M21-21-2016
CUSTOMER:
Rehabilitation of Unit 3 CONTRACTOR:
Facilities and Common System, Al Mussaib Thermal Power Plant Rehabilitation
MINISTRY OF ELECTRICITY (MOE)
BLACK SEA POWER GENERATING
REPUBLIC OF IRAQ
CUSTOMER 100% PUNCH LIST FZCO
Punch Category Discipline In Charge / Action by
A - Items affecting the safety or functionality; must be completed prior to the start of Commissioning work 01 - Civil 06 - Electrical BSP ENG - Engineering MOE ENG - Engineering
B - Items of Less importance that do not prevent commissioning of Unit / System / Sub-system / Plant 02 - Buildings 07 - Instrumentation BSP CON - Construction From MOE CON - Construction
From CUSTOMER
C - Items do not prevent plant or equipment from working and are purely cosmetic 03 - Steel Structure 08 - Insulation BSP PRO - Procurment CONTRACTOR MOE PRO - Procurment
/ CONSULTANT
D1 - items identified as additional scope of work or requirements outside the Job Specification 04 - Mechanical Equipment 09 - Painting BSP QACS – QA/QC/HSE MOE QACS – QA/QC/HSE
D2 - Minor Punch items, mutually agreed to be deferred to a later time but must be completed prior to FC 05 - Piping (Under & Aboveground) 10 –HSE & Fireproofing VEN - Vendor / Others MOE SUP - Supplier
HD0GG1197 + Contract
Active / Clearing
in progress
require finishing
exterior 01+02+ Florin Mazilu / BSP CON -
4. C and exterior 09.12.2018 Construction
Cleared Date:
walls 09 TEPSCO ………………….
painting
WWT
Waste Water
Building:
Treatment
basement, Normal
Chemicals House / D1 02+ Common sense MOE SUP – Active / Clearing
5. ground floor, exterior Not existing 09.12.2018
in progress
Building ? 06+10 Safety matter Supplier
1st floor lighting MOE QACS Can be a
– QA/QC/HSE Cleared Date: Punch of
BSP CON – category A
Safety 02+ ………………….
D1 Common sense Construction Safety
6. exterior Not existing 06+10 09.12.2018 BSP QACS –
? Safety matter
lighting QA/QC/HSE
Page 1 of 10
Punch Area Unit Punch description Raised by In Remarks (see also
Tag No. Raised Date Due Date
item System / Discipline Details Reference documents (dd/mm/yyyy) (dd/mm/yyyy) Charge / Status / Cleared Date developed in Annex)
No. Package/Component Brief description
Subsystem category Name/Organization Action by CONTRACTOR CUSTOMER
The permanent
interior lighting Interim Active / Clearing
Waste Water MOE SUP –
system (including indoor in progress
Treatment WWT Supplier
Normal bulbs,projectors lighting can MOE QACS Can be a
Chemicals House / Building: Contractual agreements /
Lighting & switches, etc.) is not 01+ 02+ Common sense only be – QA/QC/HSE Cleared Date:
Punch of
12. Building (Chemical basement, B mounted / finished; 06+10
Building House WWT Project 09.12.2018 BSP CON – category A
Emergency Safety matter acceptable
storage Tanks, ground floor, There are only details for interior Miscelanea Construction Safety
Lightining for limited ………………….
Dehydrator, Pumps 1st floor temporary portable, BSP QACS –
periods of
& Blowers etc.) improvisation light QA/QC/HSE
time
sources
Page 2 of 10
Punch Area Unit Punch description Raised by In Remarks (see also
Tag No. Raised Date Due Date
item System / Discipline Details Reference documents (dd/mm/yyyy) (dd/mm/yyyy) Charge / Status / Cleared Date developed in Annex)
No. Package/Component Brief description
Subsystem category Name/Organization Action by CONTRACTOR CUSTOMER
Fire protection
Waste Water system (hydrants, MOE SUP – Active / Clearing
Treatment WWT Firefighting correct Supplier in progress
system dimensioning fire MOE QACS
Chemicals House / Building:
(defense 01+02+ Florin Mazilu / – QA/QC/HSE
13. Building (Chemical basement, A water pipes, fire 09.12.2018 Cleared Date:
and fire 05+10 Contractual agreements / TEPSCO BSP CON –
storage Tanks, ground floor, prevention water source etc) Construction
Building House WWT Project ………………….
Dehydrator, Pumps 1st floor system) Fire water pipe BSP QACS –
details for interior Miscelanea
& Blowers etc.) must be changed QA/QC/HSE
to 65
Waste Water Rolling door must MOE SUP –
Active / Clearing
Treatment WWT be replaced with a Supplier
in progress
01+02+ MOE QACS
Chemicals House / Building: new brand one and Contractual agreements /
04+06 Florin Mazilu / – QA/QC/HSE
14. Building (Chemical basement, Vertical C the acting Building House WWT Project 09.12.2018 BSP CON –
Cleared Date:
mechanism (servo- +09+ TEPSCO
storage Tanks, ground floor, rolling door details for interior Miscelanea Construction
motor) should 10 ………………….
Dehydrator, Pumps 1st floor BSP QACS –
& Blowers etc.) replaced too QA/QC/HSE
Page 3 of 10
Punch Area Unit Punch description Raised by In Remarks (see also
Tag No. Raised Date Due Date
item System / Discipline Details Reference documents (dd/mm/yyyy) (dd/mm/yyyy) Charge / Status / Cleared Date developed in Annex)
No. Package/Component Brief description
2
Subsystem category Name/Organization Action by CONTRACTOR CUSTOMER
HD0GG1220
W-006.3.3 HD0GG1217 MOE SUP- Supplier Active / Clearing
WWT LOCAL MOUNTED MOE ENG
Waste Water A/B/C
INSTRUMENTATION: in progress
Building: H2SO4
-Engineering
Treatment Suitable / Proper 04+ MOE QACS –
H2SO4 and injection QA/QC/HSE
Chemicals House / Local indicating 05+07 Florin Mazilu /
33. NaOH pumps + W- B manometers should
09.12.2018 BSP ENG –
Building 006.3.2 A/B/C +09 + TEPSCO Engineering Cleared Date:
injection be installed on every BSP CON –
Ground Floor NaOH 10
Tanks chemicals injection Construction ………………….
Area injection BSP QACS –
Packages pumps
pump discharge pipe
QA/QC/HS
Active / Clearing
BSP ENG – in progress
ABNORMAL W-006.1.1 01+ Engineering
ABNORMAL General Cleaning
WASTE AbNormal 04+05 HD0GG1112 Installation Florin Mazilu / BSP CON –
34. WASTE WATER C inside and outside 09.12.2018 Construction
WATER WW +09 + Manual TEPSCO Cleared Date:
SYSTEM Area BSP QACS
POND POND 10
– QA/QC/HS ………………….
Active / Clearing
NORMAL WW BSP ENG – in progress
POND Engineering
NORMAL WASTE WATER POND W-006.1.2
Active / Clearing
01+ BSP ENG –
NORMAL WW in progress
HANDRAIL Engineering
NORMAL WASTE POND OPEN 04+05 Florin Mazilu /
35. SPACE FIRST C MONTAGE
09.12.2018
BSP CON –
WATER SYSTEM & PAINT +09 + HD0GG1197 TEPSCO Construction Cleared Date:
COMPARTMEN HANDRAIL 10 HD0GG1112 Installation BSP QACS
T ………………….
– QA/QC/HS
Manual
HANDRAIL Active / Clearing
NORMAL WW MONTAGE BSP ENG –
POND OPEN Engineering in progress
& PAINT
SPACE HANDRAIL HD0GG1197 Florin Mazilu / BSP CON –
SECOND + 2 PCS 09.12.2018 Construction Cleared Date:
HD0GG1112 Installation TEPSCO
COMPARTMEN SLEEVE BSP QACS
PROLONG Manual
T – QA/QC/HS ………………….
ATIONS
Page 5 of 10
Punch Area Unit Punch description Raised by In Remarks (see also
Tag No. Raised Date Due Date
item System / Discipline Details Reference documents (dd/mm/yyyy) (dd/mm/yyyy) Charge / Status / Cleared Date developed in Annex)
No. Package/Component Brief description
Subsystem category Name/Organization Action by CONTRACTOR CUSTOMER
Active / Clearing
BSP ENG – in progress
A- Polymer W-006.3.9 General cleaning
Engineering
A-POLYMER the electric motors 04+06
supply Florin Mazilu / BSP CON –
36. AUTO C are rusty
+09 + 09.12.2018 Construction
Cleared Date:
Sub DISSOLVIN require cleaning TEPSCO
System 10 BSP QACS –
G UNIT and repainting ………………….
NORMAL WASTE QA/QC/HS
HD0GG1112 Installation
WATER SYSTEM
Manual
Polymer
chemicals supply Active / Clearing
W- in progress
sub System General cleaning BSP ENG –
C- Polymer 006.3.12 Engineering
C- the electric motors 04+06
supply Florin Mazilu / BSP CON –
37. POLYMER C are rusty
+09 + 09.12.2018 Construction
Cleared Date:
Sub require cleaning TEPSCO
AUTO BSP QACS –
System DISSOLVIN and repainting
10 ………………….
QA/QC/HS
G UNIT HD0GG1112 Installation
Manual
Active / Clearing
BSP ENG – in progress
OILY WASTE W-006.4.7 Engineering
General Cleanig 04+09
WATER OIL Oil Florin Mazilu / BSP CON –
39. SEPARATOR Separation
C Painting repairings + HD0GG1112 Installation 09.12.2018 Construction Cleared Date:
TREATMENT upon the case TEPSCO
Unit 10 Manual BSP QACS –
SYSTEM ………………….
QA/QC/HS
Active / Clearing
in progress
W-006.1.3 BSP ENG –
General Cleanig Engineering
REACTION 04+09
REACTION Handrail to be Florin Mazilu / BSP CON – Cleared Date:
40. TANK C + 09.12.2018 Construction
TANK
COMPART repainted TEPSCO
10 BSP QACS – ………………….
MENT QA/QC/HS
CHEMICAL
TREATMENT &
COAGULATION
SYSTEM
Active / Clearing
W-006.1.7 BSP ENG – in progress
04+09 Engineering
REACTION
COAGULATIO General Cleanig Florin Mazilu / BSP CON –
41. N TANK
TANK C + 09.12.2018 Construction
COMPART TEPSCO Cleared Date:
10 BSP QACS –
MENT QA/QC/HS ………………….
Page 6 of 10
Punch Area Unit Punch description Raised by In Remarks (see also
Tag No. Raised Date Due Date
item System / Discipline Details Reference documents (dd/mm/yyyy) (dd/mm/yyyy) Charge / Status / Cleared Date developed in Annex)
No. Package/Component Brief description
Subsystem category Name/Organization Action by CONTRACTOR CUSTOMER
Active / Clearing
Cleaning and BSP ENG – in progress
Thickened W-006.2.3 Repainting 04+09 Engineering
Thickener Florin Mazilu / BSP CON –
42. sludge A and B C Base plates + 09.12.2018 Construction
srystem TEPSCO Cleared Date:
Pumps Thickened Mounting pipes 10 BSP QACS –
supports QA/QC/HS ………………….
Active / Clearing
in progress
Mounting pipes BSP ENG –
03+04 Engineering
Sludge transfer & Sludge supports
W-006.2.2 +05+ Florin Mazilu / BSP CON –
43. Processing transfer C REMOVAL of 09.12.2018 Construction
A and B 09 + TEPSCO Cleared Date:
subsystem Pumps improvisation aids BSP QACS –
10
for hydrostatic test QA/QC/HS ………………….
Page 7 of 10
Punch Area Unit Punch description Raised by In Remarks (see also
Tag No. Raised Date Due Date
item System / Discipline Details Reference documents (dd/mm/yyyy) (dd/mm/yyyy) Charge / Status / Cleared Date developed in Annex)
No. Package/Component Brief description
Subsystem category Name/Organization Action by CONTRACTOR CUSTOMER
Active / Clearing
MOE SUP- Supplier
MOE ENG in progress
05+ -Engineering
DW MOE QACS –
ACTIVATED PNEUMATIC Broken 06+07 QA/QC/HSE
HV013B Florin Mazilu / Cleared Date:
52. CARBON FILTERS ON / OFF B Should be + 09.12.2018 BSP ENG –
DN100 TEPSCO Engineering
SUBSYSTEM VALVE urgently replaced 09 + BSP CON – ………………….
Butterfly
10 Construction
BSP QACS –
QA/QC/HS
Page 8 of 10
Punch Area Unit Punch description Raised by In Remarks (see also
Tag No. Raised Date Due Date
item System / Discipline Details Reference documents (dd/mm/yyyy) (dd/mm/yyyy) Charge / Status / Cleared Date developed in Annex)
No. Package/Component Brief description
Subsystem category Name/Organization Action by CONTRACTOR CUSTOMER
POTABLE / DRINKING
54.
WATER 01+ MOE SUP- Supplier Active / Clearing
WATER FOR SHOWERS Florin Mazilu / MOE ENG
55 02+03 in progress
AND CLEAR EYES TEPSCO -Engineering
+04+ MOE QACS –
NOT FINALIZED 05+ QA/QC/HSE
56 UTILITIES SERVICE WATER B 09.12.2018 BSP ENG –
57 SERVICE AIR YET 06+07 Engineering
+08+ BSP CON –
58 INSTRUMENT AIR Construction Cleared Date:
09 + Common sense BSP QACS –
59 FIREFIGHTING 10 evidence QA/QC/HS ………………….
60 SEWAGE
CONSTRUCTOR
CUSTOMER
CONSTRUCTOR
CUSTOMER
CONSTRUCTOR
CUSTOMER
Page 9 of 10
Punch item WHO IS MAKING ADDITIONAL Name / Organization /
SUBJECT of REMARKS DATE
/ issue REMARKS signature
CONSTRUCTOR
CUSTOMER
CONSTRUCTOR
CUSTOMER
CONSTRUCTOR
CUSTOMER
CONSTRUCTOR
CUSTOMER
CONSTRUCTOR
CUSTOMER
Page 10 of 10