Redesign Input Process Data In Granting Process Employee

Allowances Welfare Using Value Stream Mapping Methods

Isti Surjandari1 and Achmad Ghafiqie2.


Industrial Engineering Department, Faculty of Engineering, University of Indonesia
UI Campus, Depok, 16424, Indonesia
E-mail: 1 surjandari.2@osu.edu 2 dan ghafiqie@gmail.com

Abstract
This research is focusing on the reduction time of granting process employee allowances welfare
using value stream mapping methods so that the wastes that occur in each process can be known and
may be eliminated. The purpose of this research is to provide policy suggestions to reduce the time
required in the process of providing allowances welfare. The Method used here is the method value
stream mapping. The results suggested that the studied company should changed the process policy time
in granting welfare allowances and increase the use of technology hardware.
Keywords: Reduction time, input data, process, welfare allowances, value stream mapping.

Abstrak
Penelitian ini membahas pengurangan waktu proses pemberian tunjangan kesejateraan dengan
menggunakan metode Value Stream Mapping sehingga pemborosan yang terjadi pada setiap proses
dapat diketahui dan dapat dihilangkan. Tujuan dari penelitian ini adalah memberikan usulan kebijakan
untuk mengurangi waktu yang dibutuhkan dalam proses pemberian tunjangan kesejahteraan tersebut.
Metode penelitian yang digunakan dalam penelitian ini adalah metode Value Stream Mapping. Hasil
penelitian mengusulkan pada perusahaan yang diteliti agar mengkaji ulang waktu yang disediakan
dalam proses pemberian tunjangan dan meningkatkan penggunaan teknologi perangkat keras.

Kata kunci: Pengurangan waktu, input data, proses, tunjangan kesejahteraan, value stream mapping.

1. Introduction competition, then the organization must


empower the human resources that possess
Human Resources as an integral part of the maximum. Therefore, the organization's
an organization has a very strategic function attention to the existence of human
within the organization itself. Said to have a resources who possess it should also be
very strategic function, because human given the maximum, one of which is the
resources is one of the components that welfare level, so each employee can be
move the organization. Human resources are motivated to give everything its ability to
developed to determine whether or not the achieve organizational goals and objectives.
organization, as well as the assets of an Provision of welfare benefits is an
organization. important issue that must be a top priority
program activities within the organization of
The role of human resources becomes human resource management. If the problem
increasingly important when associated with has been implemented well by the
the development of a full global competitive organization, it is expected that employees
competition among organizations. Therefore can obtain job satisfaction will have
if the organization wants to win the implications for employee motivation in
performing the task - the task and can work between fellow employees, so that no social
well and provide all abilities for the jealousies arise, of course there are
organization. differences in implementation for a diligent
employee and the lazy. To avoid any
In general, companies or organizations misunderstanding or a question mark against
in a competitive competition was more the system of employee welfare benefit
emphasis to how to provide the best service payments and benefits are increased
- good to the community, so that people feel revenue, then the payment system a
satisfied. Instead the company or transparent, meaning that payments made by
organization does not make every effort to referring to provisions that already exist.
invest for the employees by giving To provide a sense of justice to the
satisfaction to its employees. Actually it is employees in receiving welfare benefits,
very wrong, because the satisfaction that then one of them is using attendance data
they should be given at the same time, both with electronic employee absences or e -
for people and for employees, because attendance.
employee satisfaction and kesetian is part of The use of e - attandance in the
the service profit chain. calculation of welfare payments is that the
Recognizing the fundamental payment process can be faster, fair, and
importance of the strategic functions of transparent, so that employee job
human resources in achieving organizational satisfaction can be realized.
goals, Badan Kepegawaian Daerah Provinsi Provision of employee welfare benefits
DKI Jakarta, which is one of the regional made by the provincial government of
work units (SKPD) in the environment DKI Jakarta, in the implementation process
Jakarta Provincial Government in charge of involves several units of work. This is
implementing human resource management, intended to welfare provision is made
need find the best formula in an effort to possible with the principles of justice,
improve the welfare of fair to employees, to proportionate, and timely. However, by
the realization of employee job satisfaction, involving some of these work units, it still
so motivated to do the job the best - good. found in the resistance caused by the factors
Policy granting benefits or of resources, both human resources and
compensation in the form of welfare benefits other resources. So that the implementation
and allowances increased revenue by DKI of welfare payments often delayed. For the
Jakarta Provincial Government has set out in delay, the employee is possible
the Governor's Decree Number 38 Year disappointment, so the purpose of providing
2005 regarding the provision of welfare job satisfaction to employees not teracapai.
benefits (Welfare) to civil servants and If this is not resolved, it is feared that staff's
CPNS.[1] And providing increased income performance given to the organization is not
allowance (TPP) to CPNS PNS and optimal. In accordance with these
regulated in the Governor No. 30 of 2007, problems, so in this study will be conducted
for non-permanent employees (PTT) using the method of analysis with Value
regulated in the Governor No. 31 of 2007.[2] Stream Mapping (VSM) which is part of
Welfare payment mechanism and the TPP is lean management that focuses on removing
regulated by Regulation No. 42 and the non-value added, so we can get a more
Governor 92 Year 2009[3] Governor and effective process.[5]
Instruction No. 59 Year 2009 on the
implementation of welfare payments 2. Methods
(Welfare) and allowance increases in
revenue (TPP).[4] First stage in this research is to
In the provision of welfare benefits and determine areas or research areas and
allowances that increase revenue, performed methods to be used. The data was collected
by observing the principles of justice
to see a brief profile of the company and an duty - each (SKPD / UKPD) for a month
overview of the process of providing reported directly online through e-
employee welfare benefits. The data is Attendance system in accordance with a
obtained employment data and the stages - predetermined time, ie from 1 up to and
stages of the process of employee welfare including 10 each month. Input data is held
benefits in September - October 2009. The by operators who are prepared by each
data obtained from the results of interviews SKPD / UKPD for the process.
with relevant staff and direct observation at Online system provided by BKD can
the location. be accessed at the address www.bkddki.net.
The second stage of mapping stages - In these sites, the operator can perform both
stages that occur from the process of welfare input data and the performance of staff
benefits using value stream mapping attendance.
method.
The next stage is to analyze waste - 3.1.2 Employee Data Verification
waste that occurs at each stage of the In this process, data has been entered
process of providing employee welfare on the previous process will be verified by
benefits. BKD. Verification is made to check the
The final stage is to create the actual map suitability of the amount of data that is
or a map of the future benefits of the process inputted by the presence of an active
of granting. working days. Number of active working
day Provincial Government of DKI Jakarta
3. Result and Discussion is 22 days, if later discovered the presence of
excess days that had the data is inputted,
3.1 Value Stream MappingMethod then the presence of excess data will be
calculated to be 22 working days.
Value stream mapping is a Lean
process-mapping method for understanding 3.1.3 Printing Listings
the sequence of activities used to produce a After the data is verified by BKD,
product. [6] then the data will be transferred to the Office
This stage is carried out to describe the of Information and Communication
actual condition of the stages - stages that (KOMINFOMAS). In this process, the
occur from the process of employee welfare Office will record the data KOMINFOMAS
benefits.[7] that has been verified by BKD, and print the
The process of granting welfare benefits data to be returned to BKD for the next
to employees, can be described briefly to: process. Printouts are known as the listing.
1. Attendance data input Listings are printed in the order
2. Verification of employee data Municipality.
3. Printing Listings
4. Sorting Listing 3.1.4 Sorting Listing
5. Distribution Listing After the printing process is complete
6. Making Surat Perintah Menyetor listings, KOMINFOMAS Office will send
(SPM) the results to the printing of BKD. In this
7. Making Surat Penyediaan Dana process, BKD will separate listing which
(SPD) have been printed according to the Work
8. Transfer funds into their account - Unit of each.
each employee
3.1.5 Distribution Listing
3.1.1 Attendance Data Input After receiving a printed listing of
In this process, the presence of data BKD, respectively - each Head Unit will
from each employee on duty at their place of check back print listing.
or institutions - other financial institutions
3.1.6 Making Deposit Warrant that have been designated. Provision Fund
After receiving a printed listing of (SPD)will be issued by BPKD and will be
BKD, and each - each head unit will make given to the Bank DKI for the transfer to the
Deposit Warrant (SPM) who will be given to account of each employee.
the Regional Financial Management Agency
(BPKD).
3.1.8 Transfer to Employee Account
3.1.7 Making Provision of Funds Bank DKI as the Bank have been
In the next process, after receiving the appointed by the Government for
SPM, BPKD as supporting elements in the implementation of welfare payments will be
field of local government finance and asset paying some money to the person's name
management areas will perform its function and received a nominal amount has been
as monitors the implementation of budget included in the check being sent by each -
revenues and expenditures by the Bank and / each unit.[8]

Figure 1. Actual Map

3.3 Analysis Of Waste which are activities that do not provide


After getting a picture of the process value-added or waste.
that occurs today (Actual map), it will show According to Taichi Ohno of Toyota
what is an activity that adds value and Classic Seven Waste, which included the
activities that do not provide value-added. waste in manufacturing, among others:
Thus, it would appear the odds for defects / defect, transportation,
improvement by eliminating activities overproduction, waiting, process, transfer,
and inventory.
Which includes waste while in services
are: the error documents, transfer Table 1. Recapitulation calculation time
documents, conduct Data Input Process
activities that are not requested, waiting for Number of employees 1.316
the next step, step - step process and employees
approval, unnecessary movement, and Effective time / day 450 mins/day
repetition of work.[9] Input data time/employee 1 min
Of the actual maps that have been
From Table 1 above, can be obtained
obtained previously, the data input process,
by the time required to complete all work in
there is a waste of time when a very long
a way :
wait because of the time allowed too much
Time needed=
compared with the time available for other (number of employees × input data
processes. process time) Effective time / day
Analysis of the data input process
conducted at the Regional Employment So, will be obtained,
Agency as part responsible for providing Time needed =
the implementation of employee benefits to (1316 × 1 min) ≈ 2,9 days or 3 days
the Government Welfare DKI Jakarat. In 450 mins / day
addition, BKD has highest number of
employees compared to the existing body 3.4 Future State Map
within the Government of DKI Jakarta Future State Map are made to design
1316 employees. the process flow more streamlined with
The available working time in increased process by reducing the root
accordance with Regulation No.34 Year causes of waste.[11]
2008 Governor of the settings of Employee From the above calculation results, it
Hours:[10] can be seen the process and time frame
 Today is a 5-day work, Monday – provided for data input process during the
Friday 10 days it can be completed more quickly
 Effective minimum number of hours than the time allowed is 3 days. This is
37.5 hours with details: wasteful because it causes long waiting to
Monday - Thursday = 07.30-16.00, proceed to the next process.[12]
12.00-13.00 break In addition to the data input process,
Friday = 07.30-16.30, 11.30-13.00 the printing process by listing
break KOMINFOMAS Office can be done
From the effective number of hours basically in the same unit from the previous
worked per week, gained 37.5 hours or process of BKD. This happens because the
2250 minutes. Then the effective number of BKD did not have the hardware to do the
hours available per day is 2250 minutes / 5 printing of these listings. The solution in
days = 450 minutes / day. this case is to add hardware to BKD for the
In addition, the length of time was also printing process can be performed on the
obtained for work on the data input process same unit of BKD. So the time of delivery
for an employee for 1 minute. This figure is Welfare benefits to employees can be done
obtained by direct observation using a on time.
stopwatch and dirata - 3 times the average
after observation. From the data - the data
above, can be summarized in Table 1
below:
Figure 2. Future State Map

4. CONCLUSION [1] Surat Keputusan Gubernur Provinsi


DKI Jakarta No. 38 Tahun 2005
Based on the analysis of the process of [2] Peraturan Gubernur Provinsi DKI
welfare benefits in the Local Government Jakarta No. 31 Tahun 2007
environment using DKI Jakarta Value [3] Peraturan Gubernur Provinsi DKI
Stream Mapping (VSM), obtained the
Jakarta No. 42 dan 92 Tahun 2009
following conclusions :
[4] Instruksi Gubernur Provinsi DKI
 Time provided for the data input
process too much. Jakarta No. 38 Tahun 2005
 Hardware limitations in the printing [5] Douglas, L., & Edem, G. (2008). Value
process of listing. Stream Mapping to Improve
Proposed policy on DKI Jakarta Productivity in Transmission Case
Regional Government to speed up the Machining. Proceeding of the 2008
delivery of welfare benefits to employees is Industrial Engineering Research
as follows: Conference J. Fowler and S. Mason, eds.
Page. 1
 Setting the standard time re-
[6] www.greensuppliers.gov. Hal. 1
implementing the data input
[7] Mark, A.N., & Sheila, R.P. (2008).
process for 3 days.
Mapping The Total Value Stream: A
 Provide adequate training in the
Comprehensive Guide for Production
process of granting allowances.
and Transactional Process. CRC Press,
 Adding hardware for printing New York. Page. 29
purposes so that unused time can be [8] Mark, A.N., & Sheila, R.P. (2008).
effective. Mapping The Total Value Stream: A
Comprehensive Guide for Production
5. REFERENCE and Transactional Process. CRC Press,
New York. Page. 39
[9] Gaspersz, Vincent (n.d). Lean Sigma
Management System (Streamlining The
Business Process). Page. 13
[10] Peraturan Gubernur Provinsi DKI
Jakarta No. 34 Tahun 2008
[11] William, Thorsen, (n.d), Value Stream
Mapping and VM Worldwide facilities
group – Capita project General Motor
Corporation. Page. 1
[12] Mark, A.N., & Sheila, R.P. (2008).
Mapping The Total Value Stream: A
Comprehensive Guide for Production
and Transactional Process. CRC Press,
New York. Page. 222