Mid-year: Second Quarter SY 2019 – 2020 Year-end: 2020
(1) (2) (3) (4) (5) (6) (7)
Name of Project Project Objectives and Date of Accomplishments Issues/Problem Recomme Signature Targets Monitoring /Status to Date s/Challenges ndations/ of SPT and Action Project Points Team Leader
a. Access To improve School 2019-2023
1.1 School Building Facilities for a learner -Construction of: Covered friendly environment Court Comfort Room -Fencing of New Lot for Gulayan
1.2 Electrification To install electrical wiring
for lights, ventilation and accessibility in technological aspect
1.3 Repair And Maintenance To repair and maintain
of School Building the school facilities for the sustainability of a conducive learning environment
IRECAP To improve reading
Literacy from Grade 7 to Grade 8 with zero non- reader of every school year MTIMES To increase numeracy skills from Grade 9 to Grade 12 with zero non- numerates at the end of school year Stakeholder Participation To increase stakeholders participation with 2% increase every school year English , Math , MAPEH To increase academic Performance Performance with 0.05 % per every quarter