS FOR THE YEAR 2008-09 WARD NO.35, Marenahalli in Govindarajnagar sub-
S.L No Name of the Work Estimatted cost in Lakhs

I POW Grants
1 Demolition of Building (Enforcement) 1.00
2 Re-Writing of street Name/Ornamental Name borads 1.00
3 Maintenance of Nirmala Toilets in Kanakanagar slum & Saraswathi nagar 2.00

4 Protection of recovered BBMP Properties _


5 Temporary Tranisit Garbage Handling Points _
6 Providing new street Name/omamental name boards 5.00
7 Construction of missing Culvert and providing missing tertiary drain in ward no 6.00
35
8 Providing CC to Lanes along 21st 'C' cross,5th and 6th Cross of Marenahalli 25.00

9 Patching of pot holes to the Arterial & internal roads in Ward - 35 5.00
10 Desilting of territiary and secondary drains along 1st cross to 8th cross, 1st 5.00
Main to 9th Main of Marenahalli, 1st cross to 7th cross, 1st Main to 7th Main of
Subbanna Garden,1st cross to 4th cross & 1st main to 6th Main of Vinayaka lyt
3rd stage

110
11 Engaging private labourers for maintenance of Ward for the year 08-09 5.00
12 Asphalting to 1st Cross to 6th Cross of GKW Layout & Vyalikaval Layout 25.00

13 Construction of lead off drain along 8th cross of Shivananda nagar and 5.00
Marenhalli
TOTAL 85.00
II Contact Point
Nil
IV (1) Emergency repair works for Ward office Building 1.29
TOTAL 1.29
GRAND TOTAL 98.29
PROGRAMME WORKS FOR THE YEAR 2008-09 WARD NO.36, Govindarajanagar in Govindarajnagar sub-
S.L No Name of the Work Estimatted cost in Lakhs

I POW Grants
1 Demolition of Building (Enforcement) 1.00
2 Re-Writing of street Name/Ornamental Name borads 1.00
3 Maintenance of Nirmala and other BBMP toilets 2.00
4 Protection of recovered BBMP Properties 3.00
5 Temporary Tranisit Garbage Handling Points _
6 Providing new street Name/omamental name boards 2.00
8 Reconstruction of SSM drains and providing RCC desklab from 5.00
Sangollirayanna road to 4th main, M.C. Layout
9 Providing CC to Lanes at Govindarajnagar ottegere 25.00
13 Asphalting to roads at Kaveripura 15.00
14 Patching of pot holes to the internal roads 3.50
15 Desilting of territory drains at low laying area at Muneshwara Block, Sy. No.43 5.00
at Malagala, Ranganathapura & Kaveripura
16 Engaging private labourers for maintenance of ward for the year 2008-09 5.00
17 Restoration of footpath at 8th cross, M.C.Layout 5.00
18 Construction of culverts & Providing BS slab drain at sy. No.43 at Malagala 10.00
village
19 Construction of culverts western side of 3rd Main Kaveripura 2.50
TOTAL 85.00
II Contact Point
Nil
TOTAL _
IV (1) Emergency repair works for BBMP Buildings 1.29
TOTAL 1.29
GRAND TOTAL 86.29
PROGRAMME WORKS FOR THE YEAR 2008-09 WARD NO.37, Amarjyothi nagar in Govindarajnagar sub-
S.L No Name of the Work Estimatted cost in Lakhs

I POW Grants
1 Demolition of Building (Enforcement) 1.00
2 Re-Writing of street Name/Ornamental Name boards 1.00
3 Maintenance of Nirmala and other BBMP toilets
4 Protection of recovered BBMP Properties _
5 Temporary Tranisit Garbage Handling Points
6 Providing new street Name/ornamental name boards
7 Formation of new road and drain at 1st and 2nd cross of Kanakanagar 8.00
8 Construction of RCC Box drain at Kanakanagar 15.00

111
9 Providing CC to cross roads of Sampige Layout (10th E,F) and 1st A & B cross 10.00
of SVG Nagar
10 Providing asphalting from 1st cross to 8th cross roads of Sanjeevininagar 15.00

11 Providing asphalting from 9th cross to 11th cross roads of Sanjeevininagar & 18.00
Sangolli rayanna road
12 Desilting of territiary drain @ 1st Main, 2nd, 3rd main & Surrounding cross 5.00
roads of Panchasheela nagar
13 Desilting of territiary drain @ 8th cross, 10th cross, 10th D,E cross of Sampige 5.00
layout & 5th cross & 1st main of Kaveri layout
14 providing Pothole filling to Internal roads in ward no.37 2.00
14 Engaging private labourers for maintenance of Ward for the year 08-09 5.00
TOTAL 85.00
II Contact Point
1 Constructions of Contact point building in ward No.37 9.00
TOTAL 9.00
IV (1) Emergency repair works for Ward office Building & Corporation building 1.29

TOTAL 1.29
GRAND TOTAL 95.29
PROGRAMME WORKS FOR THE YEAR 2008-09 WARD NO.38, Moodala palya in Govindarajnagar sub-
S.L No Name of the Work Estimatted cost in Lakhs

I POW Grants
1 Demolition of Building (Enforcement) 1.00
2 Re-Writing of street Name/Ornamental Name borads 1.00
3 Maintenance of Nirmala and other BBMP toilets _
4 Protection of recovered BBMP Properties _
5 Temporary Transit Garbage Handling Points _
6 Providing new street Name/ornamental name boards 1.00
7 Providing protection grill and other allied works to BBMP college building at 10.00
Byraweshwaranagar
8 Comprehensive development 0f 9th& 10 th cross of garden villas 14.00
9 Providing SSM drain & Covering slab at 2nd cross & 1st Main road at Janatha 10.00
colony in Panchasheela nagar
10 Construction of Balance compound wall at BBMP High school & Protective 10.00
works at BBMP HP school
11 providing asphalting to bad roads in kalyana nagar 15.00
12 providing asphalting to bad roads in garden villas,coconut garden & Manasa 15.00
Nagar
13 providing Missing culverts in ward no.38 5.00
14 providing Pothole filling to Internal roads in ward no.38 3.00
TOTAL 85.00
II Contact Point
1 Construction of Contact point centre at Vivekanada Park in BDA Layout in 9.00
ward no.38
TOTAL 9.00
IV (1) Emergency repair works for BBMP Buildings 1.29
TOTAL 1.29
GRAND TOTAL 95.29

112
Programme of Works for the year 2008-09 pertaining to Ward No.39, Chandra Layout, Chandra Layout Sub
Division, Chandra Layout Division
Sl.No. Name of Work Est.Amount (in lakhs)
I (A) Capital works
1 Construction of watchmen quarters at ward office premises. 5.00
Construction of culverts and drain at Babaiahna Gudi main road in Vidyagiri
2 7.00
Layout.
Construction of culverts at main and cross roads in I.T.I. Layout (Nayandahalli).
3 10.00

4 Providing cement concrete to 1st to 4th main in Metro Layout. 20.00


Providing cement concrete to balance roads in Gangondanahalli slum (adjacent
5 5.00
to 4th cross).
Providing new Street Name / ornamental Name Boards in the Ward Juridiction
6 1.00
Sub Total-1 48.00
II (B) Maintenance Works
1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.00
2 Re-writing of Street Name / ornamental Name Boards in the Ward Juridiction 1.00
3 Maintenance of Nirmala & Other BBMP toilets in the Ward Juridiction 2.00
4 Protection of recovered BBMP Properties in the Ward Juridiction 2.00
Providing Asphalting to balance roads in Vidyagiri Layout, New Income Tax
5 Layout and Chandra Layout 1st stage 1st phase (from 13th to 15th cross road). 10.00

6 Providing Asphalting to balance roads in I.T.I. Layout (Nayandahalli). 15.00


7 Desilting of tertiary drains in Gangondanahalli slum area. 2.00
8 Desilting of tertiary drains in Arundathi slum area. 2.00
9 Depot collection. 2.00
Sub Total-2 37.00
III BBMP Contact Point
Construction of BBMP contact point Building at Gangondahalli main road below
1 9.00
High tension line.
Sub Total-3 9.00
V Annual Maintenance of BBMP properties
1 Annual repairs to BBMP Properties in the ward juridiction 1.29
Sub Total-4 1.29
GRAND TOTAL 112.16
Programme of Works for the year 2008-09 pertaining to Ward No.40, Attiguppe, Chandra Layout Sub
Division, Chandra Layout Division
Sl.No. Name of Work Est.Amount (in lakhs)
I (A) Capital works
1 Construction of road side drains at Railway Parallel lane and Maruthinagar. 10.00
Construction of culverts and drains at Chandra Layout and Venkateshwara
2 12.00
Layout.
Providing new Street Name / ornamental Name Boards in the Ward Juridiction
3 1.00
Sub Total-1 23.00
II (B) Maintenance Works
1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.00
2 Re-writing of Street Name / ornamental Name Boards in the Ward Juridiction 1.00
3 Maintenance of Nirmala & Other BBMP toilets in the Ward Juridiction 2.00

113
4 Protection of recovered BBMP Properties in the Ward Juridiction 5.00
Providing Asphalting and Improvements to drains at Nisarga Layout,
6 40.00
Maruthinagar, BCC Layout, Viwers Layout and C.H.B.S. Layout.
7 Improvements to drains and Footpath in front road of Skyline Apartment. 6.00
7 Maintenance of ward to ward office. 1.00
8 Filling of pot holes in jurisdiction in ward-40. 2.00
9 Maintenance of ward (Desilting) and other maintenance works. 2.00
10 Depot Collection. 2.00
Sub Total-2 62.00
IV Annual Maintenance of BBMP properties
1 Annual repairs to BBMP Properties in the ward juridiction 1.29
Sub Total-4 1.29
GRAND TOTAL 94.09

Programme of Works for the year 2008-09 pertaining to Ward No.41, Gali Anjaneya Temple, Chandra
Layout Sub Division, Chandra Layout Division

Sl.No. Name of Work Est.Amount (in lakhs)


I (A) Capital works
Providing new Street Name / ornamental Name Boards in the Ward Juridiction
1 1.00
Sub Total-1 1.00
II (B) Maintenance Works
1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.00
2 Re-writing of Street Name / ornamental Name Boards in the Ward Juridiction 1.00
3 Maintenance of Nirmala & Other BBMP toilets in the Ward Juridiction 2.00
Providing Asphalting to roads in newly taken area BDA Layout in Sy no. 17/1.
4 15.00
rd th th th
Providing Asphalting to 3 , 4 & 6 to 10 cross in Byatarayanapura New
5 Extension and 1st to 5th cross in Raghavanagar, 1st to 4th cross in Vinoba 20.00
Colony and cross roads in Ganapathinagar.
6 Providing Asphalting to 1st to 5th cross in Veerabhadranagar. 10.00
Providing Asphalting to 2nd to 5th cross in Muthachari Layout, cross roads in FCI
7 Layout and main road & cross roads in Hanumanthappa Layout and Jyothinagar. 15.00

8 Annual maintenance to Health Centre in Muneswara Block. 2.00


9 Annual maintenance to Veterinary Hospital in Byatarayanapura. 2.00
10 Filling of pot holes in jurisdiction in ward no.41. 2.00
Desilting of tertiary drains in Byatarayanapura, Vinoba Colony and Timber Yard
11 2.00
Layout.
Desilting of tertiary drains in Hanumanthappa Layout, Ranghanatha Colony,
12 2.00
Jyothinagar and F.C.I. Layout.
13 Depot Collection. 2.00
Special repairs, water supply and repairs to U.G.D. system to the Maternity
14 8.00
Hospital in Kasturiba Nagar.
Sub Total-2 84.00
III BBMP Contact Point
1 Construction of BBMP contact point Building at Avalahalli. 9.00
Sub Total-3 9.00
VI Annual Maintenance of BBMP properties
1 Annual repairs to BBMP Properties in the ward juridiction 1.29
Sub Total-4 1.29
GRAND TOTAL 150.29

114
Programme of Works for the year 2008-09 pertaining to Ward No.42, Bapujinagar, JJRNagar Sub Division,
Chandra Layout Division
Sl.No. Name of Work Est.Amount (in lakhs)
I (A) Capital works
1 Construction of R.C.C. box drain at B.W.S.S.B. road. 5.00
2 Construction of L/shape concrete drains at Bapujinagar area. 5.00
3 Construction of S.S.M. drains at Bapujinagar area. 5.00
Providing Cement Concrete to roads in Kavika Layout in between V.Valley and
4 10.00
West of Chord road.
5 Providing Cement Concrete roads in Shamanna Garden area. 8.00
Sub Total-1 33.00
II (B) Maintenance Works
1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.00
2 Re-writing of Street Name / ornamental Name Boards in the Ward Juridiction 1.00
3 Maintenance of Nirmala & Other BBMP toilets in the Ward Juridiction 2.00
4 Protection of recovered BBMP Properties in the Ward Juridiction 5.00
5 Temproary Transist of Garbage handling Points in the Ward Juridiction 1.00
Providing new Street Name / ornamental Name Boards in the Ward Juridiction
6 1.00
7 Asphalting to roads at Chowdappa Layout and balance roads at Bapujinagar. 10.00
Reconstruction of damaged portion of S.W.D. in Maruthinagar and Shamanna
8 9.00
Garden area.
9 Reconstruction of culverts at 16th and 17th cross roads Bapujinagar. 5.00
10 Annual maintenance of Tailoring hall in Maruthinagar, Anganavadi building. 5.00
11 Patching of pot holes to the inertial roads. 2.00
12 Desilting of territory drains. 3.00
13 Desilting of secondary S.W.D. 5.00
14 Engaging private labour for maintenance of ward for the year 2008-09. 2.00
Sub Total-2 52.00
IV Annual Maintenance of BBMP properties
1 Annual repairs to BBMP Properties in the Ward juridiction 1.29
Sub Total-5 1.29
GRAND TOTAL 99.29

Programme of Works for the year 2008-09 pertaining to Ward No.43, Padarayanapura, JJRNagar Sub Division

Sl.No. Name of Work Est.Amount (in lakhs)


I (A) Capital works
Providing RCC Deck Slab in between 6th & 7th Cross (Behind to Samudaya
1 5.00
Bhavana) of Padarayanapura
Reconstruction & Improvements to Road Side drains @ 3rd Cross of
2 4.00
Padarayanapura
3 Providing Cement Concrete to Lanes of Mominpura Slum 8.00
Providing Cement Concrete to Lanes & Improvemnets of drains @ Farooqia
4 10.00
nagar
Reconstruction of Culvert & Improvements to Road Side drains @ 5th Cross of
5 5.00
Padarayanapura
Sub Total-1 32.00
(B) Maintenance Works
1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.00
2 Re-writing of Street / Ornamental Name Boards in the Ward Juridiction 1.00
3 Maintenance of Nirmala & Other BBMP toilets in the Ward Juridiction 2.00

115
4 Protection of recovered BBMP Properties in the Ward Juridiction 5.00
5 Providing new Street / Ornamental Name Boards in the Ward Juridiction 1.00
Clearence of debris / over burden earth from 12th Cross to 11th Cross in
6 2.00
Padarayanapura (near Railaway Bridge)
Improvements to drains & Providing RCC Slabs @ 8th Cross of Padarayanapura
7 5.00
Desilting of Roads side drains & Maintenance of Shoulders in the Ward
8 3.00
juridiction
9 Filling the pot holes & Depot collection for the year 2008-09 2.00
Annual repairs to BBMP Samudaya Bhavana, DDUrs nagar & Electric
10 3.00
Cremitorium at 2nd cross, Mysore Road
Improvements to Footpath at Padarayanapura Main Road (from 1st cross end to
11 8.00
5th cross)
Providing Asphlating to 2nd to 6th Cross of Mysore road & Vinayakanagara
12 10.00
Roads.
13 Reconstruction of drains at Nehru Road in Padarayanapura 5.00
Providing RCC Deck Slab to SWD at 12 th main (Balance Portion) of
14 5.00
Padarayanapura (near Muneshwara Temple)
Sub Total-2 53.00
GRAND TOTAL 101.34

Programme of Works for the year 2008-09 pertaining to Ward No.44, JJRNagar, JJRNagar Sub Division

Sl.No. Name of Work Est.Amount (in lakhs)


I (A) Capital works
Improvements to drains & Providing RCC Deck Slab at 2nd Main Road, JJR
1 10.00
Nagar
Sub Total-1 10.00
(B) Maintenance Works
1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.00
2 Re-writing of Street / Ornamental Name Boards in the Ward Juridiction 1.00
3 Maintenance of Nirmala & Other BBMP toilets in the Ward Juridiction 2.00
4 Protection of recovered BBMP Properties in the Ward Juridiction 5.00
6 Providing new Street Name / ornamental Name Boards in the Ward Juridiction 1.00

Improvements to Footpath at JJR Nagar Main Road (from Police Station to


7 15.00
Church) and Tank bund Road (from CAR Quartres enterence to Darshini Hotel)
Painting to curb stones, improvements to Shoulders and desilting of drains at
8 3.00
Mysore road
9 Desilting of Roads side drains in the Ward juridiction 2.00
10 Filling the pot holes & Depot collection for the year 2008-09 2.00
Improvements to drains & Providing RCC covering slab at 9th Main Road,
11 9.00
Padarayanapura
12 Providing Rechip Carpetting to Roads of Ranganathapura Colony 10.00
Imporovements to drains & Providing RCC covering slabs to 7th Main Road,
13 9.00
Padarayanapura
Reconstruction of compund wall & Improvement Works at CAR Quarters
14 10.00
(Eastern side) at Mysore Road
Improvements to Culverts & drains at 18th main VS Garden (Lower) & 3rd
15 5.00
Cross, New pension Layout
Sub Total-2 75.00

116
II BBMP Contact Point
1 Construction of BBMP Contact Point Building at CA site JJR Nagar Main Road 9.00
Sub Total-2 9.00
IV Annual Maintenance of BBMP properties
1 Annual repairs to BBMP Properties in the Ward juridiction 1.29
Sub Total-5 1.29
GRAND TOTAL 112.34

Programme of Works for the year 2008-09 pertaining to Ward No.45, Azadnagar, J.J.R. Nagar Sub Division

Sl.No. Name of Work Est.Amount (in lakhs)


I (A) Capital works
Providing Cement Concrete to 1, 2, 6 and 7th Cross Roads to damaged
1 10.00
Conservancy at Azadnagar.
2 Providing Cement Concrete to 1, 4, 5, 6 and 7th Cross Roads in Vittalnagar. 14.00
st th rd th
Providing Cement Concrete from 1 to 4 Cross Roads, 3 to 4 Main Road at
3 10.00
Kasturibhanagar.
4 Providing new Street / Ornamental Name Boards in the Ward Juridiction 1.00
Sub Total-1 35.00
(B) Maintenance Works
1 Demolition of Buildings (Enforcement) in the Ward Juridiction 1.00
2 Re-writing of Street / Ornamental Name Boards in the Ward Juridiction 1.00
3 Protection of recovered BBMP Properties in the Ward Juridiction 5.00
4 Providing Asphalting to 1, 2 and 3rd Main Roads of R.C. Agrahara. 6.00
Providing Asphalting to Main Roads of Rudrappa Garden and Ashwathakatte
5 6.00
roads.
6 Improvement Works to Samudhaya bhavan at 6th Cross, Azadnagar . 4.00
Annual Repairs to Shishuvihar at 6th Cross, Primary Health Center at 1st Main,
7 3.00
Azadnagar and Anganavadi building at 2nd Main, Valmikinagar .
Annual repairs to Health Ward Office and Play ground at Mysore Road near toll
8 2.00
gate.
9 Annual repair works to SC/ST Hostel at 1st Main Road, Valmikinagar. 2.00
Annual Repairs to Kasturibha Junior College, Gymnesium, Anganavadi building
10 2.00
and Shishuvihar at Kasturibhanagar.
Reconstruction of SSM wall to damaged portion of SWD in Valmikinagar and
11 5.00
Vittalnagar.
12 Depot collection and pot holes filling for the Year 2008-09 2.00
13 Desilting of territary drains in the Ward jurisdiction. 2.00
Improvements to culverts from 1st to 8th cross at Azadnagar and 1st to 4th cross
14 9.00
roads, 3rd to 9th Main Road at Kasturibhanagar.
Sub Total-2 50.00
II BBMP Contact Point
1 Construction of BBMP Contact Point Building at 3rd cross of Azadnagar. 9.00
Sub Total-3 9.00
IV Annual Maintenance of BBMP properties
1 Annual repairs to BBMP Properties in the ward juridiction 1.29
Sub Total-5 1.29
GRAND TOTAL 105.49

117
PROGRAMME OF WORKS FOR THE YEAR 2008-09 PERTAINING TO WARD NO.49
Ward Name of Work Estimated Cost
No. (Rs in lakhs)
49 Providing cement concrete to Conservancy from Govindappa road to V.V.road
Pampamahakavi road to Shankar Nutt road, Vani Vilas road to S.B.M road W.A
temple to Bull temple road Kabir mutt road to Masthi Venkatesh Iyengar road, 30.00
N.A.Temple road to Dattatreya road in Ward No.49.

Sub Total-1 30.00

49 Demolition of Building (Enforcement) in Ward No.49. 1.00


49 Re-Writing of street names/ Ornamental name boards in ward No.49. 1.00
49 Maintenance of Nirmala and other BBMP toilets Ward No.49. 1.00
49 Protection of recoverd BBMP properties in Ward No.49. 2.00
49 Construction of Temporary transit garbage Handling points in Ward No.49. 1.00
49 Providing new street name / Ornamental name boards in ward No.49. 1.00
49 Depot collection in ward No.49. 2.00
49 Removal of debries and lose stones in ward No.49. 2.00
49 Removal of silt, slabs an resetting of slabs in K.G.Nagar 1st, 2nd, 3rd, 4th & 7th
cross road, Hanumanthanagar 1st, 2nd, 3rd, 4th, 5th, 6th & 7th cross road
Shankarmutt 1st, 2nd, 3rd, 4th cross roads and K.R.road reconstruction of
15.00
culverts at Gandhibazar main road, Shankar mutt 2nd, 3rd cross, Mount Joy 1st
cross and Kabir mutt and Nijaguna road Junction in ward No.49.

49 Improvements to road side drains and construction of culverts at Sameerapura


15.00
and Dhobi Nanjappa block in ward No.49.
49 Improvements to small lanes adjacent to Gandadagudi road in Sunkenahalli area
14.00
ward No.49.
Sub Total-2 55.00
Sub Total 1+2 85.00
49 Construction of contact point Building near, Bulle ward, K.R.Road in Ward
9.00
no.49.
Grand Total 94.00
PROGRAMME OF WORKS FOR THE YEAR 2008-09 PERTAINING TO WARD NO.50
Sl No Name of Work Estimated Cost
(Rs in lakhs)
CAPITAL WORKS
1 Widening of 7th main road between 8th cross to 15th cross of II Block Jayanagar
9.00
in ward No.50.
2 Providing ornamental M.S grill for balance portion of 7th main road in II
9.00
Block, Jayanagar in ward No.50.
3 Providing concrete to APS cross road and conservency between surveyor street
10.00
& Vani Vilas road in ward No.50.
4 Widening of road from Madavarao circle to Armugam circle along Kanakapura
10.00
road in Ward No.50.
Sub Total-1 38.00
MAINTENANCE WORKS
1 Improvements to road side drain and footpath for the balance portion of 7th main
between 8th cross & 15th cross of II nd block Jayanagar in Ward No.50. 12.00

2 Improvements to road side drain and footpath from 9th corss road to 15th cross
12.00
of 9th main road in 2nd Block, Jayanagar in Ward No.50.

118
3 Improvements to road side drain between Umar Shariff road & 9th cross in
10.00
Ranoji Rao road in Ward No.50.
4 Improvement to road side drain & footpath in Das compound road in Ward
10.00
No.50.
5 Providing new street name / Ornamental name boards in ward No.50. 1.00
6 Depot collection in ward No.50. 1.00
7 Removal of debries and lose stones in ward No.50 1.00
Sub Total-2 47.00
Sub Total 1+2 85.00
Grand Total 102.00
PROGRAMME OF WORKS FOR THE YEAR 2008-09 PERTAINING TO WARD
NO.51
Sl No Name of Work Estimated Cost
(Rs in lakhs)
CAPITAL WORKS
1 Providing cement concrete to small road in TR Nagar, 3rd block to 6th cross and
15.00
5th main in ward No.51
2 Providing cement concrete to dead end roads adjacent to 6th main road of TR
6.50
nagar in ward No.51
Sub Total-1 21.50
MAINTENANCE WORKS
1 Improvement to drains & footpath of Bugal Rock road in between EAT street
6.00
and Bull Temple road in ward No.51.
2 Improvement to drains & footpath of 1st, 2nd, 3 rd, 4th and 5th cross roads in
12.00
between 4th and 6th Main road of TR Nagar in ward No.51.
3 Improvement to drains & footpath of Nethaji Road in between Nagasandra Main
7.00
Road to 6th main road in ward No.51.
4 Improvement to drains along with 6th A main, 7th main, 7th A main, 8th main
18.00
road of CT Bed Grape garden in ward No.51.
5 Providing chainlink fencing to BBMP property at CT Bed in ward no 51 5.00
6 Improvements to footpath Southend cross road in ward no 51 5.00
7 Improvement to drains & footpath of Market road and Kalappa Road at
8.00
Basavanagudi in ward No.51.
8 Providing street name board inward no51 1.50
9 Depot collection for the year 2008-09 1.00
1 Construction of contact centre building at Nagasandra Village in ward no 51 9.00
Grand Total 94.00

PROGRAMME OF WORKS FOR THE YEAR 2008-09 PERTAINING TO WARD


NO.52
Sl No Name of Work Estimated Cost
(Rs in lakhs)
CAPITAL WORKS
1 Providing cement concrete to lanes at Gavipuram village & Lakshmipura
12.00
quarters lane in ward No.52
Sub Total-1 12.00
MAINTENANCE WORKS
1 Improvement to road side drains & Construction of culverts to balance roads in
16.00
Hanumnathanagar area, Maruti circle and Weavers colony in ward No.52.
2 Improvements toroad side drains and construction of culverts to balance roads in
10.00
Brundavanagar area in ward No.52.

119
3 Improvements to road side drains and construction of culverts to Chandrashekar
Azad road, Venkatesh palya roads and lanes behind Dasapp Kalyana Mantapa 15.00
road in Ward No.52.
4 Removing resetting and replacing damage slabs at Shoka Chakravarthi road,
Harsha Chakravarthi road in Lakshmipur and Hindu Maha Sagar road in ward 8.00
No.52.
5 Improvments and Maintenance at path ways, MS grill and chain link fencing at
deer park, Harihara gudda park and Ramanjaneya Gudda park in ward No.52. 10.00

6 Demolition of Building (Enforcement) in ward No.52. 1.00


7 Re-writing of street names/ Ornamental name blaord in ward No.52. 1.00
8 Maintenance of Nirmala and other BBMP properties in ward No.52. 1.00
9 Protection of recoverd BBMP properties in ward No.52. 2.00
10 Construction of Temporary transit garbage Handling points in Ward No.52. 1.00
11 Providing new street name / Ornamental name boards in ward No.52. 1.00
12 Pot hole filling in ward No.52. 1.00
13 Removal of debries in ward No.52. 1.00
14 Special reparies to Engineering ward office and staff quarters at Harihara gudda
5.00
park in ward No.52.
Sub Total-2 73.00
Total 1+2 85.00
1 Construction of contact point Building in ward No.52 9.00
Total 9.00
Grand Total 118.00

Ward Name of Work Estimated Cost


No. (Rs in lakhs)

53 Providing cement concrete to cross roads at 22nd main, BSK 1st stage, 2nd block
6.00
and 11th cross Ashoka nagar in ward No.53
Sub Total-1 6.00

53 Demolition of Building (Enforcement) in Ward No.53. 1.00


53 Re-Writing of street names/ Ornamental name boards in ward No.53. 1.00
53 Maintenance of Nirmala and other BBMP toilets in Ward No.53. 1.00
53 Protection of recoverd BBMP properties in Ward No.53. 2.00
53 Construction of Temporary transit garbage Handling points in Ward No.53. 1.00
53 Providing new street name / Ornamental name boards in ward No.53. 1.00
53 Depot collection for the year 2008-09 in ward No.53. 1.50
53 Removal of debries and lose stones in ward No.53. 1.00
53 Improvements to road side drains at 13th main & cross roads from 50 ft road to
8.00
Ramanjaneya road in ward No.53
53 Improvements to road side drains at 7th main Mount Joy from 50 ft road to pipe
8.00
line road in ward No.53
53 Improvements to road side drains & construction of culverts at 10th main road
6.00
Raghavendra block in ward No.53
53 Improvements to road side drains at 8th main from Kathriguppa main road to 8th
cross, 9th cross from 8th main road to 2nd main road, Ashok nagar in ward 8.00
No.53.
53 Improvements to road side drains at 2nd A cross Kalidasa layout in ward No.53.
5.00

120
53 Improvements to road side drains at 4th cross to 10th cross Raghavendra block
16.50
from 12th main to SWD in ward No.53.
53 Improvements to footpath at 22nd main E/S from 50 ft road to 80 ft road in ward
16.00
No.53.
53 Re-doing the road cut portion done by BWSSB at 14th main Raghavendra block
2.00
& 4th cross Mount Joy in Ward No.53.
Sub Total-2 79.00
Sub Total 1+2 85.00
Grand Total 85.00

Programme of works for the year 2008-09 in Srinivasanagara sub division ward-54
Sl. No Details Amount
(In Lakhs )
I- Maintenance works (Ward Works )
1. Temporary Gangman ( for Maintaining roads) 5

2. Depot collection 3

3. Pot hole filling & Road cutting in Ward roads including Arterial & sub Arterial 8
roads
4. Providing Name Boards in ward 10

5. Re-Construction Secondary drain & Providing RCC deck slab to the balance 15
portion at Hosakerehalli near by Ring road in ward No-54.
6. Desilting & Re grading of Drain at low level area (vulnerable points ) 4

7. Improvements to culverts and Drains at Kathriguppe Village . 5

8. Improvements to culverts and Drains in BSK 2nd Phase, 3rd Stage. 6

9. Improvements to culverts and Drains at Girinagar 6

10. Demolition of building (Enforcement) 1

11. Re-writing of street name/Ornamental name boards 1

12. Maintenance of Nirmala & other BBMP toilets 2

13. Providing New Street Name/Ornamental name boards 1

II- capital works


1 Contact point in Ward-54 9
2 Asphalting to selected bad roads 15
Total 91
Grand Total 127
Programme of works for the year 2008-09 in Padmanabha Nagar Sub Division in ward - 55

Sl.No. Details Amount in Lakhs.


I – Ward Works
1 Engaging special gangmen 4
2 Reserve fund for emergency works 10
3 Depo collection for the year 2008-09 and removal of debris. 10
4 Filling up of pot holes and road cutting in ward – 55 5

121
5 Desilting of Territiary drain at JHBCS and regrading adjacent drains. 5
6 Desilting and regrading drains at KSRTC Layout, Kumaraswamy Layout, 7
BHBCS, R.K. Layout, Kanaka Layout, Padmanabhanagar.
7 Construction of culverts at Hanumagiri Main Road and regrading low laying 5
drains and desilting.
8 Construction of lead off drain at 1st Cross, Puttalingaiah Road, 13
Padmanabhanagar.
9 Construction of RCC retaining walll to secondary SWD @ Muneshwara Nagara, 10
1st Main to 18th Main, Padmanabhanagara. (Balance Portion)
10 Construction of head off drain and covering to balance portion opp. To D.G. 5
Hospital.
11 Construction of culverts and regrading drains at 18th main Puttalingaiah Road, 5
From Raj Katte to Petrol Bunk at Junction of 6th Cross, 13th Main, R.K. Layout,
3rd Stage, Kanaka Layout.
12 Construction of culverts and improvements dain at Subhashchandra Road, at 10
JHBCS and Minaz Nagar.
13 Demolishing of building for ward works 1
14 Re-writing of street name/ ornamental name boards. 1
15 Providing new street name/ornamental name boards. 1
II Concrete Road Works
1 Providing concrete road to Muneshwara Nagara, Narrow roads 10
III Capital works
1 Providing chipcarpet to Kumaraswamy Layout, (Govi Nayakana Halli) 25
2 Providing chipcarpet to 1st & 2nd Cross to Padmanabhanagara & Bendre Nagara 13
Crosses.
3 Contact point at Ward No. 55 9
TOTAL 150
Programme of works for the year 2008-09 in Padmanabha Nagar Sub Division in ward - 56

Sl.No. Details Amount in Lakhs.


I – Ward Works
1 Reserve fund for emergency works 10
2 Depo collection for the year 2008-09 and removal of debris. 10
3 Filling up of pot holes and road cutting in ward – 56 5
4 Providing grating to territtiary drains in Ward No. 56 10
5 Improvements to drains and culverts in changaiah Layout, T.R.Nagar. 10
6 Improvements to drains and culverts at Bhavani Nagar in BSK 2nd Stage, 10
7 Demolishing of building for ward works 1
8 Re-writing of street name/ ornamental name boards. 1
9 Maintenance of Nirmala and other BBMP toilets 2
10 Providing new street name/ornamental name boards. 1
II Capital works
1 Providing Re-chipcarpet to bad roads at Karisandra in BSK 2nd Stage. 10
2 th 15
Construction of councilor office at 9 Main Road in BSK Stage.
TOTAL 85
Programme of works for the year 2008-09 pertaining to ward-55A in Srinivasanagara sub division
Sl No Details Lakhs
Maintence works
1. Engaging special Gangman for the year 2008-09 in Ward No.55A 5
2. Depo collection for the year 2008-09 in Ward No.55A 3
3. Filling up of potholes and road cutting in Ward No.55A 5

122
4. Demolition of Building (Enforcement) 1
5. Re-writing of street name / Ornamental Name Boards in Ward No.55A 1
Capital works
I-Road Concrete works
1. Providing cement concrete to 12th and 13th cross behind Mookambica temple in 10
Ward No.55A
2. Providing cement concrete to 14th and 15th cross behind Mookambica temple in 10
Ward No.55A
3. Providing cement concrete to 16th and 17th cross behind Mookambica temple in 10
Ward No.55A
4. Providing cement concrete to Subodh School road (Opp to Mookakmbica 10
temple at Moocambicanagara in Ward No.55A
5. Providing cement concrete to E/side of 1st A 1st B main road Mookambicanagara 10
in Ward No.55A
6. Providing cement concreting to 2nd main & 3rd main road, Mookambicanagara in 10
Ward No.55A
7. Providing cement concrete to W/side of Ittamadu 5th & 6th cross road in Ward 10
No.55A
8. Providing cement concrete to 7th cross Eashwarinagar in Ward No.55A 5
9.
II-Asphalting works
1. Asphalting to Balance portion of Sriramanagar & Kuvempunagar in Ward 25
No.55A
2. Asphalting to Eastern side of Dattatreyanagar 2nd main, 3rd main & 4th main road 25
in Ward No.55A
III-Drain work & Culverts
1. Providing Network of Box drains to lead of storm water into main channel at 5
Kalidasanagar in Ward No.55A
2. Providing flagging course & culverts in 6th , 7th & 8th crosses of 5
Hrushikeshanagar in Ward No.55A
150
Maintenance of Corporation Buildings
1. Maintenance of ward office and Corporation Buildings in Ward No.55A 1.29
Grand Total 187.29
Programme of Works for the Year 2008-2009 pertaining to Ward No-57, J.P.Nagar Jayanagara Sub

Sl.No Name of Work Estimate Cost


WARD GRANTS
CAPITAL WORK
1 Construction of cement concrete footpath in 4th Main Dollars layout in Ward 15.00
No-57
2 Construction of flagging course, formation of footpath, providing kerb stone in 15.00
8th main J.P.Nagar 2nd Phase in Ward No-57
3 Construction of Cultural Stage at 'Anandavana' - Sannakadu, JP Nagar 3rd 5.00
Phase, between 9th and 15th Cross in Ward No 57
Total 45.00
MAINTENANCE WORK
1 Demolition of building ( Enforcement) in Ward No-57 1.00
2 Re-writing of street name / ornamental name boards in Ward No-57 1.00
3 Maintenance of Nirmala and other BBMP toilets in Ward No-57 2.00
4 Providing new street name / ornamental name boards in Ward No-57 1.00

123
5 Improvements to drain and culverts, desilting of drains in 1st and 2nd Phase 12.50
J.P.Nagar in Ward No-57
6 Improvements to drain and culverts, desilting of drains in 3rd and 4th Phase 12.50
J.P.Nagar in Ward No-57
7 Improvements to drain and culverts, desilting of drains in 5th and 6th Phase 15.00
J.P.Nagar in Ward No-57
8 Pot hole and Road cutting filling in Ward No 57 5.00
9 Depot Collections and supply of emulsion Ward No-57 5.00
Total 55.00
Total 100.00
CONTACT POINT
1 Construction of contact point in Ward No-57 9.00
MAINTENANCE OF BUILDING
1 Maintenance of Ward office , Health ward office , open air theatre, Tailoring 1.29
hall in Ward No-57
Grand Total 117.49
Programme of Works for the Year 2008-2009 pertaining to Ward No-58, Jayanagar Jayanagara Sub

Sl.No Name of Work Estimate Cost


WARD GRANTS
CAPITAL WORK
1 Providing constructing to footpath at 39th cross road, from 11th Main to 18.00
22nd Main Road in 4th ' T ' Block Jayanagar in Ward No-58
2 Providing concreting to footpath at 38th Cross from 15th Main to 11th 5.00
Main Road in Ward No-58

Total 23.00
MAINTENANCE WORK
1 Demolition of building ( Enforcement) in Ward No-58 1.00
2 Re-writing of street name / ornamental name boards in Ward No-58 1.00
3 Maintenance of Nirmala and other BBMP toilets in Ward No-58 2.00
4 Providing new street name / ornamental name boards in Ward No-58 1.00
5 Improvements to drains including construction of flagging course and 12.00
providing covering slabs with construction of culverts in 8th block and 5th
block in Jayanagar Ward No-58
6 Providing asphalting and metaling including improvements to drain for the 7.00
balance portion in 3rd main road (8th Block) from 36th cross to 46th cross
road in Jayanagar Ward No-58
7 Improvements to the existing health ward office and contact point in 10.00
jayanagar Ward No-58
8 Desilting of road side drains including removal of berm and debris in 7th 10.00
block (West) , 8th Block and 5th block in Jayanagar Ward No-58
9 Desilting of road side drains including removal of berm and debris in 4th 8.00
T block and 9th block Jayanagar in ward No-58
10 Filling up of holes and warnout surface in Jayanagar ward in Ward -58 7.00
11 Depot collection and supply of emulsion in ward No-58 3.00
Total 62.00
85.00
MAINTENANCE OF BUILDING
1 Improvements to engineering ward office and tailoring centre in Jayanagar in 1.29
ward No-58

124
Programme of Works for the Year 2008-2009 pertaining to Ward No-59, Yediyur ,in Jayanagara Sub
Division

Sl.No Name of Work Estimate Cost


WARD GRANTS
CAPITAL WORK
1 Construction of masonry box drain and providing RCC precast slab in 22nd 11.00
cross in 3rd block jayanagar in ward no-59
2 Construction of masonry box drain and providing RCC precast slab in cross 15.00
roads of K.R. Road , Rathna Vilas Road, Guptha Layout, Papu Cottage in
ward no-59
Total 26.00
MAINTENANCE WORK
1 Demolition of building ( Enforcement) in Ward No-57 1.00
2 Re-writing of street name / ornamental name boards in Ward No-57 1.00
3 Maintenance of Nirmala and other BBMP toilets in Ward No-57 2.00
4 Providing new street name / ornamental name boards in Ward No-57 1.00
5 Repairs and improvements to sammudaya bhavan and yediyur collage 10.00
building in S. Kariyappa Road ward No-59
6 Construction of missing culverts and flagging course and RCC precast slabs for 13.00
drains from 23rd to 26th Cross, 6th Block and 6th to 9th cross in 7th Block
jayanagar in ward no -59
7 Desilting and improvements to RSD in 7th Block Jayanagar in Ward No-59 5.00

8 Desilting and improvements to road side drains at shastrinagar Tata silk farm, 5.00
Yediyur in Ward No-59
9 Pot hole and Road cutting filling in Ward No 59 5.00
10 Depot Collections and supply of emulsion Ward No-59 4.00
11 Construction of missing culverts and flagging course in obalappa Garden , 12.00
Tatasilk farm and Shastrinagar in ward no -59
Total 59.00
Total 85.00
CONTACT POINT
1 Construction of contact point in Ward No-58 9.00
MAINTENANCE OF BUILDING
2 Maintenance and repairs to ward office ,Tailoring centre and Gym buildings in 1.29
Ward No-59
Total 1.29
Grand Total 95.29
Programme of Works for the Year 2008-2009 pertaining to Ward No-60, Pattabiramanagar Jayanagara
Sub Division

Sl.No Name of Work Estimate Cost


WARD GRANTS
CAPITAL WORK
1 Providing concrete roads in 4th cross and lanes in LIC colony in Ward -No- 10.00
60
2 Providing concrete to footpath including providing kerb stones to swagath 13.00
theatre road and 32nd cross in 4th T Block Jayanagar in Ward No-60
Total 23.00

125
MAINTENANCE WORK
1 Demolition of building ( Enforcement) in Ward No-60 1.00
2 Re-writing of street name / ornamental name boards in Ward No-60 1.00
3 Maintenance of Nirmala and other BBMP toilets in Ward No-60 2.00
4 Providing new street name / ornamental name boards in Ward No-60 1.00
5 Improvements to drain and metalling of widening portion of road in 36th 5.00
cross 4th block Jayanagar
6 Improvements to community Hall at LIC colony in ward no-60 5.00
7 desilting of drain in LIC colony, byrsandra in ward no-60 5.00
8 desilting of drain in 3rd block and 4th block in Jayanagar in ward no-60 5.00
9 Filling of pot holes and warn out surface in ward no-60 7.00
10 Depot collection and supply of emulsion 2.00
11 Improvements to drain and construction of flagging course, providing 14.00
covering slabs and culvert improvements in swimming pool extension and
12th and 13 th main road , 3rd block Jayangar (East) in ward no-60
12 Improvements to drain and construction of flagging course and providing 14.00
covering slab in 8th F Main and 24 th Cross in 3rd block Jayanagar in
Ward No-60
Total 62.00
Total 85.00
CONTACT POINT
1 Construction of contact point in Ward No-60 9.00
MAINTENANCE OF BUILDING
1 Improvements to the existing veterinary Hospital and health ward office at 1.29
4th Main , 3rd block Jayanagar
Grand Total 102.49

PROGRAMME OF WORKS FOR THE YEAR 2008-09 IN WARD NO. 61, MAVALLI.

SL. NO. Head of Account & Name of Work Est Cost Rs. In Lakhs
I) General Grant
1 Demalition of building (Enforcement) in Ward No. 61 1.00
2 Re-writing of street name / ornamental name boards in Ward 61 1.00
3 Maintenance of Nirmala and other BBMP toilets in Ward 61 2.00
4 Providing new street name / ornamental name boards in Ward 61 1.00
Repairs and Desilting of drain in R.V. Road, Krumbigal Road and Mavalli Area
5 8.00
in Ward No. 61
6 Providing CC roads in Arekempanahalli (Balance Portion) in Ward No. 61 9.00
Providing Cement Concrete to Cross & Main Roads in Venkatareddy Nagara in
7 10.00
Ward No. 61
8 Providing CC roads in Someshwaranagara in ward 61 10.00
9 Construction of toilet block at Sushila Road in ward 61 2.00
10 Depot Collection for year 2008-09 in Ward No. 61 1.00
11 Improvements to drainage system at KM Colony and Guttepalya in ward 61 3.00
12 Engaging private labours for maintance of roads and footpath in ward No. 61 2.00
Repairs to Cement Concrete roads and improvements to approaches and
13 5.00
providing Screen Barriars and other improvements to drains in ward No. 61
Reconstruction of culverts and improvements to drain in Siddapura Slum
14 5.00
addjoinig road in Ward No. 61
Construction of SWD from Someshwaranagara to Hosur Road at (Near Abaya
15 25.00
Hospital) in Ward No. 61
Sub Total-1 85.00

126
II)Contact point
1 Construction of Help line Centre in Mavalli Ward 61 9.00
Sub Total-2 9.00
Sub Total-3 7.20
IV) Emergency Grant for the Building
1 Repairs to Old BBMP Buildings in Mavalli Ward No. 61 1.29
Sub Total-4 1.29
Grand Total: 102.49

PROGRAMME OF WORKS FOR THE YEAR 2008-09 IN WARD NO. 62 HOMBEGOWDANAGARA.

SL. NO. Head of Account & Name of Work Est Cost Rs. In Lakhs
I) General Grant
1 Demalition of building (Enforcement) in Ward No. 62 1.00
2 Re-writing of street name / ornamental name boards in Ward 62 1.00
3 Maintenance of Nirmala and other BBMP toilets in Ward 62 1.00
Protection of recovered BBMP properties - Maximum to be covered in Ward No.
4 2.00
62 Byrasandra
5 Temparary Transit Garbage Handling Points in Ward No. 62 1.00
6 Providing new street name / ornamental name boards in Ward 62 5.00
7 Depot Collection in ward No. 62 Hombegowdanagara 1.00
8 Engaging private labours for works in ward No. 62 2.00
9 Filling of potholes and road cutting in ward No. 62 5.00
Providing Cement Concrete roads and improvements to drains Krishnappa
10 15.00
Garden in Ward No. 62
Providing Cement Concrete roads and improvements to drains to Narayanapura
11 11.00
Slum in Ward No. 62
Desilting of SWD drains in Lakksandra, Wilson Garden and , 1st Block
12 10.00
Jayanagara, in Ward No. 62
Improvements to roads and drains at Rajanna Layout and RBI Colony in Ward.
13 10.00
62
Providing Cement Concrete to lanes and improvements to drains in Kutty
14 10.00
Colony in Ward 62
15 Asphalting to roads in 1st Block Jayanagara (Balance portion) ward 62 10.00
Sub Total-1 85.00
II) Contact point
1 Construction of Help line Centre in Ward No. 62 9.00
Sub Total-2 9.00
IV) Emergency Grant for the Building
1 Special Repairs to Old BBMP Buildings in Ward No. 62 1.29
Sub Total-4 1.29
GrandTotal: 95.29

PROGRAMME OF WORKS FOR THE YEAR 2008-09 IN WARD NO. 63, LAKKASANDRA.

SL. NO. Head of Account & Name of Work Est Cost Rs. In Lakhs
I) General Grant
1 Demalition of building under (Enforcement) in Ward No. 63 1.00
2 Re-writing of street name / ornamental name boards in Ward No. 63 1.00
3 Maintenance of Nirmala and other BBMP toilets in ward No. 63 1.00
4 Protection of recovered BBMP properties in Ward No. 63 2.00

127
Temparary Transit Garbage Handling Points at Lakkasandra &
5 1.00
Chikkalakshamaiah Layout in Ward No. 63
6 Asphalting to Bad Roads in Lakkasandra Ward No. 63 30.00
Providing Cement Concrete to 3rd, 4th, 5th and 6th Cross Road of Balajinagara
7 (Between 3rd Main of Balajinagara & KM Layout main Road) and 7th & 8th 20.50
Cross of Bharathi Layout
Improvements to Road side drain and Disilting of drain in Lakkasandra ward
8 10.00
No. 63
9 Improvements to Road side drain in Adugodi Layout in Ward No. 63 4.50
Providing CC to roads and Improvements to Road side drain in Bhavaninagar in
10 5.00
Ward No. 63
Improvements and Desilting of SWD from Banneragatta Road to Tavarekere
11 5.00
Main Road in Ward No. 63
12 Depot Collection for the year 2008-09 in ward No. 63 2.00
Engaging private labours for maintance of roads and footpath for the period
13 2.00
2008-09 in Ward No. 63
Sub Total-1 85.00
II) Contact point
1 Construction of Help line Centre in Lakkasandra Ward No. 63 9.00
Sub Total-2 9.00
IV) Emergency Grant for the Building
1 Repairs to the Old BBMP Buildings in Lakkasandra Ward No. 63 1.29
Sub Total-4 1.29
Grand Total: 95.29
PROGRAMME OF WORKS FOR THE YEAR 2008-09 IN WARD NO. 64,
SL. NO. Head of Account & Name of Work Est Cost Rs. In Lakhs
1 Re-writing of street name / ornamental name boards in ward No. 64 1.00
2 Protection of recovered BBMP properties in Ward No. 64,Gurappanapalya 2.00
3 Providing new streetname / ornamental name boards in ward No. 64 1.00
4 Depot Collection in Ward No.64 2.00
5 Engaging of private labours for removal of debries and desilting of drains in ward 2.00

6 Providing L-Shape drain in Gurappanapalya and in B T M 1st Stage 10.00


7 Shifting of Electric poles in 28th main of 9th Block Jayanagar and painting to Ker 3.00

8 Construction of R C C Deck Culverts and Flagging Courses in B T M 1st Stage 15.00


9 Construction of Cement Concrete Foot Path in 9th Block Jayanagaa 20.00
10 Construction of R C C drain and C C Road in 8th main of Gurappanapalya 10.00
11 Construction of R C C drain and C C Road in Krishanappa Garden Main Road 10.00
12 Improvements to drain in 9th A Main of B T M 1st Stage 4.00
13 Emergency Grants for low-lying Area in Ward No. 64 4.00
84.00
1 Construction of contact Point in Ward No. 64 9.00
2 Emergency Grants for the Building
3 Special Repairs to Existing Ward Office Building in Ward No. 64 1.29
Sub Total 1.29

128
PROGRAMME OF WORKS FOR THE YEAR 2008-09 IN WARD NO. 65
RASHTRA KAVI KUVEMPUNAGAR (BTM LAYOUT)
Estimated Cost Rs.
Sl. No Name of Work
In Lakhs
General Grant
1 Demolition of building (Enforcement) in Ward No. 65 1.00
2 Re-writing of street name / ornamental name boards in Ward 65 1.00
Protection of recovered BBMP properties in Ward No. 65 Rashtra Kavi
3 2.00
Kuvempunagar (BTM layout)
4 Providing new street name / ornamental name boards in Ward 65 1.00
5 Depot Collection in ward No. 65 2.00
Engaging of private labours for desilting and removal of debris in Ward No. 65
6 3.00
Rashtra Kavi Kuvempunagar (BTM layout)
Providing asphalting to V.P.Road in Old Madiwala and Venkateswara layout in
7 17.00
Ward No. 65 Rashtra Kavi Kuvempunagar (BTM layout)
Providing metalling and asphalting to roads in Mustak layout in Ward No. 65
8 20.00
Rashtra Kavi Kuvempunagar (BTM layout)
Providing concreting to 3rd main 2nd A B & C and 1st A V.P.Road in Old
9 20.00
Madivala in Ward No. 65 Rashtra Kavi Kuvempunagar (BTM layout)
Mettaling and asphalting to road along SWD in Venkateswara layout in Ward
10 18.00
No. 65 Rashtra Kavi Kuvempunagar (BTM layout)
Sub Total-1 85.00
Emergency Grants for the Building
Special repairs to existing ward office building in Ward No. 65 Rashtra Kavi
1 1.29
Kuvempunagar (BTM layout)
Sub Total- 3 1.29
GRAND TOTAL 86.29

PROGRAMME OF WORKS FOR THE YEAR IN WARD NO. 66 MADIWALA


Estimated Cost Rs.
Sl. No Name of Work
In Lakhs
General Grant
1 Demolishing of building in ward No. 66 1.00
2 Re-writing of street Name board 1.00
3 Protection of recovered B.B.M.P properties 2.00
4 Providing New Name boards 2.00
5 Engaging of provate labours for desilting & emergency works 3.00
6 Providing concreting to by lanes of Maruthinagar & Channammalaout 20.00
7 Providing asphalting to bad roads of in Tavarekere Jakkasadra Venkatapura 23.00
8 Improvements to roads at Tengin Topu Madiwala Jakkasandra Venkatapura 30.00
9 Providing Name boards at Venkatapura Madiwala Ward No. 66 3.00
Sub Total-1 85.00
Contact point
1 Construction of contact point in Ward No. 66 9.00
Sub Total-2 9.00
Emergency Grants for the Building
1 Construction of M.O.H building or existing of A.E.E. building 12.00
2 Special repairs to existing ward office building in Ward No. 66 1.29
Sub Total-4 13.29
GRAND TOTAL 107.29
Total 3245.75

129
SOUTH ZONE
PROVISIONAL BUDGETARY PROPOSAL PERTAINING TO 18%(CIVIL) WORKS FOR THE

18% - Capital Works


1 Construction of Community Toilet for SC/ST People 7.00
Construction of Anganawadi center 1st Floor & Repairs Ground Floor Building
2 5.00
Construction of Community hall (Ambedkar Bhavan) at 1st Floor Building 2nd
3 7.00
cross Hosahalli
4 Providing CC to 2nd & 10th,main road narrow cross of Hosahalli 10.00
Sub Total-4 29.00
18% - Maintainence Works
1 Reconstruction of drainage at A.K.Colony 5th Main Road 2.00
Sub Total-5 2.00

III 18% Grants


1 Provision for Acquisition or purchase of land for rehabilitation for SC/St Slum _
dwellers
2 Construction of Community Toilets for the benefit of SC/ST slum dwellers _
(1) Providing water supply connection to the individual building belongs to 2.00
SC/ST Communty in kanakanagar slum
3 Construction of Anganawadi centres for the benefits of SC/ST slum dwellers _
4 Construction of Additional Class rooms in existing school building where the _
population of SC/ST students is More than 30%
5 Construction of Community Halls (Ambedkar Bhavans) and repairs and _
improvements to existing Conmmunity Halls
6 Concreting of Narrow lanes along 4th cross in Kanaka nagara Slum 10.00
TOTAL 12.00
III 18% Grants
1 Provision for Acquisition or purchase of land for rehabilitation for SC/ST Slum _
dwellers
2 Construction of Community Toilets for the benefit of SC/ST slum dwellers _
3 Construction of Anganawadi centres for the benefits of SC/ST slum dwellers _
4 Construction of Additional Class rooms in existing school building where the _
population of SC/St students is More than 30%
5 Construction of Community Halls (Ambedkar Bhavans) and repairs and 1.00
improvements to existing Conmmunity Halls
6 Concreting of Narrow lanes in Predominant SC/ST dwelling slums _
IV 18% Grant - Capital Works
Provisin for acquistion or purchase of land for rehabilitaion for SC/ST slum
1 6.57
dwellers / Construction of indivual houses.
2 Construction of Community toilets for the benefit of SC/ST slum dwellers 2.00
3 Constructuion of Anganawadi centres for the benefit of SC/ST slum dwellers 1.50
Construction of Additional class rooms in existing school building where the
4 2.00
population of SC/ ST students is more than 30%
Construction of Community Halls (Ambedkar Bhavana) and repairs and
5 2.00
improvements to existing Community Halls
6 Concreting of narrow lanes in Predominant SC/ ST dwelling slums 2.80
Sub Total-3 16.87

130
III 18% Grant - Capital Works
Provisin for acquistion or purchase of land for rehabilitaion for SC/ST slum
1 5.00
dwellers / Construction of indivual houses.
2 Concreting of narrow lanes in Predominant SC/ ST dwelling slums 2.80
Sub Total-3 7.80
IV 18% Grant - Capital Works
Provisin for acquistion or purchase of land for rehabilitaion for SC/ST slum
1 30.00
dwellers / Construction of indivual houses.
2 Constructuion of Anganawadi centres for the benefit of SC/ST slum dwellers 5.00
Construction of Additional class rooms in existing school building where the
3 5.00
population of SC/ ST students is more than 30%
4 Concreting of narrow lanes in Predominant SC/ ST dwelling slums 5.00
Sub Total-4 45.00
V 18% Grant - Maintenance Works
Construction of Community Halls (Ambedkar Bhavana) and repairs and
1 10.00
improvements to existing Community Halls
Sub Total-3 10.00
III 18% Grant - Capital Works
Provisin for acquistion or purchase of land for rehabilitaion for SC/ST slum
1 10.20
dwellers
2 Concreting of narrow lanes in Predominant SC/ ST dwelling slums 2.80
Sub Total-3 13.00
III 18% Grant - Capital Works
Provisin for acquistion or purchase of land for rehabilitaion for SC/ST slum
1 10.20
dwellers
2 Construction of individual toilets for the benefit of SC/ST slum dwellers 2.00
3 Concreting of narrow lanes in Predominant SC/ ST dwelling slums 2.85
Sub Total-3 15.05
18% Grant - Maintenance Works
nil
IV Annual Maintenance of BBMP properties
1 Annual repairs to BBMP Properties in the Ward juridiction 1.29
Sub Total-5 1.29
III (A) 18% Grant - Capital Works
Provisin for acquistion or purchase of land for rehabilitaion for SC/ST slum
1 10.20
dwellers
2 Construction of individual toilets for the benefit of SC/ST slum dwellers 2.00
3 Concreting of narrow lanes in Predominant SC/ ST dwelling slums 2.85
Sub Total-3 15.05
(B) 18% Grant - Maintenance Works
Repairs of Community Halls (Ambedkar Bhavana) and improvements to existing
1 2.00
Community Halls
Sub Total-4 2.00
III 18% Grant - Capital Works
Provisin for acquistion or purchase of land for rehabilitaion for SC/ST slum
1 10.20
dwellers
Sub Total-4 10.20
18 % CAPITAL WORKS
1 Providing cement concrete roads in Dasara Colony in 2nd Block Jayanagar in
12.00
Ward No.50.

131
18 % MAINTENANCE WORKS
2 Improvements & special repairs to training centre building at 7th main road,
5.00
2nd Block Jayanagar in ward No.50.
18 % works Total 17.00
18% Improvements to drains at bhovi colony in ward no 51 3.00
18 % CAPITAL WORKS
1 Providing concreting to lanes at A.K.Colony in ward No.52. 5.00
2 Provision for acquisition or purchase of land for rehabilitation for SC/ST slum
14.00
dwellwrs in ward No.52.
3 Construction of community toilets for the benefit of SC/ST slum dwellers in
3.00
ward No.52.
4 Construction of Anganawadi centres for the benifit of SC/ST slum dwellers in
2.00
ward No.52.
18 % works Total 24.00
53 Provision for acquisition or purchase of land for rehabilitation for SC/ST slum
14.00
dwellwrs in ward No.53.
53 Construction of community toilets for the benefit of SC/ST slum dwellers in
3.00
ward No.53.
53 Construction of Anganawadi centres for the benifit of SC/ST slum dwellers in
2.00
ward No.53.
18 % works Total 19.00
18% Grants
1. Provision for acquisition or purchase of land for rehabilitation for SC/ST slum 18
dwellers
2. Construction of community toilets for the benefit of SC/ST slum dwellers 3.5

3. Construction of Anganawadi centers for the benefit of SC/ST slum dwellers 2.5

4. Construction of Additional class rooms in existing school building where the 3.5
population of
5. Construction of community halls (Ambedkar Bhavans ) and repairs and 3.5
Improvements to existing community Halls.
6. Concreting of narrow lanes in SC/St dwelling in Siddartha Slum 5
Total 36
18% Grants
1 Purchase of land for rehabilitation for SC / ST slum dwellers. 18
2 Construction of community toilets for the benefit of SC/ST slum dwellers. 3.5
3 Construction of Anganawadi centres for the benefit of SC/ST slum dwellers. 2.5
4 Construction of additional class rooms in existing school building for SC/ST 3.5
students
5 Repairs to community hall 3.5
6 Concreting narrow lanes in SC/ST dwelling slums in ward No. 55 5
TOTAL 36
18% Grants
1 Purchase of land for rehabilitation for SC / ST slum dwellers. 18
2 Construction of community toilets for the benefit of SC/ST slum dwellers. 3.5
3 Construction of Anganawadi centres for the benefit of SC/ST slum dwellers. 2.5
4 Construction of additional class rooms in existing school building for SC/ST 3.5
students
5 Repairs to community hall 3.5
6 Concreting narrow lanes in SC/ST dwelling slums in ward No. 56 5
TOTAL 36

132
18% Grants
1. Purchase of land of rehabilation for SC / ST slum dwellers. 18
2. Construction of community toilets for the benefit of SC/ST slum dwellers. 3.5
3. Construction of Anganawadi centres for the benefit of SC/ST slum dwellers 2.5

4. Construction of additional class rooms in existing school building for SC/ST 3.5
slum dwellers
5. Repairs to community hall 3.5
6. Concreting narrow lanes in SC/ST slum dwelling slums in Ward No.55A 5
Total 36
18% - GRANT
1 Improvements to drains and culverts , construction of Flagging course, 7.20
desilting of drains and providing cement concrete to balance lanes including
maintenance of building in A.K. colony, Marenahalli, sarakki agrahara in Ward
No-57
18% - GRANT
1 Improvements to drain including covering slabs in marenahalli tank bund 7.20
road in Jayanagar Ward No-58
18% GRANTS
1 Improvements and desilting of drains and providing precast RCC slab in 1st 7.20
Main K.R. Road, A.K. colony and surrounding area in ward no-59
18% - GRANT
1 Improvements to drain and construction of flagging course and covering slab 7.20
at Bhovi colony and kaveri slum in Ward No-60
III) 18% GRANT
Construction of Additional Class rooms in existing School building at T.
1 5.20
Mariyappa road, Siddapura in Ward No. 61
Concreting of narrow lanes in Predominant SC/ST dwelling slums in Mavalli
2 2.00
Ward No. 61
III) 18% GRANT
Construction of Community Halls (Ambedkar Bhavans) at Gulbarga Colony and
1 4.00
repairs to existing Community Halls in Ward 62
Concreting of narrow lanes in Predominant SC/ST dwelling slums in Ward No.
2 2.00
62
Sub Total-3 6.00
III) 18% GRANT
Construction of Anganawadi Centre (1st Floor) in S.R. Nagara Ward No. 63
1 4.00
Lakkasandra
Concreting of narrow lanes in Predominant SC/ST dwelling area in Lakkasandra
2 4.40
Ward 63
Sub Total-3 8.40
III) 18% GRANT
Providing Cement Concrete Road in Urasu Colony 7.20
18% Grants
Providing concreting to roads in Jaibheemanagar and Old Madiwala area in
1 7.20
Ward No. 65 Rashtra Kavi Kuvempunagar (BTM layout)
Sub Total-2 7.20
18% Grants
Improvements to road & drains at Handi Jogi colony, Siddarthacolony & slum at
1 7.20
Venkatapura Jakkasandra
Sub Total-3 7.20
457.97

133
ELECTRICAL
SOUTH
CAPITAL WORKS SOUTH
Rs. In Lakhs
Sl. No. Name of the work Est cost
2 Providing Mini High Mast Lighiting System at Vijayanagar chord road and
Attiguppe signal. 3.50
3 Providing Mini High Mast Lighiting System at 7th Main Subbanagarden main
road 3.00
4 Providing Control Wires to the Street lights in Kamakshi Palya Area 2.00
5 Providing Mini High Mast Lighiting System at 5th Main and 17th Cross Junction
M.c. Layout. 3.00
6 Providing Mini High Mast Lighiting System at Magadi Main road near Rehaja
Appartments. 3.00
7 Upgradation of Streetlight Illumination in Magadi main road 7.00
8 Providing Tubular Poles along with 250 W S. V. Fittings with connected
accessories in Sangoli rayanna Road ward Nos. 37 5.00
9 Providing Control Wires to the Street lights in Manasa Nagara Area 1.50
10 Providing Control Wires to the Street lights in Panthar Palya Area and Gurusarva
Bhouma Area 4.00
11 Providing High Mast Lighiting System at Mysore road and Ring road junction. 6.00
12 Providing Tubular Poles along with 250 W M.H. Fittings with connected
accessories in Railway parallel Road ward Nos. 40 2.00
13 Providing Control Wires to the Street lights in Hanumanthappa Industrial Area
and Patel Puttaiah Area 3.00
14 Providing Tubular Poles along with 250 W S. V. Fittings with connected
accessories in Vanivilas Road ward Nos. 49 5.00
15 Providing Mini High Mast Lighiting System at Shanimahatma Temple,
Kempegowda Nagra 3.00
16 Providing 82.5 KVA D. G. Set to Deer Park, Brindavana Nagara 10.00
17 Providing Additional Tree and Bund focusing lights to Deer Park 5.00
18 Providing double end bracket along with 250 W S. V. fittings to Nehru road,
Girinagara II Phase 3.00
19 Providing Mini High Mast Lighting System at Hosakere halli Main Road and
Giri Nagara Main Road Junction (Near Srinagara Club) 3.00
20 Providing Mini High Mast lighting system at East End Main road nad 45th
Cross junction 3.00
21 th th
Providing Mini High Mast Lighting System at 11 Main Road 5 Block
Jayanagara (Near Ganesha Temple) 3.00
22 Providing Mini High Mast Lighting System at Sangam Circle 3.00
23 Providing Mini High Mast lighting system at Armugham Circle, Ward NO.59 3.00
24 Providing Mini High Mast Lighting System at Madhavan Park Road junction 3.00
25 Providing High Mast Lighting System at Hosur Main Road and St. John
Hospital Main Road Junction 5.00
26 Providing High Mast Lighting System at St. John Hospital Main Road and
Market Road (Santhe Maidana) Road junction 5.00

Total 97.00

134
Maintenance Works
Rs. In Lakhs
Sl. No. Name of the work Est cost
1 Providing additional fixtures to auditorium at pramila bai mane school,
Vidyaranya Nagara 1.00
2 Providing 250 W S. V. Fittings to important main roads in Manjunatha nagar 6th
cross, 12th cross, Malligethota mainroad, cholurapalya 1st 'A' , 2nd , 3rd 'B', 4th,
5th, 6th, 7th, 9th, 12th, 13th, 14th cross roads 5.00
3 Providing 250 W S. V. Fittings to important main roads in Hampinagara 7th 'A',
8th, 11th Main road, 4th 'A', 'B',5th, 6th, 6th 'A', 7th , 8th, 9th, 10th, 11th, 12th
cross road Hampinagara, Hosahalli 2nd 'A', 3rd,7th, 10th to 17th, 11th 'A' Main
and Binnylayout 10.00
4 Providing 250 W S. V. Fittings to important main roads in M.C. Layout 8th to
22,2nd main, Marenahalli 2nd to 6th main, 20th 'A,B,C,D, 1st A,B cross, 2nd
cross,21st main, shivanandanagar 1st to 8th Cross, Saraswathinagar, central
excise layout, binny layout, 8th to 13th Main, Vinayaka layout 1st to 4th main,
P.F. Layout, 1st and 2nd main, 2nd to 5th cross, G.K.W. Layout 1st to 6th cross,
1st to 7th cross, priyadarshinilayout, canarabank colony 1st to 9th main and 1st
to 7th cross, Nanjarasappa layout 1st to 6th cross. 10.00
5 Providing 250 W S. V. Fittings to important main roads in M.C. Layout 1st to
14th cross, 1st to 7th main, Govindarajnagar 1st to 7th main, B.C.C. layout 1st to
9th cross, 5th and 6th main, Prashanth nagar1st to 6th main and cross, H.V.R.
Layout 1st to 6th MAin, Ranganatha colony 1st to 6th main Providing 250 W S.
V. Fittings to important main roads in Kaveripura 1st to 5th main and cross,
kamakshipalya 7th to 12th main and cross, Sampige layout 1st to 4th main,
kalidasa layout 1st and 2nd main, pete industrial estate 2nd to 4th main,
Muneshwara block 1st to 5th cross, B.D.A. Layout 3rd to 5th main 10.00
6 Providing 250 W S. V. Fittings to important main roads in S.V.G. Nagar 1st to
5th main and cross, Amarjothi nagar 1st main and cross, Kanakanagar 2to to 4th
main and cross 5.00
7 Providing 250 W S. V. Fittings to important main roads in Kalyananagar 1stmain
2nd to 4th cross, B.D.A. layout Kalyanagar 1st, 5th to 8th main, Adarsha nagar
1st and 4th main, Coconut Garden 8th & 9th Cross, Garden villa 3rd main, 3rd
and 4th Cross 5.00
8 Providing 250 W S. V. Fittings to important main roads in Chandralayout2nd to
14th cross, Jothinagar 1st to 7th cross, Income tax layout 1st to 7th cross,
Vidyagiri layout 1st to 10th cross, Arundathi nagar 5th main, 9th , 'A to E' cross,
1st to 3rd cross, Gangondanahall 1st to 8th main and cross 20.00
9 Providing 250 W S. V. Fittings to important main roads inWidia layout1st to 3rd
main and cross, R.P.C. Layout Service road, Subbannagarden 1to to 7th cross,
Basaveswaralayout 1st to 5th main, Bapuji badavane 5th to 9th cross, Dwaraka
nagara 1st and 2nd main, Chandra layout 4th to 8th cross 1st to 5th main,
Income tax layout 1st to 3rd cross, 2nd & 4th Main, Binny layout 1st to 3rd main,
Marutinagar 1st to 5th cross, Attiguppe 1st 'A', 2nd 'B' Main, Weeavers colony,
B.C.C. layout, 1st to 4th cross, 3rd, 4th, 10th and 11th main, Gangondanahalli
1st to 13th cross, B.H.E.L. Township 5.00

135
10 Providing 250 W S. V. Fittings to important main roads in Girinagara 1st to 3rd,
15 main, 1st to 12th cross, F.C.I. Layout 1st to 3rd main, 1st to 5th cross,
Roshannagar 1st to 4th cross, Hanumantappa layout 1t to 3rd main, 1st to 3rd
cross, Ranganatha colony 1st to 3rd main, 1st to 9th cross, Kasturibanagarslum
1st 'A to H', to 23cross, Sriranganagar1st to 5th main, Avalahalli 1st to 6th
cross, Avalahalli new extn. 1st to 9th main, Muneshwarablock 17thto 21st main,
1st to 13th cross , Batyanapura new extn. 1st to 5th main and cross, Jothinagar
1st to3rd main and cross, Veerabhadranagar 1st to 9th main and 1st to 4th cross,
Timberyard layout 1st to 5th cross, 1st to 3rd main, Kasturibanagar,
Deepanjalinagar 5.00
11 Providing 250 W S. V. Fittings to important main roads in Gudadahallin A to D
street, Main road, Pipe line road crosses,Shamannagarden, Kavika layout, 5.00
12 Providing 250 W S. V. Fittings to important main roads in Padarayana Pura I
Cross, II Cross, III Cross, IV Cross, 5.00
13 Annual Electrical Maintenance, House Keeping contract and providing Heating
Coil, Body Laying Bricks etc., to Electrical Crematoria at Mysore Road
10.00
14 Providing 250 W S. V. Fittings to important main roads in Valmikinagar1st and
2nd main and cross, Kasturbanagar 1st to 7th main 5.00
15 Providing Electrical Fixtures to Doctors quarters at Gavipuram Maternity Home,
Kempegowda Nagara 0.30
16 Providing Submersible Motor Pump Set to AEE (Hanumantha Nagara) and
MOH Offices at Sunkena Halli Stadium 0.50
17 Providing Flood Light Illumination to Centreal Building and Beautificaton of the
building in M. N. Krishna Rao Park, V. V. Puram 4.00
18 Annual Electrical Maintenance of Air Condition System at Additional
Commissioner (South) and Meeting Hall at II Block Jayanagara 0.40
19 Annual Maintenance Contract of Lift at D.C. Zonal Complex, II Block,
Jayanagara 0.80
20 Providing out door panel board to newly installed submersible mono block pump
set at DC Complex, Jaynagara II Block 0.10
21 Providing 250 W S. V. Fittings to Gandhi Bazzar Circle to Bull Temple Road
(Bugal Road Park Road) BMS College Hostel Road up to Rama Mandir Mahila
Mandali Road From N.R. Colony Main road to Katriguppa Main Road
Chennamma Kere Achukattu Road up to C.T. Bed Park Ashok Nagar Post Office
Road up to Gangammana Gudi Main Road Katte Balaga to 31 BUS STOP
(Thyagaraj Nagar Main Road) Bull Temple Main Road up to 5th Cross 3rd
Block Thyagaraj Nagar Nagasandra Circle to Shastri Nagar Main Road
4.00
22 Providing garden light fittings to C. T. Bed Park, at C. T. Bed, 1.00
23 Replacing of Detoriated Garden Light Fittings at Bugal Rock Park, Basavanagudi
3.00
24 Annual Electrical Maintenance Contract of Musical Fountain and other
Fountians at Hari Hara Gudda Park 1.85
25 Annual Electrical Maintenance Contract of Sound and Light along with other
fountains at Ramanjaneya Gudda Park 3.00
26 Operation and Annual Electrical Maintenance of Deer Park, Brindavana Nagara
8.00
27 Annual Electrical Maintenance Contract of Cultural Centre at Mysore Anantha
Swamy Road, Hanumantha Nagara 4.00
28 Annual Electrical Maintenance Contract of Rajiv Gandhi Sports Complex,
Brindavana Nagar 3.00

136
29 Providing Computer Points and Earthing to newly formed Help Centres in Wards
0.10
30 Repairs to Electronic Coconut Tree lighting system at Deer Park, Brindavana
Nagara 1.00
31 Repairs to Electronic Fire works System at Deer Park, Brindavana Nagara 1.00
32 Providing Electrical Fixures to watch man quarters at Hari Hara Gudda Park,
Hanumantha Nagara 0.10
33 Repairs to Electrical installation in Rajiv Gandhi Sports complex, Brindavana
Nagara 2.00
34 Providing 250 W S.V. Fittings to 50 feet Road up to Girinagr T Block (19th
Main) Kalappa Block 13th Main Road Pipe Line Road up to Kaggis Bakery Pipe
line Road (Shanimahathama Temple ) up to Shankar Nag Circle 50 feet road to
80 feet road (PES college road) PES College Main Road to Katriguppa Main
Road Katriguppa Main Road (Vidya Peet Circle to Mount Joy Ext. (50feet road)
3.00
35 Providing Computer Points and Earthing to newly formed Help Centres in Wards
0.10
36 Providing 250 W S. V. Fittings to Seetha Circle to Nehru Road (Vivekananda
Statue Road) Katriguppa Main Road to 80 feet Road (Water Tank Road) 50 feet
Road (Ganapath Nagar Main Road to Muneshwara T Block) Girinagara Police
station Road up to Ganapathi Nagar Main Road Hosakere halli 2nd Main BUS
Root 100 feet Ring Road to Water Tank 5.00
37 Repairs to Electrical installation in Avalahalli BDA Park, Girinagara Srinivasa
Nagara Ward 3.00
38 Providing electrical fixtures to Watch man shed at K. S. Narasimha Swamy Park,
0.10
39 Providing sound cable with connected accessories at K. S. Narasimha swamy
park 0.10
40 Providing UG cable to pathway light fittings to Water Tank park, Hosakere Halli
0.10
41 Repairs to electrical installation in community hall, C. T. Bed, Srinivasa Nagar 2.80
42 Providing 250 W S. V. Fittings to Itmadu Main Road From 100feet Ring Road to
Thimmaiah Garden Layout BHCS Layout Entrance to Devegowda Petrol Bunk
(Uttarahalli Main Road) Uttarahalli Main Road to D.G. House Kadirena Halli
Main Road (Ring Road to Kadirena Halli Petrol Bunk) K.S. Layout Main Road
Ring Road to ISRO Layout Bus Stop 20.00
43 Providing computer points and earthing to help centre at ward 55A 0.10
44 Providing 250W S. V. Fittings to Thyagaraj Nagar Main Road (Shanimahathma
Temple to Hirenaiah House) 9th Cross, 13th Main, Iliyas Nagar upto
Devegowda Petal Bunk Hunasemara Stop to BSK Temple 3.00
45 Oil Filtering, servicing of HT Installation and providing standby HT Cable at
Banashankari Electric Crematorium, BSK II Stage 6.00
46 Annual Electrical Maintenance, House Keeping contract and providing Heating
Coil, Body Laying Bricks etc., to Electrical Crematoria at Banashankari II stage
8.00
47 Repairs to Fountain at Brindavana Nagara Park, BSK II Stage 0.10
48 th
Providing 250W S. V. Fittings to 9 Cross Sarakki Market to Bannerugatta
Road, 8th Main (45th Cross to Ring Road) 24th Main (Shanthi Sagar, SLV Main
Road) up to 45th Cross 5.00
49 Providing Electrical Fixtures open Air theatre / Auditorium at Sarakki 0.50
50 Providing 250W S. V. Fittings to 28th Main Road 25th Main 9th Block
Jayanagar 36th Cross 5th Block Jayanagara 40th Cross Jayangara 5th Block 4.00

137
51 Supply and fixing of tubular pole at 18th Main opp. Mosque, 4th T Block,
Jayanagara 0.10
52 Arranging Temporary Illumination in connection with immersion of Lord
Ganesh at Yediyur Lake, Yediyur Ward 1.70
53 Providing Electrical Fixtures to Junior College at Yediyur 1.00
54 Providing Serive Main and Electrical Fixtures to Open Air Theatre at Shasthri
Nagara 0.35
55 Replacing of damaged pathway light fittings at Yediyur lake park, Yediyur 4.00
56 Replacing of damaged pathway light fittings at yediyur Maternity Hospital park 1.00
57 Replacing of damaged pathway light fittings at Yediyur Boule Ward Park,
Yediyur 2.00
58 Providing 250 W S. V. Fittings to 4th Block, Jayanagara Shopping Complex
Surrounding 33rd Cross up to 11th Main 10th Main up to Indusland Bank 8th
Someshwara Nagar Main Road up to Swagath Slum Road to Wilson Garden
Main Road 2.00
59 Annual Maintenance Contract of Lifts at Jayanagara Shopping Complex, IV
Block, Jayanagara 10.00
60 Provding Silver enamel paint to Ashoka Pillar Statue at Ashoka Pillar Jayanagara
I Block 0.10
61 Providing 250 W S. V. Fittings to Hombe Gowda School to Bannerugatta Road
(10th Cross) 12th Cross Wilson Garden (Bus Route) 4.00
62 Oil Filtering and Servicing of HT Installation at Wilson Garden Electric
Crematorium, Hosur Main Road 1.00
63 Annual Electrical Maintenance, House Keeping contract and providing Heating
Coil, Body Laying Bricks etc., to Electrical Crematoria at Wilson Garden, Hosur
Main Road 10.00
64 Providing 250 W S. V. Fittings to Mico Main Road, Mahalingeshwara Nagara
Main Road, Dairy Quarters Inside 4.00
65 Providing 250W S. V. Fittings to Sagar Appolo Hospital Road, 28th Main,
Corporation Colony Main Road, New Gurappana palya Main Road, 3.00
66 Providing Service Main Cable to High Mast Lighting System at 16th Main, BTM
Layout 2.50
67 Providing 250 W S. V. Fittings to 16th Main BTM 2nd Stage 7th Cross to 16th
Main 7th Main up to Madiwala Kere N.S. Palya Main Road Santhe Beedi
6.00
68 Providing 250 W S. V. Fittings to Police Quarters Road, Sujatha Colony Main
Road, Ayappa Temple Main Road, Venkateshwara Layout Main Road 4.00
69 Supply, Install and Commissioning of Automatic Capacitor Panel and servicing
of HT Installation at Bommanahalli Electric Crematorium, Kudlu Gate 4.00
70 Annual Electrical Maintenance, House Keeping contract and providing Heating
Coil, Body Laying Bricks etc., to Electrical Crematoria at Bommanahalli,Kudlu
Gate Hosur Main Road 8.00
71 Providing Computer Points and Earthing to newly formed Help Centres in Wards
0.10
72 Operation and Maintenance of Street Lights coming under Executive Engineer
(Elec) South Division 575.00
73 Providing 250 W S. V. Fittings to important main roads in Magadi road from 8th
cross to 15 th cross, Bhuvaneshwarinagara 1st to 3rd Main , 6th main to 20th
cross, 7th main to 15th cross, 8th A cross, 25th cross, Telecom layout 1to 9th
cross, Gangappa garden 1st to 4th cross 5.00
74 Annual Electrical Maintenance Contract of Buildings etc., coming under
Binnypet Constituency Executive Engineer (Elec) South Division 7.00

138
75 Arranging Temporary Illumination of BBMP Buildings coming under Executive
Engineer (Elec) South Division in connection with Kempegowda Day 1.00
76 Arranging Temporary Illumination of BBMP Buildings coming under Executive
Engineer (Elec) South Division in connection with Bangalore Habba 1.00
77 Providing Computer Points and Earthing to newly formed Help Centres in Wards
0.10
78 Providing Computer Points and Earthing to newly formed Help Centres in Wards
0.10
79 Providing Computer Points and Earthing to newly formed Help Centres in Wards
0.10
80 Providing Computer Points and Earthing to newly formed Help Centres in Wards
0.10
81 Providing Computer Points and Earthing to newly formed Help Centres in Wards
0.10
82 Providing Computer Points and Earthing to newly formed Help Centres in Wards
0.10
83 Annual Electrical Maintenance Contract of Buildings etc., coming under
Basavanaguid Constituency Executive Engineer (Elec) South Division 8.00
84 Providing Computer Points and Earthing to newly formed Help Centres in Wards
0.10
85 Providing Computer Points and Earthing to newly formed Help Centres in Wards
0.10
86 Providing Computer Points and Earthing to newly formed Help Centres in Wards
0.10
87 Annual Electrical Maintenance Contract of Buildings etc., coming under
Jayanagara Constituency Executive Engineer (Elec) South Division 8.00
88 Providing Computer Points and Earthing to newly formed Help Centres in Wards
0.10
89 Providing Computer Points and Earthing to newly formed Help Centres in Wards
0.10

Total 875.00

EMERGENCY GRANTS
Rs. In Lakhs
Sl. No. Name of the work Est cost
1 Emergency grants 25.00

Total 25.00

Sub Total 1000


Grand Total 4963.75

139
EAST ZONE
Details of Programme of works for the year 2008-09 (Works proposed for 08-09)
Programme of works for the year 2008-09 in ward No. 67 Koramangala Sub Division, Shanthinagar Division -
1
SL. No. Name of Work Amount in Lakhs
(A) General works
(I) CAPITAL WORKS
Construction of 1st floor on dispensary building for tailoring center and
1 10.00
Computer center at Adugodi in ward no. 67
Providing concreting to roads and Construction of culverts at 8th block (Near
2 15.00
Shiva theater) in ward no. 67
Providing asphalting to roads at Industrial layout 5th block, Koramangala in
3 15.00
ward no. 67
4 Providing asphalting to roads at 8th block, Koramangala in ward no. 67 15.00
Providing concreting to roads at Koramangala village (Opp. to TPNBP) in ward
5 10.00
no. 67
Construction of Gymnasium building at playground 5th block Koramangala in
6 10.00
ward no 67
7 Renovation of Kempe gowda Samudaya Bhavan at Adugodi in ward no. 67 10.00
(II) Maintenance Works
8 Removal of debris and Engaging private labour in ward no. 67 for the year 2008-
5.00
09
9 Desilting of drains at Koramangala in ward no. 67 5.00
10 Pot Holes filling in ward no. 67 for the year 2008-09 5.00
(B) 18% Grants
(I) CAPITAL WORKS
11 Construction of masonry drain near Old Doddamma temple and providing
10.00
concreting to A.K. colony Koramangala village in ward no. 67
12 Providing concreting to roads at Rajendra nagar slum in ward no. 67 11.00
(II) Maintenance Works
Nil
Total Rs. 121.00
Programme of works for the year 2008-09 in ward No. 68, K oramangala Sub Division, Shanthinagar Division - 1
SL. No. Name of Work Amount in Lakhs
(A) General works
(I) CAPITAL WORKS
1 Providing asphalting and Providing drains and culverts at Venkatareddy layout &
40.00
surroundings in ward no. 68
2 Providing asphalting and Improvements to drains at Ejipura (Eastern side of
25.00
Srirama temple road) in ward no. 68
3 Providing concreting to left out roads (adjacent to R.A. road) Ejipura in ward no.
10.00
68
4 Providing drains, culverts and asphalting to 7th 'A' main road (Niruguna Mandir
road between 1st main, KML & S.W.D. Bridge) 1st block, Koramangala in ward 15.00
no. 68
(II) Maintenance Works
5 Removal of debris and Engaging private labour in ward no. 68 for the year 2008-
5.00
09
6 Desilting of drains at Koramangala & Ejipura in ward no. 68 5.00

140
(B) 18% Grants
(I) CAPITAL WORKS
7 Providing asphalting to maistry palya main road from 8th main road
11.00
Koramangala in ward no. 68
8 Providing concreting to roads at Srinivagilu in ward no. 68 10.00
(II) Maintenance Works -
Nil
Total Rs. 121.00
Programme of works for the year 2008-09 in ward No. 69 Koramangala Sub Division, Shanthinagar Division - 1
SL. No. Name of Work Amount in Lakhs
(A) General works
(I) CAPITAL WORKS
1 Providing Cement Concrete to 5th Cross of Bazar street, 2nd cross and 3rd A
20.00
cross of Anepalya in ward no. 69
2 Construction of footpath and Improvements to drains in Cross and Main roads of
34.00
Austin Town in ward no. 69
3 Providing Asphalting to the main and cross roads of Austin town in ward no. 69 18.00
4 Construction of 1st floor for BBMP school building at Neelasandra main road in
6.00
ward no. 69
5 Emergency grants in ward no 69 for the year of 2008-09 10.00
(II) Maintenance Works
6 Pothole filling, Removal of debris, depot collection & maintenance of ward by
5.00
Engaging private labourers in ward no. 69 for the year 2008-09
7 Removal of silt in drains in ward no. 69 5.00
8 Maintenance of School buildings, Hospital buildings and others buildings in
2.00
ward no. 69
(B) 18% Grants
(I) CAPITAL WORKS
9 Construction of roads & drains (Balance reachs in Laxmanrao nagar &
21.00
Ambedkar nagar in ward no. 69
(II) Maintenance Works
Nil
Total Rs. 121.00
Programme of Works for the Year 2008-09 in Ward no.70 Pertaining to Shanthinagar Sub Division.
Estimate Cost
Sl. No Name of the Work
(Rs. In Lakhs)
CAPITAL WORKS
Providing Cement Concrete to J.K. Pura Main Road, Balance portion of 1st Main 16.00
1
Vinayakanagar and surroundings in Ward No. 70
Construction of compound wall and cement concrete lane at Hindu Burial 12.00
2
Ground in Ward No. 70
Providing drains and Culverts at southern side of Anepalya Main Road in ward 8.00
3
No. 70
Providing Asphalting to Anepalya Main Road, Nanjappa Road, Basappa Road 20.00
4
and Lakshmi Road in ward No. 70
Providing Cement Concrete to Rachappa Garden, Subbanna Garden and 10.00
5
surroundings in ward No. 70
SUB TOTAL 66.00

141
MAINTENANCE WORKS
Improvements to Corporation Community Hall at Akkithimmana Hall and Watch 8.00
1
and Ward in 70
2 Repairs to Corporation High School at Burlie street in ward No. 70 4.00
Repairs to Existing Ambedkar Bhavan at P.K. Colony and Tailoring Center at 5.00
3
Anepalya Main Road in ward No. 70
Improvements to Drain & Culverts at Vinayakanagar, J.K. Pura and surroundings 4.00
4
in ward No. 70
Depot Collection and Engaging Private Labours for the year 2008-09 in ward 5.00
5
No. 70
Improvements to Drain at Shanthinagara area and Debris Clearance in ward No. 4.00
6
70
7 Filling up Pot Holes and Road Cutting in ward No. 70 4.00
SUB TOTAL 34.00
18 % GRANTS
CAPITAL WORKS
Providing Cement Concrete to Balance Riches of J.K. Pura and Vinayakanagara 7.00
1
slum in ward No. 70
SUB TOTAL 7.00
MAINTENANCE WORKS
Improvements to Drains, Culverts and providing Cement Concrete to Balance 9.00
1 reaches of J.K. Pura Slum, Vinayakanagar Slum and surroundings in ward No.
70
Improvements to Toilets at J.K. Pura, Vinayakanagar and P.K. Colony Slums in 5.00
2
ward No. 70
SUB TOTAL 14.00
GRAND TOTAL 121.00
18 % GRANTS
CAPITAL WORKS
Providing Cement Concrete to Balance Riches of J.K. Pura and Vinayakanagara 7.00
1
slum in ward No. 70
SUB TOTAL 7.00
MAINTENANCE WORKS
Improvements to Drains, Culverts and providing Cement Concrete to Balance 9.00
1 reaches of J.K. Pura Slum, Vinayakanagar Slum and surroundings in ward No.
70
Improvements to Toilets at J.K. Pura, Vinayakanagar and P.K. Colony Slums in 5.00
2
ward No. 70
SUB TOTAL 14.00
Programme of Works for the Year 2008-09 in Ward no.71 Pertaining to Shanthinagar Sub Division.
Estimate Cost
Sl. No Name of the Work
(Rs. In Lakhs)
CAPITAL WORKS
1 Providing C C & Re- Construction of Damaged masonry drain to East road upto 48.00
Ashirvadham Apartments in ward No. 71
2 Providing Borewell to MOH Office and Sub Division Office & Special Repairs 9.00
to Sub Division Office at Austin Town in ward No. 71
3 Providing Borewell to IPP Hospital, at Vivekanagar further Extension in ward 4.00
No. 71
4 Asphalting to KBAR Road in Ward No. 71 10.00
SUB TOTAL 71.00

142
MAINTENANCE WORKS
1 Special repairs to P.U.C. Junior College O.R.C. Road & Quarters Buildings in 8.00
Ward No. 71
2 Special repairs B.M.P. Boys school at Yerrappa Garden, in Ward No. 71 8.00
Engaging Private Labours and Desilting of drains in ward No. 71 6.00
Materials Collection and Filling of Potholes and Road Cuttings in ward No. 71 7.00
SUB TOTAL 29.00
18 % GRANTS
CAPITAL WORKS
NIL
MAINTENANCE WORKS
1 Re-grading & Re- Construction of Budda Temple to John Bull street by the side 12.00
of Jayarajnagar Slum in ward No. 71
2 Special Repairs and Maintenance of Toilet Blocks in Slum Area and surrounding 9.00
Area in ward No. 71
SUB TOTAL 21.00
GRAND TOTAL 121.00
Programme of works for the year 2008-09 pertaining to ward No.72. .
Jeevanbheemanagar Sub Division
Estimate Cost ( In
Sl No Name of the Work lakhs)
I Capital works
1 Providing metalling, asphalting and non-returned wall to 6th main in Domlur 2nd 10
stage 1st phase in ward No.72
2 Providing Name boards in ward No.72 5
3 Providing CC to roads in BDA layout 8
4 Providing CC to roads in Doopanahalli Village limit and Appareddypalya village 10
limits.
5 Improvements to playgrounds in HAL 2nd stage 5
II Maintenance works
1 Special repairs to ward office and sub division office at Domlur 3
2 Asphalting to roads in HAL 2nd stage, Doopanahally & Domlur 30
3 Regarding of drains and construction of culverts in BDA layout 20
4 Filling up of potholes in ward No.72 5
5 Maintenance of ward by Engaging private labours & Removal of debries 4
III 18% Grants
Capital works Nil
Maintenance works
1 Asphalting to roads in AK colony 21
Total 121
Programme of works for the year 2008-09 pertaining to ward No.73
Jeevanbheemanagar Sub Division
Estimate Cost ( In
Sl No Name of the Work lakhs)
I Capital works
1 Construction of school building @ Sriramanagari 5
2 Providing asphalting to Vinayakanagar B block and Air view colony 15
3 Providing Asphalting to LIC colony 10
4 Providing asphalting to Konena Agrahara main road (Near Rajewari theater) 10
5 Construction of culvert @ Vinayakanagar (Near Theater) and KR Garden 6
6 Providing CC to 1st A cross of SR layout 8

143
7 Providing CC to 5th and 6th cross road of Manjunath layout 12
II Maintenance works
1 Providing help line centre in the ward office and payment of BWSSB pending 4
bill
2 Asphalting of N.R colony main road 12
3 Asphalting of Murugesh palya main roads 7.5
4 Filling up of potholes in ward NO.73 5
5 Engaging private labour for maintenance of ward No.73 2
6 Providing street Name boards in ward No.73 3
III 18% Grants
Capital works
1 Providing CC Sriramanagari slums 10
2 Providing CC to roads of Sudhamanagari slum and Anandpura slum 11.5
Maintenance works Nil
Total 121
Programme of works for the year 2008-09 pertaining to ward No.74.
Jeevanbheemanagar Sub Division.
Estimate Cost ( In
Sl No Name of the Work lakhs)
I Capital works
1 Construction of Store room adjacent to ward office in defence colony of ward 3
No.74
2 Providing street name boards in HAL 2nd stage of ward No.74 5
3 Providing street name boards in HAL 3rd stage of ward No.74 5
4 Providing cement concrete to lanes of kodihally in ward No.74 7.5
5 Providing cement concrete to lanes of putttappa layout in ward No.74 5
6 Improvements to Side Walk on 100 ft road Indranagar 10
II Maintenance works
1 Special repairs to ward ARO office and tailoring centre in ward No.74 5
2 Providing security services to Help centre at ward No.74 2
3 Providing Asphalting to roads of Defence colony (from 1st main road to 6th main 15
road) in ward No.74
4 Providing Asphalting to roads HAL 2nd stage (from 7th main road to 12th main 15
road) in ward No.74
5 Providing Asphalting to roads from 13th main to 19th main of HAL 2nd stage of 15
ward No.74
6 Providing Asphalting to roads of HAL 3rd stage in ward No.74 15
7 Filling of pothole in ward NO.74 5
8 Engaging private labour for maintenance of ward No.74 2
III 18% Grants
Capital works Nil
Maintenance works
1 Providing CC to lanes of AK colony, Kodihally in ward No.74 11.5
2 Providing CC to lanes in Bhovi colony, Kodihally of ward No.74 10
Total 121

144
Programme of works for the year 2008-09 pertaining to ward No.75.
Richmond Town Sub Division.
Estimate Cost ( In
Sl No Name of the Work lakhs)
I Capital works
1 Construction of SSM drains at Balance portion of G street from Someshwara 1st 10
cross to SWD
2 Construction CC roads at Balance portion of Lingiyyana palya & Saraswathipura 20
crosses
II Maintenance works
1 Special repairs to Engg ward office & help centre building 2.5
2 Special repairs to Corporation Girls high school building 4
3 Special repairs to Corporation Community hall building Jogupalya 7.5
4 Special repairs to referral hospital building 5
5 Special repairs to Primary school building Gowthamipura 2.5
6 Special repairs to Gymnasium building at Gowthamipura 2
7 Special repairs to Quarter buildings at Referral hospital 4
8 Filling up of potholes & Engagement of daily labours for ward maintenance. 5
9 Asphalting of roads at Cambridge layout, JK layout & BDA layout 20
10 Asphalting of Saibaba temple road 10
11 Desilting of drains at Jogupalya ward Limits. 6.72
III 18% Grants
Capital works Nil
1 Construction of toilets at Gouthamipura Community hall 2.5
Maintenance works
1 Asphalting in at Gowthamipura road 10
2 Providing CC roads to Gowthamipura cross road 9.28
Total 121
Programme of works for the year 2008-09 pertaining to ward No.76.
Richmond Town.
Estimate Cost ( In
Sl No Name of the Work lakhs)
I Capital works
1 Construction of RCC culvert in Rhenius street at Junction of Alexander street 10
2 Providing CC to Markham road 5th cross and Magrath road 2nd cross 8
3 Fencing to BBMP property in Hosur road 3.5
4 Raising up of compound wall fencing, extension of pavilion of Nandan football 9
ground
II Maintenance works
1 Annual repairs to school, health office at Ashok nagar 2
2 Annual maintenance to Nursery school at Richmond town 1
3 Annual maintenance to 76 A Health ward office 2
4 Special repairs to Building in Nandan football ground 10
5 Maintenance of M.G road from queen’s circle to trinity circle, Residency road, 8
Cubbon road (Kerb stone painting and footpath repairs)
6 Asphalting to Clapham street, Laurell lane, Prime street, Walkar lane, Aga 22
Abdullah street, Corn well road and crosses, in Richmond Town area
7 Asphalting to Cross roads in Victoria layout 10
8 Pothole filling and maintenance of roads & Depot collection for the year 2008-09 10

9 Maintenance of Richmond road fly over (Painting, repairing of expansion joints, 4


resurfacing)

145
III 18% Grants
Capital works
1 Construction of new ladies toilets in P.K Quarters 5
Maintenance works
1 Improvement to road side drains & Concreting to west road in cement lane 11.5
2 Improvement to road side drains in P.K Quarters 5
Total 121
Programme of works for the year 2008-09 in ward No. 77
Shivajinagar Sub Division, Shivajinagar Division

SL. No. Name of Work Amount in Lakhs


(I) CAPITAL WORKS
1 Construction of Help line building in ward - 77 8.00
2 Reconstruction of culvert at V.S.Raju road in Ward - 77 10.00
Construction of drain and improvements to footpath in fair field layout in ward -
3 10.00
77.
Reconstruction of drain in 4th main, 16th cross, 15th cross, and sourrounding
4 19.00
areas of kalyani slum and improvements to footpath in S.R.Nagar in Ward - 77.
Reconstruction of drain and improvements to footpath from Race course road up
5 18.00
to Railway parallel road in Ward - 77.
Construction od drain and improvements to footpath in Railway parallel road in
6 8.00
Ward - 77.
Sub Total 73.00
(II) Maintenance Works
1 Reconstruction of compound wall repairs to BBMP Quarters at Mission road in
10.00
Ward - 77
2 Repairs to toilets in Ward - 77 (8 Nos) 2.00
3 Replacement of damaged gratings over drains and allied works in Ward -77. 5.00
Maintanence of roads , Removal of debries , Desilting of drains , Shoulder
4 10.00
drains, Footpath and Painting to Kerb stones in Ward -77
Sub Total 27.00
(B) 18% Grants
(I) CAPITAL WORKS Nil
Grand Total 100.00
Bruhat Bangalore Mahanagara Palike
Programme of works for the year 2008-09 in ward No. 78,
Shivajinagar Sub Division, Shivajinagar Division

SL. No. Name of Work Amount in Lakhs


(I) CAPITAL WORKS
1 Construction of RCC Box type drain and footpath at Venkataswamy road &
20.00
Meenakshikoil street in Ward - 78
2 Construction of RCC Box type drian & footpath at Aliaskar road in Ward -78.
20.00
3 Construction of SSM drain & footpath near Jasma bhavan & Gurunanak bhavan
20.00
road in Ward -78.
4 Contruction of SSM drain & footpath in Hospital road in Ward -78. 20.00
Sub Total 80.00

146
(II) Maintenance Works
1 Repairs to Tasker town school building , Shishuvihar , Toilets 6th cross in
10.00
vasanthnagar and sub division office building in ward -78.
2 Maintanence of roads, removal of debries, desilting of drains, shoulder drains,
10.00
footpaths & paintings to kerb stones in Ward -78.
Sub Total 20.00
(B) 18% Grants
(I) CAPITAL WORKS

1 Providing drains & footpaths in approach road to Rajivgandhi colony in Ward -


78.asphalting to maistry palya main road from 8th main road Koramangala in 21.00
ward no. 68
Sub Total 21.00
(II) Maintenance Works Nil
Grand Total Rs. 121.00
Programme of works for the year 2008-09 in ward No. 79,
Shivajinagar Sub Division, Shivajinagar Division

SL. No. Name of Work Amount in Lakhs


(I) CAPITAL WORKS
1 Construction of Oldage Home at Hafiza School permises in Cickborn Road 22.00
2 Construction of Help Line Building in Ward -78. 8.00
3 Reconstruction of drain & Improvements to footpath in Thimmaiah Road in front
10.00
of Meenakshi Road in front of KSFC Office
4 Reconstruction of drain & Improvements to footpath of OPH Road from
10.00
Hospital Road to Meenkashi Koilm Street
5 Providing drain to Thimmaiah Road crosses & Cement Concrete to crosses of
10.00
Broadway road, Shivaji Road & Sulthan Nagar
6 Reconstruction of Nursery School Buildings at Kodandarama Nagar in Ward No.
10.00
79
Sub Total 70.00
(II) Maintenance Works
1 Repairs to Nursery School, Hafiza School, Repairs to Cimmunity Hall at T.B.
10.00
Hospital in Ward No. 79.
2 Repairs to Zonal Office Building & Ward Office in Ward No. 79 10.00
3 Maintenance of Roads, Removal of debrie, Desilting of drains, Repairs to drains,
10.00
shoulder drains, Footpaths & painting to kerb stones in Ward No. 79
Sub Total 30.00
(B) 18% Grants
(I) CAPITAL WORKS

1 Constrtuction of Tailoring training centre Building at Existing defaunt toilet


21.00
block at Thimmaiah Road crosses "F" Street
Sub Total 21.00
(II) Maintenance Works Nil
Grand Total Rs. 121.00

147
Programme of works for the year 2008-09 in ward No. 91,
Jayamahal Sub Division, Shivajinagar Division

SL. No. Name of Work Amount in Lakhs


(I) CAPITAL WORKS
1 Providing Fencing to BBMP Properties Special repairs to Sindhi Colony
Choultry, Special repairs to Buildings at Robertson Road, Hains Road, Williams
10.00
Town, Sub Division office and Improvements to Playground at Suthanjigunta
Road and Nethaji Road
2 Improvements to RSD & Culverts at ITI layouot, S.K. Garden, Williams Town
12.00
and Harries road
3 Improvements to RSD and Culverts at Mosque Road, M.M. Road, Bourdillon
19.00
Raod, Wheeler Road and Robertson road
4 Improvements to RSD and culverts at Cleavelans road, Hains roas, Bamboobazar
15.00
roads in Ward No. 91
5 Improvements to RSD and culverts at Asseya Road, Promnade roads Sindhi
12.00
colony and Veerannagarden in Ward No. 91
Sub Total 68.00
(II) Maintenance Works
1 Providing Asphalting to ITI layout S.K. Garden, Bore bank road, Sindhi Colony
Meanee avenue roads, A.M. Road and Bamboobazar road in Ward No. 91 25.00

2 Filling pf potholes, Desilting of drains and debris removal in Ward No. 91 6.00
Sub Total 31.00
(B) 18% Grants
(I) CAPITAL WORKS

1 Improvements to RSD and Culverts at Gandhigrama S.K. Garden and


10.00
Baidarahally in Ward No. 91
2 Providing Asphalting to Gandhi Grama, S.K. Garden and Wahab Garden in
12.00
Ward No. 91
Sub Total 22.00
Grand Total Rs. 121.00
Programme of works for the year 2008-09 in ward No. 92,
Jayamahal Sub Division, Shivajinagar Division

SL. No. Name of Work Amount in Lakhs


(I) CAPITAL WORKS
1 Construction B.S. Slab drain & Culverts from Miller road to myasore bank in
16.00
Nandidurga road & 5th main road Jayamahal (western side)
2 Construction of drains and culverts 7th, 8th & 1st main road of Kempaiah block
16.00
3 Construction of drains and culverts at Marappa block roads and Muniswamappa
9.20
road & 8th, 9th cross of Chinappa garden
4 Providing and laying R.M.C. to Marappa block cross roads & Jayamahal
16.00
extension cross roads
Sub Total 57.20
(II) Maintenance Works
1 Filling of potholes of roads, Engaging private labours & private tractors to desilt
tertiary drains, Desilting of tertiary drains & removal of debris at Borebank road,
12.00
Kempaiah block, Chinnappa garden, Muddamma garden in Ward No. 92

148
2 Re-surfacing internal roads of Jayamahal extension and Nandidurga Extension,
30.00
& Benson road in Ward No. 92
Sub Total 42.00
(B) 18% Grants

1 Improvements and regradiation of drains & Providing RMC to A.K. Colony &
21.80
M.R.S. Palya in Ward No. 92
Sub Total 21.80
Grand Total Rs. 121.00
Programme of works for the year 2008-09 in ward No. 93,
Jayamahal Sub Division, Shivajinagar Division

SL. No. Name of Work Amount in Lakhs


(I) CAPITAL WORKS
1 Providing RMC to Urdu School road & Jamiya Asafia School School road 20.00
2 Providing RMC to road & Improvements to drain concreting from
15.00
Srinivasanagar to Thangamalai Nagara & Doddannanagara Cross Roads
3 Provding RMC to road & Improvements to drain to Shivaji Road, Via Street, Old
25.00
Soap Factory road & Muneswara Temple Road
4 Provding RMC to road & Improvements to drain at 11th Cross Road of Modi
Road & Amavase lane in Doddannanagar & Sownside of Vinayaka Theatre 25.00

5 Providing Fencing to survey No. 28 of D.J. Halli 5.00


Sub Total 90.00
(II) Maintenance Works
1 Desilting of drains & Removal of debries & Engaging tractor & labours 7.00
2 Special Repairs Ward office & I.P.P. Hospital Building at D.J. Halli 3.00
Sub Total 10.00
(B) 18% Grants
CAPITAL WORKS
1 Providing RMC to road & Improvements to drain at Thangamalai Nagar &
17.00
Doddannanagar "E" Block
2 Reconstruction of drain of drain at Srinivasanagar 4.00
Sub Total 21.00
Grand Total Rs. 121.00
Programme of works for the year 2008-09 in ward No. 97,
Jayamahal Sub Division, Shivajinagar Division

SL. No. Name of Work Amount in Lakhs


(I) CAPITAL WORKS
1 Providing Chainlink fencing and Widening of road adjacent to SWD in 15th
Cross R.T. Nagar 1st Block, Widening of footpath in Ramath Nagar 3rd Cross 10.00

2 Reconstruction of Culverts & Drains at Matadahalli, Motinagar & A.K. Ashrama


10.00
Road
3 Provdiing and laying RMC to cross and Interior Road of A,K, Ashrama,
50.00
Mothinagar, Matadahalli, Chunchappa Block, Lingappa Block
4 Improvements to drains & Culverts at R.T. Nagar 1st Block, 2nd Block
9.00
Jayamahal Main Road and 1st "A" Cross Ex-Service man Colony
Sub Total 79.00

149
(II) Maintenance Works
1 Filling Pothole Engaging Tractors & Labours Desilting of Tertiory drains &
10.00
Removal of debries and Special repairs to J.C. Nagar Dasara Ground
2 Providing Asphalting to Interior roads of Rahamathanagara in Ward No. 97 10.00
Sub Total 20.00
(B) 18% Grants
CAPITAL WORKS
1 Improvements to drain & Culverts & Proveing RMC to Cross road of
19.00
Muneswara Block
Sub Total 19.00
18% Grants
Maintenance Works
1 Removal of silt in SWD at A.K. Colony in Ward No. 97 3.00
Sub Total 3.00
Grand Total Rs. 121.00
Programme of works for the year 2008-09 pertaining to ward No.80,
Bharathinagara, Bharathinagara Sub Division.
Estimate Cost
Sl No Name of the Work ( Rs. in lakhs)
Capital Works
1 Dismantling the Existing Toilets and Construction of new toilet block in
Bharathinagara E Street and Q No 4th Street 1st Cross (2 Nos) 17
2 Construction of drain and footpath on E/S of Kamaraj Road from St. Johns
Church Road to SKNP Temple 20
3
Providing precast RCC Slab and Construction of culverts on E/S of N.P. Street 10
4 Providing CC road to Thimmaiah Road crosses, Mackan road crosses and near
Mackan compound in Bharathinagara 10
5 Asphalting to Mackan road from St. Johns Church Road to AM Road 10
Maintenance Works
6 Dismantling the Existing Urinals and construction of New urinals block at
Kamaraj Road (SC Garden Junction and Thimmaiah Road Junction 2 Nos) 3
7 Desilting drains in Mackan Road and Thimmaiah Road in Bharathinagara 10
8 Providing special repairs to Corporation school & Corporation hospital at
Thimmaiah road 10
9 Providing Filling of pot holes desilting of shoulder drains and drain clearing of
debris in W-80 10
18% Grants Capital Works Nil
10 Construction of RCC culverts at Neharupuram and Shivan Chetty garden 6
11 Dismantling the existing toilets and construction of new toilet blocks in
Nerhupuram and Broad Shah street in W-80 15
18% Grants Maintenance Works Nil
Total 121
Programme of works for the year 2008-09 pertaining to ward No.81,
Ulsoor , Bharathinagara Sub Division.
Estimate Cost
Sl No Name of the Work ( Rs. in lakhs)
Capital Works
1 Providing New RCC culverts and improvements drains and footpath at St. Johns
Road from Shivan Chetty Garden to SWD 20
2 Construction of drains and culverts near Nilkatan Circle and improvements to
drains at RBANMS Compound 20

150
Maintenance Works
3 Raising of existing drains and providing RCC covering slab over side drains and
improvements to culverts at Purushotham Road and Dodda katappa road, Car
Street and Ankamma Street 15
4 Providing CC to footpath in Gangadhar Chetty road from Gurudwara to
RBANMS Circle 10
5 Providing Filling of pot holes desilting of shoulder drains and drain clearing of
debris in W-81 10
6 Providing special repairs to Shishuvihar at Sathynarayana Temple Street and
Corporation Nursery School at Yellamma Koil Street 10
7 Providing special repairs to Library building, MLA Office, KSFC Office and and
Nursery School at Shivan Chetty garden 5
8
Providing special repairs to Market at Ulsoor and Toilet behind Ulsoor Market 10
18% Grants Capital Works Nil
9 Dismantling the existing toilets and construction of new toilet blocks in MV
Garden and Yellamma Koil Street 15
18% Grants Maintenance Works
10 Desilting of drains at MV Garden 6
Total 121
Programme of works for the year 2008-09 pertaining to ward No.82,
Hoysalanagara, Bharathinagara Sub Division.
Estimate Cost
Sl No Name of the Work ( Rs. in lakhs)
Capital Works
1 Providing CC to cross roads and providing drains @ Old Binnamangala 10
2 Providing RCC Covering slabs to drains and CC to Footpaths around park @
100ft Road and CMH Junction Indiranagara 1st Stage 10
3 Providing RCC Covering slabs to drains and CC to Footpaths around Basket Ball
th th
Stadium between 6 and 9 cross Indiranagara 1st Stage 10
4 Construction of office of the Asst. Exe. Engineer, Bharathinagara Sub Division
at 6th cross Indiranagara 1st Stage 10
5 Providing RCC Covering slabs to drains and CC to Footpaths around park
between 13th and 15th cross Indiranagara 2nd Stage 10
Maintenance Works
6 Construction of RSD and covering slabs to drains at 10th and 11th Main road in
2nd stage Indiranagara 10
7 Desilting and Maintenance of Immersion tank (During Ganesh and Durga
Festivals ) in Ulsoor Lake and Deweeding, Cleaning and Maintenance of Ulsoor
Lake and maintenance of silt traps and Screen barriers 20
8 Providing Filling of pot holes desilting of shoulder drains and drain clearning of
debris in W-82 10
9 Construction of RSD and RCC culverts towards W/S of Thamarekannan Road 10
Total 100
18% Grants Capital Works
10 Construction of Aganawadi Building at Jayarajnagara 5
18% Grants Maintenance Works
11 Construction of road side drains at Jayaraj Nagara 5
12 Construction of road Side drains at Murphy Town 5
Total 15
Grand Total 115

151
Programme of works for the year 2008-09 pertaining to ward No.83,
C.V. Raman Nagara , Banasawadi Sub Division.
Estimate Cost
Sl No Name of the Work ( Rs. in lakhs)
Capital Works
1 Construction of Road side drain and Culverts and providing metalling to 1st 10
cross road Kaggadaspura
2 Construction of Road side drain and Culverts and providing metalling to road 15
from Kaggadaspura Village to Balaji layout
3 Providing metalling and asphalting to road from 5th main to National School of 20
Excellence and Victorian Enclave in Kaggadaspura
4 Providing metalling to Anjaneya Temple road in Byrasandra 10
5 Providing Metalling to 9th main road in Suddaguntepalya 10
6 Providing Flagging course to drain near park in HAL 3rd Stage 5
Maintenance Works
7 Re-surfacing to roads at Yellamma Temple road, Seethappa Colony, and HAL 3rd 15
Stage Thippasandra
8 Procuring materials for pot hole filling to roads and engaging private labours in 5
Ward -83
9 Reconstruction of road side drain and culverts in 1st cross road Malleshpalya 10
Total 100
18% Grants Capital Works
10 Providing CC to Muthalamma Devi Temple Road and Cross roads of Anjaneya 11
Temple road in Nagavarapalya
18% Grants Maintenance Works
11 Reconstruction of road side drain and culverts in Anjaneya Temple road and 10
main road in Nagavarapalya
Total 21
Grand Total 121
Programme of works for the year 2008-09 pertaining to ward No.84,
Benniganahalli, Banasawadi Sub Division.
Estimate Cost
Sl No Name of the Work ( Rs. in lakhs)
Capital Works
1 Construction of Sports Complex ( Balance work in OMBR Layout ) 10
2 Construction of Burial Ground (B. Channasandra) Watchman Shed Compound 5
and other works
3 Metalling & Providing OGPS to 1st Cross to 9th Cross and 1st to 4th Main Of B. 30
Channasandra Village
4 Cosntruction of Sub division office and ARO office in Ward no 84, 20
5 Providing Cement Concrete to Roads Lanes B. Channasandra Village Road 20
6 Providing Asphalting to Bad roads in East of NGEF layout in W-84 8
Maintenance Works
7 Annual Repaires to School, Hospital , and Children school 5
8 Repaires to Ward office Building in Park in Ward No 84 2
Total 100
18% Grants Capital Works
9 Proviidng CC road and repairs to toilet in Old Byappanahalli and 21
Gajendranagara slum and Amedkar nagara slum
Total 21
Grand Total 121

152
Programme of works for the year 2008-09 pertaining to ward No.85,
Sarvagnanagara Sub Division. (Sarvagnanagara)

Estimate Cost
Sl No Name of the Work ( Rs. in lakhs)
Capital Works
1 Providing cement concrete to 1st to 4th cross of Kadirainapalya village area & 10
crosses passing through M.M Road webstar road in ward No.85
2 Asphalting to M.M Road, Buddavihar road, Bachammal road. 40
3 Construction of SSM drain and formation of road in between Thimmaiah Garden 15
and KHB Colony at Coxtown
Maintenance Works
4 Special repairs to Dispensary, ARO Office and Ward Office in Ward No 85 10
5 Construction of flagging course in crosses of KHB Colony in W-85 5
6 Construction of drain & Cement concrete to footpath of M.M Road from Frazer 15
Town Traffic police station to Cox town Circle
7 Filling up of pot holes and engaging private labour for maintenance of work in 5
W-85
18% Grants Capital Works
8 Construction of Samudhaya Bavan, Tailoring room and compound wall to 11
Corporation property in NC Colony
18% Grants Maintenance Works
9 Construction of Drain and culverts in Indira Seva Slum in New Byappanahalli 10
Total 121
Programme of works for the year 2008-09 pertaining to ward No.86,
Maruthi Seva Nagara, Sarvagnanagara Sub Division.
Estimate Cost
Sl No Name of the Work ( Rs. in lakhs)
Capital Works
1 Construction of toilets at Sathyanagar-2, Jeevanahally, Nagaiahnapalya, Lazar 15
road, KR Garden & chettappa garden.
2 Construction of masonry drains at main road and cross road of Kondappa garden, 15
cross roads of Maruthisevanagar, chettappa garden cross roads.
Maintenance Works
3 Special Repairs & painting to toilets & library building & Health office building 5
in ward No.86
4 Asphalting to cross roads at Jaibharathnagar, Vivekanandanagar, Maruthi 50
Sevanagar and Jeevanahally surrounding area.
5 Filling up of pot holes and engaging private labour for maintenance of work in 15
W-86
Total 100
18% Grants Capital Works
6 Construction of Residential houses for SC/ST at AK Colony, Jeevanhalli in 10
Ward No 86
18% Grants Maintenance Works Nil
Providing CC to Narrow roads in KR Garden and Muthappa Garden AK Colony 11
7
Total 21
Grand Total 121

153
Programme of works for the year 2008-09 pertaining to ward No.87,
Sarvagnanagara Sub Division. (Lingarajapuram)
Estimate Cost
Sl No Name of the Work ( Rs. in lakhs)
Capital Works
1 Providing CC road to Krishnappa layout main road, VST 2nd cross, F Block, and 35
5th A cross of Subbaiahanapalya
2 Providing Chain link fencing to Corporation property at Sakkamma Layout in W- 10
87
3 Construction of compound wall and Internal pathway to Lingarajapura, Rama 20
Swamy Palya and Subbaiahnaplaya Burial Ground in W-87
4 Asphalting to 1st to 4th Cross of Anantharamiah layout, Church street main road 10
and 1st to 4th cross Church street
5 Asphalting to 1st to 3rd main road and Cross road of KSFC layout, Lingajarapura 10
Tank Bund Road, Kanakadhasa Layout Main road
6 Asphalting to Katappa road, Garden street, Chikkabanasawadi Main road and 10
Ayappa Temple road
Maintenance Works
7 Providing Filling of pot holes desilting of shoulder drains and drain clearing of
debris in W-87 5
Total 100
18% Grants Capital Works
8 Construction of BR Ambedkar Samudhaya Bavan in VST road Lingarajapura. 9
18% Grants Maintenance Works
9 Construction of collapsed drains and providing PCC slabs in Janakiram layout 12
main road and 1st to 4th cross of Janakiram Layout
Total 21
Grand Total 121
Programme of works for the year 2008-09 pertaining to ward No.88,
Banasawadi, Banasawadi Sub Division.
Estimate Cost
Sl No Name of the Work ( Rs. in lakhs)
Capital Works
1 Providing widening and asphalting to Horamavu main road 20
2 Providing Asphalting to 5th A Cross to 6th cross, 2nd Block, HRBR layout 10
3 Construction of RCC deck slab at 2nd main road OMBR layout 15
4 Providing drains, culverts and CC to road at Banasawadi village, Aswathappa 20
layout and PNS Layout
5 Construction of 1st Floor to building in park at CA Site No. 4, OMBR layout 5
Cosntruction of culverts at Lakshmamma layout, Chandramma layout, HRBR 20
Layout 1st Block.
6 Providing Asphalting to 1st 'C' Cross 1st Block, HRBR layout 5
Maintenance Works
Filling of pot holes, road cuttings and engaging private labourers for ward
7 maintenance 5
Total 100
18% Grants Capital Works
8 Construction of class rooms to Govt. Primary School at Banasawadi Village 21
18% Grants Maintenance Works
Total 21
Grand Total 121

154
Programme of works for the year 2008-09 pertaining to ward No.89,
Kacharakanahalli , Sarvagnanagara Sub Division.
Estimate Cost
Sl No Name of the Work ( Rs. in lakhs)
Capital Works
1 Metalling and Asphalting at 1st cross HRBR layout 3rd block from CMR road and 20
Hennur main road to 3rd main road.
2 Providing asphalting in Ramaiah layout, Kacharkanahalli in ward No.89 20
3 Providing asphalting in Ajjamallappa layout Kacharkanahalli in ward No.89 15
4 Providing Asphalting to cross roads at Oil mill road, Kacharkanahalli in ward 15
No.89
5 Construction of culverts at Kammanahalli from 1st to 5th cross (10 culverts) 10
Kacharakanahalli in ward No.89
6 Construction of new foot path covering the existing drain with precast covering 15
slabs from 4th cross to service road of 5th main HRBR Layout Kacharakanahalli
in ward No.89
7 Providing street name boards Kacharakanahalli in ward No.89 5
Total 100
Maintenance Works
18% Grants Capital Works
8 Providing CC road to crosses of Kacharakanahalli Slum 10
9 Construction of Ambedkar bhavan at Kammanahalli AK colony in W-89 11
18% Grants Maintenance Works
Total 21
Grand Total 121

ELECTRICAL
EAST
I ORIGINAL WORKS
NEW LINES & POLES
Sl No Name of the work Estimated cost
1 Providing 250 W SV/MH Street light fittings along with poles to Sarjapura Main 6.00
Road from Hosur Road upto Koramangala water Tank.
2 Providing 250 W SV/MH Street light fittings along with poles to Sarjapura Main 10.00
Road from 17th Main upto Koramangala 1st Block.
TOTAL 16.00

II MAINTENANCE WORK

M & R TO STREET LIGHTS – REPLACEMENT OF BURNT BULBS ETC., (PACKAGE)

Sl No Name of the work Estimated cost


1 Operation & Maintenance of street lights 582.20

PROVIDING STREET LIGHT FITTINGS

Sl No Name of the work Estimated cost


1 Providing SV/MH/Control switches to 8th Block 2nd 3rd 4th & 5th Cross 10th Main 5.25
13th Main 16th Main 5th Block 1st Cross 2nd Cross 5th Cross 6th Cross
Koramangala

155
2 Providing SV/MH/Control switches to Ejipura Village 2nd Cross to 23rd Cross 5.50
SD Bed Main Road & 3rd Cross 5th Cross 6th Cross 7th Cross 1st Block 2nd Cross
3rd Cross 4th Cross 9th Cross 11th Cross 3rd Block Post Office Road Behind BDA
Complex Road 4th Main 5th Main & 6th Main Koramangala
3 Providing SV/MH/Control switches to Rose Garden EWS Quarters, Samatha 4.20
Nagara,L.R.Nagara, 1st Cross to 17th Cross BDA Complex 1st Main to 5th Main

4 Providing SV/MH/Control switches to Lakshmi Road, 1st Cross 2nd Cross, 3rd 5.20
Cross, 4th Cross, Nanjappa Road, Basappa Road, A.T.Halli Village
5 Providing SV/MH/Control switches to Sonnenahalli 1st Main 1st Cross to 10th 4.60
Cross Vivekanagara further extension 1st Main to 9th Main Maya Bazzar Slum
Interior Bajaj Street Ayyappa Temple Road 4th Square, 5th Square, 6th Square,

6 Providing SV/MH/Control switches to Domlur 3rd Main, 1st Cross, 3rd Cross, 4th 5.50
Cross,5th Cross, 8th Cross, Domlur Layout ,Nala Road, 2nd Main Road, BDA
Quarters Dhoppanahalli Village, Appareddy Palya, Mottappana palya
,Indiranagara Double Road, 4th Main to 10th Main
7 Providing SV/MH/Control switches to KPWD Quarters 1st Cross to 10th Cross 5.00
Anandanagar Slum Sudhamanagar Slum BDA Layout 1st Main to 9th Main Nanja
reddy colony 1st Main to 7th Main by the side of Air Port wall Behind Rajeshwari
Theatre Rustham Bagh Main Road and Crosses Behind Kempfort all small
crosses
8 Providing SV/MH/Control switches to HAL 2nd Stage, 2nd Main,3rd Main 4th 6.50
Main up to 17th Main 2nd Cross to 10th Cross Thippasandra 2nd Main 3rd Main 4th
Main Kodihalli Main Road 1st Cross to 12th Cross Hanumanagar Slum

9 Providing SV/MH/Control switches to Jogupalya Bajaj Street G No 1st Street to 6.20


12th Street Cambridge 1st Main to 5th Main Jeevana Kendra Layout 1st Main to 3rd
Main Saraswathinagar 1st Main to 9th Main Deenabandhu Nagar Slum
Gowthampura Slum
10 Providing SV/MH/Control switche to Richmond town 1st Main to 6th Main 6.00
behind Johnson Market Surrounding Richmond Park Barton Street Ashoknagar
K no 1st Street to 9th Street Vinayaka Temple Street Rest House Road & Crosses
Victoria Layout 1st Main to 4th Main Ellagoddana Palya 1st Cross to 5th Cross

11 Providing SV/MH/Control switches to S.R.Nagara 1st Main Road 1st Cross upto 6.00
24th Cross 2nd Main Road 1st Cross to 12th Cross, Kumarakrupa West 6th Cross to
10th Cross Kumarakrupa North Park Road, Crescent Road, Annayappa Block
Kempamma Block , Sri puram 1st main to 4th Main Kargappa Garden 1st A,B,
Cross Cubbon Pet 4th Cross to 10th Cross
12 Providing SV/MH/Control switches to old cement Road 2nd Cross Payyappa 7.00
Garden Rajiv Gandhi Colony HKP Road New Korachi palya Vasanthanagara 1st
Main to 16th Main Chinnaswamy Mudaliar Munniswamy Main Venkatappa Road
Karyappa Layout Railway Quarters Road Das Pet Lady Curzan Road Union
Street, Ali Oscar Road Chakravarthy Road, Shivaji Road 1st to 8th Cross

156
13 Providing SV/MH/Control switches to Vockbund Road Dispensary Road 8.00
Sulthannagar 1st Cross to 3rd Cross Kodandaramnagar MKP Road Sultanji
Guntha Road Meenakshi Coridor 1st Cross to 7th Cross Jain Temple Road 1st to
8th Cross Charminar Masjid Road 5th 6th Cross Dharmaraj Coil Street Sabhapathi
Layout Ibrahim Saheeb Street Muruga Pillai Street Seppings Road Dhanakothi
Layout Slater House A to D Street Bamboo Bazar Layout Lal Masjid Street

14 Providing SV/MH/Control switches to Kamaraj Road 3rd Cross 4th Cross 5.00
Seppings Road 2nd Main 3rd Main 4th Main Thimmaiah Road 4th 6th and 7th Cross
Armstrong Road 1to 6th Cross Road Bharathinagar K No 1st Cross to 7th Cross

15 Providing SV/MH/Control switches to Ulsoor Road Bazaar Street M.V.Garden 5.20


1st Main to 4th Main Nala Road Arunachalam Mudaliar Road Kensingtown Road
Aga Abdulla Street Dikenson Road Ulssor Lake Surrounding & Guptha Layout
1st Cross to 6th Cross
16 Providing SV/MH/Control switches to Lakshmipura 1st Cross to 24th Cross Jayraj 6.00
Nagar 1st Cross to 5th Cross Morphy town 1st Main Road 6th Cross 8th Cross 9th
Cross & 10th Cross Indiranangar 2nd Stage 1st Main Road 2nd Main 4th Main 5th
Main LB Shastri Nagar 1st Cross to 7th cross
17 Providing SV/MH/Control switches to New Thippasandra from 1st Cross to 5th 8.00
Cross 2nd Main to 9th Main Geethanjali Layout 1st Cross to 5th Cross Byrasandra
Village C.V. Ramangar Main Road Kagadasanpura Main Road 1st Main to 9th
Main Suddaganthe Palya Village Byrasandra main Road Maruthinagara 1st Cross
to 10th Cross Mallesh Palya 1st Cross to 8th Cross GM Palya 1st Cross to 10th
Cross Shastrinagra Krishanppalayout Interior
18 Providing SV/MH/Control switches to OMBR Layout 1st Main to 12th Main 8.00
Kasthuri nagar 1st Main to 9th Main Krishnianpalya Village NGF Layout 2nd
Main to 7th Main chikkabannaswadi Village Bennaganahalli Village
19 Providing SV/MH/Control switches to Doddiguntha Slum Ashraya Building 6.00
Slum Ashraya Building Main Road Kallahalli Village Burial Ground Inside
Burial Main Ground New Byappanahalli Slum Kallahalli Interior
20 Providing SV/MH/Control switches to Cockstown 1st Main to 5th Main 7.00
Banaswadi Main Road ITC Colony 1st Cross to 5th Cross Jeevanahalli 1st Cross
to 10th Cross Jai Bharathnagar 1st Cross to 28th Cross Davis Road 2nd Cross to 7th
Cross
21 Providing SV/MH/Control switches to Ramaswamy Palya Main Road 1st Cross 8.00
to 20th Cross Lingarajpura Main Road 1st Cross to 10th Cross Janakiram Layout
Slum from 1st Cross to 30th Cross Ashraya Building surroundin area

22 Providing SV/MH/Control switches to Banaswadi Village Interior OMBR 8.40


Layout 1st Main to 4th Main Banaswadi Main Road 1st Main to 6th Main Behind
Shanthisagar Hotel Surrounding Area Ring Road Service Road

157
23 Providing SV/MH/Control switches to Kacharakanahalli Village interior Ramaya 8.80
Layout 1st Cross to 10th Cross Chikkamuniyappa Reddy Main Road KSFC
Layout 1st Cross to 8th Cross Oil Mill Road 1st Cross to 7th Cross Sait Palya 1st
Cross to 9th Cross Hennur Main Road BDA Layout 1st Main to 7th Main & 1st
Cross to 10th Cross
24 Providing SV/MH/Control switches to Pillannagarden , Gospal Street Old 8.00
Bagalur Layout New Bagalur Layout Hall Road Cockson Road Clock Road
P.K.Colony Giddappa Block CoConut Garden Kandaswamy mudaliar Road
Rogers Road Doddi Basappa Main Lazer Road Hennur Main Road Davis Road
Alphans School Road John Armstrong Road
25 Providing SV/MH/Control switches to Pulakeshinagar Tulasi Ramdas Road 8.00
Veena Garden Asia Road Cleavland Road Sanders Road Coles Park Kemp Road
Haries Road Williams town Boore Bank Road Hains Road M.K.Palya
Dhanakothi Lane Robertson Road Jermaiah Road New Patty town N.C Colony
Papanna Garden Wahab Garden Chinnapa Garden
26 Providing SV/MH/Control switches to Jayamahal Jayamahal 1st Main to 5th Main 8.00
Nandhi Durga Extension MRS Palya Pemmegowda Road M.V.R.Block Petal
Gundappa Block Krishnaamma Garden Rammakka Block Muddamma Garden

27 Providing SV/MH/Control switches to Devarjeevanhalli Srinivasnagar 8.00


Chakramandi Chikkanna Lane Hussain Road Old Madras Road Perriar Nagar
Sannappa Block Rajjppa Road T.P Kuppanna Street Mariyamma Coil Street

28 Providing SV/MH/Control switches to Kadugondanahalli Narasimha Layout 8.00


Mukthinagar 1st Cross to 8th Cross Kidayat nagar 1st Main to 3rd Main 1st Cross to
25th Cross Lingarajpuram 1st to 8th Cross Basavanagar 2nd Main 3rd Cross to 5th
Cross Ambedkar College Road Balaji Nagar 1st 3rd Main Pillanna Garden 1st to
5th Main Arogyamma Layout 2nd Main 3rd Cross to 5th Cross Sannappa Block
Bharathimatha Layout 1st Main to 5th Main 1st Cross to 12th Cross Ambedkar
Nagar 1st 2nd Cross Venkateshpura vinobnagar upto 32 Cross Sampangiraman
layout 1st Cross to 32 Cross
29 Providing SV/MH/Control switches to MM Layout 4th to 10th Cross Ratan Singh 8.00
Layout Chinnappa Layout Nagamma Layout Siddaratha Layout Kavalbyrasandra
1st to 8th Cross Muninaggappa Layout Modigarden layout Chinnamma layout
Sakkamma Hanumanthappa Layout Brundavana Layout Kavalbyrasand
Extension Ranka Nagara Adarashanagara Kaverinagara Ananda Gokul layout

30 Providing SV/MH/Control switches to Anandanagar Chollanagar 8.00


Amarjyothinagar Shivanna layout vinayaka layout Ayyappa Block HMT Layout
MSH Layout Chindananda Reddy Kuppaswamy Garden Gundappa Reddy
Chowdaiah Block Manjunatha Layout Bhuvaneshwari Nagara Tulasamma layout
Anandagiri Layout Hebbal Vnagennahalli Kannakanagar Shivashankar Block

31 Providing SV/MH/Control switches to J.C.Nagar Matadhalli Mothinagar 8.00


Muneshwar Block RTNagar P and T Colony Dinnur Main Road Lingappa Block
Anandappa Block Chunchappa Block Rahamatnagar R.T nagar upto 14th Main
1st to 18th Cross

158
32 Providing SV/MH/Control switche to Gangenahalli Ambedkarnagar 8.00
Lakshmidevamma Block Anjanappa Block Akkamma Block Kousar Nagar
Krishanppa Block Vasanthappa Block CBI Block Judges Colony KHM Block

Giddappa Block TPV Layout V.V Nagar Jayamahal KER Mardal Halli BEML
RBI Colony HMT Layout
33 Providing SV/MH/Control switches to RMV Extension Sadashivanagar 8.00
Vasanthappa Block Vyalikaval Sankey Tankey Aramanenagar 1st to 7th cross
Lower Palace Arcade 1st to 6th Cross V.R.Puram Munirappa Block Poojari
Layout Dollars Layout Jabbar Block Palace Guttahalli 1st to 10th Main Rammaiah
Hospital upto 4th Cross Ashwathanagar
TOTAL 225.35

II MAINTENANCE WORK

AMC OF BUILDINGS & CREMATORIUM


Sl No Name of the work Estimated cost
1 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc., Koramangala Adugodi
2 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc., Adugodi 6th 7th & 8th Block
3 Providing lightings to Park at Police Quarters Adugodi 3.00
4 Repairs to Electrical installations to Health centres at Adugodi 0.10
5 Repairs to Electrical installations to Community Hall at Adugodi 1.00
6 Providing Under water pump set to Commmunity Hall Adugodi 0.50
7 Repairs to Existing PumpSet to Community Hall Adugodi 0.50
8 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
Egipura Village
9 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,1st 2nd 3rd Block
10 Providing Park Lightings SD Bed Koramangal 3.00
11 Providing Yard Lightings and Repairs to Electrical installations to Hot Mix plant 2.00
at Koramangala
12 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,Neelasandra
13 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc., Rose Garden
14 Repairs to Electrical Installation to Health Centre at L.R.Nagar 0.40
15 Providing Submersible pump set and Electrical Accessories to A.T. Hally 0.10
community Hall
16 Repairs to Submersible pump at to A.T. Hally community Hall 0.10
17 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,Shanthinagar
18 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc., A.T.Halli
19 Annual Maintenance of DG Set and electrical installation at Maternity home at 0.10
Shanthinagara for the year 2007-08
20 Repairs to existing DG Set and electrical installation at Maternity home at 0.10
Shanthinagara
21 Providing Distribution Panel Board to Maternity Home Shanthi Nagar 0.10

159
22 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
23 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
24 Annual maintenance contract of D.G. Set and Electrical Installation at Maternity 0.50
home Austin Town for the year 2007-08
25 Repairs to Electrical Installations at Maternity Home Austin Town 0.10
26 Repairs to Submersible pump at Maternity home at Austin Town 0.10
27 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
28 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
29 Repairs to Submersible Pump at Doopana Halli 0.10
30 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
31 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
32 Repairs to Electrical Installations at Health Centre Kodihalli 0.10
33 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
34 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
35 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
36 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
37 Annual Maintenance contract of D.G. Set and Electrical Installation at Maternity 0.50
home Jogupalya for the year 2007-08
38 Repairs to Existing DG set andElectrical Installations at Maternity Home Ulsoor 0.40

39 Supplying AH Batteries to DG Set at Maternity Home Ulsoor 0.10


40 Repairs to Electrical installation Jogu Palya Community hall 1.00
41 Providing Submersible pump set and Electrical Accessories at Jogu Palya 0.50
Community hall
42 Repairs to Submersible Pumps at Jogu Palya Community hall 0.10
43 Repairs to Submersible pump at Maternity home at Jogu Palya 0.10
44 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
45 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
46 Annual Maintenance contract of 180KVA D.G. Set at Public Utility Building for 0.60
the year 2008-09
47 Annual Maintenance contract of Air-condition Equipment at D.C. East office for 0.10
the year 2008-09
48 Annual Maintenance contract of lifts M/c No ME 1911 at Public Utility Building 3.00
for the year 2008-09
49 Annual Maintenance contract of lifts M/c No ME 1912 at Public Utility Building 3.00
for the year 2008-09
50 Annual Maintenance contract of lifts M/c No ME 1913 at Public Utility Building 3.00
for the year 2008-09
51 Annual Maintenance contract of lifts M/c No ME 1914 at Public Utility Building 3.00
for the year 2008-09

160
52 Annual Maintenance contract of lifts M/c No ME 1915 at Public Utility Building 3.00
for the year 2008-09
50 Annual Maintenance Contract of Electrical Installation to Public Utility Building 3.00
and Mayohall Office Complex for the Year 2008-09
51 Repairs to Submersible Pumps at PU Building 0.10
52 Providing Oil Filtering for transformer –1 at PUB 0.10
53 Providing Oil Filtering for transformer –2 at PUB 0.10
54 Providing Distribution Panel Boards to Tower Block at PU Building 20.00
55 Providing Oil Filtering for transformer at BBMP Head office 0.10
56 Providing Oil Filtering for transformer at Modern Council hall 0.10
57 Providing UG cable and park lightings to swimming pool park at head office 1.50
premises
58 Providing UG cable to Kempegowda park opposite Head office building 1.00
59 Improvements to Electrical installation to health center at Hebbal 0.10
60 Annual Maintenance Contract of Internal Telephone Exchange at Head office 1.00
Building for the year 2008-09
61 Construction of Generator Room at Modern Council Hall 6.50
62 Annual Maintenance Contract of Head Office Building for the year 2008-09 3.00
63 Annual Maintenance Contract of Air Condition equipments at Head Office 2.00
Building for the year 2008-09
64 Annual Maintenance Contract of Air Condition equipments at Modern Council 1.00
Hall for the year 2008-09
65 Annual Maintenance Contract of VHF Wireless equipments Installed at BMP 3.50
Officers Vehicles Payable to M/s Keonics for the year 2008-09
66 Annual Maintenance Contract of Public Under systems at Modern Council Hall 0.50
for the year 2008-09
67 Annual Maintenance Contract of Lifts at Modern Council hall for the year 2008- 0.80
09
68 Annual Maintenance Contract of lift at Head office Building for the year 2008- 0.50
09
69 Annual Maintenance Contract of 125 KVA D.G. Set Including Operator Charges 0.50
at Head office Building for the year 2008-09
70 Annual Maintenance Contract of 180KVA D.G. Set at Modern Council hall 0.70
Building for the year 2008-
71 Annual Maintenance Contract of Electrical Installation at Modern Council Hall 3.60
for the year 2008-09
72 Annual Maintenance Contract of BBMP Quarters at S.R. Nagar 0.50
73 Providing Submersible pump set and Electrical Accessories to 7th Cross Pump 0.50
house S.R.Nagar
74 Providing Submersible pump set and Electrical Accessories to 11th Cross Pump 0.50
house S.R.Nagar
75 Providing Submersible pump set and Electrical Accessories to Head office 5.00
Building
76 Providing Submersible pump set and Electrical Accessories to Modern Council 5.00
Hall
77 Providing Acoustic enclosure to Modern council hall DG set 2.25
78 Repairs to Electrical Installation in Various Chambers BBMP Head office 0.10
building Ground Floor
79 Repairs to Electrical Installation in Various Chambers BBMP Head office 0.10
building First Floor
80 Repairs to Electrical Installation in Various Chambers BBMP Annex building 0.10
Ground Floor

161
81 Repairs to Electrical Installation in Various Chambers BBMP Annex building 0.10
First Floor
82 Repairs to Electrical Installation in Various Chambers BBMP Annex building 0.10
Second Floor
83 Repairs to Electrical Installation in Various Chambers Modern Council Hall 0.10
Ground Floor
84 Repairs to Electrical Installation in Various Chambers Modern Council Hall First 0.10
Floor
85 Repairs to Electrical Installation in Various Chambers Modern Council Hall 0.10
Second Floor
86 Repairs to Electrical Installation in Various Chambers Modern Council Hall 0.10
Third Floor
87 Electrical Repairs and Installations to Lift Room Modern Council Hall 0.10
88 Electrical Repairs and Installations to Union Office 0.10
89 Electrical Repairs and Installations to Lift Room BBMP Head office 0.10
90 Providing Electrical Fixtures to Basement Floor at Modern Council Hall 2.00
91 Repairs to Air Condition Equipment at Telephone exchange Room 0.30
92 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc., at S.R.Nagar
93 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc., at Kumara Krupa East
94 Providing Yard Lighting at BBMP Head Office 5.00
95 Providing Submersible pump set and Electrical Accessories to Mission road 0.50
BBMP Quarters
96 Repairs to Submersible pump at Mission road BBMP Quarters 0.10
97 Annual Maintenance Contract of Electrical Installations at North East office 1.00
98 Providing Electrification and Electrical Accessories to North East Office 2.00
99 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
Vasanthanagar 3rd Main, 8th cross, Mount Carmel Road
100 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,at Vasanthanagar 1st Main, 2nd Main, 6th Main,

101 Providing Electrical accessories to madammatemple Rajivgandhi colony 0.10


102 Providing Submersible pump set and Electrical Accessories to Vasanth Nagar 0.50
Dobhi ghat
103 Repairs to Submersible pump at vasanth nagar Dobhi ghat 0.10
104 Providing Submersible pump set and Electrical Accessories to North-East Office 0.50

105 Repairs to Submersible pump at North-East Office 0.10


106 Providing Electrical accessories to Nursery school Central bazaar street 0.10
107 Providing Electrification to Dispensary Road Girls High School 1.00
108 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc., Central Street, Commercial Street, Narayan Pillai
Street
109 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc., Broadway Road, Slater ‘A’ Street, Slater ‘E’
110 Providing Submersible pump set and Electrical Accessories to Russel market 0.50
111 Repairs to Submersible pump at Russel Market 0.10
112 Repairs to Submersible pump at Dispensary Road Girls high school 0.10
113 Repairs to Electrical installation at Thimmaiaha Road Maternity Home 0.10
114 Repairs to Submersible pump at Thimmaiaha Road Maternity Home 0.10

162
115 Supply and fixing street light wooden switch box with 0.10
necessary fixing items such as clamps, bolts, nuts etc.,
116 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
117 Annual Maintenance Contract of Electrical installation & D.G.set at Thimmaiah 0.50
Maternity Home
118 Providing Electrical Installation to Girls High School at thimmaiaha Road 0.10
119 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
120 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
121 Repairs to Electrical installation to Coir Centre at Ulsoor 0.10
122 Repairs to Electrical installation to Community Hall at Ulsoor 0.10
123 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
124 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
125 Repairs to Electrical installation at Health Centre at Murphy Town 0.10
126 Repairs to Electrical installation at Ward Office at Murphy Town 0.10
127 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
128 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
129 Repairs to Electrical installation to Health Center C.V.Raman nagar 0.10
130 Repairs to Submersible pump at to Health Center C.V.Raman nagar 0.10
131 Repairs to Electrical installation to Health Center BenaganaHally 0.10
132 Repairs to Submersible pump at to Health Center BenaganaHally 0.10
133 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
134 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
135 Repairs to Electrical installation to Maternity home Sarwagna Nagara 0.10
136 Repairs to Submersible pump at Maternity home Sarwagna Nagara 0.10
137 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
138 Repairs to Electrical installation at ARO office Building Sarwagna nagar 0.10
139 Repairs to Electrical installation at health office Sarwagna Nagara 0.10
140 Repairs to Electrical installation to Community hall Sarwagna Nagara 0.10
141 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
142 Providing Distribution Panel Board, New Wirings and repairs to DG Set to 3.50
Maternity home Sarwagna nagar
143 Annual Maintenance Contract Electrical installation & Engaging with wiremen, 10.00
Helpers, Sweepers, Security to Electrical Crematorium & Maintenance of 180
KVA DG Set & Furnace, Furnace Panel & Scrubbers at Kallahalli Crematorium

144 Repairs to pumpset to Dhobi ghat at Lazzer Road Maruthi Sevanagar 0.10
145 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
146 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,

163
147 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
148 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
149 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
150 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
151 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
152 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
153 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc., A.K. Colony, Pillanna Garden
154 Providing Electrical Accessories to Sagayapuram dispensary 0.10
155 Providing Electrical Accessories to Sagayapuram Health Centre 0.10
156 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc., Old Bagalur Road
157 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc., Pulikeshinagar.
158 Providing Electrical accessories to Nursery school Williams town 0.10
159 Providing Electrical accessories to Nursery school Gandhigrama 0.10
160 Providing Electrification and electrical accessories to Community hall Ward no- 2.00
91
161 Providing Electrical accessories to Cleave Land town Girls High school 0.10
162 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,Cook town road
163 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc., Rayaapa Road, MRS Palya
164 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
Maraapa Thota, Sannappa Block, Munni Reddy Palya
165 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc., Srinivasnagar, Bacchappa Lane, Goa Garden
Maddina
166 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
167 Annual Maintenance Contract of Electrical installation & D.G.set at P.G. Halli 0.50
Maternity Home
168 Providing Panel & Electrical Accessories to D.J. Halli Maternity Home 2.50
169 Repairs to Submersible pump at Maternity home DJ hally 0.10
170 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
171 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
172 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
173 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
174 Shifting of Tubular poles at Dinnur Main Road due to Traffic Bottle Neck 0.10
175 Shifting of Tubular Pole at AMC Road Sulthana Palya Near Govt. School 0.10

164
176 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
Anandnagar, Cholanagar,
177 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,Hebbal, V Nagennahalli
178 Providing Panel Board at Nagennahalli Main Road 0.10
179 Annual Maintenance Contract Electrical installation & Engaging with wiremen, 10.00
Helpers, Sweepers, Security to Electrical Crematorium & Maintenance of 180
KVA DG Set & Furnace, Furnace Panel & Scrubbers at Hebbal Crematorium
180 Providing Park lightings to Near Adarsha School 1.00
181 Providing park lightings Park at 14th Cross R.T.Nagar 1.00
182 Providing Shamiyana fittings to Ward Office Park 0.10
183 Providing park lightings 5th main R.T.Nagar 0.10
184 Repairs to Submersible pump at Maternity home JC Nagara 0.10
185 Annual Maintenance Contract of Electrical installation & D.G.set at J.C Nagar 0.50
Maternity Home
186 Providing Panel & Electrical Accessories to J.C Nagar Maternity Home 2.50
187 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
188 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
189 Providing Panel Board to Devegowda Road High Mast 0.10
190 Providing ACSR Control Wire to 1st Main 1st Block R.T Nagar 0.10
191 Providing ACSR Control Wire to P & T Colony 0.10
192 Providing ACSR Control Wire to 1st A Cross Dinnur Main Road Ex-Service 0.10
Man Colony
193 Shifting of Tubular pole and providing fluid lights play ground near 2.00
Lakshmidevamma Park to Ganganagar
194 Providing Park lights to Lakshmidevamma Park to Ganganagar 2.00
195 Repairs to Submersible pump at Maternity home ganga Nagara 0.10
196 Annual Maintenance Contract of Electrical installation & D.G.set at Ganganagar 0.50
Maternity Home
197 Providing Panel Board to Ganganagar Maternity Home 2.30
198 Providing Electrical Wiring to Ganganagar Maternity Home 0.10
199 Providing Electrical accessories to Ganganagar Maternity Home 0.10
200 Providing ACSR Control Wire to Lakshammaiah Block 11th Cross R.T.Nagar 0.10

201 Providing ACSR Control Wire to 12th Cross RBI Colony R.T.Nagar 0.10
202 th 0.10
Providing ACSR Control Wire to 6 Main HMT Layout R.T. Nagar
203 th 0.10
Providing ACSR Control Wire to Muninajappa Block 8 Cross
204 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
205 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
206 Providing ug cable & fittings to HMT l/o park 1.50
207 Providing Shamiyana fittings to Aramane Nagara Park 0.10
208 Providing Park lightings to Kempe Gowda Tower Park 5.00
209 Repairs to Submersible pump at Maternity home PG Hally 0.10
210 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc., Aramanenagara, Sadashivanagara

165
211 Supply and fixing street light wooden switch box with necessary fixing items 0.10
such as clamps, bolts, nuts etc.,
212 Providing Panel Board Opp CPRI BEML Road 0.10
213 Providing Panel Board in Mekhri Circle 0.10
214 Providing Panel Board to High Mast at 180 Bus Stop Ganganagar 0.10
215 Providing ACSR Control Wire to 18th Cross Sadashivanagar 0.10
216 Providing ACSR Control Wire to 2nd Main Sadashivanagar 0.10
217 Providing Passage lighting to P.G.Halli Maternity Home 0.10
218 Providing Panel, Electrical Wiring & Electrical Accessories P.G Halli Maternity 3.50
Home
219 Annual Maintenance Contract of Electrical installation & D.G.set at P.G. Halli 0.50
Maternity Home
TOTAL 172.15

TEMPORARY ILLUMINATION ON SPECIAL OCCASSIONS

Sl No Name of the work Estimated cost


1 Providing Temporary Illumination in Connection with Disposing of Ganesha 1.29
Prathima in Ulsoor lake During Ganesh chathurthi
2 Providing Temporary Illumination of BBMP buildings of East Division in 1.00
connection with Various Festivals
3 Providing Temporary Illumination of BBMP buildings of East Division in 2.00
connection with Various Festivals
4 Providing Temporary Illumination in connection with Maha Shivrathri at Shanthi 0.20
nagar Burrial Ground
5 Providing Temporary Illumination in connection with Maha Shivrathri at Austin 0.10
Town Burrial Ground
6 Arrranging Temporary illumination connection with Sale of Crackers at 0.10
Ashokanagar Play Ground
7 Arrranging Temporary illumination connection with Sale of Crackers at Tasker 0.10
Town Play Ground
8 Arrranging Temporary illumination connection with Sale of Crackers at 0.10
Indiranagar Play Ground
9 Arrranging Temporary illumination connection with Sale of Crackers at 0.10
Jaymahal Play Ground
10 Arrranging Temporary illumination connection with Sale of Crackers at Vyali 0.10
Kaval Play Ground
TOTAL 5.09
Grand Total 4997.50

166
MAJOR ROADS
Details of Programme of works for the year 2008-09
(Works proposed for 08-09)
Executive Engineer
Roads Widening Division
Programme Of Works (2008-09)
Amount in
Sl.No Name of Road
Lakhs
I Capital work
1 Widening and Improvements to Palace Road 497.00
2 Widening and Improvements to Race Course Road 391.00
3 Widening and Improvements to Sheshadri Road 344.00
4 Providing utility cable ducts and chambers for BESCOM and 98.00
other utility cables in Palace Road on East side from 0.00km to
1.35km in B’lore
5 Providing utility cable ducts and chambers for BESCOM and 98.00
other utility cables in Palace Road on West side from 0.00km to
1.35km in B’lore
6 Providing utility cable ducts and chambers for BESCOM and 58.00
other utility cables in Palace Road from 1.35km to 1.75km in
B’lore (Drugs control office to High Ground Police Station)
7 Providing utility cable ducts and chambers for BESCOM and 76.00
other utility cables in Sheshadri Road from Anand Rao Circle Fly
over to K.R.Circle to on LHS in B’lore
8 Providing utility cable ducts and chambers for BESCOM and 76.00
other utility cables in Sheshadri Road from Anand Rao Circle Fly
over to K.R.Circle to on RHS in B’lore
9 Providing utility cable ducts and chambers for BESCOM and 49.00
other utility cables in Kasturaba Road from Siddalingaiah Circle
to Queen’s Statue on RHS in B’lore
10 Providing utility cable ducts and chambers for BESCOM and 49.00
other utility cables in Kasturaba Road from Siddalingaiah Circle
to Queen’s Statue on LHS in B’lore
11 Dismantling existing compound in front of turf club from Km 7.00
0.35 to Km 1.00
12 Widening and Improvements to Hosur-Luskar Road 500.00
13 Widening and Improvements to Kasturba Road. 171.00
14 Widening and Improvements to Airport Road. 300.00
15 Widening and Improvements to Jayamahal Road. 250.00
16 Widening and Improvements to Nruptatunga Road. 200.00
17 Widening and Improvements to Hosur Road from Lalbagh Main 150.00
Gate to Yankey factory(via Diary circle).
18 Widening and Improvements to Mysore Road from Sirsi Circle to 200.00
Ring Road.

167
19 Widening and Improvements to Vedhana Veedhi from 100.00
Goplagowda circle to K.R Circle.
20 Widening and Improvements to Lower Agaram Road from 100.00
Hosmat hospital to National games Kormangala.
21 Widening and Improvements to Sarjapura Road from Kendriya 94.00
Sadana Road to Ring Road Cross.
22 Widening and Improvements to Hennur Road from Pottery Road 100.00
to Ring Road.
23 Widening and Improvements to Banaswadi Road and Wheeler 92.00
Road (via Banaswadi) from St John Road to Ring Road.
Total 4000.00
Traffic Engineering Cell
Programme Of Works - 2008-09
Amount in Lakhs
Sl No. Name of the Work Est. Cost
I CONSULTANCY SERVICES FOR PREPERATION OF DPR
Preperation of DPR for Constuction of Underpass at
1) 1.00
HOSMAT Hospital Junction near FootBall Stadium
Preperation of DPR for Improvements to the Various
2) 7.00
Junctions in BBMP Limits
SUB TOTAL- I 8.00
II CAPITAL WORKS
A. INFRASTRUCTURES, ROAD RELATED WORKS
1) Barricading to Footpath
1) Providing Barricading in East Zone 15.00
2) Providing Barricading in West Zone 10.00
3) Providing Barricading in South Zone 10.00
Installation, improvements, Central line & Kerbs Signage for
2) Road Junctions / Painting
1) Providing Signages under the Juridiction of DCP ( East) 10.00
2) Providing Signages under the Juridiction of DCP ( West ) 10.00
3) Other Structures
1) East Zone 20.00
2) West Zone 15.00
3) South Zone 15.00
4) Providing Concerete medians & Kerbs
1)Providing & fixing Pre-cast concrete Road Divider for the
Identified Road & Junctions in East Zone 5.00
2) Providing & fixing Pre-cast concrete Road Divider for the
Identified Road & Junctions in West Zone 5.00
3)Providing & fixing Pre-cast concrete Road Divider for the
Identified Road & Junctions in South Zone 5.00
4)Providing & fixing Pre-cast concrete Road Divider for the
Identified Road & Junctions in New Zones 10.00

168
5) Widening of Roads & Development Works
1) Widening of Jayamahal Road from Mekhri Circle to
Doordarshan 40.00
2) Widening of Junctions in Bruhat Bangalore Mahanagara
Palike Limits 25.00
6) Improvements to Junctions & Intersections
identified. 1000.00
B) ROAD SAFETY MEASURES
7) High Raised Medians & other safety equipments 40.00
8) Blinkers & Safety Equipments 20.00
9) One - Way Traffic
1) Improvements to Nanjappa Circle 10.00
2) Improvements to Mathikere Circle 7.00
3) Improvements to Devegowda Road Junction 5.00
4) Police requirements Works 15.00
10) Removal fo Road Constructions
1) As per Police requirements 15.00
2) Rectification & removal of unauthorised Humps 35.00
11) Road Humps
1) Construction of Road Humps in BBMP Limits 20.00
12) Raised Pedestrian Crossings
1) Forming Raised Pedestrian Crossing under Jurisdiction of
DCP ( East) 20.00
2) Forming Raised Pedestrian Crossing under Jurisdiction of
DCP ( West) 20.00
3)) Forming Raised Pedestrian Crossing New Zones. 10.00
SUB TOTAL-II 1412.00
III MAINTENANCE WORKS
1) Barricading
1) Painting & Repairs to the Existing Damaged Barricading in
Bruhath Bangalore Mahanagara Palike Limits 10.00
2) Medians & Kerbs
1) Providing & Repairing the Existing Median & Kerbs including
Painting 10.00
3) Road Marking
1) Providing Lane marking with Thermo-Plastic Painting 5.00
2)Providing Retro-Reflective Painting to the Existing Medians. 5.00
SUB TOTAL-III 30.00
GRAND TOTAL 1450.00

169
KMRP
Programme Of Works (2008-09)
(Rs. In Lakhs)
Estimated
Sl.No Name of the work
Amount
I - CAPITAL WORKS
Strengthening and Rehabilitation works of 7 Roads in Bangalore
1 city under KMRP World Bank Loan Assistance KMRP Package -
1 1000
Strengthening and Rehabilitation works of 14 Roads in
2 Bangalore city under KMRP World Bank Loan Assistance
KMRP Package -2 2000
Strengthening and Rehabilitation works of 6 Roads in Bangalore
3 city under KMRP World Bank Loan Assistance KMRP Package -
3 1000
Strengthening and Rehabilitation works of 13 Roads in
4 Bangalore city under KMRP World Bank Loan Assistance
KMRP Package -4 1700
TOTAL 5700.00
Special Cell for Underpass
Programme Of Works (2008-09)

Sl.No Name of the work


I - CAPITAL WORKS
A Consultancy Services
Investigation ,Preparation of documents, vediographic and
1 10.00
preparation of DPR
Total Amount 10.00
B Construction Works
Lowering the segments, Preparation of bed other allied works for
1 21.00
surface pass near B.D.A Junction.
Construction of approach ramps to the surface pass at B.D.A
2 72.00
Office junction using pre cast RCC box segments
Lowering the segments, Preparation of bed allied works for
3
underpass in front of K.A.I.C on Bellary Road
Lowering the segments for pedestrian subway at Hebbal Police
3 25.50
Station
Lowering the segments, Preparation of bed allied works for
4 12.50
pedestrian underpass near Anandanagar Junction
Widening of foothpath along Sankey Road and Cunningham road
5 16.00
junction
Providng Trenchless cutting to lay 300mm dia PVC drainage
6 21.50
pipe at Windsor Manor, Sanjayanagar and Cunningham Junction
7 Ring Road and Vidhya Peeta Road Junction 80.00

170
8 Ring Road near Food World Junction 80.00
9 Ring Road near Kamaya Theatre Junction 80.00
10 Ring Road near Kanakapura Road Junction 80.00
11 Ring Road near Bannergatta Road Junction 72.00
12 Ring Road near J.P Nagar 6th Phase Junction 75.00
13 NH4 and Hesargatta Road Junction 70.00
14 G.P.O Junction 75.00
15 Coffee Board Junction 75.00
16 Balekundri Circle Junction 73.00
17 Shivananda Stores Junction 75.00
18 Race course road Junction 71.00
19 Near Town Hall Junction 75.00
20 Hudson Circle Junction 75.00
21 Forum junction on Hosur Road 75.00
22 Near Housing Board Bus Stop on Magadi road 75.00
23 On Mysore Road near Timber Yard layout 75.00
24 Near Rajajinagar Underpass 75.00
25 Lalbagh Road and Siddaiaha Road Junction near Urvashi theatre 75.00
26 On West of Chord near fire Station 75.00
27 ACS Centre near India Garage 75.00
28 Airport Road Junction and Road to M G Road 75.00
29 Town Hall Junction 75.00
30 Near Vidhyardhavaka Sangha, Rajajinagar 75.00
31 Near Kannada Bhavan on J C road 75.00
32 Jaimuni Rao Circle on Magadi Road 85.00
33 On Dickenson road near Manipal Centre 67.50
34 Near Nayandhahalli Bus Stop on Mysore Road 75.00
35 Shankara Math (Kurabarahalli) 75.00
36 Kumble Circle on M.G road 75.00
37 Siddiahalingaiah Circle 75.00
38 On Jayamahal Road near Doordarshan 69.00
39 Ramakrishna Ashrama Circle 80.00
40 Subbaiah Circle on Mission road 75.00
Bannerghatta Road and Thilak Nagar Road Junction near Sagar
41 82.00
Apollo Hospital
42 Kodigehalli Cross on NH-7 75.00
43 Near Mico Factory gate on Banerghatta Road 81.00
Total Amount 2964.00
C PROJECT MANAGEMENT CONSULTANCY CHARGES
Total Amount 5.00

D UTILITY SHIFTING CHARGES


Total Amount 1.00

171
II - MAINTENANCE WORKS
For the junctions mentioned in capital works in the spill over
1 20.00
statement
Total Amount 20.00
GRAND TOTAL 3000.00

Major Roads Division


Programme Of Works (2008-09)
(Amount in lakhs)
Sl. No. Name of work Estimated cost
I - CAPITAL WORKS

1 Conducting B.B.D ,Traffic studies and necessary investigations 51.95


Sub Total -I 51.95

1 Rehabilitation and Strengthening of South End Road from South 99.00


End Circle to Netkalappa Circle Ch: 0 to 1.0km .
2 Rehabilitation and Strengthening of South End Road from South 98.00
End Circle to Netkalappa Circle Ch: 1.0 to 2.0km .
3 Rehabilitation and Strengthening of South End Road from South 99.00
End Circle to Netkalappa Circle Ch: 2.0 to 3.0km .
4 Rehabilitation and Strengthening of 40" Road Munneshwara 99.50
block to Hosakerehalli road
5 Rehabilitation and Strengthening of road from Hosakerehalli road 99.80
to ring road.
6 Rehabilitation and Strengthening of 40 feet road Avalahalli 98.50
Muneshwara block from 50 feet road to 1st main road Timber
yard Ch. 0.0 to 1.0km.
7 Rehabilitation and Strengthening of 40 feet road Avalahalli 99.00
Muneshwara block from 50 feet road to 1st main road Timber
yard Ch. 1.0 to 2.1km.
8 Rehabilitation and Strengthening of 40 feet road Avalahalli 99.50
Muneshwara block from 50 feet road to 1st main road Timber
yard Ch. 2.1 to 3.1km.
9 Rehabilitation and Strengthening of 22nd Main Road from 45th 98.00
Cross to Swagath theatre Ch: 0 to 1.0km.
10 Rehabilitation and Strengthening of 22nd Main Road from 45th 98.00
Cross to Swagath theatre Ch: 1.0 to 2.1km.
11 Rehabilitation and Strengthening of 22nd Main Road from 45th 99.00
Cross to Swagath theatre Ch: 2.1 to 3.3km.
12 Rehabilitation and Strengthening of Sangolli Rayanna Road from 99.20
Nagarbhavi Main Road junction to Vrishabhavathi valley.

172
13 Rehabilitation and Strengthening of Nagarbhavi Main Road from 99.60
Shoba hospital to Nagarbhavi Circle.
14 Rehabilitation and Strengthening of Service Road (W.O.C) 99.50
Vijayanagar from pipeline road to 5th Main RPC layout.
15 Rehabilitation and Strengthening of Service Road (Magadi Road) 99.70
From Prashanth Nagar Main Road to 1st Cross Govindraj nagar.

16 Rehabilitation and Strengthening of 1st Cross Road MC layout 98.80


from Magadi Road to Chord Road

17 Rehabilitation and Strengthening of Mathikere Main Road from 98.00


C.V.Raman road to B.E.L Circle Ch: 0 to 0.9km.
18 Rehabilitation and Strengthening of Mathikere Main Road from 99.00
C.V.Raman road to B.E.L Circle Ch: 0.9 to 2.0km.
19 Rehabilitation and Strengthening of Mathikere Main Road from 98.00
C.V.Raman road to B.E.L Circle Ch:2.0 to 3.0km.
20 Rehabilitation and Strengthening of Mathikere Main Road from 99.00
C.V.Raman road to B.E.L Circle Ch:3.0 to 4.2km.
21 Rehabilitation and Strengthening of Jallahalli Road (West) Main 98.50
Road from Ayappa temple to Gangamma Circle Ch: 0 to
0.9km..
22 Rehabilitation and Strengthening of Jallahalli Road (West) Main 98.75
Road from Ayappa temple to Gangamma Circle Ch: 0.9 to
1.10km..
23 Rehabilitation and Strengthening of Jallahalli Road (West) Main 99.00
Road from Ayappa temple to Gangamma Circle Ch: 1.10 to
3.0km.
24 Rehabilitation and Strengthening of Jallahalli Road (East) Main 98.50
Road from Jallahalli Circle Gangamma Circle Ch : 0 to
1.20km .
25 Rehabilitation and Strengthening of Jallahalli Road (East) Main 98.00
Road from Jallahalli Circle Gangamma Circle Ch : 1.20 to
2.20 km .
26 Rehabilitation and Strengthening of Jallahalli Road (East) Main 99.00
Road from Jallahalli Circle Gangamma Circle Ch : 2.20
to 3.30 km .
27 Rehabilitation and Strengthening of HMT Main Road from SBI 98.50
bank to HMT factory Ch: 0 to 0.9km
28 Rehabilitation and Strengthening of HMT Main Road from SBI 98.00
bank to HMT factory Ch: 0.9 to 2.1km
29 Rehabilitation and Strengthening of HMT Main Road from SBI 99.00
bank to HMT factory Ch: 2.1 to 3.2km

30 Rehabilitation and Strengthening of Buddha Vihar Road & 98.00


M.M.Road from Asay Road to M.M.Road Ch: 0 to 0.9km

173
31 Rehabilitation and Strengthening of Buddha Vihar Road & 98.00
M.M.Road from Asay Road to M.M.Road Ch: 0.9 to 1.9km
32 Rehabilitation and Strengthening of Buddha Vihar Road & 99.00
M.M.Road from Asay Road to M.M.Road Ch: 1.9 to 3.1km
33 Rehabilitation and Strengthening of Lingarajapurum Main Road 98.00
from Pottery Road to Flyover Ch: 0 to 0.9km.
34 Rehabilitation and Strengthening of Lingarajapurum Main Road 98.00
from Pottery Road to Flyover Ch: 0.9 to 1.8km.
35 Rehabilitation and Strengthening of Lingarajapurum Main Road 99.00
from Pottery Road to Flyover Ch: 1.80 to 2.60km.
36 Rehabilitation and Strengthening of Alexander Road in 98.00
Richmond Town area Ch: 0 to 0.9km.
37 Rehabilitation and Strengthening of Alexander Road in 98.50
Richmond Town area Ch: 0.9 to 1.90km.
38 Rehabilitation and Strengthening of Alexander Road in 99.00
Richmond Town area Ch: 1.90 to 3.0km.
39 Rehabilitation and Strengthening of selected reaches 98.50
kadugodanahalli main road from tannery road junction to ring
road Ch:0 to 1.0km
40 Rehabilitation and Strengthening of selected reaches 98.70
kadugodanahalli main road from tannery road junction to ring
road Ch:1.0 to 1.9km
Sub Total -II 3948.05
Grand Total (I+II) 4000.00

Programme Of Works - 2008-09

Estimated
Sl. No. Name of the Work
Cost

A. Consultancy Charges for preparation of DPR


1 Providing Consultancy service for preparation of DPR for
50.00
improvements to Major Road Special (High Density corridors)
B.Construction Works
1 Package - 1
Improvements to Chowdaiah Road
Road from Basaveshwara circle to Minsk Square to M.G. Road
100.00
Cubbon Road From
Minsk square to M.G Road
L.H. Road:- Basaveshwara Circle to L.H. Road

2 Package - 2
Improvements to Airport Road 100.00
Trinity Circle to Domlore

174
3 Package - 3
Improvements to Airport Road 100.00
Domlore to H.A.L main factory

4 Package - 4
Improvements to Dr. Ambedkar Road
100.00
Post office road i.e Mysore bank circle to Balekundri
Nrupathunga Road - K.R. circle to police corner

5 Package - 5
Improvements toQueen's Road
Mahathma Gandhi Circle Minsk Square - Balekundri circle to
100.00
join Miller road
Miller road - Basaveshwara circle to contonment railway station

6 Package - 6
Improvements to Palace Road
20.00
Mysore Bank Circle to Choudaih Road (High Grounds Police
Station)

7 Package - 7
Improvements to Chowdaih Road
Basaveshwara circle to Cauvery Junction 20.00
Ramana Maharshi Main Road
Bellary Main Road - Mekri Circle to upto Hebbal Fly over

8 Package - 8
Improvements to Kumara Krupa Road
Race Cource road to Sankey Road 100.00
Race Course Road - ananda Rao Circle to Basaveshwara Circle

9 Package - 9
Improvements to Kasturaba Main road
Hudson Circle to Mahatma Gandhi circle 20.00
Mahatma Gandhi road - Mahathma Gandhi circle to Trinity
circle
10 Package - 10
Improvements to
Road from palace road to Legislative House
Brigade Road - M.G. Road to Shooley Circle 20.00

Museum Road
Saint mark's Road

175
11 Package - 11
Improvements to Hosur Main Road 20.00
Hosur Main Road shooley circle to Madivala Police Station

12 Package- 12
Construction of Major Road zone 100.00
Office building (I&II floor) in the premises of BBMP

13 Package-13
Providing interiors and furnishing to the Ground, Ist and Iind 100.00
floor of Major Road zone office building
Sub-Total I 950.00

1 Annual maintenance for up keeping of Major roads Special (High


25.00
Density Corridors) for year 2008-09 -East Zone
2 Annual maintenance for up keeping of Major roads Special (High
25.00
Density Corridors) for year 2008-09 -West Zone
Sub-Total II 50.00
GRAND TOTAL (I+II) 1000.00
1 Approach Roads to Villages in each Zone 1500.00
2 Approach Roads to Banasavadi to Bileshivale Cross 500.00
CE PROJECTS - 1
Details of Programme of works for the year 2008-09
(Works proposed for 08-09)
Programme of works for the year 2008-09
Capital Works
Rupees in Lakhs
Estimated
Sl.no Desription of work
Cost
CONSULTANCY SERVICES FOR PREPARATION OF DPR
For preparation of feasibility and DPR for construction of ROBs
1 50.00
and RUBs
Preparation of feasibility report and construction of elevated
2 50.00
roads
3 Development of Lakkasandra Quarry pit to sports complex 3.00
Construction of sports complex at MICO layout 8th Main BTM 2
4 3.00
nd stage
5 Construction of Multipurpose complex at Krumbiegal Road. 1.00
Grade Separator at Pedestrian subway using RCC precast
6 elements at Commiserate road and Magrath road (At 3.00
Garudamahal)
For Elevated road from Yeshwanthpur to NHAI corridor on
7 5.00
Tumkur road
8 Grade Seperator at Ring Road and BEL Road Junction 5.00

176
Grade separator at Junction of Ring Road and Kanakpura road
9 5.00
integrating Banashankari Temple Junction
Grade separator at Junction of Ring Road and 16th Main BTM
10 5.00
Layout
Sub way at 45th cross near Ragigudda Temple in 9th Block
11 5.00
Jayanagar in Ward No 58
RCC pre- cast Element under pass at 24th Main and 15th cross at
12 3.00
Dollars Colony J P Nagar in ward No 58
RCC pre- cast Element under pass at 28th Main and 45th Cross
13 1.00
in 9th Block Jayanagar ward 58
RCC pre- cast Element under pass at 29th main in B T M II
14 3.00
Stage
RCC pre- cast Element under pass at 11th Main Road and 45th
15 cross in 5th Block Jayanagar near Raghavendraswamy temple 3.00

RCC pre- cast Element under pass at Kamakya junction in ward


16 3.00
No 55 A
RCC pre- cast Element under pass at Junction of Ring Road and
17 3.00
Kathriguppe Circle in ward No 55 A
RCC pre- cast Element under pass at Junction of Ring Road and
18 3.00
Bank Colony Road in ward No 55 A
RCC pre- cast Element under pass at the junction of West of
19 Chord road and Road leading to Chandra Layout (Near Petrol 3.00
Bunk)
RCC pre- cast Element under pass at the junction of 10th Cross
20 1.00
Wilson Garden and Hosur Road
RCC pre- cast Element under pass at the junction of B D A
21 3.00
Complex and Nagarabhavi Main road
RCC pre- cast Element under pass at the junction of Hosur road
22 3.00
and Koramangala main road opposite to Forum Mall
RCC pre- cast Element under pass at the junction of
23 1.50
Sadhashivanagar police station .
RCC pre- cast Element under pass at the junction of M S
24 1.50
Ramaiah hospital. New BEL road
Total 167.00
CONSTRUCTION WORK
Development of Lakkasandra Quarry pit to Sports Complex
25 100.00
Phase II
26 Construction of RCC Retaining wall in Lakkasandra Quarry Pit 100.00
Construction of sports complex at MICO layout 8th Main BTM 2
27 100.00
nd stage
Construction of RCC road side drain in front of National collage
28 75.00
Ground
29 Construction of Multipurpose complexat Krumbigal Road. 75.00

177
Grade Separator at Pedestrian subway using precast RCC
30 elements at Commiserate road and Magrath road (At 100.00
Garudamaal)
Elevated road from Yeshwanthpur to NHAI corridor on Tumkur
31 100.00
road
Grade separator at Junction of Ring Road and Kanakpura road
32 50.00
integrating Banashankari Temple Junction

Grade Separator/ Underpass or combination of both at Khoday


33 50.00
circle
Mysore Elevated Road from Sirsi Circle to Kengeri on Outer
34 50.00
ring road -10.2 KM
35 Underpass/ Grade Separator at Chennamma Circle 50.00
Underpass/ Grade Separator at Koramangala- Sarjapura
36 50.00
(Kendriya Sadhana Junction)
Underpass/ Grade Separator Kalyanagar and Outer Ring Road
37 50.00
junction
38 Underpass/ Grade Separator Lingarajpuram Road junction 50.00
Underpass/ Grade Separator Bannerghatta road and Outer Ring
39 50.00
Road junction
Connecting Two Loop to existing Flyover near Central Silk
40 50.00
board junction
Construction of Grade Separator at Koramangala 100 ft road and
41 50.00
Inner ring road
Construction of Element under pass at 11th Main Road and 45th
42 50.00
cross in 5th Block Jayanagar near Raghavendra swamy temple
Construction of Element under pass at Kamakya junction in ward
43 50.00
No 55 A
Construction of Element under pass at Junction of Ring Road and
44 50.00
Kathriguppe Circle in ward No 55 A
Construction of Element under pass at Junction of Ring Road and
45 50.00
Bank Colony Road in ward No 55 A
Construction of Element under pass at the junction of West of
46 Chord road and Road leading to Chandra Layout (Near Petrol 50.00
Bunk)
Construction of Element under pass at the junction of 10th Cross
47 50.00
Wilson Garden and Hosur Road
Construction of Element under pass at the junction of B D A
48 50.00
Complex and Nagarabhavi Main road
Construction of Element under pass at the junction of Hosur road
49 50.00
and Koramangala main road opposite to Forum Mall
Construction of Element under pass at the junction of
50 50.00
Sadhashivanagar police station .

178
Construction of Element under pass at the junction of M S
51 50.00
Ramaiah hospital. New BEL road
Construction of open burning platform and additional works at
52 150.00
construction of electric crematorium in chamrajapet near TR Mill
Construction of underpass using RCC precast elements at
53 50.00
Shivananda circle
Construction of underpass using RCC precast elements at
54 50.00
junction of Harekrishna road and Racecourse road junction
Construction of underpass using RCC precast elements at
55 50.00
Bannerghatta road and sagar appolo hospital road junction
Construction of underpass using RCC precast elements at the
56 junction of ring road and road towards kumaraswamy layout 50.00
(Dayananda Sagar engineering college road)
57 Elevated road in Town hall junction to south end circle 100.00
58 Elevated road in Maharanis circle 55.00
59 Elevated road in K.R.circle 55.00
60 Elevated road in Hudson circle 55.00
Construction of road from 29th cross to Hosur Road along
61 500.00
Madivala tank bund to decongest traffic at Silk Board Junvtion
Construction of underpass using RCC precast elements at
62 50.00
Marenahally Road and ring road junction near Lumbini Gardens
Construction of underpass using RCC precast elements at
63 50.00
Banasawadi Police station Road and ring road junction
64 Elevated Road Using Structural Steel along JC Road 2000.00
Formation and Widening of Link Road from Malleswaram to
200.00
65 Seshadripuram
Formation of Road behind Mantri Greens to link Malleswaram
200.00
66 Railway Parallel Road
67 Elevated Road From Yeswantpur Circle to Rajajinagar 5000.00
Total 10265.00
Consultancy Services For Project Management
Development of Lakkasandra Quarry pit to Sports Complex
10.00
68 Phase II
Construction of Sports complexl at MICO layout 8th Main BTM
8.00
69 2nd stage
70 Construction of Multipurpose complexat Krumbigal Road. 1.00
Construction of Grade separator at Junction of Ring Road and
5.00
71 Kanakpura road integrating Banashankari Temple Junction
Construction of Underpass/ Grade Separator at Maharani’s
5.00
72 College Junction
73 Construction of Underpass/ Grade Separator at K.R.Circle 5.00
Construction of Grade Separator/ Underpass or combination of
74 5.00
both at Khoday
Construction of circle
Mysore Elevated Road from Sirsi Circle to
75 5.00
Kengeri on Outer
Construction ring road Grade
of Underpass/ 10 2 KM
Separator at Chennamma
76 5.00
Circle

179
77 Construction of Underpass/ Grade Separator at Hudson Circle 5.00
Construction of Underpass/ Grade Separator at Koramangala-
78 5.00
Sarjapura (Kendriya Sadhana Junction)
Construction of Underpass/ Grade Separator Kalyanagar and
5.00
79 Outer Ring Road junction
Construction of Underpass/ Grade Separator Lingarajpuram Road
80 5.00
junction
Construction of Underpass/ Grade Separator Bannerghatta road
81 5.00
and Outer Ring Road junction
Construction of Connecting Two Loop to existing Flyover in Silk
82 5.00
board junction
Construction of Grade Separator at Koramangala 100 ft road and
83 5.00
Inner ring road
Total 84.00
DEPOSIT CONTRIBITION WORKS WITH RAILWAYS
84 ROB Nagavara 25.00
85 ROB supply depo MES road, Jalahalli. 25.00
86 ROB-RUB Kasturinagar 25.00
87 RUB Bapujinagar -LC 5 25.00
88 Construction of ROB - RUB at Allalsandra. 25.00
89 Construction of ROB - RUB at Kodigehalli, Virupakshapura 25.00
90 RUB Gangappa garden and Narasimiah compound 25.00
91 RUB J.J. Nagar Shamanna garden.- LC 4 25.00
94 RUB K.R.Puram near cable stayed bridge 25.00
Construction of ROB at L.C.No-133, Jollarpet, Chennai. Railway
25.00
95 line - Hoodi Devasandra road.
96 Construction of ROB at L.C.No-136 B, K.R.Pura. 25.00
97 Improvements to existing ROB near IOC gate at Banasavadi 8.00
Total 283.00
Grand total 10799.00
Maintanence Works
Rupees in Lakhs
Estimated
Sl.no Desription of work
Cost
CONSULTANCY SERVICES FOR PREPARATION OF
DPR
Engaging consultants for conducting BBD Test for preparation of
1 1.00
estimates for Ring road
TOTAL 1.00
CONSTRUCTION WORK
2 Maintenance of Sirsi circle Flyover 100.00
Asphalting to Road fromRajarajeswarinagar Arch to
3 Halagevadera hally (Uttarahally road) Chainage 0.00 to 1000.00 100.00
mts
Asphalting to Road fromRajarajeswarinagar Arch to
4 Halagevadera hally (Uttarahally road) Chainage 1000.00 to 100.00
2000.00 mts

180
Asphalting to Road fromRajarajeswarinagar Arch to
5 Halagevadera hally (Uttarahally road) Chainage 2000.00 to 100.00
3000.00 mts
Asphalting to Road fromRajarajeswarinagar Arch to
6 Halagevadera hally (Uttarahally road) Chainage 3000.00 to 100.00
4000.00 mts
Asphalting to Road fromRajarajeswarinagar Arch to
7 Halagevadera hally (Uttarahally road) Chainage 4000.00 to 100.00
5000.00 mts
Asphalting to Road fromRajarajeswarinagar Arch to
8 Halagevadera hally (Uttarahally road) Chainage 5000.00 to 100.00
6000.00 mts
Asphalting to Road fromRajarajeswarinagar Arch to
9 Halagevadera hally (Uttarahally road) Chainage 6000.00 to 100.00
7000.00 mts
Asphalting to White field Road from K. R. Puram Hanging
10 bridge to Hope farm Junction via Hudi Junction Chainage 0.00 100.00
to 1000.00 mts
Asphalting to White field Road from K. R. Puram Hanging
11 bridge to Hope farm Junction via Hudi Junction Chainage 100.00
1000.00 to 2000.00 mts
Asphalting to White field Road from K. R. Puram Hanging
12 bridge to Hope farm Junction via Hudi Junction Chainage 100.00
2000.00 to 3000.00 mts
Asphalting to White field Road from K. R. Puram Hanging
13 bridge to Hope farm Junction via Hudi Junction Chainage 100.00
3000.00 to 4000.00 mts
Asphalting to White field Road from K. R. Puram Hanging
14 bridge to Hope farm Junction via Hudi Junction Chainage 100.00
4000.00 to 5000.00 mts
Asphalting to White field Road from K. R. Puram Hanging
15 bridge to Hope farm Junction via Hudi Junction Chainage 100.00
5000.00 to 6000.00 mts
Asphalting to White field Road from K. R. Puram Hanging
16 bridge to Hope farm Junction via Hudi Junction Chainage 100.00
6000.00 to 7000.00 mts
Asphalting to White field Road from K. R. Puram Hanging
17 bridge to Hope farm Junction via Hudi Junction Chainage 100.00
7000.00 to 8000.00 mts
Asphalting to White field Road from K. R. Puram Hanging
18 bridge to Hope farm Junction via Hudi Junction Chainage 100.00
8000.00 to 9000.00 mts
Asphalting to White field Road from K. R. Puram Hanging
19 bridge to Hope farm Junction via Hudi Junction Chainage 100.00
9000.00 to 10000.00 mts

181
20 Asphalting to BTS road from Double road to Bannergatta road. 99.90
Asphalting to Kruimbigal road from Lal bagh main gate to Lal
21 99.00
bagh west gate
Asphalting to Ring Road from Mysore Road junction to Silk
22 Board junction via J.P.Nagar, B.T.M.layout Ch: 7.40 to 9.80 Km 99.50
Left side carriage way ( Northern side)
Asphalting to Ring Road from Mysore Road junction to Silk
23 Board junction via J.P.Nagar, B.T.M.layout Ch: 11.30 to 13.25 99.50
Km Left side carriage way ( Northern side)
Asphalting to Ring Road from Mysore Road junction to Silk
24 Board junction via J.P.Nagar, B.T.M.layout Ch: 13.25 to 14.00 60.00
Km Left side carriage way (Northern side)
Asphalting to Ring Road from Mysore Road junction to Silk
25 Board junction via J.P.Nagar, B.T.M.layout from Ch: 7.10 km to 99.50
8.80 Km Right side carriage way (Southern side)
Asphalting to Ring Road from Mysore Road junction to Silk
Board junction via J.P.Nagar, B.T.M.layout from Ch: 8.80 km to
26 99.50
10.00 Km & 11.30 to 11.80 km. Right side carriage way
(Southern side)
Asphalting to Ring Road from Mysore Road junction to Silk
27 Board junction via J.P.Nagar, B.T.M.layout from Ch: 11.80 km 99.50
to 13.50 Km Right side carriage way (Southern side)
Asphalting to Ring Road from Mysore Road junction to Silk
28 Board junction via J.P.Nagar, B.T.M.layout from Ch: 13.50 km 50.00
to 14.00 Km Right side carriage way (Southern side)
TOTAL 2606.40
CONSULTANCY SERVICES FOR PROJECT MANAGEMENT
Construction, supervision, and project management of asphalting
22 20.00
works
TOTAL 20.00
GRAND TOTAL 2627.40

182
18 % GRANT WORKS
Rupees in Lakhs
Sl.no Desription of work Estimated Cost
1 Back ward class packages ward No-93 Devarajeevanahalli 40.00
2 Back ward class packages ward No-96 Hebbal 40.00
3 Back ward class packages ward No-95 Kaval Byrasandra 40.00
4 Back ward class packages ward No-94 Kadugondanahalli 40.00
Back ward class packages ward No-84 ,83 Benniganahalli &
5 40.00
C.V.Raman nagar
6 Construction of Dr. B.R. Ambedkar Bhavans in Zones 500.00
7 Construction of Pourakarmika Bhavana 100.00
Total 800.00
Total
18% Programme
Enhanced Allocation to Reserved MLA Constituencies Under
BBMP Jurisdiction
1 (C.V.Raman Nagar, Anekal, Pulikeshi Nagar,MahadevaPura) 400.00

Grand Total of BBMP POW 72778.54