Abstract: This paper presents a case study of two PV systems, one installed on a
domestic building and the other on an educational building viz. the Eco-Energy House
and the Centre for Renewable Energy at the School of the Built Environment, The
University of Nottingham. The PV array on The Centre for Renewable Energy is a
vertical façade, constructed using thin film amorphous silicon cells. The PV array on the
Eco-Energy House is a roof-integrated system using roof slates incorporating
monocrystalline PV cells. The power generated by the PV system in each building is used
to meet building electricity demand, with any surplus exported to the local grid. The two
systems is currently being monitored as part of a two year DTI/ETSU funded programme
to evaluate their performance and highlight any problems affecting the energy output.
Since the two buildings are significantly different in construction, purpose and
occupancy, it was the aim of the project to investigate the effect of these differences on
the selection and operational performance of the building integrated PV (BIPV) system,
and to bring the lessons learned to a wider audience to encourage greater uptake. The
monitoring results also provide useful information to architects and building services
engineers.

1
1 INTRODUCTION AND BACKGROUND

Reductions in fossil fuel based energy consumption in the building sector offer the
potential to make cuts in CO2 emissions. In the short term, part of this reduction could be
achieved by improving the thermal performance of existing and future buildings to reduce
energy demand. In the longer term, making use of renewable energy resources, e.g., solar
etc., to generate power, could achieve significant reductions in CO2 emissions.

Integration of photovoltaic technology into the envelope of buildings is one of the most
attractive methods for achieving part of the above goal. Firstly, the distributed system
architecture takes advantages of the distributed nature of sunlight to generate power
locally, hence avoiding electricity distribution losses (Baker, 1999; Hestnes, 1999). In
addition, certain building mounted or integrated system configurations have the potential
to reduce part of the balance of system (BOS) costs. For example, mounting an array on a
sloped roof eliminates the need for ground mounting and structure to elevate the array to
the proper angle. In fully integrated configurations, the PV can actually replace some of
building materials and thereby generate a “credit” towards the price of the PV equal to
the value of the material that has been replaced. This strategy requires design guidelines
and know-how to motivate architects and building services engineers to seek new
techniques both for retrofit and new construction.

The School of the Built Environment at The University of Nottingham has constructed
two renewable energy facilities for this purpose. One of these is the Centre for
Renewable Energy and the other is the Eco-Energy House. Both these buildings were
designed to be thermally efficient and utilize a range of renewable energy systems. The
primary role of these facilities is to assist the evaluation of renewable energy and energy
efficient technologies developed by the School and promote renewable energy
technology transfer.

The Centre for Renewable Energy Building (Figure 1) is a two-storey building and
comprises teaching and research facilities for the School of the Built Environment. The
building is naturally ventilated and makes use of daylight, both via conventional windows

2
and through extensive use of light-pipes. Solar thermal collectors are installed to offset
energy requirements for hot water. The photovoltaics are used to meet part of the
building’s electrical demand and to educate about Building Integrated PV (BIPV)
systems.

The Eco-Energy House (Figure 2) is a four bedroom detached dwelling of brick and
block construction. The building is provided with a solar-assisted ventilation stack with
heat recovery, a trombe wall and thermal solar thermal collectors to supply part of the hot
water requirement. The PV contributes towards the building’s energy needs. Since these
two buildings are significantly different in construction and occupancy, the aim of the
project to investigate the effect of these differences on the selection and operational
performance of the building integrated BIPV system, and to encourage greater uptake by
bringing the lessons learned to a wider audience.

2 BUILDING INTEGRATED PV (BIPV) SYSTEMS

2.1 PV- Building Integration Choices

a) The Centre for Renewable Energy


The Centre for Renewable Energy has a total roof area of 160 m2 inclined at 16.5o to the
horizontal and a wall area of about 50 m2 suitable for solar installations. Half of the roof
space has been allocated for thermal solar collectors, to be used for providing part of the
building’s heating load. The rest of the roof space is available for other solar installations,
including BIPV and field-testing of new solar components.

Options available for PV integrated included, installation of PV on half of the roof space,
integration of PVs to the first floor façade (vertical attachment), and application of PVs to
the low-level roof.

b) PV system on the Eco-Energy House


The Eco-Energy House has a total area of about 92m2 suitable for solar installations on
the west, south and east faces of the roof. These all receive direct beam solar radiation,
though some for only limited periods of the day. Half of this space has been reserved for

3
solar thermal collectors, and the rest is available for PV integration, i.e., 16m2 on each
face.

2.2 BIPV Design Criterion


In order to determine which space was most suitable for the BIPV system, a number of
options were considered and evaluated. A number of methods were used to assist in the
selection of appropriate PV systems for integration into each building (Omer, 2000;
ETSU, 1999). These included energy analysis using PVSYST3 software, CAD modelling
for assessment of visual impact in addition to architectural and construction
considerations.

a) BIPV System for The Centre for Renewable Energy


Given one of the stated aims of the Renewable Energy Centre is to demonstrate
renewable technologies, it was important that the eventual solution should be prominent
and allow access for students and visitors to see the installation close up. The roof-
mounted arrays did not satisfy these criteria. Consideration of the aesthetics of the
solution turned out to have a significant influence on the selection of the eventual design
solution (Omer, 2000). A vertical array was the favoured option occupying a prominent
position on the façade (Figure 3), and offering access via the first floor windows to the
low-level roof. Opportunities for integrating the array into the fabric of the building were
limited for this solution. The large eaves overhang from the main roof made it necessary
to pull the array forward, away from the first floor wall to avoid shading. The resulting
need for a frame to support the panels and the lost opportunity for substitution of building
envelope materials with PVs, conspired to make this a more expensive solution. The
space created between the back of the array and the brick skin of the building did,
however, allow for effective ventilation to control module temperatures and ease of
access for inspection of PV array components.

The design of the vertical array was also progressed by the building's architect who attempted
to obtain guidance from a number of the main PV manufacturers to progress the design. At the
time there appeared to be little manufacturers' information available to architects to allow
development of designs beyond the initial stage of sizing and positioning the array. Help was

4
obtained from a UK PV manufacturer and this led in the adoption of amorphous silicon (a-Si)
as the collector technology on the Renewable Energy Centre. The lower output per unit area of
amorphous silicon PV is potentially less of an issue for installations on commercial buildings,
where large areas of external envelope are available for BIPV.

The PV array installed on this building has a rated capacity of 952Wp and consists of 84
single junction amorphous silicon PV cells in 26 modules. The modules are mounted
vertically on the façade with modules under windows tilted at 58o to the horizontal
(Figure 4). The array is orientated 30° east of south. A Sunny Boy 1100W inverter is
used to connect the PV system to one of the phases in the building 3-phase mains supply.
The 1100W inverter is slightly oversized relative to the PV array (952 Wp) with an
inverter power ratio (IPR) of 115%. IPRs of 70-90% are conventionally considered
appropriate for installations in the UK (Sick, 1996). Oversizing of the inverter will result
in low operating efficiency during periods of low insolation, and hence impaired system
performance and lower energy yield. The selection of the inverter was based on a need to
match the array open circuit voltage.

Installation specifications for the array are given in the Table 1.

Orientation from the south 30 east


o
Tilt angle 90
2
PV array size 19.9m
Cell Type a-silicon, (Solapak)
Number of panels 28 (four in series and seven strings in parallel)
Rated power 952Wp
Inverter 1100W Sunny Boy
Table 1 Installation specifications of the PV array on The Centre for Renewable Energy

b) BIPV system for Eco–Energy House


In the case of the Eco-Energy House, it appeared that PV integrated into roof slates
offered the best option with good coverage of the available area and visual appearance
that complemented the finishes on the roof surfaces. It was also felt that installing the
PVs using components with which homeowners are familiar, would assist in convincing

5
visitors to the Eco-Energy House of the accessibility and applicability of the technology
to domestic building types. Roof slate (or slate effect) systems are commercially
available based both on thin film and crystalline silicon cells.

An investigation was carried out to assess on which part of the roof the PVs should be
installed (Omer, 2000). Attempts were made to investigate the feasibility of increasing
generation in the mornings and evening by distributing the array over east, south and
west facing roof surfaces to match typical domestic demand profiles (Electricity
Association, 1998). However, the penalty in reduced annual production for this solution,
as compared with a south facing array, was severe and the latter solution was adopted,
i.e., roof integration system (Figure 5) on the south-facing roof using PV slates.

Monocrystalline technology, which has higher conversion efficiency than a-Si, was the
favoured option for the Eco-Energy House because of the limited area available on the
roof.

The PV array installed on this building has a rated capacity of 1568Wp and consists of
132 PV Sunslates, each containing six monocrystalline cells. An 1100W Sunny Boy
inverter is used for this system. The inverter was well sized relative to the PV array (1568
Wp) with an IPR of 70%. Installation specifications for the PV array on the Eco-energy
House are given in the Table 2

Orientation from the south Due south


o
Tilt angle 52
2
PV array size 15.9m
Cell Type Monocrystalline
Number of Sunslates 132 (two strings of 66 Sunslates)
Rated power 1580 Wp
Inverter 1100 W Sunny Boy
Table 2 Installation specifications of the PV array on The Eco-Energy House

Waterproofing of the PV roof includes overlapping of the rows of slates and the use of
roofing felt beneath. The felt’s close proximity to the rear of the roof slates will result in
some elevated temperature operation of the PV although the roof space is ventilated. The

6
PV slates used here have been designed to hang on hooks on the roof battens and have
simple electrical interconnections thus enabling easy installation.

3 PV Power Generation and Energy Savings

3.1 Predicted PV Power Generation and Energy Savings


In order to determine the contribution that the two PV systems make towards building
energy loads during the design stage, energy production for the two systems was
predicted using PVSYST3 software. The building energy load for the Renewable Energy
Centre was obtained from measured values. Building energy loads for the Eco-Energy
House were estimated from the typical values of domestic buildings, obtained from the
Electricity Association, (1998). It is worth mentioning that, the Eco-energy House was
occupied in December 2000 by three research staff who work normal office hours in a
different building and return at lunch time and after work. This helps to provide a realistic
load profile for the building.

Looking at the figures in Table 3, a comparison may be made of the two installations. It
may be seen that despite the large area of the PV array installed on the Renewable Energy
Centre, the system on the Eco-Energy House provides an output slightly over three times
greater. Part of this difference will be due to the difference in efficiency between the
crystalline and thin film cells used in the two installations. The normalised production
(the ratio between the annual energy production to the peak rated power of the array)
figures also suggest that there is an additional cause, possibly the less favourable
orientation and tilt of the Renewable Energy Centre array.

The Centre for The Eco-Energy


Renewable Energy House
Estimated annual PV output, (kWh) 293 1009
Normalized production, (kWh/k Wp/year) 308 638
Annual building electrical load, (MWh) 41 3.5
Proportion of annual load met by the PV 0.7% 29%
Table 3 PV system predicted energy production and building load for the Centre for
Renewable Energy and the Eco-Energy House

7
As may be expected, the annual electrical loads for the two buildings differ significantly,
due in part to the difference in their size. The consumption in the Renewable Energy
Centre is significantly higher suggesting that the difference in the nature of the
occupation in each building also has an effect. This explains for the difference in
proportion of annual load met by the PVs in each building.

A comparison of the PV output and the building energy load for the Renewable Energy
Centre is shown in Figures 6 and 7 for June and January respectively. It may be seen that
the pattern of production matches the building energy load fairly well, though only a
small fraction of the energy demand is met. This may be expected as only a small
proportion of the available envelope area has been covered with PV. Because the PV
array on the Centre for Renewable Energy is not facing due south, the generation curves
do not follow the characteristic bell shape.

3500
PV output
3000 Building load

2500
Energy (W)

2000

1500

1000

500

0
0 2 4 6 8 10 12 14 16 18 20 22
Time of the day (hrs)
Figure 6 Predicted PV output and building load of the Centre for Renewable Energy
(sunny day in June)

8
12000
PV output
10000 Building load

8000
Energy (W)

6000

4000

2000

0
0 2 4 6 8 10 12 14 16 18 20 22
Time of the day (hrs)

Figure 7 Predicted PV output and building load of the Centre for Renewable Energy
(sunny day in January)

Figures 8 and 9 show the predicted PV output and estimated building loads for the Eco-
Energy House for June and January respectively. These indicate that, in summer, the
array will generate a small energy surplus in the late morning/early afternoon period and
meets a reasonable proportion of the building energy load during daylight hours. The
extra energy will be exported to the grid. As a large proportion of the estimated night
time electricity demand is probably accounted for by lighting using conventional
incandescent bulbs, it is likely that part of this consumption would be reduced through
the use of low energy light bulbs in the Eco-Energy House.

9
600

500 PV output
Building load
400
Energy (W)

300

200

100

0
0 2 4 6 8 10 12 14 16 18 20 22
Time of the day (hrs)

Figure 8 Predicted PV output and building load of the Eco-Energy House (sunny day
in June)

1000
900
800 Pv output
Building load
700
Energy (W)

600
500
400
300
200
100
0
0 2 4 6 8 10 12 14 16 18 20 22
Time of the day (hrs)

Figure 9 Predicted PV output and building load of the Eco-Energy House (sunny
day in January)

10
3.2 Measured Performance of the PV Systems

a) Performance of the PV system at the Centre for Renewable Energy

The PV system at the Centre for Renewable Energy was installed in March 2000, and
began operation in May 2000. The performance of the PV system has been continuously
monitored since August 2000. Initial predictions using PVSYST software has indicated
that the PV system would deliver about 293kWh per year. However, results from
monitoring of the system performance showed that the PV energy production is
extremely low compared with the predicted values. Figure 10 compares the measured PV

45

40
No measurements PV Generation (kWh)
for this period Predicted Power (kWh)
35

30
Energy (kWh)

25

20

15

10

0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

output with predictions.

Figure 10 Comparison between the measured and the predicted PV power generation for
the Centre Renewable Energy System

One of the reasons for this discrepancy is the inverter, which was oversized relative to the
PV array. Analysis of the monitoring data also showed that the inverter has also failing
to track the maximum power point for the array, resulting in extremely poor operation.

11
This has been investigated with assistance from the inverter manufacturer. There is little
experience with grid connecting amorphous silicon PV. This inverter type adopts a
MPPT algorithm which exploits the characteristic of crystalline PV, particularly
operating voltage range and the ratio of peak power voltage to open circuit voltage. The
latter varies only slightly for crystalline PV with changing insolation levels. The array
voltage for peak power operation of amorphous silicon PV varies considerably as
radiation changes, causing the inverter to fail. The control algorithm of the inverter was
adjusted to allow a wider MPPT voltage range and appears to be giving more reliable
operation. This is, however, an interim solution and is being investigated further to
determine its long-term effectiveness. As a result of this, the inverter manufacturer is
addressing the different operation specifications for amorphous silicon, and is likely to
produce an inverter specifically for this type of PV.

b) Performance of the PV system at the Eco-Energy House

The PV system at the Eco-Energy House was installed in March 2000, and began
operation in June 2000. The performance of the PV system has been monitored
continuously from September 2000. Initial predictions of energy production for the PV
system at the Eco-Energy House, using PVSYST were 1009 kWh per year. However, the
monitoring data showed that, the actual energy production is lower. Figure 11 compares
the measured PV output with the predictions. Although, the inverter for the Eco-Energy
House system is well matched to the PV array for voltage and power, the system has two
constraints that resulted in lower than expected energy production: high temperature and
shading. Restricted ventilation of the array results in high operating temperatures and
lower energy production compared to a freestanding array. An important issue for
crystalline PV is the reduction of the operating temperature through adequate ventilation
to maximise energy production. The Eco-Energy House is close to a number of trees and
the resulting shading results in non-optimal stringing and hence power losses. Work is
underway on a project to increase the void behind the PVs to insure airflow and make use
of the collected waste heat. The School is also in negotiation with the University to trim
some of the nearby trees.

12
200
No measurement PV generation (kWh)
180 for this period predicted Power (kWh)
160

140
Energy (kWh)

120

100

80

60

40

20

0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Figure 10 Comparison between the measured and the predicted PV power generation for
the Eco-energy House System

3. ECONOMIC ANALYSIS OF THE BIPV SYSTEMS

The major cost of the BIPV system is the capital investment required for the installation.
The subsequent running costs are generally low. It is therefore of interest to examine the
distribution of cost between the different system components to investigate those aspects
of the design responsible for incurring the greatest expenditure, in order to inform future
projects. In addition the annualised energy cost for each system was calculated using the
installation costs and assuming a design life of 20 years and an interest rate of 6%. Where
available, measured performance data were used for the electrical production figures with
simulated results from PVSYST being used for those months where data have not yet
been gathered.

13
3.1 Cost of the PV system at the Centre for Renewable Energy

The PV system on Centre for Renewable Energy is one-off demonstration system,


installed for educational purposes. The total capital installation cost of the PV system was
€55,483. This includes the cost of the PV modules, PV array framework, the inverter,
balance of the system, the design and installation costs and value added tax (VAT at
17.5%). Figure 12 shows the cost breakdown for the PV system at the Centre for
Renewable Energy, as percentages of the total investment cost. It can be seen that, as the
system is attached to, rather than integrated into the building, a significant proportion of
the budget is given over to the builders’ work necessary to provide the framework on
which to support the array.

3.2 Cost of the PV system at the Eco-Energy House

Although, the array on the Eco-Energy House was fully building integrated, the supplier,
rather than the builder carried out the installation. There still appears to be some
resistance within trades to tackling new types of work. In this case, the presence of wires
and the requirement to use a screwdriver to make the connections between slates meant
the building contractor’s roofing team were reluctant to attempt the installation. The total
capital installation cost of the PV system was €27,945. This includes the cost of the PV
modules, inverter, balance of the system, the installation cost and VAT. Figure 13 shows
the cost breakdown of the PV system at the Eco-Energy House as percentages of the total
capital cost. As can be seen, a much larger proportion of the Eco-Energy House budget
was available to purchase PV modules, because the system selected was suitable for
integration into a conventional domestic roof structure without the need for any
additional support structure. The labour cost, however, accounted for about half the PV
modules cost. This could have been reduced, if the building contractor had performed the
installation at the same time as installing the remainder of the roof.

3.3 Annualised energy price

The energy costs of the two systems can be evaluated from Table 4, which summarizes
results from the economic analysis of the PV systems at the Centre for Renewable Energy
and the Eco-Energy House. The annualised energy cost of the PV systems on the Centre

14
for Renewable Energy and the Eco-Energy House are 22.77€/kWh and 3.12€/kWh
respectively.

The difference in the annual energy costs of the two PV systems is of interest. As the
system at the Renewable Energy Centre is attached to, rather than integrated into the
building, a significant proportion of the budget is given over to the builders’ work
necessary to provide the framework on which to support the array. This added to the cost
of the installation and prevented cost savings being made by substituting conventional
envelope materials with PV modules. If the Renewable Energy Centre system had been
designed to avoid the PV framework, the capital cost of the system would have been
reduced significantly and the annualised energy cost would have been reduced to
11.53€/kWh.

4 CONCLUSIONS
The two PV systems at the School of the Built Environment at Nottingham University are
different examples of building integration and PV technology. The comparison of the two
systems enables the effect of constraints on the design of such systems to be investigated.
This has lead to improved understanding of the behaviour of PV systems, their
integration in buildings, and development of efficient PV system components to
maximise production of PV in the urban environment.

Despite the differences between the two building types, the reason behind the inclusion of
a PV system in the design brief for each was broadly the same i.e., to demonstrate the use
of PV systems in buildings to students and visitors to the University and provide
information to building designers. Differences in the emphasis placed on this
demonstrative role resulted in different approaches being taken when deciding on the
mounting of the arrays.

For the Renewable Energy Centre, it was important that the array created a strong visual
impact so that people were aware the building possessed a PV system. It was also
important that the array is relatively accessible so that it will be possible for students to
inspect the components. The building roof has a large eaves overhang which because of
the inclusion of PV late in the project resulted in a relatively expensive mounting system

15
was required. These criteria also resulted in a non-optimal vertical, wall-mounted array
being adopted over a more productive, but less accessible, roof-mounted solutions.

The PV system on the Centre for Renewable Energy has a number of constraints on its
operation including shading in the afternoon, which cannot easily overcome. The use of
amorphous silicon PV is challenging as it has a different characteristic and behaviour
compared to crystalline PV, for which most inverters have been designed.

For the Eco-Energy House it was felt to be important that the array should be non-
intrusive and demonstrate to developers and householders that the technology can be
integrated into a dwelling without impacting on the visual appearance and construction
significantly. This led to the adoption of a roof-mounted solution. The higher output per
unit area of crystalline PV is potentially an important issue for installations on domestic
buildings.

Return on investment was given a low priority in the design brief for both buildings. Of
the two solutions, the Eco-Energy House system benefited from cost savings due to fuller
integration, and therefore offered lower energy cost compared to the low efficiency and
less well-integrated Renewable Energy Centre PV system.

ACKNOWLEDGMENT:

The Authors would to thank ETSU/EDI for funding this project.

REFERENCES

Baker, Pal and Charles Stirling, (1999). Photovoltaics: Integration into buildings. BRE
Scottish Laboratory, CI/SfB 163.

ETSU (1999). Photovoltaics in Buildings, A Design Guide. Report No ETSU


S/P2/00282/REP.

Hestnes, Anne Grete, (1999). Building Integration of Solar Energy Systems. Solar Energy,
Vol. 67, Nos (4 – 6), pp. 181-187.

16
Electricity Association, (1998). Load Profiles in the 1998 Electricity Supply Market,
Electricity Association. http://www.electricity.org.uk/

Omer, SA, Riffat, SB and Wilson, R, (2000). BIPV design study for Renewable Energy
Centre and Eco-Energy House, ETSU S/P2/00325/REP1.

Sick, S and Erge T. (1996) Photovoltaics in Buildings – A Design Handbook for Architects &
Engineers. James & James.

17

You might also like